Loading...
HomeMy WebLinkAboutTR-8083A Michael J. Domino, President ��OF S0Ury0 Town Hall Annex John M. Bredemeyer III,Vice-President ,`O l0 54375 Route 25 P.O. Box 11 Charles J.Sanders l [ Southold,New York 11971 Glenn Goldsmith GQ � 0 Telephone(631) 765-1892 A. Nicholas Krupskiy00UNT O Fax(631) 765-6641 � `I,�� BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD CERTIFICATE OF COMPLIANCE # 1439C Date: December 29, 2017 THIS CERTIFIES that the construction of a 10'x20' approximate stone slab patio on-grade to replace existing stone patio torn up during Hurricane Sandy, and behind existing bluff retaining wall,• with the conditions that the patio is not to be larger than 200 sq. ft.,• the easterly side of the patio be moved back to the west end of the stairs-, and the westerly side of the patio to be cut back away from propertylne; At 19625 Soundview Avenue, Southold Suffolk County Tax Map #1000-51-1-22.2 Conforms to the application for a Trustees Permit heretofore filed in this office Dated January 24, 2013 pursuant to which Trustees Administrative Permit#8083A Dated February 20, 2013, was issued and conforms to all of the requirements and conditions of the applicable provisions of law. The project for which this certificate is being issued is for the construction of a 10'x20' approximate stone slab patio on-grade to replace existing stone patio torn up during Hurricane Sandy, and behind existing bluff retaining wall; with the conditions that the patio is not to be larger than 200 sq ft • the easterly side of the patio be moved back to the west end of the stairs,• and the westerly side of the patio to be cut back away from property line. The certificate is issued to ROBERT OXNAM owner of the aforesaid property. Authorized Signature r i b *pF SOFT Michael J. Domino,President � y�lO Town Hall Annex John M. Bredemeyer III,Vice-President 54375 Route 25P.O. Box 1179 Charles J. Sanders N Southold,New York 11971 Glenn Goldsmith • �� Telephone(631) 765-1892 A. Nicholas Krupski `+oUffm Fax(631) 765,6641 - BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD DATE OF INSPECTION: ,0 VCh. 275 1 INSPECTION SCHEDULE Pre-construction, hay bale line/silt boom/silt curtain 1 st day of construction % constructed Project complete, compliance inspection. INSPECTED BY: C� 0�y�e l S'� �,,Ld COMIuIENTS: 6J U "n'o � 12et& oX&/\, �- 110 L CERTIFICATE OF COMPLIANCE: