HomeMy WebLinkAbout38373-Z OfFOt, a Town of Southold Annex 10/8/2013
y P.O.Box 1179
54375 Main Road
Southold,New York 11971
CERTIFICATE OF OCCUPANCY
No: 36554 Date: 10/8/2013
THIS CERTIFIES that the building GENERATOR
Location of Property: 28775 Route 25, Orient,
SCTM#: 473889 Sec/Block/Lot: 18.-6-25
Subdivision: Filed Map No. Lot No.
conforms substantially to the Application for Building Permit heretofore filed in this officed dated
10/1/2013 pursuant to which Building Permit No. 38373 dated 10/1/2013
was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for
which this certificate is issued is:
generator as applied for.
The certificate is issued to Hanlon,Robert&Frankel, Jessica
(OWNER)
of the aforesaid building.
SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL
ELECTRICAL CERTIFICATE NO. 38373 10/3/13
PLUMBERS CERTIFICATION DATED
Authorized Signature
o�SOFFoc,rco TOWN OF SOUTHOLD
BUILDING DEPARTMENT
y a TOWN CLERK'S OFFICE
o . SOUTHOLD, NY
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES
WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS
UNTIL FULL COMPLETION OF THE WORK AUTHORIZED)
Permit#: 38373 Date: 10/1/2013
Permission is hereby granted to:
Hanlon, Robert & Frankel, Jessica
PO BOX 178
Orient, NY 11957
To: generator
At premises located at:
28775 Route 25, Orient
SCTM # 473889
Sec/Block/Lot# 18.-6-25
Pursuant to application dated 10/1/2013 and approved by the Building Inspector.
To expire on 4/2/2015.
Fees:
ACCESSORY $100.00
CO-ACCE SORY BUILDING $50.00
ELECTRIC $85.00
Tot $235.00
B iIding ns -.
Form No.6
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
TOWN HALL
765-.1802
APPLICATION FOR CERTIFICATE OF OCCUPANCY
This application must be.filled in by typewriter or ink and submitted to the Building Department with the following:
A. For new building or new use:
l. Final suryey of property with accurate location of all buildings,property lines,streets,and unusual natural or
topographic features.
2. Final Approval from Health Dept.of water supply and sewerage-disposal (S-9 form).
3. Approval of'elect-rrical installation from Board of Fire Underwriters.
4. Sworn statement from plumber certifying that the solder used in system contains less'thari 2/10 of 1%lead.
5. Commercial building,industrial building,multiple residences and similar buildings and installations,a certificate
of Code Compliance from:" hitect or engineer responsible for the building.
6. Submit'Planning Board Approval-of completed site plan requirements.
�. For existing buildings(prioHo April 9, 1957)4non-conforming uses,or buildings and"pre-existing"land uses:
1. Accurate survey of property showing all property lines,streets,building and unusual natural or topographic
features.
2. A properly completed application and consent to inspect signed by the applicant. If a Certificate of Occupancy is
denied,the Building Inspector'shall state the reasons therefor in writing to the applicant.
C. Fees
I. Certificate of Occupancy-New dwelling$50.00,Additions to dwelling$50.00, Alterations to dwelling$50.00,
Swimming pool$50.00,-Accessory building$50.00, Additions to accessory building-$50.00, Businesses$50.007
2. Certificate of Occupancy on Pre-existing Building- $106.00
3. Copy of Certificate of Occupancy-$.25
4. Updated Certificate of Occupancy- $50.00
.5. Temporary Certificate of.Occupancy-Resid'ential$15.00,Commercial$15.00
Da
New Construction: Old or Pre-existiing,Building: (check one)
Location of -Prop a'� 7� `�`/LZ 6
House No. Street Hamlet
Owner or Owners ofPrope /'G(� l7 J /P-y1/1i01ti�
Suffolk County Tax Map No I000,'Section •Block Lot a�`
` Subdivision ::Filed Map. Lot:
Permit No. Date of Permit. Applicant:
Health Dept.Approval: Underwriters Approval:
Planning Board-Approval: .
Request for: Temporary:C61#fiicate• Final Certificate: (check one)
Fee Submitted:$
Applicant Sig ature
*pF SO�ryolo
Town Hall Annex Telephone(631)765-1802
54375 Main Road Fax(631)765-9502
P.O.Box 1179 CA
iQ roger.riche rt(ab-town.south old.ny.us
Southold,NY 11971-0959 �'
BUILDING DEPARTMENT
TOWN OF SOUTHOLD
CERTIFICATE OF ELECTRICIAL COMPLIANCE
SITE LOCATION
Issued To: Bob Hanlon
Address: 28775 Main Rd (rt 25) City: Orient St: NY Zip: 11957
Building Permit* 38373 Section: 18 Block: 6 Lot: 25
WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE
Contractor: DBA: BJ Electric License No: 2670-e
SITE DETAILS
Office Use Only
Residential X Indoor X Basement X Service Only
Commerical Outdoor X 1st Floor Pool
New Renovation 2nd Floor Hot Tub
Addition Survey Attic Garage
INVENTORY
Service 1 ph Heat Duplec Recpt Ceiling Fixtures HID Fixtures
Service 3 ph Hot Water GFCI Recpt Wall Fixtures Smoke Detectors
Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors
Sub Panel A/C Blower Range Recpt Fluorescent Fixture Pumps
Transformer Appliances Dryer Recpt Emergency Fixtures Time Clocks
Disconnect Switches Twist Lock Exit Fixtures IA TVSS
Other Equipment: 20KW stand by generator with 200a transfer switch
Notes:
Inspector Signature: Date: Oct 3 2013
81-Cert Electrical Compliance Form.xls
rsti SQ
o�� Uryol ��iG�
Town Hall Annex J [ i[ Telephone(631)765-1802
54375 Main Road G 0W(63 )76ggQQtl.P.O.Box 1179 rogerAchert nsolo22ny.us
Southold,NY 11971-0959 Q�
BUILDING DEPARTMENT
TOWN OF SOUTHOLD
APPLICATION FOR ELECTRICAL INSPECTION
REQUESTED BY: Date:
Company Name:
Name:
License No.: 70 C.
