Loading...
HomeMy WebLinkAboutTR-07/15/2026 Glenn Goldsmith,President �4QF so Town Hall Annex Nicholas Krupski,Vice President ��� Old 54375 Route 25 P.O. Box 1179 Eric Sepenoski Southold,New York 11971 Liz Gillooly G Telephone(631) 765-1892 Joseph Finora • �O Fax(631) 765-6641 BOARD OF TOWN TRUSTEES RECEIVED TOWN OF SOUTHOLD It G 14 Minutes L � Wednesday, July 15, 2026 SOUt old Mown Clerk 5:30 PM Present Were: Glenn Goldsmith, President A. Nicholas Krupski, Trustee Eric Sepenoski, Trustee Liz Gillooly, Trustee Joseph Finora, Trustee Elizabeth Cantrell, Administrative Assistant Lori Hulse, Board Counsel CALL MEETING TO ORDER PLEDGE OF ALLEGIANCE TRUSTEE GOLDSMITH: Good evening, and welcome to our Wednesday, July 15th, 2026 meeting. At this time I would like to call the meeting to order and ask that you please stand for the Pledge of Allegiance. (The Pledge of Allegiance is recited) . TRUSTEE GOLDSMITH: I'll start off by announcing the people on the dais. To my left we have Trustee Krupski, Trustee Sepenoski, Trustee Gillooly and Trustee Finora. To my right we have the attorney to the Trustees, the Honorable Lori Hulse, we have Administrative Assistant Elizabeth Cantrell and with us tonight is Court Stenographer Wayne Galante. Agendas for tonight' s meeting are out in the hallway and also posted on the Town's website. There are a couple of postponements tonight. In the agenda, on page eight, numbers 11 and 12, as follows, are postponed. Number 11, En-Consultants on behalf of 8100 INDIAN NECK, LLC requests a Wetland Permit to remove and replace in-place approximately 118 linear feet of existing concrete seawall and 15 linear foot return with vinyl bulkhead and return; backfill with up to 25 cubic yards of clean sandy fill trucked in from an approved upland source, to be replanted with native vegetation; Board of Trustees 2 July 15, 2026 and construct a 41x5.5' cantilevered wood landing with 3'x±6' steps to beach in place of existing 31x5' steps to beach. Located: 8100 Indian Neck Lane, Peconic. SCTM# 1000-86-7-9 Number 12, En-Consultants on behalf of FARLEY FINE ARTS, LLC requests a Wetland Permit to remove and replace in-place approximately 157 linear feet of existing concrete seawall with vinyl bulkhead; backfill with up to 25 cubic yards of clean sandy fill trucked in from an approved upland source, to be replanted with native vegetation; construct a 41x5.5' wood landing with 3'x±6' steps to beach in place of existing 3.51x4.5 ' steps to beach; and remove and replace in-place and in-kind 3.5'x5 .8' platform and 2.3'x4 .4' bank steps within the area of disturbance. Located: 7940 Indian Neck Lane, Peconic. SCTM# 1000-86-7-7 .2 So those won't be heard this evening. Under Town Code 275-8 (c) , files were officially closed seven days ago. Submission of any paperwork after that date may result in a delay of the processing of the application. I. NEXT FIELD INSPECTION: TRUSTEE GOLDSMITH: At this time I'll make a motion to have our next field inspections on Wednesday, July 29th, 2026 on Fishers Island, and on Wednesday, August 5th, 2026, beginning at 8: OOAM. TRUSTEE KRUPSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . II. NEXT TRUSTEE MEETING: TRUSTEE GOLDSMITH: I make a motion to hold our next Trustee meeting Wednesday, August 12th, 2026 at 5:30PM in the Town Hall Main Meeting Hall. TRUSTEE KRUPSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . III. WORK SESSIONS: TRUSTEE GOLDSMITH: I make a motion to hold our next work sessions Monday, August loth, 2026 at 5:OOPM at the Town Hall Annex 2nd Floor Executive Board Room, and on Wednesday, August 12th, 2026 at 5:OOPM in the Town Hall Main Meeting Hall. TRUSTEE KRUPSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . IV. MINUTES: TRUSTEE GOLDSMITH: I make a motion to approve the Trustees Board of Trustees 3 July 15, 2026 Minutes of the June loth, 2026 meeting. TRUSTEE SEPENOSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . V. MONTHLY REPORT: TRUSTEE GOLDSMITH: Roman numeral V, Monthly Report. The Trustees monthly report for June, 2026. A check for $21,362. 93 was forwarded to the Supervisor' s Office for the General Fund. VI. PUBLIC NOTICES: TRUSTEE GOLDSMITH: Public Notices are posted on the Town Clerk' s Bulletin Board for review. VII. STATE ENVIRONMENTAL QUALITY REVIEWS: TRUSTEE GOLDSMITH: Roman numeral VII, State Environmental Quality Reviews. RESOLVED that the Board of Trustees of the Town of Southold hereby finds that the following applications more fully described in Section X Public Hearings Section of the Trustee agenda dated Wednesday, July 15, 2026 are classified as Type II Actions pursuant to SEQRA Rules and Regulations, and are not subject to further review under SEQRA, as written. That is my motion. Theodore & Carissa Stratigos SCTM# 1000-57-1-27 Francis J. Kelly & Elizabeth G. Kelly SCTM# 1000-145-4-3 Patricia Peck SCTM# 1000-99-3-5 622 Church Lane, LLC SCTM# 1000-99-4-18 Bryan & Tracy Kappenberg SCTM# 1000-128-2-7 Pamela Valentine SCTM# 1000-17-2-14 Elizabeth Gardner SCTM# 1000-47-2-30 Patricia Bogen Revocable Trust SCTM# 1000-87-1-3.3 8100 Pine Neck, LLC SCTM# 1000-86-7-9 John M. Miller Lifetime QTIP Trust SCTM# 1000-118-1-18.4 Farley Fine Arts, LLC SCTM# 1000-86-7-7.2 Danielle & Joseph Monaco III SCTM# 1000-123-5-33 TRUSTEE SEPENOSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . VIII. RESOLUTIONS - ADMINISTRATIVE PERMITS: TRUSTEE GOLDSMITH: Roman numeral VIII, Administrative Permits. In order to simplify our meetings, the Board of Trustees regularly groups together actions that are minor or similar in Board of Trustees 4 July 15, 2026 nature. Accordingly, I'll make a motion to approve as a group items One, Two, Three and Five, as follows: Number 1, North Star Engineering on behalf of JATIN GORADIA & RAJA RAJALAKSHMI requests an Administrative Permit to install two window wells, one to be used as a basement egress window; install I/A OWTS system and sanitary leaching field; install propane tank; relocate asphalt driveway. Located: 960 Willow Terrace Lane, Orient. SCTM# 1000-26-2-21 Number 2, GARY DOROSKI requests an Administrative Permit to remediate and legally abandon a 550 gallon buried oil tank; install 350 gallon above ground oil tank on slabs on west side of dwelling. Located: 425 Monsell Lane, Cutchogue. SCTM# 1000-97-8-27 Number 3, THE STIRLING EASTERN SHORES ASSOCIATION INC. requests an Administrative Permit to install five (5) 12" x 12" signs along property boundary line. Located: 3550 Sound Drive, Greenport. SCTM# 1000-33-1-3. 1 Number 5, SUSAN M. BRAATZ requests an Administrative Permit for a Ten-Year Maintenance Permit to hand-cut Common Reed (Phragmites australis) to 12" in height by hand, as needed on the upland portion of the property; and to hand-cut Common Reed (Phragmites australis) to below water level by hand, as needed in the pond. Located: 7615 Hortons Lane, Southold. SCTM# 1000-54-5-47 TRUSTEE SEPENOSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GOLDSMITH: Number 4, BODENSTEIN FAMILY 2012 IRREVOCABLE TRUST requests an Administrative Permit to install 35-50 pieces of rip rap and a slight berm. Located: 6145 Indian Neck Lane, Peconic. SCTM# 1000-86-6-19 The Trustees conducted a field inspection, notes that the condition of the berm height not to exceed 18 inches. The LWRP found this to be consistent. I will make a motion to approve this application with the condition that the berm height does not exceed 18 inches. TRUSTEE KRUPSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . IX. APPLICATIONS FOR EXTENSIONS/TRANSFERS/ADMINISTRATIVE AMENDMENTS: TRUSTEE GOLDSMITH: Roman numeral IX, Applications for Extensions, Transfers and Administrative Amendments. Again, in order to simplify the meeting, I make a motion to approve as a group Items One through Five, as follows: Number 1, NAR DEVELOPMENT CORP. requests a One (1) Year Extension to Wetland Permit #10463, as issued September 13, Board of Trustees 5 July 15, 2026 2023. Located: 49900 Route 25, Southold. SCTM# 1000-70-5-24. 1 Number 2, Patricia C. Moore, Esq. On behalf of REINHOLD TREMBA & STEFKA NAZARKEWYCZ requests a Transfer of Wetland Permit #10571 from 600 Glenn, LLC to Reinhold Tremba & Stefka Nazarkewycz, as issued April 17, 2024. Located: 600 Glenn Road, Southold. SCTM# 1000-78-2-24 Number 3, Patricia Moore, Esq. On behalf of DAVID & LINDSAY LEVIN requests a Transfer of Wetland Permit #8263 and Coastal Erosion Permit #8263C from Oliver Frankel to David & Lindsay Levin, as issued on August 21, 2013, and Amended on November 19, 2014 . Located: 29821 Main Road, Orient. SCTM# 1000-14-2-1. 9 Number 4, En-Consultants on behalf of ADF VENTURES, LLC requests an Administrative Amendment to Wetland Permit #10691 to reconfigure a portion of the approved 4' tall pool enclosure fencing located landward of the covenanted 20' vegetated non-turf buffer. Located: 1775 Point Pleasant Road, Mattituck. SCTM# 1000-114-1-6 Number 5, Cole Environmental Services on behalf of 5415 SKUNK LANE LLC requests an Administrative Amendment to Wetland Permit #10733 to increase the height of previously approved landward stairs and fixed dock from l'-10" to 4 ' minimum above grade; landward stair to increase to 4' x 5' and seaward stairs to increase to 4' x 4' due to elevation increase. Located: 5380 Skunk Lane, Cutchogue. SCTM# 1000-138-2-16 TRUSTEE SEPENOSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GOLDSMITH: Number 6, Sol Searcher Consulting on behalf of OSCAR & BETH BLEVINS requests an Administrative Amendment to Wetland Permit #5405 to install a 4"x4" post and continuous handrail to one side of existing catwalk (top handrail to be 36" above catwalk) ; as-built gate; repair weak and damaged catwalk surface boards as necessary. Located: 275 Mason Drive, Cutchogue. SCTM# 1000-104-5-1.2 Trustee Krupski conducted a field inspection July 13th, 2026, notes to discuss with Board at work session concern about public viewshed versus safety. This is an extensive structure, over 100 feet across the wetlands. We are not looking to put any additional structure in the wetland at this location. I'll make a motion to deny this application for an adverse environmental impact for additional structures in the wetland, and also would adversely affect the esthetic values of the wetlands and adjacent areas, and obstruct public viewshed. That is my motion. TRUSTEE KRUPSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . Board of Trustees 6 July 15, 2026 X. PUBLIC HEARINGS: TRUSTEE GOLDSMITH: Under Roman numeral X, Public Hearings. At this time I make a motion to go off our regular meeting agenda and enter into Public Hearings. TRUSTEE SEPENOSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GOLDSMITH: This is a public hearing in the matter of the following applications for permits under Chapter 275 and Chapter 111 of the Southold Town Code. I have an affidavit of publication from the Suffolk Times. Pertinent correspondence may be read prior to asking for comments from the public. Please keep your comments organized and brief, five minutes or less if possible. AMENDMENTS: TRUSTEE GOLDSMITH: Under Amendments, number 1, Nigel Williamson on behalf of THEODORE & CARISSA STRATIGOS requests an Amendment to Wetland Permit #10483 to demolish existing dwelling, relocate it to be landward of the pier line, and construct additions to the one-story 2, 475sq.ft. Dwelling with 133. 65sq.ft. Open covered porch, a 1, 080sq. ft. Seaward wood deck with two sets of stairs to remain and construct 41x38 ' and 41x16' deck extensions to connect deck to relocated dwelling, a 47.236sq. ft. Hot tub, and a 214.56sq. ft. Metal awning on the deck; remove the roof on existing dwelling and construct a second-story over existing first story; construct a 618sq.ft. First-story addition onto landward side of dwelling; construct a 254sq.ft. Second-story addition to the northeast corner of dwelling; construct a 133. 65sq. ft. Addition over existing covered porch; construct a 17.375sq.ft. Set of stairs to the southwest corner of deck; remove existing metal awning and install a 241.38sq. ft. Fixed structure awning with retractable operable louvers; install a 16sq.ft. Outdoor shower; remove existing chimney; pump and remove existing block septic system and install a new I/A OWTS septic system landward of dwelling; install gutters to leaders to drywells; install a buried 500 gal. Propane tank; install a generator; and existing pervious driveway. Located: 550 Blue Marlin Drive, Southold. SCTM# 1000757-1-27 The Trustees conducted a field inspection July 8th, 2026, note the home must be pulled back to conform with the 75-foot setback from the bulkhead. The LWRP found this project to be consistent. Is there anyone here wishing to speak regarding this application? MR. WILLIAMSON: Nigel Robert Williamson on behalf of Theodore & Carissa Stratigos. And to pull it back beyond the pier line, the 3. 9 feet, and also to construct the 4x38 and 4x16 deck Board of Trustees 7 July 15, 2026 extensions to connect the existing deck to now where the house is going to be moved to, and know everything else was as per the original permit. TRUSTEE GOLDSMITH: And, Mr. Williamson, the structure for the house itself, 76. 6 feet away from bulkhead MR. WILLIAMSON: The house is 75. 1 feet. TRUSTEE GOLDSMITH: Yes, sir. Oh, yes, sir. I apologize. MR. WILLIAMSON: On the west side. TRUSTEE GOLDSMITH: Yes.. MR. WILLIAMSON: And then 76. 6 feet on the east side. TRUSTEE GOLDSMITH: So all of the house structure is more than 75 feet away from the bulkhead. MR. WILLIAMSON: Correct. TRUSTEE GOLDSMITH: Okay, is there anyone else here wishing to speak regarding this application? (No response) . Any questions or comments from the Board? (No response) . Hearing none, I make a motion to close this hearing. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GOLDSMITH: I make a motion to approve this application as submitted. TRUSTEE SEPENOSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . MR. WILLIAMSON: Before I leave, may I just approach Elizabeth to give her one card. (Handing) . TRUSTEE GOLDSMITH: Have a good night. MR. WILLIAMSON: Thank you. You, too. WETLAND & COASTAL EROSION PERMITS: TRUSTEE KRUPSKI: Under Wetland & Coastal Erosion Permits: Number 1,. CONTINUED FROM 5/13/26 & 6/10/24 AS PER REVISED PROJECT DESCRIPTION AND SITE PLAN RECEIVED 7/7/2026 Jeffrey Patanjo on behalf of STEPHANIE & IOANNIS LAGOUDIS requests a Wetland Permit and a Coastal Erosion Permit to remove existing concrete bulkhead and replace it with a 71 linear foot long vinyl bulkhead landward of existing, aligning with neighboring bulkhead with a raised height of 12" above existing bulkhead height; install 60 linear feet of rock revetment against seaward face of new bulkhead; remove existing 141x50' seaward deck with steps to beach and construct a 7 'x50' deck landward of proposed bulkhead using new un-treated timber decking. Located: 22615 Soundview Avenue, Southold. SCTM# 1000-135 .-1-25 .1 This was originally found to be inconsistent by the LWRP Board of Trustees 8 July 15, 2026 coordinator. The proposed actions include installation of stone rip rap revetment seaward of wetland boundary and does not meet the definition of a "revetment" below, and therefore is not a permitted activity. In addition the proposed plan calls for replacement of the concrete seawall, which does not appear to be legally installed and therefore should not be replaced with new structure. It should be noted that I am in receipt of new plans stamped received by the office July 7th, 2026, which show reducing the seawall by seven feet landward, bringing that above the mean high water line. The addition of some rip rap boulders, rather, in front of the sea wall, and with no cantilevered deck or structures projecting past that line. Additionally, that bulkhead to be tied directly in line with the neighbor to the east. Is there anyone here that wishes to speak regarding this application? MR. PATANJO: Jeff Patanjo, on behalf of the applicant. As mentioned in the description, we revised the application to meet the requests of the Board at the last work session. TRUSTEE KRUPSKI: Thank you. Is there anyone else here wishing to speak regarding this application? (No response) . Hearing no additional comment, I make a motion to close the hearing. TRUSTEE GOLDSMITH: Second. All in favor? (ALL AYES) . . TRUSTEE KRUPSKI: I make a motion to approve this application with the stipulation that no structures are further seaward than the seven-feet from the house, cantilevered or otherwise; that the new bulkhead is in line with the neighbor to the east, to perform a direct tie-in; that the new structures are now well above the high tide .line, thereby bringing this into conformity with the LWRP coordinator. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . WETLAND PERMITS: TRUSTEE SEPENOSKI: Under Wetland Permits, number 1, FRANCIS J. KELLY & ELIZABETH G. KELLY request a Wetland Permit for the as-built 101x18 ' floating deck against bulkhead, as-built 81x10'x8 ' high storage shed, and as-built RV storage and parking and/or 28-foot-long office trailer. Located: 1900 Great Peconic Bay Blvd. , Laurel. SCTM# 1000-145-4-3 The Trustees most recently visited the site on the 8th of July. Notes from our visit read: Review deck, shed and existing RV/proposed trailer. The LWRP coordinator found the project to be inconsistent Board of Trustees 9 July 15, 2026 with its Policy 4 and Policy 6. Is there anyone here wishing to speak regarding this application? MR. KELLY: Francis Kelly, 12 Bayview Avenue, East Islip. I believe it was three structures that were in the application. Did any of those pass at all? TRUSTEE SEPENOSKI: Tonight will determine whether or not those pass. MR. KELLY: All right, very good. And then, in the future, if there is any kind of violations, I had a neighbor that was cutting my dock, and he just basically -- all right. I would like to just make sure that I still have Trustees -- all right. Anyway. MS. HULSE: Mr. Kelly, may I ask you a question. Could you just please articulate for the record what you have a CO for on the property? MR. KELLY: That's the funny part, because the Town made me •get a CO, they took my pre-existing CO and they found that there was two ramps and it was two docks and it was one across the street and one inside this parking lot. So they decided that the CO, I think, Lori, you were there, I remember that. You actually ripped it up in front of me, the old one, and you told me I have to get a new one. And I got a new one by a Judge,, and then it came down to the ZBA. The ZBA said would you like a CO. And I'm like, of course I would like a CO. And with the CO I feel safer. MS. HULSE: So what is the CO for, particularly? MR. KELLY: I'm sorry? MS. HULSE: What is the CO for in particular? MR. KELLY: The CO is for, it' s supposed to be for the structure. I had a structure that was taken off, and a structure, like we are in a structure now. Lights, you know, things that make everything comfortable. That' s what a CO is supposed to be for. It's not supposed to be a vacant lot. How did that happen? You know, so the bottom line is the CO is for structure. It's for a structure. And I thank God I got the ZBA and they installed it for me. And they said, yes, you' re going to have the RV, it' s medical use, you got a CO. And that' s what it was for. I lost my CO. My pre-CO. Anything else, guys? TRUSTEE KRUPSKI: Do you have any other questions, Lori? MS. HULSE: No. TRUSTEE KRUPSKI: Thank you. MR. KELLY: Okay, thanks. MR. MORRISSEY: Hi, My name is Jerry Morrissey. I am the neighbor next door, unfortunately. He never had, the question is he has a Marine One status. That' s what he has. That' s what he has from the day that he go the C of 0. So with that being said, what he' s trying to apply' for, and Board of Trustees 10 July 15, 2026 many people are here to speak as well, is to get all these structures put on his 0.17 of an acre of land, which at its furthest point, you probably have the survey, is no more than like 60 to 65 feet from any water. The idea behind him is getting all these structures built is because he says he has a business. Well, three months ago, back in state supreme court, Mr. Kelly had to testify under oath he has not made one dime in the 12 years in business. Not one dime. He has not rented one boat, he hasn't rented one kayak. Nothing. He also, under testimony, under oath, says he doesn't even have insurance, which 12 years ago he swore to this Board that he would have insurance because he needs the insurance ,to get a six-foot fence. Or he needs the insurance, to get the insurance. Which he never did. He got the six-foot fence but he never got insurance. That's another thing. Also, he has three boats on the lot. One is a 30-footer which has been shrink-wrapped since 2014. The second boat is a 22-foot or 23-foot pontoon boat, which according to the CO he cannot even put in his dock. He has to have anything less than 21' or less. His third is like a 12-foot Boston Whaler. You' re not even going to rent that out. So all three boats have been sitting there. Right now he' s in contempt of court. We had a hearing yesterday. It was postponed, because once again he has his RV on the property. He was ordered three months ago to remove it and he brought it back right after the court case. He has the, well, you guys were there. He has a box truck that because it has wheels it can be left there because it's considered a parking lot. Well, that box truck has not left that spot in six months to a year. Probably closer to a year. So I can be up here a lot longer, I don't want to take up any of your time but everybody up there on the Board knows exactly who they are dealing with. He has been fighting the system for 12 years. He has been fighting the state courts, he' s been fighting the Town of Southold. He has been fighting the Zoning Board. So, you know what you are up against. Smoke and mirrors. That's what he's really good at. Smoke and mirrors. Please don't allow him to build any structures. He has no plans for sanitation, no plans for human waste. He' s right up against the water. So. And, it' s a community. It's not a commercial property. It should not be treated like a commercial property. But he' s using it as a private man summer home. He can't build a structure on it. It' s too big -- it's too small. It' s 0.17 of an acre. So, like I 've said, you've all been there, you've all seen it. You all know who you are dealing with. Thank you, for your time. TRUSTEE GOLDSMITH: Thank you. Anybody else? MS HORN: My name is April Lee Horn. I'm an attorney for the Kelly' s. And there are certain things that were just said, which Board of Trustees 11 July 15, 2026 I think the application covers most of it in that, you have the two-inch of applications that you have. And the thing is we are, the Kelly' s are not in contempt. The Kelly' s have, most of what he said is just incorrect. What we put in the application, the relevant portions of the transcript of that very trial that happened, and the thing is what most important thing, which I think undoes everything I think that has been talked about with the Town for these years, is Judge Hackeling said that if it' s covered by the DMV, it' s covered by the DMV. It' s about their jurisdiction. So that' s what was at the crux of all these issues for all those eleven or 12 years. And we put that portion of it in the application. Put that portion of the testimony in there. The things he said about Mr. Kelly, what he testified to, that's incorrect. You could look at the transcript. But the thing also is that he has the same rights as any other marina. And anything he wants to do in the marina. And I used to be a fire marshal and I inspected numerous marinas, over and over. Took them to court when it was warranted. And the thing is, anything that is even on the property right now is consistent with its use as a marina, et al, boat storage, all that. Drive to any other marina in the Town of Southold or maybe surrounding towns. There is nothing that he has on the property that is not consistent with marina use. And just to, it' s a strange thing that happens, too, it' s all over Long Island, but this idea of a C of 0. A Certificate of Occupancy was, the purpose of a Certificate of Occupancy is to ensure that a building or structure is in compliance with the New York State Uniform Fire Protection and Building Code. I