Loading...
HomeMy WebLinkAboutTR-8023 Glenn Goldsmith, President ���®� so Town Hall Annex V� ® 54375 Route 25 A. Nicholas Krupski,Vice President P.O. Box 1179 Eric Sepenoski A Southold, New York 11971 Liz Gillooly Telephone(631) 765-1892 Elizabeth Peeples � y� Fax(631) 765-6641 cow, BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD CERTIFICATE OF COMPLIANCE 9 2291 C Date: September 10, 2025 THIS CERTIFIES that the reconstruction of the existing bulkhead(100.0' L+/-), construction of two returns (20 0' L+/ ) all with fiberglass sheathing; reconstruction of the existing lower steps(60.0 sf. +/ )• wood deck(350 sf.+/ ) upper steps 350 sf. +/-)• and the of deposit clean fill obtained from an upland source in order to replace lands lost along the shoreline and landward of the original bulkheading (1,200.0 cy. +/-), At 6925 Nassau Point Road, Cutchog_ue Suffolk County Tax Map#1000-111-15-9 Conforms to the application for a Trustees Permit heretofore filed in this office Dated December 21, 2012 pursuant to which Trustees Wetland Permit#8023 Dated January 23, 2023,was issued and conforms to all of the requirements and conditions of the applicable provisions of law. The project for which this certificate is being issued is for the reconstruction of the existing bulkhead (100 0' L+/ ) construction of two returns(20 0' L+/-) all with fiberglass sheathing; reconstruction of the existing lower steps(60.0 sf. +/-)• wood deck(350 sf.+/-) upper steps(350 sf. +/-)• and the of deposit clean fill obtained from an upland source in order to replace lands lost along the shoreline and landward of the original bulkheading(1,200.0 cy. +/-). The certificate is issued to VASILIS & CHRISTWE FTHENAKIS owners of the aforesaid property. Authorized Signature Glenn Goldsmith,President *®f SO Town L Town Hall Annex A. Nicholas Krupski,Vice President ,`®� ®�® 54375 Route P.O. Box 1179 Eric Sepenoski Southold, New York 11971 Liz Gillooly zn Telephone(631) 765-1892 Elizabeth Peeples a® Fax(631) 765-6641 ef'DUNT`1,� BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD DATE OF INSPECTION: q 2� r INSPECTED BY: Iy v ''f""`' /Ch. 275 Ch. 111 INSPECTION SCHEDULE Pre-construction, haybale line/silt boom/silt curtain 1st day of construction Y2 constructed Project complete, compliance inspection COMMENTS: K'(P �(Jo'_JP" '• C* 40 c SSA e CERTIFICATE OF COMPLIANCE: