HomeMy WebLinkAboutStormwater Pollution Prevention Plan - Indian Neck Stand. Sub. u STOR WATER POLLUTION PREVENTION PLAN FOR CONSTRUCTION ACTIVITIES for Indian Neck Preserve 5 Lot Subdivision 3375 Indian Neck Lane Peconic,NY 11958 OF NEB TOL Prepared On: � July 30,2026 Prepared For: 3375 Indian Neck LLC 1 A PO Box 783 Mattituck,NY 11952 Prepared By: Aft t IS ENGINEERING PLLC 200 Broadhollow Road,Suite 207,Melville,NY 11747 - ALS Project No.:26001 " S ENGINEERING PLLC Contents Appendices Section 1 -Introduction Appendix A — Figures and Maps Objective............ ..........__..................3 Appendix B — Erosion Control Plan Notice of Intent....-........... ......3 Appendix C — eNO1,Owner/Operator&Preparer Certifications SWPPP Field Book...........................................3 Appendix D — Contractor Certifications Participant Contact Information.....................3 Appendix E — MS4 Acceptance Letter General Project Description............................3 Appendix F — Erosion and Sediment Control Details Appendix G — Sample Inspection Report/SWPPP Amendment Form Section 2—Site Conditions Appendix H — SPDES 2025 General Permit GP-0-25-001 Site Location....................................................4 Site Description...............................................4 Soils..................................................................4 Topography......................................................5 Historic Places.................................................5 Surface Waters................................................5 Environmental Resource Mapper...................5 Climate Change...............................................5 Section 3—Project Information Project Description..........................................6 Construction Sequencing................................6 Section 4—Erosion&Sediment Control Measures Overview..........................................................7 Temporary Measures.......................................7 Permanent Measures......................................8 Section 5—Pollution Prevention Measures Pollution Prevention Measures.......................8 Section 6—Inspections&Record Keeping Contractor Requirements.,.............................9 Qualified Inspector Requirements..................10 Notice of Termination......................................10 Record Retention.............................................10 Indian Neck Preserve /ALS 26001 Page 2 of 10 July 2026 ^IS ENGINEERING PLLC SECTION 1 - INTRODUCTION Objective As required by the Town of Southold and the New York State Department of Environmental Conservation(NYSDEC),this report was prepared to outline the stormwater pollution prevention measures as well as the responsibilities of all parties involved in the construction of this project in accordance with the SPDES General Permit for Stormwater Discharges(Permit No.GP-0-25-001. A copy of the General Permit is located in Appendix H of this report for reference. Notice of Intent Prior to the start of construction,the property Owner or Operator must submit an electronic Notice of Intent(eNOI)to the NYSDEC in order to obtain a Letter of Acknowledgement(LOA)and discharge stormwater under the SPDES General Permit for Stormwater Discharges. A copy of the eNOI with Owner and Preparer Certifications are included in Appendix C. SWPPP Field Book Upon receipt of the Letter of Acknowledgement and prior to commencement of construction activities,the Owner or Operator must maintain a copy of all relevant documentation at the construction site as specified in Parts I.E.3 and 4 of the General Permit.The Owner/Operator must maintain these documents in a secure location such as a job trailer or mailbox with Lock. fici. alit t .+r I f�.r_.>pn i n Owner/Applicant: 3375 Indian Neck LLC PO Box 783 Mattituck,NY 11952 (631)445-4348 SWPPP Preparer: ALS Engineering PLLC 200 Broadhollow Road,Suite 207 Melville,NY 11747 (631)759-0167 AndrewStolzenberg,P.E. Operator/Contractor: TBD f"er ryIL,P The proposed project includes the construction of a 5 lot single family residential subdivision with associated site improvements including driveways,grading, drainage,and connection to public utilities.A large portion of the site will be preserved as open space. As indicated in Table 1 of Appendix B of the Construction General Permit(CGP),this project is categorized as a "Single-family residential subdivision with 25916 or less impervious cover at total site build-out and not located in one of the watersheds listed in Appendix C and not directly discharging to one of the 303(d)segments listed in Appendix D"and disturbing between 1 and 5 acres of land.Therefore,this project requires the preparation of a SWPPP including only the erosion and sediment control component. Indian Neck Preserve /ALS 26001 Page 3 of 10 July 2026 a[S ENGINEERING PLLC SECTION 2 - SITE CONDITIONS Site Location Site Address: 3375 Indian Neck Lane, Peconic, NY 11958 Tax Map No.: 1000—98—1 —1.3 Site[ rip.tio The subject property is 649,231 sf(14.904 acres),zoned `R-80', located on the northwest corner of Indian Neck Lane and Indian Neck Road.The property is bordered by residential properties.A location map and aerial are provided in Appendix A for reference. The subject property is improved with a single family dwelling and accessory barn structures.The property also contains wetlands and an area of golf course. The following table outlines the approximate land uses for the subject property in the existing condition: Coverage Area(SF) Area(Ac) Building/Pavement 6,534 0.15 _._._. .. ........ .... Woods/Landscape 603,169 13.85 Wetland 39,528 0.91 Total Impervious 6,534 0.15 Total Woods/Landscape 603,169 _ 13.85 Total Wetland 39.."_528 0.91 Total Property 649,231 14.9 Based on the Land coverages above,the existing impervious area of the project area is 1.0% In accordance with the requirements of this Stormwater Pollution Prevention Plan(SWPPP),a plan detailing the contractor's requirements for sediment and erosion control throughout construction has been prepared by ALS Engineering PLLC(Refer to the Erosion Control Plan in Appendix B). Soils As shown in Figure 4 of Appendix A,the USDA Soil Survey classifies the soil on the subject property as: + HaA—Haven Loam,0 to 2 percent slopes,with a Hydrologic Soil Group rating of B • HaB—Haven loam,2 to 6 percent slopes,with a Hydrologic Soil Group rating of B Based on the test hole taken on the property,the subsoil of the property generally consists of 1'dark brown loam, underlain by 1' brown silt, underlain by 2'brown silty sand, underlain by 13' pale brown fine sand.Water was encountered at a depth of 15.7'. Based on the above,the subsoil appears adequate for infiltration practices assuming infiltration practices are installed within suitable draining subsoil. Indian Neck Preserve /ALS 26001 Page 4 of 10 July 2026 ""IS ENGINEERING PLLC Topography The topography of the site is relatively flat with steeper slopes along the wetland and within the graded golf areas. Stormwater generated over the property generally flows towards the wetland or to low areas within the golf course area. H t rjc Places Based on the online map from the New York State Historic Preservation Office(SHPO)Cultural Resources information System (CRIS),the subject property is located within an archaeological buffer area.According to the Map,the construction activity is not located on or immediately adjacent to a property listed or determined to be eligible for listing on the National or State Registers of Historic Places and that there is no new permanent building on the proposed construction site that is within 20'of a building, structure or object that is more than 50 years old. A copy of the Map is provided in Appendix A as Figure 5. Surface Waters There are wetlands located on the subject property as shown on the Federal Wetlands Mapper provided as Figure 6 of Appendix A. Per the FEMA map provided in Appendix A as Figure 3,a portion of the site falls within a flood zone. No work is proposed within the flood zone. .rlvir rlr :r�tsu.�..l es.cl Nce Mapper According to the NYSDEC environmental resource mapper included as Figure 7 of Appendix A,the property is located within an area that may contain rare plants or animals. Per the mapper,the subject location is in the vicinity of Bats Listed as endangered or threatened and Plants listed as endangered,threatened or rare. As the subject location is in the vicinity of Bats Listed as endangered or threatened,clearing and tree cutting within the property will be based on NYSDEC guidelines and limited to the designated tree clearing window between December 1 and February 28 for Suffolk County. lfrM°ilate C- ..ange Physical risks due to future climate change include increasing temperature,increasing precipitation,increasing variability in precipitation, increasing frequency and severity of flooding, rising sea level, increasing storm surge and shifting ecology. As wetlands are located on the subject property,the proposed lots and development have been intentionally sited away from the wetlands to provide a large area of open space to serve as a buffer between the wetlands and proposed lots. In order to decrease impervious area and the subsequent increase in stormwater runoff,the proposed lots will all take access from the existing roadways eliminating the need for the addition of impervious area associated with new roads and longer driveways. Based on the test hole,the site contains subsoil adequate for infiltration.Stormwater management systems will be provided for proposed buildings in order to reduce potential runoff.All of the above will serve to minimize the potential effects of future climate change including increase of precipitation,rising sea level,storm surges and changing ecology. Indian Neck Preserve /ALS 26001 Page 5 of 10 July 2026 ^LS ENGINEERING PLLC SECTION 3 - PROJECT INFORMATION As indicated previously,the proposed project includes the construction of a 3 lot single family residential subdivision with associated site improvements. The following table outlines the land uses for the property in the proposed condition: Coverage Area(SF) Area(Ac) Buildings/Pavement 28,314 0.65 Landscape/Wooded 581,389 13.35 Wetland 39,528 0.91 ....._............._..._._.._...� Total Impervious 28,314 0.65 Total Landscape/Wooded 581,389 13.35 Total Wetland 39,528 0.91 Total Site 649,231 14.9 Based on the land coverages above,the proposed impervious area of the project area is 4.4% The overall area of disturbance for the project is approximately4.0 acres. Construction will be performed in 1 phase with the soil disturbance limit as depicted on the project Erosion Control Plan.General sequencing of construction activities will be as follows: • Installation of erosion control measures(perimeter silt fence,off-site inlet protection,construction entrance). • Clearing and grubbing of on-site disturbance areas. • Rough grading of the proposed pavement and building areas. • Installation of drainage structures and utility services. • Installation of remaining erosion control measures(inlet protection). • Construction of building(s) • Final grading. • Paving of the driveways. • Seeding and installation of landscaping. • Final removal of the erosion control measures. The phasing described above is to be considered general.Actual construction phasing and timelines are to be determined by the contractor at the time of construction. Erosion control measures are to be installed as their need becomes appropriate. For example,the construction entrance is to be installed at the beginning of construction; while inlet protection is to be installed as the stormwater inlets are installed. Indian Neck Preserve /ALS 26001 Page 6 of 10 July 2026 + S ENGINEERING PLLC SECTION 4 - Erosion & Sediment Control Measures Overview During the course of soil disturbing activities,the potential for erosion and sedimentation must be controlled through the implementation of erosion and sediment control measures as outlined on the Erosion Control Plan included in Appendix B and in accordance with the Latest version of the New York State Standards and Specifications for Erosion and Sediment Control(See details in Appendix F). The contractor shall be responsible for implementing and maintaining the erosion and sediment control measures. The Owner or Operator is responsible for keeping the SWPPP current so that the SWPPP accurately represents the erosion and sediment control measures being used on the project site. A SWPPP Amendment Form is included in Appendix G. Erosion and sediment control measures are classified as either temporary measures or permanent measures. Temporary measures are to be used during construction. Permanent measures are to be utilized after the completion of construction. Silt Fence: Prior to any soil disturbing activities,silt fence is to be installed around the project Limit of disturbance as depicted on the Erosion Control Plan and remain in place until final stabilization.The silt fence is to be cleaned, repaired and replaced as necessary.Sediment is to be removed from behind the fence when accumulation is 1/3 of the original fence height and the silt fence should be replaced when bulges develop in the silt fence. Co,.nstruct on.Entrance:.The stabilized construction entrance is to be placed where construction vehicles enter and exit the site and is to remain until final stabilization.The construction entrance shall be maintained to prevent tracking of sediment onto adjoining roadways.Additional aggregate shall be added and vehicle tires shall be washed as necessary to prevent tracking.Any tracking of sediment shall be cleaned immediately and must not drain into stormwater structures,swales, etc. D.a,5,tC.Q.ntrci.A..Dust Control is to be implemented with the use of vegetative cover or water as necessary to minimize transport of sediment when soil is exposed. L,n,L,€ ;.,,Pr„o„t,ed,on: Inlet protection is to be placed on existing and proposed drainage inlets to prevent sediment from entering storm drains. Prior to soil disturbing activities, inlet protection is to be placed on existing inlets.After new structures are installed, inlet protection is to be placed on new inlets as depicted on the Erosion Control Plan. Inlet filter bags shall be emptied when accumulation reaches 50%. Inlet protection shall be cleaned, repaired and replaced as necessary to prevent sediment from entering storm drains. Concrete_WaShu.�+ut»,A temporary lined washout area shall be provided where concrete trucks and equipment can be washed.The washout shall be installed and Located as depicted on the Erosion Control Plan. Concrete washout facilities shall be inspected daily and any damaged facilities shall be repaired or replaced immediately ernporery. 1aWlJ fpoR Temporary stabilization of disturbed areas may be accomplished by mulching,seed and/or erosion control mats in accordance with the New York State Standards and Specifications for Erosion and Sediment Control. Indian Neck Preserve /ALS 26001 Page 7 of 10 July 2026 atS ENGINEERING PLLC Perm,anen measures $to rrnweter,ma,wogome,a1 ys The proposed stormwater management system will consist of precast concrete drywells which will serve to control runoff and minimize potential for erosion post construction. Land Grading—Land grading will be implemented throughout the site to safely convey surface runoff to the proposed stormwater management system. Land grading will occur in accordance with the project Grading Plan. Landscaping—In areas not proposed as impervious surface, Landscaping will be installed to prevent erosion and minimize stormwater runoff. SECTION 5 - Pollution Prevention Measures The following good housekeeping and material management practices shall be utilized on-site during the construction of this project to reduce the risk of spills or other accidental exposure of materials and substances such as pesticides,fertilizer, plaster, cleaning solvents,concrete,adhesives, paint,curing compounds,oil and fuel to stormwater runoff. 'W"w t„a tamlats:All waste materials including packaging, pallets, discarded materials,etc.will be collected and disposed of into a metal trash dumpster in an area designated for the storage of materials.The dumpster will have a secure,watertight lid, be placed away from stormwater conveyances and drains,and meet all federal,state and municipal regulations.Only trash and construction debris from the site will be deposited in the dumpster. No construction materials will be buried on-site.All personnel will be instructed regarding the correct disposal of trash and construction debris. Notices that state these practices will be posted in the office trailer and the individual who manages day-to-day site operation will be responsible for ensuring that these practices are followed. ,, '0raga:The permittee must comply with the prohibition of discharges other than stormwater that includes the washout and cleanout of stucco, paint,concrete,form release oils,curing compounds and other construction materials.The permittee must provide effective containment for all liquid and solid wastes generated by washout operations and provide an effective means to eliminate the discharge of these wastes to the site or receiving waters.All construction materials with potential to contaminate stormwater such as paints, building materials, building products, landscape materials,fertilizers,etc. shall be stored to minimize exposure to direct precipitation and runoff. Hazardous Waste Materilals:All hazardous waste materials such as oil filters, petroleum products, paint and equipment maintenance fluids will be stored in a structurally sound and sealed shipping container within an area designated for the storage of hazardous material. Hazardous waste materials will be stored in appropriate and clearly marked containers on pallets and segregated from other non-waste materials.Secondary containment will be provided for all waste materials in the hazardous materials area and will consist of commercially available spill pallets.Additionally, all hazardous waste materials will not be disposed of into on-site dumpsters.All personnel will be instructed regarding proper procedures for hazardous waste disposal. Notices that state these practices will be posted in the office trailer and the individual who manages day-to-day site operation will be responsible for ensuring that these practices are followed. Sanitary Waste:Temporary sanitary facilities(portable toilets)will be provided at the site throughout construction.. Portable toilets will be located away from concentrated flow paths and traffic flow and will have collection pans underneath as secondary containment. . hlcl 1. �u$pgl ant Fu.a4rPg . ,.J"lagn rice:Several types of vehicles and equipment will be used on-site throughout the project, including graders,scrapers,excavators, loaders, paving equipment, rollers and backhoes.All major equipment/vehicle fueling and maintenance will be performed off-site.When vehicle fueling must occur on- Indian Neck Preserve /ALS 26001 Page 8 of 10 July 2026 AAS ENGINEERING PLLC site,the fueling activity will occur in the staging area. Only minor equipment maintenance will occur on-site.All equipment fluids generated from maintenance activities will be disposed of into designated drums stored on spill pallets.Absorbent,spill-cleanup materials and spill kits will be available at the staging area. Drip pans will be placed under all equipment receiving maintenance and equipment parked overnight.Any washing of equipment with soaps, detergents and/or solvents is prohibited. jrl_ Vhj. fp: ;The contractor shall be responsible for maintaining control of construction generated debris and litter. On-site dumpsters will be used to manage construction and demolition debris. The dumpsters shall be emptied as necessary when they are full. The contractor will inspect the site for sources of debris and litter and ensure that it is disposed of properly. oni.Jc.al 'n,1,G_, l rgl_rr The contractor is responsible for providing a spill control plan to account for any chemical spill that may take place as a result of the proposed project.The plan shall include but not be limited to material storage practices,spill prevention methods, response and cleanup measures,etc. The contractor's plan shall at a minimum comply with all location regulations regarding the removal and disposal of toxic and hazardous waste including but not limited to chemical spills and sanitary sewer and septic materials encountered during construction. SECTION 6 - Inspections & Record Keeping Prior to the commencement of construction activity,the owner or operator must identify the contractor(s)and subcontractor(s)that will be responsible for installing, constructing, repairing, replacing, inspecting, and maintaining the erosion and sediment control practices included in the SWPPP and the contractor(s)and subcontractor(s)that will be responsible for constructing the SMPs included in the SWPPP.The owner or operator must have each of the contractors and subcontractors identify at least one person from their company to be the trained contractor that will be responsible for implementation of the SWPPP.The owner or operator must ensure that at least one trained contractor is on site daily when soil disturbance activities are being performed. Each trained contractor must sign the required certification statement.The signed contractor certification(s)are included in Appendix D. The trained contractor must inspect the erosion and sediment control practices and pollution prevention measures being implemented within the active work area daily to ensure that they are being maintained in effective operating condition at all times. If deficiencies are identified,the contractor must: a.if the corrective action does not require engineering design: i.begin implementing corrective actions within one business day;and ii.complete the corrective actions within five business days;or b.if the corrective action requires engineering design: i.begin the engineering design process within five business days;an ii.complete the corrective action in a reasonable time frame but no later than within 60 calendar days. A sample inspection report is provided in Appendix G. Indian Neck Preserve /ALS 26001 Page 9 of 10 July 2026 atS ENGINEERING PLLC Queiified..iim .aeclor.Rec uIr-e- l r t The scope of this project constitutes a construction activity that does not require site inspections by a qualified inspector as outlined in section IV.C.1.b. When the project has reached total project completion as defined by Part V.A.1 of the General Permit,the Owner/Operator must terminate permit coverage by preparing and submitting the electronic Notice of Termination (eNOT). For construction activities that require inspections by a qualified inspector,the qualified inspector must perform a final site inspection prior to submitting the eNOT.The qualified inspector must certify that all requirements in Part V.A.1.a or b of the General Permit have been achieved by signing the"Final Stabilization"and"Post-Construction Stormwater Management Practice(s)"certification statements on the eNOT. For construction activities that are subject to the review authority of Traditional Land Use Control MS4,the owner or operator must have the Traditional Land Use Control MS4 sign the"MS4 Acceptance"statement on the eNOT. After the eNOT is submitted,an owner or operator's coverage is terminated as of the termination date indicated in the Letter of Termination (LOT),which is sent by the NYSDEC after a complete eNOT is submitted. Record,.Rete.nti.on After the LOT is issued,the Owner/Operator must retain a copy of all documents specified in Part I.E.3 of the General Permit for at least 5 years from the date of termination. Indian Neck Preserve /ALS 26001 Page 10 of 10 July 2026 ^LS ENGINEERING PLLC Appendix A Figures & Maps Indian Neck Preserve/ALS 26001 i i as y,�rm�^`uina9 10 CC d Q i CA 1 f a v r 0 m > U) a� a` Y U U7 Z N c o cp N "O � 7 �a d� 0 0 cm N J Q N O7 y N Y U N Z N C o cB N a C 7 .ti qq a p E a 9 sa32 aRs ni sT z ° B gIdl ji fb aee E3 3 c�i3a37� �£ o a 9E '1 � 1 5 ! B m � 3 a M n o e" N w C a ff��Wrr 2 "O Or �1� w�kk.WJb W Q p W D.' O i CO M T �I b _ O ILLL O O LL >+ co _z JLL 'o � o Na (a 2 C 0 O LL s IR to J O V N cc N o Z � O d Y U N ID Z N C O cp N "O C 7 c OSaTS,SY 007549V �LSV94 OOISOsb 0909" 0009KV 098"90 N M AS 92 aL N ° a a` 2 ea 7 i Tn N ° n u1 o a� d ° s €� Z cd 5 x a d q 8" it 0 0 0 y N Z V J r a) M.a a oU i =9b9M' QQ 0)O 0) a U 0) Z N C �p N T C 7 nM;' tUo c ION' co 1 x r � a • �.. I to Q y��aN4�ron� , Fly u 2 U L O 7 Y Y In > c m 0 a L E °u v i o o o g Oo = c — s v — (D— m N ;Ba O 0 0 rn N CL N Y U O7 Z N c o � N T C 7 pmm � E qgg u m `m$afi e .as �3 LO s, c pa I- x •o cd M '- Ch o ^o 0 0 Ma 3 b 3 w m E `o o 0 w LL a eio O a m w ;+ m to m �;, � ��/ 3 3 3 O % _ _ _ > 9 We s r_ LL LL LL M N a m m m e0 c c O RI ccaa m Z o c c o (D O > > U) N N J 9 w w Q c C a7 m al 3 a L) U N Z N C b ca N LE T C 7 v r9P..�• m� A U E �o � CL 9 �U C A E� u a E L o C o; a C ; s C 0 y > C ' W U 13 ! Z L � C Q� t 1 A ► L O d c E E o J d L m ° d £ � 3 9 0 O D9 O O ❑a ❑ 3 z" F- z u co NJ Z N c o cB N T C 7 aLS ENGINEERING PLLC Appendix B Erosion Control Plan Indian Neck Preserve/ALS 26001 w w o z z W Q J � M z u, c., :5 �v o z o�5r z z 9s gg1rl' Z Z o �S§low H1 ��€a€¢��� [ s �r4 §��� � � m" ° xx 95ryrg� y 6 SI a � s � �� 7 i..„o 4 e ill U All t- :i �rt ..- w �ga S I"1 fi'00'E 56097 Ip` 17�r a7 MA m w r h ,c o s �, � ,�" .�� + � �k�mP !„; le°•i W'� gyaE ��� "�, Iq to°a�8 0 'TN Q' pill g� 4��°ads g terra §A pproe & nil .r^....... ^.- f and 3 01 m �4 � • ,`'�»..� ',� �d ��� � o-` dam ,�� ��w :: x �� ��$� qg i � F �ds qq OWN ? 4S,sy z . �a e aS ENGINEERING PLLC Appendix C eNOi, Owner & Preparer Certifications Indian Neck Preserve/ALS 26001 NE Department of N;ST°Ar Environmental Conservation Owner/Operator Certification Fora SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP) (In accordance with CGP Part I.D.2.b. or Part I.F.2. and 3., the completed form must be attached to the eNOI or the Request to Continue Coverage, and submitted to NYSDEC electronically. Project/Site Name: Indian Neck Preserve eNO1 Submission ID: HQP-YPJ 1 -M6V4C eNO1 Submitted by: Owner/Operator R SWPPP Preparer El Other ,,Pertification Statement - Owner/Operator I hereby certify that I read, and will comply with, the GP-0-25-001 permit requirements. I understand that authorization to discharge under the permit for the project/site named above is dependent on receipt of a Letter of Authorization (LOA) or a Letter of Continued Coverage (LOCC) from the New York State Department of Environmental Conservation (NYSDEC) in accordance with CGP Part I.D.3.b. or Part I.F.4. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Paul Pawlowski Owner/Operator First Name MI Owner/Operator Last Name Signature 7/10/26 Date Revised:January 2025 !III w Department of RK TOA Environmental Conservation SWPPP Preparer Certification Form SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP) (In accordance with CGP Part I.D.2.b., the completed form must be attached to the eN01 and submitted to NYSDEC electronically.) Project/Site Name: Indian Neck Preserve eNOl Submission ID: �HQP-YPJ1-M6V4C . .........,,..w................. i Owner/Operator Name: �3375 Indian Neck LLC 11 Certification — SWPPP Preparer hereby certify that the Stormwater Pollution Prevention Plan (SWPPP) has been prepared in accordance with the requirements of GP-0-25-001. I certify under penalty of law that the SWPPP and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. m....,................. ..... .... ......... Andrew Stolzenber __...... , a.. _ . SWPPP Preparer First Name MI SWPPP Preparer Last Name " -APOZ7 7/1126 Signature Date Revised:January 2025 7/31/26, 10:30 AM NYSDEC eBusiness Portal System-Construction General Permit(CGP)Electronic Notice of Intent(eNOI)GP-0-25-001.Revision 1 Construction General Permit (CGP) Electronic Notice of Intent (eNOI) GIB"-0-25 001 version 1.18 (Submission#: HQP-YPJ1-M6V4C, version 1) Details Originally Started By Andrew Stolzenberg Alternate Identifier Indian Neck Preserve—Region 1 Submission ID HQP-YPJ1-M6V4C Status Draft Form Input Eligibility Disturbance Threshold 1.Will the construction activity involve soil disturbances listed in Part I.A.1 of GP-0- 25-001? Yes 1.a.Will any runoff from the site enter a sewer system classified as a combined sewer? No 1.b. Is this a remediation project being done under a Department approved work plan (i.e. CERCLA, RCRA,Voluntary Cleanup Agreement, etc.)with a SWPPP which meets the substantive requirements of GP-0-25-001? No 1.c. Is the construction activity related to a stormwater discharge that does not require a permit as described in 40 CFR 122.3(e), e.g. non-point source agriculture or silviculture activities? No - https://nform-prod.dec.ny.gov/app/#/submissionversion/81 cde930-22a5-4b47-a9b3-a2916a37c80b/overview 1/9 7/31/26, 10:30 AM NYSDEC eBusiness Portal System-Construction General Permit(CGP)Electronic Notice of Intent(eNOI)GP-0-25-001. Revision 1 Other SPDES Permits 2.Will the discharge from the construction activity meet all conditions listed in Part I.A.2 of GP-0-25-001? Yes Threatened and Endangered Species 3.Will the construction activity potentially adversely affect a species that is endangered or threatened per Part I.A.3.? No _. (SHPA) State Historic Preservation Act„m„ M.nm_,, ^____ .... ............_............ 4. Is the construction activity designated by the Commissioner of the Office of Parks, Recreation and Historic Preservation (OPRHP), pursuant to 9 NYCRR §§428.12 or 428.13 as exempt from the SHPA review(see Attachment 2 of the Letter of Resolution between NYSDEC and OPRHP, dated January 9, 2015)? No 4.a. Will the construction activity: a) occur within an archeologically sensitive area indicated on the sensitivity map, or b) have the potential to affect a property that is listed or determined to be eligible for listing on the National or State Registers of Historic Places, or c) include a new permanent building on the construction site within the following distances from a building, structure, or object that is more than 50 years old and OPRHP, a Historic Preservation Commission of a Certified Local Government, or a qualified preservation professional has determined is a historically/archeologically significant building, structure, or object: w 1-5 acres of disturbance-20 feet 5-20 acres of disturbance-50 feet 20+acres of disturbance-100 feet? Yes 4.a.i. Have the impacts to historic properties been resolved? No This construction activity is not eligible for coverage under GP-0-25-001. Please see Part I.A.4. of GP-0-25-001. https://nform-prod.dec.ny.gov/app/#/submissionversion/81 cde930-22a5-4b47-a9b3-a2916a37c8Ob/overview 2/9 7/31/26, 10:30 AM NYSDEC eBusiness Portal System-Construction General Permit(CGP)Electronic Notice of Intent(eNOI)GP-0-25-001, Revision 1 The owner/operator must take necessary action to make the construction activity eligible for coverage under GP-0-25-001 in order to submit this eNOI, or seek coverage under an individual SPDES permit. Please contact the NYSDEC Regional Office for your Region if you have any questions. i Review SEAR State Environmental Qual.. !_........... _�� ..... ... ...........,. �.m 5. Is the construction activity subject to SEQR(Part I.A.5.), or the equivalent environmental review from another NYS or federal agency (Part I.A.6.)? Yes 5.a. Has the owner/operator obtained documentation that the project review pursuant to SEAR, or the equivalent, has been satisfied per Part I.A.5. or I.A.6. of G P-0-25-001? NONE PROVIDED Procedures Act(UPA) Permits Uniform Pr -..—...._ .... ............. ................................... .. .................... _m. 6. Has the owner/operator obtained all necessary UPA permits from NYSDEC, or the equivalent from another NYS or federal agency per Part I.A.7.a. of GP-0-25-001? Select"Yes" if no UPA permits, or the equivalent, are required for this construction activity. NONE PROVIDED Steep Slope 7. Is the construction activity within the watershed of surface waters of the State classified as AA or AA-S identified utilizing the Stormwater Interactive Map on NYSDEC's website? No Owner/Operator Information 8. Owner/Operator Name 3375 Indian Neck LLC 9. Owner/O erator Contact Person Information ..... ._................._ First and Last Name Phone E-mail Paul Pawlowski (631)445 4348 paulmpawlowski@gmail.com https://nform-prod.dec,ny.gov/app/#/submissionversion/81 cde930-22a5-4b47-a9b3-a2916a37c80b/overview 3/9 7/31/26, 10:30 AM NYSDEC eBusiness Portal System-Construction General Permit(CGP)Electronic Notice of Intent(eNOI)GP-0-25-001. Revision 1 10. Owner/Operator Mailing Address PO Box 783 Mattituck, NY 11952 USA 11. Is the billing contact different from the Owner/Operator Contact? No 12. What type of organization is the owner/operator? Corporation 12.b. Is the owner/operator registered with the Department of State to do business in New York State? Yes 12.b.i. Department of State ID# 7786586 The Department of State ID can be found using the following link: De rtmen gf State I Division of Corporations Site Information 13. Project/Site Name Indian Neck Preserve 14. Site Address 3375 Indian Neck Lane Peconic, NY 11958 Suffolk DEC Region 1 15. Site Latitude&Longitude 41.02888299360658,-72.45328144152528 Project Details 16. This eNOI submission is for: A construction activity not part of a common plan of development or sale in accordance with Part I.D.1.a. hftps:Hnform-prod.dec.ny.gov/app/#/submissionversion/81 cde930-22a5-4b47-a9b3-a2916a37c80b/overview 4/9 7/31/26, 10:30 AM NYSDEC eBusiness Portal System-Construction General Permit(CGP)Electronic Notice of Intent(eNO1)GP-0-25-001.Revision 1 17. Does the project type fall under Table 1 or Table 2 of Appendix B of GP-0-25-001? If any portion of the construction activity falls under Table 2, regardless of the size of the disturbance, select"Table 2". Table 1 18. Consistent with Part III.B.1.c.i. of GP-0-25-001, provide a concise overview of the project. Describe existing and proposed conditions, and include any other relevant information. 5 Lot subdivision of 14.9 acre parcel to create 5 lots for single family dwellings with 9.3 areas reserved as open space. Enter the total project site acreage, the acreage to be disturbed, and the future impervious area (acreage)within the disturbed area, rounded to the nearest tenth of an acre. 19. Total Site Area (acres) 14.9 20.Total Area to be Disturbed (acres) 4.0 21. Existing Impervious Area to be Disturbed (acres) 0.0 22. Future Impervious Area Within Disturbed Area (acres) 0.5 Nature of the project: New Construction 23. Do you plan to disturb more than 5 acres of soil at any one time? No 24. Indicate the percentage (%)of each Hydrologic Soil Group(HSG)at the site. A(%) 0 B (%) 100 C N 0 D(%) 0 https://nform-prod.dec.ny.gov/app/#/submissionversion/81 cde930-22a5-4b47-a9b3-a2916a37c8Ob/overview 5/9 7/31/26, 10:30 AM NYSDEC eBusiness Portal System-Construction General Permit(CGP)Electronic Notice of Intent(eNOI)GP-0-25-001. Revision 1 25. Enter the planned start and end dates of the disturbance activities. Start Date 12/01/2026 End Date 12/01/2027 26. Identify the nearest surface waterbody(ies)to which construction site runoff will discharge. Richmond Creek, Upper, and tribs- 1701-0043 27. Type of waterbody identified in question 26? Stream/Creek On Site 28. Has the surface waterbody in question 26 been identified as a 303(d)segment in Appendix D of GP-0-25-001? No 29. Is this project located in one of the Watersheds identified in Appendix C of GP-0- 25-001? Yes 30. Will the project disturb soils within a State regulated wetland or the protected 100 foot adjacent area? No 31. Does the site runoff enter a separate storm sewer system (including roadside drains, swales, ditches, culverts, etc)? No 32.Will future use of this site be an agricultural property as defined by the NYS Agriculture and Markets Law? No 33. Is this property owned by a state authority, state agency, federal government or local government? No Required SWPPP Components General SWPPP Requirements 34. Has a SWPPP been developed in conformance with the requirements in Part III„ of GP-0-25-001? Yes hftps://nform-prod.dec.ny.gov/app/#/submissionversion/81 cde930-22a5-4b47-a9b3-a2916a37c80b/overview 6/9 7/31/26, 10:30 AM NYSDEC eBusiness Portal System-Construction General Permit(CGP)Electronic Notice of Intent(eNOI)GP-0-25-001.Revision 1 35. Does the SWPPP demonstrate consideration of the future physical risks due to climate change pursuant to the CRRA, 6 NYCRR Part 490, and associated guidance per Part III.A.2. of GP-0-25-001? Yes 36. Has the required Erosion and Sediment Control component of the SWPPP been developed in conformance with the current NYS Standards and Specifications for Erosion and Sediment Control (aka Blue Book)? Yes SWPPP Preparer 39. The Stormwater Pollution Prevention Plan (SWPPP)was prepared by: Professional Engineer(P.E.) 40. Name of the person who prepared the SWPPP Andrew Stolzenberg 41. SWPPP Preparer Organization Name ALS Engineering PLLC 42. SWPPP Preparer Contact Information First and Last Name Phone E-mail Andrew Stolzenberg 6317590167 andrew@alsengineers.com 43. SWPPP Preparer Address 200 Broadhollow Road, Suite 207 Melville, NY 11747 Download SWPPP Preparer Certification Form Please take the following steps to prepare and upload your preparer certification form; 1) Click on the link below to download a blank certification form 2)The certified SWPPP preparer should sign this form 3) Upload the completed form I wunl ad SWPPP Preparer Certification Form 44. Please upload the SWPPP Preparer Certification cent- preparer signed. df-07/31/2026 10:16 A Comment NONE PROVIDED 44.a. Has the SWPPP Preparer Certification Form been signed by the SWPPP preparer in accordance with Part VII.J of GP-0-25-001? Yes https://nform-prod,dec.ny,gov/app/#/submissionversion/81 cde930-22a5-4b47-a9b3-a2916a37c8Ob/overview 7/9 7/31/26, 10:30 AM NYSDEC eBusiness Portal System-Construction General Permit(CGP)Electronic Notice of Intent(eN01)GP-0-25-001. Revision 1 Erosion & Sediment Control Criteria 45. Has a construction sequence schedule for the planned management practices been prepared? Yes Other Permits 56. Identify other permits, existing and new, that are required for this project/facility. NONE PROVIDED 57. Is this NOI for a change in owner/operator per Part I.G.? No MS4 SWPPP Acceptance 59.Will the construction activities be within the municipal boundary(ies)of Traditional Land Use Control MS4 Operator(s) and discharge to the MS4(s)? Yes 59.a.Which form is required per Part I.D.2.b.ii.? MS4 SWPPP Acceptance Form MS4 SWPPP Acceptance Form Download Download the MS4 SWPPP Acceptance Form from the link below. MS4 SWPPP Acceptance Form 60. MS4 Acceptance or No Jurisdiction Form Upload NONE PROVIDED Comment NONE PROVIDED 60.a. Has the form been signed by the principal executive officer or ranking elected official—or duly authorized representative of that person—in accordance with Part VII.J. and submitted along with this NOI? NONE PROVIDED Owner/Operator Certification Owner/Operator Certification Form Download Download the Owner/Operator Certification Form by clicking the link below. Owner/Operator Certification FoL a https://nform-prod.dec ny.gov/app/#/submissionversion/81 cde930-22a5-4b47-a9b3-a2916a37c80b/overview 8/9 7/31/26, 10:30 AM NYSDEC eBusiness Portal System-Construction General Permit(CGP)Electronic Notice of Intent(eNOI)GP-0-25-001.Revision 1 61. Upload Owner/Operator Certification Form gprt-owner 5,gned.p f-07131/2026 10:1 AAM Comment NONE PROVDED 61.a. Has the Owner/Operator Certification Form from Appendix J been signed by the owner/operator, or a representative of the owner/operator in accordance with Part VII.J of GP-0-25-001 and uploaded to the eNOl? Yes Additional Project Information 62. Enter any additional pertinent project information in the text box below. NONE PROVIDED Attachments Date Attachment Name Context User ..... ... 7/31/2026 10:18 AM cert-owner signed.pdf Attachment Andrew Stolzenberg 7/31/2026 10:18 AM cert-preparer signed.pdf Attachment Andrew Stolzenberg hftps://nform-prod.dec.ny.gov/app/#/submissionversion/81 cde930-22a5-4b47-a9b3-a2916a37c8Ob/overview 9/9 ^ S ENGINEERING PLLC Appendix D Contractor Certification Indian Neck Preserve/ALS 26001 Contractor Certification Project: Indian Neck Preserve The owner/operator shall comply with section III.A.7 of the New York State Department of Environmental Conservation SPDES General Permit for Stormwater Discharges from Construction Activit aP-('1-2.5- 01. Any trained individual identified in the aforementioned section shall identify the aspects of the stormwater pollution prevention plan for which they are responsible and certify the following statements. A separate certification is required for each identified individual. I from am responsible for installing, constructing, repairing, inspecting and maintaining the following aspects of the stormwater pollution prevention plan: 1 All Erosion & Sediment Control Devices 2. 3.. 4. 1 am a trained individual in accordance with the NYS General Permit GP-0-25-001 and certify the following statement: "I hereby certify under penalty of law that I understand and agree to comply with the terms and conditions of the SWPPP and agree to implement any corrective actions identified by the qualified inspector during a site inspection. I also understand that the owner or operator must comply with the terms and conditions of the most current version of the New York State Pollutant Discharge Elimination System ("SPDES") general permit for stormwater discharges from construction activities and that it is unlawful for any person to cause or contribute to a violation of water quality standards. Furthermore, I am aware that there are significant penalties for submitting false information, that I do not believe to be true, including the possibility of fine and imprisonment for knowing violations" Signature: Date, Title: Company: Address: Phone#: atS ENGINEERING PLLC Anpendix MS4 Acceptance Letter Indian Neck Preserve/ALS 26001 Department mein of RK e=�SYTOATE Environmental Conservation MIS4 SWPPP Acceptance Form for construction activities seeking authorization under the SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP) (In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNO1 and submitted to NYSDEC electronically.) I. Project Owner/Operator Information 1. Owner/Operator Name: 3375 Indian Neck LLC 2. Contact Person: Paul Pawlowski 3. Street Address: PO BOX 783 4. City/State/zip: Mattituck / New York / 11952 II. Project Site Information 5. Project/Site Name: Indian Neck Preserve 6. Street Address: 3375 Indian Neck Lane 7. City/State/zip: Peconic / New York / 11958 III. Stormwater Pollution Prevention Plan (SWPPP) Review and Acceptance Information 8. SWPPP Reviewed by: 9. Title/Position: 10. Date Final SWPPP Reviewed and Accepted,- IV. Regulated MS4 Information 11. Name of MS4 Operator: 12. MS4 SPDES Permit Identification Number: NYR20A 13. Street Address: 14. City/State/Zip: 15. Telephone Number: Pagel of 2 MS4 SWPPP Acceptance Form - continued V. Certification Statement-MS4 Official (principal executive officer or ranking elected official) or Duly Authorized Representative I hereby certify that the final Stormwater Pollution Prevention Plan (SWPPP) for the construction project identified in section II. of this form has been reviewed and meets the substantive requirements in the SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP). Note: The MS4 Operator, through the acceptance of the SWPPP, assumes no responsibility for the accuracy and adequacy of the design included in the SWPPP. In addition, review and acceptance of the SWPPP by the MS4 Operator does not relieve the owner/operator or their SWPPP preparer of responsibility or liability for errors or omissions in the plan. Printed Name': Title/Position: Signature. Date: VI.Additional Information ' Printed name of the principal executive officer or ranking elected official for the MS4 Operator or their duly authorized representative in accordance with CGP Part VII.J.2. (NYSDEC - MS4 SWPPP Acceptance Form -January 2025) Page 2 of 2 '%LS ENGINEERING PLLC Appendix F Erosion & Sediment Control Details Indian Neck Preserve/ALS 26001 STANDARD AND SPECIFICATIONS FOR SIFT" FENCE roll down. The area beyond the fence must be undis- turbed or stabilized. 3. The type of silt fence specified for each location on the i plan shall not exceed the maximum slope length and maximum fence length requirements shown in the fol- " lowing table: Slope Len F enceLen14 r pe _...�.�..e paws Standard p ;u, S<2% Ste 50 lss 00/ 00 Reinforced Super er .... 0/0 50:1 to 10:1 125/1000 2.. __- 1 _ /A 2.v� ° 50/2000 300/2500 Definition & Scope 10-20% 10:1 to 5:1 100/750 150/1000 200/1000 . 20-33% ............S I to 3:1 60/500 80/750 100/1000 A temporary barrier of geotextile fabric installed on the 33-50% 3:1 to 2:1 40/250 70/350 1 00/500 contours across a slope used to intercept sediment laden g >50 ....... ........>2:1 20/1.2......... .._...._... -.__ runoff from small drainage areas of disturbed soil y tem- 0%b 5 30/175 50/250 porarily ponding the sediment laden runoff allowing settling ............pm...._._................................... ..................................... to occur.The maximum period of use is limited by the ul- Standard Silt Fence(SF)is fabric rolls stapled to wood- traviolet stability of the fabric(approximately one year). en stakes driven 16 inches in the ground. Reinforced Silt Fence(RSF)is fabric placed against Conditions Where Practice Applies welded wire fabric with anchored steel posts driven 16 inches in the ground. A silt fence may be used subject to the following condi- Super Silt Fence(SSF)is fabric placed against chain tions: link fence as support backing with posts driven 3 feet in the ground. l. Maximum allowable slope length and fence length will not exceed the limits shown in the Design Criteria for 4. Silt fence shall be removed as soon as the disturbed the specific type of silt fence used; and area has achieved final stabilization. 2. Maximum pending depth of 1.5 feet behind the fence; The silt fence shall be installed in accordance with the ap- and propriate details.Where ends of filter cloth come together, they shall be overlapped,folded and stapled to prevent sedi- 3. Erosion would occur in the form of sheet erosion; and ment bypass.Butt joints are not acceptable.A detail of the silt fence shall be shown on the plan. See Figure 5.30 on 4. There is no concentration of water flowing to the barn- page 5.56 for Reinforced Silt Fence as an example of details er; and to be provided. 5. Soil conditions allow for proper keying of fabric, or other anchorage,to prevent blowouts. Criteria for Silt Fence Materials Design Criteria I. Silt Fence Fabric: The fabric shall meet the following 9. Design computations are not required for installations specifications unless otherwise approved by the of 1 month or less.Longer installation periods should appropriate erosion and sediment control plan approval be designed for expected runoff. authority. Such approval shall not constitute statewide acceptance. 2. All silt fences shall be placed as close to the disturbed area as possible,but at least 10 feet from the toe of a slope steeper than 3H:IV,to allow for maintenance and November 2016 Page 5.54 New York State Standards and Specifica- tions For Erosion and Sediment Control ......... Super Silt Fence Minimum Fabric Properties Acceptable Test Method Value Grab Tensile Strength(lbs) 110 ASTM D 4632 -------------- Elongation at Failure 20 ASTM D 4632 ....................... Mullen Burst Strength 300 ASTM D 3786 (PSI) Puncture Strength(lbs) 60 ASTM D 4833 - ................_ ............ ....................... Minimum Trapezoidal 50 ASTM D 4533 Tear Strength(lbs) .................... ....................... Flow Through Rate(gal/ 25 ASTM D 4491 min/sf) .......... Equivalent Opening Size 40-80 US Std Sieve ASTM D 4751 .................................. Minimum UV Residual 70 ASTM D 4355 .................................................. .......... 2. Fence Posts(for fabricated units): The length shall be a minimum of 36 inches long. Wood posts will be of sound quality hardwood with a minimum cross section- al area of 3.5 square inches. Steel posts will be stand- ard T and U section weighing not less than 1.00 pound per linear foot.Posts for super silt fence shall be stand- ard chain link fence posts. I Wire Fence for reinforced silt fence: Wire fencing shall be a minimum 14 gage with a maximum 6 in. mesh opening,or as approved. 4. Prefabricated silt fence is acceptable as long as all ma- terial specifications are met. Reinforced Silt Fence ........................... New York State Standards and Specifications Page 5.55 November 2016 For Erosion and Sediment Control Figure 5.30 Reinforced Silt Fence WOVEN VW FENCE SYMBOL 04IN. 1 .GE -V!' MAX. 6* MESH � 10' MA)L C. TO C. CIN ) - 361 MIK LENGTH FENCE ® POSTS DRIVEN HIK 16 ,71 INTO GROUND. 77-71 HEIGHT OF FILTER N� y, 181 MIN, xT' 1F r .614 mix f� ' MIN. FENCE POST WOVEN MIRE FENCE (MIK. 14 GAUGE W! MAX, 6' MESH SPACING) WITH FILTER' CLOTH 2�'FLIFL FLIT" UNDISTURlED GROUND COMPACTED SOIL m, EMBED FILTER CLOTH A MIN. OF 60 IN GROUND. CONSTRUCTION SPECIFICATIONS 1. WOVEN WIRE FENCE TO DE FASTENED SECURELY TO 'FENCE POSTS WITH' WIRE TIES OR STAPLES POSTS SHALL BE STEEL EITKR 'T' OR 'U' TYPE OR HARRV0,011. 2. FILTER CL11TH TO FASTENED SECURELY TO WOVEN WIRE FENCE WITH TIES SPACED EVERY 24' AT TOP AND MID SECTION, FENCE SHALL BE WOVEN MIRE, 6' MAXIMUM MESH OPENING. a WHEN TWO SECTIONIS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL. BE OVER— LAPPED qBY SIX INCHES ANI)��Fy FOLDED. FILTER CLOTH ALL BE EITHER FILTER Sa MIRAF'I 1D4Sa STA__ INKA TI ON, OR OVED E�IVALENT. 4. PREFABRICATED UNITS SHALL MCICT THE KINIMUM REQUIREMENTS SHOWN.., 5L MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVE111 V14EN 'BULGES, DEVELOP IN THE SILT FENCEF AI3APTED FROM DETAIL'S PROVIDED 1IYr USDA CSa — NCW YORK STATC DEPARTMENT CF TRANSPORTATION. REINFORCED NEW YORK STATE ]DEPARTMENT [IF ENVIRDNMENTAL CUNSERVATION, SILT FENCE NEW YMK STATE SOIL i WATER CONSERVATIrM CIOMCTTEE j November 2016 Page 5.56 New York State Standards and Specifica- tions For Erosion and Sediment Control STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION drainage area tributary to the inlet. The crest elevations of these practices shall provide storage and minimize bypass flow. Type I—Excavated Drop Inlet Protection This practice is generally used during initial overlot grading after the storm drain trunk line is installed. Limit the drainage area to the inlet device to 1 acre. Exca- vated side slopes shall be no steeper than 2:1. The mini- mum depth shall be 1 foot and the maximum depth 2 feet as measured from the crest of the inlet structure. Shape the excavated basin to fit conditions with the longest dimension oriented toward the longest inflow area to provide maxi- Derinition & Scope Scofte mum trap efficiency. The capacity of the excavated basin should be established to contain 900 cubic feet per acre of A temporary barrier with low permeability,installed around disturbed area. Weep holes,protected by fabric and stone, inlets in the form of a fence,berm or excavation around an should be provided for draining the temporary pool. opening,detaining water and thereby reducing the sediment content of sediment laden water by settling thus preventing Inspect and clean the excavated basin after every storm. heavily sediment laden water from entering a storm drain Sediment should be removed when 50 percent of the stor- system. age volume is achieved This material should be incorpo- rated into the site in a stabilized manner. Conditions Where Practice Applies Type II—Fabric Drop Inlet Protection This practice shall be used where the drainage area to an inlet is disturbed,it is not possible to temporarily divert the storm drain outfall into a trapping device,and watertight blocking of inlets is not advisable. It is not to be used in �� � /19�W���y J�411illiihilill�I IOim it i r i lino il4�b w' µ��"! 'iif� J /: lace of sediment trapping devices.This practice shall be used with an upstream buffer strip if placed at a storm dram inlet on a paved surface. It may be used in conjunction with storm drain diversion to help prevent siltation of pipes installed with low slope angle. Types of Storm Drain Inlet Practices There are five(5)specific types of storm drain inlet protec- tion practices that vary according to their function, location, drainage area,and availability of materials: I. Excavated Drop Inlet Protection This practice is generally used during final elevation grad- II. Fabric Drop Inlet Protection ing phases after the storm drain system is completed. III. Stone&Block Drop Inlet Protection IV. Paved Surface Inlet Protection Limit the drainage area to 1 acre per inlet device. Land area V. Manufactured Insert Inlet Protection slope immediately surrounding this device should not ex- ceed 1 percent. The maximum height of the fabric above Design Criteria the inlet crest shall not exceed 1.5 feet unless reinforced. Drainage Area—The drainage area for storm drain inlets The top of the barrier should be maintained to allow over- shall not exceed one acre. Erosion control/temporary stabi- flow to drop into the drop inlet and not bypass the inlet to lization measures must be implemented on the disturbed New York State Standards and Specifications Page 5.57 November 2016 For Erosion and Sediment Control unprotected lower areas. Support stakes for fabric shall be materials and any unstable soil and dispose of properly. a minimum of 3 feet long, spaced a maximum 3 feet apart. They should be driven close to the inlet so any overflow Bring the disturbed area to proper grade, smooth,compact drops into the inlet and not on the unprotected soil. Im- and stabilize in a manner appropriate to the site. proved performance and sediment storage volume can be Type IV—Paved Surface Inlet Protection obtained by excavating the area. Inspect the fabric barrier after each rain event and make repairs as needed. Remove sediment from the pool area as necessary with care not to undercut or damage the filter fabric. Upon stabilization of the drainage area,remove all materials and unstable sediment and dispose of properly. Bring the adjacent area of the drop inlet to grade, smooth and compact and stabilize in the appropriate manner to the site. Type III—Stone and Block Drop Inlet Protection � t This practice is generally used during the initial and inter- mediate overlot grading of a construction site. Limit the drainage area to 1 acre at the drop inlet. The stone barrier should have a minimum height of 1 foot and a maximum height of 2 feet. Do not use mortar. The height should be limited to prevent excess ponding and bypass flow. This practice is generally used after pavement construction has been done while final grading and soil stabilization is Recess the first course of blocks at least 2 inches below the occurring. These practices should be used with upstream crest opening of the storm drain for lateral support. Subse- buffer strips in linear construction applications,and with quent courses can be supported laterally if needed by plac- temporary surface stabilization for overlot areas,to reduce ing a 2x4 inch wood stud through the block openings per- the sediment load at the practice.This practice includes pendicular to the course. The bottom row should have a sand bags,compost filter socks,geo-tubes filled with bal- few blocks oriented so flow can drain through the block to last,and manufactured surface barriers. Pea gravel can also dewater the basin area. be used in conjunction with these practices to improve per- formance. When the inlet is not at a low point,and is off- The stone should be placed just below the top of the blocks set from the pavement or gutter line,protection should be on slopes of 2:1 or flatter. Place hardware cloth of wire selected and installed so that flows are not diverted around mesh with`/2 inch openings over all block openings to hold the inlet. stone in place. As an optional design,the concrete blocks may be omitted and the entire structure constructed of stone,ringing the outlet("doughnut ). The stone should be kept at a 3:1 slope toward the inlet to keep it from being washed into the inlet. A level area 1 foot wide and four inches below the crest will further prevent wash. Stone on the slope toward the inlet should be at least 3 inches in size for stability and 1 inch or smaller away from the inlet to control flow rate. The eleva- tion of the top of the stone crest must be maintained 6 inch- es lower than the ground elevation down slope from the inlet to ensure that all storm flows pass over the stone into the storm drain and not past the structure. Temporary dik- ing should be used as necessary to prevent bypass flow. ��;�illll The barrier should be inspected after each rain event and repairs made where needed. Remove sediment as necessary to provide for accurate storage volume for subsequent rains. Upon stabilization of contributing drainage area,remove all November 2016 Page 5.58 New York State Standards and Specifica- tions For Erosion and Sediment Control The drainage area should be limited to 1 acre at the drain inlet. All practices will be placed at the inlet perimeter or beyond to maximize the flow capacity of the inlet. Practices Shall be weighted,braced,tied,or otherwise anchored to prevent movement or shifting of location on paved surfaces. Traffic safety shall be integrated with the use of this prac- tice.All practices should be marked with traffic safety cones as appropriate. Structure height shall not cause flood- ing or by-pass flow that would cause additional erosion. The structure should be inspected after every storm event. Any sediment should be removed and disposed of on the site. Any broken or damaged components should be re- placed. Check all materials for proper anchorage and se- cure as necessary. Type V-Manufactured Insert Inlet Protection r" The drainage area shall be limited to 1 acre at the drain in- let.All inserts will be installed and anchored in accordance with the manufacturers recommendations and design de- tails.The fabric portion of the structure will equal or exceed the performance standard for the silt fence fabric. The in- serts will be installed to preserve a minimum of 50 percent of the open,unobstructed design flow area of the storm drain inlet opening to maintain capacity for storm events. New York State Standards and Specifications Page 5.59 November 2016 For Erosion and Sediment Control Figure 5.31 Excavated Drop Inlet Protection SYMBOL FLOW FLOW M Xf /0, FLiaw FLOW EXCAVATED AREA (AS REQUIRED) TIME SLOP 211" 1Pw�_ EXCAVATED y,NEPTFI MINL 1 V WEER HOLLES 'GRAVEL SUPPORTED BY A MAX. 21 BELL' F NDWARE CLOTH TO TOP or INLET. DEWATERING ALLOW DRAINAGE AND t RESTRICT SEDIMENT MOVEMENT. 1, CLEAR THE AREA OF ALL DEBIRIS THAT WILL HINDER E CA "'AT1 a GRADE APPROACH!, M THE MET UNIFORMLY AROUND THE, DAS B, WEER' HOLES, SHALL DE PROTECTED BY GRAVEL. FILEAII VIGRADE,'AREA, S VEEP HOLES, L EXCAVATION rM STABLE SOIL To AET IT PROPERLY AND STABILIZE VITH PERMANENT SEEDING% MAXIMUM DRAINAGE AREA I ACRE ADAPTED FROM DETAILS IPPMVIDED n USDA - NRC& NET YORK STATE DEPARTMENT OF TRANSPORTATION, EXCAVATED DROP V YORK STATE DEPARTMENT OF ENVIRONMENTAL CONURVATUKINLET PROTECTION'l ""wA YORK STATE SO N N DL & WATER CSERVATMN COMMITTEE November 2016 Page 5.60 New York State Standards and Specifica- tions For Erosion and Sediment Control Figure 5.32 Fabric Drop Inlet Protection SYMBOL I.5` MAX. FABRIC WK DRDP i INLET BURIEII FABRIC (12' WITH T'E Bf=L V GRADE) FRAME 7-11111 f . � MI �^ ,e` DRIVE STAKES A MIN. OF 18' RATHER EXCESS j j BELOv GRADE AT EURNERS CONSTRUCTION SPECIFICATIONS L FABRIC SHALL HAVE AN EOS (IF 40-05, BURLAP MAY BE USED FUR SHORT TERM APPLICATI & P. CUT FABRIC FROM A CONTINUOUS L TO ELIMINATE JOIFNTS. IF JOINTS DEEDED THEY WILL. BE OVERLAPPED TO THE NEXT STANCE. R w NW L E TAMPTN r T. "�IGQD OR ER I,\IA1. T. 4. SPACE STAKES EVENLY AROUND INLET 3 FEET APART AND DRIVE A I T GUINCH � W& MES14 T R THAN FACKD T IGAFI7. . SUP'09 N'A IC ��L EMSE�ED L FOOT MINIMUM BELOW GROUND AND A FILLED, IT SMALL SE URELY FASTENED T® THE STAKES AND FRAME, C A 2` x 4' WOOD FRAME SHALL BE COMPLETED AROUND THE CREST THE FABRIC FOR OVER FLOW STABILITY. H&XIMUM DRAINAGE AREA I ACRC TED FWN DETAILS PROVIMED BY, USIM - NRCS, FABRIC NEW YORK STATE DEPARTWNT OF TP.AN&PMTATMN, NEW YMW STIiTE "AR T QF ENVIRONME AL CONSER'VAT1_ , DROP INLET NEV YORK STATE $131L L WATER CUNSE1RVATIIIN COMMITTEE P'R O T EC T I New York State Standards and Specifications Page 5.61 November 2016 For Erosion and Sediment Control Figure 5.33 Stone & Block Drop Inlet Protection CR'ETE BLOCK SYMBOL WATERIN Niu �w w u ��. 24 SLOPE ". GRAVEL FILTER TEMPORARY SEDIMENT P SC RE DEVATERING 6' 214AY. o DROP INLET W[TH GATE SEDMENT TEMP _,,=SEDINENT POOL 1FI11 �{I SL SH 31 SL (OPTIMAL) L) A , FINE EL FACE. (IdTHICKNESS) a" ST OME A 1, LA'S ONE BLOCK EACH SIDE OF THE, ON ITS SIE FOR DEWATERI F IIATION SHALL DE 2 INCHES KI IIHUN BELOW REST OF INLET AND BLOCKS ,SHALL BE PLAID AGAINST INLET FOR SUPPORT. T. 2. HARDWARE: CLU H OR 1/2' WIRE MESH SHALL BE PLACED OVER BLOCK OPENINGS TO SUPPORT STONE. a USE CLEAN STDW DR GRAVEL 1/2-5/4 INCH IN DI TER PLACED 2' INCHES: 1 ELOV TOP OF THE BLOCK A ZI SLOPE OR FLATTER. 4. FOR STONE STRUCTURES ONLY, A I FMT THICK LAYER OF THE FILTER STME WILL BE PLACED AGAINST THE 3 INCH STONE AS SHOWN ON THE DRAVINGS, MAXIM401 .DRAINAGE AREA I ACRE ADAP'Ta rRm DETAAs PRUIvIDED BYi UM s, STONE & BLOCK NEW YORK $TATE KPARTMENT GF TRANSPENTATION, DROP INLET NEW YORK STATE DEPARTHENT OF 0MRONMENTAL €RVATI NEW ORK STATE S121L s WATER CONSERVATM COMMITTEE PROTECTi IOC November 2016 Page 5.62 New York State Standards and Specifica- tions For Erosion and Sediment Control Y STANDARD AND SPECIFICATIONS FOR CONCRETE TRUCK WASHOUT leaching of liquids into the ground.The liner shall be plastic sheeting with a minimum thickness of 10 mils with no holes or tears,and anchored beyond the top of the pit with an earthen berm,sand bags,stone,or other structural appurtenance except at the access point. J1 ;j f r Ali; If pre-fabricated washouts are used they must ensure the capture and containment of the concrete wash and be sized based on the expected frequency of concrete pours.They shall be sited as noted in the location criteria. Maintenance * All concrete washout facilities shall be inspected daily. Damaged or leaking facilities shall be deactivated and repaired or replaced immediately. Excess rainwater that has accumulated over hardened concrete should be Definition & Scope pumped to a stabilized area,such as a grass filter strip. • Accumulated hardened material shall be removed when A temporary excavated or above ground lined constructed pit 75%of the storage capacity of the structure is filled. Any where concrete truck mixers and equipment can be washed excess wash water shall be pumped into a containment after their loads have been discharged,to prevent highly vessel and properly disposed of off site. alkaline runoff from entering storm drainage systems or * Dispose of the hardened material off-site in a leaching into soil. construction/demolition landfill. On-site disposal may be Conditions Where Practice Applies allowed if this has been approved and accepted as part of the projects SWPPP.In that case,the material should be Washout facilities shall be provided for every project where recycled as specified,or buried and covered with a concrete will be poured or otherwise formed on the site.This minimum of 2 feet of clean compacted earthfill that is facility will receive highly alkaline wash water from the permanently stabilized to prevent erosion. cleaning of chutes,mixers,hoppers,vibrators,placing * The plastic liner shall be replaced with each cleaning of equipment,trowels,and screeds.Under no circumstances will the washout facility. wash water from these operations be allowed to infiltrate into * Inspect the project site frequently to ensure that no the soil or enter surface waters. concrete discharges are taking place in non-designated areas. Design Criteria Capacity: The washout facility should be sized to contain solids,wash water,and rainfall and sized to allow for the evaporation of the wash water and rainfall.Wash water shall be estimated at 7 gallons per chute and 50 gallons per hopper of the concrete pump truck and/or discharging drum. The minimum size shall be 8 feet by 8 feet at the bottom and 2 feet deep. If excavated,the side slopes shall be 2 horizontal to 1 vertical. Location: Locate the facility a minimum of 100 feet from drainage swales,storm drain inlets,wetlands,streams and other surface waters.Prevent surface water from entering the structure except for the access road.Provide appropriate access with a gravel access road sloped down to the structure. Signs shall be placed to direct drivers to the facility after their load is discharged. Liner: All washout facilities will be lined to prevent November 2016 Page 2.24 New York State Standards and Specifications For Erosion and Sediment Control STANDARD AND SPECIFICATIONS FOR DUST CONTROL dust control(see Section 3). Mulch(including gravel mulch)—Mulch offers a fast effective means of controlling dust. This can also include rolled erosion control blankets. Spray adhesives—These are products generally ' composed of polymers in a liquid or solid form that are 11104 mixed with water to form an emulsion that is sprayed on the soil surface with typical hydroseeding equipment. The mixing ratios and application rates will be in accordance with the manufacturer's recommendations for the specific soils on the site.In no ,;�,1✓��x �� 1 �,Oj,'y��i"; case should the application of these adhesives be made on wet soils or if there is a probability of precipitation within 48 hours of its proposed use. Material Safety ' Data Sheets will be provided to all applicators and Definition & Scope others working with the material. The control of dust resulting from land-disturbing activities, B. Driving Areas—These areas utilize water,polymer prevent surface and air movement of dust from disturbed emulsions, and barriers to prevent dust movement to P from the traffic surface into the air. soil surfaces that may cause off-site damage,health hazards, and traffic safety problems. Sprinkling—The site may be sprayed with water until the surface is wet. This is especially effective Conditions Where Practice Applies on haul roads and access route to provide short term limited dust control. On construction roads, access points, and other disturbed areas subject to surface dust movement and dust blowing Polymer Additives These polymers are mixed with t where off-site damage may occur if dust is not controlled. water and applied to the driving surface by a water truck with a gravity feed drip bar,spray bar or automated distributor truck. The mixing ratios and Desi n Criteria application rates will be in accordance with the manufacturer's recommendations.Incorporation of Construction operations should be scheduled to the emulsion into the soil will be done to minimize the amount of area disturbed at one time. the appropriate depth based on expected traffic. Buffer areas of vegetation should be left where practical. Compaction after incorporation will be by vibratory Temporary or permanent stabilization measures shall be roller to a minimum of 95%. The prepared surface installed. No specific design criteria is given; see shall be moist and no application of the polymer will constructions specifications below for common methods of be made if there is a probability of precipitation within p 48 hours of its proposed use.Material Safety Data dust control. Sheets will be provided to all applicators working with the material. Water quality must be considered when materials are selected for dust control. Where there is a potential for the Barriers—Woven geo-textiles can be placed on the material to wash off to a stream, ingredient information driving surface to effectively reduce dust throw and must be provided to the NYSDEC. particle migration on haul roads. Stone can also be used for construction roads for effective dust control. No polymer application shall take place without written Windbreak—A silt fence or similar barrier can approval from the NYSDEC. control air currents at intervals equal to ten times the barrier height. Preserve existing wind barrier Construction Specifications vegetation as much as practical. A. Non-driving Areas—These areas use products and Maintenance materials applied or placed on soil surfaces to prevent airborne migration of soil particles. Maintain dust control measures through dry weather periods until all disturbed areas are stabilized. Vegetative Cover—For disturbed areas not subject to traffic,vegetation provides the most practical method of New York State Standards and Specifications Page 2.25 November 2016 For Erosion and Sediment Control STANDARD AND SPECIFICATIONS FOR PROTECTING VEGETAriON DURING CONSTRUCTION recommendations made for the vegetation to be 7` saved. Minor adjustments in location of roads, dwellings,and utilities may be needed. Construction on steep slopes,erodible soils, w I !to wetlands,and streams should be avoided. Clearing limits should be delineated(See "Determine Limits of Clearing and Grading"on page 2.2). 2) Areas to be seeded and planted should be identified. Remaining vegetation should blend with their surroundings and/or provide special function such as a filter strip,buffer zone, or screen. 3) Trees and shrubs of special seasonal interest, such as flowering dogwood,red maple, striped maple, serviceberry,or shadbush, and valuable Definition & Scope potential shade trees should be identified and marked for special protective treatment as The protection of trees, shrubs,ground cover and other appropriate. vegetation from damage by construction equipment. In 4) Trees to be cut should be marked on the plans. order to preserve existing vegetation determined to be If timber can be removed for salable products,a important for soil erosion control,water quality forester should be consulted for marketing advice. protection, shade, screening,buffers,wildlife habitat, wetland protection,and other values. 5) Trees that may become a hazard to people, personal property,or utilities should be removed. These include trees that are weak-wooded, Conditions Where Practices Anides disease-prone,subject to windthrow,or those that have severely damaged root systems. On planned construction sites where valued vegetation exists and needs to be preserved. 6) The vigor of remaining trees may be improved by a selective thinning. A forester should be Desipan Criteria consulted for implementing this practice. 1. Planning Considerations 2. Measures to Protect Vegetation A. Limit soil placement over existing tree and shrub A. Inventory: roots to a maximum of 3 inches. Soils with loamy texture and good structure should be used. 1) Property boundaries,topography,vegetation and soils information should be gathered. Identify B. Use retaining walls and terraces to protect roots of potentially high erosion areas, areas with tree trees and shrubs when grades are lowered. Lowered windthrow potential, etc. A vegetative cover type grades should start no closer than the dripline of the map should be made on a copy of a topographic tree. For narrow-canopied trees and shrubs,the stem map which shows other natural and manmade diameter in inches is converted to feet and doubled, features. Vegetation that is desirable to preserve such that a 10 inch tree should be protected to 20 feet. because of its value for screening, shade, critical erosion control,endangered species,aesthetics,etc., C. Trenching across tree root systems should be the should be identified and marked on the map. same minimum distance from the trunk, as in`B". Tunnels under root systems for underground utilities 2) Based upon this data,general statements should should start 18 inches or deeper below the normal be prepared about the present condition,potential ground surface. Tree roots which must be severed problem areas, and unique features of the property. should be cut clean. Backfill material that will be in contact with the roots should be topsoil or a prepared B. Planning: planting soil mixture. 1) After engineering plans(plot maps)are prepared, D. Construct sturdy fences, or barriers,of wood, another field review should take place and steel,or other protective material around valuable November 2016 Page 2.26 New York State Standards and Specifications For Erosion and Sediment Control vegetation for protection from construction equipment. Place barriers far enough away from trees,but not less than the specifications in'B", so that tall equipment such as backhoes and dump trucks do not contact tree branches. E. Construction limits should be identified and clearly marked to exclude equipment. F. Avoid spills of oil/gas and other contaminants. G. Obstructive and broken branches should be pruned properly. The branch collar on all branches whether living or dead should not be damaged. The 3 or 4 cut method should be used on all branches larger than two inches at the cut. First cut about one-third the way through the underside of the limb(about 6-12 inches from the tree trunk). Then(approximately an inch further out)make a second cut through the limb from the upper side. When the branch is removed,there is no splintering of the main tree trunk.Remove the stub. If the branch is larger than 5-6 inches in diameter,use the four cut system. Cuts 1 and 2 remain the same and cut 3 should be from the underside of the limb,on the outside of the branch collar. Cut 4 should be from the top and in alignment with the 3rd cut. Cut 3 should be 1/4 to 1/3 the way through the limb. This will prevent the bark from peeling down the trunk. Do not paint the cut surface. H. Penalties for damage to valuable trees, shrubs, and herbaceous plants should be clearly spelled out in the contract. PROTECTING TREES IN HEAVY USE AREA The compaction of soil over the roots of trees avid shrubs by the trampling of recreationists,vehicular traffic,etc.,reduces oxygen,water,and nutrient uptake by feeder roots. This weakens and may eventually kill the plants. Table 2.6 rates the"Susceptibility of Tree Species to Compaction." Where heavy compaction is anticipated,apply and maintain a 3 to 4 inch layer of undecayed wood chips or 2 inches of No.2 washed,crushed gravel. In addition,use of a wooden or plastic mat may be used to lessen compaction,if applicable. New York State Standards and Specifications Page 2.27 November 2016 For Erosion and Sediment Control Table 2.6 Susceptibility of Tree Species to Compaction' Resistant: Box elder.................. Acer negundo Willows..................... Salix spp. Green ash................. Fraxinus pennsylvanica Honey locust............... Gleditsia triacanthos Red elm.................... Ulmus rubra Eastern cottonwood.,..,.. Populus deltoides Hawthomes............... Crataegus spp. Swamp white oak........... Quercus bicolor Bur oak................„.„„ Quercus macrocarpa Hophornbeam...............Ostrya virginiana Northern white cedar..... Thuja occidentalis Intermediate: Red maple................. Acer rubrum Sweetgum............,...... Liquidambarstyraciflua Silver maple.............. Acer saccharinum Norway maple.........„... Acer platanoides Hackberry................ Celtis occidentalis Shagbark hickory.,...„..... Carya ovata Black gum............... Nyssa sylvatica London plane........„..... Platanus x hybrida Red oak.................. Quercus rubra Pin oak............ Quercus palustris Basswood................ Tilia americana Susceptible: Sugar maple„.....„.„....... Acer saccharum Austrian Pine....,.........,.... Pinus nigra White pine..........„„...... Pinus strobus White ash........,............ Fraxinus americana Blue spruce.„„,..„.......... Piceapungens Paper birch.......,.„.„...,, Betulapaj�yr�fera White oak.................. Quercus alba Moutain ash.....„„......, Sorbus aucuparia Red pine....„..„.....„.,.... Pinus resinosa Japanese maple„........... Acer palmatum 1 If a tree species does not appear on the list,insufficient information is available to rate it for this purpose. November 2016 Page 2.28 New York State Standards and Specifications For Erosion and Sediment Control STANDARD AND SPECIFICATIONS FOR SITE POLLUTION PREVENTION h�M� I tl4� Y a vAIvY r' i Definition & Scop A collection of management practices intended to control pollutants and contamination of groundwater and non-sediment pollutants associated with construction surface waters. activities to prevent the generation of pollutants due to improper handling,storage,and spills and prevent the 5. Develop and implement a spill prevention and movement of toxic substances from the site into surface control plan. The plan should include NYSDEC's waters. spill reporting and initial notification requirements. Conditions Where Practice Applies 6. Provide adequate disposal for solid waste including woody debris,stumps,and other construction waste On all construction constr~uct.ion sitcs where the carth disturbance exceeds and include these methods and directions in the 0'10 se➢ rar.e feet and involves es the use of fertilizers, construction details on the site construction drawings. pesticides,petro➢cu n based chemica➢s, fuels and'➢ubricants, Fill,woody debris,stumps and construction waste as well as sealers,paints,cleared woody vegetation,garbage, shall not be placed in regulated wetlands,streams or and sanitary wastes. other surface waters. Desi rt'i Criteria 7. Distribute or post informational material regarding proper handling,spill response,spill kit location,and The variety of pollutants on a particular site and the severity emergency actions to be taken,to all construction of their impacts depend on factors such as the nature of the personnel. construction activity,the physical characteristics of the construction site, and the proximity of water bodies and g•Refueling equipment shall be located at least 100 conveyances to the pollutant source. feet from all wetlands,streams and other surface waters. 1. All state and federal regulations shall be followed for �w the storage,handling,application,usage,and disposal of pesticides,fertilizers, and petroleum products. 2. Vehicle and construction equipment staging and maintenance areas will be located away from all I �f drainage ways with their parking areas graded so the runoff from these areas is collected, contained and treated prior to discharge from the site. 3. Provide sanitary facilities for on-site personnel. nnel. 11 �1. i 4. Store,cover,and isolate construction materials ° including topsoil,and chemicals,to prevent runoff of f New York State Standards and Specifications Page 2.29 November 2016 For Erosion and Sediment Control STANDARD AND SPECIFICATIONS FOR STABILIZED CONSTRUCTION ACCESS inert to commonly encountered chemicals,hydro-carbons, mildew,rot resistant,and conform to the fabric properties as shown: Light Duty' Heavy Duty2 Fabric Proper- Roads Haul Roads Test Meth- ties' Grade Sub- od grade Rough Graded ` Grab Tensile ASTM Strength(lbs) 200 220 D1682 Elongation at ASTM 11 �, 50 60 l o Failure(%) D1682 r Mullen Burst ASTM Strength(lbs) 190 430 D3786 Definition & Scope Puncture 40 125 ASTM D751 Strength(lbs) Modified A stabilized pad of aggregate underlain with geotextile located Equivalent 40-80 40-80 US Std at any point where traffic will be entering or leaving a Sieve construction site to or from a public right-of-way,street,alley, sidewalk,or parking area. The purpose of stabilized Opening Size CW-02215 construction access is to reduce or eliminate the tracking of sediment onto public rights-of-way or streets. Aggregate 6 10 Depth Conditions Where Practice Applies Light Duty Road: Area sites that have been graded to subgrade and where most travel would be single axle vehicles and an occasional multi- A stabilized construction access shall be used at all points of axle truck. Acceptable materials are Trevira Spunbond 1115,Mirafi 1 construction ingress and egress. 00X,Typar 3401,or equivalent. 2Heavy Duty Road: Area sites with only rough grading,and where most Design Criteria travel would be multi-axle vehicles. Acceptable materials are Trevira Spunbond 1135,Mirafi 600X,or equivalent. See Figure 2.1 on page 2.31 for details. , Fabrics not meeting these specifications may be used only when design Aggregate Size' Use a matrix of 1-4 inch stone,or procedure and supporting documentation are supplied to determine ag- reclaimed or recycled concrete equivalent. gregate depth and fabric strength. Thickness: Not less than six(6)inches. Maintenance Width: 12-foot minimum but not less than the full width of The access shall be maintained in a condition which will points where ingress or egress occurs. 24-foot minimum if prevent tracking of sediment onto public rights-of-way or there is only one access to the site. streets. This may require periodic top dressing with additional aggregate. All sediment spilled,dropped,or Length: As required,but not less than 50 feet (except on a washed onto public rights-of-way must be removed single residence lot where a 30 foot minimum would apply). immediately. Geotextile: To be placed over the entire area to be covered When necessary,wheels must be cleaned to remove with aggregate. Filter cloth will not be required on a single- sediment prior to entrance onto public rights-of-way. When family residence lot. Piping of surface water under entrance washing is required,it shall be done on an area stabilized shall be provided as required. If piping is impossible,a with aggregate,which drains into an approved sediment- mountable berm with 5:1 slopes will be permitted. trapping device. All sediment shall be prevented from entering storm drains,ditches,or watercourses. Criteria for Geotextile: The geotextile shall be woven or nonwoven fabric consisting only of continuous chain polymeric filaments or yarns of polyester. The fabric shall be November 2016 Page 2.30 New York State Standards and Specifications For Erosion and Sediment Control Figure 2.1 Stabilized Construction Access SYMBOL ;ZIEXISTING PAVEMENT EXISTING FILTER M(CIPTIUN LE BERM GROUNDCLMM MULE HIS 1WMI 4, EXISTING GROUND le, Irk. III"I 1EXIS71MG PAVEMENT RL - CONSTRUCTION SPECIFICATITUINS 1. STONE SIZE — USE 1-4 INCH STIONE, 13R RECLAIMEDE 'YCCONCRETE EQUIVALENT. ® LENGTH - NOT LESS THAN 5o rEET T ON A SINGLERESIDENCE L 30 FOOT MINIMUM LENGTH WO1JLD APPLY). Y ICK - NOT LESS THAN! S ) INC 4. WIDTH TWELVE 1MINIMUM. BUT NOT LESS THAN THE FULL WI T POINTS HER T TY U T IF SINGLE ENTRANCE, TO SITE. T TIL - WILL BE PLACEDV THE ENTIRE AREA PRIOR' T13 PLACIWj OF STONE 6,- SURFACE WATER - ALL SURFACE WATER FLOWING M DIVERTED TOWARD CIIN- STRUCTION ACCESSL BE PIPED BENEATH THE ENTRANCE. IF PIPING, I IMPRACTICAL, T L ITH L HE PERMITTED. 7_ MAINTENANCE - THE T SHALL BE KA114TAINED IN A CONDITION H 1 ILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS-OF-WAY, ALL SEDIMENT SPILLED, DROPPED, WASHED III TRACKED ONTO PUBLICI H = Y UST REM VED IMMEDIATELY. 8. WHEN WASHING IS RECKJIRED, IT SHALL BE DONE ON A AREA STABILIZEDWITH STONE WHICHAND I IINTO AN APPROVED SEDIMENT TRAPPING, VI PERIODIC9. INSPECTION NEEDED MAINTENANCEL BE PROVIDEDT H RAIN. ADAPTED FROM METAILSVIDE Y+ US - NACS, STABILIZED NEW YORK STATE 11"APTMCN7 _ TRANSPORTATION, NEW YORK STATE DEPARTMENT (IF ERVIRDNMENTAL CIINSERVATIDN, CONSTRUCTION NEV YORK STATE SOIL & VATM. VATICD"TTM ACCESS New York State Standards and Specifications Page 2.31 November 2016 For Erosion and Sediment Control STANDARD AND SPECIFICATIONS FOR LANDGRADING damage slopes or other graded areas;see standards and specifications for Grassed Waterway,Diversion,or Grade Stabilization Structure. 2. Cut and fill slopes that are to be stabilized with grasses shall not be steeper than 2:1. When slopes exceed 2:1, special design and stabilization consideration are required and shall be adequately shown on the plans. (Note: Where the slope is to be mowed,the slope should be no steeper than 3:1,although 4:1 is preferred because of safety factors related to mowing steep slopes.) 3. Reverse slope benches or diversion shall be provided whenever the vertical interval(height)of any 2:1 slope exceeds 20 feet;for 3:1 slope it shall be increased to 30 Definition & Scop feet and for 4:1 to 40 feet. Benches shall be located to divide the slope face as equally as possible and shall Permanent reshaping of the existing land surface by convey the water to a stable outlet. Soils, seeps,rock grading in accordance with an engineering topographic plan outcrops,etc.,shall also be taken into consideration and specification to provide for erosion control and when designing benches. vegetative establishment on disturbed,reshaped areas. A. Benches shall be a minimum of six feet wide to DCriteria ,� tl provide for ease of maintenance. The grading plan should be based upon the incorporation of B. Benches shall be designed with a reverse slope of 6:1 or flatter to the toe of the upper slope and with building designs and street layouts that fit and utilize a minimum of one foot in depth. Bench gradient to existing topography and desirable natural surrounding to the outlet shall be between 2 percent and 3 percent, avoid extreme grade modifications. Information submitted unless accompanied by appropriate design and must provide sufficient topographic surveys and soil computations. investigations to determine limitations that must be imposed on the grading operation related to slope stability,effect on C. The flow length within a bench shall not exceed adjacent properties and drainage patterns,measures for 800 feet unless accompanied by appropriate design drainage and water removal,and vegetative treatment,etc. and computations; see Standard and Specifications for Diversion on page 3.9 Many municipalities and counties have regulations and design procedures already established for land grading and 4. Surface water shall be diverted from the face of all cut cut and fill slopes. Where these requirements exist,they and/or fill slopes by the use of diversions,ditches and shall be followed. swales or conveyed downslope by the use of a designed structure,except where: The plan must show existing and proposed contours of the area(s)to be graded. The plan shall also include practices A. The face of the slope is or shall be stabilized and for erosion control,slope stabilization, safe disposal of the face of all graded slopes shall be protected runoff water and drainage,such as waterways,lined ditches, from surface runoff until they are stabilized. reverse slope benches(include grade and cross section), grade stabilization structures,retaining walls,and surface B. The face of the slope shall not be subject to any and subsurface drains. The plan shall also include phasing concentrated flows of surface water such as from of these practices. The following shall be incorporated into natural drainage ways,graded ditches,downspouts, the plan: etc. 1. Provisions shall be made to safely convey surface C. The face of the slope will be protected by anchored runoff to storm drains,protected outlets,or to stable stabilization matting, sod,gravel,riprap,or other water courses to ensure that surface runoff will not stabilization method. November 2016 Page 4.24 New York State Standards and Specifications For Erosion and Sediment Control 5. Cut slopes occurring in ripable rock shall be serrated as 4. Areas to be filled shall be cleared,grubbed,and shown in Figure 4.9 on page 4.26. The serrations shall stripped of topsoil to remove trees,vegetation,roots,or be made with conventional equipment as the excavation other objectionable material. is made. Each step or serration shall be constructed on the contour and will have steps cut at nominal two-foot 5. Areas that are to be topsoiled shall be scarified to a intervals with nominal three-foot horizontal shelves. minimum depth of four inches prior to placement of These steps will vary depending on the slope ratio or topsoil. the cut slope. The nominal slope line is 1 Yz: 1. These steps will weather and act to hold moisture,lime, 6. All fills shall be compacted as required to reduce fertilizer,and seed thus producing a much quicker and erosion,slippage,settlement,subsidence,or other longer-lived vegetative cover and better slope related problems. Fill intended to support buildings, stabilization. Overland flow shall be diverted from the structures,and conduits,etc.,shall be compacted in top of all serrated cut slopes and carried to a suitable accordance with local requirements or codes. outlet. 7. All fill shall be placed and compacted in layers not to 6. Subsurface drainage shall be provided where necessary exceed 9 inches in thickness. to intercept seepage that would otherwise adversely affect slope stability or create excessively wet site 8. Except for approved landfills or nonstructural fills,fill conditions. material shall be free of frozen particles,brush,roots, sod,or other foreign objectionable materials that would 7. Slopes shall not be created so close to property lines as interfere with,or prevent,construction of satisfactory to endanger adjoining properties without adequately fills. protecting such properties against sedimentation, erosion, slippage,settlement,subsidence,or other 9. Frozen material or soft,mucky or highly compressible related damages. materials shall not be incorporated into fill slopes or structural fills. 8. Fill material shall be free of brush,rubbish,rocks,logs, 10. Fill shall not be placed on saturated or frozen surfaces. stumps,building debris,and other objectionable material. It should be free of stones over two(2)inches 11. All benches shall be kept free of sediment during all in diameter where compacted by hand or mechanical phases of development. tampers or over eight(8)inches in diameter where compacted by rollers or other equipment. Frozen 12. Seeps or springs encountered during construction shall material shall not be placed in the fill nor shall the fill be handled in accordance with the Standard and material be placed on a frozen foundation. Specification for Subsurface Drain on page 3.48 or 9. Stockpiles,borrow areas,and spoil shall be shown on other approved methods. the plans and shall be subject to the provisions of this 13. All graded areas shall be permanently stabilized Standard and Specifications. immediately following finished grading. 10. All disturbed areas shall be stabilized structurally or 14. Stockpiles,borrow areas,and spoil areas shall be vegetatively in compliance with the Permanent shown on the plans and shall be subject to the Construction Area Planting Standard on page 4.42. provisions of this Standard and Specifications. Construction Specifications See Figures 4.9 and 4.10 for details. 1. All graded or disturbed areas,including slopes,shall be protected during clearing and construction in accordance with the erosion and sediment control plan until they are adequately stabilized. 2. All erosion and sediment control practices and measures shall be constructed,applied and maintained in accordance with the erosion and sediment control plan and these standards. 3. Topsoil required for the establishment of vegetation shall be stockpiled in amount necessary to complete finished grading of all exposed areas. New York State Standards and Specifications Page 4.25 November 2016 For Erosion and Sediment Control Figure 4.9 Typical Section of Serrated Cut Slope mmm NORMAL SLOPE LINlE n : 1.5-1 OR STEEPZR ADAPTEDd TRANVURTATION. NEW YORK STATE NMENTAL C0tMRVATMN, OF SERRATED CUT STATENEV YORK L & WATER CMISCIRVATION1 November 2016 Page 4.26 New York State Standards and Specifications For Erosion and Sediment Control Figure 4.10 Landgrading SYMBOL_ )ewt ITCH OR DIVERSION! TO DIVERT SURFACP FLOW s - NCH: GRADE 2-3% s t J& JL A. lo w- JiL Y w1 a AL IN q Y MAx 1 1 .. a E2W 3 3W 4 4W ADAPTED FROM DETAILS PXVIDED BY- USDA = NRCS, NEW YQRK STATE 0EPARTKNT (IF TRANSPORTATION, LANDGRADING NEW YORK STATE ]DEPARTMENT OF EWIRDNMENTAL C(INSERVATMN, NEW YORK STATE SOIL & WATER CONSERVATION CONCrTEE DETAIL New York State Standards and Specifications Page 4.27 November 2016 For Erosion and Sediment Control Figure 4.11 Landgrading - Construction Specifications CONSTRUCTION SPECI ICATIO :L ALL GRADED OR DISTURBED AREAS INCLUDING SLOPES SHALL BE PROTECTED DURtNG CLEARIM AND CONSTRUCTION IN ACCORDANCE WITH THE APPROVED EROSION AND SED ENT CONTROL PLAN UNTIL THEY ARE PERMANENTLY STABILIZED. Z ALL SEDIMENT CONTROL PRACTICES AND MEASURES SHALL BE CONSTRUCTED, APPLIED AND MAINTAINED IN ACCORDANCE WITH THE AP ED EROMN AND SEDIMENT CONTROL PLAID. 3, TOPSOIL- REQUIRED FOR THE ESTADLI IT VENT nF VEGETATION SHALL BE STOCKPILE]) IN AMOUNT NECESSARY TO COMPLETE FINISHED CRAII = OF ALL EXPOSED ARE 4, AREAS TO HE FILLED SHALL BE CLEARED, GRUBBED, AND 'STRIPPED 13F T13PSBIL T13 RE-MOVE TREES, VEGETATION, FOOTS OR OTHER OBJEC71ONABLE MATERIAL. 5; AREAS WHICH ARE TO BE TOPSOILED SHALL _ SCARIFIED TO A MINIMUM DEPTH OF FOURINCHES 1 CEMENT TOPS 6, ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SILIPPAGIE, SETTLEMENT,, SUBSIDENCE OR OTHER 'RELATED PROBLEMS.. FILL INTENDED TO SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE C13KPACTED IN ACCORDANCE WITH' LOCAL RE4UI ENTS ' CODES. 7. ALL 'FILL SHALL BE PLACED AND COMPACTED :IN LAYERS NOT TO EXCEED 9 INCHES IN THICK S& , EXCEPT FOR APPROVED LANDFILLS, FILL MATERIAL SHALL DE FREE OF FRIIZEN PARTICLES. BRUSH, ROOTS, SOD, OR OTHER (FOREIGN OR OTHER OBJECTIONABLE 14ATERIALS THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF SATISFACTORY FILLS. 9, FROZEN MATERIALS OR SOFT, MUCKY OR HIGHLY COMP SSIBLE MATERIALS SHALL T BE INCORPORATED IN FILLS. 10, FIL.L. SHALL NOT BE PLACED ON SATURATED OR FROZEN .SURFACES. 11. ALL RENCHES SHALL BE KEPT FREE OF SEDIMENT DURING ALL PHASES OF ]DEVELOPMENT. 12, SEEPS Off'' SPRINGS E 'O NTERED DURING CONSTRUCTION SHALL BE HANDLED IN ACMRDANCE WITH T STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN OR OTHER APPROVED METHOD. 13, ALL GRADED AREAS SHALL BE PERMANENTLY STABILIZED IMMEDIATELY FOLLOVING FINISHED GRADING. 14. STOCKPILES, BORROW AREAS AND SPOIL AREAS SHALL RE SHOWN ON THE PLANS AND SHALL BE SUBJECT TO THE PROVISIONS OF THIS STANDARD AND SPECIF-ICATION. ADAPTED PROM DETAILS PROVIDED DY+ uSDA - NRC s, _ NCW StATC DEPARTMENT OF VIANSPORTATIUM. LANDGRATING NEW YORK STATE DEPART14ENT OF ENVIRONMENTAL CONSEOVATMN, SPECIFICATIONS INEW YMK STATE SOIL s wATER. CONSERvATION MmMIT-TEE November 2016 Page 4.28 New York State Standards and Specifications For Erosion and Sediment Control STANDARD AND SPECIFICATIONS FOR MULCHING Remove all undesirable stones and other debris to meet the needs of the anticipated land use and maintenance required. Apply mulch after soil amendments and planting is accomplished or simultaneously if hydroseeding is used. Select appropriate mulch material and application rate or material needs. Hay mulch shall not be used in wetlands or in areas of permanent seeding. Clean straw mulch is preferred alternative in wetland application. Determine local availability. Definition and Scope Select appropriate mulch anchoring material. Applying coarse plant residue or chips,or other suitable NOTE: The best combination for grass/legume materials,to cover the soil surface to provide initial erosion establishment is straw(cereal grain)mulch applied at 2 ton/ control while a seeding or shrub planting is establishing. acre(90 lbs./1000sq.ft.)and anchored with wood fiber Mulch will conserve moisture and modify the surface soil mulch(hydromulch)at 500—750 lbs./acre(11 —17 temperature and reduce fluctuation of both. Mulch will lbs./1000 sq.ft.). The wood fiber mulch must be applied prevent soil surface crusting and aid in weed control.Mulch through a hydroseeder immediately after mulching. can also be used alone for temporary stabilization in non- growing months. Use of stone as a mulch could be more permanent and should not be limited to non-growing 'months. Conditions Where Practice lies On soils subject to erosion and on new seedings and shrub plantings. Mulch is useful on soils with low infiltration rates by retarding runoff. Criteria Site preparation prior to mulching requires the installation of necessary erosion control or water management practices and drainage systems. Slope,grade and smooth the site to fit needs of selected mulch products. New York State Standards and Specifications Page 4.39 November 2016 For Erosion and Sediment Control Table 4.2 Guide to Mulch Materials, Rates, and Uses U In bA L t y U O y E5 x CIj o ti a� 3 3 A o o s� G a� cud d W °A cc 0 >> b i-. y O O y s. •y "" N N G O O C S"+ G U U bA.b 3 bD v bA s• c�C .U. U O .� 7r it bD O b0 'b O Q cC �, O N W 'x s�. = U z >, '� U U t7 . 3 >~ b 0 3 `" '�' U p � o o c� D o p . , a� b �DW 0 0 w o � 5 � � 0 U vi In CO O (V k O O s. N d N N00 'n ^ V1 00 M w d x x c? ° °O V] N vi O 1() O ^ > _ 6> ^ W) x � �ti y a OW) 00 01 O\ x d• �� W CA on ° o '� a°Cd to itjo o o 3 o U U CI' Gi•I O y N ^ N m y, N N .9 CD 'O AQn O 0'+ CdCd o to o ¢ � U � Q � >, P;j >~ bCd .�. " CA Cd3 ° ° U o O � O H O sue, 0 cd y U � cd N 3 333 c7CID November 2016 Page 4.40 New York State Standards and Specifications For Erosion and Sediment Control Table 4.3 Mulch Anchoring Guide Anchoring Method Kind of Mulch to How to Apply or Material be Anchored After mulching,divide areas into blocks approximately 1 sq. yd. in size. Drive 4-6 pegs per block to within 2"to 3"of soil 1. Peg and Twine Hay or straw surface. Secure mulch to surface by stretching twine between pegs in criss-cross pattern on each block. Secure twine around each peg with 2 or more tight turns. Drive pegs flush with soil. Driving stakes into ground tightens the twine. Staple the light-weight paper,jute,wood fiber,or plastic 2. Mulch netting Hay or straw nettings to soil surface according to manufacturer's recommendations. Should be biodegradable. Most products are not suitable for foot traffic. Apply with hydroseeder immediately after mulching. Use 500 3. Wood cellulose fiber Hay or straw lbs.wood fiber per acre. Some products contain an adhesive material("tackifier"),possibly advantageous. Apply mulch and pull a mulch anchoring tool(blunt,straight 4. Mulch anchoring tool Hay or straw discs)over mulch as near to the contour as possible. Mulch material should be"tucked"into soil surface about 3". Mix and apply polymeric and gum tackifiers according to 5. Tackifier Ha manufacturer's instructions. Avoid application daring rain. A y or straw 24-hour curing period and a soil temperature higher than 450 Fahrenheit are required. New York State Standards and Specifications Page 4.41 November 2016 For Erosion and Sediment Control CIS ENGINEERING PLLC Appendix Sample Inspection Report SWPPP Amendment Form Indian Neck Preserve/ALS 26001 Project Name: SWPPP Inspection Report Inspector Name: Date: Si nature re wired Time: . ....... ........ _.. _._._. . .... Weather: Inspection #: _..............__.- _... Soil Conditions (dry, saturated, etc): Note: Digital photos,with date stamp required for all practices requiring corrective action, before and after, to be attached to the inspection report. YES NO N/A 1. ❑ ❑ ❑ Routine Inspection. Date of last inspection: 2. Inspection following rain event. Date/time of storm ending: ❑ ❑ Rainfall amount: Recorded by: 3. ❑ ❑ ❑ Is this a final site inspection? 4. ❑ ❑ ❑ Has site undergone final stabilization? ❑ ❑ ❑ If so, have all temporary erosion and sediment controls been removed? Site Disturbance (Indicate Locations on Plan) YES NO N/A 1. ❑ ❑ ❑ Areas previously disturbed, but have not undergone active site work in the last 14 days? 2. ❑ ❑ ❑ Areas disturbed within last 14 days? 3. ❑ ❑ ❑ Areas expected to be disturbed in next 14 days? 4. ❑ ❑ ❑ Do areas of steep slopes or complex stabilization issues exist? If"YES" explain: 5. ❑ ❑ ❑ Are there currently more than 5 acres of disturbed soil at the site? If so make sure there is an approval letter from NY'S DEC. Additional Comments: Inspection of Erosion and Sediment Control Devices Type of Control Device Accumulation (if any) in % Repairs/Maintenance Needed 1. 2. .................._.._._.______ 3. ..............._......... 4. ........ .........................._. ..................... 5. ............. _ ...............www_._. 6. Stabilization/Runoff YES NO N/A 1. ❑ ❑ ❑ Are all existing disturbed areas contained by control devices? Type of devices: 2. ❑ ❑ ❑ Are there areas that require stabilization within the next 14 days? Specify Area: 3. ❑ ❑ ❑ Have stabilization measures been initiated in inactive areas? 4. ❑ ❑ ❑ Is there current snow cover or frozen ground conditions? 5. ❑ ❑ ❑ Rills or gullies? 6. ❑ ❑ ❑ Slumping/deposition? 7. ❑ ❑ ❑ Loss of vegetation? 8. ❑ ❑ ❑ Lack of germination? 9. ❑ ❑ 0 Loss of mulching? Receiving Structures/Water Bodies (Indicate locations where runoff leaves the project site on the site plan) YES NO N/A 1. ❑ ❑ ❑ Surface water swale or natural surface waterbody? If natural waterbody: Is waterbody located ❑ onsite, or❑ adjacent to property boundary? Description of condition: 2. ❑ ❑ ❑ Municipal or community system? Inspect locations where runoff from project site enters the receiving waters and indicate if there is evidence of: a. ❑ ❑ ❑ Rills or gullies? b. ❑ ❑ ❑ Slumping/deposition? c. ❑ ❑ ❑ Loss of vegetation? d. ❑ ❑ ❑ Undermining of structures? e. ❑ ❑ ❑ Was there a discharge into the receiving water on the day of inspection? f. ❑ ❑ ❑ Is there evidence of turbidity, sedimentation, or oil in the receiving waters? Additional Comments: Inspection of Post-Construction Stormwater Management Control Devices Type of Control Device Phase of Construction Repairs/Maintenance Needed 1. ...................................... ....... ................._. ___ ........................ 2. 3. ......... . .........................._....................... 4. General Site Condition YES NO N/A 1. ❑ ❑ ❑ Have action items from previous reports been addressed? 2. ❑ ❑ ❑ Does routine maintenance of protection components occur on a regular basis? 3. ❑ ❑ ❑ Does cleaning and/or sweeping affected roadways occur, at minimum, daily? 4. ❑ ❑ ❑ Is debris and litter removed on a monthly basis, or as necessary? 5. ❑ ❑ ❑ Is the site maintained in an orderly manner? Describe the condition of all natural waterbodies within or adjacent to the Project that receive runoff from the site: Contractors progress over last 7 days: Anticipated work to be begun in the next 7 days: Additional Comments: Visual Observations YES NO N/A 1. ❑ ❑ ❑ All erosion and sediment control measures have been installed/constructed? 2. ❑ ❑ ❑ All erosion and sediment control measures are being maintained properly? SUMMARY OF ACTION ITEMS TO REPAIR/REPLACE/MAINTAIN/CORRECT DEFICIENCIES CONSTRUCTION DURATION INSPECTIONS ^fib. Modifications to the SWPPP (To be completed as described below) The Operator shall amend the SWPPP whenever: 1. There is a significant change in design, construction, operation, or maintenance which may have a significant effect on the potential for the discharge of pollutants to the waters of the United States and which has not otherwise been addressed in the SWPPP; or 2. The SWPPP proves to be ineffective in: a. Eliminating or significantly minimizing pollutants from sources identified in the SWPPP and as required by this permit; or b. Achieving the general objectives of controlling pollutants in stormwater discharges from permitted construction activity; and 3. Additionally,the SWPPP shall be amended to identify any new contractor or subcontractor that will implement any measure of the SWPPP. Modification & Reason: November 2016 Page F.9 New York State Standards and Specifications For Erosion and Sediment Control 11S ENGINEERING PLLC Appendix H SPDES 2025 General Permit GP-0-25-001 Indian Neck Preserve/ALS 26001 1-1 E Department o YOR'rj sT<' Environmental Conservation NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION (NYSDEC) SPDES GENERAL PERMIT FOR STORMti1WATER DISCHARGES From CONSTRUCTION ACTIVITY Permit No. OIL.0-25-001 Construction General Pe-n-nit (CGP) lasijad Pursuant to Arfiele 17,Titles T 8 and Article 70 of the Environmental Conservatfon Lary Effective Dates. January 28, 2025 Explration Cute; January 28, 21030 Sett E. Strlay Chief Permit A do ini-strator r Authorized Signature Date Address: NYSDEC Divislion of Environmental Permits 625 Broadway, 4th Floor Albany, NX, 12233-1750 PREFACE Pursuant to Section 402 of the Clean Water Act (CWA), and 40 CFR 122.26(b)(14)(x), (15)(i), and (15)(ii), stormwater discharges from certain construction activities are unlawful unless they are authorized by a National Pollutant Discharge Elimination System (NPDES) permit or by a state permit program. New York State administers the approved State Pollutant Discharge Elimination System (SPDES) program with permits issued in accordance with the New York State Environmental Conservation Law (ECL) Article 17, Titles 7 and 8, and Article 70, as well as 6 NYCRR Parts 621 and 750. Construction activities constitute construction of a point source and, therefore, pursuant to ECL sections 17-0505, 17-0701, and 17-0803, the owner or operator must have coverage under a SPDES permit prior to commencement of construction activities.. The owner or operator cannot wait until there is an actual discharge from the construction site to obtain permit coverage. *Note: The italicized words/phrases within this permit are defined in Appendix A. NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION SPDES CONSTRUCTION GENERAL PERMIT (CGP) GP-0-25-001 FOR STORMWATER DISCHARGES FROM CONSTRUCTION ACTIVITIES Table of Contents Part I. How to Obtain Coverage and General Requirements ..................................... 5 A. Eligibility Requirements...................................................................................... 5 B. Types of Discharges Authorized ........................................................................ 9 C. Prohibited Discharges...................................................................................... 10 D. Electronic Notice of Intent (eNO1) Submittal..................................................... 10 E. General Requirements for Owners or Operators with Permit Coverage ........., 14 F. Permit Coverage for Discharges Authorized Under GP-0-20-001 .................... 18 G. Change of Owner or Operator.......................................................................... 19 Part II. Water Quality-Based Effluent Limitations..................................................... 20 A. Maintaining Water Quality................................................................................ 20 B. Effluent Limitations Applicable to Discharges from Construction Activities...... 20 C. Post-Construction Stormwater Management Practice (SMP) Requirements ... 23 Part III. Stormwater Pollution Prevention Plan (SWPPP)......................................... 28 A. General SWPPP Requirements ....................................................................... 28 B. Required SWPPP Contents ............................................................................. 32 C. Required SWPPP Components by Project Type.............................................. 37 Part IV. Inspection and Maintenance Requirements................................................... 37 A. General Construction Site Inspection and Maintenance Requirements __,.... 37 B. Contractor Maintenance Inspection Requirements .......................................... 37 C. Qualified Inspector Inspection Requirements................................................... 38 PartV. How to Terminate CGP Coverage.............................,....................................... 43 A. Electronic Notice of Termination (eNOT) Submittal......................_ ................ 43 PartVI. Record Retention and Reporting...,............................ ................. ...................45 A. Record Retention ..................................... ...................... ................................ 46 B. Reporting ............................... ................. ..................,,....,.,, .,...,.,......._ 46 PartVII. Standard Permit Requirements ........... ................ ........ ......... ................46 A. Duty to Comply................................................................................................. 46 B. Need to Halt or Reduce Activity Not a Defense................................................46 C. Penalties ..........................................................................................................46 D. False Statements ........................................................................................ .... 47 E. Re-Opener Clause .................................................................................„...,.... 47 F. Duty to Mitigate ................................................................................................ 47 G. Requiring Another General Permit or Individual SPDES Permit.......... ...... 47 H. Duty to Provide Information.............................................................................. 49 I. Extension ......................................................................................................... 49 J. Signatories and Certification ............................................................................ 50 K. Inspection and Entry ........................................................................................ 52 L. Confidentiality of Information............................................................................ 53 M. Other Permits May Be Required ...................................................................... 53 N. NYSDEC Orders or Civil Decrees/Judgments.................................................. 53 O. Property Rights ................................................................................................ 53 P. Compliance with Interstate Standards.............................................................. 53 Q. Oil and Hazardous Substance Liability............................................................. 54 R. Severability....................................................................................................... 54 S. NYSDEC Approved Forms............................................................................... 54 APPENDIX A —Abbreviations and Definitions.......................................................... 55 Abbreviations............................................................................................................. 55 Definitions.................................................................................................................. 56 APPENDIX B — Required SWPPP Components by Project Type............................. 64 Table1....................................................................................................................... 64 Table2....................................................................................................................... 66 APPENDIX C —Watersheds Requiring Enhanced Phosphorus Removal............... 68 APPENDIX D — Impaired Waterbodies (by Construction Related Pollutants)........ 74 APPENDIX E — List of NYSDEC Regional Offices..................................................... 80 APPENDIX F — SWPPP Preparer Certification Form ................................................ 81 APPENDIX G — MS4 SWPPP Acceptance Form........................................................ 83 APPENDIX H — NYCDEP SWPPP Acceptance/Approval Form ................................ 86 APPENDIX I — MS4 No Jurisdiction Form.................................................................. 89 APPENDIX J — Owner/Operator Certification Form.................................................. 91 Part I. Part I. How to Obtain Coverage and General Requirements To be covered under this permit, the owner or operator must meet all eligibility requirements in Part I.A. and follow the requirements for obtaining permit coverage in Part I.D., F., or G. A. Eligibility Requirements For a common plan of development or sale, the phase(s) that meet the eligibility requirements in Part I.A. may obtain coverage under this permit even if other phase(s) of the same common plan of development or sale do not meet the eligibility requirements and require an individual SPDES permit. 1. The owner's or operator's construction activities involve soil disturbances of: a. one or more acres; or b. less than one acre which are part of a common plan of development or sale that will ultimately disturb one or more acres; or c. less than one acre where NYSDEC has determined that a SPDES permit is required for stormwater discharges based on the potential for contribution to a violation of a water quality standard or for significant contribution of pollutants to surface waters of the State. i. 5,000 square feet or more, but less than one acre, and are in the New York City Watershed located east of the Hudson River, Appendix C Figure 1; or ii. 20,000 square feet or more, but less than one acre, within the municipal boundaries of the City of New York (NYC); or iii. less than 20,000 square feet which are part of a common plan of development or sale that will ultimately disturb 20,000 square feet or more, but less than one acre, within the municipal boundaries of NYC; or iv. that creates 5,000 square feet or more of impervious area within the municipal boundaries of NYC. 5 Part I.A.2. 2. Discharges from the owner's or operator's construction activities are/were not: a. already covered by a different SPDES permit; or b. covered under a different SPDES permit that was denied, terminated, or revoked; or c. identified in an expired individual SPDES permit that was not renewed; or d. required to obtain an individual SPDES permit or another general SPDES permit in accordance with Part VII.K. 3. If construction activities may adversely affect a species that is endangered or threatened, the owner or operator must obtain a: a. permit issued pursuant to 6 NYCRR Part 182 for the project; or b. letter issued by NYSDEC of non-jurisdiction pursuant to 6 NYCRR Part 182 for the project. 4. If construction activities have the potential to affect an historic property, the owner or operator must obtain one of the following: a. documentation that the construction activity is not within an archeological buffer area indicated on the sensitivity map, and that the construction activity is not located on or immediately adjacent to a property listed or determined to be eligible for listing on the National or State Registers of Historic Places, and that there is no new permanent building on the construction site within the following distances from a building, structure, or object that is more than 50 years old, or if there is such a new permanent building on the construction site within those parameters that NYS Office of Parks, Recreation and Historic Preservation (OPRHP), a Historic Preservation Commission of a Certified Local Government, or a qualified preservation professional has determined that the building, structure, or object more than 50 years old is not historically/archeologically significant: i. 1-5 acres of disturbance - 20 feet; or ii. 5-20 acres of disturbance - 50 feet; or 6 Part I.A.4.a.iii. iii. 20+ acres of disturbance - 100 feet. b. NYSDEC consultation form sent to OPRHP,1 and copied to NYSDEC's Agency Historic Preservation Officer (APO), and i. the State Environmental Quality Review Act (SEAR) Environmental Assessment Form (EAF) with a negative declaration or the Findings Statement, with documentation of OPRHP's agreement with the resolution; or ii. documentation from OPRHP that the construction activity will result in No Impact; or iii. documentation from OPRHP providing a determination of No Adverse Impact; or iv. a Letter of Resolution signed by the owner or operator, OPRHP and the DEC APO which allows for this construction activity to be eligible for coverage under the general permit in terms of the State Historic Preservation Act (SHPA). c. documentation of satisfactory compliance with Section 106 of the National Historic Preservation Act for a coterminous project area: i. No Affect; or ii. No Adverse Affect; or iii. Executed Memorandum of Agreement. d. documentation that SHPA Section 14.09 has been completed by NYSDEC or another state agency. 5. If construction activities are subject to SEQR, the owner or operator must obtain documentation that SEQR has been satisfied. 6. If construction activities are not subject to SEQR, but subject to the equivalent environmental review from another New York State or federal agency, the 1 The consultation form can be submitted, along with other project information, through OPRHP's Cultural Resource Information System (CRIS) portal. If submitted through CRIS, paper copies of the consultation form need not be mailed. 7 Part I.A.6. owner or operator must obtain documentation that project review, pursuant to a process equivalent to SEQR from another New York State or federal agency, has been satisfied. 7. If construction activities require Uniform Procedures Act (UPA) Permits (see 6 NYCRR Part 621) from NYSDEC, or the equivalent from another New York State or federal agency, the owner or operator must: a. obtain all such necessary permits; or b. receive notification from NYSDEC pursuant to 6 NYCRR 621.3(a)(4) excepting Part I.A.7.a. 8. Construction activities are not eligible if they meet the following criteria in Part I.A.8.a. or b.: a. For linear transportation and linear utility project types, the construction activities: i. are within the watershed of surface waters of the State classified as AA or AA-S identified utilizing the Stormwater Interactive Map on NYSDEC's website; and i. are undertaken on land with no existing impervious cover, and iii. disturb two or more acres of steep slope. b. For all other project types, the construction activities: i, are within the watershed of surface waters of the State classified as AA or AA-S identified utilizing the Stormwater Interactive Map on NYSDEC's website; and ii. are undertaken on land with no existing impervious cover, and iii. disturb one or more acres of steep slope. 8 Part I.B. B. Types of Discharges Authorized 1. The following stormwater discharges are authorized under this permit: a. Stormwater discharges, including stormwater runoff, snowmelt runoff, and surface runoff and drainage, associated with construction activity, are authorized under this permit provided that appropriate stormwater controls are designed, installed, and maintained in accordance with Part 11. and Part III. b. Stormwater discharges from construction support activities at the construction site (including concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, and borrow areas) if the following requirements are met: i. The support activity is directly related to the construction site required to have permit coverage for stormwater discharges; and ii. The support activity is not a commercial operation, nor does it serve multiple unrelated construction sites; and iii. The support activity does not continue to operate beyond the completion of the construction activity at the site it supports; and iv. Stormwater controls are implemented in accordance with Part 11. and Part III. for discharges from the support activity areas. 2. The following non-stormwater discharges associated with construction activity are authorized under this permit: a. Non-stormwater discharges listed in 6 NYCRR 750-1.2(a)(29)(vi), with the following exception: "Discharges from firefighting activities are authorized only when the firefighting activities are emergencies/unplanned"; and b. Non-stormwater discharges of waters to which other components have not been added that are used in accordance with the SWPPP to control dust or irrigate vegetation in stabilized areas; and c. Uncontaminated discharges from dewatering operations 9 Part 1.B.3. 3. Authorized discharges of stormwater or authorized discharges of non- stormwater, commingled with a discharge authorized by a different SPDES permit and/or a discharge that does not require SPDES permit authorization, are also authorized under this permit. C. Prohibited Discharges 1. Non-stormwater discharges prohibited under this permit include but are not limited to: a. Wastewater from washout of concrete; and b. Wastewater from washout and cleanout of stucco, paint, form release oils, curing compounds, and other construction materials; and c. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; and d. Soaps, solvents, or detergents used in vehicle and equipment washing or external building washdown; and e. Toxic or hazardous substances from a spill or other release. D. Electronic Notice of Intent (eNO1) Submittal To receive authorization in accordance with Part I.D.3.b., the owner or operator must submit a complete eNOl in accordance with the requirements in Part I.D. The eNOl contains questions to: ensure eligibility requirements in Part I.A. have been met; obtain owner or operator contact information; obtain the total area to be disturbed and the existing/future impervious areas (rounded to the nearest tenth of an acre); confirm Traditional Land Use Control MS4 Operator jurisdiction over construction projects; satisfy the EPA eRule requirements; confirm that the Water Quality-Based Effluent Limitations in Part II. have been met; demonstrate consideration of the future risks due to climate change in accordance with Part I I I.A.2.; and confirm that the other Stormwater Pollution Prevention Plan (SWPPP) requirements in Part III. have been met. 1. An eNOl may be submitted for: a. construction activities that are not part of a common plan of development or sale; or 10 Part I.D.1.b. b. an entire common plan of development or sale; or c. separate phase(s) of a common plan of development or sale if the following requirements are met: i. the common plan of development or sale meets the eligibility requirements of Part I.A.5. or 6.; and ii. the phase(s) meet(s) all other eligibility requirements of Part I.A.; and iii. Part III.C. Required SWPPP Components by Project Type is based on the common plan of development or sale, not the phase(s); or d. tree clearing that is associated with, or will support, a renewable energy generation, transmission, or storage project that meets Part I.A.5. and 6., if the tree clearing: i. meets all other eligibility requirements of Part I.A.; and ii. will occur in NYSDEC's Regions 3-9; and iii. is not within '/4 mile of a bat hibernaculum protected pursuant to 6 NYCRR Part 182; and iv, will occur between November 1 st and March 31 st. 2. As prerequisites for submitting an eNOI, the owner or operator must: a. prepare a SWPPP for Part I.D.1.a., b., c., or d. in accordance with Part III.; and b. based on the following criteria, upload the following signature forms signed in accordance with Part VII.J. to the eNOI prior to submission, . i. for all eNOls:. 1. the SWPPP Preparer Certification Form, Appendix F, signed by the SWPPP preparer; and 11 Part I.D.2.b.i.2. 2. the Owner/Operator Certification Form, Appendix J, signed by the owner or operator, and ii. if an eNO1 includes construction activities within the municipal boundary(ies) of Traditional Land Use Control MS4 Operator(s) that will discharge to the MS4(s): 1. determine if the Traditional Land Use Control MS4 Operator(s) have review authority. A Traditional Land Use Control MS4 Operator does not have review authority where: a. the owner or operator of the construction activities in Part I.D.2.b.ii. is the same entity as the Traditional Land Use Control MS4 Operator identified in Part I.D.2.b.ii.; or b. there is a statute exempting the owner or operator from zoning review by the Traditional Land Use Control MS4 Operator, or c. there is no such statute per Part I.D.2.b.ii.1.b., the Traditional Land Use Control MS4 Operator concludes, after public hearing, that it does not have zoning review authority in accordance with Legal Memorandum LU14 Updated January 2020 "Governmental Immunity from Zoning and Other Legislation"; and 2. if the Traditional Land Use Control MS4 Operator(s) have review authority, submit the SWPPP to the Traditional Land Use Control MS4 Operator(s) for review and have: a. if outside the municipal boundaries of NYC: the MS4 SWPPP Acceptance Form, Appendix G, signed by the principal executive officer or ranking elected official from the Traditional Land Use Control MS4 Operator, or by a duly authorized representative of that person in accordance with Part VII.J.2.; or 12 Part I.D.2.b.ii.2.b. b. if within the municipal boundaries of NYC: The City of New York Department of Environmental Protection (NYCDEP) SWPPP Acceptance/Approval Form, Appendix H, signed by the principal executive officer or ranking elected official from the Traditional Land Use Control MS4 Operator, or by a duly authorized representative of that person in accordance with Part VII.J.2.; and 3. if the Traditional Land Use Control MS4 Operator does not have review authority, have the MS4 No Jurisdiction Form, Appendix I, signed by the principal executive officer or ranking elected official from the Traditional Land Use Control MS4 Operator, or by a duly authorized representative of that person in accordance with Part VII.J.2. 3. Submitting an eNOI: a. The owner or operator must submit a complete Notice of Intent electronically using a NYSDEC approved form.2 b. The owner or operator is authorized to commence construction activity as of the authorization date indicated in the Letter of Authorization (LOA), which is sent by NYSDEC after a complete eNO1 is submitted. i. If an eNO1 is received for a SWPPP that deviates from one of the technical standards but demonstrates equivalence in accordance with Part III.B.1.a.ii. or Part III.B.2.b.ii., if the SWPPP includes construction activities that are not within the municipal boundary(ies) of Traditional Land Use Control MS4 Operator(s), and/or if the SWPPP includes construction activities within the municipal boundary(ies) of Traditional Land Use Control MS4 Operator(s) that do not have review authority in accordance with Part I.D.2.b.ii.1., the authorization date indicated in the LOA will be 60 business days after the eNO1 submission date. 2 Unless NYSDEC grants a waiver in accordance with 40 CFR 127.15(c) or(d). All waiver requests must be submitted to Stormwater_info@dec.ny.gov or NYSDEC, Bureau of Water Permits, 625 Broadway, 4th Floor, Albany, New York 12233-3505. 13 Part I.D.3.c. c. If Traditional Land Use Control MS4 Operator(s) have review authority in accordance with Part I.D.2.b.ii.2., the owner or operator must, within five business days of receipt of the LOA, send an electronic copy of the LOA to the Traditional Land Use Control MS4 Operator(s) with review authority. E. General Requirements for Owners or Operators with Permit Coverage 1. As of the date the LOA is received, the owner or operator must make the eNOI, SWPPP, and LOA available for review and copying in accordance with the requirements in Part VII.H. When applicable, as of the date an updated LOA is received, the owner or operator must make the updated LOA available for review and copying in accordance with the requirements in Part VII.H. 2. The owner or operator must ensure compliance with all requirements of this permit and that the provisions of the SWPPP, including any changes made to the SWPPP in accordance with Part III.A.5., are properly implemented and maintained from the commencement of construction activity until: a. all areas of disturbance have achieved final stabilization; and b. the owner's or operator's coverage under this permit is terminated in accordance with Part V.A.5.a. 3. As of the date of the commencement of construction activities until Part I.E.2.a. and b. have been met, the owner or operator must maintain at the construction site, a copy of: a. all documentation necessary to demonstrate eligibility with this permit; and b. this permit; and c. the SWPPP; and d. the signed SWPPP Preparer Certification Form; and e. the signed MS4 SWPPP Acceptance Form or signed NYCDEP SWPPP Acceptance/Approval Form or signed MS4 No Jurisdiction Form (when applicable); and f. the signed Owner/Operator Certification Form; and 14 Part I.E.3.g. g. the eNOI; and h. the LOA; and i. the LOA transmittal to the Traditional Land Use Control MS4 Operator in accordance with Part I.D.3.c. (when applicable). 4. The owner or operator must maintain at the construction site, until Part I.E.2.a. and b. have been met, as of the date the documents become final or are received, a copy of the: a. responsible contractor's or subcontractor's certification statement(s) in accordance with Part III.M.; and b. inspection reports in accordance with Part IV.C.4. and 6.; and c. Request to Disturb Greater Than Five Acres and the Authorization Letter to Disturb Greater Than Five Acres in accordance with Part I.E.6. (when applicable); and d. Request to Continue Coverage and the Letter of Continued Coverage (LOCC) in accordance with Part I.F.2. and 4. (when applicable); and e. The updated LOA(s) in accordance with Part I.E.9. (when applicable). 5. The owner or operator must maintain the documents in Part I.E.3. and 4. in a secure location, such as a job trailer, on-site construction office, or mailbox with lock. The secure location must be accessible during normal business hours to an individual performing a compliance inspection. The documents must be paper documents unless electronic documents are accessible to the inspector during an inspection to the same extent as a paper copy stored at the site would be. If electronic documents are kept on site, the owner or operator must maintain functional equipment on site available to an inspector during normal hours of operation such that an inspector may view the electronic documents in a format that can be read in a similar manner as a paper record and in a legally dependable format with no less evidentiary value than their paper equivalent. 6. The owner or operator must meet the following requirements prior to disturbing greater than five acres of soil at any one time: a. The owner or operator must submit a written Request to Disturb Greater Than Five Acres to: 15 Part I.E.6.a.i. i. NYSDEC's Regional Office Division of Water staff based on the project location, Appendix E, if a Traditional Land Use Control MS4 Operator does not have review authority in accordance with Part I.D.2.b.ii.1.; or ii. the Traditional Land Use Control MS4 Operator, if a Traditional Land Use Control MS4 Operator has review authority in accordance with Part I.D.2.b.ii.1.; or iii. NYSDEC's Regional Office Division of Water staff based on the project location, Appendix E, and each involved Traditional Land Use Control MS4 Operator, if the project spans multiple municipalities with more than one Traditional Land Use Control MS4 Operator involved with review authority in accordance with Part I.D.2.b.ii.1. b. The written Request to Disturb Greater Than Five Acres must include: i. The SPDES permit identification number (Permit ID); and ii. Full technical justification demonstrating why alternative methods of construction that would result in five acres of soil disturbance or less at any one time are not feasible; and iii. The phasing plan for the project and sequencing plans for all phases from the SWPPP in accordance with Part III.B.1.d.; and iv. Plans with locations and details of erosion and sediment control practices such that the heightened concern for erosion when disturbing greater than five acres at one time has been addressed; and v. Acknowledgment that "the owner or operator will comply with the requirements in Part IV.C.2.b."; and vi. Acknowledgment that "the owner or operator will comply with the requirements in Part II.B.1.b." c. The owner or operator must be in receipt of an Authorization Letter to Disturb Greater Than Five Acres, which will include when the 16 Part I.E.6.c. authorization begins and ends and indicate a maximum area (acres) of soil disturbance allowed at any one time, from: i. NYSDEC, if Part I.E.6.a.i. or iii. apply; or ii. the Traditional Land Use Control MS4 Operator, if Part I.E.6.a.ii, applies. 7. Upon a finding of significant non-compliance with the practices described in the SWPPP or violation of this permit, NYSDEC may order an immediate stop to all construction activity at the site until the non-compliance is remedied. The stop work order must be in writing, describe the non-compliance in detail, and be sent to the owner or operator. 8. If any human remains or archaeological remains are encountered during excavation, the owner or operator must immediately cease, or cause to cease, all construction activity in the area of the remains and notify the appropriate Regional Water Engineer (RWE).3 Construction activity shall not resume until written permission to do so has been received from the RWE. 9. To be authorized to implement modifications to the information previously submitted in the eNO1, the owner or operator must: a. notify NYSDEC via email at Stormwater—info@dec.ny.gov requesting access to update the eNO1; and b. update the eNO1 to reflect the modifications and resubmit the eNO1 in accordance with Part I.D.; and c. receive an updated LOA. 10.The eNO1, SWPPP, LOA, updated LOAs (when applicable), and inspection reports required by this permit are public documents that the owner or operator must make available for review and copying by any person within five business days of the owner or operator receiving a written request by any such person to review these documents. Copying of documents will be done at the requester's expense. 3 The Regional Water Manager where a DEC Region does not have a RWE. 17 Part I.F. F. Permit Coverage for Discharges Authorized Under GP-0-20-001 When applicable: 1. Upon the effective date of this permit, an owner or operator of a construction activity, with coverage under GP-0-20-001, will have interim coverage under GP-0-25-001 for 45 calendar days starting on the effective date of GP-0-25- 001 so long as the owner or operator maintains compliance with all applicable requirements of this permit. 2. Within 30 calendar days of the effective date of this permit, the owner or operator, with coverage under GP-0-20-001, must submit a complete Request to Continue Coverage electronically using a NYSDEC approved form,4 which contains the information identified in Part I.F.3. below, if: a. the owner or operator continues to implement the SMP component in conformance with the technical standards in place at the time of initial project authorization; and b. the owner or operator will comply with all non-design requirements of GP- 0-25-001. 3. The Request to Continue Coverage form contains questions to: ensure eligibility requirements in Part I.A. have been met; verify owner or operator contact information; verify the permit identification number; verify the original eNO1 submission ID, if applicable; verify Part I.F.2.a. and b.; verify the version of the Design Manual that the technical/design components conform to; and receive an updated Owner/Operator Certification Form, Appendix I. 4. The owner or operator has obtained continued coverage under GP-0-25-001 as of the date indicated in the LOCC, which is sent by NYSDEC after a complete Request to Continue Coverage form is submitted. 5. If the owner or operator does not submit the Request to Continue Coverage form in accordance with Part I.F.2. and 3., coverage under this permit is automatically terminated after interim coverage expires. 4 Unless NYSDEC grants a waiver in accordance with 40 CFR 127.15(c) or(d). All waiver requests must be submitted to Stormwater_info@dec.ny.gov or NYSDEC, Bureau of Water Permits, 625 Broadway, 41" Floor, Albany, New York 12233-3505. 18 Part I.G. G. Change of Owner or Operator When applicable: 1. When property ownership changes, or when there is a change in operational control over the construction plans and specifications, the following process applies: a. The new owner or operator must meet the applicable prerequisites for submitting an eNOI in accordance with Part I.D.2.; and b. The new owner or operator must submit an eNOI in accordance with Part I.D.3.; and c. Permit coverage for the new owner or operator will be effective upon receipt of the LOA in accordance with Part I.D.3.b.; and d. The new owner or operator, upon receipt of their LOA, must provide their Permit ID to the original owner or operator, and e. If the original owner or operator will no longer be the owner or operator of the construction activity identified in the original owner's or operator's eNOI, the original owner or operator, upon receipt of the new owner's or operator's Permit ID in accordance with Part I.G.1.d., must submit to NYSDEC a completed eNOT in accordance with Part V. that includes the name and Permit ID of the new owner or operator, or f. If the original owner or operator maintains ownership of a portion of the construction activity, the original owner or operator must maintain their coverage under the permit by modifying their eNOI; modifications to the eNOI must include: i. the revised area of disturbance and/or impervious area(s); and il, the revised SMP information, if applicable; and il . a narrative description of what has changed; and iv. the new owner's or operator's Permit ID for the portion of the project removed from the eNOI. Owners or operators must follow Part I.E.9. to modify the eNOI. 19 Part II. Part II. Water Quality-Based Effluent Limitations A. Maintaining Water Quality NYSDEC expects that compliance with the requirements of this permit will control discharges necessary to meet applicable water quality standards. It shall be a violation of the ECL for any discharge to either cause or contribute to a violation of the following water quality standards as contained in Parts 700 through 705 of Title 6 of the Official Compilation of Codes, Rules and Regulations of the State of New York: 1. There must be no increase in turbidity that will cause a substantial visible contrast to natural conditions; and 2. There must be no increase in suspended, colloidal or settleable solids that will cause deposition or impair the waters for their best usages; and 3. There must be no residue from oil and floating substances, nor visible oil film, nor globules of grease. If there is evidence indicating that the stormwater discharges authorized by this permit are causing, have the reasonable potential to cause, or are contributing to a violation of the water quality standard, the owner or operator must take appropriate corrective action in accordance with Part IV.C.5. of this permit and document in accordance with Part IV.C.4. of this permit. To address the water quality standard violation the owner or operator must include and implement appropriate controls in the SWPPP to correct the problem or obtain an individual SPDES permit. If, despite compliance with the requirements of this permit, it is demonstrated that the stormwater discharges authorized by this permit are causing or contributing to a violation of water quality standards, or if NYSDEC determines that a modification of this permit is necessary to prevent a violation of water quality standards, the authorized discharges will no longer be eligible for coverage under this permit, and the owner or operator must obtain an individual SPDES permit prior to further discharges from the construction site. B. Effluent Limitations Applicable to Discharges from Construction Activities Discharges authorized by this permit must achieve, at a minimum, the effluent limitations in Part II.B.1.a., b., c., d., and e. These limitations represent the 20 Part II.B. degree of effluent reduction attainable by the application of best practicable technology currently available. 1. Erosion and Sediment Control Requirements - The owner or operator must select, design, install, implement, and maintain control measures to minimize the discharge of pollutants and prevent a violation of the water quality standards. The selection, design, installation, implementation, and maintenance of these control measures must meet the non-numeric effluent limitations in Part 11.13.1.a., b., c., d., and e. and be in accordance with the New York State Standards and Specifications for Erosion and Sediment Control (BB), dated November 2016, using sound engineering judgment. Where control measures are not designed in conformance with the design criteria included in the technical standard, the owner or operator must include in SWPPP the reason(s) for the deviation, or alternative design, and provide information in the SWPPP demonstrating that the deviation or alternative design is equivalent to the technical standard. a. Erosion and Sediment Controls. At a minimum, erosion and sediment controls must be selected, designed, installed, implemented, and maintained to: i. Minimize soil erosion through application of runoff control and soil stabilization control measure to minimize pollutant discharges; and ii. Control stormwater discharges, including both peak flow rates and total stormwater volume, to minimize channel and streambank erosion and scour in the immediate vicinity of the discharge points; and iii. Minimize the amount of soil exposed during construction activity; and iv. Minimize the disturbance of steep slope; and v. Minimize sediment discharges from the site; and vi. Provide and maintain natural buffers around surface waters, direct stormwaterto vegetated areas and maximize stormwater infiltration to reduce pollutant discharges, unless infeasible; and vii. Minimize soil compaction. Minimizing soil compaction is not required 21 Part II.B.1.a.vii. where the intended function of a specific area of the site dictates that it be compacted; and viii. Unless infeasible, preserve a sufficient amount of topsoil to complete soil restoration and establish a uniform, dense vegetative cover; and ix. Minimize dust. On areas of exposed soil, minimize dust through the appropriate application of water or other dust suppression techniques to control the generation of pollutants that could be discharged from the site. b. Soil Stabilization. In areas where soil disturbance activity has ceased, whether permanently or temporarily ceased, the application of soil stabilization measures must be initiated by the end of the next business day and completed within 14 calendar days from the date the current soil disturbance activity ceased. For construction sites that directly discharge to one of the 303(d) segments listed in Appendix D, or are located in one of the watersheds listed in Appendix C, or are authorized to disturb greater than five acres in accordance with Part I.E.5.a.viii., the application of soil stabilization measures must be initiated by the end of the next business day and completed within seven calendar days from the date the soil disturbance activity ceased. c. Dewatering. Discharges from dewatering activities, including discharges from dewatering of trenches and excavations, must be managed by appropriate control measures. d. Pollution Prevention Measures. Select, design, install, implement, and maintain effective pollution prevention measures to minimize the discharge of pollutants and prevent a violation of the water quality standards. At a minimum, such measures must be selected, designed, installed, implemented, and maintained to: . Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other wash waters. Soaps, detergents and solvents cannot be used; and ii. Minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, hazardous and toxic waste, and other materials present on the site to precipitation 22 Part II.B.1.d.H. and to stormwater. Minimization of exposure is not required in cases where the exposure to precipitation and to stormwater will not result in a discharge of pollutants, or where exposure of a specific material or product poses little risk of stormwater contamination (such as final products and materials intended for outdoor use); and iii. Prevent the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures. e. Surface Outlets. When discharging from basins and impoundments, the surface outlets must be designed, constructed, and maintained in such a manner that sediment does not leave the basin or impoundment and that erosion at or below the outlet does not occur. C. Post-Construction Stormwater Management Practice (SMP) Requirements 1. The owner or operator of a construction activity that requires post- construction SMPs, in accordance with Part III.C., must select, design, install, implement, and maintain the SMPs to meet the performance criteria in the New York State Stormwater Management Design Manual, dated July 31, 2024 (DM), using sound engineering judgment. Where SMPs are not designed in conformance with the performance criteria in the DM, the owner or operator must include in the SWPPP the reason(s) for the deviation or alternative design and provide information which demonstrates that the deviation or alternative design is equivalent to the technical standard. 2. The owner or operator of a construction activity, that requires SMPs in accordance with Part III.C., must design the practices to meet the applicable sizing criteria in Part II.C.2.a., b., c., or d. a. Sizing Criteria for New Development i. Runoff Reduction Volume (RRv) and Water Quality Volume (WQv): 1. Reduce the total WQv by application of RR techniques and standard SMPs with RRv capacity. The total WQv must be calculated in accordance with the criteria in Section 4.2 of the DM; or 23 Part II.C.2.a.i.2. 2. Minimum RRv and Treatment of Remaining Total WQv: Construction activities that cannot meet the requirements in Part II.C.2.a.i.1. due to site limitations must direct runoff from all newly constructed impervious areas to a RR technique or standard SMP with RRv capacity unless infeasible. The specific site limitations that prevent the reduction of 100% of the WQv must be documented in the SWPPP. For each impervious area that is not directed to a RR technique or standard SMP with RRv capacity, the SWPPP must include documentation which demonstrates that all options were considered and for each option explains why it is considered infeasible. In no case shall the runoff reduction achieved from the newly constructed impervious areas be less than the Minimum RRv as calculated using the criteria in Section 4.4 of the DM. The remaining portion of the total WQv that cannot be reduced must be treated by application of standard SMPs. ii. Channel Protection Volume (CPv): Provide 24 hour extended detention of the post-developed 1-year, 24-hour storm event, remaining after runoff reduction. Where a CPv control orifice is provided, the minimum orifice size must be 3 inches, with acceptable external trash rack or orifice protection. The CPv requirement does not apply when: 1. Reduction of the entire CPv is achieved by application of runoff reduction techniques or infiltration systems; or 2. The 1-year post-development peak discharge is less than or equal to 2.0 cfs without detention or velocity controls; or 3. The site directly discharges into a fifth order or larger water body (stream, river, or lake), or tidal waters, where the increase in smaller flows will not impact the stream bank or channel integrity. However, the point of discharge must be adequately protected against scour and erosion by the increased peak discharge. 24 Part II.C.2.a.iii. iii. Overbank Flood Control Criteria (Qp): Requires storage to attenuate the post-development 10-year, 24-hour peak discharge rate (Qp) to predevelopment rates. The Qp requirement does not apply when: 1. the site directly discharges to tidal waters or fifth order or larger streams, or 2. A downstream analysis reveals that overbank control is not required. iv. Extreme Flood Control Criteria (Qf): Requires storage to attenuate the post-development 100-year, 24-hour peak discharge rate (Qf) to predevelopment rates. The Qf requirement does not apply when: 1. the site directly discharges to tidal waters or fifth order or larger streams, or 2. A downstream analysis reveals that overbank control is not required. b. Sizing Criteria for New Development in Enhanced Phosphorus Removal Watersheds i. Runoff Reduction Volume (RRv) and Water Quality Volume (WQv): 1. Reduce the WQv by application of RR techniques and standard SMPs with RRv capacity. The total WQv is the runoff volume from the 1-year, 24-hour design storm over the post-developed watershed and must be calculated in accordance with the criteria in Section 4.3 of the DM; or 2. Minimum RRv and Treatment of Remaining Total WQv: Construction activities that cannot meet the criteria in Part II.C.2.b.i.1. due to site limitations must direct runoff from all newly constructed impervious areas to a RR technique or standard SMP with RRv capacity unless infeasible. The specific site limitations that prevent the reduction of 100% of the WQv must be documented in the SWPPP. For each impervious area that is not directed to a RR technique or standard SMP with RRv capacity, the SWPPP must include 25 Part II.C.2.b.i.2. documentation which demonstrates that all options were considered and for each option explains why it is considered infeasible. In no case shall the runoff reduction achieved from the newly constructed impervious areas be less than the Minimum RRv as calculated using the criteria in Section 4.5 of the DM. The remaining portion of the total WQv that cannot be reduced must be treated by application of standard SMPs. ii. Channel Protection Volume (CPv): Provide 24 hour extended detention of the post-developed 1-year, 24-hour storm event, remaining after runoff reduction. Where a CPv control orifice is provided, the minimum orifice size must be 3 inches, with acceptable external trash rack or orifice protection. The CPv requirement does not apply when: 1. Reduction of the entire CPv is achieved by application of runoff reduction techniques or infiltration systems; or 2. The 1-year post-development peak discharge is less than or equal to 2.0 cfs; or 3. The site directly discharges to tidal waters, or a fifth order or larger water body (stream, river, or lake) where the increase in smaller flows will not impact the stream bank or channel integrity. However, the point of discharge must be adequately protected against scour and erosion by the increased peak discharge. iii. Overbank Flood Control Criteria (Qp): Requires storage to attenuate the post-development 10-year, 24-hour peak discharge rate (Qp) to predevelopment rates. The Qp requirement does not apply when: 1. the site directly discharges to tidal waters or fifth order or larger streams; or 2. A downstream analysis reveals that overbank control is not required. 26 Part II.C.2.b.iv. iv. Extreme Flood Control Criteria (Qf): Requires storage to attenuate the post-development 100-year, 24-hour peak discharge rate (Qf) to predevelopment rates. The Qf requirement does not apply when: 1. the site directly discharges to tidal waters or fifth order or larger streams; or 2. A downstream analysis reveals that overbank control is not required. c. Sizing Criteria for Redevelopment Activity L Water Quality Volume (WQv): The WQv treatment objective for redevelopment activity must be addressed by one of the following options, as outlined in Section 9.2.1. Redevelopment activities located in an Enhanced Phosphorus Removal Watershed (see Part III.B.3. and Appendix C) must calculate the WQv in accordance with Section 4.3 of the DM. All other redevelopment activities must calculate the WQv in accordance with Section 4.2 of the DM. 1. Reduce the existing impervious cover by a minimum of 25% of the total disturbed, impervious area. The Soil Restoration criteria in Section 5.1.6 of the DM must be applied to all newly created pervious areas; or 2. Capture and treat 100% of the required WQv, for a minimum of 25% of the disturbed redevelopment impervious area, by implementation of standard SMPs or reduced by application of runoff reduction techniques; or 3. Capture and treat 100% of the required WQv, for a minimum of 75% of the disturbed redevelopment impervious area, by implementation of a volume-based alternative SMP, as defined in Section 9.4 of the DM; or 4. Capture and treat 100% of the required WQv, for a minimum of 75% of the disturbed redevelopment impervious area, by implementation of a flow-through alternative SMP sized to treat the peak rate of runoff from the WQv design storm; or 27 Part II.C.2.c.i.5. 5. Application of a combination of 1 through 4 above that provide a weighted average of at least two of the above methods. Application of this method must be in accordance with the criteria in Section 9.2.1(A)(V) of the DM; or 6. If there is an existing SMP located on the site that captures and treats runoff from the impervious area that is being disturbed, the WQv treatment option selected must, at a minimum, provide treatment equal to the treatment that was being provided by the existing practice(s) if that treatment is greater than the treatment required by options 1 through 5 above. ii. Channel Protection Volume (CPv) is not required if there is 0% change to hydrology that increases the discharge rate and volume from the project site. iii. Overbank Flood Control (Qp) is not required if there is 0% change to hydrology that increases the discharge rate from the project site. iv. Extreme Flood Control (Qf) is not required if there is 0% change to hydrology that increases the discharge rate from the project site. d. Sizing Criteria for Combination of Redevelopment Activity and New Development Construction projects, that include both new development and redevelopment activity, must use SMPs that meet the sizing criteria calculated as an aggregate of the sizing criteria in Part II.C.2.a. or b. for the new development portion of the project and Part II.C.2.c. for the redevelopment activity portion of the project. Part III. Stormwater Pollution Prevention Plan (SWPPP) A. General SWPPP Requirements 1. A SWPPP must be prepared and implemented by the owner or operator of all construction activity covered by this permit. All authorized discharges must be identified in the SWPPP. The SWPPP must document the selection, design, installation, implementation and maintenance of the control measures and 28 Part III.A.1. practices that will be used to meet the effluent limitations in Part II.B. and, where applicable, the SMP requirements in Part II.C. 2. The SWPPP must demonstrate consideration in narrative format of the future physical risks due to climate change pursuant to the Community Risk and Resiliency Act (CRRA), 6 NYCRR Part 490, and associated guidance. a. The owner or operator must consider: i. the following physical risks due to climate change; (i) increasing temperature; and (ii) increasing precipitation; and (iii) increasing variability in precipitation, including chance of drought; and (iv) increasing frequency and severity of flooding; and (v) rising sea level; and (vi) increasing storm surge; and (vii) shifting ecology, ii. for each of the following: (i) overall site planning; and (ii) location, elevation, and sizing of: a. control measures and practices; and b. conveyance system(s); and c. detention system(s). 3. The SWPPP must describe the erosion and sediment control practices and where required, SMPs that will be used and/or constructed to reduce the pollutants in stormwater discharges and to assure compliance with the 29 Part III.A.3. requirements of this permit. In addition, the SWPPP must identify potential sources of pollution which may reasonably be expected to affect the quality of stormwater discharges. 4. All SWPPPs, that require the SMP component in accordance with Part III.B.2., must be prepared by a qualified professional. 5. The owner or operator must keep the SWPPP current so that, at all times, it accurately documents the erosion and sediment control practices that are being used or will be used during construction, and all SMPs that will be constructed on the site. At a minimum, the owner or operator must modify the SWPPP, including construction drawings: a. whenever the current provisions prove to be ineffective in minimizing pollutants in stormwater discharges from the site; and b. whenever there is a change in design, construction, or operation at the construction site that has or could have an effect on the discharge of pollutants; and c. to address issues or deficiencies identified during an inspection by the qualified inspector, NYSDEC, or other regulatory authority; and d. to document the final construction conditions in an as-built drawing. 6. NYSDEC may notify the owner or operator at any time that the SWPPP does not meet one or more of the minimum requirements of this permit. The notification must be in writing and identify the provisions of the SWPPP that require modification. Within fourteen (14) calendar days of such notification, or as otherwise indicated by NYSDEC, the owner or operator must make the required changes to the SWPPP and submit written notification to NYSDEC that the changes have been made. If the owner or operator does not respond to NYSDEC's comments in the specified time frame, NYSDEC may suspend the owner's or operator's coverage under this permit or require the owner or operator to obtain coverage under an individual SPDES permit in accordance with Part II.D.4. 7. Prior to the commencement of construction activity, the owner or operator must identify the contractor(s) and subcontractor(s) that will be responsible for installing, constructing, repairing, replacing, inspecting, and maintaining the erosion and sediment control practices included in the SWPPP and the 30 Part III.A.7, contractor(s) and subcontractor(s) that will be responsible for constructing the SMPs included in the SWPPP. The owner or operator must have each of the contractors and subcontractors identify at least one person from their company to be trained contractor that will be responsible for implementation of the SWPPP. The owner or operator must ensure that at least one trained contractor is on site daily when soil disturbance activities are being performed. The owner or operator must have each of the contractors and subcontractors identified above sign a copy of the following certification statement below before the commencement of construction activities: "I hereby certify under penalty of law that I understand and agree to comply with the requirements of the SWPPP and agree to implement any corrective actions identified by the qualified inspector during a site inspection. I also understand that the owner or operator must comply with the requirements of the most current version of the New York State Pollutant Discharge Elimination System (SPDES) Construction General Permit (CGP) for Stormwater Discharges from Construction Activities and that it is unlawful for any person to cause or contribute to a violation of water quality standards. Furthermore, I am aware that there are significant penalties for submitting false information, that I do not believe to be true, including the possibility of fine and imprisonment for knowing violations" In addition to providing the certification statement above, the certification page must also identify the specific elements of the SWPPP that each contractor and subcontractor will be responsible for and include the name and title of the person providing the signature; the name and title of the trained contractor responsible for SWPPP implementation; the name, address and telephone number of the contracting firm; the address (or other identifying description) of the site; and the date the certification statement is signed. The owner or operator must attach the certification statement(s) to the copy of the SWPPP that is maintained at the construction site. If new or additional contractors are hired to implement measures identified in the SWPPP after the commencement of construction activities, they must also sign the certification statement and provide the information listed above prior to performing construction activities. 31 Part III.B. B. Required SWPPP Contents 1. Erosion and sediment control component - The owner or operator must prepare a SWPPP that includes erosion and sediment control practices. a. Erosion and sediment control practices must be designed: i. in conformance with the BB; or ii. equivalent to the BB if deviating from Part III.B.1.a.i. b. If the erosion and sediment control practices are designed in conformance with Part III.B.1.a.ii., the SWPPP must include a demonstration of equivalence to the BB. c. At a minimum, the erosion and sediment control component of the SWPPP must include the following: i. Background information about the scope of the project, including the location, type and size of project; and ii. A site map/construction drawing(s) with north arrows for the project, including a general location map. At a minimum, the site map must show the total site area; all improvements; areas of disturbance; areas that will not be disturbed; existing vegetation; on-site and adjacent off-site surface water(s); floodplain/floodway boundaries; wetlands and drainage patterns that could be affected by the construction activity; existing and final contours; locations of different soil types with boundaries; material, waste, borrow or equipment storage areas located on adjacent properties; and location(s) of the stormwater discharge(s) and receiving surface water(s); and iii. A description of the soil(s) present at the site, including an identification of the Hydrologic Soil Group (HSG); and iv. A phasing plan for the project and sequencing plans for all phases, both of which must address clearing and grubbing, excavation and grading, utility and infrastructure installation, final stabilization, 32 Part III.B.1.c.iv. and any other construction activity at the site that will result in soil disturbance. 1. The phasing plan must include:. a. a map delineating and labeling the limits of soil disturbance for all phases of a project; and b. a table identifying the order and intended schedule of when each phase will begin and end its sequencing plan. The table must identify the total disturbed area for each phase at any one time and the total disturbed area for the overall project at any one time all on one timeline showing all overlapping quantities of disturbed area at any one time; and 2. A sequencing plan for a specific phase must include: a. a table indicating the order and intended schedule of construction activities within a phase, and corresponding construction drawings with a description of the work to be performed; and b. all permanent and temporary stabilization measures; and v. A description of the minimum erosion and sediment control practices to be installed or implemented for each construction activity that will result in soil disturbance. Include a schedule that identifies the timing of initial placement or implementation of each erosion and sediment control practice and the minimum time frames that each practice should remain in place or be implemented; and vi. A site map/construction drawing(s) showing the specific location(s), size(s), and length(s) of each erosion and sediment control practice; and vi. The dimensions, material specifications, installation details, and operation and maintenance requirements for all erosion and sediment control practices. Include the location and sizing of any 33 Part III.B.1.c.vii. temporary sediment basins and structural practices that will be used to divert flows from exposed soils; and viii. A maintenance inspection schedule for the contractor(s) and subcontractor(s) identified in Part III.A.7. to ensure continuous and effective operation of the erosion and sediment control practices. The maintenance inspection schedule must be in accordance with the requirements in the BB technical standard; and ix. A description of the pollution prevention measures that will be used to control litter, construction chemicals and construction debris from becoming a pollutant source in the stormwater discharges; and x. A description and location of any stormwater discharges associated with industrial activity other than construction at the site, including, but not limited to, stormwater discharges from asphalt plants and concrete plants located on the construction site; and A. Identification of any elements of the design that are not in conformance with the design criteria in the BB technical standard. Include the reason for the deviation or alternative design and provide information which demonstrates that the deviation or alternative design is equivalent to the technical standard. 