Loading...
HomeMy WebLinkAbout51714-Z o�aof Sao rya! Town of Southold * * P.O. Box 1179 G ao9 53095 Main Rd Ulm Southold, New York 11971 CERTIFICATE OF OCCUPANCY No: 47141 Date: 06/16/2026 THIS CERTIFIES that the building SINGLE FAMILY DWELLING-NEW Location of Property: 800 Corey Creek Ln Southold, NY 11971 See/Block/Lot: 78.4-12 Conforms substantially to the Application for Building Permit heretofore,filed in this office dated: 01/28/2025 Pursuant to which Building Permit No. 51714 and dated: 03/06/2025 Was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: Single-family dwelling with an unfinished basement and a covered front porch as applied for. The certificate is issued to: 800 Corey Creek Ln LLC Of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL: R-24-1894 5/24/2026 ELECTRICAL CERTIFICATE: AE260510-73436 5/10/2026 PLUMBERS CERTIFICATION: Paul Rupp 5/13/2026 l A o ' ed S' a e ��oFso�ry° TOWN OF SOUTHOLD BUILDING DEPARTMENT ' TOWN CLERK'S OFFICE SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 51714 Date: 03/06/2025 Permission is hereby granted to: Alfano Family Trust PO BOX 266 Laurel, NY 11948 To: construct single-family dwelling as applied for per SCHD approval. Premises Located at: 800 Corey Creek Ln, Southold, NY 11971 SCTM#78.4-12 Pursuant to application dated 01/28/2025 and approved by the Building Inspector. To expire on 03/06/2027. Contractors: Required Inspections: Fees: Single Family Dwelling-NEW $2,434.00 CO Single Family Dwelling-New $100.00 Total $2,534.00 Building Inspector ALLIANCE ELECTRICAL INSPECTIONS LIMITED 707 HYMAN AVENUE, WEST ISLIP, NY 11795 SECTION: 78 BLOCK: 4 LOT: 12 CERTIFICATE NUM: AE260510-73436 BUILDING PERMIT NUMBER: 51714,51715,51716 CERTIFICATE DATE: 05/10/2026 FINAL RESIDENTIAL ELECTRICAL CERTIFICATE THIS CERTIFIES THAT ONLY THE ELECTRICAL EQUIPMENT AS DESCRIBED AND INTRODUCED BY THE APPLICANT NAMED ON THE ABOVE CERTIFICATE NUMBER AT THE PREMISES OF: PAUL DAVEY,800 COREY CREEK LN,SOUTHHOLD,NY 11971 INSPECTION WAS CONDUCTED ON 05/10/2026 AND WAS FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRICAL CODE AND/OR NEW YORK STATE APPLICABLE CODE AT THE TIME OF CONSTRUCTION IN THE FOLLOWING LOCATIONS: Attached Garage,Attic,Basement,First Floor,In Ground Pool,Outside,Second Floor,Cabana/BBQ 1 Service-Residential 200A Overhead 3 Smoke/Carbon Combo 1 Septic Pump 4 Exhaust Fan 1 Hot water heater 1 Door Bell Transformer 1 Oil Fired Heating System 4 LED UC Ught(s) 2 A/C Condenser 1 LED Driver 2 Air Handler 90 Fixture 2 A/C Disconnect 1 Fixture-Pendant(s) 1 Washer 9 Fixtures Outside 1 Dryer 1 Flood Light 1 Wine Fridge 15 Porcelain fixture 1 Dishwasher 5 Vanity Mirror Light 1 Range Gas 1 LED Fixture 1 Microwave 1 Fan box 1 Exhaust Hood 4 Fixture Incandescent 1 Fireplace 12 AFCI Breaker 15A 5 GFCI Receptacle 1 AFCI/GFCI Dual Rated Breaker 3 Receptacle WP 3 AFCI Breaker 20A 2 Receptacle Island 1 Pool-Residential In Ground 2 Refrigerator 1 Bonding Pool#8 72 Receptacle 1 Pool Heater 56 Switch 1 Pool Filter 10 Switch(es)3-way 1 Pool Panel 1 Switch(es)4-way 1 Pool Pump/Motor 1 Caseta Switch/Pico Switch 3 Pool Light 1 Heat Detector 1 Low Voltage Transformer 5 Smoke Detector 2 Chandelier 1 Sub Panel APPLICANT: NEUBAUER ELECTRIC LICENSE NUMBER:KAI BAUER SUFFOLK 3867 ME 407 B LEXINGTON AVENUE ,WEST BABYLON,NY 11704 CATALIN DUMITRU PRESIDENT 631-539-6055 S _E ALAN GAGNON VICE PRESIDENT 516-248-0820 THIS CE TIFICATE MAY NOT BE ALTERED IN ANY WAY AND IS VALID BY THE PRESENCE OF A RAISED SEALAT THE LOCATION INDICATED THIS CERTIFICATE IS VALID FOR ONE YEAR FROM THE DATE OF ISSUANCE �o��oF sa0ry®� Town Hall Annex Telephone(631)765-1802 54375 Main Road Fax(631)765-9502 P.O.Box 1179 f Southold.NY 11971-0959 l�c0 BUILDING DEPARTMENT TOWN OF SOUTHOLD CERTIFICATION Date: �01 (U _._... .. Building Permit No. Owner: (Pleas print) Plwnbcr: U\Y-4,pp PILue print) I certify that the solder used in the water supply system contains less than 2/I 0 of I% lead. Mdmbers Signature) Sworn to before me this �3 day of �===�t— ' 208.� Notary Public, NQ%SGU County DINA f.10 NOTARY I uKx,sTATE OF NEW YORK RegWmWon No.01AN63W& Quelf ed In Newu County Commission Expires OU23J2030 OE 50(/j�olo TOWN OF SOUTHOLD BUILDING DEPT. 631-765-1802 INSPEC ION FO ATION 1ST/ RESAR ROUGH PLBG. [ NDATION 2ND [ ] INSULATION/CAULKING FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: X O VIA) v, rA-Ar%, DATE INSPECTOR OF SOUTho� # TOWN OF SOUTHOLD BUILDING DEPT. lo��m,� 631-765-1802 INSPECTION [ ] FOUNDATION 1ST/ REBAR [ ] OUGH PLBG. [ ] FOUNDATION 2ND . [ INSULATIOWCAULKING j [ ] FRAMING /STRAPPING [ ] .FINAL [ ]- FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ]- FIRE RESISTANT CONSTRUCTION .[ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: r'A � Pig. Olti J r�✓1, � S DATE yDYJ INSPECTOR OF SOUIyOIo # TOWN OF SOUTHOLD BUILDING DEPT. courm" 631-765-1802 INSPECTION [ ] FOUNDATION 1ST/ REBAR [ ] OUGH PLBG. [ ] FOUNDATION 2ND [ INSULATION/CAULKING [ ] FRAMING /STRAPPING [ FINAL N 1> [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: Xf % t>r4 , IU u �1 Lww (� p DATE y INSPECTO Energy Testing Services 2026 Combustion Safety Testing Form i i i Certified Home Address: 800 Corey Creek Lane City: Southold Builder Name: Sligo Construction Corp. Builder Tracking# I i Combustion Appliance Zone (CAZ)# of Location of this CAZ: Basement i (Use additional forms if more than one CAZ or if home has multiple heating systems or water heaters) Date of Test: 05-14-2026 Outdoors Temp During Test: 60 °F CAZ Depressurization (NOTE:Net Change=Test Pressure—Base Pressure) Base Pressure: N/A pa. CAZ Ambient CO: N/A PPM Test Pressure: N/A pa. Appliances/Fireplace Simulated for Test? Yes❑ No IZI I Net Change: N/A pa. If Yes,Total CFM Simulated (explain in notes) NOTES: i I Heating System Primary: Yes❑✓ No❑ Type: Furnace❑Boiler❑✓ Heat Pump[:[Other❑ r z Venting Type 3 DraftSin Ilaee S [n•flake CO CO E [ciene Fue!Tvpe Circle Type) (Pascal) orst Case (Natural) (Worst Case)' attn•al Rating:95•0 N❑✓ P❑O❑E❑ N❑\0MQS_2 NSA Pa. Pass❑✓ Fail❑_ Pass❑✓Fail❑ N/APPM N/A PpM Yes ❑✓ Type: Standard Tank❑Indirect Tankless El Size: 0.0 Style Common Vent ElWater Heater Primary: 4 Non Instantaneous❑✓ Commercial (See Note Sbelow) (Gallons) Stand Alone ❑✓ s z Ventinr Type s .Drat Sin llaee Spillage(Natural) CO CO Efficiency Fuel Type (Circle Type) (Pascal) (Worse Case) (Worse Case) (Natural) EF: 0.95 N_❑✓ P❑O❑E.❑ N❑M❑S❑✓ N/A Pa. Pass❑✓ Fail❑ PassZFail❑ N/A PPM N/A PPM Oven Oven is Electric or No Oven Exists ❑ Oven Range Hood Vented to Outside Yes Z No❑ Oven CO t PPM Ambient CO(During Oven CO Testing) o PPM 'Heating System Efficiency: Enter AFUE for furnace or boiler;HSPF for heat pump;COP if heat pump is geothermal 1 Fuel Type: N =Natural Gas P=Propane O=Oil E=Electric 3 Venting Type: N =Natural/Atmospheric V =Natural/Atmospheric PLUS Vent Damper M =Mechanically Assisted S =Sealed(Two Pipe) NOTE. If the Venting Type selected is M,no Draft testis required for that appliance. If the Venting Type selected is S,no Draft or Spillage tests are required for that appliance. A CO test IS REQUIRED for all appliances regardless of Venting Type,if the exhaust vent is accessible. 4 Water Heater Style: Commonly Vented with Heating System or Stand Alone(Independently Vented or Orphaned) S Water Heater Efficiency: If Water Heater Type is Indirect,no EF entry is required. If Water Heater Type is Tankless,enter efficiency of combustion source. NOTE: If Water Heater Type is"Commercial"and the unit is 99 gallons or less,enter a maximum-modeled EF of.54 If Water Heater Type is"Commercial'and the unit is 100 gallons or more,enter a maximum-modeled EF of.48 Rater Name: Michael Fauc' Rater Number: 8619824 Rater Signature: Date: 05-14-2026 Home Energy Rating Certificate Rating Date: 2026-05-14 Final Report Registry ID: 040979532 Ekotrope ID: d4rR9gr2 HERS' • - • - Savings Your home's HERS score is a relative : 11 Corev Creek , performance score.The lower the number, Southold, the more energy efficient the home.To 52learn more,visit www.hersindex.com *Relative to an average U.S.$2,368 Builder: home Sligo Construction Corp. Your Home's Estimated Energy Use: This home meets or exceeds the Use[MBtu] Annual Cost criteria of the following: Heating 49.7 $551 2020 New York ECCC Code Cooling 1.6 $94 Hot Water 11.7 $128 Lights/Appliances 21.6 $1,086 Service Charges $120 Generation (e.g.Solar) 0.0 $0 Total: 84.7 $1,978 HERY Index Home Feature Summary: Rating Completed by: M—Energy HomeType: Single family detached 2zo Model: N/A Energy Rater: Michael Fauci Existing Ito Community: N/A RESNET ID: 8619824 Homes 170 Conditioned Floor Area: 2,640 fe Rating Company Energy Testing Services 120 Number of Bedrooms:, 4 1648 Locust Avenue Unit E,Bohemia,NY 11716 Reference 2ioo Primary Heating System: Boiler•Natural Gas•95 AFUE 631-244-2627 Home Primary Cooling System: Air Conditioner•Electric•16 SEER2 90 Rating Provider: Building Efficient Resources Residential Water Heater•Natural Gas•0.95 Energy 9 9 Y 80 Primary Water Heating: Factor PO Box 1769 Brevard,NC 28712 7O eo House Tightness: 1105 CFM50(2.19 ACH50) 800-399-9620 so Ventilation: 77 CFM•30 Watts•Exhaust Only ao ¢ This Home Duct Leakage to Outside: Untested Forced Air � .:- 9 - 30 Above Grade Walls: R-21 20 � Ceiling: Sealed Attic,R-42 2O LC and Zero Energy o Window Type: U Value:0.3,SHGC:0.31 Home Foundation Walls: N/A Michael Fauci,Certified Energy Rater omuarsW Los` Ty Framed Floor. R-30 Digitally signed:5114/26 at 239 PM ekotrope Ekotrope RATER-Version:5-0-23862 reportThe EnergyRating Disclosurefor this home is availablefrorn the Approved Rating Provider. This does not constitute anywarranty or guarantee. 800 Corey Creek Lane Southold, NY 11971 r Builder:Sligo Construction Corp. THIS HOME IS CERTIFIED TO MEET THE NEWYORK2020 ENERGY CODE i Building Features Ceiling Sealed Attic,R-42 Duct Supply R-6.0,Return R-6.0 Above Grade Walls R-21 Duct Leakage to Outside Untested Forced Air(Exempt) Foundation Walls N/A Total Duct Leakage Untested(Exempt) Framed Floor R-30 Heating Boiler-Natural Gas-95 AFUE Slab N/A Cooling Air Conditioner-Electric-16 SEER2 I Infiltration 1105 CFM50(2.19 ACH50) Water Heating Residential Water Heater-Natural Gas-0.95 Energy Window U Value:0.3,SHGC:0.31 Factor Asa 3rd party extension of the code jurisdiction utilizing these reports,I certify that this energy code compliance document has been created in accordance with the requirements of Chapter 4 of the adopted New York ECCC 2020 based on SUFFOLK County.If rating is Projected,I certify that the building design described herein is consistent with the building plans,specifications,and other calculations submitted with the permit application.If rating is Confirmed,I certify that the address referenced above has been inspected/tested and that the mandatory provisions of the New York ECCC 2020 have been installed to meet or exceed the intent of the Newyork ECCC 2020 or will be verified as such by another party. Name: Michael Fauci Signature: mfc" Organization: EnergyTesting Services Digitally signed: 5/14/26 at 2:39 PM 6 Ekotrope RATER-Version 5.0.2.3862 New York ECCC 2020 compliance results calculated using Ekotrope RATER's energy and code compliance algorithm,including appropriate amendments. Ekotrope RATER is a RESNET Accredited HERS Rating Tool.All results are based on data entered by Ekotrope users. Ekotrope disclaims all liability for the information shown on this report. New York 2020 Label 800 Corey Creek Lane Ekotrope RATER-Version:5.0.2.3862 HERS®Index Score:52 Ceiling:R-42 Above Grade Walls:R-21 Foundation Walls:N/A Exposed Floor:R-30 Slab:N/A Infiltration:1105 CFM50(2.19 ACH50) Duct Insulation:N/A Duct Lkg_to Outdoors:Untested Forced Air Window&Door Specs_ U-Value:0.3,SHGC:0.3 1 Door:R-5 _ Mechanical Equipment Specs Heating:Boiler.Natural Gas-95 AFUE Cooling:Air Conditioner-Electric-16 SEER2 Hot Water:Residential Water Heater-Natural Gas-0.95 Energy Factor Average Mechanical Ventilation:77 CFM Builder or D_esi_gn Professional Signature: _ _ _ ) w ! ' New York ECCC 2020 UA Compliance Property Organization Inspection Status 800 Corey Creek Lane EnergyTesting Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp.-800 Corey Creel Initial House Design Builder Sligo Construction Corp. This report is based on a proposed design and does not confirm field enforcement of design elements. Building UA Elements IECC Reference As Designed Ceilings 39.2 48.0 Above-Grade Walls 145.3 150.9 Windows,Doors and Skylights 130.9 118.9 Slab Floor: 0.0 0.0 Framed Floors 63.1 46.4 Foundation Walls 0.0 0.0 Rim Joists 7.1 6.7 Overall UA(Design must be equal or lower): 385.6 370.9 Requirements R402.1 S Total UA alternative compliance passes by 3.8%. The proposed home meets the UA requirement by 3.8% R4023.2 Average SHGC:0.30 Max SHGC:0.40 Average SHGC of 030 is greater than the maximum of 0.40. R402.4.1.2 Air LeakageTesting A post construction blower door test is required to verify the air leakage meets the requirement ® R4025 Area-weighted average fenestration SHGC Area-weighted average fenestration SHGC is 0.3.The maximum allowed value is[No Limit]. R4025 Area-weighted average fenestration U-Factor R404.1 Lighting Equipment R403.6.1 Mechanical Ventilation Efficacy ® Mandatory Checklist Mandatory code requirements that are not checked New York 2020 Mandatory Requirements must be checked as complete. by Ekotrope must be met R403.6 Mechanical Ventilation Rate R4033A Duct Leakage Testing R40353 Hot water pipe Insulation Hot water pipes at least 3/41n diameter must be Insulated to R-3 at minimum. Design exceeds requirements for New York ECCC 2020 Prescriptive compliance by 3.8%. Name: Michael Fauci Signature: 1116CA.d TCccC6 Organization: Energy Testing Services Digitally signed: 12n3/24 at 12:53 PM Ekotrope RATER-Version 4.0.2.3542 Newyork ECCC 2020 Prescriptive compliance results calculated using Ekotrope RATER's energy and code compliance algorithm.including appropriate amendments. Ekotrope RATER is a RESNET Accredited HERS Rating Tool.All results are based on data entered by Ekotrope users. Ekotrope disclaims all liability for the information shown on this report Energy Code Inspection Checklist Property Organization Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp.-800 Corey Creel Initial House Design Builder Sligo Construction Corp. General Building Information Conditioned Area(sq ft) 2,640 Conditioned Volume(cubic ft) 30,263 Insulated Shell Area(sq ft) 5,832 The building energy model in Ekotrope reflects the building assemblies and energy features listed below.Sometimes energy features will change in the field from what has been modeled.The inspection process should identify any changes and ensure that the home continues to meet the applicable energy code. Slab None Present Framed Floor Name:Floor Over Basement(1,310 s.f.) R-0 continuous insulation,R-30 cavity insulation Insulation Grade:I Name:Exterior Floor (32 s.f.) R-0 continuous insulation,R-30 cavity insulation Insulation Grade:II Foundation Wall None Present Above Grade Wall Name:Exterior Walls(2,610 s.f.) R-3 continuous insulation,R-15 cavity insulation Insulation Grade: Name:Staircase (220 s.f.) R-0 continuous insulation,R-15 cavity insulation Insulation Grade:11 i Rim Joist Energy Code Inspection Checklist Property Organization Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp:800 Corey Creel Initial House Design Builder Sligo Construction Corp. El Name:Band Joist 054 s.f.) R:18.00 Ceiling/Roof Name:Hot Roof(1,506 s.f.) R-0 continuous insulation,R-38 cavity insulation Insulation Grade:I Opaque Door Name:Front Door(20 s.f.) R:5.00 Name:Basement Door 0 7.8 s.f.) R:5.00 Glazing Name:ff 2 e(Front)(27 s.f.), U:0.300, SHGC:0.3, Orientation:EAST Name:ff 2 e(12 s.f.), U:0.300, SHGC:0.3, Orientation:EAST Name:ff 3 e(40.5 s.f.), U:0.300, SHGC:0.3, Orientation:EAST Name:sf 2 e(27 s.f.), U:0.300, SHGC:0.3, Orientation:EAST Name:sf 1 e(13.5 s.f.), U:0.300, SHGC:0.3, Orientation:EAST Name:sf 1 e(18 s.f.), U:0.300, SHGC:0.3, Orientation:EAST Name:sf 3 e(40.5 s.f.), U:0.300, SHGC:0.3, Orientation:EAST Name:ff 2 n(Right)(22.5 s.f.), U:0.300, SHGC:0.3, Orientation:NORTH 2 Name:sf 1 n(13.5 s.f.), U:0.300, SHGC:0.3, Orientation:NORTH Energy Code Inspection Checklist Property Organization Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp.-800 Corey Creel Initial House Design Builder Sligo Construction Corp. Name:sf 1 n(13.5 s.f.), U:0.300, SHGC:0.3, Orientation:NORTH Name:ff 2 w(Rear)(19 s.f.), U:0.300, SHGC:0.3, Orientation:WEST Name:ff 1 w(40 s.f.), U:0.300, SHGC:0.3, Orientation:WEST Name:ff 1 w(13.5 s.f.), U:0.300, SHGC:0.3, Orientation:WEST / Name:ff 2 w(27 s.f.), U:0.300, SHGC:0.3, Orientation:WEST Name:sf 1 w(13.7 s.f.), U:0.300, SHGC:0.3, Orientation:WEST Name:sf 1 w(3 s.f.), U:0.300, SHGC:0.3, Orientation:WEST Name:sf 2 w(27 s.f.), U:0.300, SHGC:0.3, Orientation:WEST Skylight None Present Mechanical Ventilation Mechanical ventilation system rated for,and capable of,providing continuous ventilation. System shall include automatic timing controls. System type:Exhaust Only,24 hrs/day,42 Watts(Default) Mechanical Equipment Heating System 1 •Natural Gas•50%Heating Load @ 95 AFUE Cooling System 1 •Electric•50%Cooling Load @ 16 SEER2 Heating System 2•Natural Gas•50%Heating Load @ 95 AFUE 3 Cooling System 2•Electric•50%Cooling Load @ 16 SEER2 Energy Code Inspection Checklist Property Organization Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp.-800 Corey Creel Initial House Design Builder Sligo Construction Corp. Water Heating•Natural Gas•100%Hot Water Load @ 0.95 Energy Factor Air Leakage Control ElTest Status:To be blower-door tested House is air-sealed as to achieve 1,513 CFM50(3.00 ACH50)or less at final blower-door test. Infiltration Requirements for IECC in Climate Zone 4 2009 IECC Infiltration limit for the design home is 7 ACH50. 2012 IECC Infiltration limit for the design home is 3 ACH50. 2015 IECC Infiltration limit for the design home is 3 ACH50. 2018 IECC Infiltration limit for the design home is 3 ACH50. 2021 IECC Infiltration limit for the design home is 5 ACH50. Duct Leakage Duct System 1 NOT entirely within conditioned space,testing required Leakage to Outside specified as:52 CFM @ 251?a(3.93/100 fO Total Leakage specified as:Untested Duct System 2 All ducts and equipment within conditioned space Untested 4 Energy Code Inspection Checklist Property Organization Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp.-800 Corey Creel Initial House Design Builder Sligo Construction Corp. Duct Leakage Code Requirements for IECC 20091ECC: Postconstruction Leakage Test:Duct Leakage to Outdoors<=8 CFM25/100 sq ft CFA. Rough in Test with AHU:Total Duct Leakage<=6 CFM25/100 sq ft CFA. Rough in Test without AHU:Total Duct Leakage<=4 CFM25/100 sq ft CFA. 2012 IECC Mandatory,2015,2018,&2021 IECC Prescriptive Paths: Postconstruction Leakage Test:Total Duct Leakage<=4 CFM25/100 sq ft CFA. Rough in Test with AHU:Total Duct Leakage<=4 CFM25/100 sq ft CFA. Rough in Test without AHU:Total Duct Leakage<=3 CFM25/100 sq ft CFA. * Note:IECC 2021 requires Total Duct Leakage<=8 CFM25/100 sq ft CFA when all ducts and air handlers are within the building thermal envelope. 2015 and 2018 IECC Performance Paths(Cost Compliance): Leakage testing is required UNLESS all ducts and air handlers are located entirely within the thermal envelope. There is no pass/fail threshold for duct leakage on the performance path. Project Notes 5 I I'll VC)I Service Address Bill To ''• Energ- Testing 800 Corey Creek Lane Sligo Construction Se rvuus Southold, NY 11971 Corp. +(516) 2 04-2444 Cel l Energy Testing Services Payment terms Due upon receipt 1648 Locust Ave Suite E Invoice # 2563 Bohemia, NY 11716 Date 12/16/2024 Phone: (631) 244-2627 Email: mcaruso@energytestingservices.com Web: www.energytestingservices.com Description Total HERS Rating $0.00 The Standard HERS Rating Certification For,A Typical Dwelling Includes:The Initial Consultation, Plan Review, Recommendations To Meet The NYS Energy Code and Local Energy Code Requirements, Thermal By-Pass Checklist (TBC) or Insulation Inspection, Final Inspection (Blower Door Test, Total Duct Air Leakage Test & Combustion Safety Testing). Submittal For Confirmed HERS Rating and Final Certification of Dwelling. Manual J $310.85 Mechanical System Design - Heat Loss Calculations. Manual S $207.23 Selection of Mechanical Equipment- Mechanical Equipment Capacity& Efficiency. Manual D $310.85 Duct Design Report- Mechanical Equipment Locations, Duct Locations, CFM, Duct &Grille Sizes. Plan Review $345.38 Provisional HERS Compliance Reports. 7 Subtotal /1p $1,174.31 Total $1,174.31 Page 1 of 4 RESNET HOME ENERGY RATING Standard Disclosure For home(s) located at:800 Corey Creek Lane,Southold,NY Check the applicable disclosure(s): WIThe Rater or the Rater's employer is receiving a fee for providing the rating on this home. In addition to the rating,the Rater or the Rater's employer has also provided the following consulting services for this home: DA.Mechanical system design []B.Moisture control or indoor air quality consulting []C. Performance testing and/or commissioning other than required for the rating itself []D.Training for sales or construction personnel J]E.Other(specify) L]The Rater or the Rater's employer is: E]A.The seller of this home or their agent E[B.The mortgagor for some portion of the financed payments on this home [:JC.An employee,contractor,or consultant of the electric and/or natural gas utility serving this home /The Rater or Rater's employer is a supplier or installer of products,which may include: Products Installed in this home by OR is in the business of HVAC systems Rater Employer Rater OEmployer Thermal insulation systems ORater Employer Rater DEmployer Air sealing of envelope or duct systems Rater MEmployer Rater DEmployer Energy efficient appliances Rater Employer Rater OEmployer Construction(builder,developer,construction contractor,etc) Rater Employer Rater Employer Other(specify): Rater DEmployer Rater DEmployer This home has been verified under the provisions of Chapter 6,Section 603"Technical Requirements for Sampling"of the Mortgage Industry National Home Energy Rating Standard as set forth by the Residential Energy Services Network (RESNET).Rater Certification#:8619824 Name: Michael Fauci Signature:/ Aic "I Fcuci Organization: Energy Testing Services Digitally signed: 12/23/24 at 12:53 PM I attest that the above information is true and correct to the best of my knowledge.As a Rater or Rating Provider I abide by the rating quality control provisions of the Mortgage Industry NationalHome Energy Rating Standard as set forth by the Residential Energy Services Network(RESNET).The national rating quality control provisions of the rating standard are contained in Chapter One 102.1.4.6 of the standard and are posted at https:Hsta nda rds.resnet.us The Home Energy Rating Standard Disclosure for this home is available from the rating provider. RESNET Form 03001-2-Amended March 20,2017 Building Summary Property Organization Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp.-800 Corey Creek Lane,Southold,I Initial House Design Builder Sligo Construction Corp. General Building Information Number Of Bedrooms 4 Number Of Floors 2 Conditioned Floor Area[sq.ft.] 2,640 Has Electric Vehicle Ready Space No Unconditioned,attached garage? No Conditioned Volume[cu.ft.] 30,263 Total Units in Building 1 Residence Type Single family detached Number of Floors in Building - Floor Number - Model Community RESNETAECC 2006-2018 Climate Zone 4A IECC 2021 Climate Zone 4A Foundation Wall None Present Foundation Wall Library List None Present Slab None Present Slab Library List _ None Present Framed Floor Name Library7ype Carpet Floor Grade surface Area Location Exterior Floor 30(16/115)2(9.5)H 1 Above Grade 32.0ft' Exposed Exterior Vinyl Floor Over Basement 30(16/11.5)2(95)Exposed 1 Above Grade 1,310.0 ft' Uninsulated Unconditioned Basement Building Summary Property organization Inspection Status 800 Corey Creek Lane EnergyTesting Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp.-800 Corey Creek Lane,Southold,I Initial House Design Builder Sligo Construction Corp. Framed Floor Library List Name Effective R-value 30(16/115)2(9.5)Exposed 28.923 30(16/115)2(95)H 27.661 Vinyl Rim Joist Name LibraryType Surface Area Location Band Joist R15+3 - 154.0ft' Exposed Exterior Rim Joist Library List Name Effective Insulation R-value �� ^ R15+3 18.00 Wall Name Library Type 4i Surface Color Solar Absorptance Surface Area Location Exterior Walls R15+3(16/35)1(5) Medium 0.75 2.610Aft Exposed Exterior Staircase 15(1613.5)2(5)5taircase Medium 0.75 220.0 ft Uninsulated Unconditioned Basement Wall Library List Name Effective R-value 15(16135)2(.5)Staircase 11.421 RI5+3(16/35)1(5) 16.659 2 Building Summary Property organization Inspection Status 800 Corey Creek Lane EnergyTesting Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp:900 Corey Creek Lane,Southold,I Initial House Design Builder Sligo Construction Corp. Glazing -� Name Library Type Wall Foundation Wall Is Operable Overhang Overhang FtTo Overhang FtTo Orientation Surface Area Assignment Assignment Depth Top Bottom ff 1 w 3030 Exterior Walls Yes 0 0 0 West 40.0 ft ff 1 w 3030 Exterior Walls Yes 0 0 0 West 135 ft' ff 2 e 3030 Exterior Walls Yes 7 1.7 7.8 East 12.0 fP ff 2 e(Front) 3030 Exterior Walls Yes 7 13 5.3 East 27.0 ft' ff2n(Right) 3030 Exterior Walls Yes 0 0 0 North .225ft ff 2 w 3030 Exterior Walls Yes 0 0 0 West 27.0 ft' If 2 w(Rear) 3030 Exterior Walls Yes 0 0 0 West 19.0 ft' ff3e 3030 ExteriorWalis Yes 7 13 5.3 East 405ft' sf 1 e 3030 Exterior Walls Yes 1 23 6.3 East 135 ft' sf 1 e 3030 Exterior Wal Is Yes 1 23 4.8 East 18.0 ft sf 1 n 3030 Exterior Walls Yes 0.8 3.1 7.2 North 135 If sf 1 n 3030 Exterior Walls Yes 0.8 9.1 13.2 North 135 ft' sf 1 w 3030 Exterior Walls Yes 1 13 3.8 West 13.7 ft sf 1 w 3030 Exterior Walls Yes 1 1.2 2.8 West 3.0 ft' sf 2 e 3030 Exterior Walls Yes 0.8 5 9.1 East 27.0 f sf 2 w 3030 Exterior Walls Yes 1 13 5.3 West 27.0 ft' sf 3 e 3030 Exterior Walls Yes 0.8 7.7 11.8 East 405 ft Glazing Library List Name ��- Shgc U-factor 3030 0.3 0300 Skylight None Present 3 Building Summary Property Organisation Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp:8o0 Corey Creek Lane,Southold,I Initial House Design Builder Sligo Construction Corp. Skylight Library List None Present Opaque Door Name Library7ype Wall Assignment Foundation Wall Emittance Solar Absorptance Surface Color Surface Area Location Assignment Basement Door Fiberglass Door Staircase 0.9 0.75 Medium 17.8 ft' Uninsulated Unconditioned Basement Front Door Fiberglass Door Exterior Walls 0.9 0.75 Medium 20.0 ft' Exposed Exterior Opaque Door Library List - _.-.�..-...- Name EffectiveR-value �� Fiberglass Door 5.00 Roof Insulation Name Library Attic Clayor Doesthe Roof Slope Ceiling EaveHei ht Eave Surface Solar Surface Location Type Exterior Concrete Roof have Framing tn.] Length[in.] Color Absorptance Area Area[ft'] RoofT(les Eaves? Height[in.] Hot Roof SA 1506 No No WA N/A N/A WA Medium 0.75 1,506.0 ft'Vaulted Roof R38(16/95)1( Roof Insulation Library List Name Has Radiant Barrier Effective R-value SA R38(16/9.5)1(LDF) No 31381 Whole House Infiltration �� Infiltration ^� Measurement Type Shelter Class 3 ACH at 50 Pa To be blower-door tested 4 4 Building Summary Property Organization Inspection Status B00 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp.-800 Corey Creek Lane,Southold,I Initial House Design Builder Sligo Construction Corp. Mechanical Ventilation Ventilation Type Ventilation Rate[ft / Operational hours Fan Watts Runs once every Energy Recovery Model Number Manufacturer Minute] per day three hours Percent Exhaust Only 120CFM 24 42 Watts(Default) Yes 0 Lighting %Interior Fluorescent %Interior LED Lighting %Exterior Fluorescent %Exterior LED Lighting %Garage Fluorescent %Garage LED Lighting Lighting Lighting Lighting 0 100 0 100 0 100 Onsite Generation None Present Onsite Generation Library List None Present Solar Generation _ None Present Dehumidifier None Present Dehumidifier Library List None Present 5 Building Summary Property organization Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp.-800 Corey Creek Lane,Southold,I Initial House Design Builder Sligo Construction Corp. Whole House Fan None Present Whole House Fan Library List YNone Present Conditioning Equipment Name Library7ype Serial Number Heating Percent Load Cooling Percent Load Hot Water Percent Load Location Cooling System 1 16 SEER2 23.6K 0% 50% 096 Unconditioned Basement R07958879) /Crawlspace Cooling System 2 16 SEER2 18K(207904371) 0% 50% 096 Conditioned/Sealed Attic Heating System 1 95%AFUE Hydro-Coil,60k 50% 0% 0% Unconditioned Basement NG) /Crawispace Heating System 2 95%AFUE Hydro-Coil,60k 50% 0% 0% Conditioned/Sealed Attic (qG) Water Heating .95 EF Instant 0% 0% 10096 Unconditioned Basement /Crawlspace EquipmentType:.9S EF Instant EquipmentType Residential Water Heater Fuel Type Natural Gas Distribution Type Hydronic Delivery(Radiant) Hot Water Efficiency 0.95 Energy Factor Tankless? Yes Equipment Type: 16 SEER218K(207904371) Equipment Type Air Conditioner Fuel Type Electric Distribution Type Forced Air MotorType ECM(Variable Speed) Heat Pump System Type Unspecified Cooling Efficiency 16 SEER2 Cooling Capacity[kBtu/h) 18 6 Building Summary Property Organization Inspection status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,W 11971 Michael Fauci 631-244-2627 Sligo Construction Corp:800 Corey Creek Lane,Southold I Initial House Design Builder Sligo Construction Corp. Equipment Type: 16 SEER2 23.6K(207958879) Equipment Type Air Conditioner Fuel Type Electric Distribution Type Forced Air MotorType PSC(Single Speed) Heat Pump System Type Unspecified Cooling Efficiency 16 SEER2 Cooling Capacity[kBtu/hl 23.6 Equipment Type:95%AFUE Hydro-Coil,60k(NG) Equipment Type Boiler Fuel Type Natural Gas Distribution Type Forced Air Motor Type PSC(Single Speed) Heating Efficiency 95 AFUE Heating Capacity[kBtu/hl 60 Use default EAE Yes EAE[kWh] 170 7 Building Summary Property Organisation Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,W 11971 Michael Faud 631-244-2627 Sligo Construction Corp:800 Corey Creek Lane,Southold,I Initial House Design Builder Sligo Construction Corp. Distribution System Distribution Type Forced Air Heating Equipment Heating System 1 Cooling Equipment Cooling System 1 Sq.Feet Served 1,322 #Return Grilles 1 Supply Dud RValue 8 Return Duct R Value 8 Supply Duct Area[W) 356.94 Return Duct Area[ftz) 66.1 Leakage to Outdoors 52 CFM @ 2513a(3.93/100 fe) Total Leakage 52 CFM25 Total Leakage DuctTest Conditions Post-Construction Use Default Flow Rate Yes Dud 1 Dud Location Basement(insulated basement ceiling) Percent Supply Area 100 Percent Return Area 100 Dud 2 Dud Location Conditioned Space Percent Supply Area 0 Percent Return Area 0 Duct 3 Dud Location Conditioned Space Percent Supply Area 0 Percent Return Area 0 Duct 4 Dud Location Conditioned Space Percent Supply Area 0 Percent Return Area 0 Duct 5 Dud Location Conditioned Space Percent Supply Area 0 Percent Return Area 0 Dud 6 Dud Location Conditioned Space Percent Supply Area 0 Percent Return Area 0 Distribution System Distribution Type Forced Air Heating Equipment Heating System 2 Cooling Equipment Cooling System 2 Is All Equipment In Conditioned Space Yes Leakage Default HERS Default Leakage Duct System Efficiency 0.88 HVAC Grading HVAC Grading Not Conducted 8 Building Summary Property Organization Inspection Status 900 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp.-800 Corey Creek Lane,Southold,I Initial House Design Builder Sligo Construction Corp. Ceiling Fan Has Ceiling Fan No Water Distribution Water Fixture Type Standard Use Default Hot Water Pipe Length No Hot Water Pipe Length[ft] 97 At Least 113 Pipe Insulation? Yes Hot Water Recirculation System? No Drain Water Heat Recovery? No Clothes Dryer Cef 3.01 Fuel Type Electric Field Utilization Timer Controls Is Outside Conditioned Space No Clothes Dryer Available Yes Defaults Type HERS Reference Is Heat Pump No Clothes Washer Label Energy Rating 400 kWh/Year Annual Gas Cost $27.00 Electric Rate $0.12/kWh Gas Rate $1.09/Therm Capacity 3 Imef 1 Defaults Type HERS Reference Load Type Front-load Loads Per Week 6 Is Outside Conditioned Space No Clothes Washer Available Yes Dishwasher Dishwasher Defaults Type Custom Dishwasher Size Standard Dishwasher Efficiency 270 kWh Annual Gas Cost $30.00 Electric Rate $0.12/kWh Gas Rate $1.09/Therrn Is Outside Conditioned Space No Dishwasher Available Yes 9 Building Summary Property Organisation Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Faud 631-244-2627 Sligo Construction Corp:800 Corey Creek Lane,Southold,I Initial House Design Builder Sligo Construction Corp. Appliances and Controls Programmable thermostat? Yes Range/Oven Fuel Electric Convection Oven? No Induction Range? No Range/Oven Outside Conditioned Space? No Refrigerator Consumption 691 kWh/Year Refrigerator Outside Conditioned Space? No Notes 10 Load Short Form Job: MF641 Date: Dec 23,2024 System 1 By: Michael Fauci Energy Testing Services 1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824 Project • • For: Sligo Construction Corp. 800 Corey Creek Lane, Southold, NY 11971 Phone: 516-204-2444 Design Information Htg Clg Infiltration Outside db (°F) 16 86 Method Blower door Ins ide db(°F) 70 75 Shielding/stories 3(partial)/2 Design TD (°F) 54 11 Pressure/ACH/AVF 50 Pa/3.0/1156 cfm Daily range - L Inside humidity(%) 50 50 Moisture difference (gr/lb) 45 31 HEATING EQUIPMENT COOLING EQUIPMENT Make Laars Heating Systems Company Make Carrier Trade LAARS Trade 15 SEER2 AC Model MFTCW199(N,P).... Cond GA5SAN42400WA0 AHRI ref 9008085 Coil FMU4Z3000AL1 AHRI ref 207958879 Efficiency 95 AFUE Efficiency 13.0 EER2, 16 SEER2 Heating input 199000 Btuh Sensible cooling 16520 Btuh Heating output 181000 Btuh Latent cooling 7080 Btuh Temperature rise 210 °F Total cooling 23600 Btuh Actual air flow 787 cfm Actual air flow 787 cfm Air flow factor 0.056 cfm/Btuh Air flow factor 0.047 cfm/Btuh Static pressure 0.60 in H2O Static pressure 0.60 in H2O Space thermostat Load sensible heat ratio 0.85 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ftz) (Btuh) (Btuh) (cfm) (cfm) Bedroom 1 156 2026 2763 114 130 B1 WIC 22 247 37 14 2 Computer Room 138 1927 2116 108 100 B1 Bath 65 650 593 37 28 Lay. 23 0 9 0 0 Dining Room 156 1394 2841 78 134 Kitchen 200 2147 4451 121 210 Living Room 330 3563 2710 200 128 Foyer 195 2058 1164 116 55 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. Wrights®ft^ 2024-Dec-2312:51:48 Right-Suite@ Universal 2023 23.0.01 RSU30008 Page 1 ...:800 Corey Creek Lane,Southold,NY'11971.rup Calc=MJB Front Door faces: E System 1 1284 14013 16683 787 787 Other equip loads 0 0 Equip. @ 0.91 RSM 15132 Latent cooling 2996 TOTALS I 1284 I 14013 I 18128 I 787 I 787 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft- 2024-Dec-2312:51:48 ,.. Right-Suite(D Universal 2023 23.0.01 RSU30008 Page 2 ...:800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E Load Short Form Job: MF641 Date: Dec 23,2024 System 2 By: Michael Fauci Energy Testing Services 1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824 Project Information For: Sligo Construction Corp. 800 Corey Creek Lane, Southold, NY 11971 Phone: 516-204-2444 Design Information Htg Clg Infiltration Outside db (°F) 16 86 Method Blower door Inside db(°F) 70 75 Shielding/stories 3(partial)/2 Design TD (°F) 54 11 Pressure/ACH/AVF 50 Pa/3.0/1156 cfm Daily range - L Inside humidity(%) 50 50 Moisture difference(gr/lb) 45 31 HEATING EQUIPMENT COOLING EQUIPMENT Make Laars Heating Systems Company Make Carrier Trade LAARS Trade COMFORT 15 SEER2 AC Model MFTCW199(N,P)"""" Cond 24SCA518WC0300 AHRI ref 9008085 Coil FMU4Z3000AL1 AHRI ref 207904371 Efficiency 95 AFUE Efficiency 13.0 EER2, 16 SEER2 Heating input 199000 Btuh Sensible cooling 12600 Btuh Heating output 181000 Btuh Latent cooling 5400 Btuh Temperature rise 275 °F Total cooling 18000 Btuh Actual air flow 600 cfm Actual air flow 600 cfm Air flow factor 0.044 cfm/Btuh Air flow factor 0.054 cfm/Btuh Static pressure 0.60 in H2O Static pressure 0.60 in H2O Space thermostat Load sensible heat ratio 0.90 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Bedroom 3 144 2271 3020 100 162 B3 WIC 31 461 76 20 4 Laundry 41 160 453 7 24 B2 WIC 29 412 71 18 4 Bedroom 2 144 2358 2744 104 147 Hall 127 0 0 0 0 Bath 51 622 329 27 18 Master Bath 132 1271 768 56 41 M WIC 2 33 403 68 18 4 M WIC 75 1291 211 57 11 Master Bedroom 377 4359 3453 192 185 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsofC' 2024-Dec-23 12:51:48 ^� .,., ......_.,..,,.., Right-Suite®Universal 202323.0.01 RSU30008 Page Av ...:800 Corey Creek Lane,Southold,NY 11971.rup Cale=MJ8 Front Door faces: E System 2 1183 13607 11193 600 600 Other equip loads 0 0 Equip. @ 0.91 RSM 10152 Latent cooling 1270 TOTALS I 1183 I 13607 I 11423 I 600 I 600 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. - - wr•ightsof , 2024-Dec-2312:51:48 Right-Suite@ Universal202323.0.01 RSU30008 Page AC� ...:800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E Building Analysis Job: MF641 r \, Date: Dec 23,2024 r`"" System 1 By: Michael Fauci r.. Energy Testing Services 1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824 Project • • For: Sligo Construction Corp. 800 Corey Creek Lane, Southold, NY 11971 Phone:516-204-2444 Design Conditions Location: Indoor: Heating Cooling Long Island MacArthur AP, NY, US Indoor temperature(T) 70 75 Elevation: 84 ft Design TD(TF) 54 11 Latitude: 41°N Relative humidity(%) 50 50 Outdoor: Heating Cooling Moisture difference(gr/lb) 45.1 30.9 Dry bulb(T) 16 86 Infiltration: Daily range (7) - 15 ( L ) Method Blower door Wet bulb(°F) - 72 Shielding/stories 3 (partial)/2 Wind speed (mph) 15.0 7.5 Pressure/ACH/AVF 50 Pa/3.0/1156 cfm RPM 110M Component Btuh/ft2 Btuh %of load Walls 2.9 4511 32.2 Duns Glazing 16.2 3579 25.5 Doors 15.7 320 2.3 V1dls Ceilings 2.0 239 1.7 Floors 0.0 19 0.1 Infiltration 2.7 3752 26.8 -Irdltration Ducts 1594 11.4 Piping 0 0 Humidification 0 0 Ventilation 0 0 ! �01her Adjustments 0 D= Total 1 1 14013 100.0 oaarg Component Btuh/ftz Btuh %of load Walls 0.7 1126 6.7 WIS Glazing 24.5 5410 32.4 Doors 7.2 146 0.9 Ceilings 0.7 84 0.5 Floors 0.0 4 0.0 Infiltration 0.2 353 2.1 ���� Ducts 395 2.4 -IrterdGirs Ventilation 0 0 Internal gains 9165 54.9 Blower 0 0 Adjustments 0 Total 1 1 16683 100.0 Latent Cooling Load=2996 Btuh Overall U-value=0.062 Btuh/fF-°F, Window/Floor Area =17.2% Data entries checked. -PIA- wrightso4°t- 2024-Dec-2312:51:48 �- _...�.._ Right-Suite(D Universal 2023 23.0.01 RSU30008 Page 1 800 Corey Creek Lane,Southold,NY 11971.rup Cale=MJ8 Front Door faces: E Building Analysis Job: MF641 Date: Dec 23,2024 2; System 2 By: Michael Fauci - Energy Testing Services 1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824 Project Information For: Sligo Construction Corp. 800 Corey Creek Lane, Southold, NY 11971 Phone: 516-204-2444 Design Conditions Location: Indoor: Heating Cooling Long Island MacArthur AP, NY, US Indoor temperature (TF) 70 75 Elevation: 84 ft Design TD (T) 54 11 Latitude: 41°N Relative humidity(%) 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 45.1 30.9 Dry bulb(T) 16 86 Infiltration: Dailyrange(T) - 15 ( L ) Method Blower door Wet bulb(T) - 72 Shielding/stories 3 (partial)/2 Wind speed (mph) 15.0 7.5 Pressure/ACH/AVF 50 Pa/3.0/1156 cfm Component Btuh/ft2 Btuh %of load Walls 3.4 3766 27.7 ads Glazing 16.2 2297 16.9 Doors 0 0 0 wjls Ceilings 2.0 2354 17.3 Floors 1.5 31 0.2 Infiltration 2.7 2974 21.9 Ducts 2185 16.1 -Irtiltraticn Piping 0 0 Humidification 0 0 Ventilation 0 0 oaang Qher Adjustments 0 Total 13607 100.0 ceilings Component Btuh/ftz Btuh % of load Walls 0.9 940 8.4 VISIS Glazing 20.7 2933 26.2 Doors 0 0 0 Ceilings 0.6 703 6.3 Floors 0.3 6 0.1 Qa� Infiltration 0.2 280 2.5 �� -Irtar>1Cirs Ducts 996 8.9 Ventilation 0 0 Internal gains 5335 47.7 Blower 0 0 Adjustments 0 Total 1 1 11193 I 100.0 1���� D-Cls Latent Cooling Load= 1270 Btuh Overall U-value=0.242 Btuh/ftZ-°F, Window/Floor Area=12.0% Data entries checked. 1 -Fk Wrightseft" 2024-Dec-2312:51:48 Right-Suite@ Universal202323.0.01 RSU30008 Paget 800 Corey Creek Lane,Southold,NY 11971.rup Calc=MA Front Door faces: E Project Summary Job: MF641 Date: Dec 23,2024 System By: Michael Fauci Energy Testing Services 1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824 Promect Information For: Sligo Construction Corp. 800 Corey Creek Lane, Southold, NY 11971 Phone:516-204-2444 Notes: Design Information Weather: Long Island MacArthur AP, NY, US Winter Design Conditions Summer Design Conditions Outside db 16 °F Outside db 86 °F Inside db 70 °F Inside db 75 °F Design TD 54 °F Design TD 11 °F Daily range L Relative humidity 50 % Moisture difference 31 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 12419 Btuh Structure 16288 Btuh Ducts 1594 Btuh Ducts 395 Btuh Central vent(0 cfm) 0 Btuh Central vent(0 cfm) 0 Btuh none Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 14013 Btuh Use manufacturer's data n Rate/swing multiplier 0.91 Infiltration Equipment sensible load 15132 Btuh Method Blower door Latent Cooling Equipment Load Sizing Shielding/stories 3 (partial)/2 Pressure/ACH/AVF 50 Pa/3.0/115 cfm Structure 2331 Btuh Ducts 665 Btuh Central vent(0 cfm) 0 Btuh Heating Cooling (none) Area(ftz) 1284 1284 Equipment latent load 2996 Btuh Volume (ft3) 12430 12430 Air changes/hour 0.31 0.15 Equipment Total Load(Sen+Lat) 18128 Btuh Equiv.AVF (cfm) 63 30 Req.total capacity at 0.70 SHR 1.8 ton Heating Equipment Summary Cooling Equipment Summary Make Laars Heating Systems Company Make Carrier Trade LAARS Trade 15 SEER2 AC Model MFTCW199(N,P)`... Cond GA5SAN42400WA0 AHRI ref 9008085 Coil FMU4Z3000AL1 AHRI ref 207958879 Efficiency 95 AFUE Efficiency 13.0 EER2, 16 SEER2 Heating input 199000 Btuh Sensible cooling 16520 Btuh Heating output 181000 Btuh Latent cooling 7080 Btuh Temperature rise 210 °F Total cooling 23600 Btuh Actual air flow 787 cfm Actual air flow 787 cfm Air flow factor 0.056 cfm/Btuh Air flow factor 0.047 cfm/Btuh Static pressure 0.60 in H2O Static pressure 0.60 in H2O Space thermostat Load sensible heat ratio 0.85 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -➢�➢-wr➢gR�tsoft' 2024-Dec-23 12:51:49 w-• -— Right-Suite@ Universal 2023 23.0.01 RSU30008 Page 1 800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E f--� Project Summary Job: MF641 System 2 Byte Michael Fauci Energy Testing Services 1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824 Prowect Information For: Sliggo Construction Corp. 800 Corey Creek Lane, Southold, NY 11971 Phone:516-204-2444 Notes: Design Information Weather: Long Island MacArthur AP, NY, US Winter Design Conditions Summer Design Conditions Outside db 16 °F Outside db 86 °F Inside db 70 °F Inside db 75 °F Design TD 54 °F Design TD 11 °F Daily range L Relative humidity 50 % Moisture difference 31 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 11422 Btuh Structure 10197 Btuh Ducts 2185 Btuh Ducts 996 Btuh Central vent(0 cfm) 0 Btuh Central vent(0 cfm) 0 Btuh none (none) Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 13607 Btuh Use manufacturer's data n Rate/swing multiplier 0.91 Infiltration Equipment sensible load 10152 Btuh Method Blower door Latent Cooling Equipment Load Sizing Shielding/stories 3 (partial /2 Pressure/ACH/AVF 50 Pa/3.0/115R cfm Structure 700 Btuh Ducts 570 Btuh Central vent(0 cfm) 0 Btuh Heating Cooling (none) Area(ft2) 1183 1183 Equipment latent load 1270 Btuh Volume (ft') 9463 9463 Air changes/hour 0.32 0.15 Equipment Total Load (Sen+Lat) 11423 Btuh Equiv.AVF(cfm) 50 24 Req. total capacity at 0.70 SHR 1.2 ton Heating Equipment Summary Cooling Equipment Summary Make Laars Heating Systems Company Make Carrier Trade LAARS Trade COMFORT 15 SEER2 AC Model MFTCW199(N,P)--" Cond 24SCA518WC0300 AHRI ref 9008085 Coil FMU4Z3000AL1 AHRI ref 207904371 Efficiency 95 AFUE Efficiency 13.0 