HomeMy WebLinkAbout51714-Z o�aof Sao rya! Town of Southold
* * P.O. Box 1179
G ao9 53095 Main Rd
Ulm Southold, New York 11971
CERTIFICATE OF OCCUPANCY
No: 47141 Date: 06/16/2026
THIS CERTIFIES that the building SINGLE FAMILY DWELLING-NEW
Location of Property: 800 Corey Creek Ln Southold, NY 11971
See/Block/Lot: 78.4-12
Conforms substantially to the Application for Building Permit heretofore,filed in this office dated: 01/28/2025
Pursuant to which Building Permit No. 51714 and dated: 03/06/2025
Was issued, and conforms to all of the requirements of the applicable provisions of the law.
The occupancy for which this certificate is issued is:
Single-family dwelling with an unfinished basement and a covered front porch as applied
for.
The certificate is issued to: 800 Corey Creek Ln LLC
Of the aforesaid building.
SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL: R-24-1894 5/24/2026
ELECTRICAL CERTIFICATE: AE260510-73436 5/10/2026
PLUMBERS CERTIFICATION: Paul Rupp 5/13/2026
l
A o ' ed S' a e
��oFso�ry° TOWN OF SOUTHOLD
BUILDING DEPARTMENT
' TOWN CLERK'S OFFICE
SOUTHOLD, NY
BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES
WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS
UNTIL FULL COMPLETION OF THE WORK AUTHORIZED)
Permit#: 51714 Date: 03/06/2025
Permission is hereby granted to:
Alfano Family Trust
PO BOX 266
Laurel, NY 11948
To:
construct single-family dwelling as applied for per SCHD approval.
Premises Located at:
800 Corey Creek Ln, Southold, NY 11971
SCTM#78.4-12
Pursuant to application dated 01/28/2025 and approved by the Building Inspector.
To expire on 03/06/2027.
Contractors:
Required Inspections:
Fees:
Single Family Dwelling-NEW $2,434.00
CO Single Family Dwelling-New $100.00
Total $2,534.00
Building Inspector
ALLIANCE ELECTRICAL INSPECTIONS LIMITED
707 HYMAN AVENUE, WEST ISLIP, NY 11795
SECTION: 78 BLOCK: 4 LOT: 12 CERTIFICATE NUM: AE260510-73436
BUILDING PERMIT NUMBER: 51714,51715,51716 CERTIFICATE DATE: 05/10/2026
FINAL RESIDENTIAL ELECTRICAL CERTIFICATE
THIS CERTIFIES THAT ONLY THE ELECTRICAL EQUIPMENT AS DESCRIBED AND INTRODUCED BY THE APPLICANT
NAMED ON THE ABOVE CERTIFICATE NUMBER AT THE PREMISES OF:
PAUL DAVEY,800 COREY CREEK LN,SOUTHHOLD,NY 11971
INSPECTION WAS CONDUCTED ON 05/10/2026 AND WAS FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRICAL CODE AND/OR
NEW YORK STATE APPLICABLE CODE AT THE TIME OF CONSTRUCTION IN THE FOLLOWING LOCATIONS:
Attached Garage,Attic,Basement,First Floor,In Ground Pool,Outside,Second Floor,Cabana/BBQ
1 Service-Residential 200A Overhead 3 Smoke/Carbon Combo
1 Septic Pump 4 Exhaust Fan
1 Hot water heater 1 Door Bell Transformer
1 Oil Fired Heating System 4 LED UC Ught(s)
2 A/C Condenser 1 LED Driver
2 Air Handler 90 Fixture
2 A/C Disconnect 1 Fixture-Pendant(s)
1 Washer 9 Fixtures Outside
1 Dryer 1 Flood Light
1 Wine Fridge 15 Porcelain fixture
1 Dishwasher 5 Vanity Mirror Light
1 Range Gas 1 LED Fixture
1 Microwave 1 Fan box
1 Exhaust Hood 4 Fixture Incandescent
1 Fireplace 12 AFCI Breaker 15A
5 GFCI Receptacle 1 AFCI/GFCI Dual Rated Breaker
3 Receptacle WP 3 AFCI Breaker 20A
2 Receptacle Island 1 Pool-Residential In Ground
2 Refrigerator 1 Bonding Pool#8
72 Receptacle 1 Pool Heater
56 Switch 1 Pool Filter
10 Switch(es)3-way 1 Pool Panel
1 Switch(es)4-way 1 Pool Pump/Motor
1 Caseta Switch/Pico Switch 3 Pool Light
1 Heat Detector 1 Low Voltage Transformer
5 Smoke Detector 2 Chandelier
1 Sub Panel
APPLICANT: NEUBAUER ELECTRIC LICENSE NUMBER:KAI BAUER SUFFOLK 3867 ME
407 B LEXINGTON AVENUE ,WEST BABYLON,NY 11704
CATALIN DUMITRU PRESIDENT 631-539-6055
S _E ALAN GAGNON VICE PRESIDENT 516-248-0820
THIS CE TIFICATE MAY NOT BE ALTERED IN ANY WAY AND IS VALID BY THE PRESENCE OF A RAISED SEALAT THE LOCATION INDICATED
THIS CERTIFICATE IS VALID FOR ONE YEAR FROM THE DATE OF ISSUANCE
�o��oF sa0ry®�
Town Hall Annex Telephone(631)765-1802
54375 Main Road Fax(631)765-9502
P.O.Box 1179 f
Southold.NY 11971-0959 l�c0
BUILDING DEPARTMENT
TOWN OF SOUTHOLD
CERTIFICATION
Date: �01 (U _._... ..
Building Permit No.
Owner:
(Pleas print)
Plwnbcr: U\Y-4,pp
PILue print)
I certify that the solder used in the water supply system contains less than 2/I 0 of I%
lead.
Mdmbers Signature)
Sworn to before me this �3
day of �===�t— ' 208.�
Notary Public, NQ%SGU County
DINA f.10
NOTARY I uKx,sTATE OF NEW YORK
RegWmWon No.01AN63W&
Quelf ed In Newu County
Commission Expires OU23J2030
OE 50(/j�olo
TOWN OF SOUTHOLD BUILDING DEPT.
631-765-1802
INSPEC ION
FO ATION 1ST/ RESAR ROUGH PLBG.
[ NDATION 2ND [ ] INSULATION/CAULKING
FRAMING /STRAPPING [ ] FINAL
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL)
[ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL
REMARKS: X O
VIA) v, rA-Ar%,
DATE INSPECTOR
OF SOUTho�
# TOWN OF SOUTHOLD BUILDING DEPT.
lo��m,� 631-765-1802
INSPECTION
[ ] FOUNDATION 1ST/ REBAR [ ] OUGH PLBG.
[ ] FOUNDATION 2ND . [ INSULATIOWCAULKING j
[ ] FRAMING /STRAPPING [ ] .FINAL
[ ]- FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ]- FIRE RESISTANT CONSTRUCTION .[ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL)
[ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL
REMARKS:
r'A
� Pig. Olti J
r�✓1, � S
DATE yDYJ INSPECTOR
OF SOUIyOIo
# TOWN OF SOUTHOLD BUILDING DEPT.
courm" 631-765-1802
INSPECTION
[ ] FOUNDATION 1ST/ REBAR [ ] OUGH PLBG.
[ ] FOUNDATION 2ND [ INSULATION/CAULKING
[ ] FRAMING /STRAPPING [ FINAL N 1>
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL)
[ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL
REMARKS:
Xf % t>r4 , IU u
�1 Lww
(� p
DATE y INSPECTO
Energy Testing Services
2026 Combustion Safety Testing Form
i
i
i
Certified Home Address: 800 Corey Creek Lane City: Southold
Builder Name: Sligo Construction Corp. Builder Tracking#
I
i
Combustion Appliance Zone (CAZ)# of Location of this CAZ: Basement
i
(Use additional forms if more than one CAZ or if home has multiple heating systems or water heaters)
Date of Test: 05-14-2026 Outdoors Temp During Test: 60 °F
CAZ Depressurization (NOTE:Net Change=Test Pressure—Base Pressure)
Base Pressure: N/A pa. CAZ Ambient CO: N/A PPM
Test Pressure: N/A pa. Appliances/Fireplace Simulated for Test? Yes❑ No IZI
I
Net Change: N/A pa. If Yes,Total CFM Simulated (explain in notes)
NOTES:
i
I
Heating System Primary: Yes❑✓ No❑ Type: Furnace❑Boiler❑✓ Heat Pump[:[Other❑
r z Venting Type 3 DraftSin Ilaee S [n•flake CO CO
E [ciene Fue!Tvpe Circle Type) (Pascal) orst Case (Natural) (Worst Case)' attn•al
Rating:95•0 N❑✓ P❑O❑E❑ N❑\0MQS_2 NSA Pa. Pass❑✓ Fail❑_ Pass❑✓Fail❑ N/APPM N/A PpM
Yes ❑✓ Type: Standard Tank❑Indirect Tankless El Size: 0.0 Style Common Vent ElWater Heater Primary: 4
Non Instantaneous❑✓ Commercial (See Note Sbelow) (Gallons) Stand Alone ❑✓
s z Ventinr Type s .Drat Sin llaee Spillage(Natural) CO CO
Efficiency Fuel Type (Circle Type) (Pascal) (Worse Case) (Worse Case) (Natural)
EF: 0.95 N_❑✓ P❑O❑E.❑ N❑M❑S❑✓ N/A Pa. Pass❑✓ Fail❑ PassZFail❑ N/A PPM N/A PPM
Oven Oven is Electric or No Oven Exists ❑ Oven Range Hood Vented to Outside Yes Z No❑
Oven CO t PPM Ambient CO(During Oven CO Testing) o PPM
'Heating System Efficiency: Enter AFUE for furnace or boiler;HSPF for heat pump;COP if heat pump is geothermal
1 Fuel Type: N =Natural Gas P=Propane O=Oil E=Electric
3 Venting Type: N =Natural/Atmospheric V =Natural/Atmospheric PLUS Vent Damper
M =Mechanically Assisted S =Sealed(Two Pipe)
NOTE. If the Venting Type selected is M,no Draft testis required for that appliance.
If the Venting Type selected is S,no Draft or Spillage tests are required for that appliance.
A CO test IS REQUIRED for all appliances regardless of Venting Type,if the exhaust vent is accessible.
4 Water Heater Style: Commonly Vented with Heating System or Stand Alone(Independently Vented or Orphaned)
S Water Heater Efficiency: If Water Heater Type is Indirect,no EF entry is required.
If Water Heater Type is Tankless,enter efficiency of combustion source.
NOTE: If Water Heater Type is"Commercial"and the unit is 99 gallons or less,enter a maximum-modeled EF of.54
If Water Heater Type is"Commercial'and the unit is 100 gallons or more,enter a maximum-modeled EF of.48
Rater Name: Michael Fauc' Rater Number: 8619824
Rater Signature: Date: 05-14-2026
Home Energy Rating Certificate Rating Date: 2026-05-14
Final Report Registry ID: 040979532
Ekotrope ID: d4rR9gr2
HERS' • - • - Savings
Your home's HERS score is a relative : 11 Corev Creek ,
performance score.The lower the number, Southold,
the more energy efficient the home.To 52learn more,visit www.hersindex.com *Relative to an average U.S.$2,368 Builder:
home Sligo Construction Corp.
Your Home's Estimated Energy Use: This home meets or exceeds the
Use[MBtu] Annual Cost criteria of the following:
Heating 49.7 $551 2020 New York ECCC Code
Cooling 1.6 $94
Hot Water 11.7 $128
Lights/Appliances 21.6 $1,086
Service Charges $120
Generation (e.g.Solar) 0.0 $0
Total: 84.7 $1,978
HERY Index Home Feature Summary: Rating Completed by:
M—Energy HomeType: Single family detached
2zo Model: N/A Energy Rater: Michael Fauci
Existing Ito Community: N/A RESNET ID: 8619824
Homes 170 Conditioned Floor Area: 2,640 fe Rating Company Energy Testing Services
120 Number of Bedrooms:, 4 1648 Locust Avenue Unit E,Bohemia,NY 11716
Reference 2ioo Primary Heating System: Boiler•Natural Gas•95 AFUE 631-244-2627
Home Primary Cooling System: Air Conditioner•Electric•16 SEER2
90 Rating Provider: Building Efficient Resources
Residential Water Heater•Natural Gas•0.95 Energy 9 9 Y
80 Primary Water Heating: Factor PO Box 1769 Brevard,NC 28712
7O
eo House Tightness: 1105 CFM50(2.19 ACH50) 800-399-9620
so Ventilation: 77 CFM•30 Watts•Exhaust Only
ao ¢
This Home Duct Leakage to Outside: Untested Forced Air � .:-
9
- 30 Above Grade Walls: R-21
20
� Ceiling: Sealed Attic,R-42
2O LC and
Zero Energy o Window Type: U Value:0.3,SHGC:0.31
Home Foundation Walls: N/A Michael Fauci,Certified Energy Rater
omuarsW Los` Ty Framed Floor. R-30 Digitally signed:5114/26 at 239 PM
ekotrope Ekotrope RATER-Version:5-0-23862
reportThe EnergyRating Disclosurefor this home is availablefrorn the Approved Rating Provider.
This does not constitute anywarranty or guarantee.
800 Corey Creek Lane
Southold, NY 11971
r
Builder:Sligo Construction Corp.
THIS HOME IS CERTIFIED TO MEET THE NEWYORK2020
ENERGY CODE
i
Building Features
Ceiling Sealed Attic,R-42 Duct Supply R-6.0,Return R-6.0
Above Grade Walls R-21 Duct Leakage to Outside Untested Forced Air(Exempt)
Foundation Walls N/A Total Duct Leakage Untested(Exempt)
Framed Floor R-30 Heating Boiler-Natural Gas-95 AFUE
Slab N/A Cooling Air Conditioner-Electric-16 SEER2
I Infiltration 1105 CFM50(2.19 ACH50) Water Heating Residential Water Heater-Natural Gas-0.95 Energy
Window U Value:0.3,SHGC:0.31 Factor
Asa 3rd party extension of the code jurisdiction utilizing these reports,I certify that this energy code compliance document has been created in accordance with the requirements of Chapter 4 of the
adopted New York ECCC 2020 based on SUFFOLK County.If rating is Projected,I certify that the building design described herein is consistent with the building plans,specifications,and other
calculations submitted with the permit application.If rating is Confirmed,I certify that the address referenced above has been inspected/tested and that the mandatory provisions of the New York ECCC
2020 have been installed to meet or exceed the intent of the Newyork ECCC 2020 or will be verified as such by another party.
Name: Michael Fauci Signature: mfc"
Organization: EnergyTesting Services Digitally signed: 5/14/26 at 2:39 PM
6
Ekotrope RATER-Version 5.0.2.3862
New York ECCC 2020 compliance results calculated using Ekotrope RATER's energy and code compliance algorithm,including appropriate amendments.
Ekotrope RATER is a RESNET Accredited HERS Rating Tool.All results are based on data entered by Ekotrope users.
Ekotrope disclaims all liability for the information shown on this report.
New York 2020 Label
800 Corey Creek Lane
Ekotrope RATER-Version:5.0.2.3862
HERS®Index Score:52
Ceiling:R-42
Above Grade Walls:R-21
Foundation Walls:N/A
Exposed Floor:R-30
Slab:N/A
Infiltration:1105 CFM50(2.19 ACH50)
Duct Insulation:N/A
Duct Lkg_to Outdoors:Untested Forced Air
Window&Door Specs_
U-Value:0.3,SHGC:0.3 1
Door:R-5 _
Mechanical Equipment Specs
Heating:Boiler.Natural Gas-95 AFUE
Cooling:Air Conditioner-Electric-16 SEER2
Hot Water:Residential Water Heater-Natural Gas-0.95
Energy Factor
Average Mechanical Ventilation:77 CFM
Builder or D_esi_gn Professional
Signature: _ _ _ )
w ! '
New York ECCC 2020 UA Compliance
Property Organization Inspection Status
800 Corey Creek Lane EnergyTesting Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp.-800 Corey Creel
Initial House Design Builder
Sligo Construction Corp.
This report is based on a proposed design and does not confirm field enforcement of design elements.
Building UA
Elements IECC Reference As Designed
Ceilings 39.2 48.0
Above-Grade Walls 145.3 150.9
Windows,Doors and Skylights 130.9 118.9
Slab Floor: 0.0 0.0
Framed Floors 63.1 46.4
Foundation Walls 0.0 0.0
Rim Joists 7.1 6.7
Overall UA(Design must be equal or lower): 385.6 370.9
Requirements
R402.1 S Total UA alternative compliance passes by 3.8%. The proposed home meets the UA requirement by 3.8%
R4023.2 Average SHGC:0.30 Max SHGC:0.40 Average SHGC of 030 is greater than the maximum of 0.40.
R402.4.1.2 Air LeakageTesting A post construction blower door test is required to verify the air leakage meets the
requirement
® R4025 Area-weighted average fenestration SHGC Area-weighted average fenestration SHGC is 0.3.The maximum allowed value is[No Limit].
R4025 Area-weighted average fenestration U-Factor
R404.1 Lighting Equipment
R403.6.1 Mechanical Ventilation Efficacy
® Mandatory Checklist Mandatory code requirements that are not checked New York 2020 Mandatory Requirements must be checked as complete.
by Ekotrope must be met
R403.6 Mechanical Ventilation Rate
R4033A Duct Leakage Testing
R40353 Hot water pipe Insulation Hot water pipes at least 3/41n diameter must be Insulated to R-3 at minimum.
Design exceeds requirements for New York ECCC 2020 Prescriptive compliance by 3.8%.
Name: Michael Fauci Signature: 1116CA.d TCccC6
Organization: Energy Testing Services Digitally signed: 12n3/24 at 12:53 PM
Ekotrope RATER-Version 4.0.2.3542
Newyork ECCC 2020 Prescriptive compliance results calculated using Ekotrope RATER's energy and code compliance algorithm.including appropriate amendments.
Ekotrope RATER is a RESNET Accredited HERS Rating Tool.All results are based on data entered by Ekotrope users.
Ekotrope disclaims all liability for the information shown on this report
Energy Code Inspection Checklist
Property Organization Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp.-800 Corey Creel
Initial House Design Builder
Sligo Construction Corp.
General Building Information
Conditioned Area(sq ft) 2,640
Conditioned Volume(cubic ft) 30,263
Insulated Shell Area(sq ft) 5,832
The building energy model in Ekotrope reflects the building assemblies and energy features listed below.Sometimes energy features
will change in the field from what has been modeled.The inspection process should identify any changes and ensure that the home
continues to meet the applicable energy code.
Slab
None Present
Framed Floor
Name:Floor Over Basement(1,310 s.f.)
R-0 continuous insulation,R-30 cavity insulation
Insulation Grade:I
Name:Exterior Floor (32 s.f.)
R-0 continuous insulation,R-30 cavity insulation
Insulation Grade:II
Foundation Wall
None Present
Above Grade Wall
Name:Exterior Walls(2,610 s.f.)
R-3 continuous insulation,R-15 cavity insulation
Insulation Grade:
Name:Staircase (220 s.f.)
R-0 continuous insulation,R-15 cavity insulation
Insulation Grade:11
i
Rim Joist
Energy Code Inspection Checklist
Property Organization Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp:800 Corey Creel
Initial House Design Builder
Sligo Construction Corp.
El Name:Band Joist 054 s.f.)
R:18.00
Ceiling/Roof
Name:Hot Roof(1,506 s.f.)
R-0 continuous insulation,R-38 cavity insulation
Insulation Grade:I
Opaque Door
Name:Front Door(20 s.f.)
R:5.00
Name:Basement Door 0 7.8 s.f.)
R:5.00
Glazing
Name:ff 2 e(Front)(27 s.f.), U:0.300, SHGC:0.3, Orientation:EAST
Name:ff 2 e(12 s.f.), U:0.300, SHGC:0.3, Orientation:EAST
Name:ff 3 e(40.5 s.f.), U:0.300, SHGC:0.3, Orientation:EAST
Name:sf 2 e(27 s.f.), U:0.300, SHGC:0.3, Orientation:EAST
Name:sf 1 e(13.5 s.f.), U:0.300, SHGC:0.3, Orientation:EAST
Name:sf 1 e(18 s.f.), U:0.300, SHGC:0.3, Orientation:EAST
Name:sf 3 e(40.5 s.f.), U:0.300, SHGC:0.3, Orientation:EAST
Name:ff 2 n(Right)(22.5 s.f.), U:0.300, SHGC:0.3, Orientation:NORTH 2
Name:sf 1 n(13.5 s.f.), U:0.300, SHGC:0.3, Orientation:NORTH
Energy Code Inspection Checklist
Property Organization Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp.-800 Corey Creel
Initial House Design Builder
Sligo Construction Corp.
Name:sf 1 n(13.5 s.f.), U:0.300, SHGC:0.3, Orientation:NORTH
Name:ff 2 w(Rear)(19 s.f.), U:0.300, SHGC:0.3, Orientation:WEST
Name:ff 1 w(40 s.f.), U:0.300, SHGC:0.3, Orientation:WEST
Name:ff 1 w(13.5 s.f.), U:0.300, SHGC:0.3, Orientation:WEST /
Name:ff 2 w(27 s.f.), U:0.300, SHGC:0.3, Orientation:WEST
Name:sf 1 w(13.7 s.f.), U:0.300, SHGC:0.3, Orientation:WEST
Name:sf 1 w(3 s.f.), U:0.300, SHGC:0.3, Orientation:WEST
Name:sf 2 w(27 s.f.), U:0.300, SHGC:0.3, Orientation:WEST
Skylight
None Present
Mechanical Ventilation
Mechanical ventilation system rated for,and capable of,providing continuous ventilation.
System shall include automatic timing controls.
System type:Exhaust Only,24 hrs/day,42 Watts(Default)
Mechanical Equipment
Heating System 1 •Natural Gas•50%Heating Load @ 95 AFUE
Cooling System 1 •Electric•50%Cooling Load @ 16 SEER2
Heating System 2•Natural Gas•50%Heating Load @ 95 AFUE
3
Cooling System 2•Electric•50%Cooling Load @ 16 SEER2
Energy Code Inspection Checklist
Property Organization Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp.-800 Corey Creel
Initial House Design Builder
Sligo Construction Corp.
Water Heating•Natural Gas•100%Hot Water Load @ 0.95 Energy Factor
Air Leakage Control
ElTest Status:To be blower-door tested
House is air-sealed as to achieve 1,513 CFM50(3.00 ACH50)or less at final blower-door test.
Infiltration Requirements for IECC in Climate Zone 4
2009 IECC Infiltration limit for the design home is 7 ACH50.
2012 IECC Infiltration limit for the design home is 3 ACH50.
2015 IECC Infiltration limit for the design home is 3 ACH50.
2018 IECC Infiltration limit for the design home is 3 ACH50.
2021 IECC Infiltration limit for the design home is 5 ACH50.
Duct Leakage
Duct System 1
NOT entirely within conditioned space,testing required
Leakage to Outside specified as:52 CFM @ 251?a(3.93/100 fO
Total Leakage specified as:Untested
Duct System 2
All ducts and equipment within conditioned space
Untested
4
Energy Code Inspection Checklist
Property Organization Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp.-800 Corey Creel
Initial House Design Builder
Sligo Construction Corp.
Duct Leakage Code Requirements for IECC
20091ECC:
Postconstruction Leakage Test:Duct Leakage to Outdoors<=8 CFM25/100 sq ft CFA.
Rough in Test with AHU:Total Duct Leakage<=6 CFM25/100 sq ft CFA.
Rough in Test without AHU:Total Duct Leakage<=4 CFM25/100 sq ft CFA.
2012 IECC Mandatory,2015,2018,&2021 IECC Prescriptive Paths:
Postconstruction Leakage Test:Total Duct Leakage<=4 CFM25/100 sq ft CFA.
Rough in Test with AHU:Total Duct Leakage<=4 CFM25/100 sq ft CFA.
Rough in Test without AHU:Total Duct Leakage<=3 CFM25/100 sq ft CFA.
* Note:IECC 2021 requires Total Duct Leakage<=8 CFM25/100 sq ft CFA when all ducts
and air handlers are within the building thermal envelope.
2015 and 2018 IECC Performance Paths(Cost Compliance):
Leakage testing is required UNLESS all ducts and air handlers are located entirely within the thermal envelope.
There is no pass/fail threshold for duct leakage on the performance path.
Project Notes
5
I I'll VC)I
Service Address Bill To
''• Energ- Testing 800 Corey Creek Lane Sligo Construction
Se
rvuus
Southold, NY 11971 Corp.
+(516) 2 04-2444 Cel l
Energy Testing Services Payment terms Due upon receipt
1648 Locust Ave Suite E Invoice # 2563
Bohemia, NY 11716 Date 12/16/2024
Phone: (631) 244-2627
Email: mcaruso@energytestingservices.com
Web: www.energytestingservices.com
Description Total
HERS Rating $0.00
The Standard HERS Rating Certification For,A Typical Dwelling Includes:The Initial Consultation,
Plan Review, Recommendations To Meet The NYS Energy Code and Local Energy Code Requirements,
Thermal By-Pass Checklist (TBC) or Insulation Inspection, Final Inspection (Blower Door Test,
Total Duct Air Leakage Test & Combustion Safety Testing). Submittal For Confirmed HERS Rating
and Final Certification of Dwelling.
Manual J $310.85
Mechanical System Design - Heat Loss Calculations.
Manual S $207.23
Selection of Mechanical Equipment- Mechanical Equipment Capacity& Efficiency.
Manual D $310.85
Duct Design Report- Mechanical Equipment Locations, Duct Locations, CFM, Duct &Grille Sizes.
Plan Review $345.38
Provisional HERS Compliance Reports.
7
Subtotal /1p $1,174.31
Total $1,174.31
Page 1 of 4
RESNET HOME ENERGY RATING
Standard Disclosure
For home(s) located at:800 Corey Creek Lane,Southold,NY
Check the applicable disclosure(s):
WIThe Rater or the Rater's employer is receiving a fee for providing the rating on this home.
In addition to the rating,the Rater or the Rater's employer has also provided the following consulting services for this
home:
DA.Mechanical system design
[]B.Moisture control or indoor air quality consulting
[]C. Performance testing and/or commissioning other than required for the rating itself
[]D.Training for sales or construction personnel
J]E.Other(specify)
L]The Rater or the Rater's employer is:
E]A.The seller of this home or their agent
E[B.The mortgagor for some portion of the financed payments on this home
[:JC.An employee,contractor,or consultant of the electric and/or natural gas utility serving this home
/The Rater or Rater's employer is a supplier or installer of products,which may include:
Products Installed in this home by OR is in the business of
HVAC systems Rater Employer Rater OEmployer
Thermal insulation systems ORater Employer Rater DEmployer
Air sealing of envelope or duct systems Rater MEmployer Rater DEmployer
Energy efficient appliances Rater Employer Rater OEmployer
Construction(builder,developer,construction contractor,etc) Rater Employer Rater Employer
Other(specify): Rater DEmployer Rater DEmployer
This home has been verified under the provisions of Chapter 6,Section 603"Technical Requirements for Sampling"of
the Mortgage Industry National Home Energy Rating Standard as set forth by the Residential Energy Services Network
(RESNET).Rater Certification#:8619824
Name: Michael Fauci Signature:/ Aic "I Fcuci
Organization: Energy Testing Services Digitally signed: 12/23/24 at 12:53 PM
I attest that the above information is true and correct to the best of my knowledge.As a Rater or Rating Provider I
abide by the rating quality control provisions of the Mortgage Industry NationalHome Energy Rating Standard as set
forth by the Residential Energy Services Network(RESNET).The national rating quality control provisions of the rating
standard are contained in Chapter One 102.1.4.6 of the standard and are posted at
https:Hsta nda rds.resnet.us
The Home Energy Rating Standard Disclosure for this home is available from the rating provider.
RESNET Form 03001-2-Amended March 20,2017
Building Summary
Property Organization Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp.-800 Corey Creek Lane,Southold,I
Initial House Design Builder
Sligo Construction Corp.
General Building Information
Number Of Bedrooms 4
Number Of Floors 2
Conditioned Floor Area[sq.ft.] 2,640
Has Electric Vehicle Ready Space No
Unconditioned,attached garage? No
Conditioned Volume[cu.ft.] 30,263
Total Units in Building 1
Residence Type Single family detached
Number of Floors in Building -
Floor Number -
Model
Community
RESNETAECC 2006-2018 Climate Zone 4A
IECC 2021 Climate Zone 4A
Foundation Wall
None Present
Foundation Wall Library List
None Present
Slab
None Present
Slab Library List
_ None Present
Framed Floor
Name Library7ype Carpet Floor Grade surface Area Location
Exterior Floor 30(16/115)2(9.5)H 1 Above Grade 32.0ft' Exposed Exterior
Vinyl
Floor Over Basement 30(16/11.5)2(95)Exposed 1 Above Grade 1,310.0 ft' Uninsulated Unconditioned
Basement
Building Summary
Property organization Inspection Status
800 Corey Creek Lane EnergyTesting Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp.-800 Corey Creek Lane,Southold,I
Initial House Design Builder
Sligo Construction Corp.
Framed Floor Library List
Name Effective R-value
30(16/115)2(9.5)Exposed 28.923
30(16/115)2(95)H 27.661
Vinyl
Rim Joist
Name LibraryType Surface Area Location
Band Joist R15+3 - 154.0ft' Exposed Exterior
Rim Joist Library List
Name Effective Insulation R-value �� ^
R15+3 18.00
Wall
Name Library Type 4i Surface Color Solar Absorptance Surface Area Location
Exterior Walls R15+3(16/35)1(5) Medium 0.75 2.610Aft Exposed Exterior
Staircase 15(1613.5)2(5)5taircase Medium 0.75 220.0 ft Uninsulated Unconditioned
Basement
Wall Library List
Name Effective R-value
15(16135)2(.5)Staircase 11.421
RI5+3(16/35)1(5) 16.659
2
Building Summary
Property organization Inspection Status
800 Corey Creek Lane EnergyTesting Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp:900 Corey Creek Lane,Southold,I
Initial House Design Builder
Sligo Construction Corp.
Glazing
-� Name Library Type Wall Foundation Wall Is Operable Overhang Overhang FtTo Overhang FtTo Orientation Surface Area
Assignment Assignment Depth Top Bottom
ff 1 w 3030 Exterior Walls Yes 0 0 0 West 40.0 ft
ff 1 w 3030 Exterior Walls Yes 0 0 0 West 135 ft'
ff 2 e 3030 Exterior Walls Yes 7 1.7 7.8 East 12.0 fP
ff 2 e(Front) 3030 Exterior Walls Yes 7 13 5.3 East 27.0 ft'
ff2n(Right) 3030 Exterior Walls Yes 0 0 0 North .225ft
ff 2 w 3030 Exterior Walls Yes 0 0 0 West 27.0 ft'
If 2 w(Rear) 3030 Exterior Walls Yes 0 0 0 West 19.0 ft'
ff3e 3030 ExteriorWalis Yes 7 13 5.3 East 405ft'
sf 1 e 3030 Exterior Walls Yes 1 23 6.3 East 135 ft'
sf 1 e 3030 Exterior Wal Is Yes 1 23 4.8 East 18.0 ft
sf 1 n 3030 Exterior Walls Yes 0.8 3.1 7.2 North 135 If
sf 1 n 3030 Exterior Walls Yes 0.8 9.1 13.2 North 135 ft'
sf 1 w 3030 Exterior Walls Yes 1 13 3.8 West 13.7 ft
sf 1 w 3030 Exterior Walls Yes 1 1.2 2.8 West 3.0 ft'
sf 2 e 3030 Exterior Walls Yes 0.8 5 9.1 East 27.0 f
sf 2 w 3030 Exterior Walls Yes 1 13 5.3 West 27.0 ft'
sf 3 e 3030 Exterior Walls Yes 0.8 7.7 11.8 East 405 ft
Glazing Library List
Name ��- Shgc U-factor
3030 0.3 0300
Skylight
None Present
3
Building Summary
Property Organisation Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp:8o0 Corey Creek Lane,Southold,I
Initial House Design Builder
Sligo Construction Corp.
Skylight Library List
None Present
Opaque Door
Name Library7ype Wall Assignment Foundation Wall Emittance Solar Absorptance Surface Color Surface Area Location
Assignment
Basement Door Fiberglass Door Staircase 0.9 0.75 Medium 17.8 ft' Uninsulated
Unconditioned
Basement
Front Door Fiberglass Door Exterior Walls 0.9 0.75 Medium 20.0 ft' Exposed Exterior
Opaque Door Library List
- _.-.�..-...- Name EffectiveR-value ��
Fiberglass Door 5.00
Roof Insulation
Name Library Attic Clayor Doesthe Roof Slope Ceiling EaveHei ht Eave Surface Solar Surface Location
Type Exterior Concrete Roof have Framing tn.] Length[in.] Color Absorptance Area
Area[ft'] RoofT(les Eaves? Height[in.]
Hot Roof SA 1506 No No WA N/A N/A WA Medium 0.75 1,506.0 ft'Vaulted Roof
R38(16/95)1(
Roof Insulation Library List
Name Has Radiant Barrier Effective R-value
SA R38(16/9.5)1(LDF) No 31381
Whole House Infiltration
�� Infiltration ^� Measurement Type Shelter Class
3 ACH at 50 Pa To be blower-door tested 4
4
Building Summary
Property Organization Inspection Status
B00 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp.-800 Corey Creek Lane,Southold,I
Initial House Design Builder
Sligo Construction Corp.
Mechanical Ventilation
Ventilation Type Ventilation Rate[ft / Operational hours Fan Watts Runs once every Energy Recovery Model Number Manufacturer
Minute] per day three hours Percent
Exhaust Only 120CFM 24 42 Watts(Default) Yes 0
Lighting
%Interior Fluorescent %Interior LED Lighting %Exterior Fluorescent %Exterior LED Lighting %Garage Fluorescent %Garage LED Lighting
Lighting Lighting Lighting
0 100 0 100 0 100
Onsite Generation
None Present
Onsite Generation Library List
None Present
Solar Generation
_ None Present
Dehumidifier
None Present
Dehumidifier Library List
None Present
5
Building Summary
Property organization Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp.-800 Corey Creek Lane,Southold,I
Initial House Design Builder
Sligo Construction Corp.
Whole House Fan
None Present
Whole House Fan Library List
YNone Present
Conditioning Equipment
Name Library7ype Serial Number Heating Percent Load Cooling Percent Load Hot Water Percent Load Location
Cooling System 1 16 SEER2 23.6K 0% 50% 096 Unconditioned Basement
R07958879) /Crawlspace
Cooling System 2 16 SEER2 18K(207904371) 0% 50% 096 Conditioned/Sealed Attic
Heating System 1 95%AFUE Hydro-Coil,60k 50% 0% 0% Unconditioned Basement
NG) /Crawispace
Heating System 2 95%AFUE Hydro-Coil,60k 50% 0% 0% Conditioned/Sealed Attic
(qG)
Water Heating .95 EF Instant 0% 0% 10096 Unconditioned Basement
/Crawlspace
EquipmentType:.9S EF Instant
EquipmentType Residential Water Heater
Fuel Type Natural Gas
Distribution Type Hydronic Delivery(Radiant)
Hot Water Efficiency 0.95 Energy Factor
Tankless? Yes
Equipment Type: 16 SEER218K(207904371)
Equipment Type Air Conditioner
Fuel Type Electric
Distribution Type Forced Air
MotorType ECM(Variable Speed)
Heat Pump System Type Unspecified
Cooling Efficiency 16 SEER2
Cooling Capacity[kBtu/h) 18
6
Building Summary
Property Organization Inspection status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,W 11971 Michael Fauci
631-244-2627
Sligo Construction Corp:800 Corey Creek Lane,Southold I
Initial House Design Builder
Sligo Construction Corp.
Equipment Type: 16 SEER2 23.6K(207958879)
Equipment Type Air Conditioner
Fuel Type Electric
Distribution Type Forced Air
MotorType PSC(Single Speed)
Heat Pump System Type Unspecified
Cooling Efficiency 16 SEER2
Cooling Capacity[kBtu/hl 23.6
Equipment Type:95%AFUE Hydro-Coil,60k(NG)
Equipment Type Boiler
Fuel Type Natural Gas
Distribution Type Forced Air
Motor Type PSC(Single Speed)
Heating Efficiency 95 AFUE
Heating Capacity[kBtu/hl 60
Use default EAE Yes
EAE[kWh] 170
7
Building Summary
Property Organisation Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,W 11971 Michael Faud
631-244-2627
Sligo Construction Corp:800 Corey Creek Lane,Southold,I
Initial House Design Builder
Sligo Construction Corp.
Distribution System
Distribution Type Forced Air
Heating Equipment Heating System 1
Cooling Equipment Cooling System 1
Sq.Feet Served 1,322
#Return Grilles 1
Supply Dud RValue 8
Return Duct R Value 8
Supply Duct Area[W) 356.94
Return Duct Area[ftz) 66.1
Leakage to Outdoors 52 CFM @ 2513a(3.93/100 fe)
Total Leakage 52 CFM25
Total Leakage DuctTest Conditions Post-Construction
Use Default Flow Rate Yes
Dud 1
Dud Location Basement(insulated basement ceiling)
Percent Supply Area 100
Percent Return Area 100
Dud 2
Dud Location Conditioned Space
Percent Supply Area 0
Percent Return Area 0
Duct 3
Dud Location Conditioned Space
Percent Supply Area 0
Percent Return Area 0
Duct 4
Dud Location Conditioned Space
Percent Supply Area 0
Percent Return Area 0
Duct 5
Dud Location Conditioned Space
Percent Supply Area 0
Percent Return Area 0
Dud 6
Dud Location Conditioned Space
Percent Supply Area 0
Percent Return Area 0
Distribution System
Distribution Type Forced Air
Heating Equipment Heating System 2
Cooling Equipment Cooling System 2
Is All Equipment In Conditioned Space Yes
Leakage Default HERS Default Leakage
Duct System Efficiency 0.88
HVAC Grading
HVAC Grading Not Conducted
8
Building Summary
Property Organization Inspection Status
900 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp.-800 Corey Creek Lane,Southold,I
Initial House Design Builder
Sligo Construction Corp.
Ceiling Fan
Has Ceiling Fan No
Water Distribution
Water Fixture Type Standard
Use Default Hot Water Pipe Length No
Hot Water Pipe Length[ft] 97
At Least 113 Pipe Insulation? Yes
Hot Water Recirculation System? No
Drain Water Heat Recovery? No
Clothes Dryer
Cef 3.01
Fuel Type Electric
Field Utilization Timer Controls
Is Outside Conditioned Space No
Clothes Dryer Available Yes
Defaults Type HERS Reference
Is Heat Pump No
Clothes Washer
Label Energy Rating 400 kWh/Year
Annual Gas Cost $27.00
Electric Rate $0.12/kWh
Gas Rate $1.09/Therm
Capacity 3
Imef 1
Defaults Type HERS Reference
Load Type Front-load
Loads Per Week 6
Is Outside Conditioned Space No
Clothes Washer Available Yes
Dishwasher
Dishwasher Defaults Type Custom
Dishwasher Size Standard
Dishwasher Efficiency 270 kWh
Annual Gas Cost $30.00
Electric Rate $0.12/kWh
Gas Rate $1.09/Therrn
Is Outside Conditioned Space No
Dishwasher Available Yes
9
Building Summary
Property Organisation Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Faud
631-244-2627
Sligo Construction Corp:800 Corey Creek Lane,Southold,I
Initial House Design Builder
Sligo Construction Corp.
Appliances and Controls
Programmable thermostat? Yes
Range/Oven Fuel Electric
Convection Oven? No
Induction Range? No
Range/Oven Outside Conditioned Space? No
Refrigerator Consumption 691 kWh/Year
Refrigerator Outside Conditioned Space? No
Notes
10
Load Short Form Job: MF641
Date: Dec 23,2024
System 1 By: Michael Fauci
Energy Testing Services
1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824
Project • •
For: Sligo Construction Corp.
800 Corey Creek Lane, Southold, NY 11971
Phone: 516-204-2444
Design Information
Htg Clg Infiltration
Outside db (°F) 16 86 Method Blower door
Ins ide db(°F) 70 75 Shielding/stories 3(partial)/2
Design TD (°F) 54 11 Pressure/ACH/AVF 50 Pa/3.0/1156 cfm
Daily range - L
Inside humidity(%) 50 50
Moisture difference (gr/lb) 45 31
HEATING EQUIPMENT COOLING EQUIPMENT
Make Laars Heating Systems Company Make Carrier
Trade LAARS Trade 15 SEER2 AC
Model MFTCW199(N,P).... Cond GA5SAN42400WA0
AHRI ref 9008085 Coil FMU4Z3000AL1
AHRI ref 207958879
Efficiency 95 AFUE Efficiency 13.0 EER2, 16 SEER2
Heating input 199000 Btuh Sensible cooling 16520 Btuh
Heating output 181000 Btuh Latent cooling 7080 Btuh
Temperature rise 210 °F Total cooling 23600 Btuh
Actual air flow 787 cfm Actual air flow 787 cfm
Air flow factor 0.056 cfm/Btuh Air flow factor 0.047 cfm/Btuh
Static pressure 0.60 in H2O Static pressure 0.60 in H2O
Space thermostat Load sensible heat ratio 0.85
ROOM NAME Area Htg load Clg load Htg AVF Clg AVF
(ftz) (Btuh) (Btuh) (cfm) (cfm)
Bedroom 1 156 2026 2763 114 130
B1 WIC 22 247 37 14 2
Computer Room 138 1927 2116 108 100
B1 Bath 65 650 593 37 28
Lay. 23 0 9 0 0
Dining Room 156 1394 2841 78 134
Kitchen 200 2147 4451 121 210
Living Room 330 3563 2710 200 128
Foyer 195 2058 1164 116 55
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
Wrights®ft^ 2024-Dec-2312:51:48
Right-Suite@ Universal 2023 23.0.01 RSU30008 Page 1
...:800 Corey Creek Lane,Southold,NY'11971.rup Calc=MJB Front Door faces: E
System 1 1284 14013 16683 787 787
Other equip loads 0 0
Equip. @ 0.91 RSM 15132
Latent cooling 2996
TOTALS I 1284 I 14013 I 18128 I 787 I 787
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
wrightsoft- 2024-Dec-2312:51:48
,.. Right-Suite(D Universal 2023 23.0.01 RSU30008 Page 2
...:800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E
Load Short Form Job: MF641
Date: Dec 23,2024
System 2 By: Michael Fauci
Energy Testing Services
1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824
Project Information
For: Sligo Construction Corp.
800 Corey Creek Lane, Southold, NY 11971
Phone: 516-204-2444
Design Information
Htg Clg Infiltration
Outside db (°F) 16 86 Method Blower door
Inside db(°F) 70 75 Shielding/stories 3(partial)/2
Design TD (°F) 54 11 Pressure/ACH/AVF 50 Pa/3.0/1156 cfm
Daily range - L
Inside humidity(%) 50 50
Moisture difference(gr/lb) 45 31
HEATING EQUIPMENT COOLING EQUIPMENT
Make Laars Heating Systems Company Make Carrier
Trade LAARS Trade COMFORT 15 SEER2 AC
Model MFTCW199(N,P)"""" Cond 24SCA518WC0300
AHRI ref 9008085 Coil FMU4Z3000AL1
AHRI ref 207904371
Efficiency 95 AFUE Efficiency 13.0 EER2, 16 SEER2
Heating input 199000 Btuh Sensible cooling 12600 Btuh
Heating output 181000 Btuh Latent cooling 5400 Btuh
Temperature rise 275 °F Total cooling 18000 Btuh
Actual air flow 600 cfm Actual air flow 600 cfm
Air flow factor 0.044 cfm/Btuh Air flow factor 0.054 cfm/Btuh
Static pressure 0.60 in H2O Static pressure 0.60 in H2O
Space thermostat Load sensible heat ratio 0.90
ROOM NAME Area Htg load Clg load Htg AVF Clg AVF
(ft2) (Btuh) (Btuh) (cfm) (cfm)
Bedroom 3 144 2271 3020 100 162
B3 WIC 31 461 76 20 4
Laundry 41 160 453 7 24
B2 WIC 29 412 71 18 4
Bedroom 2 144 2358 2744 104 147
Hall 127 0 0 0 0
Bath 51 622 329 27 18
Master Bath 132 1271 768 56 41
M WIC 2 33 403 68 18 4
M WIC 75 1291 211 57 11
Master Bedroom 377 4359 3453 192 185
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
wrightsofC'
2024-Dec-23 12:51:48
^� .,., ......_.,..,,.., Right-Suite®Universal 202323.0.01 RSU30008 Page
Av ...:800 Corey Creek Lane,Southold,NY 11971.rup Cale=MJ8 Front Door faces: E
System 2 1183 13607 11193 600 600
Other equip loads 0 0
Equip. @ 0.91 RSM 10152
Latent cooling 1270
TOTALS I 1183 I 13607 I 11423 I 600 I 600
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
- - wr•ightsof , 2024-Dec-2312:51:48
Right-Suite@ Universal202323.0.01 RSU30008 Page
AC� ...:800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E
Building Analysis Job: MF641
r \, Date: Dec 23,2024
r`"" System 1 By: Michael Fauci
r..
Energy Testing Services
1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824
Project • •
For: Sligo Construction Corp.
800 Corey Creek Lane, Southold, NY 11971
Phone:516-204-2444
Design Conditions
Location: Indoor: Heating Cooling
Long Island MacArthur AP, NY, US Indoor temperature(T) 70 75
Elevation: 84 ft Design TD(TF) 54 11
Latitude: 41°N Relative humidity(%) 50 50
Outdoor: Heating Cooling Moisture difference(gr/lb) 45.1 30.9
Dry bulb(T) 16 86 Infiltration:
Daily range (7) - 15 ( L ) Method Blower door
Wet bulb(°F) - 72 Shielding/stories 3 (partial)/2
Wind speed (mph) 15.0 7.5 Pressure/ACH/AVF 50 Pa/3.0/1156 cfm
RPM 110M
Component Btuh/ft2 Btuh %of load
Walls 2.9 4511 32.2 Duns
Glazing 16.2 3579 25.5
Doors 15.7 320 2.3 V1dls
Ceilings 2.0 239 1.7
Floors 0.0 19 0.1
Infiltration 2.7 3752 26.8 -Irdltration
Ducts 1594 11.4
Piping 0 0
Humidification 0 0
Ventilation 0 0 ! �01her
Adjustments 0 D=
Total 1 1 14013 100.0 oaarg
Component Btuh/ftz Btuh %of load
Walls 0.7 1126 6.7 WIS
Glazing 24.5 5410 32.4
Doors 7.2 146 0.9
Ceilings 0.7 84 0.5
Floors 0.0 4 0.0
Infiltration 0.2 353 2.1 ����
Ducts 395 2.4 -IrterdGirs
Ventilation 0 0
Internal gains 9165 54.9
Blower 0 0
Adjustments 0
Total 1 1 16683 100.0
Latent Cooling Load=2996 Btuh
Overall U-value=0.062 Btuh/fF-°F, Window/Floor Area =17.2%
Data entries checked.
-PIA- wrightso4°t- 2024-Dec-2312:51:48
�- _...�.._ Right-Suite(D Universal 2023 23.0.01 RSU30008 Page 1
800 Corey Creek Lane,Southold,NY 11971.rup Cale=MJ8 Front Door faces: E
Building Analysis Job: MF641
Date: Dec 23,2024
2; System 2 By: Michael Fauci
- Energy Testing Services
1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824
Project Information
For: Sligo Construction Corp.
800 Corey Creek Lane, Southold, NY 11971
Phone: 516-204-2444
Design Conditions
Location: Indoor: Heating Cooling
Long Island MacArthur AP, NY, US Indoor temperature (TF) 70 75
Elevation: 84 ft Design TD (T) 54 11
Latitude: 41°N Relative humidity(%) 50 50
Outdoor: Heating Cooling Moisture difference (gr/lb) 45.1 30.9
Dry bulb(T) 16 86 Infiltration:
Dailyrange(T) - 15 ( L ) Method Blower door
Wet bulb(T) - 72 Shielding/stories 3 (partial)/2
Wind speed (mph) 15.0 7.5 Pressure/ACH/AVF 50 Pa/3.0/1156 cfm
Component Btuh/ft2 Btuh %of load
Walls 3.4 3766 27.7 ads
Glazing 16.2 2297 16.9
Doors 0 0 0 wjls
Ceilings 2.0 2354 17.3
Floors 1.5 31 0.2
Infiltration 2.7 2974 21.9
Ducts 2185 16.1 -Irtiltraticn
Piping 0 0
Humidification 0 0
Ventilation 0 0 oaang Qher
Adjustments 0
Total 13607 100.0 ceilings
Component Btuh/ftz Btuh % of load
Walls 0.9 940 8.4 VISIS
Glazing 20.7 2933 26.2
Doors 0 0 0
Ceilings 0.6 703 6.3
Floors 0.3 6 0.1 Qa�
Infiltration 0.2 280 2.5 �� -Irtar>1Cirs
Ducts 996 8.9
Ventilation 0 0
Internal gains 5335 47.7
Blower 0 0
Adjustments 0
Total 1 1 11193 I
100.0 1���� D-Cls
Latent Cooling Load= 1270 Btuh
Overall U-value=0.242 Btuh/ftZ-°F, Window/Floor Area=12.0%
Data entries checked.
1 -Fk Wrightseft" 2024-Dec-2312:51:48
Right-Suite@ Universal202323.0.01 RSU30008 Paget
800 Corey Creek Lane,Southold,NY 11971.rup Calc=MA Front Door faces: E
Project Summary Job: MF641
Date: Dec 23,2024
System By: Michael Fauci
Energy Testing Services
1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824
Promect Information
For: Sligo Construction Corp.
800 Corey Creek Lane, Southold, NY 11971
Phone:516-204-2444
Notes:
Design Information
Weather: Long Island MacArthur AP, NY, US
Winter Design Conditions Summer Design Conditions
Outside db 16 °F Outside db 86 °F
Inside db 70 °F Inside db 75 °F
Design TD 54 °F Design TD 11 °F
Daily range L
Relative humidity 50 %
Moisture difference 31 gr/lb
Heating Summary Sensible Cooling Equipment Load Sizing
Structure 12419 Btuh Structure 16288 Btuh
Ducts 1594 Btuh Ducts 395 Btuh
Central vent(0 cfm) 0 Btuh Central vent(0 cfm) 0 Btuh
none
Humidification 0 Btuh Blower 0 Btuh
Piping 0 Btuh
Equipment load 14013 Btuh Use manufacturer's data n
Rate/swing multiplier 0.91
Infiltration Equipment sensible load 15132 Btuh
Method Blower door Latent Cooling Equipment Load Sizing
Shielding/stories 3 (partial)/2
Pressure/ACH/AVF 50 Pa/3.0/115 cfm Structure 2331 Btuh
Ducts 665 Btuh
Central vent(0 cfm) 0 Btuh
Heating Cooling (none)
Area(ftz) 1284 1284 Equipment latent load 2996 Btuh
Volume (ft3) 12430 12430
Air changes/hour 0.31 0.15 Equipment Total Load(Sen+Lat) 18128 Btuh
Equiv.AVF (cfm) 63 30 Req.total capacity at 0.70 SHR 1.8 ton
Heating Equipment Summary Cooling Equipment Summary
Make Laars Heating Systems Company Make Carrier
Trade LAARS Trade 15 SEER2 AC
Model MFTCW199(N,P)`... Cond GA5SAN42400WA0
AHRI ref 9008085 Coil FMU4Z3000AL1
AHRI ref 207958879
Efficiency 95 AFUE Efficiency 13.0 EER2, 16 SEER2
Heating input 199000 Btuh Sensible cooling 16520 Btuh
Heating output 181000 Btuh Latent cooling 7080 Btuh
Temperature rise 210 °F Total cooling 23600 Btuh
Actual air flow 787 cfm Actual air flow 787 cfm
Air flow factor 0.056 cfm/Btuh Air flow factor 0.047 cfm/Btuh
Static pressure 0.60 in H2O Static pressure 0.60 in H2O
Space thermostat Load sensible heat ratio 0.85
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
-➢�➢-wr➢gR�tsoft' 2024-Dec-23 12:51:49
w-• -— Right-Suite@ Universal 2023 23.0.01 RSU30008 Page 1
800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E
f--� Project Summary Job: MF641
System 2 Byte Michael Fauci
Energy Testing Services
1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824
Prowect Information
For: Sliggo Construction Corp.
800 Corey Creek Lane, Southold, NY 11971
Phone:516-204-2444
Notes:
Design Information
Weather: Long Island MacArthur AP, NY, US
Winter Design Conditions Summer Design Conditions
Outside db 16 °F Outside db 86 °F
Inside db 70 °F Inside db 75 °F
Design TD 54 °F Design TD 11 °F
Daily range L
Relative humidity 50 %
Moisture difference 31 gr/lb
Heating Summary Sensible Cooling Equipment Load Sizing
Structure 11422 Btuh Structure 10197 Btuh
Ducts 2185 Btuh Ducts 996 Btuh
Central vent(0 cfm) 0 Btuh Central vent(0 cfm) 0 Btuh
none
(none)
Humidification 0 Btuh Blower 0 Btuh
Piping 0 Btuh
Equipment load 13607 Btuh Use manufacturer's data n
Rate/swing multiplier 0.91
Infiltration Equipment sensible load 10152 Btuh
Method Blower door Latent Cooling Equipment Load Sizing
Shielding/stories 3 (partial /2
Pressure/ACH/AVF 50 Pa/3.0/115R cfm Structure 700 Btuh
Ducts 570 Btuh
Central vent(0 cfm) 0 Btuh
Heating Cooling (none)
Area(ft2) 1183 1183 Equipment latent load 1270 Btuh
Volume (ft') 9463 9463
Air changes/hour 0.32 0.15 Equipment Total Load (Sen+Lat) 11423 Btuh
Equiv.AVF(cfm) 50 24 Req. total capacity at 0.70 SHR 1.2 ton
Heating Equipment Summary Cooling Equipment Summary
Make Laars Heating Systems Company Make Carrier
Trade LAARS Trade COMFORT 15 SEER2 AC
Model MFTCW199(N,P)--" Cond 24SCA518WC0300
AHRI ref 9008085 Coil FMU4Z3000AL1
AHRI ref 207904371
Efficiency 95 AFUE Efficiency 13.0 EER2, 16 SEER2
Heating input 199000 Btuh Sensible cooling 12600 Btuh
Heating output 181000 Btuh Latent cooling 5400 Btuh
Temperature rise 275 °F Total cooling 18000 Btuh
Actual air flow 600 cfm Actual air flow 600 cfm
Air flow factor 0.044 cfm/Btuh Air flow factor 0.054 cfm/Btuh
Static pressure 0.60 in H2O Static pressure 0.60 in H2O
Space thermostat Load sensible heat ratio 0.90
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
-r- wrilghts.oft^ 2024-Dec-23 12:51:49
ti- -•- - Right-Suite@ Universal 2023 23.0.01 RSU30008 Paget
ACCA ...:800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E
Duct System Summary Job: MF641
Date: Dec 23,2024
System 1 By: Michael Fauci
Energy Testing Services
1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824
Project Information
For: Sligo Construction Corp.
800 Corey Creek Lane, Southold, NY 11971
Phone:516-204-2444
Heating Cooling
External static pressure 0.60 in H2O 0.60 in H2O
Pressure losses 0 in H2O 0 in H2O
Available static pressure 0.60 in H2O 0.60 in H2O
Supply/return available pressure 0.480/0.120 in H2O 0.480/0.120 in H2O
Lowest friction rate 0.131 in/100ft 0.131 in/100ft
Actual air flow 787 .cfm 787 cfm
Total effective length (TEL) 458 ft
SupplyDetail Table
Design Htg Clg Design Diam H x W Duct Actual Ftg.Egv
Name (Btuh) (cfm) (cfm) FIR (in) (in) Matl Ln (ft) Ln (ft) Trunk
B1 Bath h 650 37 28 0.134 4.0 Ox 0 ShMt 24.0 335.0 st3
B1 WIC h 247 14 2 0.172 4.0 Ox 0 ShMt 8.8 270.0 st3
Bedrooms c 2763 114 130 0.198 5.6 8x4 ShMt 17.8 225.0 st3
Computer Room h 1927 108 100 0.165 6.0 Ox 0 ShMt 21.5 270.0 st3
Dining Room C 2841 78 134 0.133 7.0 Ox 0 ShMt 42.0 320.0 st3
Foyer h 2058 116 55 0.131 6.0 Ox 0 ShMt 41.8 325.0 st3
Kitchen C 2225 60 105 0.135 6.0 Ox 0 ShMt 46.0 310.0 st3
Kitchen-A C 2225 60 105 0.138 6.0 Ox 0 ShMt 57.0 290.0 st3
Lay. C 9 0 0 0.137 4.0 Ox 0 ShMt 15.5 335.0 st3
Living Room h 3563 200 128 0.136 8.0 Ox 0 ShMt 54.0 300.0 st3
SupplyDetail Table
Trunk Htg Clg Design Veloc Diam H x W Duct
Name Type (cfm) (cfm) FIR (fpm) (in) (in) Material Trunk
st3 Peak AVF 787 787 0.131 885 11.9 8 x 16 ShtMetl st1
st1 Peak AVF 787 787 0.131 885 11.9 8 x 16 ShtMetl
- - wrightsoft•� 2024-Dec-2312:51:49
Right-Suite@ Universal 2023 23.0.01 RSU30008 Page 1
...:800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJB Front Door faces: E
Return Branch Detail Table Htg Clg TEL Design Veloc Diam H x W Stud/Joist Duct
Name Size (in) (cfm) (cfm) (ft) FR (fpm) (in) (in) Opening (in) Matl Trunk
rb2 12x 30 787 787 91.5 0.131 564 16.0 Ox 0 ShMt
c
t -fk wrightseft- 2024-Dec-2312:51:49
Right-Suite(D Universal 2023 23.0.01 RSU30008 Page 2
+� ...:800 Corey Creek Lane,Southold,NY 11971.rup Calc=MA Front Door faces: E
Duct System Summary Job: MF641
\ System Date: Dec 23,2024
a7
Fr?r: stem 2 By: Michael Fauci
y_.I ,. -
Energy Testing Services
1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824
Project • •
For: Sligo Construction Corp.
800 Corey Creek Lane, Southold, NY 11971
Phone: 516-204-2444
Heating Cooling
External static pressure 0.60 in H2O 0.60 in H2O
Pressure losses 0.35 in H2O 0.35 in H2O
Available static pressure 0.25 in H2O 0.25 in H2O
Supply/return available pressure 0.210/0.040 in H2O 0.210/0.040 in H2O
Lowest friction rate 0.063 in/100ft 0.063 in/100ft
Actual air flow 600 cfm 600 cfm
Total effective length (TEL) 399 ft
Supply Branch Detail Table
Design Htg Clg Design Diam H x W Duct Actual Ftg.Egv
Name (Btuh) (cfm) (cfm) FIR (in) (in) Matl Ln (ft) Ln (ft) Trunk
B2 WIC h 412 18 4 0.063 4.0 Ox 0 ShMt 15.5 320.0 st6
B3 WIC h 461 20 4 0.076 4.0 Ox 0 ShMt 12.3 265.0 st6
Bath h 622 27 18 0.071 4.0 Ox 0 ShMt 15.3 280.0 st5
Bedroom 2 C 2744 104 147 0.075 8.0 Ox 0 ShMt 26.0 255.0 st6
Bedroom 3 C 3020 100 162 0.076 8.0 Ox 0 ShMt 21.5 255.0 st6
Laundry c 453 7 24 0.071 4.0 Ox 0 ShMt 8.3 290.0 st5
M WIC h 1291 57 11 0.072 6.0 Ox 0 ShMt 35.5 255.0 st5
M WIC 2 h 403 18 4 0.070 4.0 Ox 0 ShMt 34.5 265.0 st5
Master Bath h 1271 56 41 0.069 6.0 Ox0 ShMt 32.3 275.0 st5
Master Bedroom h 4359 192 185 0.072 8.0 Ox0 ShMt 47.8 245.0 st5
SupplyDetail Table
Trunk Htg Clg Design Veloc Diam H x W Duct
Name Type (cfm) (cfm) FIR (fpm) (in) (in) Material Trunk
St5 Peak AVF 357 283 0.069 536 10.1 8 x 12 ShtMetl st2
st6 Peak AVF 243 317 0.063 475 9.8 8 x 12 ShtMetl st2
st2 Peak AVF 600 600 0.063 600 12.5 8 x 18 ShtMetl
Bold/italic values have been manually overridden
ti wrigMtsoft- 2024-Dec-2312:51:49
,�, �•, Right-Suite®Universal 2023 23.0.01 RSU30008 Page 3
...:800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E
Return Branch Detail Table
Grille Htg Clg TEL Design Veloc Diam H x W Stud/Joist Duct
Name Size (in) (cfm) (cfm) (ft) FIR (fpm) (in) (in) Opening (in) Matl Trunk
rb1 12x 23 600 600 63.0 0.063 561 14.0 Ox 0 ShMt
wr➢ghtsof - 2024-Dec-2312:51:49
�'� _e.�. Right-Suite@ Universal202323.0.01 RSU30008 Page
...:800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJS Front Door faces: E
Manual S Compliance Report Job: MF641
Date: Dec 23,2024
System 1 By: Michael Fauci
Energy Testing Services
1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824
Project Information--
For: Sligo Construction Corp.
800 Corey Creek Lane, Southold, NY 11971
Phone: 516-204-2444
Cooling Equipment
Design Conditions
Outdoor design DB: 85.7°F Sensible gain: 16683 Btuh Entering coil DB: 75.2°F
Outdoor design WB: 71.9°F Latent gain: 2996 Btuh Entering coil WB: 62XF
Indoor design DB: 75.0°F Total gain: 19680 Btuh
Indoor RH: 50% Estimated airflow: 787 cfm
Manufacturer's Performance Data at Actual Design Conditions
Equipment type: Split AC
Manufacturer: Carrier Model: GA5SAN42400WA0+FMLI4Z3000AL1
Actual airflow: 787 cfm
Sensible capacity: 23441 Btuh 141%of load
Latent capacity: 5877 Btuh 196%of load
Total capacity: 29318 Btuh 149%of load SHR: 80%
Heating Equipment
Design Conditions
Outdoor design DB: 15.9°F Heat loss: 14013 Btuh Entering coil DB: 68.9°F
.Indoor design DB: 70.07
Manufacturer's Performance Data at Actual Design Conditions
Equipment type: Gas boiler
Manufacturer: Laars Heating Syste Model: MFTCW199(N,P)****
Actual airflow: 787 cfm
Output capacity: 181000 Btuh 1292%of load
Meets all requirements of ACCA Manual S.
_Pk wriglhtsoW 2024-Dec-2312:51:49
�'�` Right-Suite®Universal 2023 23.0.01 RSU30008 Page 1
800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJB Front Door faces: E
Manual S Compliance Report Job: MF641
Date: Dec 23,2024
eicric,�. Stem 2
y By: Michael Fauci
Energy Testing Services
1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824
Project Information
For: Sligo Construction Corp.
800 Corey Creek Lane, Southold, NY 11971
Phone: 516-204-2444
Cooling Equipment
Design Conditions
Outdoor design DB: 85.7°F Sensible gain: 11193 Btuh Entering coil DB: 75.1°F
Outdoor design WB: 71.9°F Latent gain: 1270 Btuh Entering coil WB: 62XF
Indoor design DB: 75.0°F Total gain: 12464 Btuh
Indoor RH: 50% Estimated airflow: 600 cfm
Manufacturer's Performance Data at Actual Design Conditions
Equipment type: Split AC
Manufacturer: Carrier Model: 24SCA518WC0300+FMU4Z3000AL1
Actual airflow: 600 cfm
Sensible capacity: 14746 Btuh 132%of load
Latent capacity: 2740 Btuh 216%of load
Total capacity: 17486 Btuh 140%of load SHR: 84%
Heating Equipment
Design Conditions
Outdoor design DB: 15.9°F Heat loss: 13607 Btuh Entering coil DB: 69.8°F
Indoor design DB: 70.OoF
Manufacturer's Performance Data at Actual Design Conditions
Equipment type: Gas boiler
Manufacturer: Laars Heating Syste Model: MFTCW199(N,P)****
Actual airflow: 600 cfm
Output capacity: 181000 Btuh 1330% of load
Meets all requirements of ACCA Manual S.
wrigehtsoft" 2024-Dec-2312:51:49
�• .. ..�.., Right-Suite@ Universal 2023 23.0.01 RSU30008 Page 2
ACCN 800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJB Front Door faces: E
Review • Form
Residential —
RPER 1
ACCK�, for _ — • (Loads, • • 15 Mar 09
Header Information
Contractor: Energy Testing Services REQUIRED ATTACHMENTS ATTACHED
Michael Fauci Manual J1 Form(and supporting worksheets): Yes ❑ No ❑
Mechanical license: 8619824 or MAAE Form*(and supporting worksheets): Yes ❑ No ❑
OEM performance data(heating,cooling,blower): Yes ❑ No ❑
Building plan#: Manual D Friction Rate Worksheet: Yes ❑ No ❑
Duct distribution sketch: Yes ❑ No ❑
Home address(Street or Lot#,Block,Subdivision): 800 Corey Creek Lane, System 1
HVAC LOADCALCULATION ,0
Design Conditions Building-Construction-information
Winter Design Conditions Building
Outdoor temperature: 16 °F Orientation: Front Door faces East
Indoor temperature: 70 of North,East,West,South,Northeast,Northwest,Southeast,Southwest
Total heat loss: 14013 Btuh Number of bedrooms: 1
Conditioned floor area: 1284 ftz
Summer Design Conditions Number of occupants: q
Outdoor temperature: 86 °F
Indoor temperature: 75 °F Windows Roar
Grains difference: 31 gr/lb @50% RH Eave overhang depth: 1.0 ft
Sensible heat gain: 18394 Btuh Internal shade: blinds Blinds,drapes,etc. F
rave
Latent heat gain: 3304 Btuh l]eplh Wlndax
Total heat gain: 21698 Btuh Number of skylights: 0
EQUIPMENTHVAC • 41
Heating_Eq.uipment_Data Cooling_Equipment_Data BI_ower_Data
Equipment type: Gas boiler Equipment type: Split AC Heating cfm: 787
urnace,Healpump,Boiler,etc. it conditio er,Heat pump,etc.
Cooling cfm: 787
Model: Laars Heating Systems Company Model: Carrier Static pressure: 0.60 in H2O
MFTCW199(N,P)**** GA5SAN42400WA0+FMU4Z3000AL1 Fan's rated external static pressure for design
airflow
Heating output capacity: 1§1000 Btuh Total cooling capacity: 29318 Btuh
Heat pumps-capacity at winter design out oor conditions
Sensible cooling capacity: 23441 Btuh
Aux.heating output capacity: 0 Btuh Latent cooling capacity: 5877 Btuh
DISTRIBUTIONHVAC DUCT •1
Design airflow: 787 cfm Longest supply duct: 367 ft Duct Materials Used
Equipment design ESP: 0.60 in H2O Longest return duct: 92 ft Trunk duct: Sheet metal
Total device pressure losses: 0 in H2O Total effective length(TEL): 458 ft
Available static pressure(ASP): 0.60 in H2O Friction rate: 0 1 41 in/100ft Branch duct: Sheet metal
Friction Rate=ASP+(TEL x 1
I declare the load calculation,equipment,equipment selection and duct design were rigorously performed based on the building plan
listed above. I understand the claims made on these forms will be subject to review and verification.
Contractor's printed name:
Contractor's signature: Date:
Reserved ..
*Home qualifies for MJ1AE Form based on Abridged Edition Checklist
wrights®ft-
- Right-Suite®Universal202323.0.01 RSU30008
— Residential — — Form
/tom •
/} jj RPER 1
ACC;;ke for HVACSystem Design
• (Loads, Equipment, 15 Mar 09
Pr[;cxrt'artg ruUa7as d:r vta
Header Information
Contractor: Energy Testing Services REQUIRED ATTACHMENTS ATTACHED
Michael Faucl Manual J1 Form(and supporting worksheets): Yes ❑ No ❑
Mechanical license: 8619824 or MJ1AE Form'(and supporting worksheets): Yes ❑ No ❑
OEM performance data(heating,cooling,blower): Yes ❑ No ❑
Building plan#: Manual D Friction Rate Worksheet: Yes ❑ No ❑
Duct distribution sketch: Yes ❑ No ❑
Home address(Street or Lot#,Block,Subdivision): 800 Corey Creek Lane, System 2
HVAC LOAD CALCULATION ,0
Design Conditions Building Construction_Infor-mati_on
Winter Design Conditions Building
Outdoor temperature: 16 °F Orientation: Front Door faces East
Indoor temperature: 70 of North,East,West,South,Northeast,Northwest,Southeast,Southwest
Total heat loss: 13607 Btuh Number of bedrooms: 3
Conditioned floor area: 1183 ftz
Summer Design Conditions Number of occupants: 1
Outdoor temperature: 86 °F
Indoor temperature: 75 °F Windows Rx`
Grains difference: 31 gr/lb @50% RH Eave overhang depth: 1.0 ft
Sensible heat gain: 12341 Btuh Internal shade: blinds [ave
Latent heat gain: 1401 Btuh Blinds,drapes,etc. oeplh 4Vindaw
Total heat gain: 13742 Btuh Number of skylights: 0
EQUIPMENTHVAC • ,0
Heating-Equipment-Data Cooling-Equipment-Data Blower-Data
Equipment type: Gas boiler Eaulpment type: Split AC Heating cfm: 600
Furnace,Heat pump,Boiler,etc. Air Conditioner,Heat pump,etc.
Cooling cfm: 600
Model: Laars Heating Systems Company Model: Carrier Static pressure: 0.60 in H2O
MFTCW199(N,P)"" 24SCA518WC0300+FMU4Z3000AL1 Fan's rated extemalstatic pressure for design
airflow
Heating output capacity: 1�1000 .Btuh Total cooling capacity: 17486 Btuh
Heat pumps-capacity at winter design out oor conditions
Sensible cooling capacity: 14746 Btuh
Aux.heating output capacity: 0 Btuh Latent cooling capacity: 2740 Btuh
DISTRIBUTIONHVAC DUCT •1
Design airflow: 600 cfm Longest supply duct: 336 ft Duct Materials Used
Equipment design ESP: 0.60 in H2O Longest return duct: 63 ft Trunk duct: Sheet metal
Total device pressure losses: -0.3 in H2O Total effective length(TEL): 399 ft
Available static pressure(ASP): 0.25 in H2O Friction rate:Friction Rate=ASP+(TELx 0.f1R3 in/100ft Branch duct: Sheet metal
I declare the load calculation,equipment,equipment selection and duct design were rigorously performed based on the building plan
listed above. I understand the claims made on these forms will be subject to review and verification.
Contractor's printed name:
Contractor's signature: Date:
Reserved
'Home qualifies for MJ1AE Form based on Abridged Edition Checklist
-�wrigAats®trt-
--^^ - Right-Suite®Universal202323.0.01 RSU30008
M
! N
P
Level 1
4x8 7 6 6
16 x 8 4 Basemei
4
4"
16x8
6 I 6 8
Job#: MF641 Scale: 1 : 87
Performed by Michael Fauci for: Energy Testing Services
Sligo Construction Corp. Page 1
800 Corey Creek Lane
1648 Locust Ave,Unit E RightSuite®Universal 2023
Southold,NY 11971 Bohemia,NY 11716 23.0.01 RSU30008
Phone:516-204-2444 Phone:631-244-2627 License:8619824 2024-Dec-23 12:52:44
www.energytestingservices.com mfauci@energytestingservices ...eek Lane,Southold,NY 11971.rup
Level 2
®-130 cfm 134 cfm 105 cfm 105 cfm
B1 Batt
Bedroom Dining Roor Kitcher
37 cfm
Lay.
®-0 cfm
B1 WIC
14 cfm--®
Foye
Living Roor
Computer Roo Stain 787 cfm
®-108 cfm 116 cfm H-200 cfm
Job#: MF641 Scale: 1 : 87
Performed by Michael Fauci for: Energy Testing Services
Sligo Construction Corp. Page 2
800 Corey Creek Lane 1648 Locust Ave,Unit E RightSuite®Universal 2023
Southold,NY 11971 Bohemia,NY 11716 23.0.01 RSU30008
Phone:516-204-2444 Phone:631-244-2627 License:8619824 2024-Dec-23 12:52:44
www.energytestingservices.com mfauci@energytestingservices ...eek Lane,Southold,NY 11971.rup
N
I
Level 3
162 cfm B3 WIC 56 cfm M WIC
20 cfm 18 cfm
Bat[Master Bat
Bedroom 27 cfm
Laundr M WIC
g 6"
4 24 cfm 57 cfm
4
12x8 4„
"
4„ 0 *—6„
B2 WIC
4„ Hal 12x8 '
21
18cfm 18x8 14"
600 cfm
Master Bedroo 8
8'
Bedroom OTE
Stairs
192 cfm
147 cfm
Job#: MF641 Energy Testing Services Scale: 1 : 87
Performed by Michael Fauci for: gY g
Sligo Construction Corp. Page 3
800 Corey Creek Lane 1648 Locust Ave,Unit E Right-Suite®Universal 2023
Southold,NY 11971 Bohemia,NY 11716 23.0.01 RSU30008
Phone:516-204-2444 Phone:631-244-2627 License:8619824 2024-Dec-23 12:52:44
www.energytestingservices.com mfauci@energytestingservices ...eek Lane,Southold,NY 11971.rup
4
New York ECCC 2020 UA Compliance
Property Organization Inspection Status
800 Corey Creek Lane EnergyTesting Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp.-800 Corey Creel
Initial House Design Builder
Sligo Construction Corp.
This report is based on a proposed design and does not confirm field enforcement of design elements.
Building UA
Elements IECC Reference As Designed
Ceilings 39.2 48.0
Above-Grade Walls 145.3 150.9
Windows,Doors and Skylights 130.9 118.9
Slab Floor: 0.0 0.0
Framed Floors 63.1 46.4
Foundation Walls 0.0 0.0
Rim Joists 7.1 6.7
Overall UA(Design must be equal or lower): 385.6 370.9
Requirements
® R402.15 Total UA alternative compliance passes by 3.8%. The proposed home meets the LIA requirement by 3.896
R4023.2 Average SHGC.0.30 Max SHGG 0.40 Average SHGC of 030 is greater than the maximum of 0.40.
R402.4.1.2 Air LeakageTesting A post construction blower door test is required to verify the air leakage meets the
requirement
® R4025 Area-weighted average fenestration SHGC Area-weighted average fenestration SHGC is 0.3.The maximum allowed value is[No Limit].
® R4025 Area-weighted average fenestration U-Factor
® R404.1 Lighting Equipment
® R403.6.1 Mechanical Ventilation Efficacy
MandatoryChecklist Mandatory code requirements that are not checked New York 2020 Mandatory by Ekotrope must be met Requirements must be checked as complete.
R403.6 Mechanical Ventilation Rate
® R4033A Duct Leakage Testing
® R40353 Hot water pipe Insulation Hot water pipes at least 3/41n diameter must be insulated to R-3 at minimum.
Design exceeds requirements for New York ECCC 2020 Prescriptive compliance by 3.8%.
Name: Michael Fauci Signature: Af&"FaUIC6
Organization: EnergyTesting Services Digitally signed: 12/23/24 at 12:53 PM
Ekotrope RATER-Version 4.0.23542
Newyork ECCC 2020 Prescriptive compliance results calculated using Ekotrope RATER's energy and code compliance algorithm,including appropriate amendments.
Ekotrope RATER is a RESNET Accredited HERS Rating Tool.All results are based on data entered by Ekotrope users.
Ekotrope disclaims all liability for the information shown on this report
Energy Code Inspection Checklist
Property Organization Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp.-800 Corey Creel
Initial House Design Builder
Sligo Construction Corp.
General Building Information
Conditioned Area(sq ft) 2,640
Conditioned Volume(cubic ft) 30,263
Insulated Shell Area(sq ft) 5,832
The building energy model in Ekotrope reflects the building assemblies and energy features listed below.Sometimes energy features
will change in the field from what has been modeled.The inspection process should identify any changes and ensure that the home
continues to meet the applicable energy code.
Slab
None Present
Framed Floor
Name:Floor Over Basement(1,310 s.f.)
R-0 continuous insulation,R-30 cavity insulation
Insulation Grade:I
Name:Exterior Floor (32 s.f.)
R-0 continuous insulation,R-30 cavity insulation
Insulation Grade:II
Foundation Wall
None Present
Above Grade Wall
Name:Exterior Walls(2,610 s.f.)
R-3 continuous insulation,R-15 cavity insulation
Insulation Grade:I
Name:Staircase (220 s.f.)
R-0 continuous insulation,R-15 cavity insulation
Insulation Grade:II
1
Rim Joist
Energy Code Inspection Checklist
Property Organization Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp.-800 Corey Creel
Initial House Design Builder
Sligo Construction Corp.
Name:Band Joist (154 s.f.)
R:18.00
Ceiling/Roof
Name:Hot Roof(1,506 s.f.)
R-0 continuous insulation,R-38 cavity insulation
Insulation Grade:I
Opaque Door
ElName:Front Door(20 s.f.)
R:5.00
ElName:Basement Door(17.8 s.f.)
R:5.00
Glazing
Name:ff 2 e(Front)(27 s.f.), U:0.300, SHGC:0.3, Orientation:EAST
Name:ff2 e(12 s.f.), U:0.300, SHGC:0.3, Orientation:EAST
Name:ff 3 e(40.S s.f.), U:0.300, SHGC:0.3, Orientation:EAST
Name:sf 2 e(27 s.f.), U:0.300, SHGC:0.3, Orientation:EAST
Name:sf 1 e(13.5 s.f.), U:0.300, SHGC:0.3, Orientation:EAST
Name:sf 1 e(18 s.f.), U:0.300, SHGC:0.3, Orientation:EAST
Name:sf 3 e(40.5 s.f.), U:0.300, SHGC:0.3, Orientation:EAST
Name:ff 2 n(Right)(22.5 s.f.), U:0.300, SHGC:0.3, Orientation:NORTH 2
Name:sf 1 n(13.5 s.f.), U:0.300, SHGC:0.3, Orientation:NORTH
Energy Code Inspection Checklist
Property Organization Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp.-800 Corey Creel
Initial House Design Builder
Sligo Construction Corp.
F1 Name:sf 1 n(13.5 s.f.), U:0.300, SHGC:0.3, Orientation:NORTH
El Name:ff 2 w(Rear)(19 s.f.), U:0.300, SHGC:0.3, Orientation:WEST
Name:ff 1 w(40 s.f.), U:0.300, SHGC:0.3, Orientation:WEST
Name:ff 1 w(13.5 s.f.), U:0.300, SHGC:0.3, Orientation:WEST
Name:ff 2 w(27 s.f.), U:0.300, SHGC:0.3, Orientation:WEST
Name:sf 1 w(13.7 s.f.), U:0.300, SHGC:0.3, Orientation:WEST
Name:sf 1 w(3 s.f.), U:0.300, SHGC:0.3, Orientation:WEST
Name:sf 2 w(27 s.f.), U:0.300, SHGC:0.3, Orientation:WEST
Skylight
None Present
Mechanical Ventilation
Mechanical ventilation system rated for,and capable of,providing continuous ventilation.
System shall include automatic timing controls.
System type:Exhaust Only,24 hrs/day,42 Watts(Default)
Mechanical Equipment
Heating System 1 -Natural Gas-50%Heating Load @ 95 AFUE
Cooling System 1 -Electric-50%Cooling Load @ 16 SEER2
Heating System 2•Natural Gas•50%Heating Load @ 95 AFUE
3
Cooling System 2-Electric-50%Cooling Load @ 16 SEER2
Energy Code Inspection Checklist
Property Organization Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp.-800 Corey Creel
Initial House Design Builder
Sligo Construction Corp.
Water Heating•Natural Gas•100%Hot Water Load @ 0.95 Energy Factor
Air Leakage Control
ElTest Status:To be blower-door tested
House is air-sealed as to achieve 1,513 CFM50(3.00 ACH50)or less at final blower-door test.
Infiltration Requirements for IECC in Climate Zone 4
2009 IECC Infiltration limit for the design home is 7 ACH50.
2012 IECC Infiltration limit for the design home is 3 ACH50.
2015 IECC Infiltration limit for the design home is 3 ACH50.
2018 IECC Infiltration limit for the design home is 3 ACH50.
2021 IECC Infiltration limit for the design home is 5 ACH50.
Duct Leakage
Duct System 1
NOT entirely within conditioned space,testing required
Leakage to Outside specified as:52 CFM @ 25Pa(3.93/100 ft2)
Total Leakage specified as:Untested
Duct System 2
All ducts and equipment within conditioned space
Untested
4
Energy Code Inspection Checklist
Property Organization Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp.-800 Corey Creel
Initial House Design Builder
Sligo Construction Corp.
Duct Leakage Code Requirements for IECC
2009 IECC:
Postconstruction Leakage Test:Duct Leakage to Outdoors<=8 CFM25/100 sq ft CFA.
Rough in Test with AHU:Total Duct Leakage<=6 CFM25/100 sq ft CFA.
Rough in Test without AHU:Total Duct Leakage<=4 CFM25/100 sq ft CFA.
2012 IECC Mandatory,2015,2018,&2021 IECC Prescriptive Paths:
Postconstruction Leakage Test:Total Duct Leakage<=4 CFM25/100 sq ft CFA.
Rough in Test with AHU:Total Duct Leakage<=4 CFM25/100 sq ft CFA.
Rough in Test without AHU:Total Duct Leakage<=3,CFM25/100 sq ft CFA.
* Note:IECC 2021 requires Total Duct Leakage<=8 CFM25/100 sq ft CFA when all ducts
and air handlers are within the building thermal envelope.
2015 and 2018 IECC Performance Paths(Cost Compliance):
Leakage testing is required UNLESS all ducts and air handlers are located entirely within the thermal envelope.
There is no pass/fail threshold for duct leakage on the performance path.
Project Notes
5
Building Summary
Property organization Inspection Status
800 Corey Creek Lane EnergyTesting Services Results are projected
Southold,NY 11971 Michael Faud
631-244-2627
Sligo Construction Corp.-800 Corey Creek Lane,Southold,I
Initial House Design Builder
Sligo Construction Corp.