2. SMP component— The owner or operator of construction activity identified in Table 2 of Appendix B must prepare a SWPPP that includes SMPs. a. SMPs must be designed in conformance with the applicable sizing criteria in Part II.C.2.a., c., or d.; and b. SMPs must be designed in conformance with the performance criteria. i. in the DM; or ii. equivalent to the DM if deviating from Part III.B.2.b.i.; or iii. in the New York State Stormwater Management Design Manual, dated January 2015 (2015 Design Manual), or equivalent to it, if the following criteria are met: 34 Part III.B.2.b.iii.1. 1. The eNO1 is submitted in accordance with Part I.D. before January 29, 2027 for construction activities that are either: a. subject to governmental review and approval; i. where the owner or operator made any application to that governmental entity prior to the effective date of this permit; and ii. such application included a SWPPP developed using the 2015 Design Manual or equivalent to it; or b. not subject to governmental review and approval:. i. where a fiscal allocation for the construction activities has been developed and approved by a governmental entity; and ii. the SWPPP was developed using the 2015 Design Manual or equivalent to it; and c. If SMPs are designed in conformance with Part III.B.2.b.ii., the SWPPP must include the reason(s) for the deviation or alternative design and a demonstration of equivalence to the DM; and d. If SMPs are designed in conformance with Part III.B.2.b.iii., the SWPPP must include supporting information or documentation demonstrating that Part III.B.2.b.iii.1.a. or b. apply; and e. The SMP component of the SWPPP must include the following: i. Identification of all SMPs to be constructed as part of the project, including which option the SMP designs conform to, either Part III.B.2.b.i., ii., or iii. Include the dimensions, material specifications and installation details for each SMP; and ii. A site map/construction drawing(s) showing the specific location and size of each SMP; and 35 Part III.B.2.e.iii. iii. A Stormwater Modeling and Analysis Report that includes: (i) Map(s) showing pre-development conditions, including watershed/subcatchments boundaries, flow paths/routing, and design points; and (ii) Map(s) showing post-development conditions, including watershed/subcatchments boundaries, flow paths/routing, design points and SMPs; and (iii) Results of stormwater modeling (i.e. hydrology and hydraulic analysis) for the required storm events. Include supporting calculations (model runs), methodology, and a summary table that compares pre- and post-development runoff rates and volumes for the different storm events; and (iv) Summary table, with supporting calculations, which demonstrates that each SMP has been designed in conformance with the sizing criteria included in the DM; and (v) Identification of any sizing criteria that is not required based on the requirements included in Part II.C.; and (vi) Identification of any elements of the design that are not in conformance with the performance criteria in the DM. Include the reason(s) for the deviation or alternative design and provide information which demonstrates that the deviation or alternative design is equivalent to the DM. iv. Soil testing results and locations (test pits, borings); and v. Infiltration test results, when required in accordance with Part III.B.2.a.; and vi. An operations and maintenance plan that includes inspection and maintenance schedules and actions to ensure continuous and effective operation of each SMP. The plan must identify the entity 36 Part III.B.2.e.vi. that will be responsible for the long-term operation and maintenance of each practice; and 3. Enhanced Phosphorus Removal Standards - The owner or operator of construction activity identified in Table 2 of Appendix B that is located in a watershed identified in Appendix C must prepare a SWPPP that includes SMPs designed in conformance with the applicable sizing criteria in Part II.C.2.b., c., or d. and the performance criteria Enhanced Phosphorus Removal Standards included in the DM. At a minimum, the SMP component of the SWPPP must meet the requirements of Part III.B.2. C. Required SWPPP Components by Project Type Owners or operators of construction activities, identified in Table 1 of Appendix B, are required to prepare a SWPPP that only includes erosion and sediment control practices designed in accordance with Part I11.B.1. Owners or operators of the construction activities, identified in Table 2 of Appendix B, must prepare a SWPPP that also includes SMPs designed in accordance with Part 111.B.2 or 3. For the entire area of disturbance, including the entire common plan of development or sale if applicable, the owner or operator must evaluate every bullet from Appendix B Table 1 and Table 2 separately. If bullets from both Table 1 and Table 2 apply, the SWPPP must include erosion and sediment control practices for all construction activities but SMPs for only those portions of the construction activities that fall under Table 2 bullet(s). Part IV. Inspection and Maintenance Requirements A. General Construction Site Inspection and Maintenance Requirements 1. The owner or operator must ensure that all erosion and sediment control practices (including pollution prevention measures), and all SMPs identified in the SWPPP, are inspected and maintained in accordance with Part IV.B. and C. B. Contractor Maintenance Inspection Requirements 1. The owner or operator of each construction activity, identified in Tables 1 and 2 of Appendix B, must have a trained contractor inspect the erosion and sediment control practices and pollution prevention measures being 37 Part IV.B.1, implemented within the active work area daily to ensure that they are being maintained in effective operating condition at all times. If deficiencies are identified, the contractor must: a. if the corrective action does not require engineering design: i. begin implementing corrective actions within one business day; and ii. complete the corrective actions within five business days; or b. if the corrective action requires engineering design: i. begin the engineering design process within five business days; and ii. complete the corrective action in a reasonable time frame but no later than within 60 calendar days. 2. For construction sites where soil disturbance activities have been temporarily suspended (e.g. winter shutdown) and temporary stabilization measures have been applied to all disturbed areas, the trained contractor can stop conducting the maintenance inspections in accordance with Part IV.B.1. The trained contractor must begin conducting the maintenance inspections in accordance with Part IV.13.1. as soon as soil disturbance activities resume. 3. For construction sites where soil disturbance activities have been shut down with partial project completion, the trained contractor can stop conducting the maintenance inspections in accordance with Part IV.B.1. if all areas disturbed as of the project shutdown date have achieved final stabilization and all SMPs required for the completed portion of the project have been constructed in conformance with the SWPPP and are operational. C. Qualified Inspector Inspection Requirements 1. With the exception of the following construction activities identified in Tables 1 and 2 of Appendix B, a qualified inspector must conduct site inspections for all other construction activities identified in Tables 1 and 2 of Appendix B: a. the construction of a single-family residential subdivision with 25% or less impervious cover at total site build-out that involves a soil disturbance of one (1) or more acres of land but less than or equal to five (5) acres and is 38 Part IV.C.1.a. not located in one of the watersheds listed in Appendix C and not directly discharging to one of the 303(d) segments listed in Appendix D; and b. the construction of a single-family home that involves soil disturbances of one (1) or more acres but less than or equal to five (5) acres and is not located in one of the watersheds listed in Appendix C and not directly discharging to one of the 303(d) segments listed in Appendix D; and c. construction on agricultural property that involves soil disturbances of one (1) or more acres but less than five (5) acres; and d. construction activities located in the New York City Watershed located east of the Hudson River, see Appendix C Figure 1, that involve soil disturbances of 5,000 square feet or more, but less than one acre. 2. The qualified inspector must conduct site inspections in accordance with the following timetable: a. For construction sites where soil disturbance activities are on-going, the qualified inspector must conduct a site inspection at least once every seven (7) calendar days; or b. For construction sites where soil disturbance activities are on-going and the owner or operator has received authorization in accordance with Part I.E.6. to disturb greater than five (5) acres of soil at any one time, the qualified inspector must conduct at least two (2) site inspections every seven (7) calendar days. The two (2) inspections must be separated by a minimum of two (2) full calendar days; or c. For construction sites where soil disturbance activities have been temporarily suspended (e.g. winter shutdown) and temporary stabilization measures have been applied to all disturbed areas, the qualified inspector must conduct a site inspection at least once every thirty (30) calendar days. The owner or operator must notify the DOW Water (SPDES) Program contact at the Regional Office (see contact information in Appendix E) or, in areas under the jurisdiction of a Traditional Land Use Control MS4 Operator, the Traditional Land Use Control MS4 Operator (provided the Traditional Land Use Control MS4 Operator is not the owner or operator of the construction activity) by hard copy or email prior to reducing the inspections to this frequency and again by hard copy or email prior to re-commencing construction; or 39 Part IV.C.2.d. d. For construction sites where soil disturbance activities have been shut down with partial project completion, the requirement to have the qualified inspector conduct inspections ceases if all areas disturbed as of the project shutdown date have achieved final stabilization and all SMPs required for the completed portion of the project have been constructed in conformance with the SWPPP and are operational. The owner or operator must notify the DOW Water (SPDES) Program contact at the Regional Office (see contact information in Appendix E) or, in areas subject to the review authority of Traditional Land Use Control MS4 Operator(s) in accordance with Part I.D.2.b.ii.1., the Traditional Land Use Control MS4 Operator(s) (provided the Traditional Land Use Control MS4 Operator(s) are not the owners or operators of the construction activity) in writing prior to the shutdown and again in writing prior to resuming construction activity. If soil disturbance activities are not resumed within 2 years from the date of shutdown, the owner or operator must terminate coverage by meeting the requirements of Part V; or e. For construction sites involving soil disturbance of one (1) or more acres that directly discharge to one of the 303(d) segments listed in Appendix D or is located in one of the watersheds listed in Appendix C, the qualified inspector must conduct at least two (2) site inspections every seven (7) calendar days. The two (2) inspections must be separated by a minimum of two (2) full calendar days. 3. At a minimum, the qualified inspector must inspect: a. all erosion and sediment control practices and pollution prevention measures to ensure integrity and effectiveness; and b. all SMPs under construction to ensure that they are constructed in conformance with the SWPPP; and c. all areas of disturbance that have not achieved final stabilization; and d. all points of discharge to surface waters of the State located within, or immediately adjacent to, the property boundaries of the construction site; and e. all points of discharge from the construction site.. 40 Part IV.C.4. 4. The qualified inspector must prepare an inspection report subsequent to each and every inspection. At a minimum, the inspection report must include and/or address all of the following, for all construction activities except those listed in Part IV.C.1.: a. Permit identification number; and b, Date and time of inspection; and c. Name and title of person(s) performing inspection; and d. A description of the weather and soil conditions (e.g. dry, wet, saturated) at the time of the inspection, including the temperature at the time of the inspection; and e. A description of the condition of the runoff at all points of discharge from the construction site. This must include identification of any discharges of sediment from the construction site. Include discharges from conveyance systems (i.e. pipes, culverts, ditches, etc.) and overland flow; and f. A description of the condition of all surface waters of the State located within, or immediately adjacent to, the property boundaries of the construction site which receive runoff from disturbed areas. This must include identification of any discharges of sediment to the surface waters of the State; and g. Identification of all erosion and sediment control practices and pollution prevention measures that need repair or maintenance; and h. Identification of all erosion and sediment control practices and pollution prevention measures that were not installed properly or are not functioning as designed and need to be reinstalled or replaced; and i. Description and sketch (map) of areas with active soil disturbance activity, areas that have been disturbed but are inactive at the time of the inspection, and areas that have been stabilized (temporary and/or final) since the last inspection; and j. Estimates, in square feet or acres, of the following areas: 41 Part IV.C.4.j.i. i. Total area with active soil disturbance (not requiring either temporary stabilization or final stabilization); and ii. Total area with inactive soil disturbance (requiring either temporary stabilization or final stabilization); and iii. Total area that has achieved temporary stabilization; and iv. Total area that has achieved final stabilization; and k. Current stage of construction of all SMPs and identification of all construction activity on site that is not in conformance with the SWPPP and technical standards; and 1. Corrective action(s) that must be taken to install, repair, replace or maintain erosion and sediment control practices and pollution prevention measures; and to correct deficiencies identified with the construction of the SMP(s); and m. Identification and status of all corrective actions that were required by previous inspection; and n. Digital photographs, with date stamp, that clearly show the condition of all practices that have been identified as needing corrective actions. The qualified inspector must attach color copies of the digital photographs to the inspection report being maintained onsite within seven (7) calendar days of the date of the inspection. The qualified inspector must also take digital photographs, with date stamp, that clearly show the condition of the practice(s) after the corrective action has been completed. The qualified inspector must attach paper color copies of the digital photographs to the inspection report that documents the completion of the corrective action work within seven (7) calendar days of that inspection. 5. Within one business day of the completion of an inspection, the qualified inspector must notify the owner or operator, and appropriate contractor or subcontractor identified in Part III.A.7., of any corrective actions that need to be taken. The contractor or subcontractor must: a.. if the corrective action does not require engineering design: 42 Part IV.C.5.a.i. i. begin implementing corrective actions within one business day; and ii. complete the corrective actions within five business days; or b. if the corrective action requires engineering design: i. begin the engineering design process within five business days; and ii. complete the corrective action in a reasonable time frame but no later than within 60 calendar days. 6. All inspection reports must be signed by the qualified inspector. In accordance with Part I.E.3., the inspection reports must be maintained on site with the SWPPP. Part V. How to Terminate CGP Coverage A. Electronic Notice of Termination (eNOT) Submittal The eNOT contains questions to ensure requirements in Part V.A. have been met. 1 . An owner or operator must terminate coverage when one or more of the following requirements have been met: a. Total project completion: i. all construction activity identified in the SWPPP has been completed; and ii. all areas of disturbance have achieved final stabilization; and iii. all temporary, structural erosion and sediment control measures have been removed; and iv. all SMPs have been constructed in conformance with the SWPPP and are operational; and v. an as-built drawing has been prepared; or 43 Part V.A.1.b. b. Planned shutdown with partial project completion, i. all soil disturbance activities have ceased; and ii. all areas disturbed as of the project shutdown date have achieved final stabilization; and iii. all temporary, structural erosion and sediment control measures have been removed; and iv. all SMPs required for the completed portion of the project have been constructed in conformance with the SWPPP and are operational; and v. an as-built drawing has been prepared; or c. In accordance with Part I.G. Change of Owner or Operator; or d. The owner or operator has obtained coverage under an alternative general SPDES permit or an individual SPDES permit. 2. For construction activities that require qualified inspector inspections in accordance with Part N.C.1. and have met Part V.A.1.a. or b., the owner or operator must have the qualified inspector perform a final site inspection prior to submitting the eNOT. The qualified inspector must, by signing the "Final Stabilization" and "Post-Construction Stormwater Management Practice(s)" certification statements on the eNOT, certify that all the requirements in Part V.A.1.a. or b. have been achieved. 3. For construction activities that are subject to the review authority of Traditional Land Use Control MS4 Operator(s) in accordance with Part I.D.2.b.ii.1. and meet Part V.A.1.a. or b., the owner or operator must have the Traditional Land Use Control MS4 Operator(s) sign the "MS4 Acceptance" statement on the eNOT in accordance with the requirements in Part VII.J. A Traditional Land Use Control MS4 Operator official, by signing this statement, determined that it is acceptable for the owner or operator to submit the eNOT in accordance with the requirements of this Part. A Traditional Land Use Control MS4 Operator can make this determination by performing a final site inspection themselves or by accepting the qualified inspector's final site inspection certification(s) when required in Part V.A.2. 44 Part V.A.4. 4. For construction activities that require SMPs and meet Part V.A.1.a. orb., the owner or operator must, prior to submitting the eNOT, ensure one of the following: a. for SMP(s) that were constructed by a private entity, but will be owned, operated, and maintained by a public entity, the SMP(s) and any right-of- way(s) needed to operate and maintain such practice(s) have been deeded to the municipality in which the practice(s) is located; or b. for SMP(s) that are privately owned, but will be operated and maintained by a public entity, an executed operation and maintenance agreement is in place with the municipality that will operate and maintain the SMP(s); or c. for SMP(s) that are privately owned, the owner or operator has a mechanism in place that requires operation and maintenance of the practice(s) in accordance with the operation and maintenance plan, such as a deed covenant in the owner or operator's deed of record; or d. for SMP(s) that are owned by a public or private institution (e.g. school, university, hospital), government agency or authority, or public utility, the owner or operator has policies and procedures in place that ensure operation and maintenance of the practices in accordance with the operation and maintenance plan. 5. An owner or operator that has met the requirements of Part V.A.1., 2., 3., and 4. must request termination of coverage under this permit by submitting a complete Notice of Termination form electronically using a NYSDEC approved form.5 a. The owner's or operator's coverage is terminated as of the termination date indicated in the Letter of Termination (LOT), which is sent by NYSDEC after a complete eNOT is submitted. 5 Unless NYSDEC grants a waiver in accordance with 40 CFR 127.15(c) or(d). All waiver requests must be submitted to Stormwater_info@dec.ny.gov or NYSDEC, Bureau of Water Permits, 625 Broadway, 4�h Floor, Albany, New York 12233-3505. 45 Part VI. Part VI. Record Retention and Reporting A. Record Retention The owner or operator must retain a copy of the documents listed in Part I.E.3. and a copy of the LOT for a period of at least five years from the date that NYSDEC accepts a complete NOT submitted in accordance with Part V. B. Reporting Except for the eNO1, the signature forms associated with the eNO1, and the eNOT, all other written correspondence requested by NYSDEC, including individual permit applications, must be sent to the address of the appropriate DOW (SPDES) Program contact at the Regional Office listed in Appendix E. Part VII. Standard Permit Requirements For the purposes of this permit, examples of contractors and subcontractors include: third-party maintenance and construction contractors. A. Duty to Comply The owner or operator, and all contractors or subcontractors, must comply with all requirements of this permit. Any non-compliance with the requirements of this permit constitutes a violation of the New York State Environmental Conservation Law (ECL), and its implementing regulations, and is grounds for enforcement action. Filing of a request for termination of coverage under this permit, or a notification of planned changes or anticipated non-compliance, does not limit, diminish or stay compliance with any requirements of this permit. B. Need to Halt or Reduce Activity Not a Defense The necessity to halt or reduce the construction activity regulated by this permit, in order to maintain compliance with the requirements of this permit, must not be a defense in an enforcement action. C. Penalties There are substantial criminal, civil, and administrative penalties associated with violating the requirements of this permit. Fines of up to $37,500 per day for each 46 Part VII.C. violation and imprisonment for up to 15 years may be assessed depending upon the nature and degree of the offense. D. False Statements Any person who knowingly makes any false material statement, representation, or certification in any application, record, report, or other document filed or required to be maintained under this permit, including monitoring reports or reports of compliance or noncompliance must, upon conviction, be punished in accordance with ECL §71-1933 and or New York State Penal Law Articles 175 and 210. E. Re-Opener Clause Upon issuance of this permit, a determination has been made on the basis of a submitted Notice of Intent, plans, or other available information, that compliance with the specified permit requirements will reasonably protect classified water use and assure compliance with applicable water quality standards. Satisfaction of the requirements of this permit notwithstanding, if operation pursuant to this permit causes or contributes to a condition in contravention of State water quality standards or guidance values, or if NYSDEC determines that a modification is necessary to prevent impairment of the best use of the waters or to assure maintenance of water quality standards or compliance with other provisions of ECL Article 17 or the Clean Water Act (CWA), or any regulations adopted pursuant thereto, NYSDEC may require such modification and the Commissioner may require abatement action to be taken by the owner or operator and may also prohibit such operation until the modification has been implemented. F. Duty to Mitigate The owner or operator, and its contractors and subcontractors, must take all reasonable steps to minimize or prevent any discharge in violation of this permit which has a reasonable likelihood of adversely affecting human health or the environment. G. Requiring Another General Permit or Individual SPDES Permit NYSDEC may require any owner or operator authorized to discharge in accordance with this permit to apply for and obtain an individual SPDES permit or apply for authorization to discharge in accordance with another general SPDES permit. 1. Cases where an individual SPDES permit or authorization to discharge in accordance with another general SPDES permit may be required include, but is not limited to the following: 47 Part VII.G.1.a. a. the owner or operator is not in compliance with the conditions of this permit or does not meet the requirements for coverage under this permit; and b. a change has occurred in the availability of demonstrated technology or practices for the control or abatement of pollutants applicable to the point source; and c. new effluent limitation guidelines or new source performance standards are promulgated that are applicable to point sources authorized to discharge in accordance with this permit; and d. existing effluent limitation guidelines or new source performance standards that are applicable to point sources authorized to discharge in accordance with this permit are modified; and e. a water quality management plan containing requirements applicable to such point sources is approved by NYSDEC; and f. circumstances have changed since the time of the request to be covered so that the owner or operator is no longer appropriately controlled under this permit, or either a temporary or permanent reduction or elimination of the authorized discharge is necessary; and g. the discharge is in violation of section 17-0501 of the ECL; and h. the discharge(s) is a significant contributor of pollutants. In making this determination, NYSDEC may consider the following factors: i. the location of the discharge(s) with respect to surface waters of the State; and ii. the size of the discharge(s); and iii. the quantity and nature of the pollutants discharged to surface waters of the State; and iv. other relevant factors including compliance with other provisions of ECL Article 17, or the CWA. 2. When NYSDEC requires any owner or operator authorized by this permit to apply for an individual SPDES permit as provided for in this subdivision, it must notify the owner or operator in writing that a permit application is required. This notice must include a brief statement of the reasons for this decision, an application 48 Part VII.G.2. form, a statement setting a time for the owner or operator to file the application for an individual SPDES permit, and a deadline, not sooner than 180 days from the owner's or operator's receipt of the notification letter, whereby the authorization to discharge under this permit must be terminated. NYSDEC may grant additional time upon demonstration, to the satisfaction of the RWE,6 that additional time to apply for an alternative authorization is necessary or where NYSDEC has not provided a permit determination in accordance with 6 NYCRR Part 621. 3. When an individual SPDES permit is issued to an owner or operator authorized to discharge under this permit for the same discharge(s), this permit authorization for construction activities authorized under the individual SPDES permit is automatically terminated on the effective date of the individual SPDES permit unless termination is earlier in accordance with 6 NYCRR Part 750. H. Duty to Provide Information The owner or operator must furnish to NYSDEC, within five business days, unless otherwise set forth by NYSDEC, any information that NYSDEC may request to determine whether cause exists to determine compliance with this permit or to determine whether cause exists for requiring an individual SPDES permit in accordance with 6 NYCRR 750-1.21(e) (see Part VII.G. Requiring Another General Permit or Individual Permit). The owner or operator must make available to NYSDEC, for inspection and copying, or furnish to NYSDEC within 25 business days of receipt of a NYSDEC request for such information, any information retained in accordance with this permit. Except for Part I.D.4. and 5. and Part I.G., the following applies: where the owner or operator becomes aware that it failed to submit any relevant facts on the Notice of Intent, or submitted incorrect information in a Notice of Intent or in any report to NYSDEC, the owner or operator must submit such facts or corrected information to NYSDEC within five business days. I. Extension In the event a new permit is not issued and effective prior to the expiration of this permit, and this permit is extended pursuant to the State Administrative Procedure Act and 6 NYCRR Part 621, then the owner or operator with coverage under this permit may continue to operate and discharge in accordance with the requirements of this permit until a new permit is issued and effective. 6 The Regional Water Manager where a DEC Region does not have a RWE. 49 Part VII.J. J. Signatories and Certification The Notice of Intent, Notice of Termination, and reports required by this permit must be signed as provided in 40 CFR §122.22. 1. All Notices of Intent and Notices of Termination must be signed as follows.. a. For a corporation. By a responsible corporate officer. For the purpose of this section, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy- or decision-making functions for the corporation; or (ii) the manager of one or more manufacturing, production or operating facilities, provided, the manager is authorized to make management decisions which govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for Notice of Intent or Notice of Termination requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. Note: NYSDEC does not require specific assignments or delegations of authority to responsible corporate officers identified in 40 CFR §122.22(a)(1)(i). NYSDEC will presume that these responsible corporate officers have the requisite authority to sign the Notice of Intent or Notice of Termination unless the corporation has notified NYSDEC to the contrary. Corporate procedures governing authority to sign a Notice of Intent or Notice of Termination may provide for assignment or delegation to applicable corporate positions under 40 CFR §122.22(a)(1)(ii) rather than to specific individuals. b. For a partnership or sole proprietorship. By a general partner or the proprietor, respectively. 50 Part VII.J.1.c. c. For a municipality, State, Federal, or other public agency. By either a principal executive officer or ranking elected official. For purposes of this section, a principal executive officer of a Federal agency includes: 1. the chief executive officer of the agency; or Z a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency (e.g., Regional Administrators of EPA). 2. All reports required by this permit, and other information requested by NYSDEC, must be signed by a person described in Part VII.J.1., or by a duly authorized representative of that person. A person is a duly authorized representative only if: a. The authorization is made in writing by a person described in Part VII.J.1. or using the Duly Authorized Form, found on the DEC website; and b. The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and c. The written authorization is submitted to NYSDEC. 3. Changes to authorization. If an authorization under Part VII.J.2. is no longer accurate because a different individual or position has responsibility for the overall operation of the construction activity, a new authorization satisfying the requirements of Part VII.J.2. must be submitted to NYSDEC prior to or together with any reports, information, or applications to be signed by an authorized representative. 