EER2, 16 SEER2 Heating input 199000 Btuh Sensible cooling 12600 Btuh Heating output 181000 Btuh Latent cooling 5400 Btuh Temperature rise 275 °F Total cooling 18000 Btuh Actual air flow 600 cfm Actual air flow 600 cfm Air flow factor 0.044 cfm/Btuh Air flow factor 0.054 cfm/Btuh Static pressure 0.60 in H2O Static pressure 0.60 in H2O Space thermostat Load sensible heat ratio 0.90 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. -r- wrilghts.oft^ 2024-Dec-23 12:51:49 ti- -•- - Right-Suite@ Universal 2023 23.0.01 RSU30008 Paget ACCA ...:800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E Duct System Summary Job: MF641 Date: Dec 23,2024 System 1 By: Michael Fauci Energy Testing Services 1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824 Project Information For: Sligo Construction Corp. 800 Corey Creek Lane, Southold, NY 11971 Phone:516-204-2444 Heating Cooling External static pressure 0.60 in H2O 0.60 in H2O Pressure losses 0 in H2O 0 in H2O Available static pressure 0.60 in H2O 0.60 in H2O Supply/return available pressure 0.480/0.120 in H2O 0.480/0.120 in H2O Lowest friction rate 0.131 in/100ft 0.131 in/100ft Actual air flow 787 .cfm 787 cfm Total effective length (TEL) 458 ft SupplyDetail Table Design Htg Clg Design Diam H x W Duct Actual Ftg.Egv Name (Btuh) (cfm) (cfm) FIR (in) (in) Matl Ln (ft) Ln (ft) Trunk B1 Bath h 650 37 28 0.134 4.0 Ox 0 ShMt 24.0 335.0 st3 B1 WIC h 247 14 2 0.172 4.0 Ox 0 ShMt 8.8 270.0 st3 Bedrooms c 2763 114 130 0.198 5.6 8x4 ShMt 17.8 225.0 st3 Computer Room h 1927 108 100 0.165 6.0 Ox 0 ShMt 21.5 270.0 st3 Dining Room C 2841 78 134 0.133 7.0 Ox 0 ShMt 42.0 320.0 st3 Foyer h 2058 116 55 0.131 6.0 Ox 0 ShMt 41.8 325.0 st3 Kitchen C 2225 60 105 0.135 6.0 Ox 0 ShMt 46.0 310.0 st3 Kitchen-A C 2225 60 105 0.138 6.0 Ox 0 ShMt 57.0 290.0 st3 Lay. C 9 0 0 0.137 4.0 Ox 0 ShMt 15.5 335.0 st3 Living Room h 3563 200 128 0.136 8.0 Ox 0 ShMt 54.0 300.0 st3 SupplyDetail Table Trunk Htg Clg Design Veloc Diam H x W Duct Name Type (cfm) (cfm) FIR (fpm) (in) (in) Material Trunk st3 Peak AVF 787 787 0.131 885 11.9 8 x 16 ShtMetl st1 st1 Peak AVF 787 787 0.131 885 11.9 8 x 16 ShtMetl - - wrightsoft•� 2024-Dec-2312:51:49 Right-Suite@ Universal 2023 23.0.01 RSU30008 Page 1 ...:800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJB Front Door faces: E Return Branch Detail Table Htg Clg TEL Design Veloc Diam H x W Stud/Joist Duct Name Size (in) (cfm) (cfm) (ft) FR (fpm) (in) (in) Opening (in) Matl Trunk rb2 12x 30 787 787 91.5 0.131 564 16.0 Ox 0 ShMt c t -fk wrightseft- 2024-Dec-2312:51:49 Right-Suite(D Universal 2023 23.0.01 RSU30008 Page 2 +� ...:800 Corey Creek Lane,Southold,NY 11971.rup Calc=MA Front Door faces: E Duct System Summary Job: MF641 \ System Date: Dec 23,2024 a7 Fr?r: stem 2 By: Michael Fauci y_.I ,. - Energy Testing Services 1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824 Project • • For: Sligo Construction Corp. 800 Corey Creek Lane, Southold, NY 11971 Phone: 516-204-2444 Heating Cooling External static pressure 0.60 in H2O 0.60 in H2O Pressure losses 0.35 in H2O 0.35 in H2O Available static pressure 0.25 in H2O 0.25 in H2O Supply/return available pressure 0.210/0.040 in H2O 0.210/0.040 in H2O Lowest friction rate 0.063 in/100ft 0.063 in/100ft Actual air flow 600 cfm 600 cfm Total effective length (TEL) 399 ft Supply Branch Detail Table Design Htg Clg Design Diam H x W Duct Actual Ftg.Egv Name (Btuh) (cfm) (cfm) FIR (in) (in) Matl Ln (ft) Ln (ft) Trunk B2 WIC h 412 18 4 0.063 4.0 Ox 0 ShMt 15.5 320.0 st6 B3 WIC h 461 20 4 0.076 4.0 Ox 0 ShMt 12.3 265.0 st6 Bath h 622 27 18 0.071 4.0 Ox 0 ShMt 15.3 280.0 st5 Bedroom 2 C 2744 104 147 0.075 8.0 Ox 0 ShMt 26.0 255.0 st6 Bedroom 3 C 3020 100 162 0.076 8.0 Ox 0 ShMt 21.5 255.0 st6 Laundry c 453 7 24 0.071 4.0 Ox 0 ShMt 8.3 290.0 st5 M WIC h 1291 57 11 0.072 6.0 Ox 0 ShMt 35.5 255.0 st5 M WIC 2 h 403 18 4 0.070 4.0 Ox 0 ShMt 34.5 265.0 st5 Master Bath h 1271 56 41 0.069 6.0 Ox0 ShMt 32.3 275.0 st5 Master Bedroom h 4359 192 185 0.072 8.0 Ox0 ShMt 47.8 245.0 st5 SupplyDetail Table Trunk Htg Clg Design Veloc Diam H x W Duct Name Type (cfm) (cfm) FIR (fpm) (in) (in) Material Trunk St5 Peak AVF 357 283 0.069 536 10.1 8 x 12 ShtMetl st2 st6 Peak AVF 243 317 0.063 475 9.8 8 x 12 ShtMetl st2 st2 Peak AVF 600 600 0.063 600 12.5 8 x 18 ShtMetl Bold/italic values have been manually overridden ti wrigMtsoft- 2024-Dec-2312:51:49 ,�, �•, Right-Suite®Universal 2023 23.0.01 RSU30008 Page 3 ...:800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E Return Branch Detail Table Grille Htg Clg TEL Design Veloc Diam H x W Stud/Joist Duct Name Size (in) (cfm) (cfm) (ft) FIR (fpm) (in) (in) Opening (in) Matl Trunk rb1 12x 23 600 600 63.0 0.063 561 14.0 Ox 0 ShMt wr➢ghtsof - 2024-Dec-2312:51:49 �'� _e.�. Right-Suite@ Universal202323.0.01 RSU30008 Page ...:800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJS Front Door faces: E Manual S Compliance Report Job: MF641 Date: Dec 23,2024 System 1 By: Michael Fauci Energy Testing Services 1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824 Project Information-- For: Sligo Construction Corp. 800 Corey Creek Lane, Southold, NY 11971 Phone: 516-204-2444 Cooling Equipment Design Conditions Outdoor design DB: 85.7°F Sensible gain: 16683 Btuh Entering coil DB: 75.2°F Outdoor design WB: 71.9°F Latent gain: 2996 Btuh Entering coil WB: 62XF Indoor design DB: 75.0°F Total gain: 19680 Btuh Indoor RH: 50% Estimated airflow: 787 cfm Manufacturer's Performance Data at Actual Design Conditions Equipment type: Split AC Manufacturer: Carrier Model: GA5SAN42400WA0+FMLI4Z3000AL1 Actual airflow: 787 cfm Sensible capacity: 23441 Btuh 141%of load Latent capacity: 5877 Btuh 196%of load Total capacity: 29318 Btuh 149%of load SHR: 80% Heating Equipment Design Conditions Outdoor design DB: 15.9°F Heat loss: 14013 Btuh Entering coil DB: 68.9°F .Indoor design DB: 70.07 Manufacturer's Performance Data at Actual Design Conditions Equipment type: Gas boiler Manufacturer: Laars Heating Syste Model: MFTCW199(N,P)**** Actual airflow: 787 cfm Output capacity: 181000 Btuh 1292%of load Meets all requirements of ACCA Manual S. _Pk wriglhtsoW 2024-Dec-2312:51:49 �'�` Right-Suite®Universal 2023 23.0.01 RSU30008 Page 1 800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJB Front Door faces: E Manual S Compliance Report Job: MF641 Date: Dec 23,2024 eicric,�. Stem 2 y By: Michael Fauci Energy Testing Services 1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824 Project Information For: Sligo Construction Corp. 800 Corey Creek Lane, Southold, NY 11971 Phone: 516-204-2444 Cooling Equipment Design Conditions Outdoor design DB: 85.7°F Sensible gain: 11193 Btuh Entering coil DB: 75.1°F Outdoor design WB: 71.9°F Latent gain: 1270 Btuh Entering coil WB: 62XF Indoor design DB: 75.0°F Total gain: 12464 Btuh Indoor RH: 50% Estimated airflow: 600 cfm Manufacturer's Performance Data at Actual Design Conditions Equipment type: Split AC Manufacturer: Carrier Model: 24SCA518WC0300+FMU4Z3000AL1 Actual airflow: 600 cfm Sensible capacity: 14746 Btuh 132%of load Latent capacity: 2740 Btuh 216%of load Total capacity: 17486 Btuh 140%of load SHR: 84% Heating Equipment Design Conditions Outdoor design DB: 15.9°F Heat loss: 13607 Btuh Entering coil DB: 69.8°F Indoor design DB: 70.OoF Manufacturer's Performance Data at Actual Design Conditions Equipment type: Gas boiler Manufacturer: Laars Heating Syste Model: MFTCW199(N,P)**** Actual airflow: 600 cfm Output capacity: 181000 Btuh 1330% of load Meets all requirements of ACCA Manual S. wrigehtsoft" 2024-Dec-2312:51:49 �• .. ..�.., Right-Suite@ Universal 2023 23.0.01 RSU30008 Page 2 ACCN 800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJB Front Door faces: E Review • Form Residential — RPER 1 ACCK�, for _ — • (Loads, • • 15 Mar 09 Header Information Contractor: Energy Testing Services REQUIRED ATTACHMENTS ATTACHED Michael Fauci Manual J1 Form(and supporting worksheets): Yes ❑ No ❑ Mechanical license: 8619824 or MAAE Form*(and supporting worksheets): Yes ❑ No ❑ OEM performance data(heating,cooling,blower): Yes ❑ No ❑ Building plan#: Manual D Friction Rate Worksheet: Yes ❑ No ❑ Duct distribution sketch: Yes ❑ No ❑ Home address(Street or Lot#,Block,Subdivision): 800 Corey Creek Lane, System 1 HVAC LOADCALCULATION ,0 Design Conditions Building-Construction-information Winter Design Conditions Building Outdoor temperature: 16 °F Orientation: Front Door faces East Indoor temperature: 70 of North,East,West,South,Northeast,Northwest,Southeast,Southwest Total heat loss: 14013 Btuh Number of bedrooms: 1 Conditioned floor area: 1284 ftz Summer Design Conditions Number of occupants: q Outdoor temperature: 86 °F Indoor temperature: 75 °F Windows Roar Grains difference: 31 gr/lb @50% RH Eave overhang depth: 1.0 ft Sensible heat gain: 18394 Btuh Internal shade: blinds Blinds,drapes,etc. F rave Latent heat gain: 3304 Btuh l]eplh Wlndax Total heat gain: 21698 Btuh Number of skylights: 0 EQUIPMENTHVAC • 41 Heating_Eq.uipment_Data Cooling_Equipment_Data BI_ower_Data Equipment type: Gas boiler Equipment type: Split AC Heating cfm: 787 urnace,Healpump,Boiler,etc. it conditio er,Heat pump,etc. Cooling cfm: 787 Model: Laars Heating Systems Company Model: Carrier Static pressure: 0.60 in H2O MFTCW199(N,P)**** GA5SAN42400WA0+FMU4Z3000AL1 Fan's rated external static pressure for design airflow Heating output capacity: 1§1000 Btuh Total cooling capacity: 29318 Btuh Heat pumps-capacity at winter design out oor conditions Sensible cooling capacity: 23441 Btuh Aux.heating output capacity: 0 Btuh Latent cooling capacity: 5877 Btuh DISTRIBUTIONHVAC DUCT •1 Design airflow: 787 cfm Longest supply duct: 367 ft Duct Materials Used Equipment design ESP: 0.60 in H2O Longest return duct: 92 ft Trunk duct: Sheet metal Total device pressure losses: 0 in H2O Total effective length(TEL): 458 ft Available static pressure(ASP): 0.60 in H2O Friction rate: 0 1 41 in/100ft Branch duct: Sheet metal Friction Rate=ASP+(TEL x 1 I declare the load calculation,equipment,equipment selection and duct design were rigorously performed based on the building plan listed above. I understand the claims made on these forms will be subject to review and verification. Contractor's printed name: Contractor's signature: Date: Reserved .. *Home qualifies for MJ1AE Form based on Abridged Edition Checklist wrights®ft- - Right-Suite®Universal202323.0.01 RSU30008 — Residential — — Form /tom • /} jj RPER 1 ACC;;ke for HVACSystem Design • (Loads, Equipment, 15 Mar 09 Pr[;cxrt'artg ruUa7as d:r vta Header Information Contractor: Energy Testing Services REQUIRED ATTACHMENTS ATTACHED Michael Faucl Manual J1 Form(and supporting worksheets): Yes ❑ No ❑ Mechanical license: 8619824 or MJ1AE Form'(and supporting worksheets): Yes ❑ No ❑ OEM performance data(heating,cooling,blower): Yes ❑ No ❑ Building plan#: Manual D Friction Rate Worksheet: Yes ❑ No ❑ Duct distribution sketch: Yes ❑ No ❑ Home address(Street or Lot#,Block,Subdivision): 800 Corey Creek Lane, System 2 HVAC LOAD CALCULATION ,0 Design Conditions Building Construction_Infor-mati_on Winter Design Conditions Building Outdoor temperature: 16 °F Orientation: Front Door faces East Indoor temperature: 70 of North,East,West,South,Northeast,Northwest,Southeast,Southwest Total heat loss: 13607 Btuh Number of bedrooms: 3 Conditioned floor area: 1183 ftz Summer Design Conditions Number of occupants: 1 Outdoor temperature: 86 °F Indoor temperature: 75 °F Windows Rx` Grains difference: 31 gr/lb @50% RH Eave overhang depth: 1.0 ft Sensible heat gain: 12341 Btuh Internal shade: blinds [ave Latent heat gain: 1401 Btuh Blinds,drapes,etc. oeplh 4Vindaw Total heat gain: 13742 Btuh Number of skylights: 0 EQUIPMENTHVAC • ,0 Heating-Equipment-Data Cooling-Equipment-Data Blower-Data Equipment type: Gas boiler Eaulpment type: Split AC Heating cfm: 600 Furnace,Heat pump,Boiler,etc. Air Conditioner,Heat pump,etc. Cooling cfm: 600 Model: Laars Heating Systems Company Model: Carrier Static pressure: 0.60 in H2O MFTCW199(N,P)"" 24SCA518WC0300+FMU4Z3000AL1 Fan's rated extemalstatic pressure for design airflow Heating output capacity: 1�1000 .Btuh Total cooling capacity: 17486 Btuh Heat pumps-capacity at winter design out oor conditions Sensible cooling capacity: 14746 Btuh Aux.heating output capacity: 0 Btuh Latent cooling capacity: 2740 Btuh DISTRIBUTIONHVAC DUCT •1 Design airflow: 600 cfm Longest supply duct: 336 ft Duct Materials Used Equipment design ESP: 0.60 in H2O Longest return duct: 63 ft Trunk duct: Sheet metal Total device pressure losses: -0.3 in H2O Total effective length(TEL): 399 ft Available static pressure(ASP): 0.25 in H2O Friction rate:Friction Rate=ASP+(TELx 0.f1R3 in/100ft Branch duct: Sheet metal I declare the load calculation,equipment,equipment selection and duct design were rigorously performed based on the building plan listed above. I understand the claims made on these forms will be subject to review and verification. Contractor's printed name: Contractor's signature: Date: Reserved 'Home qualifies for MJ1AE Form based on Abridged Edition Checklist -�wrigAats®trt- --^^ - Right-Suite®Universal202323.0.01 RSU30008 M ! N P Level 1 4x8 7 6 6 16 x 8 4 Basemei 4 4" 16x8 6 I 6 8 Job#: MF641 Scale: 1 : 87 Performed by Michael Fauci for: Energy Testing Services Sligo Construction Corp. Page 1 800 Corey Creek Lane 1648 Locust Ave,Unit E RightSuite®Universal 2023 Southold,NY 11971 Bohemia,NY 11716 23.0.01 RSU30008 Phone:516-204-2444 Phone:631-244-2627 License:8619824 2024-Dec-23 12:52:44 www.energytestingservices.com mfauci@energytestingservices ...eek Lane,Southold,NY 11971.rup Level 2 ®-130 cfm 134 cfm 105 cfm 105 cfm B1 Batt Bedroom Dining Roor Kitcher 37 cfm Lay. ®-0 cfm B1 WIC 14 cfm--® Foye Living Roor Computer Roo Stain 787 cfm ®-108 cfm 116 cfm H-200 cfm Job#: MF641 Scale: 1 : 87 Performed by Michael Fauci for: Energy Testing Services Sligo Construction Corp. Page 2 800 Corey Creek Lane 1648 Locust Ave,Unit E RightSuite®Universal 2023 Southold,NY 11971 Bohemia,NY 11716 23.0.01 RSU30008 Phone:516-204-2444 Phone:631-244-2627 License:8619824 2024-Dec-23 12:52:44 www.energytestingservices.com mfauci@energytestingservices ...eek Lane,Southold,NY 11971.rup N I Level 3 162 cfm B3 WIC 56 cfm M WIC 20 cfm 18 cfm Bat[Master Bat Bedroom 27 cfm Laundr M WIC g 6" 4 24 cfm 57 cfm 4 12x8 4„ " 4„ 0 *—6„ B2 WIC 4„ Hal 12x8 ' 21 18cfm 18x8 14" 600 cfm Master Bedroo 8 8' Bedroom OTE Stairs 192 cfm 147 cfm Job#: MF641 Energy Testing Services Scale: 1 : 87 Performed by Michael Fauci for: gY g Sligo Construction Corp. Page 3 800 Corey Creek Lane 1648 Locust Ave,Unit E Right-Suite®Universal 2023 Southold,NY 11971 Bohemia,NY 11716 23.0.01 RSU30008 Phone:516-204-2444 Phone:631-244-2627 License:8619824 2024-Dec-23 12:52:44 www.energytestingservices.com mfauci@energytestingservices ...eek Lane,Southold,NY 11971.rup 4 New York ECCC 2020 UA Compliance Property Organization Inspection Status 800 Corey Creek Lane EnergyTesting Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp.-800 Corey Creel Initial House Design Builder Sligo Construction Corp. This report is based on a proposed design and does not confirm field enforcement of design elements. Building UA Elements IECC Reference As Designed Ceilings 39.2 48.0 Above-Grade Walls 145.3 150.9 Windows,Doors and Skylights 130.9 118.9 Slab Floor: 0.0 0.0 Framed Floors 63.1 46.4 Foundation Walls 0.0 0.0 Rim Joists 7.1 6.7 Overall UA(Design must be equal or lower): 385.6 370.9 Requirements ® R402.15 Total UA alternative compliance passes by 3.8%. The proposed home meets the LIA requirement by 3.896 R4023.2 Average SHGC.0.30 Max SHGG 0.40 Average SHGC of 030 is greater than the maximum of 0.40. R402.4.1.2 Air LeakageTesting A post construction blower door test is required to verify the air leakage meets the requirement ® R4025 Area-weighted average fenestration SHGC Area-weighted average fenestration SHGC is 0.3.The maximum allowed value is[No Limit]. ® R4025 Area-weighted average fenestration U-Factor ® R404.1 Lighting Equipment ® R403.6.1 Mechanical Ventilation Efficacy MandatoryChecklist Mandatory code requirements that are not checked New York 2020 Mandatory by Ekotrope must be met Requirements must be checked as complete. R403.6 Mechanical Ventilation Rate ® R4033A Duct Leakage Testing ® R40353 Hot water pipe Insulation Hot water pipes at least 3/41n diameter must be insulated to R-3 at minimum. Design exceeds requirements for New York ECCC 2020 Prescriptive compliance by 3.8%. Name: Michael Fauci Signature: Af&"FaUIC6 Organization: EnergyTesting Services Digitally signed: 12/23/24 at 12:53 PM Ekotrope RATER-Version 4.0.23542 Newyork ECCC 2020 Prescriptive compliance results calculated using Ekotrope RATER's energy and code compliance algorithm,including appropriate amendments. Ekotrope RATER is a RESNET Accredited HERS Rating Tool.All results are based on data entered by Ekotrope users. Ekotrope disclaims all liability for the information shown on this report Energy Code Inspection Checklist Property Organization Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp.-800 Corey Creel Initial House Design Builder Sligo Construction Corp. General Building Information Conditioned Area(sq ft) 2,640 Conditioned Volume(cubic ft) 30,263 Insulated Shell Area(sq ft) 5,832 The building energy model in Ekotrope reflects the building assemblies and energy features listed below.Sometimes energy features will change in the field from what has been modeled.The inspection process should identify any changes and ensure that the home continues to meet the applicable energy code. Slab None Present Framed Floor Name:Floor Over Basement(1,310 s.f.) R-0 continuous insulation,R-30 cavity insulation Insulation Grade:I Name:Exterior Floor (32 s.f.) R-0 continuous insulation,R-30 cavity insulation Insulation Grade:II Foundation Wall None Present Above Grade Wall Name:Exterior Walls(2,610 s.f.) R-3 continuous insulation,R-15 cavity insulation Insulation Grade:I Name:Staircase (220 s.f.) R-0 continuous insulation,R-15 cavity insulation Insulation Grade:II 1 Rim Joist Energy Code Inspection Checklist Property Organization Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp.-800 Corey Creel Initial House Design Builder Sligo Construction Corp. Name:Band Joist (154 s.f.) R:18.00 Ceiling/Roof Name:Hot Roof(1,506 s.f.) R-0 continuous insulation,R-38 cavity insulation Insulation Grade:I Opaque Door ElName:Front Door(20 s.f.) R:5.00 ElName:Basement Door(17.8 s.f.) R:5.00 Glazing Name:ff 2 e(Front)(27 s.f.), U:0.300, SHGC:0.3, Orientation:EAST Name:ff2 e(12 s.f.), U:0.300, SHGC:0.3, Orientation:EAST Name:ff 3 e(40.S s.f.), U:0.300, SHGC:0.3, Orientation:EAST Name:sf 2 e(27 s.f.), U:0.300, SHGC:0.3, Orientation:EAST Name:sf 1 e(13.5 s.f.), U:0.300, SHGC:0.3, Orientation:EAST Name:sf 1 e(18 s.f.), U:0.300, SHGC:0.3, Orientation:EAST Name:sf 3 e(40.5 s.f.), U:0.300, SHGC:0.3, Orientation:EAST Name:ff 2 n(Right)(22.5 s.f.), U:0.300, SHGC:0.3, Orientation:NORTH 2 Name:sf 1 n(13.5 s.f.), U:0.300, SHGC:0.3, Orientation:NORTH Energy Code Inspection Checklist Property Organization Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp.-800 Corey Creel Initial House Design Builder Sligo Construction Corp. F1 Name:sf 1 n(13.5 s.f.), U:0.300, SHGC:0.3, Orientation:NORTH El Name:ff 2 w(Rear)(19 s.f.), U:0.300, SHGC:0.3, Orientation:WEST Name:ff 1 w(40 s.f.), U:0.300, SHGC:0.3, Orientation:WEST Name:ff 1 w(13.5 s.f.), U:0.300, SHGC:0.3, Orientation:WEST Name:ff 2 w(27 s.f.), U:0.300, SHGC:0.3, Orientation:WEST Name:sf 1 w(13.7 s.f.), U:0.300, SHGC:0.3, Orientation:WEST Name:sf 1 w(3 s.f.), U:0.300, SHGC:0.3, Orientation:WEST Name:sf 2 w(27 s.f.), U:0.300, SHGC:0.3, Orientation:WEST Skylight None Present Mechanical Ventilation Mechanical ventilation system rated for,and capable of,providing continuous ventilation. System shall include automatic timing controls. System type:Exhaust Only,24 hrs/day,42 Watts(Default) Mechanical Equipment Heating System 1 -Natural Gas-50%Heating Load @ 95 AFUE Cooling System 1 -Electric-50%Cooling Load @ 16 SEER2 Heating System 2•Natural Gas•50%Heating Load @ 95 AFUE 3 Cooling System 2-Electric-50%Cooling Load @ 16 SEER2 Energy Code Inspection Checklist Property Organization Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp.-800 Corey Creel Initial House Design Builder Sligo Construction Corp. Water Heating•Natural Gas•100%Hot Water Load @ 0.95 Energy Factor Air Leakage Control ElTest Status:To be blower-door tested House is air-sealed as to achieve 1,513 CFM50(3.00 ACH50)or less at final blower-door test. Infiltration Requirements for IECC in Climate Zone 4 2009 IECC Infiltration limit for the design home is 7 ACH50. 2012 IECC Infiltration limit for the design home is 3 ACH50. 2015 IECC Infiltration limit for the design home is 3 ACH50. 2018 IECC Infiltration limit for the design home is 3 ACH50. 2021 IECC Infiltration limit for the design home is 5 ACH50. Duct Leakage Duct System 1 NOT entirely within conditioned space,testing required Leakage to Outside specified as:52 CFM @ 25Pa(3.93/100 ft2) Total Leakage specified as:Untested Duct System 2 All ducts and equipment within conditioned space Untested 4 Energy Code Inspection Checklist Property Organization Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp.-800 Corey Creel Initial House Design Builder Sligo Construction Corp. Duct Leakage Code Requirements for IECC 2009 IECC: Postconstruction Leakage Test:Duct Leakage to Outdoors<=8 CFM25/100 sq ft CFA. Rough in Test with AHU:Total Duct Leakage<=6 CFM25/100 sq ft CFA. Rough in Test without AHU:Total Duct Leakage<=4 CFM25/100 sq ft CFA. 2012 IECC Mandatory,2015,2018,&2021 IECC Prescriptive Paths: Postconstruction Leakage Test:Total Duct Leakage<=4 CFM25/100 sq ft CFA. Rough in Test with AHU:Total Duct Leakage<=4 CFM25/100 sq ft CFA. Rough in Test without AHU:Total Duct Leakage<=3,CFM25/100 sq ft CFA. * Note:IECC 2021 requires Total Duct Leakage<=8 CFM25/100 sq ft CFA when all ducts and air handlers are within the building thermal envelope. 2015 and 2018 IECC Performance Paths(Cost Compliance): Leakage testing is required UNLESS all ducts and air handlers are located entirely within the thermal envelope. There is no pass/fail threshold for duct leakage on the performance path. Project Notes 5 Building Summary Property organization Inspection Status 800 Corey Creek Lane EnergyTesting Services Results are projected Southold,NY 11971 Michael Faud 631-244-2627 Sligo Construction Corp.-800 Corey Creek Lane,Southold,I Initial House Design Builder Sligo Construction Corp. General Building Information Number Of Bedrooms 4 Number Of Floors 2 Conditioned Floor Area[sq.ft.] 2,640 Has Electric Vehicle Ready Space No Unconditioned,attached garage? No Conditioned Volume[cu.fQ 30,263 Total Units in Building 1 Residence Type Single family detached Number of Floors in Building - Floor Number - Model Community RESNETAECC 2006-2018 Climate Zone 4A IECC 2021 Climate Zone 4A Foundation Wall None Present u —"-' —' —_---'----_ Foundation Wall Library List None Present Slab �^ �^ None Present Slab Library List None Present —' Framed Floor Name LibraryType CarpetR Floor Grade Surface Area Location Exterior Floor 30(16/115)2(9.5)H 1 Above Grade 32.0 ft Exposed Exterior V nyl Floor Over Basement 30(16/11.5)2(9.5)Exposed 1 Above Grade 1,310.0fe Uninsulated Unconditioned Basement Building Summary Property organization inspection status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp:900 Corey Creek Lane,Southold,I Initial House Design Builder Sligo Construction Corp. Framed Floor Library List Name Effective R-value 30(161115)2(95)Exposed 28.923 30(16/11.5)2(95)H 27.661 Vinyl Rim Joist Name LibraryT"e Surface Area Location Band Joist R15+3 154.0 fe Exposed Exterior Rim Joist Library List Name Effective Insulation R-value R15+3 18.00 wall Name 'Librarylype surface Color Solar Absorptance Surface Area Location Exterior Walls R15+3(16/35)1(.5) Medium 0.75 2,610.0ft' Exposed Exterior Staircase 15(16/3.5)2(.5)5taircase Medium 0.75 220.0 ft' Uninsulated Unconditioned Basement Wall Library List Name w Effective R-value 15(16/35)2(.5)Staircase 11.421 R15+3(16135)1(5) 16.659 2 Building Summary Property Organization Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Faud 631-244-2627 Sligo Construction Corp.-800 Corey Creek Lane,Southold,I Initial House Design Builder Sligo Construction Corp. Glazing Name Library7ype Wall Foundation Wall Is Operable Overhang Overhang Ft To Overhang FtTo _Orientation Surface Area Assignment Assignment Depth Top Bottom ff 1 w 3030 Exterior Walls Yes 0 0 0 West 40.0 ft' ff 1 w 3030 Exterior Walls Yes 0 0 0 West 135 fP ff 2 e 3030 Exterior Walls Yes 7 1.7 7.8 East 12.0 ft' ff2e(Front) 3030 Exterior Walls Yes 7 13 5.3 East 27.0ft' ff 2 n(Right) 3030 Exterior Walls Yes 0 0 0 North 225 ft' ff2w 3030 Exterior Walls Yes 0 0 0 West 27.0fe ff 2 w(Rear) 3030 Exterior Walls Yes 0 0 0 West 19.0 ft ff 3 e 3030 Exterior Walls Yes 7 13 5.3 East 405 ft' sf 1 e 3030 Exterior Walls Yes 1 23 6.3 East 135 ft sf 1 e 3030 Exterior Walls Yes 1 23 4.8 East 18.0 ft sf 1 n 3030 Exterior Walls Yes 0.8 3.1 7.2 North 135 ft sf 1 n 3030 Exterior Walls Yes U 9.1 13.2 North 135 ft' sf 1 w 3030 Exterior Walls Yes 1 13 3.8 West 13.7 fP sf 1 w 3030 Exterior Walls Yes 1 1.2 2.8 West 3.0 ft' sf2e 3030 Exterior Walls Yes 0.8 5 9.1 East 27.0ft' sf 2 w 3030 Exterior Walls Yes 1 13 5.3 West 27.0 ft' sf 3 e 3030 Exterior Walls Yes 0.8 7.7 11.8 East 40.5 fP Glazing Library List -_-_ Name Shgc U-factor -®-r 3030 0.3 0300 Skylight None Present 3 Building Summary Property Organization Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauc] 631-244-2627 Sligo Construction Corp:800 Corey Creek Lane,Southold,I Initial House Design Builder Sligo Construction Corp. Skylight Library List r None Present Opaque Door Name LibraryType Wall Assignment Foundation Wall Emittance Solar Absorptance Surface Color Surface Area Location Assignment Basement Door Fiberglass Door Staircase 0.9 0.75 Medium 17.8 ft' Uninsulated Unconditioned Rac m nt Front Door Fiberglass Door Exterior Walls 0.9 0.75 Medium 20.0 ft' Exposed Exterior Opaque Door Library List Name .W..w. Effective R-value —�- Fiberglass Door 5.00 Roof Insulation Name Library Attic Clay or Doesthe Roof5lope Ceiling EaveHei ht Eave Surface Solar Surface Location type Exterior Concrete Roof have Framing jn.] Length[in.] Color Absorptance Area Area[ft'] Roof Tiles Eaves' Height[in.] Hot Roof SA 11506 No No N/A NIA N/A N/A Medium 0.75 1,506.0 ft'Vaulted Roof R38(16/9.5)1( Roof Insulation Library List. Name .___. Has Radiant Barrier Effective R-value SA R38(16I9.5)1(LDF) No 31381 Whole House Infiltration Infiltration Measurement Type Shelter Class 3 ACH at 50 Pa To be blower-door tested 4 4 Building Summary Property Organisation Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp:800 Corey Creek Lane,Southold,I Initial House Design Builder Sligo Construction Corp. Mechanical Ventilation Ventilation Type Ventilation Rate[fe/ Operational hours Fan Watts Runs once every Energy Recovery Model Number _ Manufacturer Minute] perday three hours Percent Exhaust Only 120 CFM 24 42 Watts(Default) Yes 0 Lighting %Interior Fluorescent %Interior LED Lighting v %Exterior Fluorescent %Exterior LED Lighting %Garage Fluorescent %Garage LED Lighting Lighting Lighting Lighting 0 100 0 100 0 100 Onsite Generation None Present Onsite Generation Library List None Present m Solar Generation None Present Dehumidifier None Present Dehumidifier Library List None Present 5 Building Summary Property - Organization Inspection Status B00 Corey Creek lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp:800 Corey Creek Lane,Southold,I initial House Design Builder Sligo Construction Corp. Whole House Fan None Present Whole House Fan Library List None Present Conditioning Equipment Name Libr2ry7ype W Serial Number Heating Percent Load Cooling Percent Load Hot Water Percent Load Location Cooling System 1 16 SEER2 23.61K 09b 50% 0% Unconditioned Basement 907958879) /Crawispace Cooling System 2 16 SEER2 18K(20790437 1) 0% 50% 0% Conditioned/Sealed Attic Heating System 1 95%AFUE Hydro-Coil,60k 509% 0% 0% Unconditioned Basement NG) /Crawispace Heating System 2 95%AFUE Hydro-Coil,60k 50% 0% 0% Conditioned/Sealed Attic NO Water Heating .95 EF Instant 0% 0% 100% Unconditioned Basement /Crawlspace Equipment Type:.95 EF Instant EquipmentType Residential Water Heater Fuel Type Natural Gas Distribution Type Hydronic Delivery(Radiant) Hot Water Efficiency 0.95 Energy Factor Tankless? Yes Equipment Type: 16 SEER2 18K(207904371) EquipmentType Air Conditioner Fuel Type Electric Distribution Type Forced Air Motor Type ECM(Variable Speed) Heat Pump System Type Unspecified Cooling Efficiency 16 SEER2 Cooling Capacity[kBtu/h) 18 6 Building Summary Property Organization Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Faud 631-244-2627 Sligo Construction Corp:SW Corey Creek Lane,Southold,I Initial House Design Builder Sligo Construction Corp. Equipment Type: 16 SEER2 23.6K(207958879) Equipment Type Air Conditioner Fuel Type Electric Distribution Type Forced Air MotorType PSC(Single Speed) Heat Pump System Type Unspecified Cooling Efficiency 16 SEER2 Cooling Capacity[kBtu/h] 23.6 Equipment Type:95%AFUE Hydro-Coil,60k(NG) EqulpmentType Boiler Fuel Type Natural Gas Distribution Type Forced Air MotorType PSC(Single Speed) Heating Efficiency 95 AFUE Heating Capacity[kBtu/h] 60 Use default EAE Yes EAE[kWh] 170 Building Summary Property Organization Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp.-800 Corey Creek Lane,Southold,I Initial House Design Builder Sligo Construction Corp. Distribution System Distribution Type Forced Air Heating Equipment Heating System 1 Cooling Equipment Cooling System 1 Sq.Feet Served 1,322 9 Return Grilles 1 Supply Duct RValue _ 8 Return Duct RValue 8 Supply Dud Area[�] 356.94 Return Duct Area[" 66.1 Leakage to Outdoors 52 CFM @ 25Pa(3.93/100 ft2) Total Leakage 52 CFM25 Total Leakage DuctTest Conditions Post-Construction Use Default Flow Rate Yes Duct 1 Duct Location Basement(insulated basement ceiling) Percent Supply Area 100 Percent Return Area 100 Duct 2 Duct Location Conditioned Space Percent Supply Area 0 Percent Return Area 0 Duct 3 Dud Location Conditioned Space Percent Supply Area 0 Percent Return Area 0 Duct4 Dud Location Conditioned Space, Percent Supply Area 0 Percent Return Area 0 Dud 5 Duct Location Conditioned Space Percent Supply Area 0 Percent Return Area 0 Duct 6 Dud Location Conditioned Space Percent Supply Area 0 Percent Return Area 0 Distribution System Distribution Type Forced Air Heating Equipment Heating System 2 Cooling Equipment Cooling System 2 Is All Equipment In Conditioned Space Yes Leakage Default HERS Default Leakage Duct System Efficiency 0.88 HVAC Grading HVAC Grading Not Conducted 8 Building Summary Property Organization Inspection Status 800 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp:800 Corey Creek Lane Southold I Initial House Design Builder Sligo Construction Corp. Ceiling Fan Has Ceiling Fan No Water Distribution Water Fixture Type Standard Use Default Hot Water Pipe Length No Hot Water Pipe Length[it] 97 At Least R3 Pipe Insulation? Yes Hot Water Recirculation System? No Drain Water Heat Recovery? No Clothes Dryer Cef 3.01 Fuel Type Electric Field Utilization Timer Controls Is Outside Conditioned Space No Clothes Dryer Available Yes Defaults Type HERS Reference Is Heat Pump No Clothes Washer Label Energy Rating 400 kWh/Year Annual Gas Cost $27.00 Electric Rate $0.12/kWh Gas Rate $1.09/Therm Capacity 3 Imef 1 Defaults Type HERS Reference Load Type Front-load Loads Per Week 6 Is Outside Conditioned Space No Clothes Washer Available Yes Dishwasher Dishwasher Defaults Type Custom Dishwasher Size Standard Dishwasher Efficiency 270 kWh Annual Gas Cost $30.00 Electric Rate $0.12/kWh Gas Rate $1.09/Therm Is Outside Conditioned Space No Dishwasher Available Yes 9 Building Summary Property Organisation Inspection Status 900 Corey Creek Lane Energy Testing Services Results are projected Southold,NY 11971 Michael Fauci 631-244-2627 Sligo Construction Corp.-800 Corey Creek Lane,Southold,I Initial House Design Builder Sligo Construction Corp. Appliances and Controls Programmable thermostat? Yes Range/Oven Fuel Electric Convection Oven? No Induction Range? No Range/Oven Outside Conditioned Space? No Refrigerator Consumption 691 kWh/Year Refrigerator Outside Conditioned Space? No Notes 10 Load Short Form Job: MF641 Date: Dec 23,2024 F System 1 By: Michael Fauci Energy Testing Services 1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824 Project • • For: Sligo Construction Corp. 800 Corey Creek Lane, Southold, NY 11971 Phone:516-204-2444 Design Information Htg Clg Infiltration Outside db (°F) 16 86 Method Blower door Ins ide db(7) 70 75 Shielding/stories 3(partial)/2 Design TD (°F) 54 11 Pressure/ACH/AVF 50 Pa/3.0/1156 cfm Daily range - L Inside humidity(%) 50 50 Moisture difference (gr/lb) 45 31 HEATING EQUIPMENT COOLING EQUIPMENT Make Laars Heating Systems Company Make Carrier Trade LAARS Trade 15 SEER2 AC Model MFTCW199(N,P)**'* Cond GA5SAN42400WA0 AHRI ref 9008085 Coil FMU4Z3000AL1 AHRI ref 207958879 Efficiency 95 AFUE Efficiency 13.0 EER2, 16 SEER2 Heating input 199000 Btuh Sensible cooling 16520 Btuh Heating output 181000 Btuh Latent cooling 7080 Btuh Temperature rise 210 °F Total cooling 23600 Btuh Actual air flow 787 cfm Actual air flow 787 cfm Air flow factor 0.056 cfm/Btuh Air flow factor 0.047 cfm/Btuh Static pressure 0.60 in H2O Static pressure 0.60 in H2O Space thermostat Load sensible heat ratio 0.85 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Bedroom 1 156 2026 2763 114 130 61 WIC 22 247 37 14 2 Computer Room 138 1927 2116 108 100 B 1 Bath 65 650 593 37 28 Lay. 23 0 9 0 0 Dining Room 156 1394 2841 78 134 Kitchen 200 2147 4451 121 210 Living Room 330 3563 2710 200 128 Foyer 195 2058 1164 116 55 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrilghtsoft., 2024-Dec-2312:51:48 Right-Suite®Universal 2023 23.0.01 RSU30008 Page 1 ...:800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E System 1 1284 14013 16683 787 787 Other equip loads 0 0 Equip. @ 0.91 RSM 15132 Latent cooling 2996 TOTALS 1 1284 1 14013 1 18128 1 787 1 787 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrighioft~ 2024-Dec-23 12:51:48 �� .. _.,..o.,.._,..., Right-SuiteO Universal 2023 23.0.01 RSU30008 Page 2 �� ...:800 Corey Creek Lane,Southold,NY 11971.rup Cale=MJ8 Front Door faces: E Load Short Form Job: MF641 Date: Dec 23,2024 System 2 By: Michael Fauci _ - Energy Testing Services 1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824 Project Information For: Sligo Construction Corp. 800 Corey Creek Lane, Southold, NY 11971 Phone:516-204-2444 Design Information Htg Clg Infiltration Outside db(°F) 16 86 Method Blower door Inside db(°F) 70 75 Shielding/stories 3 (partial)/2 Design TD (7) 54 11 Pressure/ACH/AVF 50 Pa/3.0/1156 cfm Daily range - L Inside humidity(%) 50 50 Moisture difference(gr/lb) 45 31 HEATING EQUIPMENT COOLING EQUIPMENT Make Laars Heating Systems Company Make Carrier Trade LAARS Trade COMFORT 15 SEER2 AC Model MFTCW199(N,P).... Cond 24SCA518WC0300 AHRI ref 9008085 Coil FMU4Z3000AL1 AHRI Fef 207904371 Efficiency 95 AFUE Efficiency 13.0 EER2, 16 SEER2 Heating input 199000 Btuh Sensible cooling 12600 Btuh Heating output 181000 Btuh Latent cooling 5400 Btuh Temperature rise 275 °F Total cooling 18000 Btuh Actual air flow 600 cfm Actual air flow 600 cfm Air flow factor 0.044 cfm/Btuh Air flow factor 0.054 cfm/Btuh Static pressure 0.60 in H2O Static pressure 0.60 in H2O Space thermostat Load sensible heat ratio 0.90 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) Bedroom 3 144 2271 3020 100 162 B3 WIC 31 461 76 20 4 Laundry 41 160 453 7 24 B2 WIC 29 412 71 18 4 Bedroom 2 144 2358 2744 104 147 Hall 127 0 0 0 0 Bath 51 622 329 27 18 Master Bath 132 1271 768 56 41 M WIC 2 33 403 68 18 4 M WIC 75 1291 211 57 11 Master Bedroom 377 4359 3453 192 185 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. t -fia- wr�ghtsoft.. 2024-Dec-23 12:51:48 .. r ..,.,., Right-Suite®Universal 2023 23.0.01 RSU30008 Page 3 vC ...:800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJB Front Door faces: E System 2 1183 13607 11193 600 600 Other equip loads 0 0 Equip. @ 0.91 RSM 10152 Latent cooling 1270 TOTALS I 1183 I 13607 I 11423 I 600 I 600 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. - - Wr➢ghtsoft'• 2024-Dec-2312:51:48 Right-Suite®Universal 2023 23.0.01 RSU30008 Page A00. .....800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E Building Analysis Job: MF641 / f Date: Dec 23,2024 System 1 By: Michael Fauci Energy Testing Services 1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824 Project Information For: Sligo Construction Corp. 800 Corey Creek Lane, Southold, NY 11971 Phone: 516-204-2444 Design Conditions Location: Indoor: Heating Cooling Long Island MacArthur AP, NY, US Indoor temperature (°F) 70 75 Elevation: 84 ft Design TD (°F) 54 11 Latitude: 41°N Relative humidity(%) 50 50 Outdoor: Heating Cooling Moisture difference(gr/lb) 45.1 30.9 Dry bulb(°F) 16 86 Infiltration: Dailyrange (°F) - 15 ( L ) Method Blower door Wet bulb(°F) - 72 Shielding/stories 3 (partial)/2 Wind speed (mph) 15.0 7.5 Pressure/ACH/AVF 50 Pa/3.0/1156 cfm • Component Btuh/ft2 Btuh % of load Walls 2.9 4511 32.2 axis Glazing 16.2 3579 25.5 Doors 15.7 320 2.3 MIS Ceilings 2.0 239 1.7 Floors 0.0 19 0.1 Infiltration 2.7 3752 26.8 Infiltration Ducts 1594 11.4 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1 1 14013 100.0 aa2ing Cooling Component Btuh/ftZ Btuh % of load Walls 0.7 1126 6.7 Vals Glazing 24.5 5410 32.4 Doors 7.2 146 0.9 Ceilings 0.7 84 0.5 Floors 0.0 4 0.0 Infiltration 0.2 353 2.1 ���� Ducts 395 2.4 -IrtardGirs Ventilation 0 0 Internal gains 9165 54.9 Blower 0 0 Adjustments 0 Total 16683 100.0 Latent Cooling Load =2996 Btuh Overall U-value=0.062 Btuh/ft�°F, Window/Floor Area=17.2% Data entries checked. ' Wt iAYtSOft' 2024-Dec-23 12:51:48 -� -^ - Right-Suite@ Universal202323.0.01 RSU30008 Pagel Jam• 800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E Building Analysis Job: MF641 Date: Dec 23,2024 System 2 By: Michael Fauci Energy Testing Services 1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824 Project • • For: Sligo Construction Corp. 800 Corey Creek Lane, Southold, NY 11971 Phone:516-204-2444 Design Conditions Location: Indoor: Heating Cooling Long Island MacArthur AP, NY, US Indoor temperature (OF) 70 75 Elevation: 84 ft Design TD (OF) 54 11 Latitude: 41 ON Relative humidity(%) 50 50 Outdoor: Heating Cooling Moisture difference(gr/lb) 45.1 30.9 Dry bulb(OF) 16 86 Infiltration: Dailyrange (OF) - 15 ( L ) Method Blower door Wet bulb(°F) - 72 Shielding/stories 3 (partial)/2 Wind speed (mph) 15.0 7.5 Pressure/ACH/AVF 50 Pa/3.0/1156 cfm • Component Btuh/ftz Btuh % of load Walls 3.4 3766 27.7 Ducts Glazing 16.2 2297 16.9 v�lls\ Doors 0 0 0 Ceilings 2.0 2354 17.3 Floors 1.5 31 0.2 Infiltration 2.7 2974 21.9 Ducts 2185 16.1 --Irdltralicn Piping 0 0 Humidification 0 0 Ventilation 0 0 Gating Qher Adjustments 0 Total 1 1 13607 100.0 Ceilings Component Btuh/112 Btuh %of load Walls 0.9 940 8.4 VIAls Glazing 20.7 2933 26.2 Doors 0 0 0 Ceilings 0.6 703 6.3 Floors 0.3 6 0.1 Day Infiltration 0.2 280 2.5 �� -IrC�rs Ducts 996 8.9 Ventilation 0 0 Internal gains 5335 47.7 Blower 0 0 Ct31i Adjustments 0 / I Total 11193 I 100.0 166 ai DuJs Latent Cooling Load= 1270 Btuh Overall U-value=0.242 Btuh/ft�°F, Window/Floor Area=12.0% Data entries checked. ,t--- r'' wmic,, htsc)4V 2024-Dec-2312:51:48 �^ •� Right-Suite@ Universal202323.0.01 RSU30008 Paget Boo Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E Project Summary Job: MFG41 / Date: Dec 23,2024 System 1 By: Michael Fauci Energy Testing Services 1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824 Proffiect Information For: Sliggo Construction Corp. 800 Corey Creek Lane, Southold, NY 11971 Phone: 516-204-2444 Notes: Desicin Information Weather: Long Island MacArthur AP, NY, US Winter Design Conditions Summer Design Conditions Outside db 16 °F Outside db 86 °F Inside db 70 °F Inside db 75 °F Design TD 54 °F Design TD 11 °F Daily range L Relative humidity 50 % Moisture difference 31 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 12419 Btuh Structure 16288 Btuh Ducts 1594 Btuh Ducts 395 Btuh Central vent(0 cfm) 0 Btuh Central vent(0 cfm) 0 Btuh (none) (none) Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 14013 Btuh Use manufacturer's data n Rate/swing multiplier 0.91 Infiltration Equipment sensible load 15132 Btuh Method Blower door Latent Cooling Equipment Load Sizing Shielding/stories 3(partial /2 Pressure/ACH/AVF 50 Pa/3.0/115R cfm Structure 2331 Btuh Ducts 665 Btuh Central vent(0 cfm) 0 Btuh Heating Cooling (none) Area(ft2) 1284 1284 Equipment latent load 2996 Btuh Volume(ft) 12430 12430 Air changes/hour 0.31 0.15 Equipment Total Load (Sen+Lat) 18128 Btuh Equiv.AVF (cfm) 63 30 Req.total capacity at 0.70 SHR 1.8 ton Heating Equipment Summary Cooling Equipment Summary Make Laars Heating Systems Company Make Carrier Trade LAARS Trade 15 SEER2 AC Model MFTCW199(N,P).... Cond GA5SAN42400WA0 AHRI ref 9008085 Coil FMU4Z3000AL1 AHRI ref 207958879 Efficiency 95 AFUE Efficiency 13.0 EER2, 16 SEER2 Heating input 199000 Btuh Sensible cooling 16520 Btuh Heating output 181000 Btuh Latent cooling 7080 Btuh Temperature rise 210 °F Total cooling 23600 Btuh Actual air flow 787 cfm Actual air flow 787 cfm Air flow factor 0.056 cfm/Btuh Air flow factor 0.047 cfm/Btuh Static pressure 0.60 in H2O Static pressure 0.60 in H2O Space thermostat Load sensible heat ratio 0.85 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrlghtsoft' 2024-Dec-23 12:51:49 ^• — Right-Suite@ Universal 2023 23.0.01 RSU30008 Page 1 ACCA 800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E Project Summary Job: MF641 } ti Date: Dec 23,2024 System 2 By: Michael Fauci - Energy Testing Services 1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824 Proaect Information For: Sliggo Construction Corp. 800 Corey Creek Lane, Southold, NY 11971 Phone:516-204-2444 Notes: Design Information Weather: Long Island MacArthur AP, NY, US Winter Design Conditions Summer Design Conditions Outside db 16 °F Outside db 86 °F Inside db 70 °F Inside db 75 °F Design TD 54 °F Design TD 11 °F Daily range L Relative humidity 50 % Moisture difference 31 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 11422 Btuh Structure 10197 Btuh Ducts 2185 Btuh Ducts 996 Btuh Central vent(0 cfm) 0 Btuh Central vent(0 cfm) 0 Btuh (none) (none) ' Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 13607 Btuh Use manufacturer's data n Rate/swing multiplier 0.91 Infiltration Equipment sensible load 10152 Btuh Method Blower door Latent Cooling Equipment Load Sizing Shielding/stories 3(partial /2 Pressure/ACH/AVF 50 Pa/3.0/1158 cfm Structure 700 Btuh Ducts 570 Btuh Central vent(0 cfm) 0 Btuh Heating Cooling (none) Area(ft� 1183 1183 Equipment latent load 1270 Btuh Volume(ft3) 9463 9463 Air changes/hour 0.32 0.15 Equipment Total Load (Sen+Lat) 11423 Btuh Equiv.AVF(cfm) 50 24 Req. total capacity at 0.70 SHR 1.2 ton Heating Equipment Summary Cooling Equipment Summary Make Laars Heating Systems Company Make Carrier Trade LAARS Trade COMFORT 15 SEER2 AC Model MFTCW199(N,P)"" Cond 24SCA518WC0300 AHRI ref 9008085 Coil FMU4Z3000AL1 AHRI ref 207904371 Efficiency 95 AFUE Efficiency 13.0 EER2, 16 SEER2 Heating input 199000 Btuh Sensible cooling 12600 Btuh Heating output, 181000 Btuh Latent cooling 5400 Btuh Temperature rise 275 °F Total cooling 18000 Btuh Actual air flow 600 cfm Actual air flow 600 cfm Air flow factor 0.044 cfm/Btuh Air flow factor 0.054 cfm/Btuh Static pressure 0.60 in H2O Static pressure 0.60 in H2O Space thermostat Load sensible heat ratio 0.90 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. !� yyr➢��ttSDTt" 2024-Dec-2312:51:49 w•• --- Right-Suite@ Universal 2023 23.0.01 RSU30008 Page 2 ...:800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E