General Building Information
Number Of Bedrooms 4
Number Of Floors 2
Conditioned Floor Area[sq.ft.] 2,640
Has Electric Vehicle Ready Space No
Unconditioned,attached garage? No
Conditioned Volume[cu.fQ 30,263
Total Units in Building 1
Residence Type Single family detached
Number of Floors in Building -
Floor Number -
Model
Community
RESNETAECC 2006-2018 Climate Zone 4A
IECC 2021 Climate Zone 4A
Foundation Wall
None Present u —"-' —' —_---'----_
Foundation Wall Library List
None Present
Slab
�^ �^ None Present
Slab Library List
None Present —'
Framed Floor
Name LibraryType CarpetR Floor Grade Surface Area Location
Exterior Floor 30(16/115)2(9.5)H 1 Above Grade 32.0 ft Exposed Exterior
V nyl
Floor Over Basement 30(16/11.5)2(9.5)Exposed 1 Above Grade 1,310.0fe Uninsulated Unconditioned
Basement
Building Summary
Property organization inspection status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp:900 Corey Creek Lane,Southold,I
Initial House Design Builder
Sligo Construction Corp.
Framed Floor Library List
Name Effective R-value
30(161115)2(95)Exposed 28.923
30(16/11.5)2(95)H 27.661
Vinyl
Rim Joist
Name LibraryT"e Surface Area Location
Band Joist R15+3 154.0 fe Exposed Exterior
Rim Joist Library List
Name Effective Insulation R-value
R15+3 18.00
wall
Name 'Librarylype surface Color Solar Absorptance Surface Area Location
Exterior Walls R15+3(16/35)1(.5) Medium 0.75 2,610.0ft' Exposed Exterior
Staircase 15(16/3.5)2(.5)5taircase Medium 0.75 220.0 ft' Uninsulated Unconditioned
Basement
Wall Library List
Name w Effective R-value
15(16/35)2(.5)Staircase 11.421
R15+3(16135)1(5) 16.659
2
Building Summary
Property Organization Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Faud
631-244-2627
Sligo Construction Corp.-800 Corey Creek Lane,Southold,I
Initial House Design Builder
Sligo Construction Corp.
Glazing
Name Library7ype Wall Foundation Wall Is Operable Overhang Overhang Ft To Overhang FtTo _Orientation Surface Area
Assignment Assignment Depth Top Bottom
ff 1 w 3030 Exterior Walls Yes 0 0 0 West 40.0 ft'
ff 1 w 3030 Exterior Walls Yes 0 0 0 West 135 fP
ff 2 e 3030 Exterior Walls Yes 7 1.7 7.8 East 12.0 ft'
ff2e(Front) 3030 Exterior Walls Yes 7 13 5.3 East 27.0ft'
ff 2 n(Right) 3030 Exterior Walls Yes 0 0 0 North 225 ft'
ff2w 3030 Exterior Walls Yes 0 0 0 West 27.0fe
ff 2 w(Rear) 3030 Exterior Walls Yes 0 0 0 West 19.0 ft
ff 3 e 3030 Exterior Walls Yes 7 13 5.3 East 405 ft'
sf 1 e 3030 Exterior Walls Yes 1 23 6.3 East 135 ft
sf 1 e 3030 Exterior Walls Yes 1 23 4.8 East 18.0 ft
sf 1 n 3030 Exterior Walls Yes 0.8 3.1 7.2 North 135 ft
sf 1 n 3030 Exterior Walls Yes U 9.1 13.2 North 135 ft'
sf 1 w 3030 Exterior Walls Yes 1 13 3.8 West 13.7 fP
sf 1 w 3030 Exterior Walls Yes 1 1.2 2.8 West 3.0 ft'
sf2e 3030 Exterior Walls Yes 0.8 5 9.1 East 27.0ft'
sf 2 w 3030 Exterior Walls Yes 1 13 5.3 West 27.0 ft'
sf 3 e 3030 Exterior Walls Yes 0.8 7.7 11.8 East 40.5 fP
Glazing Library List
-_-_ Name Shgc U-factor -®-r
3030 0.3 0300
Skylight
None Present
3
Building Summary
Property Organization Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauc]
631-244-2627
Sligo Construction Corp:800 Corey Creek Lane,Southold,I
Initial House Design Builder
Sligo Construction Corp.
Skylight Library List
r None Present
Opaque Door
Name LibraryType Wall Assignment Foundation Wall Emittance Solar Absorptance Surface Color Surface Area Location
Assignment
Basement Door Fiberglass Door Staircase 0.9 0.75 Medium 17.8 ft' Uninsulated
Unconditioned
Rac m nt
Front Door Fiberglass Door Exterior Walls 0.9 0.75 Medium 20.0 ft' Exposed Exterior
Opaque Door Library List
Name .W..w. Effective R-value —�-
Fiberglass Door 5.00
Roof Insulation
Name Library Attic Clay or Doesthe Roof5lope Ceiling EaveHei ht Eave Surface Solar Surface Location
type Exterior Concrete Roof have Framing jn.] Length[in.] Color Absorptance Area
Area[ft'] Roof Tiles Eaves' Height[in.]
Hot Roof SA 11506 No No N/A NIA N/A N/A Medium 0.75 1,506.0 ft'Vaulted Roof
R38(16/9.5)1(
Roof Insulation Library List.
Name .___. Has Radiant Barrier Effective R-value
SA R38(16I9.5)1(LDF) No 31381
Whole House Infiltration
Infiltration Measurement Type Shelter Class
3 ACH at 50 Pa To be blower-door tested 4
4
Building Summary
Property Organisation Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp:800 Corey Creek Lane,Southold,I
Initial House Design Builder
Sligo Construction Corp.
Mechanical Ventilation
Ventilation Type Ventilation Rate[fe/ Operational hours Fan Watts Runs once every Energy Recovery Model Number _ Manufacturer
Minute] perday three hours Percent
Exhaust Only 120 CFM 24 42 Watts(Default) Yes 0
Lighting
%Interior Fluorescent %Interior LED Lighting v %Exterior Fluorescent %Exterior LED Lighting %Garage Fluorescent %Garage LED Lighting
Lighting Lighting Lighting
0 100 0 100 0 100
Onsite Generation
None Present
Onsite Generation Library List
None Present m
Solar Generation
None Present
Dehumidifier
None Present
Dehumidifier Library List
None Present
5
Building Summary
Property - Organization Inspection Status
B00 Corey Creek lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp:800 Corey Creek Lane,Southold,I
initial House Design Builder
Sligo Construction Corp.
Whole House Fan
None Present
Whole House Fan Library List
None Present
Conditioning Equipment
Name Libr2ry7ype W Serial Number Heating Percent Load Cooling Percent Load Hot Water Percent Load Location
Cooling System 1 16 SEER2 23.61K 09b 50% 0% Unconditioned Basement
907958879) /Crawispace
Cooling System 2 16 SEER2 18K(20790437 1) 0% 50% 0% Conditioned/Sealed Attic
Heating System 1 95%AFUE Hydro-Coil,60k 509% 0% 0% Unconditioned Basement
NG) /Crawispace
Heating System 2 95%AFUE Hydro-Coil,60k 50% 0% 0% Conditioned/Sealed Attic
NO
Water Heating .95 EF Instant 0% 0% 100% Unconditioned Basement
/Crawlspace
Equipment Type:.95 EF Instant
EquipmentType Residential Water Heater
Fuel Type Natural Gas
Distribution Type Hydronic Delivery(Radiant)
Hot Water Efficiency 0.95 Energy Factor
Tankless? Yes
Equipment Type: 16 SEER2 18K(207904371)
EquipmentType Air Conditioner
Fuel Type Electric
Distribution Type Forced Air
Motor Type ECM(Variable Speed)
Heat Pump System Type Unspecified
Cooling Efficiency 16 SEER2
Cooling Capacity[kBtu/h) 18
6
Building Summary
Property Organization Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Faud
631-244-2627
Sligo Construction Corp:SW Corey Creek Lane,Southold,I
Initial House Design Builder
Sligo Construction Corp.
Equipment Type: 16 SEER2 23.6K(207958879)
Equipment Type Air Conditioner
Fuel Type Electric
Distribution Type Forced Air
MotorType PSC(Single Speed)
Heat Pump System Type Unspecified
Cooling Efficiency 16 SEER2
Cooling Capacity[kBtu/h] 23.6
Equipment Type:95%AFUE Hydro-Coil,60k(NG)
EqulpmentType Boiler
Fuel Type Natural Gas
Distribution Type Forced Air
MotorType PSC(Single Speed)
Heating Efficiency 95 AFUE
Heating Capacity[kBtu/h] 60
Use default EAE Yes
EAE[kWh] 170
Building Summary
Property Organization Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp.-800 Corey Creek Lane,Southold,I
Initial House Design Builder
Sligo Construction Corp.
Distribution System
Distribution Type Forced Air
Heating Equipment Heating System 1
Cooling Equipment Cooling System 1
Sq.Feet Served 1,322
9 Return Grilles 1
Supply Duct RValue _ 8
Return Duct RValue 8
Supply Dud Area[�] 356.94
Return Duct Area[" 66.1
Leakage to Outdoors 52 CFM @ 25Pa(3.93/100 ft2)
Total Leakage 52 CFM25
Total Leakage DuctTest Conditions Post-Construction
Use Default Flow Rate Yes
Duct 1
Duct Location Basement(insulated basement ceiling)
Percent Supply Area 100
Percent Return Area 100
Duct 2
Duct Location Conditioned Space
Percent Supply Area 0
Percent Return Area 0
Duct 3
Dud Location Conditioned Space
Percent Supply Area 0
Percent Return Area 0
Duct4
Dud Location Conditioned Space,
Percent Supply Area 0
Percent Return Area 0
Dud 5
Duct Location Conditioned Space
Percent Supply Area 0
Percent Return Area 0
Duct 6
Dud Location Conditioned Space
Percent Supply Area 0
Percent Return Area 0
Distribution System
Distribution Type Forced Air
Heating Equipment Heating System 2
Cooling Equipment Cooling System 2
Is All Equipment In Conditioned Space Yes
Leakage Default HERS Default Leakage
Duct System Efficiency 0.88
HVAC Grading
HVAC Grading Not Conducted
8
Building Summary
Property Organization Inspection Status
800 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp:800 Corey Creek Lane Southold I
Initial House Design Builder
Sligo Construction Corp.
Ceiling Fan
Has Ceiling Fan No
Water Distribution
Water Fixture Type Standard
Use Default Hot Water Pipe Length No
Hot Water Pipe Length[it] 97
At Least R3 Pipe Insulation? Yes
Hot Water Recirculation System? No
Drain Water Heat Recovery? No
Clothes Dryer
Cef 3.01
Fuel Type Electric
Field Utilization Timer Controls
Is Outside Conditioned Space No
Clothes Dryer Available Yes
Defaults Type HERS Reference
Is Heat Pump No
Clothes Washer
Label Energy Rating 400 kWh/Year
Annual Gas Cost $27.00
Electric Rate $0.12/kWh
Gas Rate $1.09/Therm
Capacity 3
Imef 1
Defaults Type HERS Reference
Load Type Front-load
Loads Per Week 6
Is Outside Conditioned Space No
Clothes Washer Available Yes
Dishwasher
Dishwasher Defaults Type Custom
Dishwasher Size Standard
Dishwasher Efficiency 270 kWh
Annual Gas Cost $30.00
Electric Rate $0.12/kWh
Gas Rate $1.09/Therm
Is Outside Conditioned Space No
Dishwasher Available Yes
9
Building Summary
Property Organisation Inspection Status
900 Corey Creek Lane Energy Testing Services Results are projected
Southold,NY 11971 Michael Fauci
631-244-2627
Sligo Construction Corp.-800 Corey Creek Lane,Southold,I
Initial House Design Builder
Sligo Construction Corp.
Appliances and Controls
Programmable thermostat? Yes
Range/Oven Fuel Electric
Convection Oven? No
Induction Range? No
Range/Oven Outside Conditioned Space? No
Refrigerator Consumption 691 kWh/Year
Refrigerator Outside Conditioned Space? No
Notes
10
Load Short Form Job: MF641
Date: Dec 23,2024
F System 1 By: Michael Fauci
Energy Testing Services
1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824
Project • •
For: Sligo Construction Corp.
800 Corey Creek Lane, Southold, NY 11971
Phone:516-204-2444
Design Information
Htg Clg Infiltration
Outside db (°F) 16 86 Method Blower door
Ins ide db(7) 70 75 Shielding/stories 3(partial)/2
Design TD (°F) 54 11 Pressure/ACH/AVF 50 Pa/3.0/1156 cfm
Daily range - L
Inside humidity(%) 50 50
Moisture difference (gr/lb) 45 31
HEATING EQUIPMENT COOLING EQUIPMENT
Make Laars Heating Systems Company Make Carrier
Trade LAARS Trade 15 SEER2 AC
Model MFTCW199(N,P)**'* Cond GA5SAN42400WA0
AHRI ref 9008085 Coil FMU4Z3000AL1
AHRI ref 207958879
Efficiency 95 AFUE Efficiency 13.0 EER2, 16 SEER2
Heating input 199000 Btuh Sensible cooling 16520 Btuh
Heating output 181000 Btuh Latent cooling 7080 Btuh
Temperature rise 210 °F Total cooling 23600 Btuh
Actual air flow 787 cfm Actual air flow 787 cfm
Air flow factor 0.056 cfm/Btuh Air flow factor 0.047 cfm/Btuh
Static pressure 0.60 in H2O Static pressure 0.60 in H2O
Space thermostat Load sensible heat ratio 0.85
ROOM NAME Area Htg load Clg load Htg AVF Clg AVF
(ft2) (Btuh) (Btuh) (cfm) (cfm)
Bedroom 1 156 2026 2763 114 130
61 WIC 22 247 37 14 2
Computer Room 138 1927 2116 108 100
B 1 Bath 65 650 593 37 28
Lay. 23 0 9 0 0
Dining Room 156 1394 2841 78 134
Kitchen 200 2147 4451 121 210
Living Room 330 3563 2710 200 128
Foyer 195 2058 1164 116 55
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
wrilghtsoft., 2024-Dec-2312:51:48
Right-Suite®Universal 2023 23.0.01 RSU30008 Page 1
...:800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E
System 1 1284 14013 16683 787 787
Other equip loads 0 0
Equip. @ 0.91 RSM 15132
Latent cooling 2996
TOTALS 1 1284 1 14013 1 18128 1 787 1 787
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
wrighioft~
2024-Dec-23 12:51:48
�� .. _.,..o.,.._,..., Right-SuiteO Universal 2023 23.0.01 RSU30008 Page 2
�� ...:800 Corey Creek Lane,Southold,NY 11971.rup Cale=MJ8 Front Door faces: E
Load Short Form Job: MF641
Date: Dec 23,2024
System 2 By: Michael Fauci
_ - Energy Testing Services
1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824
Project Information
For: Sligo Construction Corp.
800 Corey Creek Lane, Southold, NY 11971
Phone:516-204-2444
Design Information
Htg Clg Infiltration
Outside db(°F) 16 86 Method Blower door
Inside db(°F) 70 75 Shielding/stories 3 (partial)/2
Design TD (7) 54 11 Pressure/ACH/AVF 50 Pa/3.0/1156 cfm
Daily range - L
Inside humidity(%) 50 50
Moisture difference(gr/lb) 45 31
HEATING EQUIPMENT COOLING EQUIPMENT
Make Laars Heating Systems Company Make Carrier
Trade LAARS Trade COMFORT 15 SEER2 AC
Model MFTCW199(N,P).... Cond 24SCA518WC0300
AHRI ref 9008085 Coil FMU4Z3000AL1
AHRI Fef 207904371
Efficiency 95 AFUE Efficiency 13.0 EER2, 16 SEER2
Heating input 199000 Btuh Sensible cooling 12600 Btuh
Heating output 181000 Btuh Latent cooling 5400 Btuh
Temperature rise 275 °F Total cooling 18000 Btuh
Actual air flow 600 cfm Actual air flow 600 cfm
Air flow factor 0.044 cfm/Btuh Air flow factor 0.054 cfm/Btuh
Static pressure 0.60 in H2O Static pressure 0.60 in H2O
Space thermostat Load sensible heat ratio 0.90
ROOM NAME Area Htg load Clg load Htg AVF Clg AVF
(ft2) (Btuh) (Btuh) (cfm) (cfm)
Bedroom 3 144 2271 3020 100 162
B3 WIC 31 461 76 20 4
Laundry 41 160 453 7 24
B2 WIC 29 412 71 18 4
Bedroom 2 144 2358 2744 104 147
Hall 127 0 0 0 0
Bath 51 622 329 27 18
Master Bath 132 1271 768 56 41
M WIC 2 33 403 68 18 4
M WIC 75 1291 211 57 11
Master Bedroom 377 4359 3453 192 185
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
t -fia- wr�ghtsoft.. 2024-Dec-23 12:51:48
.. r ..,.,., Right-Suite®Universal 2023 23.0.01 RSU30008 Page 3
vC ...:800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJB Front Door faces: E
System 2 1183 13607 11193 600 600
Other equip loads 0 0
Equip. @ 0.91 RSM 10152
Latent cooling 1270
TOTALS I 1183 I 13607 I 11423 I 600 I 600
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
- - Wr➢ghtsoft'• 2024-Dec-2312:51:48
Right-Suite®Universal 2023 23.0.01 RSU30008 Page
A00. .....800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E
Building Analysis Job: MF641
/ f Date: Dec 23,2024
System 1 By: Michael Fauci
Energy Testing Services
1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824
Project Information
For: Sligo Construction Corp.
800 Corey Creek Lane, Southold, NY 11971
Phone: 516-204-2444
Design Conditions
Location: Indoor: Heating Cooling
Long Island MacArthur AP, NY, US Indoor temperature (°F) 70 75
Elevation: 84 ft Design TD (°F) 54 11
Latitude: 41°N Relative humidity(%) 50 50
Outdoor: Heating Cooling Moisture difference(gr/lb) 45.1 30.9
Dry bulb(°F) 16 86 Infiltration:
Dailyrange (°F) - 15 ( L ) Method Blower door
Wet bulb(°F) - 72 Shielding/stories 3 (partial)/2
Wind speed (mph) 15.0 7.5 Pressure/ACH/AVF 50 Pa/3.0/1156 cfm
•
Component Btuh/ft2 Btuh % of load
Walls 2.9 4511 32.2 axis
Glazing 16.2 3579 25.5
Doors 15.7 320 2.3 MIS
Ceilings 2.0 239 1.7
Floors 0.0 19 0.1
Infiltration 2.7 3752 26.8 Infiltration
Ducts 1594 11.4
Piping 0 0
Humidification 0 0
Ventilation 0 0
Adjustments 0
Total 1 1 14013 100.0 aa2ing
Cooling
Component Btuh/ftZ Btuh % of load
Walls 0.7 1126 6.7 Vals
Glazing 24.5 5410 32.4
Doors 7.2 146 0.9
Ceilings 0.7 84 0.5
Floors 0.0 4 0.0
Infiltration 0.2 353 2.1 ����
Ducts 395 2.4 -IrtardGirs
Ventilation 0 0
Internal gains 9165 54.9
Blower 0 0
Adjustments 0
Total 16683 100.0
Latent Cooling Load =2996 Btuh
Overall U-value=0.062 Btuh/ft�°F, Window/Floor Area=17.2%
Data entries checked.
' Wt iAYtSOft' 2024-Dec-23 12:51:48
-� -^ - Right-Suite@ Universal202323.0.01 RSU30008 Pagel
Jam• 800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E
Building Analysis Job: MF641
Date: Dec 23,2024
System 2 By: Michael Fauci
Energy Testing Services
1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824
Project • •
For: Sligo Construction Corp.
800 Corey Creek Lane, Southold, NY 11971
Phone:516-204-2444
Design Conditions
Location: Indoor: Heating Cooling
Long Island MacArthur AP, NY, US Indoor temperature (OF) 70 75
Elevation: 84 ft Design TD (OF) 54 11
Latitude: 41 ON Relative humidity(%) 50 50
Outdoor: Heating Cooling Moisture difference(gr/lb) 45.1 30.9
Dry bulb(OF) 16 86 Infiltration:
Dailyrange (OF) - 15 ( L ) Method Blower door
Wet bulb(°F) - 72 Shielding/stories 3 (partial)/2
Wind speed (mph) 15.0 7.5 Pressure/ACH/AVF 50 Pa/3.0/1156 cfm
•
Component Btuh/ftz Btuh % of load
Walls 3.4 3766 27.7 Ducts
Glazing 16.2 2297 16.9 v�lls\
Doors 0 0 0
Ceilings 2.0 2354 17.3
Floors 1.5 31 0.2
Infiltration 2.7 2974 21.9
Ducts 2185 16.1 --Irdltralicn
Piping 0 0
Humidification 0 0
Ventilation 0 0 Gating Qher
Adjustments 0
Total 1 1 13607 100.0 Ceilings
Component Btuh/112 Btuh %of load
Walls 0.9 940 8.4 VIAls
Glazing 20.7 2933 26.2
Doors 0 0 0
Ceilings 0.6 703 6.3
Floors 0.3 6 0.1 Day
Infiltration 0.2 280 2.5 �� -IrC�rs
Ducts 996 8.9
Ventilation 0 0
Internal gains 5335 47.7
Blower 0 0 Ct31i
Adjustments 0 / I
Total 11193 I 100.0 166 ai
DuJs
Latent Cooling Load= 1270 Btuh
Overall U-value=0.242 Btuh/ft�°F, Window/Floor Area=12.0%
Data entries checked.
,t--- r'' wmic,, htsc)4V 2024-Dec-2312:51:48
�^ •� Right-Suite@ Universal202323.0.01 RSU30008 Paget
Boo Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E
Project Summary Job: MFG41
/ Date: Dec 23,2024
System 1 By: Michael Fauci
Energy Testing Services
1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824
Proffiect Information
For: Sliggo Construction Corp.
800 Corey Creek Lane, Southold, NY 11971
Phone: 516-204-2444
Notes:
Desicin Information
Weather: Long Island MacArthur AP, NY, US
Winter Design Conditions Summer Design Conditions
Outside db 16 °F Outside db 86 °F
Inside db 70 °F Inside db 75 °F
Design TD 54 °F Design TD 11 °F
Daily range L
Relative humidity 50 %
Moisture difference 31 gr/lb
Heating Summary Sensible Cooling Equipment Load Sizing
Structure 12419 Btuh Structure 16288 Btuh
Ducts 1594 Btuh Ducts 395 Btuh
Central vent(0 cfm) 0 Btuh Central vent(0 cfm) 0 Btuh
(none) (none)
Humidification 0 Btuh Blower 0 Btuh
Piping 0 Btuh
Equipment load 14013 Btuh Use manufacturer's data n
Rate/swing multiplier 0.91
Infiltration Equipment sensible load 15132 Btuh
Method Blower door Latent Cooling Equipment Load Sizing
Shielding/stories 3(partial /2
Pressure/ACH/AVF 50 Pa/3.0/115R cfm Structure 2331 Btuh
Ducts 665 Btuh
Central vent(0 cfm) 0 Btuh
Heating Cooling (none)
Area(ft2) 1284 1284 Equipment latent load 2996 Btuh
Volume(ft) 12430 12430
Air changes/hour 0.31 0.15 Equipment Total Load (Sen+Lat) 18128 Btuh
Equiv.AVF (cfm) 63 30 Req.total capacity at 0.70 SHR 1.8 ton
Heating Equipment Summary Cooling Equipment Summary
Make Laars Heating Systems Company Make Carrier
Trade LAARS Trade 15 SEER2 AC
Model MFTCW199(N,P).... Cond GA5SAN42400WA0
AHRI ref 9008085 Coil FMU4Z3000AL1
AHRI ref 207958879
Efficiency 95 AFUE Efficiency 13.0 EER2, 16 SEER2
Heating input 199000 Btuh Sensible cooling 16520 Btuh
Heating output 181000 Btuh Latent cooling 7080 Btuh
Temperature rise 210 °F Total cooling 23600 Btuh
Actual air flow 787 cfm Actual air flow 787 cfm
Air flow factor 0.056 cfm/Btuh Air flow factor 0.047 cfm/Btuh
Static pressure 0.60 in H2O Static pressure 0.60 in H2O
Space thermostat Load sensible heat ratio 0.85
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
wrlghtsoft' 2024-Dec-23 12:51:49
^• — Right-Suite@ Universal 2023 23.0.01 RSU30008 Page 1
ACCA 800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E
Project Summary Job: MF641
} ti Date: Dec 23,2024
System 2 By: Michael Fauci
- Energy Testing Services
1648 Locust Ave,Unit E,Bohemia,NY 11716 Phone:631-244-2627 Email:mfauci@energytestingservices.com Web:www.energytestingservices.com License:8619824
Proaect Information
For: Sliggo Construction Corp.
800 Corey Creek Lane, Southold, NY 11971
Phone:516-204-2444
Notes:
Design Information
Weather: Long Island MacArthur AP, NY, US
Winter Design Conditions Summer Design Conditions
Outside db 16 °F Outside db 86 °F
Inside db 70 °F Inside db 75 °F
Design TD 54 °F Design TD 11 °F
Daily range L
Relative humidity 50 %
Moisture difference 31 gr/lb
Heating Summary Sensible Cooling Equipment Load Sizing
Structure 11422 Btuh Structure 10197 Btuh
Ducts 2185 Btuh Ducts 996 Btuh
Central vent(0 cfm) 0 Btuh Central vent(0 cfm) 0 Btuh
(none) (none) '
Humidification 0 Btuh Blower 0 Btuh
Piping 0 Btuh
Equipment load 13607 Btuh Use manufacturer's data n
Rate/swing multiplier 0.91
Infiltration Equipment sensible load 10152 Btuh
Method Blower door Latent Cooling Equipment Load Sizing
Shielding/stories 3(partial /2
Pressure/ACH/AVF 50 Pa/3.0/1158 cfm Structure 700 Btuh
Ducts 570 Btuh
Central vent(0 cfm) 0 Btuh
Heating Cooling (none)
Area(ft� 1183 1183 Equipment latent load 1270 Btuh
Volume(ft3) 9463 9463
Air changes/hour 0.32 0.15 Equipment Total Load (Sen+Lat) 11423 Btuh
Equiv.AVF(cfm) 50 24 Req. total capacity at 0.70 SHR 1.2 ton
Heating Equipment Summary Cooling Equipment Summary
Make Laars Heating Systems Company Make Carrier
Trade LAARS Trade COMFORT 15 SEER2 AC
Model MFTCW199(N,P)"" Cond 24SCA518WC0300
AHRI ref 9008085 Coil FMU4Z3000AL1
AHRI ref 207904371
Efficiency 95 AFUE Efficiency 13.0 EER2, 16 SEER2
Heating input 199000 Btuh Sensible cooling 12600 Btuh
Heating output, 181000 Btuh Latent cooling 5400 Btuh
Temperature rise 275 °F Total cooling 18000 Btuh
Actual air flow 600 cfm Actual air flow 600 cfm
Air flow factor 0.044 cfm/Btuh Air flow factor 0.054 cfm/Btuh
Static pressure 0.60 in H2O Static pressure 0.60 in H2O
Space thermostat Load sensible heat ratio 0.90
Calculations approved by ACCA to meet all requirements of Manual J 8th Ed.
!� yyr➢��ttSDTt" 2024-Dec-2312:51:49
w•• --- Right-Suite@ Universal 2023 23.0.01 RSU30008
Page 2
...:800 Corey Creek Lane,Southold,NY 11971.rup Calc=MJ8 Front Door faces: E