Loading...
HomeMy WebLinkAboutTR-8249 X40 SOUry Town Hall Annex d John M.Bredemeyer III,President ����� Michael J.Domino,Vice-President ,° 4I 4 54375 Main Road P.O.Box 1179 James F.King,Trustee N Southold,New York 11971-0959 Dave Bergen,Trustee �� i0 •� Telephone(631) 765-1892 Charles J.Sanders,Trustee ;4 ,, �i�� Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD CERTIFICATE OF COMPLIANCE #0978C Date: May 7,2014 THIS CERTIFIES that the installation of approximately 135 linear feet of 1-2 ton stone armor over+/-1001b. core stone and filter cloth along toe of and atop existing buried steel bulkhead; and restore eroded berm area landward thereof with+/-400 cubic yards of clean sand and re-vegetate with Cape American beach grass; and re-connect dwelling gutters to leaders to drywells. At 170 Park Avenue Extension, Mattituck,New York Suffolk County Tax Map# 123-8-24.1 Conforms to the application for a Trustees Permit heretofore filed in this office Dated June 20, 2013 pursuant to which Trustees Wetland Permit#8249 Dated July 17, 2013 was issued and conforms to all of the requirements and conditions of the applicable provisions of law. The project for which this certificate is being issued is for the installation of approximately 135 linear feet of 1-2 ton stone armor over+/-1001b. core stone and filter cloth along toe of and atop existing buried steel bulkhead; and restore eroded berm area landward thereof with+/-400 cubic yards of clean sand and re-vegetate with Cape American beach grass; and re-connect dwelling gutters to leaders to drywells. The certificate is issued to DAVID & ELIZABETH ROSS owner of the aforesaid property. Authorized Signature • • John M.Bredemeyer III,President /1„/ guFFtl( Town Hall,53095 Main Rd. Michael J. Domino,Vice-President �,},��0�• eoGy P.O.Box 1179 James F.King ■ y ae ; Southold,NY 11971 Per Dave Bergen `��� Telephone(631)765-1892 Charles J. Sanders y Q.( 4 14,," Fax(631)765-6641 -------,..,•,`ryI1I/ BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD DATE INSPECTION: ,4 t ;;'/ 2-- / f 4, ' Ch. 275 Ch. 111 INSPECTION SCHEDULE Pre-construction, hay bale line/silt boom/silt curtain 1st day of construction • 1/2 constructed IProject complete, compliance inspection. INSPECTED BY: J' Iii ! ' COMMENTS: r !VlCjz ttOd " L) /)7 /5,,X77 ' < ' f f ,y "upA !_,.. of ti t c=rr C2,''s' CERTIFICATE OF COMPLIANCE: )..t f