HomeMy WebLinkAboutTR-7405 Glenn Goldsmith, President so Town Hall Annex
A. Nicholas Krupski,Vice President ®amu ®�® 54375 Route 25
P.O. Box 1179
Eric Sepenoski Southold,New York 11971
Liz Gillooly Telephone (631) 765-1892
Elizabeth Peeples Fax(631) 765-6641
C®UNTY,�
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
CERTIFICATE OF COMPLIANCE
# 1972C Date: October 30, 2022
THIS CERTIFIES that the addition of a 11'x21' covered sunroom to the southeast of the existing
structure; raise the existing roof over the existing kitchen/living room area; and add 24 square feet to the
existing deck; with the condition of the installation of gutters to leaders to drywells to contain roof runoff
and in accordance with Chapter 236 of the Town Code Storm Water Runoff;
At 1185 Fleetwood Road, Cutchogue
Suffolk County Tax Map#1000-137-4-27
Conforms to the application for a Trustees Permit heretofore filed in this
office Dated August 31, 2010 pursuant to which Trustees Wetland Permit#7405
Dated September 22, 2010,was issued and conforms to all
the requirements and conditions of the applicable provisions of law. The project for which
this certificate is being issued is for the addition of a 11'x21' covered sunroom to the southeast of the
existing structure; raise the existing roof over the existing kitchen/living room area; and add 24 square
feet to the existing deck; with the condition of the installation of gutters to leaders to dawells to contain
roof runoff and in accordance with Chapter 236 of the Town Code Storm Water Runoff.
The certificate is issued o Annette Cam bell owner of the aforesaid property.
Authorized Signature
Glenn Goldsmith, President a� Town Hall Annex
> 54375 Route 25
A. Nicholas Krupski,Vice President P.O. Box 1179
Eric Sepenoski Southold, New York 11971
Liz Gillooly ^� Telephone (631) 765-1892
Elizabeth Peeples Fax (631) 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
DATE OF INSPECTION: as ZZ
INSPECTED BY:
Ch. 275 Ch. 111
INSPECTION SCHEDULE
Pre-construction, haybale line/silt boom/silt curtain
1St day of construction
'/2 constructed
Project complete, compliance inspection
COMMENTS: _k f e 4 ck1wP( 15-
s
/I Ar P-gr
C*'%, le 13fV{ cc-C.
CERTIFICATE OF COMPLIANCE:
r1 S
Glenn Goldsmith, President SDE so(/rTown Hall Annex
A.Nicholas Krupski,Vice President ,`O� �ol� 54375 Route 25
P.O. Box 1179
John M. Bredemeyer III
Southold,New York
11971
Michael J. Domino
G @ Telephone(631) 765-1892
Greg Williams �� Fax(631) 765-6641
"yC4UNV,��
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
DATE OF INSPECTION: -3L J 1 /�]"CAMPZ��bQ��N•k�
J
INSPECTED BY: 1\J1
Ch. 275 Ch. 111
INSPECTION SCHEDULE
Pre-construction; haybale-.line/silt, boom/silt curtain
1st day of construction
% construbted
Project complete, compliance inspection
COMMENTS:
Nee ks �v44vs l '40
—5Irj iroo/A )s dV� G��- Ne12A d , wc1IS 7�0 rsJ�°_.
CERTIFICATE OF COMPLIANCE:
Jill M. Doherty, President
James F. King, Vice-President
Dave Bergen
Bob Ghosio, Jr.
John Br~demeyer
Town Hall, 53095 Main Rd.
P.O. Box 1179
Southold, NY 11971
Telephone (631) 765-1892
Fax (63 I) 765-6641
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES 72
HOURS PRIOR TO COMMENCEMENT OF THE WORK~ TO MAKE AN APPOINTMENT
FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO SHALL BE
CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE PERMIT.
INSPECTION SCHEDULE
Pre-construction, hay bale line
I st day of construction
½ constructed
V/Project complete, compliance inspection.