HomeMy WebLinkAbout37117-Z ��pFD Town of Southold Annex 7/9/2012
g� l���
k P.O.Box 1179
cm x 54375 Main Road
o Southold,New York 11971
CERTIFICATE OF OCCUPANCY
No: 35807 Date: 7/9/2012
THIS CERTIFIES that the building SOLAR PANEL
Location of Property: 300 Hamilton Ave, Cutchogue,
SCTM#: 473889 Sec/Block/Lot: 110.-4-12.2
Subdivision: Filed Map No. Lot No.
conforms substantially to the Application for Building Permit heretofore filed in this officed dated
3/28/2012 pursuant to which Building Permit No. 37117 dated 4/4/2012
was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for
which this certificate is issued is:
install a roof mounted Solar Panel system to an existing dwelling as applied for
The certificate is issued to Grathwohl,Glen&Williams,Nancy
(OWNER)
of the aforesaid building.
SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL
ELECTRICAL CERTIFICATE NO. 37117 7/6/12
PLUMBERS CERTIFICATION DATED
(Z-
//4/thor' d Sign ture
o�sur TOWN OF SOUTHOLD
Gyp BUILDING DEPARTMENT
Mo
cz
TOWN CLERK'S OFFICE
• SOUTHOLD, NY
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES
WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS
UNTIL FULL COMPLETION OF THE WORK AUTHORIZED)
Permit#: 37117 Date: 4/4/2012
Permission is hereby granted to:
Grathwohl, Glen &Williams, Nancy
300 Hamilton Ave
Cutchogue, NY 11935
To: install a roof mounted Solar Panel system to an existing dwelling as applied for
At premises located at:
300 Hamilton Ave, Cutchogue
SCTM # 473889
Sec/Block/Lot# 110.-4-12.2
Pursuant to application dated 3/28/2012 and approved by the Building Inspector.
To expire on 10/4/2013.
Fees:
SINGLE FAMILY DWELLING-ADDITION OR ALTERATION $200.00
CO -ALTERATION TO DWELLING $50.00
Total: $250.00
Building Inspector
Form No.6
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
TOWN HALL
765-1802
APPLICATION FOR CERTIFICATE OF OCCUPANCY
This application must be filled in by typewriter or ink and submitted to the Building Department with the following:
A. For new building or new use:
l. Final survey of property with accurate location of all buildings, property lines, streets,and unusual natural or
topographic features.
2. Final Approval from Health Dept. of water supply and sewerage-disposal (S-9 form).
3. Approval of electrical installation from Board of Fire Underwriters.
4. Sworn statement from plumber certifying that the solder used in system contains less than 2/10 of 1%lead.
5. Commercial building, industrial building,multiple residences and similar buildings and installations,a certificate
of Code Compliance from architect or engineer responsible for the building.
6. Submit Planning Board Approval of completed site plan requirements.
B. For existing buildings(prior to April 9, 1957)non-conforming uses,or buildings and"pre-existing" land uses:
1. Accurate survey of property showing all property lines, streets, building and unusual natural or topographic
features.
2. A properly completed application and consent to inspect signed by the applicant. If a Certificate of Occupancy is
denied,the Building Inspector shall state the reasons therefor in writing to the applicant.
C. Fees
1. Certificate of Occupancy-New dwelling$25.00,Additions to dwelling$25.00, Alterations to dwelling$25.00,
Swimming pool$25.00,Accessory building$25.00,Additions to accessory building$25.00,Businesses $50.00.
2. Certificate of Occupancy on Pre-existing Building- $100.00
3. Copy of Certificate of Occupancy-$.25
4. Updated Certificate of Occupancy- $50.00
5. Temporary Certificate of Occupancy-Residential$15.00, Commercial$15.00
Date. 3 ."a 3' �—
New Construction: Old or Pre-existing Building: ✓ (check one)
Location of Property: 300 m��-bn A-4eP eL4C k99 ule_
House No. Street Hamlet
Owner or Owners of Property:
Suffolk County Tax Map No 1000, Section I L O Block 04 Lot I • a-
Subdivision Filed Map. ��5++ 3 Lot: .1-1 A-Q
Permit No. Date of Permit. Applicant:
Health Dept. Approval: Underwriters Approval:
Planning Board Approval:
Request for: Temporary Certificate Final Certificate: f (check one)
Fee Submitted:$ SO
IVI
plicant Signature
pF SO!/r�olo
Town Hall Annex Telephone(631)765-1802
54375 Main Road Fax(631)765-9502
P.O.Box 1179 C roger.riche rt(aD-town.southold.ny.us
Southold,NY 11971-0959
�lyC4UNTY,�c�
BUILDING DEPARTMENT
TOWN OF SOUTHOLD
CERTIFICATE OF ELECTRICIAL COMPLIANCE
SITE LOCATION
Issued To: Glen Grathwohl
Address: 300 Hamilton Ave City: Cutchogue St: NY Zip: 11935
Building Permit* 37117 Section: 110 Block: 4 Lot: 12.2
WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE
Contractor: DBA: Green Logic LLC License No: 43858-me
SITE DETAILS
Office Use Only
Residential X Indoor X Basement X Service Only
Commerical Outdoor X 1st Floor Pool
New Renovation 2nd Floor Hot Tub
Addition Survey Attic Garage
INVENTORY
Service 1 ph Heat Duplec Recpt Ceiling Fixtures HID Fixtures
Service 3 ph Hot Water GFCI Recpt Wall.Fixtures Smoke Detectors
Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors
Sub Panel A/C Blower Range Recpt Fluorescent Fixture Pumps '
Transformer Appliances Dryer Recpt Emergency Fixtures Time Clocks
Disconnect Switches Twist Lock Exit Fixtures TVSS
Other Equipment: PHOTOVOLTAIC SYSTEM to include 24 Sun Power Spr-230 panels,1-Sun Power
Spr-6000 inverter.(5520 wafts)
Notes:
Inspector Signature: Date: July 6 2012
81-Cert Electrical Compliance Form.xls
ti
SOUlyo�o
o�ycoulm'
TOWN OF SOUTHOLD BUILDING DEPT.
765-1802
INSPECTION
[ ] FOUNDATION 1ST [ ] ROUGH PLBG.
[ ] FOUNDATION 2ND [ ] SULATION
[ ] FRAMING/STRAPPING [ FINAL
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) _ [ ] ELECTRICAL (FINAL)
REMARKS: "
� N /
DATE- f INSPECTOR
OF SOUryolo
coulm,�
TOWN OF SOUTHOLD BUILDING DE� PT.
765-1802
INSPECTION .
[ ] FOUNDATION 1 ST [ ] ROUGH PLOG.
[ ] FOUNDATION 2ND [ ] INSULATION
[ ] FRAMING/STRAPPING [ ] FINAL
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) [ ELECTRICAL (FINAL)
REMARKS:
DATE 16,/�Z,,-INSPECTO '
Pacifico Engineering PC Engineering Consulting
700 Lakeland Ave, Suite 2B Ph: 631-988-0000
Bohemia, NY 11716 Fax: 631-382-8236
www.pacificoengineering.com engineer@pacificoengineering.com
June 4, 2012
Town of Southold
Building Department
54375 Route 25, P.O. Box 1179
Southold, NY 11971
Subject: Solar Energy Installation for
Glen Grathwohl
300 Hamilton Ave
Cutchogue, NY 11935
I have reviewed the solar energy system installation at the subject address. The units have been installed in
accordance with the manufacturer's installation instructions and the approved construction drawing. I have
determined that the installation meets the requirements of the 2010 NYS Building Code, and ASCE7-05.
To my best belief and knowledge, the Work in this document is accurate, conforms with the governing codes
applicable at the time of submission, conforms with reasonable standards of practice,with the view to the
safeguarding of life, health', property and public welfare.
Regards,
Ralph Pacifico, PE
Professional Engineer
0 tAEW O
q
\-\ pAC/p,
co cc DECE VE
�Z J U N 18 2012
Rap a „® ngineer BLDG.DEPT.
NY 06 • 4744306 TOWN OF SOUTHOLD
MD.INW Q W !)A= CCM1VM1 Ts.
UNI, f'SOX IS
Iw..�M.wMM�w.�w.f►ww.rr.w�Lw�wwr,Y .. ..
ITOtINWATION(2ND)
rA
ROUGH MkAWMC,
• PLUNlBIi�IG . .
IN$UL•ANION PV.A N.'V. H.
STATE V.UMGY CODE• '
CUE
FINAL
ADDITIONAL.Cl7M1VlENTS .
1 p d
s
TOWN"OF SOUTHOLD BUILDING PERMIT APPLICATION CHECKLIST
BUILDING DEPARTMENT Do you have or need the following,before applying?
TOWN HALL Board of Health
SOUTHOLD,NY 11971 4 sets of Building Plans
TEL: (631) 765-1802 Planning Board approval
FAX: (631) 765-9502 Survey
SoutholdTown.NorthFork.net PERMIT NO. Check
Septic Form
N.Y.S.D.E.C.
Trustees
Flood Permit
Examined qN, ,20 1 a Storm-Water Assessment Form
Contact: G✓5criwL3 I C- LL r,
Approved ,20 [
M �34ail to: a.5 Duntt�l (
Disapproved a/c CJOI.t �m�-}�jr� JN y 1 t9 k e
Phone: (03I- 7 71 . 5!5 a--
Expiration 20 j
Building Inspector
LICATION FOR BUILDING PERMIT
D
MAR 2 8 2012 INSTRUCTIONS Date r4c?t . ;� a 20 L1--
Thi scat MR ���e comple ely filled in by typewriter or in ink and submitted to the Building Inspector with 4
sets of pl ns, accurat® " a e. Fee according to schedule.
b. p an showing location of lot and of buildings on premises,relationship to adjoining premises or public streets or
areas, and waterways.
c. The work covered by this application may not be commenced before issuance of Building Permit.
d. Upon approval of this application,the Building Inspector will issue a Building Permit to the applicant. Such a permit
shall be kept on the premises available for inspection throughout the work.
e.No building shall be occupied or used in whole or in part for any purpose what so ever until the Building Inspector
issues a Certificate of Occupancy.
f.Every building permit shall expire if the work authorized has not commenced within 12 months after the date of
issuance or has not been completed within 18 months from such date. If no zoning amendments or other regulations affecting the
property have been enacted in the interim,the Building Inspector may authorize, in writing,the extension of the permit for an
addition six months. Thereafter, a new permit shall be required.
APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the
Building Zone Ordinance of the Town of Southold, Suffolk County,New York,and other applicable Laws, Ordinances or
Regulations,for the construction of buildings,additions, or alterations or for removal or demolition as herein described.The
applicant agrees to comply with all applicable laws, ordinances, building code, housing code, and regulations, and to admit
authorized inspectors on premises and in building for necessary inspections.
C reeri�Ic L.l_C—
(Signature o applicant or name,if a corporation)
4�s L'ou�-,-E,� 3q A-
�t,t��avh
(Mailing address of applicant)
State whether applicant is owner, lessee, agent, architect, engineer, general contractor, electrician,plumber or builder
Cow C+w
Name of owner of premises G, Vv0
(As on the tax roll or latest deed)
If applicant is a corporation, signature of duly authorized officer
(Name arorate of corp officer)
Builders License No. 44 OaJ`1
Plumbers License No.
Electricians License No. 43 959 , rA P—
Other Trade's License No.
1. Location of I d on which proposed work will be done: n
House Number Street Ham et
County.Tax Map No. 1000 Section l y Block d d- Lot Z -2-
Subdivision_ R�Va4r-e R rat Filed Map No. 53 ► Lot o2-1 4--"1 Fl
2. State existing use and occupancy of premises and intended use and occupancy of proposed construction:
a. Existing use and occupancy
b. Intended use and occupancy c►-tq
3. Nature of work(check which applicable):New Building Addition Alteration
Repair Removal Demolition Other Work Q mo�tgk-A nova,-e;
4. Estimated Cost 9oo Fee (Description)
(To be paid on filing this application)
5. If dwelling, number of dwelling units Number of dwelling units on each floor
If garage, number of cars
6. If business, commercial or mixed occupancy, specify nature and extent of each type of use.
7. Dimensions of existing structures, if any: Front Rear Depth
Height Number of Stories
Dimensions of same structure with alterations or additions: Front Rear
Depth Height Number of Stories
8. Dimensions of entire new construction: Front Rear Depth
Height Number of Stories
9. Size of lot: Front 1 o o Rear too Depth 1
10. Date of Purchase Name of Former Owner
11. Zone or use district in which premises are situated
12. Does proposed construction violate any zoning law, ordinance or regulation? YES NO
13. Will lot be re-graded? YES NO ✓ Will excess fill be removed from premises? YES NO
flo�cZg3
14.Names of Owner of premises len (!�ivo-4h At-,,I Address-E►)a,ton r•rl LL93 9 Phone No.
Name of Architect R2e rFi�o > cheep-,no Address-1dO ���a�—phone No 631-q 89-0000
Name of ContractorG r em LN to L� Address S �3 ttx( Phone No. (v 31•�-11• S c S i
15 a. Is this property within 100 feet of a tidal wetland or a freshwater wetland? *YES NO ✓
* IF YES, SOUTHOLD TOWN TRUSTEES &D.E.C. PERMITS MAY BE REQUIRED.
b. Is this property within 300 feet of a tidal wetland? * YES NO ✓
* IF YES,D.E.C. PERMITS MAY BE REQUIRED.
16. Provide survey,to scale, with accurate foundation plan and distances to property lines.
17. If elevation at any point on property is at 10 feet or below,must provide topographical data on survey.
18. Are there any covenants and restrictions with respect to this property? * YES NO +✓
* IF YES,PROVIDE A COPY.
STATE OF NEW YORK)
SS.
COUNTY IO175:L �C..
,,
f est m A l�t � � being duly sworn, deposes and says that(s)he is the applicant
(Name of individual signing contract)above named,
(S)He is the � �� ✓
(Contractor,Agent, Corporate Officer, etc.)
of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application;
that all statements contained in this application are true to the best of his knowledge and belief, and that the work will be
performed in the manner set forth in the application filed therewith.
Sworn to before me this
3 day of h�a 20
r'
Nota Public BARBARA A.CASCIOTTA Signature of Applicant
Notary Public,State of New York
No.01-CA4894969
Qualified in Suffolk Count m',� -
4 COeneisaion Expires May 11.
4ev-AP
of sot,
Town Hall Annex 41 � Telephone(631)765-1802
54375 Main Road y *AC �ax(631)76,95(�2�
P.O.Box 1179 G @ rouer.richerd0Wn.SQU o 5 nV us
Southold,NY 11971-0959
BUILDING DEPARTMENT
TOWN OF SOUTHOLD
APPLICATION FOR ELECTRICAL INSPECTION
REQUESTED BY: r�a v� Ca sc�oa Date: i3•a3 • �.
Company Name: remt4q tG L ,(2
Name: - O{xv+ v., a t a
License No.:
Address: L -S pt tr1 39 A. SOLC+ a N l I b
Phone No.: (0 Z✓4 711. 5 1 is •
JOBSITE INFORMATION: (*Indicates required information)
*Name:. C ten G va-�k wok
*Address: 3 00 ,=- yn i I+ot\ A-ve: ( U. Oaue Q
*Cross Street:
*Phone No.: (cal • 3 4--4? 30 I C I�Jar�c�/ (�i`l l larvl Sl
Pjarmit No.: ( (
Tax Map District: 1000 Section: I 1 O _ Block: 04 Lot: I Z , a.,
*BRIEF DESCRIPTION OF WORK(Please Print Clearly) �� VY10un SO ,
mocLu U c,
C.I) SunpoWer Sp�ebOOQYN 1 nyei4ee 158 5a-0 W-44+s
(Please Circle All That Apply)
*Is.job ready for inspection: YES / 0 Rough In Final
*Do you need a Temp Certificate: / NO
Temp Information (If needed} -
*Service Size: 1 Phase ' 3Phase 100 150 200 300 350 400 Other
*New Service: Re-connect Underground Number of Meters Change of Service Overhead
Additional Information: PAYMENT DUE WITH APPLICATION
82-Request for Inspection Form
R E LOGIC®
ENERGY
March 23, 2012
Town of Southold
Building Department
Town Hall
53095 Route 25
Southold, NY 11971
Dear Building Inspector:
Please find attached a building permit application on behalf of Glen Grathwohl who has
engaged us to install a roof-mounted (flat to the roof) solar photovoltaic (PV) electric system for
his home at 300 Hamilton Avenue, Cutchogue.
In connection with this application, please find attached:
• Building Permit application
• A Storm Water Assessment Run-off Form
• Certificate of Occupancy Application
• 2 Surveys of the Premises
• Four Engineer's Reports (2 originals and 2 copies)
• Four Visio Diagrams of the proposed system
• Two spec. sheets of the solar panels (SunPower SPR-230WHT)
• Two Spec. sheets of the inverter (SunPower SPR6000m)
• GreenLogic Suffolk County Home Improvement License
• GreenLogic Certificate of Liability Insurance
• GreenLogic Certificate of Worker's Compensation Insurance Coverage
• Installation Manager's Master Electrician's License
• Check for$250 ($200 building permit/$50 CO)
• Application for Electrical Inspection with a check for$100
Please let us know if you need anything else in connection with this application.
Yours truly,
hlv�
Barbara Casciotta
Account Manager
GreenLogic LLC
631-771-5152 ext. 117
GREENLOGIC, LLC •www.GreenLogic.com Tel: 877.771,4330 Fax: 877.771.4320
SOUTHAMPTON/CORPORATE: CUTCHOGUE: MANORVILLE: NEW YORK CITY: ROSLYN HEIGHTS:
425 County Rd. 39A 1070 Depot Lane 40 Woodland Avenue 241 6th Avenue #313 200 S. Service Rd., #108
Southampton, NY 11968 Cutchogue, NY 11935 Manorville, NY 11949 New York, NY 10014 Rosyln Heights, NY 11577
GREENLOGIC®
ENERGY
June 5, 2012
The Town of Southold
Building Department
54375 Route 25
P.O. Box 1179
Southold, NY 11971
Re: Building Permit No. 37117
Glen Grathwohl
300 Hamilton Avenue, Cutchogue
To the Building Inspector:
Enclosed please find the Engineer's Certification Letter and the for Glen Grathwohl's
solar electric system, which we installed at 300 Hamilton Avenue, Southold. Please
arrange to send him the Certificate of Occupancy and close out the building permit.
Please let me know if you have any questions about the installation.
Sincerely,
Barbara Casciotta
Account Manager
GreenLogic LLC
631-771-5152 ext. 117 ® ( Q V
JUN — 7 2012
BLDG. DEPT.
TOWPl OF SOUTHOLD
GREENLOGIC, LLC www.GreedLogic.com Tel: 877.771.4330 Fax: 877.771.4320
SOUTHAMPTON/CORPORATE: CUTCHOGUE: MANORVILLE: NEW YORK CITY: ROSLYN HEIGHTS:
425 County Rd.39A 1070 Depot Lane 40 Woodland Avenue 241 6th Avenue #313 200 S. Service Rd.,#108
Southampton, NY 11968 Cutchogue, NY 11935 Manorville, NY 11949 New York, NY 10014 Rosyln Heights, NY 11577
SOUI�oI
Town Hall Annex Telephone(631)765-1802
54375 Main Road Fax(631)765-9502
P.O.Box 1179
Southold,NY 11971-0959 �O
�yO0UNNI
BUILDING DEPARTMENT
TOWN OF SOUTHOLD
June 11, 2012
GreenLogic LLC
425 County Rd 39A
Southampton, NY 11968
RE: Grathwohl, 300 Hamilton Ave., Cutchogue
TO WHOM IT MAY CONCERN:
The Following Items Are Needed To Complete Your Certificate of Occupancy:
te: Need Certification from an Architect of Engineer to certify the fastening of the panels to the
o system.
0f
Application for Certificate of Occupancy. (Enclosed)
Electrical Underwriters Certificate. (contact your electrician)
A fee of$50.00.
Final Health Department Approval.
Plumbers Solder Certificate. (All permits involving plumbing after 4w84)
Trustees Certificate of Compliance. (Town Trustees#765-1892)
Final Planning Board Approval. (Planning#765-1938)
Final Fire Inspection from Fire Marshall.
Final Landmark Preservation approval.
BUILDING PERMIT: 37117 — Solar Panels
SOUryolo
Town Hall Annex Telephone(631)765-1802
54375 Main Road Fax(631)765-9502
P.O.Box 1179
Southold,NY 11971-0959
�couff ,�
BUILDING DEPARTMENT
TOWN OF SOUTHOLD
June 11, 2012
GreenLogic LLC
425 County Rd 39A
Southampton, NY 11968
RE: Grathwohl, 300 Hamilton Ave., Cutchogue
TO WHOM IT MAY CONCERN:
The Following Items Are Needed To Complete Your Certificate of Occupancy:
"Note: Need Certification from an Architect of Engineer to certify the fastening of the panels to the
roof system.
Application for Certificate of Occupancy. (Enclosed)
Electrical Underwriters Certificate. (contact your electrician)
A fee of$50.00.
Final Health Department Approval.
Plumbers Solder Certificate. (All permits involving plumbing after 4/1184)
Trustees Certificate of Compliance. (Town Trustees#765-1892)
Final Planning Board Approval. (Planning#765-1938)
Final Fire Inspection from Fire Marshall.
Final Landmark Preservation approval.
BUILDING PERMIT: 37117 — Solar Panels
O�*pF SOUTyoI
Town Hall Annex ~ Telephone(631)765-1802
54375 Main Road Fax(631)765-9502
P.O.Box 1179
Southold,NY 11971-0959 Ol ��
yOUNT`I,��
BUILDING DEPARTMENT
TOWN OF SOUTHOLD
June 25, 2012
GreenLogic LLC
425 County Rd 39A
Southampton, NY 11968
RE: Grathwohl, 300 Hamilton Ave., Cutchogue
TO WHOM IT MAY CONCERN:
The Following Items Are Needed To Complete Your Certificate of Occupancy:
Application for Certificate of Occupancy. (Enclosed)
Electrical Underwriters Certificate. (contact your electrician)
A fee of$50.00.
Final Health Department Approval.
Plumbers Solder Certificate. (All permits involving plumbing after 4/1/84)
Trustees Certificate of Compliance. (Town Trustees#765-1892)
Final Planning Board Approval. (Planning#765-1938)
Final Fire Inspection from Fire Marshall.
Final Landmark Preservation approval.