4. Certification. Any person signing a document under Part VII.J.1. or 2. must make the following certification: 1 certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who 51 Part VII.J.4. manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. 5. Electronic reporting. If documents described in Part VII.J.1. or 2. are submitted electronically by or on behalf of the construction activity with coverage under this permit, any person providing the electronic signature for such documents must meet all relevant requirements of this section, and must ensure that all of the relevant requirements of 40 CFR Part 3 (including, in all cases, subpart D to Part 3) (Cross-Media Electronic Reporting) and 40 CFR Part 127 (NPDES Electronic Reporting Requirements) are met for that submission. K. Inspection and Entry The owner or operator must allow NYSDEC, the USEPA Regional Administrator, the applicable county health department, or any authorized representatives of those entities, or, in the case of a construction site which discharges through an MS4, an authorized representative of the MS4 receiving the discharge, upon the presentation of credentials and other documents as may be required by law, to: 1. enter upon the owner's or operator's premises where a regulated facility or activity is located or conducted or where records must be kept under the requirements of this permit; and 2. have access to and copy at reasonable times, any records that must be kept under the requirements of this permit, including records required to be maintained for purposes of operation and maintenance; and 3. inspect at reasonable times any facilities, equipment (including monitoring and control equipment), practices or operations regulated or required under this permit; and 4. sample or monitor at reasonable times, for the purposes of assuring general SPDES permit compliance or as otherwise authorized by the CWA or ECL, any substances or parameters at any location; and 5. enter upon the property of any contributor to the regulated facility or activity under authority of the owner or operator. 52 Part VILL. L. Confidentiality of Information The following must not be held confidential: this permit, the fact sheet for this permit, the name and address of any owner or operator, effluent data, the Notice of Intent, and information regarding the need to obtain an individual permit or an alternative general SPDES permit. This includes information submitted on forms themselves and any attachments used to supply information required by the forms (except information submitted on usage of substances). Upon the request of the owner or operator, NYSDEC must make determinations of confidentiality in accordance with 6 NYCRR Part 616, except as set forth in the previous sentence. Any information accorded confidential status must be disclosed to the Regional Administrator upon his or her written request. Prior to disclosing such information to the Regional Administrator, NYSDEC will notify the Regional Administrator of the confidential status of such information. M. Other Permits May Be Required Nothing in this permit relieves the owner or operatorfrom a requirement to obtain any other permits required by law. N. NYSDEC Orders or Civil Decrees/Judgments The issuance of this permit by the NYSDEC, and the coverage under this permit by the owner or operator, does not supersede, revoke, or rescind any existing order on consent or civil Decree/Judgment, or modification to any such documents or to any order issued by the Commissioner, or any of the terms, conditions, or requirements contained in such order or modification therefore, unless expressly noted. O. Property Rights Coverage under this permit does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorize any injury to private property or any invasion of personal rights, nor any infringement of Federal, State, or local laws or regulations, nor does it obviate the necessity of obtaining the assent of any other jurisdiction as required by law for the discharge authorized. P. Compliance with Interstate Standards If the construction activity covered by this permit originates within the jurisdiction of an interstate water pollution control agency, then the construction activity must also comply with any applicable effluent standards or water quality standards promulgated by that interstate agency and as set forth in this permit for such construction activities. 53 Part VII.Q. Q. Oil and Hazardous Substance Liability Coverage under this permit does not affect the imposition of responsibilities upon, or the institution of any legal action against, the owner or operator under section 311 of the CWA, which must be in conformance with regulations promulgated pursuant to section 311 governing the applicability of section 311 of the CWA to discharges from facilities with NPDES permits, nor must such issuance preclude the institution of any legal action or relieve the owner or operator from any responsibilities, liabilities, or penalties to which the owner or operator is or may be subject pursuant to the Comprehensive Environmental Response, Compensation and Liability Act of 1980, 42 U.S.C. section 9601 et seq. (CERCLA). R. Severability The provisions of this permit are severable, and if any provision of this permit, or the application of any provision of this permit to any circumstance, is held invalid, the application of such provision to other circumstances, and the remainder of this permit, must not be affected thereby. S. NYSDEC Approved Forms The owner or operator must provide all relevant information that is requested by NYSDEC, and required by this permit, on all NYSDEC approved forms. 54 Appendix A APPENDIX A—Abbreviations and Definitions Abbreviations APO — Agency Preservation Officer BB — New York State Standards and Specifications for Erosion and Sediment Control (Blue Book), dated November 2016 BMP — Best Management Practice CPESC — Certified Professional in Erosion and Sediment Control CPv — Channel Protection Volume CWA — Clean Water Act (or the Federal Water Pollution Control Act, 33 U.S.C. §1251 et seq) DM — New York State Stormwater Management Design Manual (Design Manual), dated July 31, 2024 DOW— Division of Water EAF — Environmental Assessment Form ECL — chapter 43-B of the Consolidated Laws of the State of New York, entitled the Environmental Conservation Law EPA — U.S. Environmental Protection Agency HSG — Hydrologic Soil Group MS4 — Municipal Separate Storm Sewer System NOI — Notice of Intent NOT — Notice of Termination NPDES — National Pollutant Discharge Elimination System NYC — The City of New York NYCDEP — The City of New York Department of Environmental Protection NYSDEC — The New York State Department of Environmental Conservation OPRHP — Office of Parks, Recreation and Historic Places Qf— Extreme Flood Qp — Overbank Flood RR — Runoff Reduction RRv — Runoff Reduction Volume RWE — Regional Water Engineer SEQR — State Environmental Quality Review Act SHPA — State Historic Preservation Act SMP — Post-Construction Stormwater Management Practice SPDES — State Pollutant Discharge Elimination System SWPPP — Stormwater Pollution Prevention Plan TMDL — Total Maximum Daily Load UPA — Uniform Procedures Act USDA — United States Department of Agriculture WQv— Water Quality Volume 55 Appendix A Definitions All definitions in this section are solely for the purposes of this permit. If a word is not italicized in the permit, use its common definition.. Agricultural Building — a structure designed and constructed to house farm implements, hay, grain, poultry, livestock or other horticultural products; excluding any structure designed, constructed or used, in whole or in part, for human habitation, as a place of employment where agricultural products are processed, treated or packaged, or as a place used by the public. Agricultural Property — the land for construction of a barn, agricultural building, silo, stockyard, pen or other structural practices identified in Table II in the "Agricultural Best Management Practice Systems Catalogue" (dated June 2023). Alter Hydrology from Pre- to Post-Development Conditions — the post-development peak flow rate(s) has increased by more than 5% of the pre-developed condition for the design storm of interest (e.g. 10 yr and 100 yr). Combined Sewer System — a sewer system which conveys sewage and stormwater through a single pipe system to a publicly owned treatment works. Commence (Commencement of) Construction Activities —the initial disturbance of soils associated with clearing, grading or excavation activities; or other construction related activities that disturb or expose soils such as demolition, stockpiling of fill material, and the initial installation of erosion and sediment control practices required in the SWPPP. See definition for "Construction Activity(ies)" also. Common Plan of Development or Sale — a contiguous area where multiple separate and distinct construction activities are occurring, or may occur, under one plan. The "common plan" of development or sale is broadly defined as any announcement or piece of documentation (including a sign, public notice or hearing, marketing plan, advertisement, drawing, permit application, State Environmental Quality Review Act (SEQR) environmental assessment form or other documents, zoning request, computer design, etc.) or physical demarcation (including boundary signs, lot stakes, surveyor markings, etc.) indicating construction activities may occur on a specific plot. A common plan of development or sale is comprised of two or more phases. Common plan of development or sale does not include separate and distinct construction activities that are occurring, or may occur, under one plan that are at least 1/4 mile apart provided any interconnecting road, pipeline or utility project that is part of the same "common plan" is not concurrently being disturbed. 56 Appendix A Construction Activity(ies) — identified within 40 CFR 122.26(b)(14)(x), 122.26(b)(15)(i), and 122.26(b)(15)(ii), any clearing, grading, excavation, filling, demolition or stockpiling activities that result in soil disturbance. Clearing activities can include, but are not limited to, mechanized logging equipment operation, the cutting and skidding of trees, stump removal and/or brush root removal. Construction activity does not include routine maintenance that is performed to maintain the original line and grade, hydraulic capacity, or original purpose of a facility, which is excluded from the calculation of the soil disturbance for a project. Routine maintenance includes, but is not limited to: • Re-grading of gravel roads or parking lots; and • Cleaning and shaping of existing roadside ditches and culverts that maintains the approximate original line and grade, and maintains or improves the hydraulic capacity of the ditch; and • Replacement of existing culverts that maintains the approximate original line and grade, and maintains or improves the hydraulic capacity of a ditch; and • Replacement of existing bridges that maintains the approximate original line and grade, and maintains or improves the hydraulic capacity beneath the bridges; and • Cleaning and shaping of existing roadside ditches that does not maintain the approximate original grade, hydraulic capacity and purpose of the ditch if the changes to the line and grade, hydraulic capacity or purpose of the ditch are installed to improve water quality and quantity controls (e.g. installing grass lined ditch); and ■ Placement of aggregate shoulder backing that stabilizes the transition between the road shoulder and the ditch or embankment; and • Full depth milling and filling of existing asphalt pavements, replacement of concrete pavement slabs, and similar work that does not expose soil or disturb the bottom six (6) inches of subbase material; and • Long-term use of equipment storage areas at or near highway maintenance facilities; and • Removal of sediment from the edge of the highway to restore a previously existing sheet-flow drainage connection from the highway surface to the highway ditch or embankment; and • Existing use of Canal Corp owned upland disposal sites for the canal, and • Replacement of curbs, gutters, sidewalks and guide rail posts; and • Maintenance of ski trails including brush hog use and mowing; and • Above ground snowmaking pipe replacement; and • Replacement of existing utility poles; etc. Construction Site —the land area where construction activity(ies) will occur. See also the definitions for "Commence (Commencement of) Construction Activities"and "Common Plan of Development or Sale." 57 Appendix A Dewatering — the act of draining rainwater and/or groundwater from building foundations, vaults or excavations/trenches. Directly Discharge(s)(ing) (to a specific surface waterbody) — runoff flows from a construction site by overland flow and the first point of discharge is the specific surface waterbody, or runoff flows from a construction site to a separate storm sewer system and the first point of discharge from the separate storm sewer system is the specific surface waterbody. Discharge(s)(d) — any addition of any pollutant to waters of the State through an outlet or point source. Embankment— an earthen or rock slope that supports a road/highway. Equivalent (Equivalence) — the practice or measure meets all the performance, longevity, maintenance, and safety objectives of the technical standard and will provide an equal or greater degree of water quality protection. Final Stabilization — all soil disturbance activities have ceased and a uniform, perennial vegetative cover with a density of eighty (80) percent over the entire pervious surface has been established; or other equivalent stabilization measures, such as permanent landscape mulches, rock rip-rap or washed/crushed stone have been applied on all disturbed areas that are not covered by permanent structures, concrete or pavement. Historic Property — any building, structure, site, object or district that is listed on the State or National Registers of Historic Places or is determined to be eligible for listing on the State or National Registers of Historic Places. Impervious Area (Cover) — all impermeable surfaces that cannot effectively infiltrate rainfall. This includes paved, concrete and compacted gravel surfaces (i.e. parking lots, driveways, roads, runways and sidewalks); building rooftops and miscellaneous impermeable structures such as patios, pools, and sheds. Infeasible — not technologically possible, or not economically practicable and achievable considering best industry practices. Minimize(ing)(ation) — reduce and/or eliminate to the extent achievable using control measures (including best management practices) that are technologically available and economically practicable and achievable in light of best industry practices. Municipal Separate Storm Sewer System (MS4) - a conveyance or system of conveyances (including roads with drainage systems, municipal streets, catch basins, curbs, gutters, ditches, man-made channels, or storm drains): 58 Appendix A 1. owned or operated by a State, city, town, village, borough, county, parish, district, association, or other public body (created by or pursuant to State law) having jurisdiction over disposal of sewage, industrial wastes, stormwater, or other wastes, including special districts under State law such as a sewer district, flood control district or drainage district, or similar entity, or an Indian tribe or an authorized Indian tribal organization, or a designated and approved management agency under section 208 of the CWA, that discharges to surface waters of the State; and 2. designed or used for collecting or conveying stormwater, and 3. which is not a combined sewer system; and 4. which is not part of a Publicly Owned Treatment Works (POTW) as defined at 40 CFR 122.2. Natural Buffer(s) — an undisturbed area with natural cover running along a surface water (e.g. wetland, stream, river, lake, etc.). New Development— any land disturbance that does not meet the definition of Redevelopment Activity included in this appendix. New York State Erosion and Sediment Control Certificate Program — a certificate program that establishes and maintains a process to identify and recognize individuals who are capable of developing, designing, inspecting and maintaining erosion and sediment control plans on projects that disturb soils in New York State. The certificate program is administered by the New York State Conservation District Employees Association. Nonpoint Source(s) — any source of water pollution or pollutants which is not a discrete conveyance or point source permitted pursuant to Title 7 or 8 of Article 17 of the Environmental Conservation Law (see ECL Section 17-1403). Overbank—flow events that exceed the capacity of the stream channel and spill out into the adjacent floodplain. Owner or Operator—the person, persons, or legal entity which owns or leases the property on which the construction activity is occurring; an entity that has operational control over the construction plans and specifications, including the ability to make modifications to the plans and specifications; and/or an entity that has day-to-day operational control of those activities at a project that are necessary to ensure compliance with the permit requirements. 59 Appendix A Performance Criteria —the six performance criteria for each group of SMPs in Chapters 5 and 6 of the technical standard, New York State Stormwater Management Design Manual (DM), dated July 31, 2024. These include feasibility, conveyance, pretreatment, treatment, landscaping, and maintenance. It does not include the Sizing Criteria (i.e. WQv, RRv, CPv, Qp and Qf) in Part I.C.2. of the permit. Phase — a defined area in which construction activities are occurring or will occur separate from other defined area(s). Point Source — any discernible, confined, and discrete conveyance, including but not limited to any pipe, ditch, channel, tunnel, conduit, well, discrete fissure, container, rolling stock, concentrated animal feeding operation, vessel or other floating craft, or landfill leachate collection system from which pollutants are or may be discharged. Pollutant(s) — dredged spoil, filter backwash, solid waste, incinerator residue, sewage, garbage, sewage sludge, munitions, chemical wastes, biological materials, radioactive materials, heat, wrecked or discarded equipment, rock, sand and industrial, municipal, agricultural waste and ballast discharged into water; which may cause or might reasonably be expected to cause pollution of the waters of the state in contravention of the standards or guidance values adopted as provided in 6 NYCRR Parts 700 et seq. Qualified Inspector— a person that is knowledgeable in the principles and practices of erosion and sediment control, such as a licensed Professional Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered Landscape Architect, New York State Erosion and Sediment Control Certificate Program holder or other NYSDEC endorsed individual(s). It can also mean someone working under the direct supervision of, and at the same company as, the licensed Professional Engineer or Registered Landscape Architect, provided that person has training in the principles and practices of erosion and sediment control. Training in the principles and practices of erosion and sediment control means that the individual working under the direct supervision of the licensed Professional Engineer or Registered Landscape Architect has received four (4) hours of NYSDEC endorsed training in proper erosion and sediment control principles from a Soil and Water Conservation District, or other NYSDEC endorsed entity. After receiving the initial training, the individual working under the direct supervision of the licensed Professional Engineer or Registered Landscape Architect shall receive four (4) hours of training every three (3) years. It can also mean a person that meets the Qualified Professional qualifications in addition to the Qualified Inspector qualifications. Note: Inspections of any SMPs that include structural components, such as a dam for an impoundment, shall be performed by a licensed Professional Engineer. 60 Appendix A Qualified Professional — a person that is knowledgeable in the principles and practices of stormwater management and treatment, such as a licensed Professional Engineer, Registered Landscape Architect or other NYSDEC endorsed individual(s). Individuals preparing SWPPPs that require the SMP component must have an understanding of the principles of hydrology, water quality management practice design, water quantity control design, and, in many cases, the principles of hydraulics. All components of the SWPPP that involve the practice of engineering, as defined by the NYS Education Law (see Article 145), shall be prepared by, or under the direct supervision of, a professional engineer licensed to practice in the State of New York, Redevelopment Activity(ies) —the disturbance and reconstruction of existing impervious area, including impervious areas that were removed from a project site within five (5) years of preliminary project plan submission to the local government (i.e.. site plan, subdivision, etc.). Renewable Energy — electricity or thermal energy generated by renewable energy systems through use of the following technologies: solar thermal, photovoltaics, on land and offshore wind, hydroelectric, geothermal electric, geothermal ground source heat, tidal energy, wave energy, ocean thermal, and fuel cells which do not utilize a fossil fuel resource in the process of generating electricity. Site Limitations — site conditions that prevent the use of an infiltration technique and or infiltration of the total WQv. Typical site limitations include: seasonal high groundwater, shallow depth to bedrock, and soils with an infiltration rate less than 0.5 inches/hour. The existence of site limitations shall be confirmed and documented using actual field testing (i.e. test pits, soil borings, and infiltration test) or using information from the most current United States Department of Agriculture (USDA) Soil Survey for the County where the project is located. Sizing Criteria —the criteria included in Part I.C.2 of the permit that are used to size SMPs. The criteria include; Water Quality Volume (WQv), Runoff Reduction Volume (RRv), Channel Protection Volume (Cpv), Overbank Flood (Qp), and Extreme Flood (Qf). Steep Slope — land area designated on the current United States Department of Agriculture (USDA) Soil Survey as Soil Slope Phase D, (provided the map unit name or description is inclusive of slopes greater than 25%), or Soil Slope Phase E or F, (regardless of the map unit name), or a combination of the three designations. Stormwater—that portion of precipitation that, once having fallen to the ground, is in excess of the evaporative or infiltrative capacity of soils, or the retentive capacity of surface features, which flows or will flow off the land by surface runoff to waters of the State. 61 Appendix A Streambank— the terrain alongside the bed of a creek or stream. The bank consists of the sides of the channel, between which the flow is confined. Stormwater Pollution Prevention Plan (SWPPP) — a project specific report, including construction drawings, that among other things: describes the construction activity(ies), identifies the potential sources of pollution at the construction site; describes and shows the stormwater controls that will be used to control the pollutants (i.e. erosion and sediment controls; for many projects, includes SMPs); and identifies procedures the owner or operator will implement to comply with the requirements of the permit. See Part III of the permit for a complete description of the information that must be included in the SWPPP. Surface Waters of the State — shall be construed to include lakes, bays, sounds, ponds, impounding reservoirs, springs, rivers, streams, creeks, estuaries, marshes, inlets, canals, the Atlantic ocean within the territorial seas of the state of New York and all other bodies of surface water, natural or artificial, inland or coastal, fresh or salt, public or private (except those private waters that do not combine or effect a junction with natural surface waters), which are wholly or partially within or bordering the state or within its jurisdiction. Waters of the state are further defined in 6 NYCRR Parts 800 to 941. Temporarily Ceased — an existing disturbed area will not be disturbed again within 14 calendar days of the previous soil disturbance. Temporary Stabilization — exposed soil has been covered with material(s) as set forth in the technical standard, New York Standards and Specifications for Erosion and Sediment Control, to prevent the exposed soil from eroding. The materials can include, but are not limited to, mulch, seed and mulch, and erosion control mats (e.g. jute twisted yarn, excelsior wood fiber mats). Total Maximum Daily Load (TMDL) — the sum of the allowable loads of a single pollutant from all contributing point and nonpoint sources. It is a calculation of the maximum amount of a pollutant that a waterbody can receive and still meet water quality standards, and an allocation of that amount to the pollutant's sources. A TMDL stipulates Waste Load Allocations (WLA) for point source discharges, Load Allocations (LA) for nonpoint sources, and a margin of safety (MOS). Traditional Land Use Control MS4 Operator— a city, town, or village with land use control authority that is authorized to discharge under New York State DEC's SPDES General Permit For Stormwater Discharges from Municipal Separate Stormwater Sewer Systems (MS4s) or the City of New York's Individual SPDES Permit for their Municipal Separate Storm Sewer Systems (NY-0287890). Trained Contractor— an employee from the contracting (construction) company, identified in Part III.A.7., that has received four (4) hours of NYSDEC endorsed training 62 Appendix A in proper erosion and sediment control principles from a Soil and Water Conservation District, or other NYSDEC endorsed entity. After receiving the initial training, the trained contractor shall receive four (4) hours of training every three (3) years. It can also mean an employee from the contracting (construction) company, identified in Part I I I.A.7., that meets the qualified inspector qualifications (e.g. licensed Professional Engineer, Certified Professional in Erosion and Sediment Control (CPESC), Registered Landscape Architect, New York State Erosion and Sediment Control Certificate Program holder, or someone working under the direct supervision of, and at the same company as, the licensed Professional Engineer or Registered Landscape Architect, provided they have received four (4) hours of NYSDEC endorsed training in proper erosion and sediment control principles from a Soil and Water Conservation District, or other NYSDEC endorsed entity). The trained contractor is responsible for the day-to-day implementation of the SWPPP. Tree Clearing — construction activities limited to felling and removal of trees. Tree clearing does not include hand felling and leaving the trees in place with no support from mechanized equipment, which is not considered construction activity requiring coverage under this permit. Water Quality Standard — such measures of purity or quality for any waters in relation to their reasonable and necessary use as promulgated in 6 NYCRR Part 700 et seq. 63 Appendix B APPENDIX B — Required SWPPP Components by Project Type Table 1 CONSTRUCTION ACTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP THAT ONLY INCLUDES EROSION AND SEDIMENT CONTROLS The following construction activities that involve soil disturbances of one (1) or more acres of land, but less than five (5) acres: • Single-family home not located in one of the watersheds listed in Appendix C and not directly discharging to one of the 303(d) segments listed in Appendix D • Single-family residential subdivisions with 25% or less impervious cover at total site build-out and not, located in one of the watersheds listed in Appendix C and not directly discharging to one of the 303(d) segments listed in Appendix D • Construction of a barn or other agricultural building, silo, stock yard or pen. • Structural agricultural conservation practices as identified in Table II in the "Agricultural Best Management Practice Systems Catalogue" (dated June 2023)that include construction or reconstruction of impervious area or alter hydrology from pre-to post-development conditions. The following construction activities that involve soil disturbances between five thousand (5000) square feet and one (1) acre of land: • All construction activities located in the New York City Watershed located east of the Hudson River, see Appendix C Figure 1, that involve soil disturbances between five thousand (5,000) square feet and one (1) acre of land. Within the municipal boundaries of NYC: • Stand-alone road reconstruction, where the total soil disturbance from only that road construction, is less than one (1) acre of land. The following construction activities: • Installation of underground linear utilities; such as gas lines, fiber-optic cable, cable TV, electric, telephone, sewer mains, and water mains • Environmental enhancement projects, such as wetland mitigation, stormwater retrofits, stream restoration, and resiliency projects that reconstruct shoreline areas to address sea level rise • Pond construction • Linear bike paths running through areas with vegetative cover, including bike paths surfaced with an impervious cover • Cross-country ski trails, walking/hiking trails, and mountain biking trails, including a de minimis parking lot(maximum 10 spaces total, sized for passenger cars)with 35 feet minimum preservation of undisturbed area downgradient from the parking lot • Dam rehabilitation (the structure of the dam itself) • Sidewalks, bike paths, or walking paths, surfaced with an impervious cover, that are not part of residential, commercial, or institutional development; • Sidewalks, bike paths, or walking paths, surfaced with an impervious cover, that include incidental shoulder or curb work along an existing highway to support construction of the sidewalk, bike path, or walking path. 64 Appendix B Table 1 (Continued) CONSTRUCTION ACTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP THAT ONLY INCLUDES EROSION AND SEDIMENT CONTROLS The following construction activities: • Slope stabilization • Slope flattening that changes the grade of the site, but does not significantly change the runoff characteristics • Spoil areas that will be covered with vegetation • Vegetated open space (i.e. recreational parks, lawns, meadows, fields, downhill ski trails)that do not alter hydrology from pre-to post-development conditions • Athletic fields (natural grass)that do not include the construction or reconstruction of impervious area and do not alter hydrology from pre- to post-development conditions • Demolition where vegetation will be established, and no redevelopment activity is planned' • Installation or replacement of either an overhead electric transmission line or a ski lift tower that does not include the construction of permanent access roads or parking areas surfaced with impervious cover. • Solar array field areas that have tables elevated off the ground, spaced one table width apart, do not alter hydrology from pre-to post-development conditions, and address water quality volume and runoff reduction volume by maintaining sheet flow on slopes less than 8%. • Structural agricultural conservation practices as identified in Table II in the"Agricultural Best Management Practice Systems Catalogue" (dated June 2023)that do not include construction or reconstruction of impervious area and do not alter hydrology from pre- to post-development conditions. • Temporary access roads, median crossovers, detour roads, lanes, or other temporary impervious areas that will be restored to pre-construction conditions once the construction activity is complete (in this context, "temporary" means the impervious area will be in place for two years or less) • Other construction activities that do not include the construction or reconstruction of impervious area, and do not alter hydrology from pre- to post-development conditions, and are not listed in Table 2. 1. If the site is redeveloped in the future,a new eNOI must be submitted. 