Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
51651-Z
�o��pf SO�ryO`o Town of Southold * P.O. Box 1179 oA 53095 Main Rd UN" Southold, New York 11971 CERTIFICATE OF OCCUPANCY No: 47079 Date: 05/21/2026 THIS CERTIFIES that the building BATTERY STORAGE Location of Property: 1395 Henrys Ln Peconic, NY 11958 Sec/Block/Lot: 74.4-10 Conforms substantially to the Application for Building Permit heretofore,filed in this office dated: 12/31/2024 Pursuant to which Building Permit No. 51651 and dated: 02/18/2025 Was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: Energy storage system (interior) at existing single-family dwelling as applied for. The certificate is issued to: Robert Otani Of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL: ELECTRICAL CERTIFICATE: 51651 10/3/2025 PLUMBERS CERTIFICATION: %ivll &Z othoed Si ature hO�apFSO(/Tyo� TOWN OF SOUTHOLD AMENDMENT BUILDING DEPARTMENT �a7oL� • TOWN CLERK'S OFFICE SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 51651 Date: 02/18/2025 Permission is hereby granted to: Robert Otani 211 Thompson St Apt 2-P New York, NY 10012 To: Install energy storage system at existing single family dwelling as applied for. `3/27/25 AMEND P.ermt:_fo include battery storage system. Premises Located at: 1395 Henrys Ln, Peconic, NY 11958 SCTM#74.4-10 Pursuant to application dated 12/31/2024 and approved by the Building Inspector. To expire on 02/18/2027. Contractors: Required Inspections: Fees: Battery Storage $100.00 ELECTRIC -Residential $125.00 CO-RESIDENTIAL $100.00 Total $325.00 ------ — ------------- Building Inspector *of SO& TOWN OF SOUTHOLD BUILDING DEPARTMENT ' TOWN CLERK'S OFFICE SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 51651 Date: 02/18/2025 Permission is hereby granted to: Robert Otani 211 Thompson St Apt 2-P New York, NY 10012 To: Install energy storage system at existing single family dwelling as applied for. Premises Located at: 1395 Henrys Ln, Peconic, NY 11958 SCTM#74.4-10 Pursuant to application dated 12/31/2024 and approved by the Building Inspector. To expire on 02/18/2027. Contractors: Required Inspections: Fees: Battery Storage $100.00 ELECTRIC -Residential $125.00 CO-RESIDENTIAL $100.00 Total $325.00 Building Inspector SO!/ryol Town Hall Annex Telephone(631)765-1802 54375 Main Road P.O.Box 1179 G • 0 Southold,NY 11971-0959 'Q 01UNV,� BUILDING DEPARTMENT TOWN OF SOUTHOLD CERTIFICATE OF ELECTRICAL COMPLIANCE SITE LOCATION Issued To: Robert Otani Address: 1395 Henrys Ln City: Peconic St: NY Zip: 11958 Building Permit#: 51651 Section: 74 Block: 1 Lot: 10 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE Contractor: Electrician: Element Energy License No: 52689ME SITE DETAILS Office Use Only Indoor W Basement F Service Solar F Outdoor W 1st Floor Fv Pool r Spa F Renovation F 2nd Floor F Hot Tub r Generator Survey Fri Attic I— Garage Battery Storage (✓ INVENTORY Service 1 ph F Heat Duplec Recpt Ceiling Fixtures Bath Exhaust Fan Service 3 ph (— Hot Water GFCI Recpt Wall Fixtures Smoke Detectors Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors Sub Panel A/C Blower Range Recpt Ceiling Fan Combo Smoke/CO Transfer Switch UC Lights Dryer Recpt Emergency Strobe Heat Detectors Disconnect Switches 4'LED Exit Fixtures Other Equipment: 20kW Battery Storage System w/ (4) Enphase IQ 5P Batteries, 125A IQ Syst. Conti w/80A Battery Breaker, 40A Solar Breaker, 60A Dedicated Loads Panel, Rapid Shutdown Switch Notes: Batt. Storage Inspector Signature: X Date: October 3, 2025 Sean Devlin Electrical Inspector sean.deviin(D-town.southold.ny.us 1395 He n rys Ln Batt.Sto rage OF SOUTyO� TOWN OF SOUTHOLD .BUILDING DEPT. 631-765-1802 I_NSPECTION . [ ] FOUNDATION 1 ST/REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [. . ] SULATION/CAULKING [ ] FRAMING/STRAPPING [ FINAL A911- FIREPLACE4 CHIMNEY [ ]-.'FIRE SAFETY INSPECTION. [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH). [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ . ] PRE C/O [ ] RENTAL REMARKS: 61 6)T�l 1V1%% U"v bv- ht_,qm��%oc' v 'n DATE ti INSPECTOR pFSOpT�°!o l 65( tCa/"'v /�� / � # # OWN .OF SOUTHOLD BUILDING DEPT. " - y U�m�i� 631-765-1802 . INSPECTION [ ] FOUNDATION 1 ST/ REBAR: [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING' ] FRAMING/STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY- [ ] FIRE SAFETY INSPECTION [ ] FIRE-RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: (p P r-,, _r c G. T`C V ol Cr Lo Q d�_e o' 6MI`f fs- G a,r VN 0 n�� _ i