Loading...
HomeMy WebLinkAboutTR-8259A Michael J.Domino, President QF SO(/j", Town Hall Annex John M.Bredemeyer III,Vice-President � Ol0 54375 Route 25 P.O.Box 1 Charles J.Sanders l Southold, New York 11971 Glenn GoldsmithTele hone(631) 765-1892 ski A.Nicholas Kru G �Q p p '`O Fax(631) 765-6641 COMM BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD CERTIFICATE OF COMPLIANCE # 1423C Date: November 27, 2017 THIS CERTIFIES that reconstruction of the existingLmudroom and bathroom area which will increase the footprint of the existing dwelling by 27 square feet, At 65490 Route 25, Breezy Shores Cottage#13, Greenport Suffolk County Tax Map #1000-53-5-12.6 Conforms to the application for a Trustees Permit heretofore filed in this office Dated July 15, 2013 pursuant to which Trustees Administrative Permit#8259A Dated August 21, 2013, was issued and conforms to all of the requirements and conditions of the applicable provisions of law. The project for which this certificate is being issued is for the reconstruction of the existing mudroom and bathroom area which will increase the footprint of the existing dwelling by 27 square feet. The certificate is issued to Graham Willoughby owners of the aforesaid property. Authorized Signature w f �pF SOT Michael J. Domino,President � yQIO Town Hall Annex John M.Bredemeyer III,Vice-President 54375 Route 25� � P.O.Box 1179 Charles J. Sanders y Southold,New York 11971 Glenn Goldsmith �. • O � Telephone (631) 765-1892 A.Nicholas Krupski ��ij'OUitlT`I, � Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD DATE OF INSPECTION: d l - 2 5 Ch. 111 INSPECTION SCHEDULE Pre-construction, hay bale line/silt boom/silt curtain 1 st day of construction % constructed Project complete, compliance inspection. INSPECTED BY: n 0 f(2.Z'&)�r I ev- COMMENTS: 1 PAWIJI CERTIFICATE OF COMPLIANCE: James F.King,President o�QgFQ(,I co Town gall,53095 Main Rd. Bob Ghosio,Jr.,Vice-President �� Gy P.O.Box 1179 Dave Bergen y ae Southold,NY 11971 0 John Bredemeyer Telephone(631)765-1892 Michael J.Domino �1 Fax(631)765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES 72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, TO MAKE AN APPOINTMENT FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO SHALL BE CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE PERMIT. INSPECTION SCHEDULE Pre-construction, hay bale line 9 st day of construction %constructed VProject complete, compliance inspection