65 Appendix B Table 2 CONSTRUCTION ACTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP THAT INCLUDES POST-CONSTRUCTION STORMWATER MANAGEMENT PRACTICES (SMPS) The following construction activities: • Single-family home located in one of the watersheds listed in Appendix C or directly discharging to one of the 303(d) segments listed in Appendix D • Single-family home that disturbs five (5) or more acres of land • Single-family residential subdivisions located in one of the watersheds listed in Appendix C or directly discharging to one of the 303(d) segments listed in Appendix D • Single-family residential subdivisions that involve soil disturbances of between one (1) and five (5) acres of land with greater than 25% impervious cover at total site build-out • Single-family residential subdivisions that involve soil disturbances of between 20,000 square feet and one (1) acre of land within the municipal boundaries of NYC with greater than 25% impervious cover at total site build-out • Single-family residential subdivisions that involve soil disturbances of five (5) or more acres of land, and single-family residential subdivisions that involve soil disturbances of less than five (5) acres that are part of a common plan of development or sale that will ultimately disturb five (5) or more acres of land • Multi-family residential developments; includes duplexes, townhomes, condominiums, senior housing complexes, apartment complexes, and mobile home parks • Creation of 5,000 square feet or more of impervious area in the municipal boundaries of NYC • Airports • Amusement parks • Breweries, cideries, and wineries, including establishments constructed on agricultural land • Campgrounds • Cemeteries that include the construction or reconstruction of impervious area (>5% of disturbed area)or alter the hydrology from pre- to post-development conditions • Commercial developments • Churches and other places of worship • Construction of a barn or other agricultural building(e.g. silo)that involves soil disturbance greater than five acres. • Structural agricultural conservation practices as identified in Table II in the"Agricultural Best Management Practice Systems Catalogue" (dated June 2023)that involves soil disturbance greater than five acres and include the construction or reconstruction of impervious area or alter hydrology from pre- to post-development conditions. • Facility buildings, including ski lodges, restroom buildings, pumphouses, ski lift terminals, and maintenance and groomer garages • Institutional development; includes hospitals, prisons, schools and colleges • Industrial facilities; includes industrial parks • Landfills; including creation of landfills or capping landfills. • Municipal facilities; includes highway garages, transfer stations, office buildings, POTWs, water treatment plants, and water storage tanks • Golf courses • Office complexes 66 Appendix B Table 2 (Continued) CONSTRUCTION ACTIVITIES THAT REQUIRE THE PREPARATION OF A SWPPP THAT INCLUDES POST-CONSTRUCTION STORMWATER MANAGEMENT PRACTICES (SMPS) The following construction activities: • Permanent laydown yards and equipment storage lots • Playgrounds that include the construction or reconstruction of impervious area • Sports complexes • Racetracks; includes racetracks with earthen (dirt) surfaces • Road construction or reconstruction, outside the municipal boundaries of NYC • Road construction within the municipal boundaries of NYC • Stand-alone road reconstruction, within the municipal boundaries of NYC where the total soil disturbance from that road reconstruction involves soil disturbance of one (1)acre or more of land • Parking lot construction or reconstruction (as with all Table 2 bullets, this includes parking lots constructed as part of the construction activities listed in Table 1, unless a Table 1 bullet specifies otherwise) • Athletic fields (natural grass)that include the construction or reconstruction of impervious area (>5% of disturbed area) or alter the hydrology from pre- to post-development conditions • Athletic fields with artificial turf • Permanent access roads, parking areas, substations, compressor stations, and well drilling pads, surfaced with impervious cover, and constructed as part of an overhead electric transmission line, wind-power, cell tower, oil or gas well drilling, sewer or water main, ski lift, or other linear utility project • Sidewalks, bike paths, or walking paths, surfaced with an impervious cover, that are part of a residential, commercial or institutional development • Sidewalks, bike paths, or walking paths, surfaced with an impervious cover, that are part of highway construction or reconstruction • Solar array field areas on slopes greater than 8%that cannot maintain sheet flow using management practices identified in the BB or the DM • Solar array field areas on slopes less than 8%that will alter the hydrology from pre- to post- development conditions • Solar array field areas with tables that are not elevated high enough to achieve final stabilization beneath the tables • Traditional impervious areas associated with solar development(e.g. roads, buildings, transformers) • Utility pads surfaced with impervious cover, including electric vehicle charging stations • All other construction activities that include the construction or reconstruction of impervious area or alter the hydrology from pre- to post-development conditions, and are not listed in Table 1 67 Appendix C APPENDIX C —Watersheds Requiring Enhanced Phosphorus Removal Watersheds where owners or operators of construction activities identified in Table 2 of Appendix B must prepare a SWPPP that includes SMPs designed in conformance with the Enhanced Phosphorus Removal Standards included in the DM technical standard. • Entire New York City Watershed located east of the Hudson River— Figure 1 • Onondaga Lake Watershed — Figure 2 • Greenwood Lake Watershed — Figure 3 • Oscawana Lake Watershed — Figure 4 • Kinderhook Lake Watershed — Figure 5 68 Appendix C Figure 1 - New York City 'watershed East of the Hudson EEKir AN EAST FISHKILL " , i LJ C �ATTERSQN ��. KENT PUT AM V AL LE w� f, N RAH SALEMF. .j �. ,,),Y A KTOW DFORD wYy �� aw RTH CAE dam" "I U LEASAN HA SON EOH Watershed 69 Appendix C Figure 2 - Onondaga Luce Watershed 3 CLAY ICER{? h. BANURE NR �� � 7, Ll NA US E SE p �p�yy .��+�. s BT�pp.�V^5 SY . � � w D .ITT SKAN AM. S ONONDAGA �a�aw ,APAYeI E " OTIsco �, PAFF if TI.ILLY mm� . .... � sphoros b „`` EELE 70 Appendix C Figure 3 - G�reenwoodl Lake Watershed P � WARWII GREENWOOD LAKE Phowhorm MwiriMsd 71 Appendix C Figure 4 - Oscawana Lake Watershed PHILIP TO I C KENT PUTNAM VALLEY - SCWANLAE" . ,r ARMEL Phosphorus Watershed t l 72 Appendix C Figure 5 - Kinderhook Lake Watershed �n m a SMD LAKE EAST GREENEUSH . - J� CHODACK ,d wv... NEW LEBANON Y l iaNaE�Hoaac CHATHAM uz� CANAAN VALATI Tyr,VHkW.ar CMV ElDuerdwy forNm Voilk Smote 1 2 4 Was Kindahook LaM Watl ntmd 73 APPENDIX D — Impaired Waterbodies (by Construction Related Pollutants) List of waterbodies impaired by pollutants related to construction activity, including turbidity, silt/sediment, and nutrients (e.g. nitrogen, phosphorus). This list is a subset of"The Final New York State 2018 Section 303(d) List of Impaired Waters Requiring a TMDL" dated June 2020. County Waterbody Pollutant Albany Ann Lee (Shakers) Pond, Stump Pond (1201-0096) Phosphorus Albany Lawsons Lake (1301-0235) Phosphorus Allegany Amity ' y Lake, Saunders Pond (0403-0054) ....................�.�, Phosphorus ....................._. ....................................... Allegany Andover Pond (0403-0056) Ph .......... Bronx Reservoir No.1/Lake Isle (1702-0075) Phosphorus ............. ........ ........_. ......... Bronx Van Cortlandt Lake (1702-0008) Phosphorus ............. Broome Blueberry, Laurel Lakes (1404-0033) Phosphorus ........_............. ................ _ ........ ........ Broome Fly Pond, Deer Lake (1404-0038) Phosphorus Broome MinorTribs to Lower Susquehanna (0603-0044) Phosphorus ....._ Broome Whitney Point Lake/Reservoir(0602-0004) Phosphorus Cattaraugus Allegheny River/Reservoir(0201-0023) Phosphorus ................. _.................. Cattaraugus Beaver Lake/Alma Pond (0201-0073) Phosphorus Cattaraugus Case Lake (0201-0020) Phosphorus Cattaraugus Linlyco/Club Pond (0201-0035) Phosphorus .... _............................ Cayuga Duck Lake (0704-0025) Phosphorus Cayuga Owasco Inlet, Upper, and tribs (0706-0014) Nutrients Chautauqua Chadakoin River and tribs (0202-0018) Phosphorus Chautauqua Hulburt/CI mer Pond 0202-0079) --��..w----®----w___________y ...._..(................_������. ) Phosphorus ...m .... ............._. .. _._ ............................... Chautauqua Middle Cassadaga Lake (0202-0002) Phosphorus .... Clinton Grat . e Chazy River, Lower, Main Stem (1002-0001) Silt/Sediment Columbia Robinson Pond (1308-0003) Phosphorus Cortland Dean Pond (0602-0077) Phosphorus Dutchess Fallkill Creek(1301-0087) Phosphorus _. ...._ ......... ... _ ......... Dutchess Hillside Lake (1304-0001) Phosphorus ..._ ..._.._.._. _.... Dutchess Wappingers Lake (1305-0001) Phosphorus .__...�._ ..._......................._ ......... Dutchess Wappingers Lake (1305-0001) Silt/Sediment Erie Beeman Creek and tribs (0102-0030) Phosphorus Erie Delaware Park Pond (0101-0026) Phosphorus Erie Ellicott Creek, Lower, and tribs (0102-0018) Phosphorus Erie Ellicott Creek, Lower, and tribs (0102-0018)-.._.�, Silt/Sediment Erie Green Lake (0101-0038) Phosphorus -_____�............ ) ......... ............... ( Erie Little Sister Creek, Lower, and tribs 0104-0045 Phos horus Erie Murder Creek, Lower, and tribs (0102-0031) Phosphorus ........... _...................... .......... _. Erie Rush Creek and tribs (0104-0018) Phosphorus w...._.......... Erie Scajaquada Creek, Lower, an ( ) p horus d tribs 0101-0023 Phos Erie Scajmaquada Creek, Middle, and tribs (0101-0033) Phosphorus Erie Scajaquada Creek, Upper, and tribs.........(010 ................_mmmITITIT ����������������������. ......................_... 01-0034) Phosphorus Erie South Branch Smoke Cr, Lower, and tribs Phosphorus (0101-0036) _.._._...� ........... _ .' Erie South 0101-0036)h Smoke Cr, Lower, and tribs ( Silt/Sediment ................................. Genesee Bigelow Creek and tribs (0402-0016) Phosphorus ............ _ ................ Genesee Black Creek, Middle, and minor tribs(0402 0028) Phosphorus ................. _. Genesee Black Creek, Upper, and minor tribs (0402-0048) Phosphorus Genesee Bowen Brook and tribs (0102-0036) Phosphorus Genesee LeRoy Reservoir(0402-0003) Phosphorus Genesee Mill Pond (0402-0050) Phosphorus Genesee Oak Orchard Cr, Upper, and tribs (0301-0014) Phosphorus Genesee Creek, Middle, G Oatka 0 ... ......_ �. and minor tribs (0402-0031) Phosphorus Genessee Tonawanda Cr, Middle, Main Stem 0102-0002 Phosphorus ..... _....._........._. _.......... .... ....... Greene Schoharie Reservoir(1202-0012) Silt/Sediment Greene SleepyHollow Lake 1301-0059 Silt/Sediment( ) ent Herkimer Steele Creek tribs 1201-0197 Phosphorus horus _... ............... _............. Herkimer Steele Creek trib_s (1201-0197) Silt/Sediment Kings Hendrix Creek 1701-0006 18 Nitrogen g ....... �. .- ( ) gen ....g....... ......... .._ _...... Kings Prospect Park Lake (1701-0196) Phosphorus _. _. ........... Lewis Mill Creek/South Branch, and tribs (0801-0200) Nutrients Livingston Livin Christie Creek g ....... and tribs (0402-0060) ; Phosphorus Livingston Conesus Lake (0402-0004) Phosphorus Livingston Mill Creek and minor tribs (0404-0011) Silt/Sediment ...prow ........ _....._._. Monroe Black Creek, Lower, and minor tribs (0402-0033) Phosphorus ._.._.._._ ..............._ __. Monroe Buck Pond (0301-0017) Phosphorus Monroe Cranberry Pond (0301-0016) Phosphorus Monroe Durand, Eastman Lakes (0302-0037) Phosphorus ......_._._. �. Monroe Lake Ontario Shoreline,Western (0301-0069) 9 Phosphorus Monroe.. Long Pond (0301-0015) Phosphorus ........... ......._._. ............................_... ......__ ....� Monroe Mill Creek and tribs (0302-0025) Phosphorus 2 ................._ . ...m a........................_...... Monroe Mill Creek/Blue Pond Outlet and tribs (0402-0049) Phosphorus __- __... ....__... ...... Monroe Minor Tribs to Irondequoit Bay(0302-0038) Phosphorus Monroe R East ...... _. Rochester Embayment- Et (0302-0002) [9j Phosphorus Monroe Rochester Embayment-West (0301-0068) 9 Phosphorus Monroe Shipbuilders Creek and tribs (0302-0026) Phosphorus 2 Monroe Thomas Creek/White� —.__. mmmmmmmmmmmmmITIT m Brook and tribs (0302-0023) Phosphorus 75 __ ....._._. _ .. _.._.._.._.._._. Nassau Bannister Creek/Bay(1701-0380) Nitrogen Nassau Beaver Lake (1702-0152) Phosphorus Nassau Browswere Bay(1701-0383) Nitrogen Nassau Camaans Pond (1701-0052) Phosphorus ................. Nassau East Meadow Brook, Upper, and tribs (1701-0211) Silt/Sediment ........ ........� �...........__............ Nassau East Rockaway Channel (1701-0381) Nitrogen ......... ........ Nassau Glen Cove Creek, Lower, and tribs (1702-0146) Silt/Sediment Nassau Grant Park Pond (1701-0054) Phosphorus .................... p Y ....... ........ ................_. Nassau Hempstead Bay, Broad Channel (1701-0032) Nitrogen _. .. Nassau Hempstead Lake (1701-0015) Phosphorus Nassau Hewlett WBa 1701-0382 �mmmmmIT_. y( ) Nitrogen Nassau Hog Island Channel (1701-0220) Nitrogen ......... ............... . Nassau Massapequa Creek, Upper, and tribs (1701-0174) Phosphorus .�. ............................ . ...._ Milburn/Parsonage Creeks, Upp, and tribs (1701- Nassau Phosphorus 212) Nassau Reynolds Channel, East(1701-0215) [12] Nitrogen Nassau Reynolds Channel, West (1701-0216) 12 Nitrogen _..............._._ ..... . .......................____.._.._....m... Nassau Tidal Tribs to Hempstead Bay (1701-0218) Nitrogen _.... ............. _� ........................_ _ .................. Nassau Tribs fresh to East Bay 1701-0204 Silt/Sediment (fresh) Y( ) Nassau Tribs (fresh)to East Bay(1701-0204) Phosphorus .... ... ...... .... ....� Nassau Tribs to Smith Pond/Halls Pond (1701-0221) Phosphorus ...................._........_._.._. ................................_ _... . Nassau Woodmere Channel (1701-0219) Nitrogen _. ..... ........- New York Harlem Meer(1702-0103) Phosphorus ... n.... ......_�............- ............................._.......... New York The Lake in Central Park(1702-0105) Phosphorus ..........---- _- Niagara Bergholtz Creek and tribs (0101-0004) Phosphorus Niagara Hyde Park Lake (0101-0030) Phosphorus Niagara Lake Ontario Shoreline,Western (0301-0053) 9 Phosphorus ............ ... ..._ . ... Niagara Lake Ontario Shoreline,Western (0301-0072) 9 Phosphorus Oneida Ballou, Nail Creeks (1201-0203) Phosphorus _...........-- ............._-. .............. Onondaga Ley Creek and tribs (0702-0001) 10 Nutrients (phosphorus) _._. ._.-.................. .... Onondaga Minor Tribs to Onondaga Lake (0702-0022) 10 Nutrients (phosphorus) Onondaga Minor Tribs to Onondaga Lake (0702-0022) 10 Nitrogen (NH3, NO2) Onondaga Onondaga Creek, Lower(0702-0023) 10 Nutrients ....... ... _...... �mmITITITITmm ................ (phosph o rus)....._m Onondaga Onondaga Creek, Lower, and tribs (0702-0023) Turbidity ............................ Onondaga Onondaga Creek, Middle, and tribs (0702-0004) Turbidity ............................................. Onondaga Onondaga Creek, Upper, and tribs (0702-0024) Turbidity ( ...)............................................... --_ p Ontario Great Brook and minor tribs 0704-0034 Phosphorus 2 .................._ ...... ...... _....-_.. Ontario Great Brook and minor tribs (0704-0034) Silt/Sediment ........................ 7. ._ __...................................... Ontario Hemlock Lake Outlet and minor tribs (0402-0013) Phosphorus Ontario Honeoye Lake (0402-0032) Phosphorus Orange Brown Pond Reservoir(1303-0013) Phosphorus Orange Lake Washington (1303-0012) Phosphorus ..............._...... .................. Orange Minor Tribs to Middle Wallkill (1306-0061) Phosphorus _.............. _ ........_ ........... Orange Monhagen Brook and tribs(1306-0074) Phosphorus Orange Orange Lake (1301-0008) [16] Phosphorus — _._.._.._. _ Orange Quaker Creek and tribs (1306-0025) Phosphorus Orange Wallkill River, Middle, Main Stem (1306-0038) Phosphorus Orange Wallkill River, Upper, and Minor tribs (1306-0017) Phosphorus ... ( ) .........._ p Orleans Glenvwood Lake 0301-0041 Phosphorus Orleans Lake....... Ontario Shoreline, Western (0301 0070) 9 Phosphorus Orleans Lake Ontario _ .._............. Shoreline, Western (0301-0071) 9 Phosphorus Oswego Lake Neatahwanta (0701-0018) Nutrients . . Oswego Pleasant Lake (0703-0047) Phosphorus Putnam Lost Lake, Putnam Lake (1302-0053) Phosphorus ........................._.._. Putnam Minor Tribs to Croton Falls Reservoir(1302-0001) Phosphorus ............................... Queens Bergen Basin (1701-0009) 18 Nitrogen ....... Jamaica Bay, Eastern, and tribs, Queens (1701- Queens 0005) 18 Nitrogen Queens Kissena Lake (1702-0258) Phosphorus _. ....................... Queens Meadow Lake (1702-0030) Phosphorus ...__ ..._......... . ...................... Queens Shellbank Basin (1701-0001) 18 Nitrogen ......... ............. ............................_...... ____. Queens Willow Lake (1702-0031) Phosphorus Rensselaer Nassau Lake (1310-0001) Phosphorus ............ .__�... Rensselaer Snyders Lake (1301-0043) Phosphorus Richmond Gra... ... ... _.........s ssmere Lake/Bradys Pond (1701-0357) Phosphorus Rockland Congers Lake, Swartout Lake (1501-0019) Phosphorus Rockland Rockland Lake (1501-0021) Phosphorus ....................... Saratoga Ballston Lake (1101-0036) Phosphorus Saratoga Dwaas Kill and tribs (1101-0007) Phosphorus � m. _ .... ....................... Saratoga Dwaas Kill and trib ................................ .............. Saratoga Lake Lonely(1101-0034) Phosphorus Saratoga Round Lake (1101-0060) Phosphorus Saratoga Tribs to Lake Lonely(1101-0001) Phosphorus Schenectady Collins Lake (1201-0077) Phosphorus ..................... �._............. Schenectady Duane Lake (1311-0006) Phosphorus u_............. Schenectady Lake Mariaville Lake (1201-0113) Phosphorus Schuyler Cayuta Lake (0603-0005) Phosphorus 77 Seneca _ _-_. Reeder Creek and tribs (0705-0074) 1 Phosphorus ........ .................._ ......___ .... St.Lawrence Black Lake Outlet Black Lake (0906-0001) Phosphorus St.Lawrence Fish Creek and minor tribs (0906-0026) Phosphorus Steuben Smith Pond (0502-0012) Phosphorus ...... ._._._._. Suffolk Agawam Lake (1701-0117) Phosphorus Suffolk Big/Little Fresh Ponds (1701-0125) Phosphorus ........ Suffolk Canaan Lake (1701-0018) Phosphorus _.......... ......... Suffolk Canaan Lake (1701-0018) Silt/Sediment _._._. ............. ........ ... Suffolk Fresh Pond (1701-0241) Phosphorus ...... . ......... .................. Suffolk Great South Bay, East(1701-0039) Nitrogen ...... .................. ........................ _ .._.............................. Suffolk Great South Bay, Middle (1701-0040) Nitrogen ............................... ................................................... Suffolk Great South Bay, West(1701-0173) Nitrogen ...................... ......_ _..._..._...................._ Suffolk Lake Ronkonkoma (1701-0020) Phosphorus .......................... .................... Suffolk Mattituck/Marratooka Pond (1701-0129) Phosphorus Suffolk Mill and Seven Ponds (1701-0113) Phosphorus Suffolk Millers Pond (1702-0013) Phosphorus .......... .._.._. Suffolk Moriches Bay, East (1701-0305) Nitrogen w _..........._............................._ ......_........._....._ Suffolk Moriches Bay, West(1701-0038) Nitrogen _..._....._ ............................ Suffolk Quantuck Bay (1701-0042) Nitrogen ................._...----.m_ Suffolk Shinnecock Bay and Inlet (1701-0033) Nitrogen ........_._ ...... .................................... -.._ Suffolk Tidal Tribs to West Moriches Bay(1701-0312) Nitrogen W_.............................. Sullivan Bodine, Mongomery Lakes (1401-0091) Phosphorus �..__ .... ........� Sullivan Davies Lake (1402-0047) Phosphorus Sullivan Evens La.._._._ .................._....._...._.. Lake (1402-0004) Phosphorus . ... Sullivan Pleasure Lake (1402-0055) Phosphorus .......... Sullivan Swan Lake (1401-0063) Phosphorus Tompkins Cayuga Lake, Southern End (0705-mmmIT0040) Phosphorus Tompkins Cayuga Lake, Southern End (0705-0040) Silt/Sediment Ulster Ashokan Reservoir(1307-0004) Silt/Sediment Ulster Esopus Creek, Lower, Main Stem (1307-0010) [17] Turbidity Ulster Esopus Creek, Middle, Main Stem (1307-0003) 17 Turbidity Ulster Esopus Creek, Upper, and minor tribs Silt/Sediment (1307-0007)[31 Ulster Wallkill River, Lower, Main Stem (1306-0027) Phosphorus Warren Hague Brook and tribs (1006-0006) Silt/Sediment _............... ........ _ .._._..................__ Warren Huddle/Finkle Brooks and tribs (1006-0003) Silt/Sediment Warren Indian Brook and tribs (1006-0002) Silt/Sediment ..................................._._ ... Warren Lake George (1006-0016) and tribs Silt/Sediment ..._._......................................... ..................................... .................. �. Warren Tribs to Lake George, East Shore (1006-0020) Silt/Sediment .....��... .....................................�.. .. ....... Warren Tribs to Lake George, Lk.George Village (1006-0008) Silt/Sediment 78 _................. .... _. Washington Wood Cr/Champlain Canal and tribs (1005-0036) Phosphorus Westchester Lake Kato nah (1302-0136) Phosphorus Westchester Lake Lincolndale (1302-0089) Phosphorus �....... ..................... ...._ ................ Westchester Lake Meahagh (1301-0053) Phosphorus Westchester Lake Mohegan (1301-0149) Phosphorus Westchester Lake Shenorock(1302-0083) Phosphorus Westchester Mamaroneck River, Lower(1702-0071) Silt/Sediment ................ Westchester Mamaroneck River, Upp, & minor tribs (1702-0123) Silt/Sediment Westchester Saw Mill River(1301-0007) Phosphorus ...................... .................. ............... Westchester Saw Mill River, Middle, and tribs (1301-0100) Phosphorus Westchester Sheldrake River(1702-0069) Phosphorus Westchester Sheldrake River(1702-0069) Silt/Sedimnt ....... Lake ) Westchester Silver Lake 1702-0040 Phosphorus Westchester Teatown Lakemm(m1302-0150) Phosphorus ..... ( ........ ................... )......... �.....� ..............p.................. - Westchester Truesdale Lake 1302-0054 Phosphorus ...... ....... _. Westchester Wallace Pond (1301-0140) Phosphorus 79 APPENDIX E — List of NYSDEC Regional Offices 4 50 CIRCLE ROAD 50 CIRCLE ROAD NASSAU AND SUFFOLK STONY BROOK,NY 11790 STONY BROOK,NY 11790-3409 TEL.(631)444-0365 TEL.(631)444-0405 1 HUNTERS POINT PLAZA, 1 HUNTERS POINT PLAZA, 2 BRONX,KINGS,NEW YORK, 47-40 21 ST ST. 47-40 21 ST ST. QUEENS AND RICHMOND LONG ISLAND CITY,NY 11101-5407 LONG ISLAND CITY,NY 11101-5407 TEL.(718)482-4997 TEL.(718)482-4933 DUTCHESS,ORANGE,PUTNAM, 21 SOUTH PUTT CORNERS ROAD 220 WHITE PLAINS ROAD,SUITE 110 3 ROCKLAND,SULLIVAN,ULSTER NEW PALTZ,NY 12561-1696 TEL.(914)428-2505 AND WESTCHESTER TEL.(845)256-3059 ALBANY,COLUMBIA, DELAWARE,GREENE, 1130 NORTH WESTCOTT ROAD 1130 NORTH WESTCOTT ROAD 4 MONTGOMERY,OTSEGO, SCHENECTADY,NY 12306-2014 SCHENECTADY,NY 12306-2014 RENSSELAER,SCHENECTADY TEL.(518)357-2069 TEL.(518)357-2045 AND SCHOHARIE CLINTON,ESSEX,FRANKLIN, 1115 STATE ROUTE 86, PO BOX 296 232 GOLF COURSE ROAD C FULTON,HAMILTON, RAY BROOK,NY 12977-0296 WARRENSBURG,NY 12885-1172 `� SARATOGA,WARREN AND TEL.(518)897-1234 TEL.(518)623-1200 WASHINGTON _. ... ..... _ HERKIMER,JEFFERSON, STATE OFFICE BUILDING STATE OFFICE BUILDING 6 LEWIS,ONEIDA AND 317 WASHINGTON STREET 207 GENESEE STREET ST.LAW NEIDAENCE WATERTOWN,NY 13601-3787 UTICA,NY 13501-2885 TEL.(315)785-2245 TEL.(315)793-2554 -------------- BROOME,CAYUGA, CHENANGO,CORTLAND, 5786 WIDEWATERS PARKWAY 5786 WIDEWATERS PARKWAY 7 MADISON,ONONDAGA, SYRACUSE,NY 13214-1867 SYRACUSE,NY 13214-1867 OSWEGO,TIOGA AND TEL.(315)426-7438 TEL.(315)426-7500 TOMPKINS CHEMUNG,GENESEE, LIVINGSTON,MONROE, 6274 EAST AVON-LIMA 6274 EAST AVON-LIMA RD. ONTARIO,ORLEANS, ROADAVON,NY 14414-9519 AVON, NY 14414-9519 SCHUYLER,SENECA, STEUBEN,WAYNE AND TEL.(585)226-2466 TEL.(585)226-2466 YATES I ALLEGANY, 700 DELAWARE AVENUE 700 DELAWARE AVENUE CATTARAUGUS, 9 CHAUTAUQUA,ERIE, , BUFFALO,NY 14209-2999 BUFFALO,NY 14209-2999 NIAGARA AND WYOMING TEL.(716)851-7165 TEL.(716)851-7070 80 APPENDIX F — SWPPP Preparer Certification Form The SWPPP Preparer Certification Form required by this permit begins on the following page. 81 Department of �SOTAOt_ Environmental Conservation SWPPP Preparer Certification Form SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP) (in accordance with CGP Part I.D.2.b., the completed form must be attached to the eN01 and submitted to NYSDEC electronically.) Project/Site Name: eNOI Submission ID: Owner/Operator Name: Certification — SWPPP Preparer I hereby certify that the Stormwater Pollution Prevention Plan (SWPPP) has been prepared in accordance with the requirements of GP-0-25-001. I certify under penalty of law that the SWPPP and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. SWPPP Preparer First Name MI SWPPP Preparer Last Name Signature Date Revised:January 2025 APPENDIX G — MS4 SWPPP Acceptance Form The MS4 SWPPP Acceptance Form required by this permit begins on the following page. 83 SEW Diep,artment of YORK AfE Environmental Conservation MS4 SWPPP Acceptance Form for construction activities seeking authorization under the SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP) (In accordance with CGP Part I.D.2.b., the completed form must be attached to the eNOl and submitted to NYSDEC electronically.) I. Project Owner/Operator Information 1. Owner/Operator Name: 2. Contact Person: 3. Street Address: 4. City/State/Zip: II. Project Site Information 5. Project/Site Name: 6. Street Address: 7. City/State/Zip: III. Stormwater Pollution Prevention Plan (SWPPP) Review and Acceptance Information 8. SWPPP Reviewed by: 9. Title/Position: 10. Date Final SWPPP Reviewed and Accepted: IV. Regulated MS4 Information 11. Name of MS4 Operator: 12. MS4 SPDES Permit Identification Number: NYR20A 13. Street Address: 14. City/State/Zip: 15. Telephone Number: Page 1 of 2 MS4 SWPPP Acceptance Form - continued V. Certification Statement- MS4 Official (principal executive officer or ranking elected official) or Duly Authorized Representative I hereby certify that the final Stormwater Pollution Prevention Plan (SWPPP)for the construction project identified in section 11. of this form has been reviewed and meets the substantive requirements in the SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP). Note: The MS4 Operator, through the acceptance of the SWPPP, assumes no responsibility for the accuracy and adequacy of the design included in the SWPPP. In addition, review and acceptance of the SWPPP by the MS4 Operator does not relieve the owner/operator or their SWPPP preparer of responsibility or liability for errors or omissions in the plan. Printed Name'.. Title/Position; Signature: Date: VI. Additional Information ' Printed name of the principal executive officer or ranking elected official for the MS4 Operator or their duly authorized representative in accordance with CGP Part VII.J.2. - (NYSDEC - MS4 SWPPP Acceptance Form -January 2025) Page 2 of 2 APPENDIX H — NYCDEP SWPPP Acceptance/Approval Form The City of New York Department of Environmental Protection (NYCDEP) SWPPP Acceptance/Approval form required by this permit begins on the following page. 86 THE CITY OF NEW YORK DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Environmental Planning and Analysis 59-17 Junction Blvd., 9th Floor;Flushing, NY 11373 SWPPP Acceptance/Approval Application Number: I. Project Owner/Operator Information 1. Owner/Operator Name: 2. Contact Person: 3. Street Address: 4. City/State/Zip: II. Project Site Information 5. Project/Site Name: 6. Street Address: 7. City/State/Zip: '_. Stormwater Pollution Prevention Plan (SWPPP) Review and Acceptance/Approval 8. SWPPP Reviewed by: 9. Title/Position: / 10. Date Final SWPPP Reviewed and Accepted:. 11. Acceptance/Approval Expiration Date: IV. Regulated MS4 Information for projects that require coverage under the NY State Pollution Discharge Elimination System General Permit for Stormwater Discharges from Construction Activity 12. Name of MS4: CITY OF NEW YORK 13. MS4 SPDES Permit Identification Number: NY-0287890 14. Contact Person: 15. Street Address: 59-17Junction Blvd. 9th Floor 16. City/State/Zip: Flushing, NY 11373 17. Telephone Number: Projects in the MS4 area must submit a copy of this SWPPP Acceptance with a Notice of " Intent for coverage under the NY SPDES General Permit for Stormwater Discharges from DtparlkN' ent at Construction Activity to: NYS Department of Environmental Conservation, Division of Water; EnWrvanwnuit 625 Broadway, 4th Floor; Albany, New York 12233-3505. € w paryA 1 of 7 THE CITY OF NEW YORK DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Environmental Planning and Analysis 59-17 Junction Blvd., 9th Floor; Flushing, NY 11373 V. Certification Statement - MS4 Official (principal executive officer or ranking elected official) or Duly Authorized Representative I hereby certify that the final Stormwater Pollution Prevention Plan (SWPPP) for the construction project identified in question 5 has been reviewed and meets the substantive requirements in the SPDES General Permit For Stormwater Discharges from Municipal Separate Storm Sewer Systems (MS4s). Note: The MS4, through the acceptance of the SWPPP, assumes no responsibility for the accuracy and adequacy of the design included in the SWPPP. In addition, review and acceptance of the SWPPP by the MS4 does not relieve the owner/operator or their SWPPP preparer of responsibility or liability for errors or omissions in the plan. Printed Name: Title/Position: Signature: Jate: VI. Conditions of Acceptance/Approval and Additional Information �wEW YORK Projects in the MS4 area must submit a copy of this SWPPP Acceptance with a Notice of Intent for coverage under the NY SPDES General Permit for Stormwater Discharges from DeparitnentalI Construction Activity to: NYS Department of Environmental Conservation, Division of Water; Eaormnwntaf 625 Broadway, 4th Floor; Albany, New York 12233-3505. ems , pano ? of APPENDIX I — MS4 No Jurisdiction Form The MS4 No Jurisdiction Form required by this permit begins on the following page.. 89 K @epllrtlnrlent of rA'r EnvironrTl�ental Conservation MS4 No Jurisdiction Form for construction activities seeking authorization under the SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP) (In accordance with CGP Part I.D.2.b.,the completed form must be attached to the eNOI and submitted to NYSDEC electronically.) I. Project Owner/Operator Information a. Owner/Operator Name: b. Contact Person: c. Street Address: d. City/State/Zip: II. Project Site Information a. Project/Site Name: b. Street Address: c. City/State/Zip: d. eNOI Submission ID: III. Traditional Land Use Control MS4 Operator Information a. Name of MS4 Operator: b. MS4 SPDES Permit ID Number: NYR20A c. Street Address: d. City/State/Zip: e. Telephone Number: IV. Certification Statement In accordance with CGP Part I.D.2.b.ii.3., I hereby certify that the Traditional Land Use Control MS4 Operator identified in section III.of this form does not have review authority over the construction project identified in section II.of this form,which is owned/operated by the entity identified in section I. of this form. I am aware that there are significant penalties for submitting false information,including the possibility of fine and imprisonment for knowing violations. a.. Printed name of the principal executive officer or ranking elected official for the MS4 Operator or their duly authorized representative in accordance with CGP Part VII.J.2.: b. Title/Position: c. Signature: d. Dater APPENDIX J — Owner/Operator Certification Form The Owner/Operator Certification Form required by this permit begins on the following page. 91 Department of Environmental Zonservation Owner/Operator Certification Form SPDES General Permit for Stormwater Discharges from Construction Activity, GP-0-25-001 (CGP) (In accordance with CGP Part I.D.2.b. or Part I.F.2. and 3., the completed form must be attached to the eNOI or the Request to Continue Coverage, and submitted to NYSDEC electronically. Project/Site Name: eNO1 Submission ID: eN01 Submitted by: Owner/Operator SWPPP Preparer Other Certification - Owner/Operator I hereby certify that I read, and will comply with, the GP-0-25-001 permit requirements. I understand that authorization to discharge under the permit for the project/site named above is dependent on receipt of a Letter of Authorization (LOA) or a Letter of Continued Coverage (LOCC)from the New York State Department of Environmental Conservation (NYSDEC) in accordance with CGP Part I.D.3.b. or Part I.F.4. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Owner/Operator First Name MI Owner/Operator Last Name Signature Date Revised:January 2025