BUILDING PERMIT: 37117 — Solar Panels
I
I
Town of Southold
Erosion, Sedimentation & Storm-Water Run-off ASSESSMENT FORM ;
PROPERTY LOCATION: s cTM.ff: THE FOLLOWING ACTIONS MAY REQUIRE THE SUBMISSION OF A
Ol 3j 1000 1 l d 04- 1 a. a STORM-WATER,GRADING,DRAINAGE AND EROSION CONTROL PLAN
s67�rict e=efron —MERcr —Col— CERTIFIED BY A DESIGN PROFESSIONAL IN THE STATE OF NEW YORru i
i
SCOPE OF WORK - PROPOSED CONSTRUCTION ITEM# / WORK ASSESSMENT Yes No
a. What is the Total Area of the Project Parcels? Will this Project Retain All Storm-Water Run-Off
(Include Total Area of all Parcels located within Generated by a Two(2')Inch Rainfall on Site?
(S.F.!Apes) item will e a run-off created by site
the Scope of Work for Proposed Construction} his ll Include
b. What is the Total Area of Land Clearing clearing and/or construction activities as well as all a
and/or Ground Disturbance for the proposed Site Improvements and the permanent creation of i
construction activity? (S.F.!Acres) impervious surfaces.)
PROVIDE BRIEF PROJECT DESCRIPITON (Provrde Addfaanal Pages as Needed) 2 Does the Site Plan and/or Survey Show All Proposed
Drainage Structures indicating Size&Location?This ❑
,` � Item shall include all Proposed Grade Changes and
2� �unW SO 4' Slopes Controlling Surface Water Flow.
(fAe 3 Does the Site Plan and/or Survey describe the erosion /
LC- Sy S and sediment control practices that will be used to V
control site erosion and storm water discharges. This
Item must be maintained throughout the Entire
Construction Period. r
4 Will thls Project Require any Land Filling,Grading or i
Excavation where there is a change to the Natural
Existing Grade Involving more than 200 Cubic Yards F]
of Material within any Parcel? s
Ij Will this Application Require Land Disturbing Activities
Encompassing an Area In Excess of Five Thousand a
(5,000 S.F.)Square Feet of Ground Surface?
6 Is there a Natural Water Course Running through the
Site? Is this Project within the Trustees jurisdiction ❑
General DEC SWPPP Requirements: Orwithin One Hundred(100')feet of a Wetland or
Submission of a SWPPP Is required for ail Construction activities involving soil Beach?
disturbances of one(1)or more acres; including disturbances of less than one acre that 7 Will there be Site preparation an Existing Grade Slopes
are part of a larger common plan that will ultimately disturb one or more acres of land; which Exceed Fifteen(15)feet of Vertical Rise to —
Including Construction activities involving soil disturbances of less than one(1)acre where One Hundred(100')of Horizontal Distance?
the DEC has determined that a SPDES permit Is required for storm water discharges.
(SWPPP's Shall meet the Minimum Requirements of the SPDES General Permit $ WIII Driveways,Parking Areas or other impervious
for Storm Water Discharges from Construction activity-Permit No.GP-0-10.001.) Surfaces be Sloped to Direct Storm-Water Run-Off ❑
1.The SWPPP shall be prepared prior to the submittal of the Not.The NOI shall be into and/or in the direction of a Town light-of-way?
submitted to the Department prior to the commencement of construction activity.
2.The SWPPP shall describe the erosion and sediment control practices and where 9 Will this Project Require the Placement of Material,
required,post-construction storm water management practices that will be used and/or Removal of Vegetation and/or the Construction of any ❑ r—�/
constructed to reduce the pollutants In storm water discharges and to assure Item Within the Town Right-of-Way or.Road Shoulder
compliance with the terms and conditions of this permit.In addition,the SWPPP shall Area?(Thus Item will NOTlncrude the Installation of Driveway Aprons.)
identify potential sources of pollution which may reasonably be expected to affect the
quality of storm water discharges. NOTE. if Any Answer to Questions One through Nine Is Answered with a Check Mark
3.All SWPPPs that require the post-construction storm water management practice in a Box and the construction site disturbance Is between 5.000 S.F.&1 Acre in area,
component shall be prepared by a qualiffed Design Professional Licensed In New York a Storm Water,Grading,Drainage&Erosion Control Plan is Required by the Town of
that Is knowledgeable In the principles and practices of Storm Water Management. Southold and Must be Submitted for Review Prior to Issuande of Any Building Permit.
(NOTE: A Check Mark(4)and/or Answer for each Question is Required for a Complete Application)
STATE OF NEW YORK, Su, L�
COUNTYOF...........................................SS
Nz°siim e .
That i.........................................................v. .................being duly sworn,deposes and says that he/she is the applicant for Permit,
(Name of individual slgntng Document) /1
Andthat he/she is the .....................................................` ............ ......................................................................,...............
(Owner,Contractor,Agent,Corporate Officer,etc.}
Ommer and/or representative of the Ommer or Owners,and is duly authorized to perform or have performed the said work and to
make mid file this application;that all statements contained in this application are true to the best of his knowledge and belief;and
that the work mOl be performed in the manner set forth in the application filed herewith.
Swom to before rule this;
............. .` ...... ....day ...... ,20.1.E
.. .. ..... ..... .. ............ .
Notary Public:
.............. ......................................
e.
BARBARA A.CASCIOTTA (Signature of Applicant)
FORM - 06110 F40IOry PUblIC,btate ot Now o
No.01-CA4894969
Qualified in Suffolk Cou
Commission Expires May 11,
SURVEY OF
j LOTS 27 & 28
MAP OF PROPERTY
RAVATONE REALTY CORPORATION
FILE No. 539 FILED DECEMBER 22, 1930
° SITUATE
CUTCHOGUE
$ TOWN OF SOUTHOLD
SUFFOLK COUNTY, NEW YORK
1<Dp� v'�° ° S.C. TAX No. 1000-110-04-12.2
'lea e SCALE 1"=30'
JULY 29, 2008
° ° O ° DECEMBER 11, 2009 REVISED PROPOSED HOUSE
a�����Py JANU RY 17, 2o11 ADDED DRYWELLS
TAFOUNDATION
FEBRUARY 10, 2011 FOUNDATION LOCATION
JUNE 22, 2011 FINAL SURVEY
1/ °° AREA = 000 ft.
0.344 ac.51
CERTIFIED TO:
00+ m GLEN GRATHWOHL
PRe° Gsr' �A� 00,
NANCY WILLIAMS
�� °
9 .
Cr 0 SEPTIC SYSTEM TIE MEASUREMENTS
°°o- °
a o �• 9cv� oat HOUSE° HOUSE HOUSE
y0 F000Poi �90 F CORNER DA CORNER
o 4 j SEPTIC TANK 48' 37'
COVER
LEACH�y� \°" p Op 2�1 COVERING POOL 50' 50'
LEACHING POOL
ga �� 61' 50'
0
• _ 1,0`� O, COVER 2
�0T $oe PAR LEACHING POOL 61' 37'
o ti• COVER 3
/ 10- eo
,pp
L o
3� OOP J I °� PREPARED GCeRBANCF`WITH THE MINIMUM
° n BY yl�FO TTI TE SPU RO L;ANDSADOPTEDD
S.O °Goa / •� Y'� F Qt�� k &;tll YORIC-.STATE LAND
IT f
e'
Al
N.Y.S. Lic. No. 50467
UNAUTHORIZED ALTERATION OR ADDITION
TO THIS SURVEY IS A VIOLATION OF
SECTION 72 OF THE NEW YORK STATE
LA
EDUCATION LAW. Nathan®Ta t Corwin III
I
COPIES OF THIS SURVEY MAP NOT BEARING
THE LAND SURVEYOR'S INKED SEAL Lane! Surveyor
EMBOSSED SEAL SHALL NOT BE CONSIDERED
TO BE A VALID TRUE COPY.
CERTIFICATIONS INDICATED HEREON SHALL RUN
ONLY TO THE PERSON FOR WHOM THE SURVEY
IS PREPARED,AND ON HIS BEHALF TO THE Successor To: Stanley J. Isaksen, Jr. L.S.
TITLE COMPANY, GOVERNMENTAL AGENCY AND Joseph A. Ingegno L.S.
LENDING INSTITUTION LISTED HEREON,AND
TO THE ASSIGNEES OF THE LENDING INSTI Title Surveys — Subdivisions — Site Plans — Construction Layout
TUTION. CERTIFICATIONS ARE NOT TRANSFERABLE.
PHONE (631)727-2090 Fax (631)727-1727
THE EXISTENCE OF RIGHT OF WAYS OFFICES LOCATED AT MAILING ADDRESS
AND/OR EASEMENTS OF RECORD, IF
ANY, NOT SHOWN ARE NOT GUARANTEED. 1586 Main Road P.O. Box 16
Jamesport, New York 11947 Jamesport, New York 11947
S U N POWE R E / 230 SOLAR PANEL
•
EXCEPTIONAL EFFICIENCY AND PERFO.
I i �
i i P I
BENEFITS
ID
Highest Efficiency
SunPowerT Solar Panels are the most SERIES
efficient photovoltaic panels on the
market today.
i
More Power
Our panels produce more power in
the same amount of space—up to 50%
i more than conventional designs and
100% more than thin film solar panels. j
Reduced Installation Cost l
More power per panel means fewer
panels per install. This saves both time
and money.
l I I
I
Reliable and Robust Design
Proven materials, tempered front glass, TM l
and a sturdy anodized frame allow The SunPower 230 Solar Panel provides today's highest efficiency and
panel to operate reliably in multiple performance. Utilizing 72 all back-contact solar cells, the SunPower
mountingconfigurations. °
9 230 delivers a total panel conversion efficiency of 18.5/°. The panels
reduced voltage-temperature coefficient and exceptional low-light
performance attributes provide outstanding energy delivery per peak
power watt.
9
I
SunPower's High Efficiency Advantage ; l
20% 18% 19% 1
15%
10%
10%
5/°
i I
0/°
Thin Film Conventional SunPower SunPower
E18 Series E19 Series
I
SPR-230E-WHT D C us
i I
/ 230 SOLAR PANEL
• •
EXCEPTIONAL EFFICIENCY AND PERFORMANCE
Electrical Data I-V Curve
Measured at Standard Test Conditions(STC):iaadionca of 1000w/ms,AM 1.5,and cell tempam1um 25•C J
Peak Power(+5/-3%) Pmax 230 W 7,0 �
1000 W/m=at 50'C ! )
Efficiency rl 18.5% 6,0 -
1000 W/m2
Rated Voltage Vmpp 40.5 V 5,0
g 0 800 W/m2 !
Rated Current Impp 5.68 A 4 i
Open Circuit Voltage Voc 48.2 V 2 3,0 500 W/nn
2,0
Short Circuit Current Isc 6.05 A j
Maximum System Voltage UL 600 V 00 200 W/W
Temperature Coefficients Power(P) -0.38%/K 0 10 20 30 40 50 60 ' {
{
! Voltage(Voc) -132.5mV/K Voltage M i I
!l Current(Isc) 3.5mA/K 11 Current/voltage characteristics with dependence on irradiance and module temperature. ( {
I NOCT 45a C+/-2a C
Series Fuse Rating 20 A ( Tested Operating Conditions
Temperature -400 F to+185o F(-40o C to+85'C)
Mechanical Data 113 psf 550kg/M2(5400 Pa)front—e.g.snow; t i
Max load 245ksf s
Solar Cells 72 SunPower all-back contact monocrystalline 50 p g/m (2400 Pa)front and back—e.g.wind
Front Glass High transmission tempered glass Impact Resistance Hai[ 1 in (25 mm)at 52mph (23 m/s) J
Junction Box IP 65 rated with 3 bypass diodes
Warranties and Certifications 1 I I
Dimensions:32 x 155 x 128 (mm)
Warranties 25 year limited power warranty J
Output Cables 1000mm length cables/MultiContact(MC4)connectors
Frame Anodized aluminum alloy type 6063 (black) 10 year limited product warranty
r i j
I Weight 3 3.1 lbs. (15.0 kg) 1 Certifications Tested to UL 1703.Class C Fire Rating
i
Dimensions i
Grounding Holes
2X 1200 Il
2X 200 [47.24]
MM 12 06.6 4X 180
(IN) [7.851 [.26] [7.07]
2X 30 �J 2X 577 8X 04.2 4X 231
[1.19] [22.70] [.17] [9.09]
F 2X[1.11.0] 1
! i
798 6X 754
[31.42] 2X 04.2 [29.69]
[.17]
1559 46 I 4X 322 2X 915 2X 199.51
[61.39] [1.81] "'III IIIFFF [12.69] [36.02] [7.85]
4X 12 2X 1535
[.47] [60.45]
[
CAUTION: READ SAFETY AND INSTALLATION INSTRUCTIONS BEFORE USING THE PRODUCT.
Visit 5unpowercorp.com for details
d SUNPOWER and the SUNPOWER Iago are trademarks or registered trademarks of SunPower Corporation. sunpOWercorp.com I
f m February 2010 SunPower Corporation.All rights reserved.Specifications included in this datasheet are subject to change without notice. Document#001-60680 Rev 0R EN )
I ` t
Pacifico Engineering PC I�'; Engineering Consulting
700 Lakeland Ave, Suite 2B - I`=, "a Ph:631-988-0000
Bohemia, NY 11716 Fax: 631-382-8236
www.pacificoengineering.com �__— _ engineer@pacificoengineering.com
February 24,2012ie0 V IEp A IS ;DOTED
Town of Southold
Building DepartmentB.P. # 2 7 /�
54375 Route 25, P.O. Box 1179
Southold, NY 11971 BY
NOTIFY BUILDING DEPARTMENT AT
Subject: Solar Energy Installation for 76:54 -62 3 AIM TO 4 PM FOR THE
Glen Grathwohl ".JlNt,, INSPECTIONS:
300 Hamilton Ave riI_,r.l,.;n;I,,)N -TWO REQUIRED
Cutchogue, NY 11935 r,�k I'J`.JRED CONCRETE
- RAMING,PLUMBING,
-'' SING. ELECTRICAL&CAULKING
z INSULATION
d RNAL- CONSTRUCTION &ELECTRICAL
L US, BE COMPLETE FOR C.O.
ELECTRICAL ALL CONSTRUCTION SHALL MEET THE
INSPECTION REQU �� R=1UiREMENTS OF THE CODES OF NEW
YORK STATE NOT RESPONSIBLE FOR
DESIGN OR CONSTRUCTION ERRORS.
I have reviewed the roofing structure at the subject address. The structure can support the additional weight of
the roof mounted system. The units are to be installed in accordance with the manufacturer's installation
instructions. I have determined that the installation will meet the requirements of the 2010 NYS Building Code,
and ASCE7-05 when installed in accordance with the man�f�at+yrs�ilt�Ui�ti,'s�'i[]
Roof Section A VV 6T; ��`""AII la OR
mean roof height 12 ft U S t� IS UNLAWFUL
pitch 12 /12
roof rafter 2x6b"-�:J�F CE TIF LATE
rafter spacing 16 in OC a� L i f_ RA
Reflected roof rafter span 4.4 ft t 4.n (2°'�> kJ i /`�I K u"W8
Table R802.5.1(1) max 13.3 ft
The climactic and load information is below:
CLIMACTIC AND Ground Wind Live load, point
GEOGRAPHIC DESIGN Category Snow Load, Speed,3 pnet30 per
sec gust ASCE 7, pullout Fastener type
,
CRITERIA Pg load,lb
mph psf
Roof Section A C 20 120 31 635 5/16"dia screw, 4-1/2"length
r
Cr I
', w I
Ralph Pacifico, PE ._ �7LU
Professional Engineer ,gyfs
m 1
Ralph Pa :fico,Prdfe naf Engineer
- -
NY 0661827 N 12dGE04744306
i
I
-IvLOG 1C
ELIMINATING THE COST Of ENERGY
0
7XVVxXxx
i
I
DRAWING NUMBER: Pad fico Engineering PC
1 OF 5 PO Box 1448,Sayville,NY 11782
631-9804MM' www.pacifcoengineedng.com
SURFACE 1 LAYOUT *Always double check measurements NYLcC66162 NJ`Lc824GE047443DO
GreenLogic, LLC—Approved 5.52kW
Layout 24 Sunpower 230w Panel Dimension =61.39"x31.42"
Array Length = 251.36" o` r� Vi' •
UniRac Sunframe o
Glen Grathwohl O Array Height= 188.67" ��� VACi
Azimuth = 220 g Q� � �c fr\1
300 Hamilton Ave Surface Dimensions =452"x253" �� �� ,,J o
Pitch = 45 �
Cutchouge, NY = Magic# = 62.14" n a� w
Scale 3/16 1.0 �,t w
ISSUES!SPECIAL INSTRUCTIONS �
PROJECT COMPONENT COUNT n C" %y' <f
Sunpower 230w
A)Attachment type and count: 26 Green Fasten Retro-Fit. sF 0661a2
0 Attachment Point \�A0FP55\0
B) Rail type and count: UniRac Sunframe o UniRac Sunframe
2x6"Douglas Fir Rafters 16"On Ralph Pacifico Professional Engineer
Center NYS I ill 066182 NJ Lid!249EO4744300
Layout Created By: MVP Date: 2-16-12
k E_[_'N LOG IC'
EljFRGY
ELIMINATING THE COST OF ENERGYA !X
O
I
Hinge in roof 3'3" from
f
bottom row of shingles.
Place top row of
attachments 9" down
from ridge to avoid this.
i
L 11
i
I IL JL
DRAWING NUMBER: Pacifico.Engineering PC
2 OF 5 PO Box 1448,Sayville,NY 11782
631-988-0000 www.pacifeoengineen'ng.com
SURFACE 1 ATTACHMENTS * Ralph Pacifico,Professional Engineer
Always double check measurements NYLic066182 NJLic 24GE04744300
GreenLogic, LLC-Approved 5.52kW
Panel Dimension =61.39"x31.42"
Layout 24 Sunpower 230w �
Array Length = 251.36" r NEbV -Z-,
UniRac Sunframe f r� Y ��,
Array Height = 188.67" ,V S��a PAC�p
Glen Grathwohl Azimuth = 220
300 Hamilton Ave Pitch = 45e Surface Dimensions =452"x253" CO �`�✓ ;<< l o
Cutchouge, NY Scale 3/16" - 1.0 Magic# = 62.14" ` x W
ISSUES/SPECIAL INSTRUCTIONS 0i
PROJECT COMPONENT COUNTI Sunpower Mw
A)Attachment type and count: 26 Green Fasten Retro-Fit. ��� 06610 w�
• Attachment Point fiESS}o��
B S1) Rail type and count: UniRac Sunframe o UniRac Sunframe � .
2x6°Douglas Fir Rafters 16"On Ralph Pacific
o Professional Engineer
Center NYS Lidt 066182 NJ LidJ 249E04744300
Layout Created By: MVP Date: 2-16-12
"FEf"LOGIC0
ELIMINATING THE COST OF ENERGY
0
A
3x8 on SPR6000m
DRAWING NUMBER: Pkifico Engineeiing PC
PO Box 1448.Sayville;NY 11782
30F5 631-988-o000 www.pacificoengineeLR'ng.com
SURFACE 1 STRINGING Ralph Pacifico,Professional Engineer
*Always double check measurements NY Lid Offil b2 NJ Li.,24GE047"300
GreenLogic, LLC—Approved 5.52kW Panel Dimension =61.39"x31.42"
Layout 24 Sunpower 230w UniRac Sunframe Array Length = 251.36"Glen Grathwohl Azimuth = 220' Array Height= 188.67"Surface Dimensions =452"x253"
300 Hamilton Ave Pitch = 45'
Cutchouge, NY Scale 3/16" = 1.0' Magic#= 62.14"
PROJECT COMPONENT COUNT ISSUES/SPECIAL INSTRUCTIONS
Sunpower230w
A) Attachment type and count: 26 Green Fasten Retro-Fit.
0 Attachment Point
13) Rail type and count: UniRac Sunframe — UniRac Sunframe
24"Douglas Fir Rafters 16"OnRalph Pacifico Professional Engineer
Center 1182 NJ Llc#249ED4744300
Layout Created By: MVP Date: 2-16-12
LOGIC"'
ELIMINATING THE COST OF ENERGY
Material List _QM Rail Material List OM
:co-Fasten Green Fasten Flashing 26
an Green Fasten Square Aluminum Blocks 26
5/16"x4.5"SS Lag Bolts 26
5/16"Stainless Steel Washers 26
DRAWING NUMBER: Pacifico Engineering PC
4 OF 5 Po Box,448,.sayv7le,NY 11782
631-988-PM0 www.pad0coengineering.com
MATERIAL LIST 'Always double check measurements. Ralph Pacdioo,Professional Engineer
NY Lic C66182 NJ Lic 24GE04744360
GreenLogic, LLC—Approved 5.52kW
Layout 24 Sunpower 230w Panel Dimension = 61.39"x31.42"
UniRac Sunframe Array Length
Glen Grathwohl Azimuth = 2200 Array Height= /` � yeY` PAc/F,c
300 Hamilton Ave Pitch = 450 Surface Dimensions = / Co �� o
Cutchouge, NY Scale 3/16" = 1.0' Magic#
PROJECT COMPONENT COUNT
A Attachment Sunpower 230w mP C /
type and count: os,.
• Attachment Point �aq
B) Rail type and count: UniRac Sunframe — UniRac Sunframe DFC-SS%Ol
2x_" Douglas Fir
Layout Created By: MVP Date: 1-16-12
Rafters 16" On Center Ralph Pacifico Professional Engineer
NYS L cq 066182 NJ Lic#249E04744300
NE'NLOGIC'
W11-IM.ME AST Of ENERGY '
I ^
I
I
I
I
I
I
18" Walkway �
I
_Xxxxxx_
VV
/V\XXXIxXAX
x XXX
I
I
o I
f
T
{ t
DRAWING NUMBER: Pacifico Engirieering PC
5 OF 5 PO 130 1448,S�yvlle,NY 11762 .
631._§i 000 vrww.padficoengineering.ccm
FAST TRACK PERMIT *Always double check measurements NY LieD6618 NJUc524G1Eo4744300
GreenLogic, LLC-Approved 5.52kW
Layout 24 Sunpower 230w Panel Dimension = 61.39"x31.42" jF E �
= r �'
UniRac Array Length
Sunframe _ �/G�N pAc/F�
Glen Grathwohl Array Height- < r\
Azimuth = 2200 y g 0
300 Hamilton Ave Pitch =45° Surface Dimensions
,r
Cutchouge, NY Scale 3/32" = 1.0' Magic# _ v l I a W
ISSUES/SPECIAL INSTRUCTIONS
PROJECT COMPONENT COUNT
A) Number of Roof Layers: 1 D) Added Roof Load of PV System Sunpower 230w 066182 IV
B) Height above Roof Surface: 4" 3.5 PSF Attachment Point ` �9� OFESS\o�P
C) Materials Used: UniRac Eco-Fasten Attachments,Sunframe o UniRac Sunframe
Racking, Sunpower Panels 2x6"Douglas Fir Rafters 16"On Ralph Pacifico Professional Engineer
ated.By: MVP Date: 2-16-12 Center NYS Lld#066162 NJ Lid#24SED4744300
Layout Cre