e� -� U� DATE l INSPECTOR SOUTyOIo - # TOWN OF SOUTHOLD BUI DING DEP o � 631-765-1802 INSPE CTION [ ] FOUNDATION 1ST/ REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] .FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) ,] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: 44 , l � DATE INSPECTOR MELD INSPECTION REPORT DATE COMMENTS FOUNDATION (1ST) ------------------------------------- IOUNDATION (2ND) c cf) ROUGH FRAMING & PLUMBING INSULATION PER N. Y. STATE ENERGY CODE clw FINAL ADDITIONAL COMMENTS r. Oft-Co V-c ce�,Fn c 9�lect- Urt UnA fn no-N)4 te PIZ- ------------- X) TOWN OF SO'1JTHOLD —BUILDING DEPARTMENT ( Totilm Hall Armex 54375 Main Load P. 0. Box 1 179 Southold,.NY 11971-0959 I Telephone (631) 765-1802 Fax (631) 765-9502 hito�: i Cate Received i j APPLICATION FOR BUILDING PERMIT I I i For Office Use Only I 3...,>Js i Building Inspector: DEC 3 1 2024 i_��.✓.' Applications and forms must be filled out in their entirety.Incomplete applications will not be accepted. where The Applicant is nct the owner,an T � � I: Owner's Authorization form(Page 2)sh,all be completed. r l a �01a Date- 04VNEiR(S) DE(PROPERTY, Name: R0 r4 0+&'11 SCTM#l000- O D 1 `O Project Address: 13 qS Ht4 L a ., !?gUY1 iz, �. C l 1 Q c Phone#: � � -!J Email: r, IMailing Address: ` 3 9 P„n _nt N_ t i -CON7ACi PERSON: i i Name: Lo Mailing Address: Phone#: ;0 3 I b 2192 _7 011 Email: i I' DESGGIN iPEROFESSIOP4AL RNFORMATION: l I Name: Mailing Address: Phone#: Email: CONTRACTOR INFORMAITION- Name: Sit?-m Y)e rq Ll Mailing Address: 1 4 V 61 vy r 44, va, 0, Y. 11 967. Phone#: °-� Email: PVA4s Q, caz ,�, corn [DESCR3P_nON OF PROPOSED CONSTRUC'9ON ❑New Structure ❑Addition_ 8❑Alteration ❑,R,P,--.r ❑Demolition,pQ Estimated Cost of Project: Will the lot be re-graded? ❑Yes;.ivo V excess fill be removed from premises? ❑Yes 610 i I i i 1 ,PROPERTY INFORMATION Existing use of property: e—L Intended use of property: XLZ Zone or use distri in which premises is situated: Are there any covenants and restrictions with respect to this property? ❑Ye,5)6No IF YES, PROVIDE A COPY. heck Box After Reading: The owner/contractor/design professional Is responsible for all drainage and storm water Issues as provided by apter Z35 of the Town Code.APPUCATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold,Suffolk,County,New York and other applicable Laws,Ordinances or Regulations,for the construction of buildings, additions,alterations orfor removal or demolition as herein described.The applicant agrees to comply with all applicable laws,ordinances,building code, housing code and regulations and to admit authorized Inspectors on premises and in building(s)for necessary Inspections.False statements made herein are punishable as a Class A misdemeanor pursuant to Section Z30.4S of the New York State Penal taw. Application Submitted B name):Lorraine Lorraine DiPenta Pp Y(print ) BAuthorized Agent ❑Owner Signature of Applicant: Date: l G 1 y STATE OF NEW YORK) SS: COUNTY OF Suffolk ) Lorraine DiPenta being duly sworn,deposes and says that(s)he is the applicant (Name of individual signing contract)above named, (S)he is the Contractor (Contractor,Agent,Corporate Officer,etc.) of said owner or owners,and is duly authorized to perform or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and belief;and that the work will be performed in the manner set forth in the application file therewith. Sworn before me this day of / aVCKZ6c-- 20Zy Ivry Public _ LOUIS J ROMEO PROPERTY OWNER AUTHORIZATION Notary Public,State of New York No.01 R06314813 (Where the applicant is not the owner) Qualified in Suffolk County Commission Expires November 17,20z/o I, o LJ lev_� ��'� I residing at 139 S AE N(.1--i S t Aj c Lz ref L 1 do hereby authorize LO r�� �t 14./th-Li- 15k- CAf to apply on y my behalf to the Town of Southold Building Department for approval as described herein. 12.E Owner's Signature Date R/0/10 V.V_�_ O+(31 V t Print Owner's Name 2 �gUFFQ[,+Y BUILDING DEPARTMENT-Electrical Inspector c �Gy TOWN OF SOUTHOILD o =` " Town Hall Annex - 54375 Main Road - PO Sox 1179 C y� t Southold, New York 11971-0959 Telephone (631) 765-1802 - FAX (631) 765-9502 iamesh(Q_south®Idfcwnny clov arada-s®utholdtowrar,y c ov APPLICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (Au Information Required) Date: Company Name: EQ-m ui+ c, Electrician's Name: ,I` did nnI License No.: S,;Ze, i; 15 Elec. email: Elec. Phone No: �_;5 am•?