Address:
Phone No.: DGlS O
JOBSITE INFORMATION: (*Indicates required information)
*Name:
*Address: ^fAv h
*Cross Street:
Phone No_:
Permit No.:
Tax-Map District: 1000 . Section: Block: Lot: �S
*BRIEF DESCRIPTION OF WORK(Please Print Clearly)
(Please Circle All That Apply)
*Is job ready for inspection: YES O Rough In Final
*Do-you need a Temp Certificate: YES/ NO
Temp Information(if needed)
*Service Size: 1 Phase 3Phase 100 150 200 300 350 400 Other
*New Service: Re-connect Underground Number of Meters Change of Service Overhead
` Additional Information: PAYMENT DUE WITH APPLICATION
.82=Request forinspection Form
TOWN OF SOUTHOLD BUILDING PERMIT APPLICATION CHECKLIST
BUILDJNG;DEPARTMENT Do you have or need the following,before applying?
TOWN HALL Board of Health
SOUTHOLD, NY 11971 4 sets of Building Plans
TEL: (631) 765-1802 Planning Board approval
FAX: (631) 765-9502 Survey
SoutholdTown.NorthFork.net PERMIT NO. ��� Check
Septic Form
N.Y.S.D.E.C.
Trustees
C.O.Application
Flood Permit
Examined 20 Single&Separate
Storm-Water Assessment Form
CContact:
Approved 20 Mail to:
Disapproved a/c
Phone:.161 O W 0 0
Expiration 20 � /f
rrZ� �n � Building spe o
Lno
1J PPLICATION FOR BUILDING PERMIT
213 Date , 20
INSTRUCTIONS
T.
HMb
completely filled in-by typewriter or in ink and submitted to the Building Inspector with 4
sets of plans, accurate plot plan to scale. Fee according to schedule.
b. Plot plan showing location of lot and of buildings on premises,relationship to adjoining premises or public streets or
areas, and waterways.
c. The work covered by this application may not be commenced before issuance of Building Permit.
d. Upon approval of this application,the Building Inspector will issue a Building Permit to the applicant. Such a permit
shall be kept on the premises available for inspection throughout the work.
e.No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector
issues a Certificate of Occupancy.
f. Every building permit shall expire if the work authorized has not commenced within 12 months after the date of
issuance or has not been completed within 18 months from such date. If no.zoning amendments or other regulations affecting the
property have been enacted in the interim,the Building Inspector may authorize, in writing,the extension of the permit for an
addition six months. Thereafter, a new permit shall.be required.
APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the
Building Zone Ordinance of the Town of Southold, Suffolk County,New York, and other applicable Laws,Ordinances or
Regulations, for the construction of buildings, additions, or alterations or for removal or demolition as herein described. The
applicant agrees to comply with all applicable laws, ordinances,building code, housing code nd regulations, and to admit
authorized inspectors on premises and in building for necessary inspections.
(Signature of allplicant or name, if a corporation)
3
(Mailing address of applicant)
State whether applicant is owner, lessee; agent, architect, engineer, general contractor, electrician, plumber or builder
Name of owner of premises TWO
(As on the tax roll or latest deed)
If applicant is a corporation, signature of duly authorized officer
.(Name and title of corporate officer)
Builders License No.
Plumbers License No.
Electricians License No.
Other Trade's License No.
1. Location of land on which proposed work will be done:ey
D�IC
House Number Street Hamlet
County Tax Map No. 1000 Section Block Lot
Subdivision, Filed Map No. Lot
2. State existing use and occupancy of premises and intended use and occupancy of proposed construction:
a. Existing use and occupancy
b. Intended use and occupancy
3. Nature of work(check which applicable): New Building Addition Alteration
Repair Removal Demolition Other Work
(Description)
4. Estimated Cost Fee
(To be paid on filing this application)
5. If dwelling, number of dwelling units Number of dwelling units on each floor
If garage, number of cars
6. If business, commercial or mixed occupancy, specify nature and extent of each type of use.
7. Dimensions of existing structures, if any: Front Rear Depth
Height Number of Stories
Dimensions of same structure with alterations or additions: Front Rear
Depth Height Number of Stories
8. Dimensions of entire new construction: Front Rear Depth
Height Number of Stories
9. Size of lot: Front Rear Depth
10. Date of Purchase Name of Former Owner
11. Zone or use district in which premises are situated
12. Does proposed construction violate any zoning law, ordinance or regulation? YES NO
13. Will lot be re-graded? YES NO Will excess fill be removed from premises? YES NO
14. Names of Owner of premises Address Phone No.
Name of Architect Address Phone No
Name of Contractor Address Phone No.
15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES NO
* IF YES, SOUTHOLD TOWN TRUSTEES & D.E.C. PERMITS MAY BE REQUIRED.
b. Is this property within 300 feet of a tidal wetland? * YES NO
* IF YES, D.E.C. PERMITS MAY BE REQUIRED.
16. Provide survey;to scale, with accurate foundation plan and distances to property lines.
17. If elevation at any point on property is at 10 feet or below, must provide topographical data on survey.
18. Are there any covenants and restrictions with respect to this property? * YES NO
* IF YES, PROVIDE A COPY.
STATE OF NEW YORK)
SS:
COUNTY OF )
being duly sworn, deposes and says that(s)he is the applicant
(Name of individual signing contract)above named,
CONIMie D.st1MiYH
(S)He is the Nok aq Public', , G a;�v York
(Contractor, Agent, Corporate Officer, etc,) Qualifiedto Suffolk��sLirttj of ka
Commission Expireo APrii 14,—_..-
of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application;
that all statements contained in this application are true to the best of his knowledge and belief; and that the work will be
performed in the manner set forth in the application filed therewith.
Sworn to before me this
_-51� day of �/L. 20 l
gu��
Notary Public Sign Lire of Applicant
SuRVY OF PoPE
�TY
51TUATE: ORIENT � OF;
TOWN OF 50UTHOLD °� FOB"' - �
5UFFOLK COUNTY, NY L R ed y deg x f
2g3 S
9)RVEYED 03-31-Cf9
5UFFOLK COUNTY TAX it
1000- 16-6-25
CERTIFIED TO: 01��
PETER J.GOLDMAN 1✓ uO t r Q lS`fl
NORYE5T MORTAGE,ING.
COMMONWEALTH LAND TITLE } sad } O
INSURANGE GOMPANY ,
NOTES:
MONUMENT FOUND
O PIPE FOUND Q r//jrr�� f e•
_1=77_7=7v1 HEDGE 9 �, 2 ` ,e ca E1.154 �EiR/ L P i
J � r fl. �JI 1 {9
TREE MARKED WITH RIBBON
=72 031 SF OR 1.65 ACRES AREA
09
tl> - 30 ,.,
e
H
034
�V" I• ter.- 5�
#?S) pF NE�y .lpa .�.,:w .•w:
Vj c./Ilnwu..lN,s•t �r.l••u/we w.
....K..Iv w..-
4/'.a,•r•. NI•u't,tlulYr�till/w Mf/
of.'•wKr'w f..i t./I
p � :.......a v.�le.•1/a..rluw,l,:e`u;aw.
�ySFO iA!:D%Y, N.Y.S. LIC. N0. 50202
GRAPHIC SCALE I°= 40- 6 EA C. EHLERS-EAND SURVEYOR
6 MAIN STREET
RFVERHVERHEAD,N.Y. SI901
369-8288 Fax 369-8287 REFERENCE 9 99-151
Installation
Residential/Commercial Generator Sets
a
r
Models.:
14/20,RESA
14/20 R ESAL
Controllers:
RDC2
�. DC2
09001
NATIONALLY REGISTERED
KOHLER.
POWER SYSTEMS
TP-6803 10/12b
r
Section 1 Installation
1.1 Introduction A WARNING
A DANGER
Carbon monoxide.
Can cause severe nausea,
Hazardous voltage. fainting,or death.
will cause severe injury.or death.
The exhaust system must be
This equipment must be installed and. leakproof and routinely inspected.
serviced by qualified electrical
personnel. Generator set operation. Carbon monoxide can cause
severe nausea;,faulting,or death. Carbon monoxide is an
Have the generator set installed by an authorized Kohler odorless,colorless,tasteless,nonirritating gas that can cause
death,if inhaled for even a shorttime.Avoid breathing exhaust
distributor/dealer or authorized representative. Install fumes when working on or near the generator set. ;..Never
the equipment in compliance with the National Electrical operate the.generator set inside a building. Never operatethe
Code (NEC), and local codes. : For Canadian generator set where exhaust gas could seep inside or be
installations, refer to the Canadian Electrical Code drawn into a potentially occupied building through windows,
1 (CEC). air intake vents,or other openings.
.The generator.set must be installed outdoors. The Carbon monoxide detectors. Carbon monoxide can
exhaust systems. on-enclosed units are designed for cause severe nausea, fainting, or deathy Install carbon
i monoxide detectors on each level of any building adjacent to
outdoor.installation only. the generator set. Locate the detectors to adequately warn
the building's occupants of the.presence of carbon monoxide.
Note: DO NOT install these-,generator sets .inside a Keep the detectors operational at all times: Periodically test
building. and replace the carbon'monoxide detectors according to the
manufacturer's instructions.
Note: Install carbon:monoxide(CO)detector(s).on each
level-of any building adjacent to a generator set.
Locate: the detectors .to adequately warn .the 1.2 Lifting
building's occupants of the,preaence of carbon
monoxide. A WARNING
ti
Obtain a building permit and contact your local utility
companies to mark the locations of underground pipes
( and cables.
Read and follow the safety precautions in this manual
and observe-the decals on the equipment. Refer to the Unbalanced weight.
diagrams and drawings in this manual.for dimensions, Improper lifting can cause severe
and `electrical connections during the installation injury or death and equipment
procedure. Read the entire installation procedure and damage.
obtain the accessories .and tools needed before Do not use lifting eyes..
beginning installation. 'Perform the steps in the order Lift the generator set using lifting bars
shown. inserted through the lifting holes"on
the skid.
To install optional accessories, follow the instructions
provided with each kit. Approximate generator set weights are.,, shown in
i Figure 1-1. Use lifting bars inserted through the holes in
the skid to lift the unit. See the dimension drawings in
Section 2 for lifting hole locations.
TP=6803 10/12 Section 1 Installation 11
Model Weight,kg(lb.) Do not install the mounting pad directly on grass,wood,
or other combustible materials. Clear all combustible
14RESA/RESAL 191 (420) materials, including plants and shrubs, building
20RESAIRESAL 243 (535) materials,and lawn furniture,from an area.at least 2.4 m
and the exhaust.end of the generator set. See
Figure 1-1 Approximate Weights (8 ft.)beyond
Figure 2-5 in Section 2.
1.3 Generator Set Inspection 1.4.2 Exhaust Requirements
Complete.a thorough inspection of the generator set. Figure 1-2 gives the exhaust temperature at rated load.
Check for the following: The engine exhaust mixes with the generator set cooling
1. Inspect the generator set for loose or damaged air at.the exhaust end-of the enclosure. Mount the
parts.or wires. Repair or tighten any loose parts generator set so that the hot exhaust does not blow on
before installation. plants or .other combustible- materials. Maintain the
clearances shown in Figure 2-5 in Section 2.
2. Check the.engine oil. Fill, if necessary, with the
recommended viscosity and grade of oil. Use Temperature,
Exhaust °C(°�
synthetic oil, APL(American Petroleum Institute)
Service -Class .SG or higher. See TP=6804, Exhaust gas exiting the enclosure
Operation Manual,for additional information. at rated kW, °C(°F) 260(500)
Figure 1-2 Exhaust Flow and Temperature
1.4 Location and Mounting The generator set requires correct air flow for cooling
and combustion. The inlet and outlet openings in the
Install the generator set outdoors. Choose a location sound enclosure provide the cooling and combustion air.
that is at least 0.9 m(3 ft.)from any building or structure Figure 1-3ahows the locations of the cooling air intake
and Hearths incoming gas service: Allow a minimum of and exhaust vents.' Inspect the air inlet and outlet
2.4 m (8 ft.) clearance beyond the exhaust end'of the openings inside and outside the housing to ensure that
generator set. Locate the generator set that the hot the air flow is not blocked.
exhaust.does not blow on.plants or other combustible
materials. Do not install the generator set where The generator set is designed to operate with all
exhaust gas could accumulate and seep inside or be enclosure panels and internal baffling iri`place:'If during
drawn into a potentially occupied building. installation, maintenance or repair the unit must be
operated withoutthe complete enclosure and baffling as
Notice shipped from the factory make sure the exhaust panel is
removed as well.
DO NOT locate the generator set near patios,
decks,play areas,or'arimal shelters. Keep items 1
such as, lawn furniture, toys; sports equipment, 1 2
and all combustible' materials away from the
generator set exhaust outlet. \ Q
Remind family members, chiildfk and visitors to �..�
use caution near the,generator set. Generator
sets connected to automatic transfer switches
start automatically during exercise periods and
power outages. Some generator set,components REAR.vIEW tp6733
become,hot when the generator set is running and 1. Air intake
remain hot for a time after the generator set shuts 2. Exhaust outlet
down.
Figure 1-3 Cooling Air Intake and Exhaust.,
1.4.1 Mounting Area
The generator set is shipped on an engineered 1.5 Dimension Drawings
composite mounting pad. Prepare aflat, level mounting See the dimension drawings in Section. 2 for the 1
area covered with a weed barrier and gravel or a generator set dimensions, fuel and electric inlet
concrete mounting pad. Set the composite mounting locations, and recommended clearance.
pad directly on the gravel or concrete.
i 12 Section 1 Installation TP-6803 10/12
4
1.6 Fuel Requirements 1.6.2 Fuel Pipe Size
The generator set operates using natural gas or LPG Ensure that the fuel pipe size and length meet the
fuel. The generator set is EPA-certified for both natural specifications in Figure 1-5. Measure the pipe length
gas and LPG fuels. from the primary gas pressure regulator to-the pipe
connection on the generator set fuel inlet. Add 2.4 m
The fuel system installation must comply with the NEC (8 ft.)to the measured length for each 90 degree elbow.
and local codes. Comparethe total pipe length with the chart in Figure 1-5
to find the required pipe size.
1.6.1 Fuel Supply Contact local LPG provider for LPG installation
Because of variable climates and geographical information.
considerations, contact the local fuel supplier for fuel Minimum Gas Pipe Size Recommendation,in. NPT
system planning and:installation: Figure 1-4 lists the 14RESA/RESAL 20RESA/RESAL
recommended fuel ratings and other fuel supply
information for natural gas and LPG fuels. Natural Natural
Pipe Gas LPG Gas LPG
Length, (193,000 (263,0010 (281,000 (340,000
Natueal m.(ft.) Btu/hr.) Btu/hr.) Btu/hr.) Btu/hr.)
Fuel.type Gas LPG 8. (25) 3/4 3/4 1 3/4
Fuel supply inlet 1/2-NPT 15 (50) 1 3/4 1 1
Fuel supply pressure, 1.3-2.7 1.7-2.7 30 (100) 1 1 1 1/4 1
i kPa(in. H20) (5-11) (7-11) 46 (150) 1 1/4 1 1 1/4 1 1/4
Fuel flow rate, maximum Btu/hr.:
61 (200) 1 1/4 1 1 1/4 1 1 1/4
14RESA/RESAL 198,000 203;000 Figure 1-5 Fuel Pipe;Size Recommendations
20RESA/RESAL 281,000; 340,000
Nominal Fuel Rating,Btu/ft 3
+ 1.6.3 Connecting the Fuel-Supply
1. Natural gas 1000
LPG 2500 The dimension drawing in Section 2 shows the location
of the fuel inlet connection. Have the fuel supplier install
Figure 1-4. Fuel-Supply rigid gas piping and a manual fuel shut-off valve. The
I Verify that the output pressure from the primary gas fuel supply line should'line up with the generator set fuel
utility pressure regulator•is as shown in Figure 1-4 and inlet and end about 12 inches away to allow connection
that the utility gas meter flow rate is sufficient to supply with a section of flexible fuel line. Use flexible sections to
the generator set at, rated load plus all other prevent fuel line breakage caused by vibration.
gas-consuming appliances. For LPG tanks, verify that Note: Do not bend the flexible fuel line to-make up for
the output pressure is as.shown in Figure 1-4. See misalignment of the fuel supply line and the
Figure 1-6 for fuel consumption. Contact the fuel
generator set fuel inlet.
� supplier for flow rate information bra gas meter upgrade,
i if necessary.
Fuel Consumption,m3/hr.(cfh)
14RESA/RESAL 20RESA/RESAL
Fuel Type % Load 60 Hz 50 Hz , 60 Hz 50 Hz
100% 5.4 (1 93) 4.9 (175) 8.0 (281) 6.4 (225).
75% 4.7 (163) 4.2 (148) 6.9 (243) 504 (189)
Natural Gas 50% 3.5 (124) 3.1 (108) 4.6 (161) 3.9 (139)
25% 2.6 (93) 2.4 (84) 3.6 (127) 2.9 (103)
100% 2.3 (81) 2.1 (74) 3.9 (136) 2.9 (102)
75% 2.1 (75) 1.9 (68) 3.1. (109) 2.4 (85)
LPG 50% 1.8 (60) 1.5 (53) 2.3 (82) 1.8 (63)
25% 1.2 (45) 1.1 (40) 1.7 (59) 1.3 (47)
LPG conversion factors: Nominal fuel rating:
8.58 ft.3=1 lb. Natural gas: 37 MJ/m3(1000 Btu/ft.3)
0.535 m3=1 kg LPG: 93 MJ/m3(2500 Btu/ft.3)
36.39 ft.3 =1 gal.
Figure 1-6 Fuel Consumption
TP-6803 10/12 Section 1 Installation 13
Apply pipe sealant that is approved for fuel connections. A WARNING
Hold the fuel solenoid valve with a wrench when
tightening the fuel connections.
Open the manual fuel valves and test all fuel
connections using soapy water. If a leak is found,close
the fuel valves, clean the fittings, and tapply fresh Explosive fuel vapors.
sealant. Check for fuel'leaks again with the generator Can cause severe injury or death.
set running.
Use extreme care when handling,
Protect all fuel lines from machinery or equipment storing,and using fuels.
contact,adverse weather conditions, and environmental
damage. _
1.7 Fuel Conversion
The multi-fuel system allows conversion from natural
gas to LPG (orvice-versa) in the field while maintaining
emissions-standard. Atrainedtechnicianor �%
an authorized,distributor/dealer can convert the fuel 2
system.
Figure 1-7 shows the fuel system-components. AR
�z
A WARNING s
• 1
' 4
Accidental:starting. g
Can.cause severe injury.or death. �.
Disconnectthe battery cables before
working_ on the generator set. GM80110
Remove the negative (-) lead.first
when disconnecting the battery.
Reconnect
ahe negative(,) lead last icNirioN nMwc
When reconnecting the battery . FUEL TYPeSt CH9"0 .
NATURAL GAS. CON NECT 65 TO N
Disabling the .generator set. Accidental starting can LP'GAS' DO NOT CONNECT vp
cause severe injury or death. Before working on the ,GNM(SEE c aNG
generator set or equipment connected to the set,disable the N3 .(M) -�
generator set as follows: (1) press the.generator set off/reset 65 (P8-4)
button to shut down,the generator set. (2)Disconnect the
power to the battery:charger;:if equipped. (3) Remove'the DSAI Lead.Connection
battery cables,negative(-)lead first. Reconnectthe.negative
(-) lead last when reconnecting the,-,. Follow these 1. Fuel Regulator
precautions to prevent the starting of the generator set by the 2.'Fuel block(not shown;see Figure 1-8)or LPG orifice locatio
remote start/stop switch. (see Figure 1-10)
3. Fuel solenoid valve and digital spark advance ignition(DSAI)
leads
4. Fuel inlet,1/2 in.NPT female
Figure 1-7 Fuel System (20RESA shown)
TP-6803 10/12
14 Section 1 Installation
1.7.1 Fuel Conversion, 14RESA/RESAL 12. Connect,and turn on the new fuel supply.
Two fuel connections on the fuel .block allow field- 1
conversion between natural gas and.,LPG. The fuel
metering valves are factory-set and sealed to comply 5 2'.
with applicable emission standards and to provide the
best possible hot and cold starting. 4 Natural gas
;..setup shown
Note: Do not adjust the factory-sealed fuel-metering
adjustments on the fuel block. Changing the fuel-
metering adjustments may violate federal or state
laws. I
Use the following procedure to convert-from natural..-gas
(NG) to.LPG. The.procedure includes moving the fuel
connection from the natural gas to the-LP port,plugging
the natural gas port,and disconnecting the,leads for the
digital spark advance ignition.(DSAI). See Figure 1-7 for 3.
the fuel system,component locations.
Procedure to convert from NG to LP; GNI84143
14RESA/RESAL 1. Fuel block
2. Fuel metering valves—factory-sealed,do not adjust
1. Press the OFF button on the generator set 3. Fuel inlet,1/2 in.NPT.
4. Hose fitting
controller. 5. Plug :
2. Disconnect the power to the battery charger. Figure 1-8 Fuel Block, 14RESA/RESAL
3. Disconnect the generator set engine starting 13. Reconnect the generator set engine starting
battery;negative (=) lead first. battery leads, negative (-) lead last.
4. Turn off the fuel supply. 14. Reconnect power to the battery charger.
5. Remove the hose clamp and fuel hose from the 15. Start the generator set by pressing the'RUN button
hose fitting in the fuel block. See Figure 1-8. on the generator set controller.
6. Remove the hose fitting from the natural gas outlet 16. Check for leaks using a gas leak detector.
port in the fuel block.. See Figure 1-8.
17. Run the generator set and check the operation.
7. Remove the plug from the LP port in the fuel block.
See Figure:1-8. 18. Pressthe OFF button to to shutdown the generator
set.
8. Clean the plug with a dry cloth or brush,apply fresh
pipe sealant,and install the plug into the natural gas Conversion from LPG to Natural Gas
outlet port.
To convert from LPG to natural gas, follow the fuel j
9. Clean the hose fitting with a dry cloth or brush, conversion procedure above, moving the hose fitting to i
apply fresh pipe sealant to the threads, and install. the natural gas port and plugging the LP port. Connect j
the fitting into the LP port. the DSAI leads for natural gas.: See Figure 1-7.
Note: Do not adjust the fuel metering valves.
10. Slide the hose onto the hose fitting and secure it
with the clamp.
11. Disconnect the DSAI leads for LP. The DSAI leads
are located near the fuel solenoid'valve. See
9 Figure 1-7.
TP-6803 10/12 Section 1 Installation 15
1.7.2 Fuel Conversion, 20RESA/RESAL Conversion from LPG to Natural Gas
For LPG fuel,an orifice is used in the fuel line. The unit is To convert from.LPG to natural gas, remove the fuel
typically shipped set up for natural gas, with the loose orifice and connect the DSAI leads together.
orifice tied near the fuel solenoid valve. To convert to
LPG, install the orifice and disconnect the spark Fuel DSAI Leads 65 and N
advance leads as described below. See Figure 1-10 for Natural Gas Connect lead 65 to N
the fuel system component location's. LP Disconnect
Figure
Procedure to Convert from NG'to LP,
1-9. DSAI Connections
20RESA/RESAL
Rating
1. Press the OFF button on the generator set
controller. Converting the fuel will change the generator set rating.
See the generator set specification sheet for ratings with
2. Disconnect the power to the battery charger. natural-gas-and',.LP.. Order a new:nameplate with the
updated rating:and fuel information from an authorized
3. Disconnect the generator set engine starting distributor/dealer; if necessary. Provide the following
battery, negative (.-) lead first. informatiori.from the original nameplate:.
4. Turn off the fuel supply. • Model Number • kVA
• Spec Number • Amps
5. Remove the hose.clamp;and fuel hose from the • Serial Number • Volts
hose fitting. See Figure 1-10. • Fuel (original and new) 4� Hz
• kW
6. Insert the orifice into the hose fitting. See
Figure 1-10. Note: LPG"setup i
7. Slide the.hose onto the hose fitting and secure it
with the clamp. shown
8. Disconnect digital spark-advance module (DSAI) 1
leads 65 and N5 for LP. The DSAI leads are located 2
near the fuel solenoid valve. See Figure 1-7. 3
9. Connect and turn on the new fuel supply.
10. Reconnect the generator set engine starting
battery leads, negative (-) lead last. ti
i.
11,. Reconnect power to the battery charger.
12. Start the generator set by pressing the RUN button
on the generator set controller,
13. Check for leaks using a gas_.leak detector. 4
14. Run the'generator'set and check the operation.. 1. LPG orifice GM84143
2. Hose fitting .
3. Regulator
15. Press the OFF button to shut down the generator 4. Fuel inlet, 1/2 in.NPT female
set.
Figure 1-10 Fuel Regulator and LPG Orifice,
20RESA/RESAL
16 Section 1 Installation TP-6803 10/12
1.8 Electrical Connections generator set will operate properly with the neutral either
bonded to ground or isolated from ground at the
A DANGER generator.
-7 Various regulations and site configurations including the
National Electrical Code (NEC), local codes, and the
type of transfer switch used in the application determine
the grounding of the neutral at the generator. NEC
,Hazardous-voltage. Section 250 is one example that has a very good
Will cause severe injury or death. explanation of the neutral grounding. requirements for
Thisequipmed t must.be installed and generators.
serviced by <qua.!fled electrical
personnel... 1.8.2 Electrical Lead Entry
Grounding electrical equipment. Hazardous voltage can Drill or punch holes in the enclosure for the electrical
( cause severe injury or.death. Electrocution is possible conduit in the locations shown in Figure'l-11. A
whenever electricity is present. Ensure you comply with all full-scale.dimensioned template for the hole locations is
applicable codes'and standards. Electrically ground the printed in Appendix B. See page 41.
generator set, transfer switch, and related equipment and
electrical circuits. Turn off the main circuit breakers of all
power sources before servicing the equipment. Never
;1 contact electrical leads or appliances when standing in water
or on wet ground because these conditions increase the risk
of electrocution.
Electrical backfeed to the utility. Hazardous backfeed 0
voltage can cause severe injury or death. Install a transfer
switch in standby power installations to prevent_-the
connection of standby and other sources of power. Electrical
backfeed into a utility electrical system can cause severe 1 2
injury or death to utility personnel working on power lines. 3
NOTICE
Canadian installations only. For standby service connect
i the output of the generator set to a suitably rated transfer
switch in accordance with Canadian Electrical Code, Part 1.
Have an authorized distributor/dealer or a licensed ADV-7876
electrician make the following electrical connections: Note: See.Appendix Bfor afull-scale template
The electrical installation must comply with the National
Electrical Code@(NEC) class 1.wire designation and all with dimensions. .
applicable local codes. Canadian installations must 1. 1/2_NPT female fuel inlet
comply with the Canadian Electrical Code (CEC) and 2. utility voltage.electrical lead entry point
applicable local codes. 3. ATS signal electrical lead entry point
1.8.1 Grounding Figure 1-11 Electrical Lead Entry Locations
Ground the generator set: The grounding method must 1.8.3 Field-Connection Terminal Block
comply with NEC avid local codes. Connect the
grounding:strap to the generator set ground lug,terminal The generator set is equipped with afield-connection
GND inside the controller compartment. terminal,block located in the. air inlet area near the
junction box. Leads have been faotory-installed from the
Generator sets are shipped with the generator neutral junction box to the terminal block for easy field wiring.
bonded (connected) to the generator ground in the
junction box. The requirement for having a bonded See the dimension drawing in Section 2 for the terminal
i (grounded)neutral or ungrounded neutral is determined block location. See Figure 1-12 for terminal block
by the type of installation. At installation,the neutral can details. Refer to the terminal block decal for connections
be grounded at the generator set or lifted from the and cable sizes. Also see the wiring diagram in
ground stud and isolated if the installation requires an Section 2.
ungrounded neutral connection at the generator. The
The National Electrical Code® is a registered trademark of the National Fire Protection Association,Inc.
TP-6803 10/12 Section 1 Installation 17
f
Route AC leads through flexible conduit. Ensurethatthe
leads and conduit do not interfere with the operation of 3
the generator set or obstruct the service areas. Route 2
F
low-voltage communication leads through separate 4
- n
conduit.
r
5
Procedure �
1. Drill holes for the conduit fittings. See Figure 1-11
and Appendix B for the recommended electrical
inlet locations. Feed the cables through the
openings.
2. Connect the leads from the transfer switch
emergency source lugs to the Li and L2
connections on the generator set terminal block.
GMB4094
3. Connect the neutral (LO) and ground (GRD) leads
from the ATS and the main panel to the M a m a J m
corresponding connection points on the terminal
block. See Section 1.8.1, Grounding.
1. Low voltage communication and engine start connections
4. Connect utility power leads to the terminal block 2• Ground connection.for communication cable shield.
3. Ethernet cable for optional OnCue connection
connections labelled Utility. Connect to a circuit 4. AC load connections
that is supplied by the utility source and backed up 5..AQ power connections
by the generator. The power source must be GFCI
protected. See Section 1.8.4 for more information' Figure 1-12 Electrical Connections
about the utility power requirement.
5. For connection of optional transfer switches, the 1.8.4 Power Supply. ..
programmable interface module (PIM), and/or a Provide AC power for the battery charger(integral to the s,
load control module(LCM), see Section 1.8.5. RD.C2 and DC2 controllers) and the optional
accessories shown in Figure 1-i3. The power source
6. If the OnCue Home Generator Management must be GFCI protected. The power to the battery
System will be used with the generator set, run charger and accessories'must be available at all times,
category 5E network cable from the generator set the circuit must be powered by the utility source and
to the customer's router or modem. backed up by the generator.-
Note: Installation of the network cable at the time Be:.sure to disconnect power at the distribution panel
of generator set installation is highly before making the connections..Connect power leads to
recommended. Installing the Ethernet cable. the utility power connection points on the terminal block.
now will make connection:much.easier if you
See Section 1.8.3 and the wiring diagrams in.Section 2
choose to add OnCue later. for connection details.
a. Route the network cable with other low-voltage
signal wiring (for example, the RBUS Power Requirement,Max.
