HomeMy WebLinkAboutTR-8023 Glenn Goldsmith, President ���®� so Town Hall Annex
V� ® 54375 Route 25
A. Nicholas Krupski,Vice President P.O. Box 1179
Eric Sepenoski A Southold, New York 11971
Liz Gillooly Telephone(631) 765-1892
Elizabeth Peeples � y� Fax(631) 765-6641
cow,
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
CERTIFICATE OF COMPLIANCE
9 2291 C Date: September 10, 2025
THIS CERTIFIES that the reconstruction of the existing bulkhead(100.0' L+/-), construction
of two returns (20 0' L+/ ) all with fiberglass sheathing; reconstruction of the existing lower steps(60.0
sf. +/ )• wood deck(350 sf.+/ ) upper steps 350 sf. +/-)• and the of deposit clean fill obtained from an
upland source in order to replace lands lost along the shoreline and landward of the original bulkheading
(1,200.0 cy. +/-),
At 6925 Nassau Point Road, Cutchog_ue
Suffolk County Tax Map#1000-111-15-9
Conforms to the application for a Trustees Permit heretofore filed in this
office Dated December 21, 2012 pursuant to which Trustees Wetland Permit#8023
Dated January 23, 2023,was issued and conforms to all of the
requirements and conditions of the applicable provisions of law. The project
for which this certificate is being issued is for the reconstruction of the existing bulkhead
(100 0' L+/ ) construction of two returns(20 0' L+/-) all with fiberglass sheathing; reconstruction of the
existing lower steps(60.0 sf. +/-)• wood deck(350 sf.+/-) upper steps(350 sf. +/-)• and the of deposit
clean fill obtained from an upland source in order to replace lands lost along the shoreline and landward
of the original bulkheading(1,200.0 cy. +/-).
The certificate is issued to VASILIS & CHRISTWE FTHENAKIS owners of the aforesaid property.
Authorized Signature
Glenn Goldsmith,President *®f SO Town L Town Hall Annex
A. Nicholas Krupski,Vice President ,`®� ®�® 54375 Route P.O. Box 1179
Eric Sepenoski Southold, New York 11971
Liz Gillooly zn
Telephone(631) 765-1892
Elizabeth Peeples a® Fax(631) 765-6641
ef'DUNT`1,�
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
DATE OF INSPECTION: q 2�
r
INSPECTED BY: Iy v ''f""`'
/Ch. 275 Ch. 111
INSPECTION SCHEDULE
Pre-construction, haybale line/silt boom/silt curtain
1st day of construction
Y2 constructed
Project complete, compliance inspection
COMMENTS: K'(P
�(Jo'_JP" '• C* 40 c SSA e
CERTIFICATE OF COMPLIANCE: