Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
TR-7210
Jill M.Doherty,President Qf SOUryo Town Hall Annex James F.King,Vice-President ,`O l0 54375 Main Road Dave Bergen F.O. Box 1179 Southold,New York 11971-0959 Bob Ghosio,Jr. y John Bredemeyer Telephone(631) 765-1892 COU '� Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD CERTIFICATE OF COMPLIANCE # 0586C Date September 22, 2010 THIS CERTIFIES that the 77' of double.row of stone at toe of dune,underlain with filter fabric and core stone with the placement of sand over stone and plantings, and stone steps At 370 Harbor Rd., Orient Suffolk County Tax Map #27-4-6 Conforms to the application,for a Trustees Permit heretofore.filed in this office dated 10/22/00 pursuant to which Trustees Wetland Permit#7210 and Coastal Erosion Permit #7210C dated 11/18/09 were issued and Amended on 9/22/10 and conforms to all of the requirements and Conditions of the applicable provisions of law.. The protect for which this certificate is being issued is for / 77' of double row of stone at toe of dune, underlain with filter fabric and core stone with the - placement of sand over stone and plantings, and stone steps. The certificate is issued to YAN RIEGER owner of the aforesaid property. uthorized Signatur Jill M.Doherty,President QF SO!/ryQ Town Hall Annex James F.King,Vice-President h� l� 54375 Main Road Dave Bergen P.O. Box 1179 Southold,New York 11971-0959 Bob Ghosio,Jr. y • O@ Telephone(631) 765-1892 John Bredemeyer Q Fax(631) 765-6641 Irou BOARD OF TOWN TRUSTEES TOWN.OF SOUTHOLD September 22, 2010 Mr. Yan Rieger 370 Harbor Rd. P.O. Box 491 Orient, NY 11939 RE: 370 HARBOR RD., ORIENT SCTM#27-4-6 Dear Mr. Rieger: The following action was taken.by th'e.Southold Town Board of Trustees at their Regular .Meeting held on Wed., September 22, 2010 RESOLVED, that the Southold Town Board of Trustees APPROVES the Amendment to Wetland Permit#7210 and.Coastal Erosion Permit#7210C to allow for two rows of stone at the toe of the dune, and as depicted on the plan received on 9/16/10 and stamped approved on 9/22/10. This is not a determination from any other agency. Sincerely, Jill Doherty, Preside Board of Trustees JMD:Ims f Jill M.Doherty,President if SO(/�yO Town Hall Annex James F.King,Vice-President 1 54375 Main Road P.O.Box 1179 Dave Bergen Southold,New York 11971-0959 Bob Ghosio,Jr. G Q John Bredemeyer Telephone(631) 765-1892 U '� Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD DATE OF SPECTION: o V� 3 Ch. 275 v Ch. 111 INSPECTION SCHEDULE Pre-construction, hay bale line/silt boom/silt curtain 1 St day of construction constructed V Project complete, compliance inspection. INSPECTED BY: COMMENTS: le 40 zu � Lh 'i i CA,' ✓A'o- ! Q e3 4 a r zs_ -0� svb r"i EGG v Ad- 6 -} i0l&ns OR,Lb Af CERTIFICATE OF COMPLIANCE: James F.King,President ��OF SUUryo Town Hall Jill M.Doherty,Vice-President 53095 Route 25 Peggy A. Dickerson P.O.Box 1179 Southold,New York 11971-0959 Dave Bergen G Q Bob Ghosio, Jr. Telephone(631)765-1892 COU '� Fax(631)765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES 72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, TO MAKE AN APPOINTMENT FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO SHALL BE CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE PERMIT. INSPECTION SCHEDULE Pre-construction, hay bale line 1 st day of construction % constructed Project complete, compliance inspection. Rieger Art & Design 0 W E AUG 16 2010 Southhold Town Board of Trustees yan & francoise deger 08/16/10 370.harbor rd.box 491 orient,n.y. 11957-0491 Wifax (631)323-2579 fyr2@optoniine.net Board of Town Trustees James King, President Jill Doherty, Vice-President Peggy A. Dickerson Dave Bergen Bob Ghosio Jr. Lauren Standish - Secretarial Assistant Elizabeth Cantrell, Clerk Town Hall Annex Building 54375 Route 25 P.O. Box 1179 Southold NY 11971 Re: Demand for a wetland permit. Deer Mister King, I would like to thank you and all Town Trustees for the approval of our first Application. We contracted Latham Sand and Gravel Company for the implementation as per permit. Unable to obtain and handle the size of rocks indicated on the submitted drawing he suggested to divide the rocks in two and place them in a similar fashion Being unaware of the formality required and being unable to locate a contractor with heavier equipment on the north fork,I procked with Latham Gravel. We are herewith asking the Trustees to consider the amended project plan submieed Enclosed please find the amended scale drawing. e ec 1 yours L Rieg James F.King,President S"\OF SUUTy� Town Hall Jill M. Doherty,Vice-President ,`O l0 53095 Route 25 P.O. Box 1179 Peggy A. Dickerson Southold,New York 11971-0959 Dave Bergen lw John Holzapfel 0 aQ Telephone(681) 765-1892 IyCOU Fax(631) 76� 5-6641 D E E BOARD OF TOWN TRUSTEES AUG 16 2010 TOWN OF SOUTHOLD SOuthhold Town Board of Trustees APPLICATION FOR AN AMENDMENT TO A WETLAND PERMIT DATE OWNER / 0 R I PHONE i�3 ADDRESS 3 7C Ll A f� j D ff R A D AGENT PHONE ADDRESS , PROPERTY LOCATION 3 7_0 f (-1 pe�/ OR `�lam41I l ' �'PI , TAX MAP NO. 2 7 I/We request an Amendment to Permit# t D to Signed By: rcrcmi i. - INSPECTION SCHEDULE Pre-Construction, hay bale line 1st day of construction %a constructed Project complete, compliance inspection. 37o 1 r A JUL 2 2 2010 Southholtl Town Board of Trustees FROM :RIEGER/LITURGICART+DESIGP FAX NO. Jul. 22 2010 02:02PM P1 Q 2 2 2010 Sau �>✓/ Boar«hOld Toi • `—.. inenna F W;"G,'PraciAd m. Q� V�f� Tnavn Roll .Till m nnhPrfyr,VirR_ProciAont �t0 � 53095 Route 25 P.O.Box 1179 Peggy A.Dickerson Southold,New York 11971-0959 Dave Bergen 33ob Cl- 1-, Jr. TPl vk nr(AA117RF_15247 ���DUIVZ'1, Fax(01)765-6641 ROAIW OF TOWN TRUSS TOWN OF SOUTHOLD YOU ARE REQUIRED TO CONTACT THE OFFICE OF THE BOARD OF TRUSTEES 72 HOURS PRIOR TO COMMENCEMENT OF THE WORK, TO MAKE AN APPOINTMENT FOR A PRE-CONSTRUCTION INSPECTION. FAILURE TO DO SO SHALE. BE CONSIDERED A VIOLATION AND POSSIBLE REVOCATION OF THE one ,pole T',,,� a Number I. ONE - DRI�/EWAY V i I Story p p �i E.. ••e • •o <i...\. r EL = ' Frame . � � ._ � ; Garage c� �:. �''�� � ,� � _�`,;�'• 't`o:. ) '�`��.,:° — trelIts for 22.0' R111111, access to +, � -n ,' �Cem '�• _. 12 gcirage I..,-�„ �1Central .............. y �) 2 I ,�: o• 4 �� .Cem �'' �.... AUG20101 if `•�•„,' OAD roROHARO:,.o j•. Fr o0 SOUtflhold Town / ! Club �I� Board of Trustees I Story a calve h x �, a' j ) s . - Q ,. . �e }� +• ••.� ••�..• Frame Hoy P� 5e' m 370 Harb ¢co or Road '°•WE ';J • • �Po� ,' sn eo \e .,` J TV. ry�p' F.Lj CD .' s Orient,New York 11957 i 9 2 �"•sF °x •' :; ;..,..: _ 1 ;�. o o 48.2 cr i\ 1J INUOCI '' 'T h• CD CA CD CD W :. a p O O o P5 10 2 • ......... CD CD •�4 CD "�•` a cr El c`D a O �; "� d. � / � �� : ; � BA,Y io a Peters.NeP co t✓ Q. i j eoa 1-a43011 CD W (�Cp papd� '"'r r� •>�' I _ 7., •'/0�* 1 i I.1 y __.... -0A RD OF E6v\9S L.L.:-J CD rA 11�••�� ~ �V TOWN OF SO GOL � a14 O r'�' �.. �," � � ink*S 10 28.: - 8� `S'��,'.',� !.�`.•a, 'i r � . CD CD N APPROv J . o E'ER TERMS ;ice ,_�d`•� �-•�-, 4r.ND CONDITIONS OF C' zQ p. BEAGH PERMIT NO. �—l��IFJ'D3017IUoogI fit . Z • q l DATE (Ele lineg A.H.Ka� . .� - _ .. _�.: >.-...:. ss�-::.a,:�.:e...,-.......�.;� :�cs..+nt—•--ram:- ....�. .. .,,.,..L _.C-a9 0.�_ _ .:..�- CR�SSV�IEW DIAGR" A �y : .`...... . p2��2L7L •�.� .�` pqo•••....•• • k.. UNU ' :•. Village.. °y ( `emu Cem ... i Y'` m En PO/lO` {•�Tl t... ��.... ((( NE -�i1 entral �. S .-.... .. ..6C `"G`. .. s0• ot,o "rem ................. • �/ .."},/�-1..?.l.fief�G.m�-�"4•'-�FP'3F.)�g� - !f� �NRE•`PEq"S GRC/+C9R0:'�o •p'}fi�J `. "` f BEn t S T. 'vER 04 ` /.' Y S M L • ...6 P� o �q ''`, '•mow- 2 Peters Ne 10 . �t�a.'4-�r,j' if....r�n-•¢ :.,..{..�1u- s_, '��i.� � r-.'�i,�,-- �!""� � e5+ a� � a,�c ` 9t-•i`�t a,� 6 � - • --fit\ ���-1,���.�,�E:r'%�., -�� �; `� �: ' N X S D E C m , kND CONDITIONS OF DATE AJ 0 (., .Vide propose: To install a �rowsof stones at the.toe of the dune. Stones to be 1 to 2 tons in size,plus underlain by filter fabric. _ Stones to be installed approximately 6 inches'below grade. Stones will be covered with sand and planted with beach grass. - • P g ��s-��_.�__.__ �....._ .�__�...cam.•....-�_::_: Beach grass will be maintained yearly. • Stone steps will be built into the stones. 5URYEY OF PROPERTY 51TUATE: ORIENT TOWN: 5OUTHOLD � 5WFOLK COUNTY, NY SURVEYED 10-21-200-1 Hubor Road COUNTY TAX # Stu SU y� 1000 - 2-1 - 4 - (2 T-C1510 of Pavement EL = 5' C;BRTHM TO: Ham IL Riegra � � 9 o. i ! 1N57016'10"W -► 100.00' ti. s 6 42' Fr. _ Shed !i 4) v BRICK ? ti STONE V I Story O �o DRIVEWAY Frame QP� I EL = 7' m Garage cV o 22.0' tre1115 for 'F AGGe55 t0 Y . ° 12' garage 12 / I Story - o Frame s LHouse O B k LL- LO 0 48.2' d _1 ® •/ � aeck t �(�ASTAL.ER�3IOR1 Hp�I�D LIME Lop Of eEL= g BEACH z V (tie IineTA.H.N.M7-- �V�lty� 9 _. , 0.74 Orient HgrbOr - � - � ,aretwr,zao aea�tlon a•om�mn ro a a�voy i NOTES: .. nKY bmm419 a IiCAG�10'd avv�b facl b O Nobibn yr aectbn i304,..b-dMb:al�.oI the t:era York 5tnte FgrotlIXl l.aa.' 'Qtly Wybe Fran tM erV�t J W Lfila auw� PIPE FOUND o y �c.erwmatroro aYseae.e I.r�akjvr nnL nm 4(. ar.por'aa m acca-�xi.rs.a,u,e Area = 13a6 1.65 Sq. Ft. V b::g a. ty Wm rbn Yak�e Maock3bn W PNPeaalu�cl Area = 0.320-7 Acres tal J ad&-dk-3 YntlhRton li%.-h.—od � a tb urt.� ' Lkap r!a nct IrarmreraWo W uYJRlanl b'J4lknn FLOOD ZONE LINES ANNOTATED FROM FEMA JOHN C. EHLERS LAND SURVEYOR FLOOD INSURANCE RATE MAP # 3610360068 G 6 EAST MAIN STREET N.Y.S.LIC.NO.50202 GRAPHIG SGALE 1°'= 20' RIVERHEAD,N.Y. 11901 369-8288 Fax 369-8287 REF.\\Compagserver\pros\07\07-205.pro a-•......•. f�.. Pd �O R® .®F TRUSTEES Of /• to Q!``o •• c Ei Yi2� -_ "i ��°��p► ,n�i. c O/ � ����� d _ • \� Y a^„ �'' 4 PpP - .' •J••. _ UU `•i �, 9 a• - N \ E ' �-.: - ,��„- �r r �• � .. � �-" _. �NOV 2 4 2009 o Ij- oq � c J o c� i iiTo C of f i u rpn�?o�s _ _ __._ �66 LUl i�-6 ��®ly Cy e� - • s � _ �_� x 1 � 1"� _ _—lam�11.:I:�:t•$...�'_' 1, ,Q Oz N1 Cu O2J9.�1�O�1 ! LNG O .. _—�• - P. - —LL 01, .Ord J a, v � W 'FLU%,_, Q .. � G► Q � u N, u � Z We propose: To install a single row of stones at the toe of the dune. Uj Stones to be l to 2 tons in size,plus underlain by filter fabric. i Stones to be installed approximately 6 inches below grade. O. Stones will be covered with sand and planted with beach grass. _- _ Beach grass will be maintained yearly: Stone steps will be built into the stones. CREPDIARAM ': 4 ' �w..+..................�+.....e....r......�...._.,. -:ice?' 'T^`{4''.�w�l•e.+�'— :.`.+7/r•;f� ay, W� .. ..{i.............. T ! ",�ffy t ....• I �5 1Pu.' 'i/ G f s ' � II! 1•�• �,—{-'f• � __. t f-, -y � t _ !/ at � 1 �� .{�X { ! ` - -- '---- -' - �.. - CY..7F`.?��,:+'�',�,',:'`f �: ?l-�t �.'ty'�i•`� "'\�,, -,n" �s-•-• i —r-.._'ti----•__i L �jJ,t �`t y�• I � ��, �,��' _I . -- •Y��.' .t"�"'{ �\itF ��'{�,, t- w .a ._ �( L 'w•.... ."..?.'..... ,rt \ ' ���� � ' ` .s.ry ••a .n, .O_=3� •, "'•.n, .r.., 5 '. .ti ...•..6 �,,qA� l,r�' s1r / ..fir' CD {1�:; f _I w 'C ,-.���.1',v�t�r" ,.�,<:�, �uw..�i.�lN`�n° ' ^l?• �, P.�' �•'(S/O.. c.. h, 'p°�}�r a�9 .� C _.._ .r.-•.n. � �� '_� , .�°t � ���.f.. F'r��.��°�•.0��gip. O �� We pro' ose: To install a single tow of stones at the toe of the dune. Stones.to be 1 to-2 tons in size;plus underlain'by filter.fabric. Stones to be installed.approximately 6 inches below grade. . Stones will be covered with sand and planted with beach grass. A . . Waineeacrasswill bema d yeafly. Storiesteps will be built into the stones.-:i'f .' . J - µ x r, ' BOARD OF SOUTHOLD TOWN SOUTHOLD NEW YORK JZll PERMIT NO 7210f .f. a -DATE. NOVEMBER 1912009, ISSUED TO:'-YAN'RIEGER PROPERTY ADDRESS:-370 HARBOR'ROAD;ORhENT 7-474 a AUTHORIZATION , bm Pursuant to the provisions of Chapter 275 and/or Chapter 111'of the Town Code of the Town of Southold?and in-aceordan-d with the iResoluhor tof the Board of Trustees adopted at the me, held on November 1$,2009„and n consideration of apphcahon feetto the!Sum df$500.00 paid by Yan Rieeer and subject to.the Terms and Conditions as stated in the,Resotut}onFthe Southo�d£Town Board of Trustees authorrzesand.permits the following - r `:? a t f *.. ;:.•' r� f doc r... ; �,r>, Wetland Permit to install 77 of a single row of•stone(one to two tons m size):at toe of dune underlain With filter fabric and:core-stone and place sand over stone and' plantings, and..ins09 tallstone steps, with'�the condition,that only a single row,,of stone is to be installed,,and as depicted on the pr -a-n:.oject plprepared by Yan,Rieger,flast dated' , Noveml er 21 2009 and stam ed p a ppr ye m 1,2 o d onD ece ber 1 009 4 IN WIT1vESS WHEREOF;the said Board of TrusteesFhereby causes`its Corporate Seal to be affxed; t r arid3these;presents to be subscnbed by a ma�onty ofrthe aid Board as of this date, ; !/ N. - s .. j Peggy Dickerson r • ale ' 5 TERMS AND CONDITIONS The Permittee Yan Rieger,residing at 370 Harbor Road Orient,New York.as part of the consideration for the issuance of the Permit does understand and prescribe to the following: l. That the said Board of Trustees and the Town of Southold are released from any and all damages,or claims for damages,of suits arising directly or indirectly as a result of any operation perf6ri med.pursuant to this permit,"and the said Permittee will,at his or her own expense,defend any and all such suits initiated by third parties,and the said Permittee assumes full liability with respect thereto,to the complete exclusion of the Board,of Trustees of the Town of Southold. 2. That this Permit is valid for a period of 24inonths,which is considered to be the estimated time required to complete the work involved,but should circumstances warrant,request for an extension may be made to the Board at a later date. 3. That this Permit should be retained indefinitely,or as long as the said Permittee wishes to maintain the structure or project involved,to' provide evidence to anyone concerned that authorization was originally obtained. 4. That the work involved will be subject to the inspection andapproval of the Board or its agents,and non-compliance with the provisions of the originating application may be cause for revocation of this Permit by resolution of the said-Board. 5. That there will be.no unreasonable interference with navigation as a result of the work herein authorized: 6. That there shall be no interference with the right of the public to pass and repass along the beach between'high and low water marks. 7. That if future operations of the Town of Southold require the removal and/or alterations in the location of the work herein authorized,or if,in the opinion of the Board of Trustees, the work shall cause unreasonable obstruction to free navigation,the said Permittee will be required, upon due notice,to remove or alter this work project herein stated without expenses to the Town of Southold. 8. That the said Board will be notified by the Permittee of the completion of the work . authorized. 9. That the Permittee will obtain all other permits and consents that may be required supplemental to this permit,which may be subject to revoke upon failure to obtain same. James F.King,President ��OF SOUr�o Town Hall Annex Jill M.Doherty,Vice-President ,`O 0 0 54375 Main Road P.O.Box 1179 Peggy A.Dickerson Southold,New York 11971-0959 Dave Bergen Bob Ghosio,Jr. Telephone(631) 765-1892 IyCOU '� Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD COASTAL EROSION MANAGEMENT PERMIT Permit#: 7210C Date: November 18, 2009 SCTM#: 27-4-6 Name of Applicant/Agent: Yan Rieger Name of Permittee: Yan Rieger Address of Permittee: 370 Harbor Road, P.O. Box 491, Orient, NY 11957 Property Located: 370 Harbor Road, Orient, New York DESCRIPTION OF ACTIVITY: Coastal Erosion Permit to install 77' of a single row of stone (one to two tons in size)at toe of dune, underlain with filter fabric and core stone and place sand over stone and plantings, and install stone steps. The Coastal Erosion Management Permit allows for the operations as indicated on the project plan prepared by Yan Rieger, last dated November 21, 2009, and stamped approved on December 11, 2009. Permit to construct and complete project will expire two years from the date the permit is signed. INSPECTION: Final Inspection SPECIAL CONDITIONS: (apply if marked) N/A Bluff restoration through a re-vegetation plan is a necessary special condition of this permit. N/A A relocation.agreement is attached hereto and is a necessary special condition of this permit. N/A A maintenance agreement is attached with application and is a necessary special condition of this permit. a4 ' es Jam F. King, President Board of Trustees James F.King,President QF SO(/f Town Hall Annex Jill M.Doherty,Vice-President ��� Ol0 54375 Main Road P.O.Box 1179 Peggy A.Dickerson Southold,New York 11971-0959 Dave Bergen Bob Ghosio,Jr. �� Telephone(631) 765-1892 Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD November 18, 2009 Mr. Yan Rieger P.O. Box 491 Orient, NY 11957 RE: 370 HARBOR ROAD, ORIENT SCTM# 27-4-6 Dear Mr. Yan Rieger: The Board of Town Trustees took the following action during its regular meetings held on Wednesday, November 14, 2007 and on Wednesday, November 18, 2009 regarding the above matter: WHEREAS, YAN RIEGER applied to the Southold Town Trustees for a permit under the provisions of Chapter 275 of the Southold Town Code, the Wetland Ordinance of the Town of Southold, and Chapter 111 of the Southold Town Code, Coastal Erosion Hazard Areas, original application dated October 22, 2007, and amended application dated October 22, 2009, and, WHEREAS, said application was referred to the Southold Town Conservation Advisory Council and to the Local Waterfront Revitalization Program Coordinator for their findings and recommendations, and, WHEREAS, the LWRP Coordinator recommended that the proposed application be found Inconsistent with the LWRP,.and, WHEREAS, the Board of Trustees has furthered Policy 4.1 & 6 of the Local Waterfront Revitalization Program to the greatest extent possible through the imposition of the following Best Management Practice requirements: only a single row of stone is to be installed, and WHEREAS, Public Hearings were held by the Town Trustees with respect to said original application on November 14, 2007, and amended application on November 18, 2009, at which time all interested persons were given an opportunity to be heard, and, z WHEREAS, the Board members have personally viewed and are familiar with the premises in question and the surrounding area, and, WHEREAS, the Board has considered all the testimony and documentation submitted concerning this application, and, WHEREAS, the structure complies with the standards set forth in Chapter 275 and Chapter 111 of the Southold Town Code, WHEREAS, the Board has determined that the project as proposed will not affect the health, safety and general welfare of the people of the town, NOW THEREFORE BE IT, RESOLVED, that for the mitigating factors and based upon the Best Management Practice requirement imposed above, the Board of Trustees deems the action to be Consistent with the Local Waterfront Revitalization Program pursuant to Chapter 268-5 of the Southold Town Code, and, RESOLVED, that the Board of Trustees approve the amended application of YAN RIEGER to install 77' of a single row of stone (one to two tons in size)at toe of dune, underlain with filter fabric and core stone and place sand over stone and plantings, and install stone steps, with the condition that.only a single row of stone is to be installed, and as depicted on the project plan prepared by Yan Rieger, last dated November 21, 2009, and stamped approved on December 11, 2009. Permit to construct and complete project will expire two years from the date the permit is signed. Fees must be paid, if applicable, and permit issued within six months of the date of this notification. Inspections are required at a fee of$50.00 per inspection. (See attached schedule.) Fees: $ 50.00 Very truly yours, James F. King President, Board of Trustees JFK/eac 1 a James F. King,President oOF SO(/TyOI Town Hall Jill M.Doherty,Vice-President 53095 Route 25 P.O.Box 1179 Peggy A.Dickerson [ Southold,New York 11971-0959 Dave Bergen G • Telephone(631)765-1892 Bob Ghosio,Jr. Fax(631)765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD TO: Y&O "_Re [qer Please be advised that your application dated act'. has been reviewed by this Board at the regular meeting of ,c�✓ea�b !� �cb9' and your application has been approved pending the completion of the following items checked off below. Revised Plans for proposed project Pre-Constructioh Hay Bale Line Inspection Fee ($50.00) 1st Day of Construction ($50.00) '/2 Constructed ($50.00) ZFinal Inspection Fee ($50.00) Dock Fees ($3.00 per sq. ft.) Permit fees are now due. Please make check or money order payable to Town of Southold. The fee is computed below according to the schedule of rates as set forth in Chapter 275 of the Southold Town Code. The following fee must be paid within 90 days or re-application fees will be necessary. You will receive your permit upon completion of the above. COMPUTATION OF PERMIT FEES: TOTAL FEES DUE: $ .7 BY: James F. King, President Board of Trustees _. �b��gpEFQ(�-Cotes James Eckert,Chairman CATown Hall,53095 Main Rd. Lauren Standish,Secretary t P.O. Box 4 Southold,NY NY 11971 4 � Telephone(631)765-1892 Ji[ Fax(631)765-6641 Conservation Advisory Council Town of Southold At the meeting of the Southold Town Conservation Advisory Council held Thurs., November 12, 2009, the following recommendation was made: Moved by Doug Hardy, seconded by Jack McGreevy, it was RESOLVED to NOT SUPPORT the Wetland Permit application of YAN RIEGER to install 77' of a single row of stone (one to two tons in size) at toe of dune, underlain with filter fabric and core stone and place sand over stone and plantings, and install stone steps. Located: 370 Harbor Rd., Orient. SCTM#27-4-6 Inspected by: Peter Young, Doug Hardy The CAC does Not Support the application at this time because there should be a coordinated mitigation plan with the adjacent property owner(Gilooly). Vote of Council: Ayes: All Motion Carried �SUFFQ(,� James F.King,President r11V Cp P.O.Box 1179 Jill A Doherty;Vice-President Gy� Southold,NY 11971 Peggy A.Dickerson y Telephone(631)765-1892 Dave Bergen t Fax(631)765-6641 Bob Ghosio,Jr. y �'� dal Southold Town Board of Trustees Field InspectionMorksession Report Date/Time: YAN RIEGER requests a Wetland Permit and Coastal Erosion Permit to install 77' of a single row of stone (one to two tons in size) at toe of dune, underlain with filter fabric and core stone and place sand over stone and plantings, and install stone steps. Located: 370 Harbor Rd., Orient. SCTM#27-4-6 Type of area to be impacted: _Saltwater Wetland Freshwater Wetland Sound Bay Distance of proposed work to edge of wetland Part of Town Code proposed work falls under: _Chapt.275 Chapt. 111 other Type of Application: Wetland _Coastal Erosion _Amendment Administrative_Emergency . Pre-Submission Violation Info needed: Modifications: Conditions: Present Were: `J.King _J.Doherty_P.Dickerson D. Bergen_ B.Ghosio, D. Dzenkowski other Form filled out in the field by Mailed/Faxed to: Date: New. York State Department of Environmental Conservation Division of Environmental Permits SUNY @ Stony Brook, 50 Circle-Road, Stony Brook, NY 1 1790-3409 Telephone (631) 444-0372 Facsimile (631) 444=0360 Alexander B. Grannis Commissioner September 15 2009 Mr. Yari H.'Rieger _' t P.O. Box 491 j `! OCT 2 2 2009 Orient, NY 11957 RE: 1-473 8-03 817/00001 Dear Permittee: In conformance with the requirements of the State Uniform Procedures Act (Article 703 ECL) and its implementing regulations (6NYCRR, Part .621) we are enclosing your ^permit. Please carefully read all permit conditions and special conditions contained in the . ,permit to ensure compliance during the term of the permit. If you are unable-to comply with any conditions, please contact us at the above address. Also enclosed is a,permit sign which is to be conspicuously posted at the project site and protected from the weather. . Sincerely, d Claire K. Werner Environmental Analyst " CKW/ls Enclosure NEW YORK STATE DEPART]":. T OF ENVIRONMENTAL CONSERVA'., 7 Facility DEC ID 1=4738-03817 PERMIT Under the Environmental Conservation Law CL Permittee and Facility Information- Permit Issued To: Facility: YAN H RIEGER RIEGER PROPERTY . PO BOX 491 370 HARBOR RDIS,CTM# 1000-27-4-6 ORIENT,NY 11957 ORIENT,NY 11957 Facility Location: in SOUTHOLD in SUFFOLK COUNTY 'Village: Orient Facility Principal Reference Point: NYTM-E: NYTM-N:.= Latitude: Longitude: Project Location: 370 Harbor Road-.Watercourse- Orient Bay Authorized Activity: Install 77'of a single row-of stone(one to two tons.in size) at.toe of dune, underlain with filter fabric and corestone and place sand over stone and plantings. Install stone steps. All work must be in accordance with the attached plans stamped NYSDEC approved on 9/15/09. (CKW) - Permit Authorizations Tidal Wetlands -Under Article 25 Permit ID 1-4738-03817/00001 -New Permit Effective Date: 9/15/2009 Expiration Date: 9/15/2014 Water Quality Certification-Under Section 401 -,Clean Water Act Permit ID 1-473 8-03 817/00002 New Permit Effective Date: 9/15/2009 Expiration.Date: 9/15/2014 Excavation & Fill in Navigable Waters - Under Article.15,Title 5 Permit ID 1-473 M3 817/00003 New Permit. Effective.Date: 9/15/2009 Expiration Date: 9/15/2.014 NYSDEC Approval By acceptance of this permit, the permittee agrees that the permit is contingent upon strict compliance with the ECL, all applicable regulations, and-all conditions included as part of this permit. Permit Administrator: MARK CARRARA, Deputy Regional Permit Administrator Address: nNYSDEC REGION 1 HEADQUARTERS SUNY @ STONY BROOK150 CIRCLE RD STONY BROOK,NY 11790 -3409 Authorized Signature: Date 7 /9 Page 1 of 6 AM. v NEW YORK STATE DEPART' JT OF ENVIRONMENTAL CONSERVA _ ,J - Facility'DEC ID 1-4738-03817 Distribution List Marine Habitat Protection CLAIRE K WERNER - Permit Components NATURAL RESOURCE PERMIT CONDITIONS WATER QUALITY CERTIFICATION SPECIFIC CONDITION GENERAL CONDITIONS,APPLY TO ALL AUTHORIZED PERMITS NOTIFICATION OF OTHER PERMITTEE OBLIGATIONS NATURAL RESOURCE PERMIT CONDITIONS - Apply to the Following Permits: TIDAL WETLANDS; WATER QUALITY CERTIFICATION; EXCAVATION & FILL IN NAVIGABLE WATERS 1. No_Interference With Navigation There shall be no unreasonable interference with navigation by the work herein authorized. .2..Notice of Commencement At least 48 hours prior to commencement of the project, the permittee. and contractor shall sign and return the top portion of the.enclosed notification'form certifying that they are fully aware of and understand all terms and conditions of this permit. Within 30 days of completion of project, the bottom portion of the form must also by signed and returned, along with photographs of the completed work. I. No Construction-Debris in Wetland or Adjacent Area Any debris or excess material from" construction of this project shall be'completelyremoved from the adjacent area(upland) and removed to an approved.upland area for disposal. No debris is.permitted in wetlands and/or protected buffer areas. 4. Storage of Equipment,Materials The storage of construction equipment and mhterials shall be confined to landward'of the dune. 5. No Beach Excavation For Fill .No excavation of the beach is authorized for the purpose of obtaining fill or stone materials. 6. No Equipment below Apparent High Water Equipment operation below(seaward) apparent high water is strictly prohibited. 7. Rock Revetment Rock revetment shall consist of one row of one to two ton.stone placed at toe of the existing dune and underlain with filter cloth. Page 2 of.6 - v NEW YORK STATE DEPARTP'"—_cT OF ENVIRONMENTAL CONSERVAi,,, ,.`f Now Facility DEC ID 1-4738-03817 8. Plant Beach Grass The area of fill placement shall be planted with American Beach Grass planted 12 inches on center during the first growing season following placement,but not more than 6 months following the.placement of fill. The permittee shall maintain'a beach grass survival rate of at least 85% after 3 years. Any grass planted after April 15 of any calendar year shall be irrigated. 9. Maintain Dune The permittee shall maintain the reconstructed dune and vegetative plantings in accordance with the project's NYSDEC approved cross-section and profile for the life of the permit.. To -.be deemed in compliance with this maintenance requirements the permittee shall apply upland sand of compatible grain size as needed to maintain the required covering at the project location by May 15 of each year. The project area shall be restored to its original configuration in accordance with the NYSDEC approved cross-section.: The quantity of sand applied shall be the amount necessary to restore the cross-section and profile to its original.configuration as shown on the NYSDEC approved cross-. section. . 10. Maintain Reconstructed Dune Substructure- If the substructure(e.g.,'approved revetment as shown on the approved-plans) of the reconstructed dune becomes exposed at any time, the permittee shall cover the structure with upland,sand of a compatible grain size within 30 days of discovering the exposure. If the permittee fails to comply with these requirements,the structure shall be removed by April 15. . The permittee must notify the Region 1 Marine Habitat Protection Manager of the erosion occurrence and submit a Notice of Commencement prior to placing any sand. This Notice must include a description/photo of the exposure and the quantity and source of sand required to restore the approved cross-section. . 11. State Not Liable for Damage The State of New York shall in no case be liable for any damage or mJWy to the structure or work herein authorized which may be caused'by or result from future operations undertaken by State for the conservation or improvement of navigation, or for other.purposes, and no claim or right to compensation shall accrue from any such damage. 12. Conformance With Plans All activities authorized by this permit must be in strict conformance with the approved plans submitted by the applicant or applicant's agent as part of the permit application. Such approved plans were prepared by Yan Rieger(2 sheets) stamped NYSDEC approved on 9/15/09. 13. State May Order Removal or Alteration of Work If future operations by the State of New Yoik require an alteration in the position of the structure or work herein authorized,or if,in the opinion of the Department of Environmental Conservation it shall cause unreasonable obstruction t6 the free:navigation of said waters or flood flows or endanger the health, safety or welfare of the people of the State;or.cause loss or destruction of the natural'resources of the State,the owner may be ordered by the Department to remove or alter the structural work, obstructions, or hazards caused,thereby without expense to the State, and if,upon the expiration or revocation of this permit, the structure, fill, excavation, or other modification of the watercourse hereby authorized:shall not be completed, the owners,.shall,without expense to the State, and to such extent and in such time and manner as the Department of Environmental Conservation may require,remove all or any portion of the uncompleted structure or fill and restore to its former condition the navigable and flood capacity of the watercourse. No claim shall be made against the State of New York on account of any such removal or alteration. Page 3 of 6 NEW YORK STATE DEPARV T OF ENVIRONMENTAL CONSERVX Facility DEC ID.1-4738-03817 14. Precautions Against Contamination of Waters All necessary precautions shall be taken to preclude contamination of any wetland or waterway by suspended solids, sediments, fuels, solvents, lubricants, epoxy coatings, paints,concrete, leachate or any other environmentally deleterious materials associated with the project. 15. State May Require Site Restoration If upon the expiration-or revocation of this permit,the project hereby authorized has not been completed,the applicant shall, without expense to the State, and .to such extent and in such time and manner as the Department of Environmental Conservation may require,remove all or any portion-of the uncompleted structure or fill and restore the site to its former condition. No claim shall be made against the State of New York on account of any such removal or, alteration. - WATER QUALITY CERTIFICATION.SPECIFIC CONDITIONS 1. Water Quality Certification The NYS Department of Environmental Conservation hereby certifies that the subject project will not contravene effluent limitations or other limitations or standards under Sections 301, 302, 303, 306 and 307 of the Clean Water Act of 1977 (PL 95-217)provided that all of the conditions listed herein are met. GENERAL CONDITIONS - Apply to ALL Authorized Permits: 1. Facility Inspection by The Department The permitted site or facility,including relevant records, is subject to inspection at reasonable hours and intervals by an authorized representative of the Department of Environmental Conservation (the Department)to determine whether the per nittee is complying with this permit and the ECL. Such representative may order the,work suspended pursuant to ECL 71- 0301 and SAPA 401(3). , The permittee shall provide a person_to accompany the Department's representative during an inspection . to the permit area when requested by the Department. A copy of this permit,including all referenced maps, drawings and.special conditions,must be available for inspection by the Department at all times at the project site or facility. Failure to produce a copy of the permit upon request by a Department representative is a violation of this permit. 2. Relationship of this Permit to Other Department Orders and Determinations Unless expressly provided for by the Department, issuance of this permit does not modify, supersede or rescind any order or determination previously issued by the Department or any of the terms, conditions or requirements contained in such order,or determination. Page 4 of 6 95-20-1(11/03)—9d New York State. Department of Environmental. Conservation Aft AM � . low -NOTICE The. Department of Environmental Conservation (DEC) has issued permit(s) pursuant to the Environmental Conservation Law for , work being conducted at . this• site. . For further . information regarding the nature and extent of the approved work and any Department conditions applied to .the approval, contact'the Regional Permit Administrator listed below. Please refer to'the permit number shown when contacting the DEC. Regional Permit Administrator Permit Number. � R®GER EVANS Expiration Date91 . p NOTE: This notice is NOT a permit 0 X 'Telephone,pole -7 ................ • NONE 0 X• X DRIVEWAY .5? 1 51or e Lin ...... Garage 22.01 trellis for -� Uem access to PROJECT PLAN. 0 121 garage NE, I. R4 CeT 1�v IV 7 0A 4 rl nt 13 C I Stor LANE CEP F ratn e 16 310iiarbor Road y 0 0 so, ...... ...... 9 New York 1195,IJ ... ........W CD Orient, W CA W a+ Er 4&.21 3 "R PA 1E W W CD CD M o 11 1 . 7 r !Ai P5 10 2 7 (o, 0.CD r+ " 0 " .1 ,::!�w c. 2 Petem.Nbcl r 0 9 . . B A Y 10 P 0. i 470F000 1713011 m Er' CD Cn fjo OA gA 0 CD In 0 ON 0 W • 0 CD CD O J=A CA .4� Cr 510 CD % CD N Y s D p, C fD APPROV---j ,,a PER TERMS J, AND CONDITIONS OF BEACH V 1 PERMIT NO. J—q�36-03017 00ql Z , DATE (tie 11n0— N56014 9PQQW 78 .s>r-asisz-.•.•-, w�-.em*a::a=r^ ���z:=�s� �,:^.,.W:m:}•s•YZwzr.. .ucas;-s:�� � _ � _ �sxa�r+ axraax,�..e . .....�. .. . -`� ..y--�^'"'-=''_°"'."...,u..-�""S,�!-c Ri.a....aau ,._,_o.•�.s..y:m�so...na....m�.•.w,q.=sr iy '^ �L �-a9,.�O C i� ' .••.....::� 0 CROSSVIEW' DIAG'FM'M. ' ��// • • ° Village <y )Central ////�j/ .._ ....�_ yam,:�... ,�, °• � r.0�8T1'G ��1 em •,...... •• � V � / 1� [gNEPEgF � ., .,,,., � '�1 Oq.1 • • I•�•% :i'�. . RD -�..'�'-''.� r-r �ri`•.s=-Egd'1 / t J s-In' ' ) •,r�• .+ 1 - .._ -1...___ a �•�• �� . ' i 1 LANE KI G~��- .. •.�..'JEP a. K t'�+� — G7. ,Via' :7�`., t ,;;: •••� "` P` • .,. � "°�,�,�,,� j'// r° 'ram ', .; :, �ag _� ,Y T z Pefers.Ne � r r 10 ... '- .. l».fi�fc, Swt;'[Y...,..f7 izoc . '- 1A4�'gVgavli'L'L4`^4i•'S3:.3M, Orr •T er..+.�;�- _..rt� � V`V �ey.�,u•.� __ .. NYSAEC ,ANI CONDITIONS OF F ivuT 19 DAT We ro ose: To install a single row of stones at the toe of the dune. '- P P g Stones to be 1 to 2 tons in 'size;plus underlain by filter fabric: _ Stones to be installed approximately.6 inches below grade. f Stones will be covered with sand and planted with beach grass. Beach grass will be maintained yearly. - -- - -r stone steps will be built into the stones. STATE OF NEW YORK DEPARTMENT OF STATE 41 STATE STREET ALBANY, NY 12231-0001 ELIOT SPITZER LORRAINE A.CORTES-WzQLIEZ GOVERNOR SECRETARY OF STATE June 26, 2008 Mr. Yan Rieger 370-Harbor Road P. O. Box 491 Orient,New York 11957 Re: F-2008-0204 U.S. Army Corps of Engineers/New York District Permit Application#NAN-2007-01606-EST Yan H.,Rieger Construct an 80'L seawall above the spring water line Orient Bay,Town of Southold, Suffolk County , No.Review Necessary Dear Mr. Rieger: The Department of State received your Federal Consistency Assessment Form and supporting information on March 7,2008. In a letter dated May 3, 2008, and received June 25, 2008, the U.S. Army Corps of Engineers informed us that the proposed activity does not require a federal permit. Therefore, further review of this project by the Department of State, and concurrence with your consistency certification, are not necessary. Please call me at(5]8)486-7669 (email: rebecca.madlin c@dos.state.ny.us) if you have any questions regarding this matter,-and refer to our file#F-2008-0204:- --- - Sincerely, a Rebecca Madlin- Coastal Resource Specialist Consistency Review and Analysis cc: COE/New York District-Naomi Handel] NYS DEC Region ] -Claire Werner ,Town of Southold - Scott Hilary/Mark Terry WWW.DOS.STATE.NY.US E-MAIL:INFO@DOS.STATE.NY.US DEPARTMENT OF THE ARMY NEW YORK DISTRICT,CORPS OF ENGINEERS JACOB K.JAVITS FEDERAL BUILDING NEW YORK,N.Y.10278-0090 REPLYTO ATTENTION OF: _ •,�,IMa �� ���� Regulatory Branch M SUBJECT: Permit Application Number NAN-2007-01606-EST by Yan Rieger Yan-Rieger 370 Harbor Road PO Box 491 Orient,NY 11957 -- --- ---_— ---- �— - -_ Dear Mr.Rieger: On December 14,2007,the New York District,U.S.Army Corps of Engineers received a > request for Department of the Army authorization for construction of an 80 foot long seawall above the spring water line in the Orient Bay, in the Town of Southold, Suffolk County,New York. Our review indicates that since the proposed work does not appear to include dredging or construction activities in or over any navigable waters of the United States,the placement of any dredged or fill material in any waters of the United States(including'coastal or inland wetlands)or the accomplishment of any work affecting the course,location,-condition or capacity of such areas, a Department of the Army permit,in accordance with 33 CFR 320-330,will not be required provided the proposed work is executed in accordance with the referenced material. Care should be taken so that any fill or construction materials,including debris, do not enter the waterway to become a drift or pollution hazard. You are to contact appropriate state and local government officials to ensure that the subject work is performed in compliance with their requirements. if any questions should arise concerning this matter,please contact Mr. Leo Strogach, of my staff, at 917-790-8533. Sincerely, - George Nieves )out-Chief,.Eastern Permits Section- Enclosures cf- NYSDEC -Region 3 Town of Southold FROM :RIEGER/LITURGICI =SIGN -N FRX NO. 19 2005 11:59AM P2 FnDD E C E W E AUG 9 2008 Southold Town Board of Trustees STATE OF NEW YORK t)EPARTMENT OF STATE 41 STATE STREET ALBANY,NY 12231-0001 ELIOT SPITZER LORRAINEA:CORTts-VAzouE2 GOVERNOR SECRETARYOFSTATE une 26,2008 Mr.Yan Rieger 37.0 Harbor Road P.O.Box 491 Orient,New York 11957 Re: F-2008-0204 [)_S.Army Corps of Engineers/New York District Permit Application,a NAN-2007-0160E-EST Yan H.Rieger Construct an 30'L seavvall above the spring water line Orient Ray,Town of Southold,Suffolk County No Review NeEEss Dear Mr.Rieger: The Bepzrtmem or Stare received your Federal CDnsistency Assessment Form and supporting information on. March 7,2008. in a letter dated May 3,2003,and received June 25,2008,the U.S.Army Corps of Engineers informed us that the proposed activity does not require a federal permit. Therefore,ftmther review of this project by the Department of State,and convuTrence with your consistency certification;are not neccw_ary. PIease call me at(518)486-7669 (email:rebecca.madlin@dos state.ny.us)if you have any questions regarding this matter,and refer,tc our file t1F-2008-0204. Sincerely, Rabecca MadIirl Coastal Resource Specialist Consistency Review and Analysis cc: COENew York District-Naomi Handeil NYS DJ C region t-Claire Werner Town of Southold -Scott Hilary/Mark Terry WWW.D06.6TATE.NV.U6 E-MAIL:)1F0@D06.8TATE.NY.U8 I. DEPARTME114T OF THE ARMY NEW`ORK MSTRI"CORMS of ENGINEERS ; REPLY TO ATTENTION OF: Regulatory Branch SUBJECT: Pen tit Applicatirr W-nber IT T-200 7-01606-rST by x M Rieger Yan Rieger 370 harbor Road PO Box 491. Orieni,Imo" 1 195 1.. - - - - Dear Mr.Rieger: On December 14,2007,the New York District, U.S. —Tiny Corps o.e Engincers received a request for Departmenfof the Army authorization for eonsttuction of an 80 foot long seawall above the spring water line in the Orient Bay,in the Town of Southold, Suffolk County, New York. Cwr review indics hat since t�!�e proposed work does not ar to;.nctude dredging or cons6oti.on activities in or over%-iy navigabt:waters of the U-olted,,,,,ties,the placement of any 'dredged or fill material in any waters of the United Stares(including eoas'cas or inland wetlands)or the accomplishment of any work affec thig the course,tocation,condition or capacity of such areas,a Department of the Army permit,in arcordance with 33 CTF: 320-330,will riot be required provided the proposed work i�g exezuted in accordance with the referenced matenal. Care should b--taken so that any.till or constmcilon materials,including debris, do not enter the waterway to become adrift or polhition hazard. 't"ou au-a to contact app►opraatp state and local government officials to ensure that the subject work is perfoi-med in'complia ce with their requirements. If any questions should arise concerning this maiater,please contact Mr. LQo, Strogach, of my staff, at 917-790-8533. si==lw, George Nieves Chief,Eastern.permits Section. Enclastres cf NYSD C -Region 3 Town of Southold td Wlj8s:T T 800Z 6Z '6nN : 'ON XUA N--N0 i sDc+1Nd0I odni I 7/N30D I�1: WOd.� r 1 STATE OF NEW YORK DEPARTMENT OF STATE 41 STATE STREET ALBANY, NY 12231-0001 ELIOT SPITZER - LORRAINE A. CORT�s-VAZQUEZ GOVERNOR SECRETARY OF STATE June 26, 2008 Mr. Yan Rieger 370 Harbor Road P. O. Box 491 Orient,New York 11957 Re: F-2008-0204 U.S. Army Corps of Engineers/New York District Permit Application#NAN-2007-01606-EST Yan H. Rieger Construct an 80'L seawall above the spring water line Orient Bay, Town of Southold, Suffolk County , No Review Necessary Dear Mr. Rieger: The Department of State received your Federal Consistency Assessment Form and supporting information on March.7, 2008. In a letter dated May 3,2008, and received June 25, 2008,the U.S. Army Corps of Engineers informed us that the proposed activity does not require a federal permit. Therefore, further review of this project by the Department of State, and,concurrence with your'consistency certification, are not necessary. Please call me at(518)486-7669 (email: rebecca.madlin@a dos.state.ny.us) if you have any questions regarding this-matter,and refer to our file#F-2008-0204. - _- - - Sincerely, Rebecca Madlin- Coastal Resource Specialist Consistency Review and Analysis cc: COE/New York District-Naomi Handell . NYS DEC Region,I -Claire Werner. Town of Southold =Scott Hilary/Mark Terry WWW.DOS.STATE.NY.US E-MAIL:INFOU@DOS.STATE.NY.US DEPARTMENT OF THE ARMY NEW YORK DISTRICT,CORPS OF ENGINEERS _ JACOB K.JAVITS FEDERAL BUILDING NEW YORK,N.Y.10278-0090 REPLYTO ATTENTION OF: Regulatory Branch MAY U 3 2a SUBJECT: Permit Application Number NAN-2007-01606-EST by Yan Rieger Yan Rieger 370 Harbor Road PO Box 491 Orient NY 11957 Dear Mr.Rieger: On December 14,2007,the New York District,U.S.Army Corps of Engineers received a request for Department of the Army authorization for construction of an 80 foot long seawall above the spring water line in the Orient`Bay, in the Town of Southold, Suffolk County,New York. Our review indicates that since the proposed work does not appear to include dredging or construction activities in or over any navigable waters of the United States,the placement of any dredged Or fill material in any waters of the United States(including coastal or inland wetlands)or the accomplishment of any work affecting the course,location,"condition or capacity of such areas, a Department of the Army permit,in accordance with 33 CFR 320-330,will not be required provided the proposed.work is executed in accordance with the referenced material. Care should be taken so that any fill or construction materials,including debris,do not enter the waterway to become a drift or pollution hazard. You are to contact appropriate state and local government officials to ensure that the subject work is performed in compliance with their requirements. - If any questions should arise concerning this matter,please contact Mr. Leo Strogach, of my staff, at 917-790-8533. Sincerely, S Of George Nieves o4 Chief-Eastern Perriiits Section Enclosures cf NYSDEC ,Region 3 Town of Southold.- r James F.King,President OF SQUjyO Town Hall Jill M. Doherty,Vice-President ,`O �� 53095 Route 25 Peggy A.Dickerson P.O. Box 1179 Southold,New York 11971-0959 Dave Bergen G Bob Ghosio,Jr. �0 Telephone(631) 765-1892 AV Fax(631) 765-6641 �4 ,� BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Southold Town Board of Trustees Field Inspection/Work session Report Date/Time: bz YAN RIEGE requests a Wetland Permit to construct a low-profile bulkhead using vinyl sheathing, a 12' X 32' platform and 4'X 18' catwalk. Located: 370 Harbor Rd., Orient. SCTM#27-4-6 Type of area to be impacted: _Saltwater Wetland Freshwater Wetland _Sound /Bay Distance of proposed work to edge of above: Patt of Town Code.proposed work falls under: Chapt.275 _Chapt..111 _other Type of Application: Wetland Vcoastal Erosion_Amendment Administrative _Emergency Pre-Submission Violation Planning Info needed: Modifications: Ro(kJ ,�`,;� Sf L-rkr 4L,l/rke bec. Conditions: Present Were: Tking _J.Doherty P.Dickerson D. Bergen B. Ghosio, Jr H. Cusack_D. Dzenkowski_Mark Terry other i Form filled out in the field by Mailed/Faxed to: Date: Environmental Technician Review _TUA Co a_--6l e-os,;57n 1�ve o 1) s(nr-V��_ Sv 9 pa, co-rLe :Xm re.,lcs poLt i c of cu-v mi ch-) 62 6kclk Q��gL1�F9(�-coG Donald Wilder,Chairman - Town Hall,53095 Main Rd. coo Lauren Standish,Secretary Q P.O.Box 1179 Southold,NY 11971 Telephone(631)765-1892 Fax(631)765-6641 Conservation Advisory Council Town of Southold At the meeting of the Southold Town Conservation Advisory Council held Wed., November 7, 2007, the following recommendation was made: Moved by Don Wilder, seconded by Doug Hardy, it was RESOLVED to SUPPORT the Wetland Permit & Coastal Erosion Permit applications of YAN RIEGER to construct a low-profile bulkhead using vinyl sheathing, a 12' X 32' platform and 4'X 18' catwalk. Located: 370 Harbor Rd., Orient. SCTM#27-4-6 Inspected by: James Eckert The CAC Supports the application with the Condition of a 10' non-turf buffer, the catwalk is constructed using Thru-Flow and 4X4 posts, the deck is limited to 2'X 4', and the bulkhead is low-profile and kept in line with the neighboring bulkhead. Vote of Council: Ayes: All Motion Carried i f� n _ a'tr�r• 7 i r a e, y .✓. .� :rA( tee.� '"' ���. _ .r�•�� .•' „ �„ .. Ala • � � r 9 91t� Y•p� 1 1 Y� :3.„•',fir..�s .,f T �+�) ti ✓er � iDard of Trustees Applicat '^n WETLAND/TRUSTEE LANDS APPLICATION DATA. Purpose of the proposed operations: "TAD ty Area of wetlands on lot: square feet Percent coverage of lot: � % Closest distance between nearest existing structure and upland edge of wetlands: & A feet Closest distance between nearest proposed structure and upland edge of wetlands: A feet If Does the project involve excavation or filling? No Yes If yes, how much material will be excavated? cubic yards How much material will be filled? cubic yards Depth of which material will be removed or deposited: ©.& feet Proposed slope throughout the area of operations: 121 5 Manner in which material will be removed or deposited: '6LG 1 �tel�� Statement of the effect, if any, on the wetlands and tidal waters of the town that may result by reason of such proposed operations (use attachments if appropriate): --?yard of Trustees Applicat' COASTAL EROSION APPLICATION DATA Purposes of proposed activity: Ve Are wetlands present within 100 feet of the proposed activity? y No Yes Does the project involve excavation or filling? No ✓ Yes If Yes,how much material will be excavated? :1' 310 (cubic yards) How much material will be filled? (cubic yards) Manner in which material will be removed or deposited: Describe the nature and extent of the environmental impacts reasonably anticipated.resulting from implementation of the project as proposed. (Use attachments if necessary) f PROJECT ID NUMBER 617.20 SEQR APPENDIX C STATE ENVIRONMENTAL QUALITY REVIEW SHORT ENVIRONMENTAL ASSESSMENT FORM for UNLISTED ACTIONS Only PART 1 -PROJECT INFORMATION (To be completed by Applicant or Project Sponsor) 1.APPLICANT/SPONSOR 2.PROJECT IJAME Rfg g 2 Y. Pow nrZrok(es &PROJECT LOCATION:: Municipality vf 1'[ .� County 4.PRECISE LOCATION: Street Addess and Roa Intersections, Prominent landmarks etc -or provide map ,P, wP,P�r 5.IS PROPOSED ACTION: New ❑Expansion ❑Modification/alteration 6.DESCRIBE PROJECT BRIEFLY: 7.AMOUNT OF LAND AFFECTED: Initially 1 3_2_ acres Ultimately acres 8.WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER RESTRICTIONS? 9Yes ❑ No If no,describe briefly: 9.WH T IS PRESENT LAND USE IN VICINITY OF PROJECT? (Choose as many as apply.) Residential ❑Industrial ❑Commercial ❑Agriculture ❑Park/Forest/Open Space ❑Other (describe) 10. DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGEN Y (Federal, State or Local) rA. — s ❑No If yes, list agency name and permit / approval: P 6 ©r /' W 5r.Be 7 of `W I FF 11.DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL? FoYes ❑No If yes, list agency name and permit / approval: �E-G -�f738-0-2r) W�AVAW-?ev7 �W s �o4196 ar, 12. AS A RESULT OF PROPOSED ACTION WILL EXISTING PERMIT/ APPROVAL REQUIRE MODIFICATION? Dyes ENO I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE TO THE BEST OF MY KNOWLEDGE Applicant / Spon or Name Date: 10 I219 10q Signature If the action is a Costal Area, and you are a state agency, complete the Coastal Assessment Form before proceeding with this assessment PART II - IMPACT ASSESSMENT(To be completed by Lead Agency) A. DOES ACTION EED ANY TYPE I THRESHOLD IN 6 NYCRR,PART 617.4? If yes,coordinate the review process and use the FULL EAF. Yes M No B. WILL ACTION RECEIVE COORDINATED REVIEW AS PROVIDED FOR UNLISTED ACTIONS IN 6 NYCRR,PART 617.6? If No,a negative declaration may be superseded by another involved agency. Yes E�'No C. COULD ACTION RESULT IN ANY ADVERSE EFFECTS ASSOCIATED WITH THE FOLLOWING:(Answers may be handwritten,if legible) C1. Existing air quality,surface or groundwater quality or quantity,noise levels,existing traffic pattern,solid waste production or disposal, potential for erosion,drainage or flooding problems? Explain briefly: V0 C2. Aesthetic,agricultural,archaeological,historic,or other natural or cultural resources;or community or neighborhood character?Explain briefly: Al 0 C3. Vegetation or fauna,fish,shellfish or wildlife species,significant habitats,or threatened or endangered species?Explain briefly: N0 C4. A community's existing plans or goals as officially adopted,or a change in use or intensity of use of land or other natural resources?Explain briefly: �Q C5. Growth,subsequent development,or related activities likely to be induced by the proposed action?Explain briefly: NO C6. Long term,short term,cumulative,or other effects not identified in CI-05? Explain briefly:- r� C7. Other impacts(including changes in use of either quantity or type of energy? Explain briefly. D. WILL THE PROJECT HAVE AN IMPACT ON THE ENVIRONMENTAL CHARACTERISTICS THAT CAUSED THE ESTABLISHMENT OF A CRITICAL ENVIRONMENTA AREA(CEA? If Xes,ex lain briefl : ❑ Yes V1 0 E. IS THERE,OR IS THERE LIKELY TO BE,CONTROVERSY RELATED TO POTENTIAL ADVERSE ENVIRONMENTAL IMPACTS? If es explain: ❑ Yes E No _.. .. ..... ... PART III-DETERMINATION OF SIGNIFICANCE(To be completed by Agency) INSTRUCTIONS: For each adverse effect identified above,determine whether it is substantial,large,important or otherwise significant. Each effect should be assessed in connection with its(a)setting(i.e.urban or rural);(b)probability of occurring; (c)duration;(d)irreversibility;(e) geographic scope;and (f)magnitude. If necessary,add attachments or reference supporting materials. Ensure that explanations contain sufficient detail to show that all relevant adverse impacts have been identified and adequately addressed. If question d of part ii was checked yes,the determination of significance must evaluate the potential impact of the proposed action on the environmental characteristics of the CEA. Check this box if you have identified one or more potentially large or significant adverse impacts which MAY occur.Then proceed directly to the FULL EAF and/or prepare a positive declaration. Check this box if you have determined,based on the information and analysis above and any supporting documentation,that the proposed actin WILL.NOT result in any significant adverse environmental impacts AND provide, on attachments as necessary, the reasons supporting thi determination. Name of Lead Agency Date Print or Type Name of Responsible Officer in Lead Agency Title of Responsible Officer Signature of Responsible Officer in Lead Agency Signature of Preparer(If different from responsible officer) NOTICE TO ADJACENT PROPERTY OWNER BOARD OF TRUSTEES,TOWN OF SOUTHOLD In the matter of applicant: - -YAW 11, P 4 MR SCTM# z YOU ARE HEREBY GIVEN NOTICE: 1. That it is the intention of the nde signed to request a Permit fr the Bp-ard of Trustees to: GI �'0?�t� S es !�K Sal epto 2. That the property which is the subject of Environmental Review is located adjacent to your pr perty and is describe J as follows: VOW?Op"� 3. That the project which is subject to Environmental Review under Chapters 32, 37, and/or 97 of the Town Code is open to public comment on: Ay. /e . You may contact the Trustees Office at 765-1892 or in writing. The above-referenced proposal is under review of the Board of Trustees of the Town of Southold and does not reference any other agency that might have to review same proposal. OWNERS NAME: MAILING ADDRESS: / PHONE#: i Enc: Copy of sketch or plan showing proposal for your convenience. I i i NOTICE TO ADJACENT PROPERTY.OWNER BOARD OF TRUSTEES,TOWN OF SOUTHOLD In the matter of applicant: YAW 11, Pft4E6 SCTM# YOU ARE HER9BY GIVEN NOTICE: ' 1. That it is the intention of the pdersigned,to request a Permit frX the Board of Trusteesto: 61 epw Of q Ct Dec a ro�e� p I ur r 2. That the property which is the subject of Environmental Review is located adjacent to your pr perry and is describe as follows: .40— a 79 ivr 3. That the project which is subject to Environmental Review under Chapters 32, 37, and/or 97 of the Town Code is open to public comment on: You may contact the Trustees Office at 765-1892 or in writing. The above-referenced proposal is under review of the-Board of Trustees of the Town of Southold and does not reference any other agency that might have to review same proposal. OWNERS NAME: MAILING ADDRESS: 5 A)Y 1179f/ PHONOM Enc: Copy of sketch or plan showing proposal for your convenience: PROOF OF MAILING OF NOTICE ATTACH CERTIFIED MAIL RECEIPTS Name: Address: yam H. H" Rd © ivy. I q 5 STATE-OF NEW YORK COUNTY OF SUFFOLK residing at ✓? t� /�1 !19S being duly sworn, deposes and says that on the day of ,20__, deponent mailed a true copy of the Notice set forth.in the Board of Trustees Application,directed to each of the above named persons at the addresses set opposite there respective names;that the addresses set opposite the names of said persons are the address of said persons as shown on the current assessment roll..of the Town of Southold;that said Notices were mailed at.the United States Post Office at ,that said Notices were mailed to each of said persons by (certified) (registered)mail. Sworn to before me this 2 2 Day of ©c A- 20 o q Notary Public John M.Judge NOTARY PUBLIC,State of New York No. 01JU6059400 Qualified In Suffolk County Commission Expires May 29,-20�, James F. King,President y -� Town Hall,53095 Main Rd. Jill M. Doherty,Vice-President ,F, P.O. Box 1179 Peggy A. Dickerson ' Southold,NY 11971 Dave Bergen ��/� ��T Telephone(631)765-1892 Bob Ghosio,Jr. y' Fax(631)765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD BOARD OF TRUSTEES: TOWN OF SOUTHOLD �; 8 2009 --------------------------------------------------------------- NOV In the Matter of the Application of Soutl�aVd To��'n YAN RIEGER Baard of Trustees COUNTY OF SUFFOLK) STATE OF NEW YORK) AFFIDAVIT OF POSTING I, , residing at/dba ,3 D� Ny being duly sworn, depose and say: That on the/Q day of I-14 , 200 ,, I personally posted the property known as by placing the Board of Trustees official poster where it can easily be seen, and that I have checked to be sure the poster has remained in place for eight days prior to the date of the public hearing. Date of hearing noted thereon to be held Wed. November 18 2009 on or about 6:00 PM. Dated: C (sign ure) Sworn to before me this KHALID M.CHAUDHARY day of M0V 200 9 Notary Public,State of New York No.01 CH6164382 Qualified in Suffolk County Commission€xpir0 April 1a, 2o19 N tary Public I Attach additional sheets if necessary Policy 3: Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section IH—Policies Pages 6 through 7 for evaluation criteria dYes ❑ No ❑ Not Applicable Attach additional sheets if necessary NATURAL COAST POLICIES Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP Section iH—Policies Pages 8 through 16 for evaluation criteria 0 Yes ❑ No ❑ Not Applicable Attach additional sheets if necessary Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section III —Policies Pages.16 through 21 for evaluation criteria ( u Yes ❑ No ❑Not Applicable a Attach additional sheets if necessary Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III—Policies; Pages 22 through 32 for evaluation criteria. Yes No Not A• :able c Attach additional sheets if necessary Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III — Policies Pages 32 through 34 for evaluation criteria. ❑ Yes ❑ No E/Not Applicable Attach additional sheets if necessary Policy S. Minimize environmental degradation in Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III—Policies; Pages 34 through 38 for evaluation criteria. Yes ❑ No ❑ Not Applicable P,"9 PUBLIC COAST POLICIES I Policy 9. Provide for public access to, and recreational use of, coastal waters, public lands, and public resources of the. Town of Southold. See LWRP Section III—Policies; Pages 38 through 46 for evaluation criteria. u YeZl No 12d/Not Applicable f r i Attach additional sheets if necessary i WORKING COAST POLIC] Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in suitable locations. See LWRP Section III Policies; Pages 47 through 56 for evaluation criteria. 2 Yes ❑ No ❑ Not Applicable 01 Attach additional sheets if necessary Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic Estua and Town waters. See LWRP Section III-Policies; Pages 57 through 62 for evaluation criteria. Yes ❑ No ❑ Not Applicable Attach additional sheets if necessary Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III —Policies; Pages 62 through 65 for evaluation criteria. ❑ Yes El No 2Not Applicable Attach additional sheets if necessary Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP Section III—Policies; Pages 65 through 68 for evaluation criteria. dyes ❑ No ❑ Not Applicable r PREPARED BY ?A t,/ TITLE 014)Ue DATE /0 �01� Helping Long Island Adapt to Sea Level Rise n 1938,a hurricane Soo-miles wide with 183 mile-per-hour winds slammed into Long Island with an impact that registered on seismographs in Alaska. Named for its sheer force and speed,the"Long e. Island Express"left more than boo dead,cost the ®J , - ® a modern equivalent of about$5 billion in damage, and altered the geographic shape of Long Island: 12 new inlets were created (including Shinnecock ad Inlet) and Montauk was temporarily an island. • While the Long Island Express remains the worst hurricane to ever hit here,scientists warn that • �+v1�'F €i d: ,, global warming will bring more intense storms and sea level rise to coastal communities. Wetlands help protect coastal communities against rising waters,in addition to cleaning and filtering the water in our harbor's and bays;and,wetlands are home Today, Long Island's coastlines are even more to hundreds of important fish,shellfish,birds and other wildlife.The loss of wetland vulnerable than they were 70 years ago.As much habitat on Long Island could have devastating effects. as 8o percent of the wetlands that once occurred in New England have been lost to development. Wetlands serve as natural buffers to storms and sea level rise. In response,The Nature Conservancy is putting tools in place to make our coast more resilient to global warming.We are measuring how wetlands respond to rising sea levels and providing decision-makers with the scientific data they need to protect our coasts. "There is a growing awareness of global warming and flooding due to sea level rise and storms,but our collective response to this threat has been slow—in part due to the fact that decision-makers can't picture the impacts on the landscapes they manage,or identify solutions for protecting people and nature simultaneously,"said Sarah Newkirk,the Conservancy's coastal team director."Decision-makers and planners need a clear and compelling case for their constituents and that's exactly what we are working to provide." The Nature Conservancy recently launched cansrALResIuewcE LONG ISLAND X www.coa8tairesilience.org a tool for planners andBeen- - ecision-makers that exp ores'future flooding` -- - � T--• _ Sea Itvel risa and coaaWl hazuds arp P!ring scenarios caused by-storm surge.and sea level.,rise ham=n=ndn,tgaltammamlle,=Ianeth—sta for-the south shore.-The scenarios'are all developedr a g , kth from widely accepted climate and hazard models.- � t r'��•� �.A���`+L t< '" .Using this information, government agencies and What Con 90 Done b.v Supporting CoasUl Managementan Cedslans d officials can determine what lands should be AdaU"°n j K , The CoesUl Wiliam pmlett alms lanners,o prM p preserved, how to best manage coastal land, and Y'7+ understand deh,,deshl-n tken rtll^the t.11 de st d mas nable emu Imoads o,p Eno imm sea level dse and Amms ad to ptan and adV, determine which wetlands should be restored in aanjl4h'.TheC-1R"Illen"P j'"P�dea r, Supoart lnpWnlnp and eGenct GUWgh . order to best protect our coastal communities. """"""°"'°""a"`l",ed aaa d,ma 0 11 s i n I p l d l l k i t �V tom. Sea level rise and coastal hazards are putting human and natural communities along the coasts at greater risk than ever Socioeconomic Resources Long Island's shores have some of the most highly developed lands in the coastal zone. Much of this private property is only inches above sea level,which puts millions of dollars in public and private funds at great risk. Even moderate sea level rise will result in a significant increase in the likelihood of flooding. More significant rise—'or the occurrence of a catastrophic storm—would be devastatingly expensive. For more information,please click below to find out how sea level rise might affect these resources. • Human Populations • Infrastructure • Response • Vulnerability Infrastructure Infrastructure at risk from sea level rise on Long Island includes commercial and residential buildings. Distribution of these types of infrastructure can be mapped in the mapping too Coastal Resilience: Planning for Sea Level Rise and Coastal Hazards Stony Brook University Decision-makers need information to support choices for managing natural resources and human communities in the face of coastal changes that are already underway. The purpose of the Coastal Resilience project is to provide communities with.easy access to information to assist in coastal planning and management decisions regarding resources at risk from sea level rise and coastal hazards. This information is accessible through an interactive decision support tool. With the Future Scenarios Mapper, users can characterize current conditions and visualize the ecological, social and economic impacts of reasonable future flooding scenarios. Proactive solutions and adaptations can reduce impacts to human and natural communities.Appropriate planning for adaptation requires data-driven decision support, and the Coastal Resilience project provides a suite of interactive analysis options to support decision-makers. Long Island program Information> The Issue Coastlines have always been dynamic ecosystems where tides,winds, and sediment movement combine to change the landscape. The forces will only get more intense because of the increasing pace of sea level rise and development of these shorelines. Human and natural communities near the shore are at greater risk than ever and the losses and costs of coastal hazards are growing as investments in coastal development increase. Coastal communities are at further risk as their natural buffers such as coastal wetlands and dunes are lost.Abating these losses and protecting communities can be achieved by proactively managing coastal natural resources.' Sea level rise is not a bridge to be crossed when"we get there."It is real, its effects are already evident, and it will affect our coasts for the foreseeable future. Despite the risks, communities and local decision-makers still have little access to information needed to protect our natural and human coastal communities from the dramatic changes that are coming, and are indeed already underway. The unique tools presented here explore flooding scenarios resulting from sea level rise and storm surge for the south shore of Long Island,New York. The information is presented without hype or hyperbole in a user-friendly framework that can be used to inform decision making. Chief among these tools is an interactive mapper that helps users visualize flooding using a range of sea level rise and storm scenarios. Long Island,New York is the ideal case study for examining future flooding scenarios and approaches for responding to these changes now. Home to 7.5 million people, low- lying Long Island is heavily developed along much of its shoreline, and is at risk of inundation from sea level rise and coastal flooding. There are also significant barrier islands, dunes, and wetlands that provide critical habitat for natural communities and buffers for human communities. 2 . A Liturgical Art & Design; ', I— E ' SEP - 3 2008 Southold Town Board of Trustees yan & francoise rieger 08/30/08 370 harbor rd. box 491 orient,n.y. 1 1957-0491 tel/fax (631) 323-2579 - www. -liturgicart com -- -- -- fyr2@optonline.net Board of Town Trustees James King, President Jill Doherty, Vice-President Peggy A. Dickerson Dave Bergen Bob Ghosio Jr. Lauren Standish - Secretarial Assistant Elizabeth Cantrell, Clerk Town Hall Annex Building 54375 Route 25 P.O. Box 1179 Southold NY 11971 Re: Demand of wetland permit. Dear Mister King, I would like to advise you that our permit from the DEC would be forthcoming within the next couple of weeks. Ms Claire K Werner(DEC staff)telephoned me apologizing for the delay in processing our applications because of an overload in their department. I shall forward it as soon as I receive them. Enclosed please find letter of approval from the Department of the Army and Department of State. Sincerely urs tger r OFFICE LOCATION: o�*qF S�uryOl MAILING ADDRESS: Town Hall Annex '` O P.O. Box 1179 54375 State Route 25 l Southold, NY 11971 (cor.Main Rd. &Youngs Ave.) N Telephone: Southold NY G � 631 765-1938 �� Fax: 631 765-3136 '00UNm,��' LOCAL WATERFRONT REVITALIZATION PROGRAM COORDINATOR TOWN OF SOUTHOLD MEMORANDUM To: Jim King, President Town of Southold Board of Trustees pp From: Mark Terry, LWRP Coordinator ` E C V y D Principal Planner NOV 1 3 2007 " Date: November 13, 2007 Southold Town Re: Wetland Permit for Yan Rieger Board of Trustees SCTM#27-4-6 YAN RIEGER requests a Wetland Permit to construct a low-profile bulkhead using vinyl sheathing, a 12' X 32' platform and 4'X 18' catwalk. Located: 370 Harbor Rd., Orient. SCTM#27-4-6 The proposed action has been reviewed to Chapter 268, Waterfront Consistency Review of the Town of Southold Town Code and the Local Waterfront Revitalization Program (LWRP) Policy Standards. Based upon the information provided on the LWRP Consistency Assessment Form submitted to this department, as well as the records available to me, it is my recommendation that the proposed action is INCONSISTENT with the denoted following Policy Standards and therefore is INCONSISTENT with the LWRP. Policy 6 Protect and restore the quality and function of the Town of Southold ecosystem. 6.3 Protect and restore tidal and freshwater wetlands. A. Comply with statutory and regulatory requirements of the Southold Town Board of Trustees laws and regulations for all Andros Patent and other lands under their jurisdiction 1. Comply with Trustee regulations and recommendations as set forth in Trustee permit conditions. The proposed low-profile bulkhead is a prohibited action pursuant to & 275-11. Construction and operation standards section B. 1. (d)which states. (h) New bulkheads in creeks and bays are prohibited, unless the operation involves construction of a low-sill bulkhead. Chapter 275 defines a low sill bulkhead as LOW-SILL BULKHEAD --A subtidal structure designed to stabilize the toe of a slope or shore and often associated with boat basins or other navigable waterways. In addition, the proposed 12' x 321deck is proposed to be located on the beach and associated with the catwalk is prohibited pursuant to Chapter 275-11, A. (6) Decks and platforms. No decks or platforms shall be permitted on or near bluffs. Platforms associated with stairs may not be larger than 32 square feet. [Amended 10-I1- 2005 by L.L. No. 17-20051 (8) No structures on beaches, bluffs or dunes unless approved by the Board at its discretion based on its site inspection. [Added 10-11-2005 by L.L. No. 17-2005] No structures are allowed on the beach, pursuant to Costal Erosion Hazard Areas Chapter 111-12 (d) which states: D. All development is prohibited on beaches unless specifically provided for by this chapter. 4.1 Minimize losses of human life and structures from flooding and erosion hazards. B. Use vegetative non-structural measures to manage flooding and erosion hazards. 1. Use vegetative non-structural measures which have a reasonable probability of managing flooding and erosion, based on shoreline characteristics including exposure, geometry, and sediment composition. 2. Use vegetative measures to increase protective capabilities of natural protective features. C. Enhance existing natural protective features and processes, and use non- structural measures which have a reasonable probability of managing erosion 1. Enhance the protective capabilities of beaches by using fill, artificial nourishment, dredge disposal, or by restoring coastal processes. a. Use only clean sand or gravel with a grain size equivalent to or slightly larger than the native material at the project site. b. Design criteria for enhancing the protective capabilities of beaches should not exceed the level necessary to achieve protection from a 30-year storm, except where there is an overriding public benefit. D. Use hard structural erosion protection measures for control of erosion only where: 1. Avoidance of the hazard is not appropriate because a structure is functionally dependent on a location on or in coastal waters; located in an area of extensive public investment; or reinforces the role of Maritime Centers or Areas for Concentrated Development. 2. Vegetative approaches to controlling erosion are not effective. 3. Enhancement of natural protective features would not prove practical in providing erosion protection. 4. Construction of a hard structure is the only practical design consideration and is essential to protecting the principal use. 5. The proposed hard structural erosion protection measures are: a. limited to the minimum scale necessary b. based on sound engineering practices 6. Practical vegetative methods have been included in the project design and implementation. 7. Adequate mitigation is provided and maintained to ensure that there is no adverse impact to adjacent property or to natural coastal processes and natural resources and, if undertaken by a private property owner, does not incur significant direct or indirect public costs. The site was inspected on November 13, 2007. Erosion of the bank where the bulkhead is proposed is low with slight scouring of the toe of the bank at the lower elevations. The bank is currently vegetated with American beach grass, Montauk daisy, and prickly pear cactus and is stable. However, due to the fetch of the waterway and exposure the Board may consider a low rock revetment application to stabilize the toe of the slope. Pursuant to Chapter 268, the Board of Trustees shall consider this recommendation in preparing its written determination regarding the consistency of the proposed action. MT/hkc c -a -a � d S. Y 13 U _ l �{Y�� ,fir t,+y-�� W .,. rw: s �,•!%•.f j .1._.._ ...j .� T ._....,- !-.. -._..-.. # _._.__.1_...� ,. p ( i' rr 'xi tca 17N13;11. 7 --1�-___ram---r'Y'' rr , f tF 1 t saa,sna1�D a_eD� # # �i- 1r.Dj ,lDU�rO� !0�j � LL i.eti�' Fst i LOOZ Z G 130 ?s 'i _ as tt� - Hit,- 71 e lh I -. f.m�(_ a__ , . . t I r y;� ,.. , ,• , �' --. -it i +� �q ,` ��� ��"se"{� , ` � ._ 1 � �, f i fit'\ z; • ! y t �`' - ('e PS�J' �..a .a. � — '''-r..... _.�— __ _ a , , _ C Lo �. Cba a, ly a .ti 10 o James F.King,President *OF SOUj Town Hall Jill M.Doherty,Vice-President �0� Ol0 53095.Route 25 P.O.Box 1179 Peggy A. Dickerson Southold,New York 11971-0959 Dave Bergen Telephone(631)765-1892 John Holzapfel " 4-UN Fax(631) 765-6641 BOARD OF TOWN TRUSTEES TOWN OF SOUTHOLD Office Use Only V Coastal Erosion Permit Application /Wetland Permit Application Administrative Permit _Amendment/Transfer/Extension _Received Application: -,-lu �eceivedFee:$ J Os- "ompleted Application y _Incomplete r SEQRA Classification: 1 ; Type I Type II Unlisted L OCT 2 :Z`"20I ' _Coordination:(date sent) ,I VWRP Consistency Assessment Form a E—---•--"— SAC Referral Sent Seuti;4old Tom Bsaa of Trustees ,,Hate of Inspection: /1 O _Receipt of CAC Report: _Lead Agency Determination: _Technical Review: .public Hearing Held: / Resolution: Name of Applicant R lC—CI E R YAN 14 Address H A R t3O K CZ� 47. 0 50y/ L+g I c) Z l e V 0 p Phone Numb er:(b] 3 23 - 25�-I Suffolk County Tax Map Number: 1000 - z7- 4 Property Location: --S`,7-O 14A 30g 1ROAC2 IDKIEt`Ir' 1 l ROCS* 1 12501` J> UCGU. 6 R01 CI�R CST (provide LILCO Pole#, distance to cross streets, and location) AGENT: ►,I 4 (If applicable) ' Address: tl Phone: � ,ol� oard of Trustees Applicai a GENERAL DATA Land Area (in square feet): Area Zoning: R Qj(� Previous use of property: T I A L Intended use of property: Rt—=C, OT LAL. M A l_c.1 l��tom)CiCC Covenants and Restrictions: Yes __,X_No If"Yes", please provide copy. I ,� Prior permits/approvals for site improvements: �, ��� Agency Date So l Q Q U1 obc>ro%/,�JEy AouL( ��1 I D No prior permits/approvals for site improvements. Has any permit/approval ever been revoked or suspended by a governmental agency? No Yes If yes, provide explanation: Project Description (use attachments if necessary): A Loki/ PRo Fi L15 BUU!GL-[E�A D 155A�LL Re O • LA-rFbKA l • 12,`-1, 321 ���►7 �1L5\,1AT7i,::D cam►�\/ALk • �fc oard of Trustees Applicai 1 COASTAL EROSION APPLICATION DATA --ro Purposes of proposed activity: To { QT'��1 Fe5t CF&5 �J G� Are wetlands present within 100 feet of the proposed activity? No Yes Does the project involve excavation or filling? No_ Yes If Yes,how much material will be excavated? —' (cubic yards) How much material will be filled? 100 (cubic yards) Manner in which material will be removed or deposited: MA�J V CL Describe the nature and extent of the environmental impacts reasonably anticipated resulting from implementation of the project as proposed. (Use attachments if necessary) MpLemetirC o A�2 } NM7S 710>-J oard of Trustees Applicat�n WETLAND/TRUSTEE LANDS APPLICATION DATA. Purpose of the proposed operations: 1_0 FRK21 EG'C C 1 '['l tJ �l�►tJ—�-�t��t�G� C�R,O��"c�( �201y1 �i''RTi� —t Area of wetlands on lot: -_eQ-- square feet Percent coverage of lot: 0— % Closest distance between ne rest existing structure and upland edge of wetlands: feet Closest distance between nearest proposed structure and upland edge of wetlands: feet Does the project involve excavation or filling? No Yes If yes, how much material will be excavated? cubic yards How much material will be filled? 00 cubic yards Depth of which material will be removed or deposited: �Jfeet Proposed slope throughout the area of operations: O Manner in which material will be removed or deposited: 11414 t.-il>EL J L A4—h_ tEQ0 l PA4 Et-1 r Statement of the effect, if any, on the wetlands and tidal waters of the town that may result by reason of such proposed operations(use attachments if appropriate): J PROJECT ID NUMBER SEAR APPPENDIENDI X C STATE ENVIRONMENTAL QUALITY REVIEW SHORT ENVIRONMENTAL ASSESSMENT FORM for UNLISTED ACTIONS Only PART 1 -PROJECT INFORMATION (To be completed by Applicant or Project Sponsor) 1.APPLICANT/SPONSOR 2.PROJECT NAME R�� �•R y/�tir �� E2 R�l ��1•� cE 3.PROJECT LOOCATION::� 1 + /� Municipality Sou{�/cup County ✓0rf✓Ll< 4.PRECISE LOCATION: Street Addess and Road Intersections, Prominent landmarks etc -or provide map 5. IS PROPOSED ACTION: ❑ New ❑Expansion ❑Modification/alteration 6. DESCRIBE PROJECT BRIEFLY: l Nstl��cd¢70 rJ or A 5,5-,ak1Au-st. ,5gt1ARP 7m PREr/e5-x)r �UR1lt��DSiDti! PdMAC,e TO R L-S 9,5xMAL PRO>>j6FR,tY 6TOM 7.AMOUNT OF LAND AFFECTED: Initially O.3Zacres Ultimately 0.32 acres 8.WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER RESTRICTIONS? ©Yes ❑ No If no,describe briefly: 9.WHAT IS PRESENT LAND USE IN VICINITY OF PROJECT? (Choose as many as apply.) ®Residential ❑Industrial ❑Commercial ❑Agriculture ❑Park/Forest/Open Space ❑Other (describe) 10. DOES ACTION INVOLVE A PERMIT APPROVAL, OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY (Federal, Statc or Local) ,I�/ nYes No If yes, list agency name and permit / approval: D-�•G• r 1 S d�7t•[.f/us 11�4 N `' USAilW y 'l"' Id IW FiX�G1t 2��1 11.DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VALID PERMIT OR APPROVAL? ❑Yes ®No If yes, list agency name and permit / approval: 12. AS A RESULT OF PROPOSED ACTION WILL EXISTING PERMIT/ APPROVAL REQUIRE MODIFICATION? ❑Yes No I CERTIFY THAT THE INFORMA PROVIDED ABOVE IS TRUE TO THE BEST OF MY KNOWLEDGE Applicant / Date fo-f f 07 Signature J!� I If the action is a Costal Area, and you are a state agency, complete the Coastal Assessment Form before proceeding with this assessment PROOF OF MAILING OF NOTICE ATTACH CERTIFIED MAIL RECEIPTS Name: -Fhu(k AO cia. Address:300 qa r6H t STATE OF NEW YORK COUNTY OF SUFFOLK r ' f Q D ,residing at being duly sworn, deposes and says that on the Z�a;Lday of , P4VaG 0 a7, deponent mailed a true copy of the Notice set forth in the Board of Trustees Application, directed to each of the above named persons at the addresses set opposite there respective names; that the addresses set opposite the names of said persons are the address of said persons as shown on the current assessment roll of the Town of Southold; that said Notices were mailed at the United States Post Office at QRP-0(-►FYI L qr,� ,that said Notices were fled to each of said persons by (certified) (registered)mail. ` OWL Sworn to be re e this Day of , 20_0__� otary Public PATRIdA CORWIN. NotmyNo 01t0501785 Now � Qua!' m Suffolk County Cow s= Sapt.13.�Of NOTICE TO ADJACENT PROPERTY OWNER BOARD OF TRUSTEES,TOWN OF SOUTHOLD In the matter of applicant: �'/�►til l�G'j� SCTM# YOU ARE HEREBY GIVEN NOTICE: n 1. That it is the intention of the undersigned to request a Permit from the Board of Trustees to: [1-15'C/�cLl. 5 /�►v�/Q�-lr Sl- jCZ E�.0 JAI�C� Vl t�►lrl��4-�'C--fir [�I LI�CI 2.. That the property which is the subject of Envir nmental Review is located adjacent to your property and is described as follows:` �t?rd21'S rD�.t d wipNtt F.Vi Ott so�ct�t s� • fit,►-P�o� �l ��l� ,�/�f�. , 4r� wta� -�aurle �c. 3. That the project which is subject to-Environmental Review under Chapters 32, 37, and/or - 97 of the Town Code is open to public comment on: You may contact the Trustees Office at 765-1892 or in writing. The above-referenced proposal is under review of the Board of Trustees of the Town of Southold and does not reference any other agency that might have to review same proposal. OWNERS NAME: t�I ( G � MAILING ADDRESS: V (l p) � PHONE#: Enc: Copy of sketch or plan showing proposal for your convenience. PROOF OF MAILING OF NOTICE ATTACH CERTIFIED MAIL RECEIPTS a4H (Qd ok4f lg'S Name: `�r�.lQ, �l�Q uac Address:30l�0 qEo STATE OF NEW YORK COUNTY OF SUFFOLK D ,residing at being duly sworn, deposes and says that on the day of ,20_, deponent mailed a true copy of the Notice set forth in the Board of Trustees Application, directed to each of the above named persons at the addresses set opposite there respective names; that the addresses set opposite the names of said persons are the address of said persons as shown on the current assessment roll of the Town of Southold; that said Notices were mailed at.the United States Post Office at ,that said Notices were mailed to each of said persons by -(certified) (registered)mail. Sworn to before me this Day of , 20 Notary Public Board of Trustees Application County of Suffolk State of New York BEING DULY SWORN DEPOSES AND AFFIRMS THAT HE/SHE IS THE APPLICANT FOR THE ABOVE DESCRIBED PERMIT(S)AND THAT ALL STATEMENTS CONTAINED HEREIN ARE TRUE TO THE BEST OF HIS/HER KNOWLEDGE AND BELIEF, AND THAT ALL WORK WILL BE DONE IN THE MANNER SET FORTH IN THIS APPLICATION AND AS MAY BE APPROVED BY THE SOUTHOLD TOWN BOARD OF TRUSTEES. THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE TOWN TRUSTEES HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING UNDER OR BY VIRTUE OF SAID PERMIT(S), IF GRANTED. IN COMPLETING THIS APPLICATION, I HEREBY AUTHORIZE THE TRUSTEES, THEIR AGENT(S) OR REPRESENTATIVES(S), TO ENTER ONTO MY PROPERTY TO INSPECT THE PREMISES IN CONJUNCTION WITH REVIEW OF S APPLICATION. & , Signature SWORN TO BEFORE ME THIS o20-"a DAY OF dC ,200-) LA E aSTANDISH Notary ic, to of New York No.O1ST6164 Co lified in Suffolk Counttyy Notary Public CommQ�(a sslon Expires April 9,20� APPLICANT/AGENT/REPRESENTATIVE TRANSACTIONAL DISCLOSURE FORM The Town of Southold's Code of Ethics prohibits conflicts of interest on the part of town officers and employees.The purpose of this form is to provide information which can alert the town of possible conflicts of interest and allow it to take whatever action is necessary to avoid same. YOUR NAME: ME t✓1:Z yA r.l 44 (Last name,first name,griddle initial,unless you are applying in the name of someone else or other entity,such as a company.If so,indicate.the.other person's or company's name.) NAME OF APPLICATION: (Check all that apply.) Tax grievance Building Variance Trustee !� Change of Zone Coastal Erosion Approval of plat Mooring Exemption from plat or official map Planning Other (If"Other',name the activity.) Do you personally(or through your company,spouse,sibling,parent,or child)have a relationship.with any officer or employee of the Town of Southold? "Relationship"includes by blood,marriage,or business interest.`Business interest"means a business, including a partnership,in which the town officer or employee has even a partial ownership of(or employment by)a corporation in which the town officer or employee owns more than 5%of the shares. YES NO If you answered"YES",complete the balance of this form and date and sign where indicated. Name of person employed by the Town of Southold Title or position of that person Describe the relationship between yourself(the applicantlagent/representative)and the town officer or employee.Either check the appropriate line A)through D)and/or describe in the space provided. The town officer or employee or his or her spouse,sibling,parent,or child is(check all that apply): A)the owner of greater than 5%of the shares of the corporate stock of the applicant (when the applicant is a corporation); B)the legal or beneficial owner of any interest in a non-corporate entity(when the applicant is not a corporation); C)an officer,director,partner,or employee of the applicant;or D)the actual applicant. DESCRIPTION OF RELATIONSHIP Submitted this of G 200 Signature_ �N Print Name Form TS I s Town of Southold LWRP CONSISTENCY ASSESSMENT FORM A. INSTRUCTIONS 1. All applicants for permits* including Town of Southold agencies, shall complete this CCAF for proposed actions that are subject to the Town of Southold Waterfront Consistency Review Law. This assessment is intended to supplement other information used by a Town,of Southold agency in making a determination of consistency. *Except minor exempt actions including Building Permits and other ministerial permits not located within the Coastal Erosion Hazard Area. 2. Before answering the questions in Section C, the preparer of this form should review the exempt minor action list, policies and explanations of each policy contained in the Town of Southold Local Waterfront Revitalization Program. A proposed action will be evaluated as to its significant ificant beneficial and adverse effects upon the coastal area(which includes all of Southold Town, 3. If any question in Section C on this form is answered "yes" or "no", then the proposed action will affect the achievement of the LWRP policy standards and conditions contained in the consistency review law. Thus, each answer must be explained in detail, listing both supporting and non- supporting facts. If an action cannot be certified as consistent with the LWRP policy standards and conditions,it shall not be undertaken. A copy of the LWRP is available in the following places: online at the Town of Southold's website (southoldtown.northfork.net), the Board of Trustees Office, the Planning Department, all local libraries and the Town Clerk's office. B. DESCRIPTION OF SITE AND PROPOSED ACTION SCTM# 2 - —4 - — PROJECT NAME G�� 010E 13e J Gf:5 The Application has been submitted to (check appropriate response): Town Board ❑ Planning Board❑ Building Dept. ❑ Board of Trustees 1. Category of Town of Southold agency action(check appropriate response): (a) Action undertaken directly by Town agency(e.g. capital ❑ construction,planning activity, agency regulation,land transaction) ❑ (b) Financial assistance (e.g. grant, loan, subsidy) (c) Permit, approval,license,certification: ❑ Nature d extent of action: "V t- ott) �A WA t/tPY Lt .:D Location of action: law /1-L` 15©� � ��I�T-. Site acreage: t O.3 Z O-1 Present land use: �?4=1 S l C l A L— Present zoning classification: W 2. If an application for the proposed action has been filed with the Town of Southold agency, the following information shall be provided: (a) Name of applicant: �Ac� (b) Mailing address: O 3 0 0 R E LJ (c) Telephone number: Area Code(63 '3 Z.3 �CJ (d) Application number, if any: Will the action be directly undertaken,require funding;or approval by a state or federal agency? Yes 2r No❑ If yes,which state or federal agency? j EG V.5 14L?A/L Y�,0/ pop� • -' C. Evaluate the project to the following policies by analyzing how the project will further support or not support the policies. Provide all proposed Best Management Practices that will further each policy. Incomplete answers will require that the form be returned for completion. DEVELOPED COAST POLICY Policy 1. Foster a pattern of development in the Town of Southold that enhances community character, preserves open space, makes efficient use of infrastructure, makes beneficial use of a coastal location, and minimizes adverse effects of development. See LWRP Section III—Policies; Page 2 for evaluation criteria. ®Yes ❑ No ❑ Not Applicable v �- v Attach additional sheets if necessary Policy 2. Protect and preserve historic and archaeological resources of the Town of Southold. See LWRP Section III—Policies Pages 3 through 6 for evaluation criteria Of Yes 0 No ❑ Not Applicable Attach additional sheets if necessary Policy 3: Enhance visual quality and protect scenic resources throughout the Town of Southold. See LWRP Section III—Policies Pages 6 through 7 for evaluation criteria © Yes ❑ No ❑ Not Applicable v P Eerr Attach additional sheets if necessary NATURAL COAST POLICIES Policy 4. Minimize loss of life, structures, and natural resources from flooding and erosion. See LWRP Section III—Policies Pages 8 through 16 for evaluation criteria ® Yes ❑ No ❑ Not Applicable 739 =�r- 4.os,s Attach additional sheets if necessary Policy 5. Protect and improve water quality and supply in the Town of Southold. See LWRP Section III —Policies Pages 16 through 21 for evaluation criteria Yes ❑ No ❑Not Applicable Attach additional sheets if necessary Policy 6. Protect and restore the quality and function of the Town of Southold ecosystems including Significant Coastal Fish and Wildlife Habitats and wetlands. See LWRP Section III—Policies; Pages 22 through 32 for evaluation criteria. ® ❑ ❑ Yes No Not Applicable Attach additional sheets if necessary Policy 7. Protect and improve air quality in the Town of Southold. See LWRP Section III — Policies Pages 32 through 34 for evaluation criteria. Yes ❑ No® Not Applicable Attach additional sheets if necessary Policy 8. Minimize environmental degradation in`Town of Southold from solid waste and hazardous substances and wastes. See LWRP Section III—Policies; Pages 34 through 38 for evaluation criteria. © Yes ❑ No ❑ Not Applicable n Io i Tn �L' D� /U l- /-1 PUBLIC COAST POLICIES Policy 9. Provide for public access to, and recreational use of,-coastal waters, public lands, and public resources of the Town of Southold. See LWRP Section III—Policies; Pages 38 through 46 for evaluation criteria. ❑ YeO No Not Applicable Attach additional sheets if necessary WORKING COAST POLICj2a Policy 10. Protect Southold's water-dependent uses and promote siting of new water-dependent uses in suitable locations. See LWRP Section III Policies; Pages 47 through 56 for evaluation criteria. ® s PNo ❑ Not Applicable l Attach additional sheets if necessary Policy 11. Promote sustainable use of living marine resources in Long Island Sound, the Peconic Estuary and Town waters. See LWRP Section III—Policies; Pages 57 through 62 for evaluation criteria. 4.Yes ❑ No ❑ Not Applicable IV IF Attach additional sheets if necessary Policy 12. Protect agricultural lands in the Town of Southold. See LWRP Section III — Policies; Pages 62 through 65 for evaluation criteria. ❑ Yes ❑ No© Not Applicable Attach additional sheets if necessary Policy 13. Promote appropriate use and development of energy and mineral resources. See LWRP Section III—Policies; Pages 65 through 68 for evaluation criteria. 9b s ❑ No ❑ Not Applicable PREPARED BY /At J TITLE DATE