-29_`?,9cj3 Z request an email copy of Certificate of Compliance EIeC. Address.: °'It ® Ct V e— 4L++0-+L''LC< �J,-J — JOB SITE INFORMATION (All Information Required) Name: �p,ber4 04m/ii Address: ( MS n�G � Cross Street. D Ou Phone No.: d ! - °I l - 10 3y Bldg.Permit#: email: Tax Map District: 1000 Section: DI Block: d Lot: (7) p BRIEF DESCRIPTION OF WORK, INCLUDE SQUARE FOOTAGE (Please Print Clearly): 5 S-P L a,o r—PA) -Cyl - b me4c �. Footage: Circ3e All That APPIye Square Is job ready for inspection?: ❑ YES N NO ❑Rough In Final Do you need a Temp Certificate?: YES O Issued On Tamp Information: (All information required) Service SizeEl1 Ph[_]3 Ph Size: A #Meters Old Meter# ❑NewServiceOFire ReconnectE]Flood ReconnectOService Reconnect ElUnderg round®Overhead # Underground Laterals R 1 FJ2 H Frame Pole Work done on Service? Y N Additional Information: PAYMENT DUE WITH APPLICATION Zoho Sign Document ID:2A768FFA-6UG15JF5PB01VT1L4ZTEZXI4CC_WCY1--NDJT1DW5X8 Town of Southold December 23rd, 2024 Building Department Town Hall Annex 54375 Main Road P.O. Box 1179 Southold, New York 11971-0959 Subject: Battery Energy Storage System at the Otani Residence, 1395 Henrys Lane, Peconic, NY 11959 To Town of Southold: I hereby affirm that, following a comprehensive professional evaluation, the plans for the installation of the Battery Energy Storage System (BESS) complies with the 2020 Residential Code of New York State, the 2020 Building Code of New York State, the 2020 Fire Code of New York State, the 2017 National Electric Code, ASCE 7-16, and other relevant industry standards and regulations. This certification is provided in strict adherence to the governing regulations and standards applicable to such installations. The locations and connections detailed in the submitted plans have undergone thorough scrutiny and are confirmed to align with the requisite codes and standards. The proposed BESS, utilizing Lithium Iron Phosphate technology, adheres to UL9540A standards, ensuring it does not exhibit thermal runaway. In my professional opinion, derived from the site inspection and detailed analysis, the proposed BESS and the accompanying enclosure system demonstrate structural adequacy to withstand the reactions associated with the BESS. Please contact me if you have any questions or comments about the above. Sincerely, Gennaro Anthony Giustra. P.E. Great Eastern Services, Inc. of NEW �P�� o A c� 1-0� PO Box 240 24 Harvey Rd _ o! Riverhead, NY 11901 y Mobile: 631.235.0189 N �� Email: jerrygiustra@gmail.com �oARO'o3445 ssto Zoho Sign Document ID:2A768FFA-6UG15JF5PB01 VT1 L4ZTEZXI4CC_WCY1--NDJT1 DW5X8 COPE OF WORK DESIGN$DRAFTING BY: ELEMENT ENERGY LLC TO INSTALL A 20 KW BATTERY ENERGY STORAGE SYSTEM AT OTANI RESIDENCE, REVIEW BY J.M.NABCEP CERTIFIE LOCATED AT 1305 HENRYS LANE, PECONIC, NY 11959. OS 1 1 1 2-1 29l THI5 BATTERY ENERGY STORAGE SYSTEM WILL BE INTERCONNECTED WITH THE UTILITY GRID THROUGH THE EXISTING ELECTRICAL SERVICE EQUIPMENT. REVISIONS DESCRIPTION DATE REV SYSTEM RATING 48 ORIGINAL 12-23-2024 20 kWh < ®p me+Sand EQUIPMENT SUMMARY Pee°nic 4 UNIT5 OF ENPHA5E IQ BATTERY 5P 5.0 KWH BATTERY ENERGY STORAGE 48 SHEET INDEX CONTRACTOR PV-1.0 COVER a ELEMENT ENERGY, LLC. Pv-2.0 517E PLAN 7470 SOUND AVE PV-3.0 FLOOR PLAN MATTITUCK, NY I 1952 PV-4.0-4.1 ELECTRICAL DIAGRAM PROJECT LOCATION LICENSE# G74G I-HI Y •. LICENSE# 52G89-ME GOVERNING CODES , A F �OF NE[7,Y 2017 NATIONAL ELECTRICAL CODE. 71 2020 RESIDENTIAL CODE OF NEW YORK STATE. _ 2020 BUILDING CODE OF NEW YORK STATE. W 2020 FIRE CODE OF NEW YORK STATE. m 2 A5CE 7-1 G AND NFPA-70. ? UNDERWRITERS LABORATORIES(UL)STANDARDS 703443 05HA 29 CFR 191 0.2G9 ARQFESSI°NPR' GENERAL NOTES m - PROJECT NAME 1. CONTRACTOR SHALL CHECK AND VERIFY ALL CONDITIONS AT RETAIN STORM WATER RUNOFF THE SITE PRIOR TO STARTING TO WORK AND SHALL FAMILIARIZE HIMSELF PURSUANT TO CHAPTER 236lig AGREE THE ITH SAMEE INTENT OF THESE PLANS AND MAKE WORK OF THE TOWN CODE. AERIAL VIEW �' Ln WZLn 2. CONTRACTOR OR OWNER SHALL OBTAIN ALL REQUIRED z APPROVALS, PERMITS, CERTIFICATES OF OCCUPANCY, LU 10. CONTRACTOR TO EFFECT AND MAINTAIN INSURANCE, I.E. TO D APPROVAL STAMP } INSPECTION APPROVALS, ETC., FOR WORK PERFORMED FROM CONTRACTOR'S LIABILITY, WORKMAN'S COMPENSATION, (Dz z A3.GENLL CIES RK SHALL HAVING JURISDICTION THEREOF, IF REQUIRED. COMPLETED OPERATION ETC. ADEQUATE FOR THE PURPOSES �j rJ LIDALLRU RULE AND REGULATIO SMOf THE TO ORESPO SI BLE ODE AND OF THIS PROJECT AND FURNISH PROOF OF SAME PRIOR TO DA ' ' o "R�B.P. 614p.5� OCCUPANCY OR z = z COMMENCING WITH