CERTIFICATE OF COMPLIANCE
# 1439C Date: December 29, 2017
THIS CERTIFIES that the construction of a 10'x20' approximate stone slab patio on-grade to
replace existing stone patio torn up during Hurricane Sandy, and behind existing bluff retaining
wall,• with the conditions that the patio is not to be larger than 200 sq. ft.,• the easterly side of the
patio be moved back to the west end of the stairs-, and the westerly side of the patio to be cut
back away from propertylne;
At 19625 Soundview Avenue, Southold
Suffolk County Tax Map #1000-51-1-22.2
Conforms to the application for a Trustees Permit heretofore filed in this
office Dated January 24, 2013 pursuant to which Trustees Administrative Permit#8083A
Dated February 20, 2013, was issued and conforms to all of the
requirements and conditions of the applicable provisions of law. The project
for which this certificate is being issued is
for the construction of a 10'x20' approximate stone slab patio on-grade to replace
existing stone patio torn up during Hurricane Sandy, and behind existing bluff retaining wall;
with the conditions that the patio is not to be larger than 200 sq ft • the easterly side of the patio
be moved back to the west end of the stairs,• and the westerly side of the patio to be cut back
away from property line.
The certificate is issued to ROBERT OXNAM owner of the
aforesaid property.
Authorized Signature
r
i b
*pF SOFT
Michael J. Domino,President � y�lO Town Hall Annex
John M. Bredemeyer III,Vice-President 54375 Route 25P.O. Box 1179
Charles J. Sanders N Southold,New York 11971
Glenn Goldsmith • �� Telephone(631) 765-1892
A. Nicholas Krupski `+oUffm Fax(631) 765,6641
- BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
DATE OF INSPECTION: ,0
VCh. 275 1
INSPECTION SCHEDULE
Pre-construction, hay bale line/silt boom/silt curtain
1 st day of construction
% constructed
Project complete, compliance inspection.
INSPECTED BY: C� 0�y�e l S'� �,,Ld
COMIuIENTS:
6J U "n'o � 12et&
oX&/\,
�- 110 L
CERTIFICATE OF COMPLIANCE: