HomeMy WebLinkAboutTR-8259A Michael J.Domino, President QF SO(/j", Town Hall Annex
John M.Bredemeyer III,Vice-President � Ol0 54375 Route 25
P.O.Box 1
Charles J.Sanders l
Southold, New York
11971
Glenn GoldsmithTele hone(631) 765-1892
ski
A.Nicholas Kru G �Q p
p '`O Fax(631) 765-6641
COMM
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
CERTIFICATE OF COMPLIANCE
# 1423C Date: November 27, 2017
THIS CERTIFIES that reconstruction of the existingLmudroom and bathroom area which will
increase the footprint of the existing dwelling by 27 square feet,
At 65490 Route 25, Breezy Shores Cottage#13, Greenport
Suffolk County Tax Map #1000-53-5-12.6
Conforms to the application for a Trustees Permit heretofore filed in this
office Dated July 15, 2013 pursuant to which Trustees Administrative Permit#8259A
Dated August 21, 2013, was issued and conforms to all of the
requirements and conditions of the applicable provisions of law. The project
for which this certificate is being issued is
for the reconstruction of the existing mudroom and bathroom area which will increase
the footprint of the existing dwelling by 27 square feet.
The certificate is issued to Graham Willoughby owners of the
aforesaid property.
Authorized Signature
w f �pF SOT
Michael J. Domino,President � yQIO Town Hall Annex
John M.Bredemeyer III,Vice-President 54375 Route 25� � P.O.Box 1179
Charles J. Sanders y Southold,New York 11971
Glenn Goldsmith �. • O
� Telephone (631) 765-1892
A.Nicholas Krupski ��ij'OUitlT`I, � Fax(631) 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
DATE OF INSPECTION: d l
- 2 5 Ch. 111
INSPECTION SCHEDULE
Pre-construction, hay bale line/silt boom/silt curtain
1 st day of construction
% constructed
Project complete, compliance inspection.
INSPECTED BY: n 0 f(2.Z'&)�r I ev-
COMMENTS: 1 PAWIJI
CERTIFICATE OF COMPLIANCE:
James F.King,President o�QgFQ(,I co Town gall,53095 Main Rd.
Bob Ghosio,Jr.,Vice-President �� Gy P.O.Box 1179
Dave Bergen y ae Southold,NY 11971
0
John Bredemeyer Telephone(631)765-1892
Michael J.Domino �1 Fax(631)765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES
72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, TO MAKE AN
APPOINTMENT FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO
SHALL BE CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE
PERMIT.
INSPECTION SCHEDULE
Pre-construction, hay bale line
9 st day of construction
%constructed
VProject complete, compliance inspection