WORK. Q O JURISDICTION. I--- n U 4. IF IN THE COURSE OF CONSTRUCTION A CONDITION EXISTS . EACH SUBCONTRACTOR SHALL BE RESPONSIBLE FOR p 1 1 m ❑, WHICH DISAGREES WITH THAT AS INDICATED ON THESE PLANS, MAINTAINING SAFETY ON THE JOB SITE DURING THE FE 5 BY USE IS UNLAWFUL - THE CONTRACTOR SHALL STOP WORK AND NOTIFY THE CONSTRUCTION PHASE TO COMPLY WITH THE REGULATIONS NOTIFY BUILDING DEPARTMENT AT WITHOUT CERTIFICATE ENGINEER. SHOULD HE FAIL TO FOLLOW THIS PROCEDURE AND AND REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND 631-765.1802 8AMT04PM FOR TNE HEALTH ADMINISTRATION.THIS SHALL INCLUDE, BUT ARE NOT CONTINUE WITH THE WORK, HE SHALL ASSUME ALL FOLLOWING INSPECTIONS: OF OCCUPANCY LIMITED TO: PROVIDING FOR ADEQUATE AND PROPER BRACING, RESPONSIBILITY AND LIABILITY THEREFROM SAFETY RAILINGS AND SECURE FOOTINGS FOR ALL TEMPORARY 1. FOUNDATION-TWO REQUIRED SHEET NAME FABRICATED AND INSTALLED AS PER LATE 5. ALL STRUCTURAL STEEL SHALL BE LATEST A.I.S.0 AND SHALL BE SCAFFOLDING, STAIRS, ETC.. AS WELL AS PERMANENT FOR POURED CONCRETE CONSTRUCTION. SPECIFICATIONS. 2. ROUGH-FRAMING&PLUMBING O`V,C r - - G. ALL ELECTRICAL WORK SHALL BE BOARD OF FIRE DRAWINGS, WHERE DIMENSIONS ARE ESTABLISHED BY EXISTING Co 12. FIGURED DIMENSIONS SHALL GOVERN. DO NOT SCALE $, INSULATION MPLY WfTH ALE.CODES OF UNDERWRITERS APPROVED AND IN ACCORDANCE WITH N.E.C. CONDITIONS. EACH CONTRACTOR SHALL VERIFY EXISTING 4. FINAL-CONSTRUCTION MUST NEW YORK S ATE 8 TOWN CODES NYS CODES*REGULATIONS CONDITIONS PRIOR TO ORDERING MATERIALS AND COMMENCING WITH WORK. AND CONDITIONS BE COMPLETE FOR C.O. 7. ANY DEVIATION FROM THESE PLANS WITHOUT THE WRITTEN .O. DRAWING SCALE CONSENT OF THE ENGINEER WILL NEGATE THE ENGINEER'S ALL CONSTRUCTION SHALL MEET THE 13. CONTRACTOR TO REMOVE ALL DEBRIS CREATED BY THIS CERTIFICATION OF THESE PLANS. WORK FROM THE 51TE AND DISPOSE OF IN A LEGAL MANNER ON REQUIREMENTSOFTHECODESOFNEW TOINNZBA 8. THESE DRAWINGS AS INSTRUCMENTS OF SERVICE ARE AND A WEEKLY BASIS OR SOONER IF CONDITIONS WARRANT. YORK STATE NOT RESPONSIBLE FOR SODA UTOWNFMNINGBO N .T.S. SHALL REMAIN THE PROPERTY OF THE ENGINEER WHETHER THE 14. AT THE COMPLETION OF WORK, THE SITE TO BE CLEARED PROJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. OF ALL DEBRIS AND EXCESS MATERIALS. THE FACILITY IS TO BE DESIGN OR CONSTRUCTION ERRORS �TOWNTRU$jEES THEY ARE NOT TO BE USED ON ANY OTHER PROJECTS OR LEFT BROOM CLEAN AND WORK IS TO BE COMPLETED TO THE EXTENSIONS TO THIS PROJECT It.Y.S a 9. CONTRACTOR SHALL PROTECT, PATCH AND REPAIR ALL TOTAL SATISFACTION OF THE OWNER PRIOR TO RELEASE OF SHEET NUMBER EXISTING WORK ADJACENT TO HI5 WORK, OR DAMAGED A5 FINAL PAYMENT. wu1f1ULU PV— I .O RESULT of HIS WORK. T - . 0-01 .00-0 I 0.'000 Zoho Sign Document ID:2A768FFA-6UG15JF5PB01 VTi L4ZTEZXI4CC_WCYI--NDJT1 DW5X8 LEGEND DESIGN 4 DRAFTING BY: �E)OSTING UTILITY METER ELEMENT ENERGY LLC MAIN SERVICE PANEL REVIEW BY J.M.NABCEP CERTIFIE � NEW PV SUB-PANELS 051112-129 A/C DISCONNECT COMBINER INVERTERS MAIN HOUSE ONO ELECTRODE REVISIONS PV MODULE DE5CRIPTION DATE REV ORIGINAL 12-23-2024 RACKING RAIL O ATTACHMENT POINT ---RAFTERS -*--ROOF PITCH ANGLE N9SUNRUN METER ®VENT OPLUMBING VENT (E) UTILITY METER ®SKY LIGHT ®CHIMNEY CONTRACTOR ®COMPOSITE SHINGLES ELEMENT ENERGY, LLC. GOOD CONDITION POTENTIAL SHADING ISSUES 7470 MATT T C SOUND N IAVE 95 �TRIM/REMOVE AS NECESSARY LICENSE# G74G I-HI 6" TYP. LICENSE# 52G89-ME of NEty 6" TYP. �,�PaQgo A c,Gso-per m w 703443 ZI ® ARO�sstoNP�" 3' N. PROJECT NAME (E) PV AC DISCONNECT LU z In Z Q LLJ (4) ENPHASE IQ BATTERY 5P UNITS >_ ON H—FRAME, OUTSIDE w Z � WU < In ono Om „_, 5MEET NAME SITE PLAN OHO� DRAWING SCALE - 4 0 I /Q11 _ I 1_01 CONSTRUCTION NOTES �2�0 ° Q ,�50° 210° 1�0° 1.)ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE 2&0 � SHEET NUMBER MANUFACTURERS INSTALLATION INSTRUCTIONS. 2.)ALL OUTDOOR EQUIPMENT SHALL BE RAINTIGHT WITH MINIMUM NEMA 3R RATING. PV- .O 3.)ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION. 4.)THE BATTERY ENERGY STORAGE UNIT SHALL BE MOUNTED ON THE NORTH SIDE OUTSIDE WALL. TAX MAP: 1 000-074.00-0 1 .00-0 10.000 Zoho Sign Document ID:2A768FFA-6UG15JF5PB01 VT1 L4ZTEZXI4CC—WCYI--NDJTi DW5X8 CONSTRUCTION SUMMARY LEGEND DE51GN 8 DRAFTING BY: EXISTING UTILITY METER ELEMENT ENERGY LLC o (4) UNITS OF ENPHASE IQ BATTERY 5P 5KWH BATTERY MAIN SERVICE PANEL REVIEW BY J.M.NABCEP CERTIFIED ENERGY STORAGE UNITS ON THE OUTSIDE H-FRAME NEW PV SUB-PANELS 051 112-120 (DIMENSIONS: 21.65" X 38.58" X 7.4") A/C DISCONNECT COMBINER INVERTERS B GND ELECTRODE REVISIONS 6" TYP. 6" TYP. DE5CRIPf10N DATE REV PV MODULE ORIGINAL 12-23-2024 —RACKING RAIL CONSTRUCTION NOTES o ATTACHMENT POINT 1.) ALL EQUIPMENT SHALL BE INSTALLED IN ---RAFTERS ACCORDANCE WITH THE MANUFACTURER'S - --ROOF PITCH ANGLE INSTALLATION INSTRUCTIONS. tSUNRUN METER 2.) ALL OUTDOOR EQUIPMENT SHALL BE ®VENT RAIN-TIGHT WITH MINIMUM NEMA 3R RATING. PLUMBING VENT 3.) ALL LOCATIONS ARE APPROXIMATE AND O REQUIRE FIELD VERIFICATION. ®SKY LIGHT 4.) THE LOCATION OF BESS SYSTEM IS COMPLIANT MCHIMNEY CONTRACTOR WITH THE SECTION R327 OF THE INTERNATIONAL COMPOSITE SHINGLES ELEMENT ENERGY, LLC. RESIDENTIAL CODE, AS AMENDED BY THE NEW ®GOOD CONDITIONPOTENTIAL G ISSUES 7470 SOUND AVE YORK STATE UNIFORM CODE. ❑TRIM/REMOVE ASN EMMAR MATTITUCK, NY 1195 LICENSE 5.) THE BESS IS NOT INSTALLED IN A LOCATION #G74G I-HI SUBJECT TO VEHICLE DAMAGE. LICENSE# 52G69-ME Of NE4y y o a[BESS EQUIPMENT PLAN — TOP VIEW] G o - U 1034A'S 6" TYP. AR�FEsstoN°� PROJECT NAME 0 o ILL z Ln U Q n Z _J - LU } ILL Z U3 U Z Z O 0 LU — TL 6" MIN. 5HEET NAME FLOOR PLAN DRAWING 5CALE 3/1 6° = 1 1-011 5NEET NUMBER [BESS ON H—FRAME] PV-3 .0 TAX MAP: 1 000-074.00-01 .00-01 0.000 Zoho Sign Document ID:2A768FFA-6UGI5JF5PB01 VT1 L4ZTEZXI4CC—WCY1--NDJT1 DW5X8 DESIGN 4 DRAFTING 13' ELEMENT ENERGY LLC REVIEW BY J.M.NABCEP CERTIFIE 051112-123 REVISIONS DE5CRIPTION DATE REV (N) N DISCONNECT TO UTILITY GRID ORIGINAL 12-23-2024 /AC DISCONNECT 240 VAC,200 A PRE—INSTALLED BREAKER NEMA 3R, UL LISTED GATEWAY (2)125 A FUSES OR t N (N)ENPHASE IQ SYSTEM CONTROLLER 3.' 240V,20A ` 125 A CIRCUIT BREAKER EN—DMC71ONAL 120/240 VAC,200 A PASSTHROUG TED tas A UTILITY PHASE,240 V NEMA 3R.UL LISTED (9 1 N 2-POLE BREAKER t r— --- --- ° --� WITH HOLD-DOWN KIT--,,,,, I I t N 240 V. 50 AI I MAIN SERVICE CONTRACTOR (E)SOLAR ARRAY ON MAIN HOUSE 9.6 kW 1 I ISCONNECT (24)OCELL Q.PEAK DUO BLK ML-GIG+400 WATT PV MODULES 2-POLE BREAKER I I 200 A' ELEMENT ENERGY, LLC. (2)STRINGS OF(12)MICRO—INVERTERS WITH HOLD—DOWN KI K t I I 21 s7RING5 TOTAL OLAR MODULE TYPICAL 240 V.40 A I I 7470 SOUND AVE ens u.n v I I 1 t MATTITUCK, NY 1195 STRING #1 C ' ' i i LICENSE# G74G I-HI ERPHASE M. CSR ENPHASE 10 BAl7ERY SP UNITS V A I RANGE LICENSE# 52G89-ME I t _ 1 BRANCH , , , , , , w e�tmn -POLE BREAKER I TERMINATOR tw I 240 V.60 A I ONCE TYPICAL _—, t e.a-uP.nros Dan I i t t PANEL B 1—PH,3—W I I 240 VAC OF NE1N y STRING #2 I N t N I 200 A ��Q�=pgO A G�Gittp�� MICRO-INVERTER 2 I ENPHASE IOSPLUS-72-2—US I G r — -- ---- --� t t I G r A a 1 240 VAC,1.21 A — 97tL CEC—WEIGHTED EFF. I I I I I I I NEMA 6 UL LISTED t t 1 gENPHASE t t CIRCUIT CABLE TYPICAL I I I I I 6 1 7034b3 I IIII I A �, I I (E)AC COMBINER BOX 4 L------- I 171 240 VAC,80 A I I I I 1—PH,3—W I EXISTING GROUNDING NEMA 31t,UL LISTED I I I N t t (2)ZO A DOUBLE POLE BREAKERS I I I 1 240 VAC,6DA I — ELECTRODE SYSTEM O A A i I I. I ��PANEL _= PROJECT NAME II I I III L------1 I RAPID SHUTDOWN SM CH I Uj W ---------------------------.J I 1 ENPHASE I U 600 VDC, 16A IP66/NEMA 4X, I _ UL1741 PVRSE I n (� j w U I O OmW -------------------------------------------------------- --------------j SHEET NAME ELECTRICAL NOTES GENERAL NOTES 1.) ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL, AND LABELED FOR ITS APPLICATION. 1.) THE BESS PROVIDES MONITORING AND BALANCING CELL ELECTRICAL DIAGRAM 2.) ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600 V AND 90'C WET ENVIRONMENT. VOLTAGES, CURRENTS, 3.) WIRING, CONDUIT, AND RACEWAYS MOUNTED ON ROOFTOPS SHALL BE ROUTED DIRECTLY TO, AND LOCATED AS CLOSE AS POSSIBLE TO THE NEAREST RIDGE, HIP, OR VALLEY. AND TEMPERATURES WITHIN THE MANUFACTURERS 4.) WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL COMPLY WITH NEC 110.26. SPECIFICATION THROUGH WEB AND MOBILE APPLICATIONS. 5.) DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS. CONTRACTOR SHALL FURNISH ALL NECESSARY OUTLETS, SUPPORTS, FITTINGS AND ACESSORIES TO FULFILL APPLICABLE CODES AND 2.) THE BESS SYSTEM SHALL TRANSMIT AN ALARM SIGNAL STANDARDS. VIA MOBILE PORTAL IF POTENTIALLY HAZARDOUS DRAWING SCALE 6.) WHERE SIZES OF JUNCTION BOXES, RACEWAYS, AND CONDUITS ARE NOT SPECIFIED, THE CONTRACTOR SHALL SIZE THEM ACCORDINGLY. TEMPERATURES OR OTHER CONDITIONS SUCH AS SHORT 7.) ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE. CIRCUITS, OVER VOLTAGE OR UNDER VOLTAGE ARE n I . . B.) MODULE GROUNDING CUPS TO BE INSTALLED BETWEEN MODULE FRAME AND MODULE SUPPORT RAIL, PER THE GROUNDING CUP MANUFACTURER'S INSTRUCTION. DETECTED. . I V 9.) MODULE SUPPORT RAIL TO BE BONDED TO CONTINUOUS COPPER G.E.C. VIA WEEB LUG OR ILSCO GBL-4DBT LAY—IN LUG. 3.) CONDUIT AND CONDUCTORS SPECIFICATIONS ARE 10.) THE POLARITY OF THE GROUNDED CONDUCTORS IS (positive/negative) BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT OR MEANT TO LIMIT UP—SIZING AS REQUIRED BY FIELD 10.) THE DC SIDE OF THE PV SYSTEM IS UNGROUNDED AND SHALL COMPLY WITH NEC 690.35. CONDITIONS. 511EET NUMBER 11.) THE INSTALLATION COMPLIES WITH R327 ENERGY STORAGE SYSTEMS. 12.) CONDUIT AND CONDUCTORS SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP—SIZING AS REQUIRED BY FIELD CONDITIONS. ALL CONDUCTORS NOT UNDER PV-4.O ARRAY ARE TO BE IN CONDUIT MINIMUM 7/8" ABOVE ROOF. TAX MAP: 1000-074.00-0 1 .00-0 10.000 Zoho Sign Document ID:2A768FFA-6UG15JF5PB01 VT1 L4ZTEZXI4CC_WCY1--NDJTi DW5X8 EDE51GN$DRAFTING BY: NT ENERGY LLC .M.NABCEP CERTIME 51112-129 WIRE CALCULATION REVISIONS DE5CRIPTION DATE REV ORIGINAL 12-23-2024 STARTING STARTING TEMPERATURE ADJUSTMENT MAXIMUM CONDUIT CURRENT FACTOR FOR ADJUSTED CURRENT CONDUCTOR CONDUCTOR ALLOWABLE TEMPERATURE CORRECTION TAG QTY. SIZE (AWG) AMPA DESCRIPTION SIZE & (.C) APPLIED TO MORE THAN 3 CONDUCTOR APPLIED TO TYPE CONDUCTORS CONDUCTORS AMPACITY CONDUCTORS 310.15(B)(1)(16) RATING IN RACEWAY 310.FACTOR 15(B)(2)(a) 310.15(B)(3)(a) IN RACEWAY 4 12 THWN-2 COPPER- (L1,L2,N) 1 3/4" PVC 30 90' 14.52 0.96 0.8 23.04 18.15 THWN-2 BARE COPPER-(GROUND) CONTRACTOR 1 8 ELEMENT ENERGY, L.L.C. 3 4 THWN-2 COPPER- (L1,L2,N) 7470 50UND AVE 2 1-1/4" PVC 95 90' 64.0 0.96 1 91.20 80.00 MATTITUCK, NY 1 1952 1 8 THWN-2 BARE COPPER-(GROUND) LICEN5E# G74G 1-111 3 2 12 THWN COPPER- (L1,L2) 1/2" PVC 30 90' 0.02 0.96 1 28.80 0.03 LICENSE# 52G89-ME 1 8 THWN-2 BARE COPPER-(GROUND) Pof NEW 3 2 y THWN-2 COPPER- (L1,L2,N) 4 1 g THWN-2 BARE COPPER-(GROUND) 1-1/4" PVC 130 90' 93.04 0.96 1 124.80 116.30 3 2 THWN COPPER- (L1,L2,N) z I 5 1-1/4" PVC 130 90' 93.04 0.96 1 124.80 116.30 �' �0344 1 8 THWN-2 BARE COPPER-(GROUND) �A 3 Ro�sstoN��' 3 4 THWN COPPER- (L1,L2,N) 6 1-1/4" PVC 95 90' 60 0.96 0.8 72.96 60.00 1 8 THWN-2 BARE COPPER-(GROUND) PROJECT NAME u.J JU zg � Ln o � � L LJ - = U z � z O OmL ELECTRICAL NOTES GENERAL NOTES SHEET NAME 1.) ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL, AND LABELED FOR ITS APPLICATION. 1.) THE BESS PROVIDES MONITORING AND BALANCING CELL 2.) ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600 V AND 90-C WET ENVIRONMENT. VOLTAGES, CURRENTS, ELECTRICAL DIAGRAM 3.) WIRING, CONDUIT, AND RACEWAYS MOUNTED ON ROOFTOPS SHALL BE ROUTED DIRECTLY TO, AND LOCATED AS CLOSE AS POSSIBLE TO THE NEAREST RIDGE, HIP, OR VALLEY. AND TEMPERATURES WITHIN THE MANUFACTURER'S SPECIFICATION THROUGH WEB AND MOBILE APPLICATIONS. 4.) WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL COMPLY WITH NEC 110.26. 2.) THE HEAT DETECTOR OR HEAT ALARM SHALL BE 5.) DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS. CONTRACTOR SHALL FURNISH ALL NECESSARY OUTLETS, SUPPORTS, FITTINGS AND ACESSORIES TO FULFILL APPLICABLE CODES AND INSTALLED AND INTERCONNECTED WITH SMOKE ALARM AND STANDARDS. THE BESS SYSTEM SHALL TRANSMIT AN ALARM SIGNAL DRAWING SCALE 6.) WHERE SIZES OF JUNCTION BOXES, RACEWAYS, AND CONDUITS ARE NOT SPECIFIED, THE CONTRACTOR SHALL SIZE THEM ACCORDINGLY. VIA MOBILE PORTAL OR THE SMOKE AND/OR HEAT 7.) ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE. ALARM/DETECTOR IF POTENTIALLY HAZARDOUS 8.) MODULE GROUNDING CUPS TO BE INSTALLED BETWEEN MODULE FRAME AND MODULE SUPPORT RAIL, PER THE GROUNDING CUP MANUFACTURER'S INSTRUCTION. TEMPERATURES OR OTHER CONDITIONS SUCH AS SHORT 1 V ,T,5 9.) MODULE SUPPORT RAIL TO BE BONDED TO CONTINUOUS COPPER G.E.C. VIA WEEB LUG OR ILSCO GBL-4DBT LAY-IN LUG. CIRCUITS, OVER VOLTAGE OR UNDER VOLTAGE ARE ) THE POLARITY OF THE GROUNDED CONDUCTORS IS (positive/negative) DETECTED. OR 3.) CONDUIT AND CONDUCTORS SPECIFICATIONS ARE 10.) THE DC SIDE OF THE PV SYSTEM IS UNGROUNDED AND SHALL COMPLY WITH NEC 690.35. BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT SHEET NUMBER 11.) THE INSTALLATION COMPLIES WITH R327 ENERGY STORAGE SYSTEMS. MEANT TO OMIT UP-SIZING AS REQUIRED BY FIELD 12.) CONDUIT AND CONDUCTORS SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS. ALL CONDUCTORS NOT UNDER CONDITIONS. P\ ARRAY ARE TO BE IN CONDUIT MINIMUM 7/8" ABOVE ROOF WITH PROPER JUNCTION BOX AT EACH END. I V 4 TAX MAP: 1000-074.00-0 I .00-010.000 /-/1. ® ELEMENT f ENERGY Loraine DiPenta<lorraine.dipenta@e2sys.com> SM918AT-MY SAMLP 16313717993 JUSY&04 lC, RE: [SPAM] - Re: 1395 Henry's Lane ''V, 2025 1 message Meyer, Nancy <nancym@southoldtownny.gov> Tue, Mar 18, 2025 at 8:30 AM To: Lorraine DiPenta <lorraine.dipenta@e2sys.com> Cc: "permits@e2sys.com" <permits@e2sys.com> 312-Z l 2-6- OK thank you- please have the drawing revised to reflect that. N u 6 )S From: Lorraine DiPenta<lorraine.dipenta@e2sys.com> fit . Sent: Friday, March 14, 2025 4:16 PM V3/0 -4+9_- To: Meyer, Nancy<nancym@southoldtownny.gov> ` Cc: permits@e2sys.com Subject: [SPAM] - Re: 1395 Henry's Lane Q C��'�` chia�h-c. Hi Nancy, He actually completely removed the attic access and sheetrocked the whole garage with the fire rated sheetrock. Thank you, Lorraine DiPenta Project Manager Element Energy LLC 7470 Sound Avenue Mattituck, New York 11952 C: 631-388-7041 P: 631-779-7993 di r&J ELEMENT ENERGY . SOLAR I BATTERY BACK UP WIND I GEOTHERMAL On Fri, Mar 14, 2025 at 3:53 PM Meyer, Nancy <nancym@southoldtownny.gov>wrote: Hi Lorraine, I'm reviewing the amendment for the proposed-battery storage in the Otani garage. On the drawing, please have the engineer include a detail which shows how the attic access is being fire rated. Thank you, Nancy i Nancy Meyer Building Inspector i Town of Southold Building Department Annex Building k 54375 Main Road i Southold,NY 11971 (631)765-1802 i Zoho Sign Document ID:2A768FFA-71 LO9EQ3A-RVXYJZNVQMLYGURN181 PZUVAV2EL8_GNY Town of Southold March 19th, 2025 Building Department Town Hall Annex 54375 Main Road P.O. Box 1179 Southold, New York 11971-0959 Subject: Battery Energy Storage System at the Otani Residence, 1395 Henrys Lane, Peconic, NY 11959 To Town of Southold: I hereby affirm that, following a comprehensive professional evaluation, the plans for the installation of the Battery Energy Storage System (BESS) complies with the 2020 Residential Code of New York State, the 2020 Building Code of New York State, the 2020 Fire Code of New York State, the 2017 National Electric Code, ASCE 7-16, and other relevant industry standards and regulations. This certification is provided in strict adherence to the governing regulations and standards applicable to such installations. The locations and connections detailed in the submitted plans have undergone thorough scrutiny and are confirmed to align with the requisite codes and standards. The proposed BESS, utilizing Lithium Iron Phosphate technology, adheres to UL9540A standards, ensuring it does not exhibit thermal runaway. In my professional opinion, derived from the site inspection and detailed analysis, the proposed BESS and the accompanying enclosure system demonstrate structural adequacy to withstand the reactions associated with the BESS. Please contact me if you have any questions or comments about the above. Sincerely, NEI.v Gennaro Anthony Giustra. P.E. Great Eastern Services, Inc. PO Box 240 24 Harvey Rd m w Riverhead, NY 11901 2� 103443 Mobile: 631.235.0189 ARo�ss1oNP� Email: jerrygiustra@gmail.com Zoho Sign Document ID:2A768FFA-71LO9EQ3A-RVXYJZNVQMLYGURN181PZUVAV2EL8_GNY OPE OF WORK DE51GN B DRAFTING BY: _ ELEMENT ENERGY LLC TO INSTALL A 20 KW BATTERY ENERGY 5TORAGE SYSTEM AT OTANI RE5IDENCE, REVIEW BY J.M.NABCEP CERTIFIE LOCATED AT 1395 HENKY5 LANE, PECONIC, NY 1 1959. 05 1 1 1 2-1 29 THI5 BATTERY ENERGY 5TORAGE SYSTEM WILL BE INTERCONNECTED WITH THE UTILITY GRIDSol THROUGH THE EXISTING ELECTRICAL SERVICE EQUIPMENT. - REVISIONS DESCRIPTION DATE REV SYSTEM RATING 48 ORIGINAL 12_23-2024 - --- - REVISION 03-07-2025 A REV151ON 03-19-2025 B 20 kWh _ -- ; ®o ine+Sand EQUIPMENT SUMMARY Pecanic 4 UNITS OF ENPHA5E IQ BATTERY 5P 5.0 KWH BATTERY ENERGY STORAGE ae S h E ET INDEX °°NTRACTOR Pv-1.o COVER ELEMENT ENERGY, LLC. PV-2.0 51TE PLAN - - 7470 SOUND AVE PV-3.0 FLOOR PLAN MATTITUCK, NY 1 195 PV-4.0-4.1 ELECTRICAL DIAGRAM PROJECT LOCATION LICENSE # G74G I -HI LICENSE # 52G89-ME GOVERNING CODES Hof NEwr tQ� 0 A G, O 2017 NATIONAL ELECTRICAL CODE. Y~ GS 2020 RESIDENTIAL CODE OF NEW YORK STATE. 