enforced that code for years. I was around when we were under the old .code. But everything changed in 2003. However, none of the 13 towns, and I have been in all of them, spoke there or litigated there, none of them kept track of that, that the code changed in 2003. And the idea that communities were making up things like a pre-CO, a CO for things -- the idea that a stairway, some people would think -- I inspected the Town of East Hampton. And they had a great big set of stairs going up the bluffs. And the thing is, I thought it was terrible. And the New York State Uniforms Code says does it attach to a building. I go, no, it' s like 30-feet from the building. But it's like a 30-foot high stairway. And they go, not covered by the code. As far as when the Town of Southold, when they testified at that trial, they put a code enforcement officer up there, and the judge, myself, it was just embarrassing. It was cringe worthy. When I asked them what, to define a structure, he said, well, three walls and a roof. And I said, what is a swing set. And that launched into a ten-minute explanation, which everyone started feeling uncomfortable with. Board of Trustees 12 July 15, 2026 But he's not asked for anything that any other marina would ask for. And right down to even some of the things that people are calling structures, they are not even really structures. And they are certainly not covered by the New York State Uniform Fire Prevention Building Code. And the shed, you can have one that's 12xl2, 144 square feet. That' s not covered by the code. And all his setbacks for the structures they have there meet the code. But I just couldn't let that pass. I was determined not to say anything, but I couldn't let that pass. TRUSTEE SEPENOSKI: Ma'am? MS. PALMER: Good evening, I'm Marilou Palmer, I'm one of the neighbors with this problem. I 'm questioning this wetland proposal of Mr. Kelly and his wife to add additional structures and various items to the parcel, when they haven't complied with the court' s decision in prior litigation to remove items. I recall that they were not allowed to bring in an RV, which they did, in blatant violation. Do they think somehow with this new proposal all the prior litigation will be reversed? In addition, this is a small, triangular parcel, zoned many years ago as a marina, and has been grandfathered as such. With their ownership, I believe the Kelly's are trying to change the usage of this parcel. For several years it's been used only as storage and there has been no boat activity. Mr. Murray, Sr. , prior owner, and was the one to establish this parcel as currently zoned because he operated a neighborly boat dock for small boats and enough room for owners' parking. Under Murray's ownership, families came with kids, coolers and fishing gear. It' s not a social club. It' s a place that should remain as a mini marina. This parcel is not a Block Island or a Strong' s marina, and I am against approving this proposal. TRUSTEE GILLOOLY: Thank you. TRUSTEE SEPENOSKI: Is there anyone else who wants to speak regarding the application? MS. MORRISSEY: Linda Morrissey. I live next door to the Kelly' s. The day we moved into our property at 1780 Peconic Bay Boulevard, they had signed a lease on the ownership of their property next door. When I saw our lot, it was completely opened to the entire canal. Little boats were there. My concern was is there noise there, like what happens there, do people come and go. And the realtor said, oh, no, no, no, it' s just a little neighborhood thing, bla, bla, bla. Well, within the first week of them owning the property, they were allowed somehow a six-foot fence because they wanted to have a marina, and they needed insurance. They've never lent out a boat, a kayak. No one has ever been there. They have a big Board of Trustees 13 July 15, 2026 box truck there that says "Kayak Rentals. " You call the number, goes nowhere. Never been a rental. Ever. He wants this property as his own little summer home. He's brought RVs, a brought a tiny house on wheels. All of which were in contempt, that he had to remove. He now has another RV there, sitting there, his box truck, he's not using it as a marina in any way, shape or form. It' s too close to have a toilet to the water. The sewage, he claims he needs an RV or an office because he has a disability, being diabetes. I'm sure there are other people in this room with diabetes that could use a cooler if they needed to bring insulin with them. There is no reason for a home, a trailer or anything of that sort on this property. And he's using it as a cheap man' s summer home with $500 in taxes, when the rest of the neighborhood has high taxes, when he's only brought our property down because of the eyesore we have to live next door to. He' s had campers there, he' s just, and he' s just tents, campers. He' s just refusing to realize that this is not what that property was sold for and sold as, and he bought it thinking he could do whatever he wanted, and he found out he couldn't, and he' s just trying and trying and trying to get his way and not lose. And that' s basically what he' s trying to do. MR. KELLY: (INDISCERNIBLE) . TRUSTEE KRUPSKI : Mr. Kelly. Mr. Kelly -- MS. MORRISSEY: (Continuing) This is what we are dealing with. This is his personality. He's been taken away on stretchers. And he's crazy. And just don't give him an inch, he'll take a mile. TRUSTEE GOLDSMITH: Just for the record, it's one person at a time at the dais. That' s the only thing we can take on the record. So, please. Anyone else wishing to speak regarding this application? TRUSTEE SEPENOSKI: All me. All right. Just based on what I'm hearing this evening, it sounds like there is a long and complex history regarding this property. And perhaps for many of you, that's an understatement. But we review what is before us, we did visit the site. There is one item on this description that, quite frankly, I don't think exists in our code to approve. I think it's probably better to seek some other form of permission from the Town Board. And that' s the RV, and/or office trailer, as it's written in there. So there is no other further comment, I make a motion to close the hearing. TRUSTEE KRUPSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE SEPENOSKI: I make a motion to approve the portion of this wetland permit, which includes a 10x18 floating deck against bulkhead, and for the 8xlOx8 high storage shed; and Board of Trustees 14 July 15, 2026 striking from this application description the as-built RV storage and parking and/or 28-foot long office trailer. By approving these in the M-1 zone, which are minor in nature, and striking from the record the RV storage, we thereby bring it into consistency with the LWRP. TRUSTEE KRUPSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GILLOOLY: Number 2, Islandwide Engineering & Land Surveying on behalf of PATRICIA PECK requests a Wetland Permit to remove the existing failing sanitary system and install a new I/A type sanitary system further landward; to install the new system excavate a minimum of four feet beyond the proposed leaching chambers to remove unsuitable soils and replace soils with suitable SP/SW soil;' and to install silt fencing around the work area until the site is fully stabilized. Located: 782 Bailie Beach Road, Mattituck. SCTM# 1000-99-3-5. The Trustees most recently visited the site on the 13th of July, noting that it was a straightforward application. The LWRP found this to be consistent. Is there anyone here wishing to speak regarding this application? MR. PATANJO: Jeff Patanjo, on behalf of the applicant. If you have any questions. TRUSTEE GILLOOLY: I do not have any questions at this time. Is there anyone else here wishing to speak regarding this application? (No response) . Any questions or comments from the Board? (No response) . Hearing none, I make a motion to close the hearing. TRUSTEE KRUPSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GILLOOLY: I make a motion to approve this application as submitted. TRUSTEE GOLDSMITH: Second. All in favor? (ALL AYES) . TRUSTEE FINORA: Project .number 3, CONTINUED FROM 4/15/26 AS PER REVISED SITE PLANS AND PROJECT DESCRIPTION RECEIVED 7/7/26 Islandwide Engineering & Land Surveying on behalf of BLUE MARLIN REALTY, LLC requests a Wetland. Permit to demolish existing one-story dwelling including all footings and associated appurtenances; construct an irregularly shaped 61.8 ' x 38.0' two-story, single-family dwelling with attached garage, a 51xl7' front covered porch, an 8 'xll' west covered porch with 2'x4 ' steps; 21x7 ' steps at rear of dwelling; a 12.7 'x18. 10' second-story balcony; install A/C units and heat pump; remove Board of Trustees 15 July 15, 2026 existing sanitary system and landward of dwelling install a Septi-Tech STAAR 0.75 I/A sanitary system and 168 ' of Quick 4 Plus Standard Infiltrators; install gutters to leaders to dwelling along with driveway to a 14 .8 linear foot trench drain to catch runoff; install silt fencing around work area until site is stabilized; and to maintain the existing 15' wide non-turf buffer area along the landward edge of the bulkhead. Located: 450 Blue Marlin Drive, Southold. SCTM# 1000-57-1-26 The Trustees visited the site on July 8th, noting that they've reviewed the staking, and subsequent discussion at the work session reveal that the revised drawings, received July 7th, included updated dimensions as previously discussed. The LWRP findings were found to be consistent. Is there anybody here that wishes to speak on this application? MR. PATANJO: Jeff Patanjo, on behalf of the applicant. And as mentioned, revised plans were prepared. Based on comments addressed at a previous hearing, the house was shifted back to be outside of the 75-foot setback, and adjustments were made to the IA sanitary system and drainage systems to the site. I was going to say more, but I'm not. TRUSTEE FINORA: Thank you. Is there anybody else here that wishes to speak on behalf of this application? (No response) . Any comments from the Board? (No response) Hearing none, I make a motion to. close this hearing. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE FINORA: I make a motion to approve this application in accordance with the drawings that were received July 7th. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GOLDSMITH: Number 4, Patricia Moore, Esq. On behalf of 622 CHURCH LANE, LLC requests a Wetland Permit to construct a two-story dwelling set on piles with a 2, 018sq.ft. Ground level and a 4,291sq.ft. Second story level including an attached garage and a glass bridge that connects to existing 469sq.ft. 11-� story cottage (cottage #2) ; existing 81x22.3' storage area attached to cottage #2 to be removed and replaced. with stairs leading to the bridge; construct a raised pool, patios and decks totaling 1, 829sq. ft. ; install 800sq. ft. Of additional landings and walkways; install an oil & stone parking area and driveway.; install an I/A OWTS sanitary system landward of dwelling; install nine storm-water drainage drywells to contain runoff, and a pool bench; install pool enclosure fencing; existing 87 .4sq.ft. Block shed and 51.8sq.ft. Frame shed to remain; Board of Trustees 16 July 15, 2026 convert 326sq. ft cottage #1 to boat storage; 525sq. ft. Seasonal cottage #3 to remain; concrete slab walkway from cottage #2 and concrete patio on north side of cottage #1 to be removed; cut and fill areas and general regrading to be performed; revegetation of disturbed areas and supplementing existing vegetation with 22 trees, 85 shrubs, native grasses, perennials and lawn areas with existing seaward paths, existing woodlands on 20% slopes to the north, south and east to remain undisturbed, and lawn areas to remain. Located: 1625 Naugles Drive, Mattituck. SCTM# 1000-99-4-18 The Trustees conducted a field inspection July 8th. Notes read concern about location of structures in proximity to bluff bank; move structures landward away from bluff bank; concerns about proposed regrading; concerns about construction over bank in connection to existing cottage; proposed pool is less than 60 feet from top of bank; adverse environmental impact due to construction and proximity to wetlands, banks and bluffs with all structures; concerns about bridge on bluff bank. The LWRP found this to be inconsistent. The inconsistencies are with. Police 1, Policy 5 and Policy 6. The proposed action is on a nonconforming waterfront lot with three pre-existing structures. Considering that the lot has a waterfront boundary at the north and a partial waterfront boundary to the east, all pre-existing structures are less than 100 feet from the top of the bank, leading to the wetland boundary of Mattituck creek. Although the proposed action is underneath the allowable 20% of lot coverage at 9%, it is inconsistent with Policy 1 because the building footprint of the single-family dwelling is expanded by 6.32%, which increases the adverse effects of development. The proposed action of building a connection from the current single-family dwelling to the newly constructed addition over the slope bank is inconsistent with Policy 5.4 (a) .2 and 5. 4 (a) .3, which calls for the maintenance of natural characteristics of drainage systems and protection of areas that are particularly susceptible to erosion and sediment loss. The proposed action would require clearing the land and altering the blank landscaping. Although native vegetation is proposed to be planted in replacement in the same areas, the drainage system of the bank will be affected and erosion can increase in the future. Additionally, the proposed plant species, Winter King Hawthorne, is not native to New York and should be replaced by a plant species that is. The proposed action of the new addition to the single-family dwelling is inconsistent with Policy 6.3 (a) because it does not comply with the regulatory requirements of the Town Code Chapter 275 . On site plan L2. 1, the limit of Trustee jurisdiction is not labeled correctly. The Trustees jurisdiction starts at the top of the bank and then extends 100-feet landward. When properly labeled, the Board of Trustees 17 July 15, 2026 proposed additions are within the Trustees jurisdiction, and the residence, including the pool, because it is attached to the house, does not meet the top of the bank setback under Town Code 275.3 (d) (1) (a) (1) . The proposed action is also inconsistent with Policy 6.3 (c) (1) (b) , which calls for reduction of development intensity to avoid the evacuation or fill of vegetated wetlands. The site plan proposes that 1,200 cubic yards is to be excavated, cut, and 365 cubic yards are to be filled on the property. Reducing the scale of the proposed development will lower the environmental footprint. The proposed installation of an IA onsite wastewater treatment system is consistent with Policy 5.1 (c) (3) . Is there anyone here wishing to speak regarding this application? MS. MOORE: Yes, thank you. Patricia Moore, on behalf of the applicants. I have with me Ed Harbes, who is the principal. He and Shannon, his wife, are planning to build this house on the property. I also have with me Charles Hamilton who I'll have his resume for the record. I'm going to have him speak with regard to the application since he has the technical expertise. I will defer to him so that he has plenty of time to go over the application. Chuck, if you don't mind. MR. HAMILTON: Good evening, Mr. Chairman, Members of the Board, my name is Chuck Hamilton, .I'm with A.M. Weber Associates, PO Box 2753, Setauket New York 11733. As you may know, I'm the former regional supervisor of the DEC and have a few years of experience in tidal wetlands work. So I was the one who first got involved with this project to obtain the New York State DEC permits for this project. And the first thing we knew that we had to, you know, do a design that gets us as far away from the wetlands. Because it' s a difficult piece of property. If I may just walk over to the screen, it might be an easier way to talk about what I did. So, when we first came and looked at it, now obviously we have this hill area, we have this beautiful cove wetland area, you know, flagged and wetlands. And we came, we went to the DEC, and we basically said we're going to get a no-jurisdiction from the, because of Elevation 10. But we are over here, the jurisdiction came up the side of the hill, and so a permit was needed for that part of the project. But now we are dealing with Chapter 275, which deals with up to 2023, tidal wetland areas, it's been a very effective law, very similar to one of, the DEC wetlands law, but a very effective law in protecting the resources here in the town. Then in 2023, you modified the wetland law to add the new banks and bluffs, which is kind of like what the coastal erosion hazard law does, with the state law and things like that. Board of Trustees 18 July 15, 2026 . And again, bluffs and banks are really an integral part of the tidal wetlands. And also, depending on where you, primarily on the north shore we see that as an important feature to protect. So you are probably talking to one of the biggest fans of your Chapter 275. It' s a good law, written good, and things like that. So I just want to go a little bit over the design and how we did this design of the project. And, you know, how we ended up where we are today. So when you, the first thing that I look at, and I'll just want to show you here, but I tried to look at the south, you know, cove is the most important natural resource feature and tidal wetlands and bank that needed to be protected. It's got a mature canopy forest, wooded area, on the south side of the property, and really needed to be protected. So when we did the design, we moved the dwelling up to the north. And when you actually' look at this survey, you can see the most natural shoreline is the south portion of the property, with the cove, the banks, and then as you come to the east, you have a bulkheaded shoreline.- You guys all know the history of this property. It was an old commercial lot, Tim and Heidi' s place here had an old bulkhead, it went non-functional. Permits were given to build a rock revetment. That's there. Redo the bulkhead, add a floating dock. And then there' s a stone wall over here. So pretty much the whole eastern side of the property at the shore, at least with the tidal wetlands, is pretty much developed with hard structures. Then as you come further to the north of the property, that' s where you really see development. You see the cottage. You see the cottage that people live in. You see there is a gravel driveway that actually comes down between both properties. There is a concrete patio and another cottage. Then when you start looking north, you start looking how does this bluff work. This bluff hooks right into another property to the north. It' s got 80 foot of a very high, big retaining wall there. There is a shed. And when you actually look at the other side of the property, it's a bulkhead. So basically, the shoreline that, and I looked at it, I felt it really needed to be protected, was this particular area. This is the most natural remaining aspect of this bluff system, our hill system and wetland system here on Mattituck Creek. As you can see, we have a bulkhead, the rock armor, another stone wall over here, big stone wall right here. This is a gravel driveway they made, and they have a gravel parking area here. This here, anything that happens here is not going to do anything to the wetlands or the bluff. Because this is an already significant altered area with manmade structures, things like that. Board of Trustees 19 July 15, 2026 So we pushed the structures all, and, you know, with the direction. I think. this is the third modification of this project. So what we did -- make sure I get this right -- is again, push the project to the north and put it up to the 60-foot setback, so it meets front yard setback, which is really where you want to be in this project. When you start looking at distances, you know, the driveway, the sanitary system is 145 feet from wetlands. Um, the house is 115, 115, 118, 120. So a really good distance away from the tidal wetlands. And the 120 feet away for the toe of the bank. The toe of the bank to the north is 120 feet away from the tidal wetland boundary. When we think about bluffs and banks and hills, you know, first thing I think of is Long Island Sound. I look at they have an intertidal area, they have a beach and they have bluff. That' s an integrated natural feature, natural structure. When I look at this project, I have an intertidal marsh, high marsh, rock wall, grass lawn, driveway, bunch of houses. And then I have a hill. This little dip on the north side. So I look at this hill here and say, it meets the code definition of a bank, not a bluff, but a bank. And I call it more like a hill. But its value in the natural resources is of limited value. Then when I looked at the eastern portion of the property, where I have a stone wall, substantial rock revetment, a bulkhead, that has limited value. Then I have a stretch of 60, 80-foot of lawn. And that has less value but I find that the hill is not really connected to that intertidal wetland section. But when I come to the south side of the property, it's all connected. And it obviously shows on the survey. That is the most important part of this property, is' that south section. And that's actually where we have the highest square footage of 20-foot tall slopes, pretty steep slopes, that we are staying Away from. So now let's talk about the design of the project. I don't design houses, first thing I'll tell you. It's a house. And so what we did is, and if you look at the roadway, the roadway is about 40, and when you come down, it goes down to like three. So 'it's a big drop. So it comes down, we are doing a gravel driveway, so the runoff will not be directed anywhere. We have at least nine drywells on the project site to grab all the roof runoff, all the runoff from the driveways. The sanitary systems are in the front yard, as far away as possible. And pretty much in the center of this hill area, if you look at right here on the front yard of the property. It's a linear home. It' s, again, anywhere from 45 to 75 feet away from the top of the bank to the south. But when I get to the north, I'm right on the edge. I'm zero feet away. So when I talked to the architect, I said, you know what, how are you going to build this? Well, I'm just going to build Board of Trustees 20 July 15, 2026 it. No, you're not. You start doing an excavation and put a foundation there, you'll tear the whole bluff apart. I said, I'll tell you how you're going to do it. You'll pile-drive it. You'll pile-drive the foundation for this structure, with the bank here. We are not going to disturb that bank to the north, where I think it's of lesser value than other ones, it' s a protected structure that it' s in the code. So we're going to build that house on that bank as far away from that south area, pile drive it then put your foundation and then your dwelling on top of that. Same thing with the pool. So we can be on a terra firma area. And the key factor is no alteration to the surface topography, we don't want to modify any of the drainage patterns, any of the salt types. So the architect has a design to have this, I guess I call it a bridge, for lack of a better word, to the lower dwelling down there. And it' s going to be over that. So the first thing I said, well, how are you going to build that. Helicopter, right? So we are going to have to consider anything in that area is going to be disturbed, the vegetation, just by manual labor and people going in there. So I said, so when I talked to John Hamilton -- by the way, I'm not a landscape architect. That would be my son, okay, that's not me. I didn't go to school again. So he, and we came up, we said we're going to restore that. We're going to restore that with native vegetation. And that was another creative way, I directed and advised these guys, you gotta do native plantings. Anything else is totally unacceptable. So John put together a plan that shows areas that we will do the restoration that is needed. There' s no way you can do it. There' s no sense, and I told these guys, we are not lying to regulators, we're not going to tell them we can just plop it in there. It' s going to happen. It' s going to be disturbances, but what we are going to do is we are going to put erosion control structures. So when you look at the plan, you'll see that, I think it's the orange line, we have a line of silt fence and construction limiting fence entirely around the construction site so that anything on the seaward side or toward the bank will not be disturbed. And that first thing that we do, construction that would be installed, it would be maintained, and it's, you know, when you start looking at the south side again, you can see that' s a really super-protected area as far as setbacks. When I get up to the north side, which is this area, where it's been manmade, altered, we are still going to protect the large wooded area up to the northwest. And when actually look at the area below the top of the bank that we are disturbing here, it's about 70 feet. It' s about I think 490 feet of top of bank in this particular area. So Board of Trustees 21 July 15, 2026 probably about, you know, 17% of that area is proposed to be altered. But when we alter it, there is going to be some slight grading and filling just to get a smooth grade, not to have a sharp grade, and it's all intended to be planted with native plants. We have a bunch of drywells there so that slope, so this house, if you kind of look at it, you'll see the blue areas of the drywells, we surround the entire house with drywells, we grab roof runoff, any change of topography, to grab that, so we don't have any alteration, any surface runoff increase that would denude the vegetation. As you know, it' s a pretty heavy home there, but again, we'll do the plantings. So all the plantings are native. I saw the thing about King Hawthorn tree. Its zone is in New York state. It' s kind of a neat plant, a lot of flowers in May. Which means it' s a pollinator. All winter it has a lot of red berries, which means bird food, and bird habitat. So if you want that removed, we can do that. But I looked at it and said, you know, from a wildlife perspective it's not a bad plant to have, and it' s not a bad thing to have a pollinator tree in this area. We are planting over a thousand plants, you know, grasses, shrubs, and things like that. All native. I did have an opportunity to review the LWRP report. I reviewed it. I had comments on them. If it' s okay, I'll just present this, I 'll just present it as evidence and you can read it, or do you want me to read it to you, my review? TRUSTEE GOLDSMITH: No, you can submit it into the file. MR. HAMILTON: Okay, that will save your time here. And I do have a report that I wrote about this. It's pretty much, I pretty much go over the project, what it is. It's a two-story dwelling on piles, pool, fabulous decks, all-stone pervious driveway, IA system, nine stormwater drywells, a pool drywell, retention of the existing structures and the seasonal cottage, conversion of a cottage one to boat storage, removal of the concrete slab out in front, we'll do some cut and fill; plant, you know, over a thousand plants, we'll preserve all the existing woodlands in a 20% area. In fact the whole, the perimeter is going to be protected. We're. going to install salt-control devices, we'll maintain -- there'll be no alteration to topography other than that 70-foot area that I talked about behind the two cottages. We maximize the distance from tidal wetlands . So when I look at the compliance with wetland setbacks, the residence is 115 to 118. The driveway is 115. This is from tidal wetlands now. Okay, the sanitary system is 145 feet to 240 feet. The septic tank is over 150 feet. And the swimming pool is 120 feet. So from a wetland perspective, it' s a really protected, good design. When we look at drainage and stormwater compliance, with Board of Trustees 22 July 15, 2026 Chapter 275, we're putting nine storm wells, we have a dedicated pool drywell, a permeable oil and stone driveway and we are going to retain all runoff from the roofs and the property into below-grade drywells. Woodlands on the 20o slopes are going to remain undisturbed. All the woodlands on the south and the east side are going to remain as is. The seaward paths that are there will be maintained but not increased in the area. The regrading is paired with revegetation. The entire construction area, before construction starts, will be surrounded by erosion control devices and a construction-limiting fence. I'm talking about a four-foot high fence, avoid any alteration to the protected slope area. I'll skip some of this stuff. I don't want to say it again. TRUSTEE KRUPSKI: I think we are starting to circle back on some of the points you already made. MR. HAMILTON: Okay, that' s okay. Yes. I'll, there's that. As far as flood and storm tide resiliency, Chapter 275-12 (e) , we -are compliant. We are not going to have any impact on flood and storm tide resilience. There will be no adverse impact in navigation, tidal flow or lateral support. The lateral support means when we do the piling driving and things like that, there will be no alteration to those topographies, those sloped areas, that would diminish the lateral support of the existing slopes. As far as esthetic and environmental improvements, we' ll maintain the Oak and Hickory mature woodland area. There will be no alteration to tidal wetlands, we're going to preserve the natural shoreline, and all the installation of new structures are going to be landward of existing structure. They are landward of an existing cottage, a building, concrete patio, and all kinds of marine hardware that's on the shoreline. So now we are going to get back to the bank setback of 100 feet. Local Law 5200223 was amended on March 29th, 2023, Chapter 25, Chapter 275, Wetlands and Shorelines. So again, I talked about the project hill, it' s a hill with open slopes northeast and south. I did all that. The proposed dwelling and driveway are proposed 41 on the south, proposed project is 41, is 75 feet landward from the top of bank. From the south, 41 to 75 feet to the top of the bank. We can't be 100 feet away from the south top of bank. But we're 41 to 75 feet away but these areas will remain fully vegetated with no man alterations to that area seaward of that dwelling. The setbacks on the north side, as I indicated, is a diminished value, having a gravel driveway, gravel parking area, a reticence in building, a concrete patio. TRUSTEE GOLDSMITH: Excuse me, Mr. Hamilton. I'm just going to interrupt you for one point here. You did mention the code was updated in 2023, banks and bluffs. MR. HAMILTON: That. was my information. TRUSTEE GOLDSMITH: That' s not true. So, just for the record, Board of Trustees 23 July 15, 2026 that is not a true statement. MR. HAMILTON: Okay, so when was it amended? MS. HULSE: In Chapter 275? In 275? MR. HAMILTON: Yes. MS. HULSE: Looks like in 2017. MR. HAMILTON: Okay, I stand corrected. Thank you, sir. MS. HULSE: What are you referencing, Pat? MS. MOORE: Local Law, it was Local Law 2000 -- what was the number I gave you where you changed, you added banks. (Perusing) . It's Local Law 5 of 2023. That law is the first time that you added "bank" to the definition of the jurisdiction. MS. HULSE: Are you talking about under 280? MS. MOORE: No, 275. Yeah. That' s what the Town Clerk had. MR. HULSE: I don't think we changed that. I don't think it was changed. You're saying it was changed, Pat? MS. MOORE: Yes, that word was added. I'll pull the law. MS. HULSE: We had the definition of "bank" in the code in 2017. That' s the last time I had it. It was changed -- but you are saying it changed the definition? MS. MOORE: It was changed, you changed the jurisdiction. Hold on. Let me finish. I'll pull up the local law. Maybe I can give it to you after the meeting so we don't delay. TRUSTEE GOLDSMITH: Yes, Mr. Hamilton -- MR. HAMILTON: I don't want to talk about any legal matters. TRUSTEE GOLDSMITH: And, sir, please, five minutes or less, if possible. TRUSTEE KRUPSKI: It started ten minutes ago. We are trying to take care of this. MR. HAMILTON: Yes, sir. Yes, sir. Okay, the residence is proposed right at the top of the hill, however no excavation is needed as a power foundation will be installed, with no alteration or disturbance to the slope or topography of that area. The north slope is not connected directly to tidal wetlands, it's connected to a gravel driveway with a substantial retaining wall on the north side, and also to the area to the south. The high natural resource value of this project site is the south slope with a direct connection to the south cove tidal wetlands, which is why we designed the project. As far as residence, regarding the bank setbacks, the bank setbacks to the residence is 41 feet to 74 feet on the south; on the north slope it' s two feet to 22 feet; on the driveway it's 20 feet from the south top of bank; 42 feet from the south top of bank. The sanitary leaching pool is proposed 57 feet from the south, and 30 feet from the north. The septic tank is 50 feet from the south and 48 feet from the north. The swimming pool is proposed two to four feet from the north slope. Board of Trustees 24 July 15, 2026 So when you look at the way it is, we try to maximize the maximum distance and equidistance some of the other structures that are proposed here. So my request to the Board is that we meet and protect all the resources of the tidal wetlands, we protect all of the bank areas, however we cannot meet the hundred-foot setback, so respectfully we would ask -- they are not attainable, and we would ask that a variance to the 100-foot setback is requested. TRUSTEE GOLDSMITH: Thank you. Is there anyone else here wishing to speak regarding this application? TRUSTEE FINORA: I have a question for Mr. Hamilton. MR. HAMILTON: Sure. TRUSTEE FINORA: I appreciate your review of the concept that, I commend you for the approach in recognizing those important features, the aspects of that topography orientation where the wetlands are located. One particular issue that I would be curious what your take is on, just the general intensification of the project on the specific site. We have a number of structures there already. The need for connectivity of the lower main dwelling now, at the lower elevation, to the proposed large dwelling at the higher elevation. I understand in talking to the applicant and their representation, this is largely a zoning need to have these connected because there's already an existing single-family dwelling on the property, and associated accessory structures. One thing I would be curious about, from your opinion, environmentally, you know, what is justification for this extraordinary increase in size of structure and its given location, and how is that really mitigated here? MR. HAMILTON: I think the critical aspect is, is where we should be working, when you do development of any of kind of property, it should be concentrated in one common location. And when you look at this property, it's been developed over time, where we've had these pre-existing cottages, and then we built a bulkhead, and the dock, it' s that nickel-dime approach that we get caught on as a regulator, and here we are at the end of the game saying how do we straighten this mess up. And so when I look at it, the best approach to me is that we should concentrate the development, for these residential developments, because this is the last development of this parcel, and we should concentrate that on the top of that hill, and anything below that should have limited value as far as views and things like that. I would concentrate everything on top of that hill. You know, walkway, staircase, clear, you know, access to the rest of the property. Because it' s kind of connected where you have the residence on the top part of the property, and the recreational aspects would be down by the water, where we've already altered so much, it's just the lawn and bulkheads, you know. But you try to keep it up on top. The mitigation is to move as far away as possible. And I Board of Trustees 25 July 15, 2026 think I did the best I could on the south side. Any closer to the road, it's obviously a zoning issue with front yard setback, and I think the key thing in making decisions is we as regulators have to protect our resources, the Zoning Board has to protect their resources with the zoning code and things like that. So, we try to do the best we can to put it together. So, you know, we're at the very -- and we got good direction, to the right at 60 foot. So that's where we're at. So I think that's the best mitigation we can do at this point. TRUSTEE FINORA: Thank you. MR. HAMILTON: You're welcome. TRUSTEE GOLDSMITH: Anyone else wishing to speak regarding this application? (No response) . Any other questions or comments by the Board? (No response) . Hearing none, I make a motion to table this hearing for ZBA review. TRUSTEE KRUPSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE KRUPSKI: Number 5, Cole Environmental Services on behalf of PAMELA VALENTINE requests a Wetland Permit to construct a proposed 42 . 