--communication leads br engine start leads to Equipment Watts Amps; . Volts. i
the transfer switch), in separate conduit from Battery charger 100-250 VAC
'the AC1oad leads:`Ifthe network cabie is'longer (standard) 120 1 50/60 Hz
than 100 meters (32-8 ft.), use a repeater or Carburetor heater* 37 0.33
switch.
• Battery heater* 110 0.92 120 VAC i
b. Use an RJ45 inline coupler to connect the Fuel regulator heater* 50/60 Hz
Ethernet cable to the cable in the customer (20RESA/RESAL only) 60 0.50 i
connection box. See Figure 1-12. The inline Optional accessory
coupler is included with the OnCue kit. Figure 1-13 Power Requirements
I
1
18 Section 1 Installation TP-6803 10/12
1.8.5 Transfer Switch Connection through PI 0-4 on the transfer switch interface module to
the generator set terminal block TB1 connections A, B,.
Connect the ATS or remote start/stop switch. Connect PWR, and COM.
the load leads from the generator set to the Emergency
IfA.T source lugs on the ATS. Route low-voltage See Section 1.8.6 for the maximum cable length.
communication leads through separate conduit from the
AC power and load leads. All connections must comply Note: Connections 3 and 4 on the generator set are not
with applicable state and local code's. used with the Model RXT transfer switch.
Note: Do not use the Kohler@' Model RRT transfer Engine start connection for other transfer
switch with the 14/20RESA or 14/20RESAL switches or a remote start/stop switch
generator set..
Connect the engine start leads from the transfer switch.
Communication connections for a Kohler
o or remote start switch to terminals 3 and .4 on the
Model RXT transfer switch terminal block. See Figure 1-15. Route the engine start
leads through separate conduit from the AC power and
See Figure 1-14. Use Belden #9402 or equivalent load leads.
20 AWG shielded, twisted-pair cable to connect P10-1
1
f /Generator Set
\GND*
i
A A
RBUS B . e
pW PwR Interface Board on the
12 VDC. CO coon, 4 Model RXT Transfer Switch
4 A a RXT. ,.
3 / a
a 'm m o
TB1 3
PM c
COM 8 g
C
ti 4
Note: Generator set terminal block (TB1) connections 3 and 4 are NOT USED with the,Model RXT ATS.
1: Generator set terminal block TB1. See Figure 2-4 for location. Check the decal on the generator set for.terminal block connections:
2. Connect one end of each cable shield to GROUND at the generator set.
3. Communication cable Belden#9402 or equivalent 20 AWG shielded,twisted-pair cable
4. Leave one end of each cable shield disconnected. If accessory modules(PIM or LCM)are connected,see Section 1.8.7.
Figure 1-14 Model RXT Transfer Switch Communication Connection to Generator Set Terminal Block
j
(0-
TP-6803 10/12 Section 1 Installation 19
' 1
Generator Set
TBi
A.
B 2 ATS
PWF Models RDT
CON or RSB
4
3
tp6803
1. Generator Set Terminal Block TBi. See Figure 2-4 for location. Check the decal on the generator set for terminal block connections.
2. Engine start leads 3 and 4. See the ATS manual for cable size specifications.
Figure 1-15 Engine Start Connections with Transfer Switch Models RDT or RSB
'.:
1.8.6 Cable Specifications connections Aand B. The maximum total cable length is
the value shown for 12 or 14 AWG wire in Figure 1-16.
For the RBUS communication connections(A, B,PWR,
and COM), the maximum cable length for one model The maximum cable length depends on the number of
RXT transfer switch.connection using Belden #9402 optional modules connected. A module can be a Model
cable is 61 m.(200 ft.)." RXT transfer switch, a load control module (LCM), or a
programmable interface module(PIM). See Figure 1-16
For longer cable.runs,use 12-14 AWG wire for the COM for the maximum cable lengths for 1,2,or 3 modules per
and PWR connections and Belden#8762(2-conductor) cable run. . Note the shield connections shown in
20AWG shielded twisted-paie cable .for RBUS Figure 1-17.
Maximum length per run,meters(ft.)
'Numberof,Modules(ATS;PIM,and LCM).per Run
Cable(TBi-PWR and COM) 1 Module 2 Modules 3 Modules
Belden#9402 or equivalent 20AWG 61 (200) 31 (100) 21 (67)
14 AWG for PWR and COM 152 `(500) 152 (500) 122 (400)
12 AWG for PWR and COM 152 (500) 152 (500) 152 (500)
Figure 1-16 Total Cable Lengths with Accessory Modules Connected
20 Section 1 Installation TP-6803 10/12
1.8.7 System Connections with one programmable interface module (PIM), and/or one
Accessory Modules load control module (LCM).
See Figure 1-17 through Figure 1-21 for connection See Figure 1-16 for the maximum total cable length with
options with up to three accessory modules. Accessory 1, 2, or 3 accessory modules per cable run.
\\0 .
modules can include one Model RXT transfer switch,
2
GND
f Generator Set A 4
RBUS — A /
B — B
12 vDC CO PWR 3
COM RXT
4
3 A a a A
TB1 B W . — B
PWR PWR
COM g g co,M
P10 (RBUS)
1
PIM
A a a A
B m m B
PWR PWR
COM S 8 COM
P10 (RBUS)
i
ti
V5E5
Av
B— m o 'a
Z LCM
PWR c
cOM g cn
lNote: See Figure 1-16 for maximum total cable length per run (1 run shown).
1. Generator set terminal block T131. See Figure 2-4 for location. Check.the decal on the generator set for terminal block connections.
