Loading...
HomeMy WebLinkAboutTR-7897 John M. Bredemeyer III,President ,�i �• �QF sour John Town Hall Annex Michael J.Domino,Vice-President �� 4 O l0 ; 54375 Main Road P.O.Box 1179 James F.King,Trustee Southold,New York 11971-0959 Dave Bergen,Trustee Q Telephone(631) 765-1892 Charles J.Sanders,Trustee ‘�� Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD CERTIFICATE OF COMPLIANCE #0976C Date: May 6, 2014 THIS CERTIFIES that the replacement of formerly existing 4'x30' section of fixed catwalk,hinged ramp, and 8'x24' float secured by two (2)remaining pilings with a new 4'x30' section of fixed timber catwalk(partially in-place of remaining 4'-5' portion of catwalk to be removed); a 3'x20' hinged ramp; and 6'x20' float secured by the two (2)relocated pilings. At 305 Lesters Road, Mattituck,New York Suffolk County Tax Map# 114-7-2.2 Conforms to the application for a Trustees Permit heretofore filed in this office Dated July 27, 2012 pursuant to which Trustees Wetland Permit#7897 Dated August 22, 2012 was issued and conforms to all of the requirements and conditions of the applicable provisions of law. The project for which this certificate is being issued is for the replacement of formerly existing 4'x30' section of fixed catwalk,hinged ramp, and 8'x24' float secured by two(2)remaining pilings with a new 4'x30' section of fixed timber catwalk(partially in-place of remaining 4'-5' portion of catwalk to be removed); a 3'x20' hinged ramp; and 6'x20' float secured by the two (2)relocated pilings. The certificate is issued to 19-64 REALTY CORP., do STEVE MOURKAKOS owner of the aforesaid property. dipt— Apv,„ 8,10,4070.2r_ Authorized Signature • • John M. Bredemeyer 111,President '4" FO(,' Town Hall,53095 Main Rd. G Michael J. Domino,Vice-President P.O.Box 1179,+ `t` y� James F. King x ; Southold,NY 11971 Dave Bergen :Oy �'�� Telephone(631)765-1892 Charles J.Sanders _� 4 •,,i'` Fax(631)765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD DATE OF INSPECTION: /t4 " Z- /7 1/ Ch. 275 Ch. 111 INSPECTION SCHEDULE Pre-construction, hay bale line/silt boom/silt curtain 1st day of construction % constructed / Project complete, compliance inspection. • INSPECTED BY: �, 14, du&- COMMENTS: �r .0:49 7 z) j.6")1 M J iv t10 r° S d 1 c ,1 6 CERTIFICATE OF COMPLIANCE: 1 6124 11