6' x 17' (793 S.F. ) two-story dwelling on piles, a 42 . 6' x 12 ' (510 S. F. ) rear first-story wood deck with stairs, a 373 S.F. irregular rear second-story deck, a 20.5 ' x 7' (145 S. F. ) front wood deck with a +/- 20 S.F. outdoor shower; an I/A sanitary system to be installed to the west of the dwelling; existing firepit to remain; install a well to establish water supply line; install two drywells; install a 500 gallon buried propane tank; construct an 80' x 12 ' timber bridge over approximately 473 S.F. of wetlands consisting of five (5) 16' bents supported by a wooden pile substructure with a structural wooden deck; all bridge elements to be constructed of exterior-grade structural timber with no disturbance to occur below the bridge; install an approximately 35' x 12 ' driveway extending from the dwelling to the bridge approach with a 15' x 20' turnaround area, to be constructed of pervious material consisting of medium-compaction RCA or a pervious masonry/stone product; two (2) approximately 20' x 12' bridge approach areas, grade dependent, to be constructed of medium-compaction pervious RCA; install an approximately 140' x 12' private road accessway within the existing 30' right-of-way extending from the terminus of the bridge to Birdseye Road with existing vegetation within the accessway to be cleared and the roadbed leveled to match existing grade; accessway to be constructed of medium-compaction pervious RCA and silt fencing to be established and maintained during construction. Located: 1675 Birds Eye Road, Orient. SCTM# 1000-17-2-1.4 Board of Trustees 26 July 15, 2026 The Trustees most recently visited the property on July 8th, 2026, questions raised about the paper road over the wetlands, fresh and salt nearby; concerns about bridge; diminishing freshwater wetlands; house can be located closer to IA septic system; an alternative possibility open for access closer to driveway; hydrology a factor as it feeds through paper road area. This is the most recent of multiple site inspections which echoed the same concerns about the sensitivity of the area. The LWRP found this to be inconsistent. The proposed action is inconsistent with Policy One as it does not preserve open space, make efficient use of infrastructure or provide a beneficial use of coastal location while increasing the adverse affects of development. The only pre-existing structures on the parcel are gravel paths. The proposed action is inconsistent with Policy 4. 1A because there are flooding and erosion hazards on the parcel. Directly off the shoreline of the Long Island Sound is the Coastal Erosion Hazard Area. Extending past the CEHA is the FEMA VE flood zone, which holds the high coastal risk of flooding and high wave action. Beyond the VE flood zone where the proposed second/third dwelling is proposed is the FEMA AE flood zone, which has a high flood risk. The proposed actions of the proposed residence and the proposed sanitary leaching pool are inconsistent with Policy 6.3A, which states the Town of Southold Trustees jurisdiction, and does not comply with the wetland setbacks in Town Code Chapter 275 (D) (1) (A) , under "waterfront parcel. " The residence should be 100 feet from the wetland boundary and sanitary leaching pools, and should be 75 feet from the wetland boundary. The proposed installation of an IA Onsite Wastewater Treatment System is consistent with Policy 5.1 (C) (3) . Is there anyone here that wishes to speak regarding this application? MR. COLE: Yes. Chris Cole, Cole Environmental, agent for the applicant. To go through a few points on here, we met with the Trustees in the Fall originally, from our side of the things, and discussed the project. We worked in Trustee comments into the design. We put a lot of time and effort into creating a plan that creates minimal disturbance. I do want to note that there is a permit granted by this Board from 1990, that granted approval for a house, a pool and a driveway that filled in the westerly side of wetlands. This current proposal proposes to extend the road on the southern side, Birdseye Road, and create a bridge in,. you can almost see it on the aerial here, where there is a pathway in between two sections of wetlands, so we are going to traverse the wetlands to minimally impact them, compared to the previous Board of Trustees 27 July 15, 2026 1990 permit. The house will be, the house has been designed using helical piles and using strategies to minimize as much disturbance as possible. We discussed the helical piles on the site, and the builder and architect have assured me that they can be installed with augurs, so it won't be a team of oxen. Access to the site will be from the adjacent property to the west, and all storage and materials, dumpster, et cetera, will be on that property. We discussed the septic and the house location, potentially flipping those. If we flipped them, that would bring the effluent closer to the well. But we did investigate shrinking the footprint of the septic system and bringing it closer to the house, which the architect believes he can do. He can shrink that and put the septic system more inline with the previously disturbed and already disturbed areas on site. So if that is something the Board is open to, we can resubmit plans depicting that. And we also have the attorney, John here, who can speak further to the road and the access and the legality of that side of things. MR. BOURQUIN: Good afternoon, Board members. John Bourquin of Greenberg Traurig, 2317 Main Street in Bridgehampton, on behalf of the applicant. Myself and Mr. Portillo, the builder of the project, met with Mike Verity of the Building Department in July 2025 and again in September of 2025 to discuss this concept. Mr. Verity's wish list for us at that time was proof that the properties, the two properties, were single and separate, distinct from each other and thus buildable. And also whether the applicant had legal access over the Birdseye Road, kind of the T-shaped road there for this parcel. So as I have provided Mr. Verity in writing, the road and its "T" configuration as well as these two lots were created by the map of JD Stern, which was approved by the Town's Planning Board in 1970. Dime Abstract has proved that the two lots have been held single and separate. These two lots are plotted on the tax map prior to 1981 and are thus conforming as to the Health Department. And the deed by which the applicant took the easterly property, 1675 Tax Lot 1. 4, also grants use of the right-of-way, particularly the easterly or the right-hand side of the T-shaped element, which runs to the south of the lot and where the proposed access and bridge would take from. So to give you a quick summary of all that, the applicant has a buildable lot and has legal access over the T-shaped private road. TRUSTEE SEPENOSKI: Thank you. TRUSTEE KRUPSKI: Is there anyone else here wishing to speak regarding this application? Board of Trustees 28 July 15, 2026 (No response) So I think if you look back in the notes, the Board of Trustees has been pretty uniform since the first pre-submission of this application. It's -- in 2026, to say it' s a buildable lot is, with such firmness, is troubling to me. I 'm not sure if we are speaking of the dune that extends all the way up .to this application, and is not mapped or pictured correctly, or if we are talking about the pond that says "area of phragmites and drainage. " But I'm not sure which part of that is clearly buildable. One thing the Trustees had talked about from the start is the concept -- and which you see on the, part of which you see in the original permit from 30 years ago, when we don't know as much as we do now about the environment, but which takes the access from the other side of the property, thereby preserving a lot of the sensitive habitat, certainly arguably not enough, but a lot of sensitive habitat that is absolutely going to be destroyed with this application. But for myself, a large part of my trouble with this is that it shows 40. 9 feet to the crest of dune, and as per our code it's on unconsolidated earth, which is very apparent in the field, mere feet from this proposal and the flagged area. So I think at minimum, the plans would have to be changed and would have to be some justification as to why we would allow a structure so close to that. Furthermore, just environmentally speaking, it doesn't seem like since the pre-submission in this application there has been any attempt to mitigate the environmental concerns of the Trustees and try to minimize those as required in our code, whether it be with the expansion of a bridge immediately adjacent to the wetlands, expansion of a paper road that goes over the wetlands, or sliding the structure over, condensing the structures and trying to mitigate the enormous environmental impact of a very sensitive area in a very special place within this Town, that has a history of trying to preserve the environment and work within those confines. MR. COLE: John will speak to the road. One also piece that I would also just like to hand the Board is just a no-jurisdiction letter from the DEC. They don't have jurisdiction over freshwater wetlands. MR. BOURQUIN: So, just a few comments. I know that I 've touched on the paper road and the legal access to that, but as to the concept of access with the bridge. While it might not look like this is the most straightforward approach or straightforward way to get access to the lot, any other alternative, such as using a portion of the westerly lot to access, would create a whole host of other complications. It would at least require recording some sort of document against title to the westerly property, which could create single and separate implications for both the zoning and Board of Trustees 29 July 15, 2026 the Health Department. Further having access from the westerly lot may create the deed for a Town Lot 280 (a) variance, which generally is building on a lot without road access. So that is the, part of the legal argument that is behind that concept. MR. COLE: So we will revisit the proposal, if the Board is open to the idea of shrinking the overall development by condensing the sanitary system and the house, and we will revegetate any areas that have been disturbed with native species. And we could even expand the area of wetlands to the northwest corner and create additional habitat in that area, and add additional native species. In addition to that we'll take a look at the plan and see if there is anything else that we can do to minimize overall impact on the site here. And we have Anthony, the architect, here as well. TRUSTEE KRUPSKI: I think, I 'd suggest as part of that as well, I mean, you can, it' s a Tittle hard to tell, but frankly speaking, those sand paths, the sand wasn't brought in to create those. So to say, again, the dune and the beach line is 40 feet away, I think that should be revisited as well as part of that. MR. COLE: Okay. MR. PORTILLO: Hi, Board, Anthony Portillo, AMP Architecture. I just wanted to put .on the record that if you look at the site plan from the 1990 application, there was actually a road pretty much in the area that we are proposing this road, that at some point was removed. And I just thought that interesting that, you know, that that was sort of already existing at some point and then removed. I just wanted to say that on the record. And just one other thing. The right-of-way is at 30 feet, you know, we are proposing just 15 feet, for emergency vehicle access. And trying to stay as far from the wetlands line as possible. That' s the reason we are proposing it that way. TRUSTEE GILLOOLY: Mr. Portillo, to that point, have you explored the concept of maybe 15-feet wide for the road leading up but the bridge going across the wetlands potentially being smaller than 15-feet wide, knowing that there is no way that a fire truck could turn all the way down and traverse a bridge to access this property. It would be pulling hose over the bridge anyway. MR. PORTILLO: Sure. And Bob actually, the builder of the project, spoke with the Fire Marshall in Orient about that situation, and just sort of wanted to understand how they were to sort of access the house if there ever was a fire. And I 'm not speaking for Bob, but basically the conversation led to fire apparatus would park at the road and basically go up the driveway with the hoses. So to your point, I think we could look at it less wide of a bridge and reduce that, you know, based on that conversation. TRUSTEE KRUPSKI: And just to respond about the road on the Board of Trustees 30 July 15, 2026 original permit that was removed, it says "create marsh by removing old road. " So, that' s a positive. But the old road that was removed, if it' s to scale, based off the measurements of the driveway, is about three-feet wide. TRUSTEE GOLDSMITH: And also, just for the record, obviously we all know the environmental conditions have changed since 1990, in coastal erosion and everything. MR. PORTILLO: Of course. TRUSTEE GOLDSMITH: And the setbacks from 1990 to now have changed as well. MR. PORTILLO: Sure. I mean I think we need what we got, what we just heard from Nick, I think we need to unpack a little bit and look at some of those things. And I appreciate it. You know, one of my other statements to the Board would be that, you know, our lot coverage is very minimal. I think this a very condensed -- you know, I don't think, I think it's about a 750 or so square-foot footprint. There are some decks that we're requesting off the rear that are not covered structures, they are open decks. Which that's what that measurement was to. It's not actually to the residence. But again, those are the things I think we can look at and take, you know, into consideration. TRUSTEE KRUPSKI: I appreciate that. One of my issues with lot coverage is it doesn't take into account everything that is going on there. So a piece of property like this, you are talking about like 100% lot coverage of the sensitive area when you are dealing with, you know, primary and secondary dunes, unconsolidated sediments, and a wetland area that, you know appears to be pretty healthy. So I do think it's certainly worth taking a look at. And certainly the impacts of shading of a two-story structure, that is also on piles_ , to the surrounding habitat and vegetation. MR. PORTILLO: The piles are not actually for an elevation purpose. It' s going to be somewhat in line with grade. I mean, we are following the natural grade and not disturbing it. The piles were more in line with trying to create a way to have a foundation without having to excavate, essentially. TRUSTEE KRUPSKI: No, I appreciate that. I just, a lot of things that are not taken into account is the height of these structures that just wipes out the native vegetation that's around it. MR. PORTILLO: And to that statement, we are within our zoning height. I mean, we're not going over that. But I understand that' s something we can discuss and maybe mitigate. MR. BOURQUIN: To the earlier point about fire apparatuses, we do have, for the record, a letter dated today, July 15th, 2026, . from Richard Gillooly, the Chief of the Orient Fire Department, in which he expresses support for the concept. So, I can hand this up to counsel, if you would like. Board of Trustees 31 July 15, 2026 TRUSTEE GOLDSMITH: Sure. Thank you. TRUSTEE KRUPSKI: Thank you. MR. COLE: So we'll take all of the Board' s comments and work it in to address all of them to the maximum extent possible, and we'll request to table the application. Thank you. TRUSTEE KRUPSKI: Is there anyone else here wishing to speak regarding this application? (No response) . Or any members of the Board? (Negative response) . Hearing none, I make a motion to table this application at the applicant's request. . TRUSTEE GOLDSMITH: Second. All in favor? (ALL AYES) . TRUSTEE SEPENOSKI: Number 6, Cole Environmental Services on behalf of BRYAN & TRACY KAPPENBERG requests a Wetland Permit to demolish existing one-story dwelling, foundation, concrete stoop and stairs, paver walk, concrete porch, paver' patio, and asphalt driveway; construct .an irregularly shaped two-story 2, 655.3sq.ft. Dwelling with an attached 24 'x27.5 ' garage, 111x6' and 9. 61x4 ' front porches; a 19. 6'xl5.5' seaward screened porch with 4'x5' landing and steps; a basement stair egress on west side and a basement window egress on east side of dwelling; an 18 'xl1' inground pool within an a 1, 006.7sq.ft. Pool patio with stairs to ground; install pool enclosure fencing with gates and pool equipment area with sound deadening enclosure; install three 8' diameter by 6' deep drywells to contain roof runoff and one 8' diameter by 4' deep drywell for pool; abandon existing septic system and install an I/A sanitary system landward of dwelling; and install a pervious driveway. Located: 6050 Great Peconic Bay Blvd. , Laurel. SCTM#1000-128-2-7 The Trustees visited the site on 7/8/26. Notes from our visit read: . Two-for-one tree replacement, increase non-turf buffer. The LWRP found the project inconsistent with its policies, Policy 6, specifically 6.3, noting the move of the structure further landward and the addition of a pool and patio, making it slightly closer to the water. Is there anyone here wishing to speak regarding the application? MS. RUMMEL: Kate Rummel, Cole Environmental, on behalf of the homeowner. So we are demoing the existing residence, and then the proposed new residence is almost entirely landward of the existing. There is a slight encroachment of the patio beyond the seaward of the existing house. But all covered structures remain. I guess the screened porch, the corner, does not encroach further towards the bulkhead. And the majority of the proposal is beyond the 100-foot setback. Board of Trustees 32 July 15, 2026 I do have updated plans that do show the 100-foot setback also includes, there is the 13-foot existing buffer, sand buffer, and then the stair, like, the rock retaining wall, is approximately two-feet wide and then we do have a proposed three-foot wide vegetated buffer, that I can submit, if it pleases the Board. TRUSTEE SEPENOSKI: Ms. Rummel, you were at our work session. Were you able to conference about the driveway? MS. RUMMEL: Yes. It was part of the design with the architect, it was just, you know, taking into consideration the site and trying to maximize the enjoyment of it. But the client did walk the site and there are minimal trees to be taken down, but he is open to replanting them. They would be outside of Trustee jurisdiction, but he would still be open to replanting them outside. And we do have a note that any tree within Trustee jurisdiction would be replaced two-to-one. And I believe at the work session you noted that you wanted cedar for cedar, instead of another species. TRUSTEE SEPENOSKI: All right. TRUSTEE GILLOOLY: At times like this I really wish we had more strength to a tree code in town, because while I understand the client's desire to move .the driveway, there will be a significant loss of trees on the property due to that decision. And while it may not be our purview, it is still worth noting that that is a loss for the community. MS. RUMMEL: They did count, it would be in total for the project, they approximate about five trees would come down. Which I understand is not what the Board would like to hear, but he is open to replanting. TRUSTEE GILLOOLY: Thank you. TRUSTEE SEPENOSKI: Okay. Do you have plans ready? MS. RUMMEL: I have two copies, yes, of additional plans, with an additional vegetated buffer. TRUSTEE SEPENOSKI: Would you mind letting us take a quick look? MS. RUMMEL: (Handing) . TRUSTEE SEPENOSKI: Liz, can you stamp them. MS. CANTRELL: (Complying) . MS. RUMMEL: I also have a copy of the plans, which I've highlighted the existing structure, if that helps, for comparison. (Stenographer asks Ms. Rummel to repeat her sentence) . I've highlighted the existing structure on this site, I don't know if that's helpful, for comparison of where things are located, but. TRUSTEE KRUPSKI: While it may not be related to the entirety of this application, I would just, too, echo my concerns about the trees that, there's a lot of really talented architects and engineers in town designing this projects, and environmental and consulting firms, and it' s becoming a new trend to not design Board of Trustees 33 July 15, 2026 around the existing native landscape, and it's getting worse and worse across town. So while we might not have a metric tonight for some of those, to protect these actually beautiful cedars, which is not the case of all the cedars we are trying to protect, it's certainly something that I 'm going to look for in the future if it does come by again. MS. RUMMEL: Understood. Aside from the driveway, the proposed house is within, primarily within like the cleared area, and noted on your sentiments. TRUSTEE GILLOOLY: But we are losing one beautiful tree for the extension, right? MS. RUMMEL: I understand. I apologize, on behalf of the tree. TRUSTEE SEPENOSKI: Is there anyone else here to speak regarding this application? (No response) . Hearing no further comment, I make a motion to close the hearing. TRUSTEE KRUPSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . . TRUSTEE SEPENOSKI : I make a motion to approve this application with the new plans submitted this evening, July 15th, 2026, depicting the addition of a three-foot wide vegetated non-turf buffer and a 13-foot wide sand area seaward of that buffer. The addition of the buffer and the retreat of the structure further landward, taking it almost out of Trustee jurisdiction, satisfies the concerns of the LWRP, bringing it into consistency. I make a motion to approve the application with the addition of six native trees, two to three-inch caliper, four of which will be the Eastern Red Cedars. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . MS. RUMMEL: Thank you. TRUSTEE GILLOOLY: Number 7, En-Consultants on behalf of ELIZABETH GARDNER requests a Wetland Permit to construct onto existing 1, 424sq. ft. Single-family dwelling a cantilevered second-floor addition with a 1'x19' overhang over approximately 496sq. ft. Portion of existing first floor to remain, and a 41x8 ' balcony; in place of existing entry steps construct a 40sq. ft. Covered entry porch addition with steps; reconnect renovated roof to existing stormwater drywell; and to maintain the existing 10' wide non-turf buffer along the landward edge of the bulkhead. Located: 1665 Shore Drive, Greenport. SCTM# 1000-47-2-30. The Trustees most recently visited the site and noted to add a five-foot vegetated buffer on the 8th of July. The LWRP reviewed this application and found it to be Board of Trustees 34 July 15, 2026 consistent. Is there anyone here wishing to speak regarding this application? MR. HERRMANN: Yes. Rob Herrmann of En-Consultants, on behalf of the applicant. It' s a straightforward project with a second-floor addition. There is an existing IA sanitary system to accommodate that. There is an existing non-turf buffer, but in the field, as you just mentioned, there was discussion of adding a proposed five-foot vegetated non-turf buffer, which more or less is established already, but this would make that permanent and memorialize it, landward of that approximately 1.3-foot high masonry landscape wall. And so to that end we have revised plans from Mark Schwartz, architect, dated July 14th, 2026, and I'll hand up three copies of that now. TRUSTEE GILLOOLY: Thank you. Is there anyone else here wishing to speak regarding this application? (No response) . MR. HERRMANN: I should also note that we did add that landscape wall for reference and the stairs that were missing from the original plans. So those features as they relate to that buffer are now shown on the site plan. And I can give Elizabeth a revised project description to reflect that. TRUSTEE GILLOOLY: All right, we just reviewed the plan that we just received. It reflects the vegetated non-buffer as requested. Is there anyone else who would like to make any comments from the Board? (No response) . Hearing none, I make a motion to close the hearing. TRUSTEE SEPENOSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GILLOOLY: I make a motion to approve this application with the new plans received July 15th, 2026. TRUSTEE KRUPSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE FINORA: Number 8, En-Consultants on behalf of PATRICIA BOGEN REVOCABLE TRUST requests a Wetland Permit to demolish and remove existing two-story dwelling with waterside deck and covered porch, accessory garage, shed and brick oven; existing 18 'x36' swimming pool and .722sq. ft. Brick pool patio to remain; construct a new 1, 353sq.ft. Two-story, single-family dwelling with attached garage and a covered porch; a 379sq.ft. Free-standing (structurally independent) waterside deck with steps; a 322sq. ft. Grade-level permeable patio; install a permeable gravel walkway in place of existing brick walk; Board of Trustees 35 July 15, 2026 replace existing septic system with an I/A OWTS sanitary system landward of dwelling; install a stormwater drainage system including a pool drywell; and to establish and perpetually maintain a 15' wide vegetated non-turf buffer area along the landward edge of the wetland boundary. Located: 375 Old Wood Path, Southold. SCTM# 1000-87-1-3.3 The Trustees conducted a site inspection on July 8th requesting the establishment of a non-disturbance area seaward of the berm; ten-foot non-turf buffer landward of the non-disturbance, laterally across the property, through area of existing shed. The LWRP found this to be consistent. I am looking at plans that depict those changes that were requested in the field showing a non-disturbance area located seaward of the existing berm and following the wetland line. Is there anyone here wishing to speak on behalf of this application? MR. HERRMANN: Yes. Rob Herrmann of En-Consultants on behalf of the applicant, on behest of the applicant. Pat Bogen is also here, with her husband, and the design team, Lisa Murray is here. This is, as I presented in the field, a good application, it' s a coastal retreat application. The house and majority of the structures are being pushed away from the nearest point of the wetlands, which angle up on the neighboring property. The sanitary waste will be treated with an upgraded IA sanitary system. Runoff will be treated with a new stormwater drainage system. And as Joe just referenced, we have submitted a revised site plan that shows two buffer areas, and the first closest to the house is a ten-foot wide vegetated non-turf buffer that is measured off the seaward toe of the berm, that is also been added to the survey and site plan. And then the entire area seaward of that vegetated non-turf buffer between the buffer and the wetland is additionally labeled to remain as a non-disturbance buffer. So I believe those buffers ,designations should align with the Board' s request, and you'll notice that the way that vegetated non-turf runs linearly across the property, that will actually occupy half of the footprint of where that existing shed is now, and is slated to be removed. So the one part of the project that is closest to the wetland is actually a removal, and so the Board will be finding a vegetated non-turf buffer going in place of half the footprint of where that shed was. I think that' s all I have. If the Board has any questions, I'm happy to answer them. TRUSTEE FINORA: Thank you. Any questions from the Board? TRUSTEE KRUPSKI: I don't remember if it had come up in the field or not, but it might make sense to add a few trees in there with the vegetation. It's a pretty treed area and there' s not, I Board of Trustees 36 July 15, 2026 don't think, a native on the site. MR. HERRMANN: Particularly where that shed is now, because there are actually some trees in that corner of the property already, so we could, if that' s -- Patricia is nodding yes. TRUSTEE KRUPSKI: Great. MR. HERRMANN: So if you want to note as a condition a minimum of three trees within that. We wouldn't put it in the non-disturbance, correct? It would be within the vegetated buffer. TRUSTEE KRUPSKI: Yes. Or outside of the vegetated buffer, whatever works. I'm pretty open in my opinion on that. MR. HERRMANN: Sure, .okay. . That sounds agreeable. Sounds good. TRUSTEE FINORA: Hearing no other comments, questions, I make a motion to close this hearing. TRUSTEE KRUPSKI: Second TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE FINORA: I make a motion to approve this application, noting conformity with the July 15th drawings set, indicating the change in modification to the buffers as we described, and also adding the condition of the additional three native hardwood trees to be included, which are not depicted on these plans at present. TRUSTEE KRUPSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GOLDSMITH: Number 9, En-Consultants on behalf of JOHN M. MILLER LIFETIME QTIP TRUST requests a Wetland Permit to construct a dock attached to bulkhead consisting of a 3'xl4 ' hinged ramp to a 6'x20' floating dock secured by two 10" diameter piles situated in an "L" configuration; construct a 161x33' swimming pool (southwest corner to be elevated up to 18" above existing grade) ; remove portion of existing stone patio as needed and install 6' wide paver stones; construct a 596sq. ft. Masonry pool patio; and install a pool drywell and pool enclosure fencing. Located: 1132 Bridge Lane, Cutchogue. SCTM# 1000-118-1-18. 4 The Trustees conducted a field inspection July 8th, notes need to see pool equipment location; ten-foot wide non-turf buffer to be shown on plans; dock and pool acceptable. The LWRP found it to be inconsistent. The inconsistency is the proposed pool is inconsistent with Policy 6.3 (a) , because it does not comply with Town Code Chapter 275.3 (d) (1) (a) (5) , that states the setback at the top of the bank slope for a swimming pool and related structures is 16 feet. Is there anyone here wishing to speak regarding this application? MR. HERRMANN: Yes, Rob Herrmann, of En-Consultants. This is a straightforward application. There is a proposed Board of Trustees 37 July 15, 2026 dock that consists of a hinged ramp off the existing bulkhead with a floating dock. And then a swimming pool and patio with a minimum setback from the wetlands associated with Wunneweta Pond of 78 eight feet. Regarding the LWRP review, I think there is, I doubt they get a chance to go out to these properties, but there is no bank here, it is a basically rolling lawn between the bulkhead and the house, as the Board .saw. There is perhaps a slight embankment on the south side of Bridge Lane, but the pool is, the 60-foot setback from the pool in that direction ends up in the middle of Bridge Lane. So if that small, steeper incline on the south side of Bridge Lane were considered to be a top of bank, a pool and patio do conform, they exceed that setback. The Board had discussed in the field the addition of buffer areas on the Wunneweta pond side. I did just hand up to Elizabeth a revised site plan, survey site plan last dated July 12th. We showed two different non-turf buffer areas, a traditional ten-foot wide non-turf buffer landward of the bulkhead, and a ten-foot wide vegetated non-turf buffer adjacent to the wetland boundary in the area of the existing lawn just to the east of the bulkhead as we had discussed in the field. So hopefully that does satisfy the conditions we talked about. Oh, and the pool equipment, we added to the north, off the north corner of the house, just outside wetlands jurisdiction and showing that pool equipment to be screened with evergreens on both sides facing the water and facing the neighbor. TRUSTEE GOLDSMITH: So, yes, we do have that, and new plans were submitted. Mr. Herrmann, just one quick question. On the plans you submitted you have one area that says "sand, " which as we know is supposed to be just a non-turf buffer, because it' s acting as a non-turf buffer. MR. HERRMANN: Right. TRUSTEE GOLDSMITH: So we'd probably look for new plans to depict that as a non-turf buffer, not just "sand. MR. HERRMANN: Okay. TRUSTEE GOLDSMITH: And while you are updating the plans, the proposed ten-foot wide vegetated non-turf buffer, and then the other proposed ten-foot wide non-turf buffer, it seems as if between those two areas, there is nothing. So is there a way that you could— MR. HERRMANN: Sort of tie them in together? TRUSTEE GOLDSMITH: Yes, sir. MR. HERRMANN: Yes. And so the sand was just, that was shown on the survey originally, and we got very focused on the area we were establishing and I just, I apologize, I didn't even think to ask Ken to extend that over. And I assume you'll want to see sort of like a similar Board of Trustees 38 July 15, 2026 tie-in on that side, it's a continuous -- TRUSTEE GOLDSMITH: Yes. MR. HERRMANN: Yes. That's fine. That's my bad. TRUSTEE GOLDSMITH: Is there anyone else here wishing to speak regarding this application? (No response) . Any other questions or comments from the Board? (No response) . Hearing none, I make a motion to close this hearing. TRUSTEE GILLOOLY: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . TRUSTEE GOLDSMITH: I make a motion to approve this application with the condition of new plans depicting the non-turf buffer continuous along that bulkhead, and noting that in the field we found this was not a bank, therefore it brings it into consistency with the LWRP. TRUSTEE SEPENOSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . MR. HERRMANN: Thank you. TRUSTEE KRU.PSKI: Number 10, En-Consultants on behalf of DANIELLE & JOSEPH MONACO III requests a Wetland Permit to construct approximately 60 linear feet of vinyl bulkhead in place of existing timber bulkhead; construct a 12. linear foot long vinyl return along easterly property line in place of existing return; backfill with approximately 15 cubic yards of clean sandy fill to be trucked in from an approved upland source; remove and replace in-place existing ±51x5.5' cantilevered wood landing and 31x6' steps to beach; remove and replace in-place a 3'x±10' section of existing .3'x±22' masonry walkway; and to maintain the existing 7 ' wide non-turf buffer along the landward edge of the bulkhead. Located: 3775 Camp Mineola Road, Mattituck. SCTM# 1000-123-5-33 The Trustees most recently visited the property on the 8th of July, noted it was a straightforward replacement of an existing bulkhead. And the LWRP coordinator found this to be consistent. Is there anyone here wishing to speak regarding this application? MR. HERRMANN: Yes, Rob Herrmann, on behalf of the applicant. It is a straightforward, in-place bulkhead replacement, and we noted the existing seven-foot non-turf buffer to be memorialized, that is consistent, as we noted in the field, that same buffer that extends along the shoreline. So we would anticipate that that would be the subject of a covenant requirement. So other than that, it' s about as straightforward as it gets. TRUSTEE KRUPSKI: Thank you. Is there anyone else wishing to Board of Trustees 39 July 15, 2026 speak regarding this application, or any comments from the Board? (No response) . TRUSTEE KRUPSKI: Hearing none, I make a motion to close the hearing. TRUSTEE GOLDSMITH: Second. All in favor? (ALL AYES) . TRUSTEE KRUPSKI: I make a motion to approve this application as submitted. TRUSTEE GOLDSMITH: Second. All in favor? (ALL AYES) . MR. HERRMANN: Thank you. TRUSTEE GOLDSMITH: I make a motion for adjournment. TRUSTEE KRUPSKI: Second. TRUSTEE GOLDSMITH: All in favor? (ALL AYES) . Resp ctfully submitted by, Glenn Goldsmith, President Board of Trustees