2. Connect one end of each cable shield to GROUND at the generator set.
3. Communication cable Belden#9402 or equivalent 20 AWG shielded,twisted-pair cable
4. Connect shields together as shown.
Figure 1-17 Accessory Module Communication Connection Details
TP-6803 10/12 Section 1 Installation 21
Generator Set
RXT ATS
TB1
NOTES: LCM
• See Figure 2-4forterminal block location on generatorset. Check
the decal on the generator set for terminal block connections.
• See Figure 1-16 for maximum total cable length per run (3 runs
with 1 module each shown). PIM
• See Figure 1-.17 for communication connection detail (A and B, I
PWR and COM).
•. Use splices-or wire nuts to collect multiple leads for connection to tp6803
the generator set terminal block. See Figure 1-19.
Figure 1 A 8 Accessory Module Connections (three cable runs with one module each)
1 3
2
A
B
Generator Set 9402 CABLE
PWR
COM
RBUS A
B
12 VDC CO 3 4
4 A .
3 e
9402 CABLE
TB1 PWR
COM
tp6803
1. Generator Set Terminal Block TB1. See Figure 2-4 for location. Check the decal on the generator set for terminal block-connections.
2. Splice
3. Connect all of the shield leads on this end to GROUND at the generator set.
Figure 1-19 Multiple Connections to the Generator Set
22 Section 1 Installation
TP-6803 10/12
Generator Set RXT ATS
TB1
PIM
Notes:
.• See Figure 2-4 for terminal block location on generator set.
Check the decal on the generator'-set for terminal block
connections. LCM
• See Figure 1-16 for maximum total cable length with i
12 or 14 AWG wire.
• See Figure 1717 for communication connection detail(A and B,
PWR and COM). Connect the cable shield to ground at the
generator set. tPasos
Figure 1-20 Accessory Module Connections,(two cable runs with.one and two modules shown)
ti
TP-6803 10/12 Section 1 Installation 23
RXT ATS
Generator Set A and B 1 A and B }
PWR 2 PWR
COM 2 COM
1_
2
2
PIM
A and B
PWR
COM
1
2
NOTES: y>
• See Figure 2-4 for terminal block location on generator set. Check the 2 LCM
decal on the generator set for terminal block connections.
A and B
• See Figure 1-16 for maximum total cable length with 12 or 14AWG
wire. (1 run with 3 modules shown). PWR
COM
• See Figure 1-17 for communication connection (A and B) detail.
jConnect the cable shield to ground at the generator set.
1. Belden#9402 or equivalent,20 AWG shielded cable(use one pair);or Belden 8762.or equivalent 20 AWG shielded cable
2. 12-14 AWG wire . cPseos ,
Figure 1-21 Accessory Module Connections with 12-14 AWG Power Leads (one cable run with three modules
shown)
ti.
i
i
24 Section 1 Installation TP-6803 10/12
CD p CL <_ e L
In n O n CD j
T. O
U) =F CD -e
CD CD CD
5 4 3 z CD
n+
N
y�J n
"S
- C3D swei6LIQ
7 C0
� Cn
N
7 D
n 0
m Al
cn �
�.
ca
D
03
LOW VOLTAGE
117 [d7 9'. AIR INLET ELECTRICAL
N STUB•UP AREA C
EXHAUST AIR -
c o OUTLET
CD o 1 o r
urmae�e. I!2 NP T T
mYa>�R+ Ym�,aan I (FEMALE)
'1 mon9tasaaY ' I P9� FUEL INL'cT T
j .onxmnmR ' — f
omYY9O+aY.
8
6 I 3 3 % 38 li
I I. 0 620 4 41 313 3 IAI
p MAX N I I N 1 a I L _ 1686 FJ
(VHIGH VOLTAGE
13 t0.57_ 6 ELECTRICAL
[2.5 STUB-UP AREA
ON VOLTAGE COMMUNICATION LEADS
i �•�HIGH VOLTAGE LOAD LEADS
NOTE
DIMENSIONS IN t) ARE INCH EOUIYALENTS.
A.
D* ROHLER C
Y10 19M51.1Q tae
A ro 117 R F Rcv Dna oN<a11
1- 10.21•II N Y DRA)xG 1N•x NYI. 9L p
I .7 1 ,A G•I-I2 Idll lDR Y9l TA9L f e14N YDlTA4!t[A9f$NMR ICT04314 VPV i i• .Ee lo:IryUgL[i1�N�,C nvSt bt 9[NYSEOrtltlllc lyNlte CO
4 i d -, x Y3Y It SCE SNF[T 1 Or 9.ICTI[49N GLR iwLu• rtY n[a14t �4I.EP°o,N`.CL`a:i�evia,tc° 19 or
7 o. d d o DIMENSION PRINT
1!90 C 46 1. DDx wi4-IE
� 14/20REBA 1 -••�^• l,Ix Io-u•❑ ADV•8424 •D
j
2
l 5 4 3
-{ 0. $C3
co
O
1
N
r'
f
1
rvx•
(0
CD (p
W
N
CD
y
0 D D
�• ,�a4 ..�. ,� av�`R III _ OIL FILTER
(Q „..
/Q AIR CLEANS.
kyF
00 OIL DIPSTICK
aid�� ^•*"� ��. �," �
CD
a
IL FILL
EXHAUST
AIR OUTLET -
OIL DRAIN VALVE
CD
.� .,
7
N
A A
• 7EV OAEC 1 Kopltl pii.3(t.UI q.rp.[��Itp Plt(S j U ABET O-E- lo•u•IlnEnoxAnnoi+Eor•u ooxlpli6l��x'J�°`°"""'KOHLERCQ IORM1 Sraas. u.n s ll tt
fn A S•I.12 SEf SX[EI I ICTOSSSSI Vir is i' a YAUIC I.3�[ YM1G[V3YIPIIG,II iYxl[M1 Ca.
(n B 3-JD-Ir S[[SXCCI SOP x. IC11193rJ GE9 iAGtr}♦ �<il CC C tl M1lGxtf 0/ '
• Si"Slo.oY":G�:r�B:L'E YIsR"ne.
DIMENSION PRINT
a �snox to-tan,,,n.m p
0 14/ A _ onx lo•rau
JJx lo•a•n ADV•8424 [•D
[n 8 7 6 5 4 3 2 I
w
3
E(nn
W
{4'