2020 BUILDING CODE OF NEW YORK STATE. r e r- m w 2020 FIRE CODE OF NEW YORK STATE. y - A5CE 7-1 G AND NFPA-70. UNDERWRITERS LABORATORIES(UL)STANDARDS 703445 05HA 29 CFR 1910.2G9 AROFESS10r1P�' GENERAL NOTES - PROJECT NAME 1 . CONTRACTOR SHALL CHECK AND VERIFY ALL CONDITIONS AT THE SITE PRIOR TO STARTING TO WORK AND SHALL FAMILIARIZE HIMSELF WITH THE INTENT OF THESE PLANS AND MAKE WORK AGREE THE SAME. AERIAL VIEW U z 2. CONTRACTOR OR OWNER SHALL OBTAIN ALL REQUIRED APPROVALS, PERMITS, CERTIFICATES OF OCCUPANCY, w INSPECTION APPROVALS, ETC., FOR WORK PERFORMED FROM 10. CONTRACTOR TO EFFECT AND MAINTAIN INSURANCE, I.E. TOWN COMMENTS AND APPROVAL STAMP z AGENCIES HAVING JURISDICTION THEREOF, IF REQUIRED. CONTRACTORS LIABILITY, WOKKMAN'5 COMPENSATION, COMPLETED OPERATION, ETC. ADEQUATE FOR THE PURPOSES Dz w 3. ALL WORK SHALL CONFORM TO CONSTRUCTION CODE AND ,� ALL RULES AND REGULATIONS OF THE RESPONSIBLE OF THIS PROJECT AND FURNISH PROOF OF SAME PRIOR TO DAB, ,�J�.P ✓/ SI Q Ln z COMMENCING WITH WORK. - O JURISDICTION. u U 4. IF IN THE COURSE OF CONSTRUCTION A CONDITION EXISTS 1 1 . EACH SUBCONTRACTOR SHALL BE RESPONSIBLE FOR , 'V O m uJ WHICH DISAGREES WITH THAT AS INDICATED ON THESE PLANS, MAINTAINING SAFETY ON THE JOB SITE DURING THE FEE BY: — a- THE CONTRACTOR SHALL STOP WORK AND NOTIFY THE CONSTRUCTION PHASE TO COMPLY WITH THE REGULATIONS NOTIFY UILDING DEPARTMENT AT ' 2 5 2025 ENGINEER. SHOULD HE FAIL TO FOLLOW THIS PROCEDURE AND AND REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND 631-765-i802 8AMT04PM FOR THE CONTINUE WITH THE WORK, HE SHALL ASSUME ALL �� HEALTH ADMINISTRATION. THIS SHALL INCLUDE, BUT ARE NOT FOLLO.:ING INSPECTIONS: RESPONSIBILITY AND LIABILITY THEREFROM LIMITED TO: PROVIDING FOR ADEQUATE AND PROPER BRACING, Ir 5. ALL STRUCTURAL STEEL SHALL BE A-3G AND SHALL BE SAFETY RAILINGS AND SECURE FOOTINGS FOR ALL TEMPORARY 1. FC?i,INDATION-TWO REQUIRED SHEET NAME FABRICATED AND INSTALLED AS PER LATEST A.I.S.0 SCAFFOLDING, STAIRS, ETC.. AS WELL AS PERMANENT F(N� 0OUPED CONCRETE SPECIFICATIONS. CONSTRUCTION. Q, P�`, !I- =-=iyijNG&PLUMBING u t COVER G. ALL ELECTRICAL WORK SHALL BE BOARD OF FIRE 12. FIGURED DIMENSIONS SHALL GOVERN. DO NOT SCALE $, li:b Lii I04N UNDERWRITERS APPROVED AND ACCORDANCE WITH N.E.C. DRAWINGS, WHERE DIMENSIONS ARE ESTABLISHED BY EXISTING CONDITIONS. EACH CONTRACTOR SHALL VERIFY EXISTING 4. FINAL-CONSTRUCTION MUST AMENDMENT NYS CODES *REGULATIONS CONDITIONS PRIOR TO ORDERING MATERIALS AND BE G ON1PLETE FOR C.O. 7. ANY DEVIATION FROM THESE PLANS WITHOUT THE WRITTEN COMMENCING WITH WORK. CONSENT OF THE ENGINEER WILL NEGATE THE ENGINEER'S ALL CONSTRUCTION SHALL MEET THE DRAWING SCALE 13. CONTRACTOR TO REMOVE ALL DEBRIS CREATED BY THIS � CERTIFICATION OF THESE PLANS. REQUIREMENTS OFTHE CODESOF NEW 8. THESE DRAWINGS AS INSTKUCMENT5 OF SERVICE ARE AND WORK FROM THE SITE AND DISPOSE OF IN A LEGAL MANNER ON SHALL REMAIN THE PROPERTY OF THE ENGINEER WHETHER THE A WEEKLY DA515 OR SOONER IF CONDITIONS WARRANT. YORK S.ATE. NOT RESPONSIBLE FOR N .T,S. PROJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. 14. AT THE COMPLETION OF WORK, THE 51TE TO BE CLEARED DESIGN A CONSTRUCTION ERRORS THEY ARE NOT TO BE USED ON ANY OTHER PROJECTS OR OF ALL DEBRIS AND EXCESS MATERIALS.THE FACILITY IS TO BE EXTENSIONS TO THIS PROJECT LEFT BROOM CLEAN AND WORK 15 TO BE COMPLETED TO THE 9. CONTRACTOR SHALL PROTECT, PATCH AND REPAIR ALL TOTAL SATISFACTION OF THE OWNER PRIOR TO RELEASE OF SHEET NUMBER V p� /_ I EXISTING WORK ADJACENT TO HIS WORK, OR DAMAGED AS FINAL PAYMENT. I RESULT OF HIS WORK. TAX MAP: 1000-074.00-01 .00-010.000 Zoho Sign Document ID:2A768FFA-71 LO9EQ3A-RVXYJZNVQMLYGURN181 PZUVAV2EL8_GNY LEGEND DESIGN$DRAFTING BY: o EXISTING UTILITY METER ELEMENT ENERGY LLC MAIN SERVICE PANEL REVIEW BY J.M.NABCEP CEKTIFIE � NEW PV SUB-PANELS 05 1 1 1 2-1 29 A/C DISCONNECT COMBINER INVERTERS MAIN HOUSE GND ELECTRODE REVISIONS HM PV MODULE DE5CRIPfION DATE REV ORIGINAL 12-23-2024 RACKING RAIL REV1510N 03-07-2025 A o ATTACHMENT POINT REV51ON 03-19-2025 B ---RAFTERS F ROOF PITCH ANGLE N9SUNRUN METER ®VENT 0PLUMBING VENT ® (E) UTILITY METER SKY LIGHT ®CHIMNEY CONTRACTOR ®COMPOSITE SHINGLES ELEMENT ENERGY, LLC. GOOD CONDITION POTENTIAL SHADING ISSUES 7470 SOUND AVE TRIM/REMOVE AS NECESSARY MATTITUCK, NY 1 1952 LICENSE # G74G I-HI LICENSE # 52G89-ME ZI of: NEby 3" TYP. CJ pg0 A G�GsQ'P e ® ytp �2 �O 103443 ARO�sstoN�� (4) ENPHASE IQ BATTERY 5P UNITS IN ATTACHED EXISTING FIRE—RATED GARAGE PROJECT NAME (E) PV AC DISCONNECT LLJ ILJ z Lnn zgm UJ CZwU zQ In O (N) IQ SYSTEM CONTROLLER 3 m W (E) MAIN SERVICE PANEL — (N) PREFERRED BACK—UP LOAD PANEL J SHEET NAME ® SITE PLAN o° DRAWING SCALE 4 0 II = I_oI CONSTRUCTION NOTES I 1 .)ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE 2�0 21�° 1��° MANUFACTURERS INSTALLATION INSTRUCTIONS. SHEET NUMBER 2.)ALL OUTDOOR EQUIPMENT SHALL BE RAINTIGHT WITH MINIMUM NEMA 3R-RATING. 3.)ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION. PV-2 4.)THE,BATTERYENERGY STORAGE UNIT SHALL BE MOUNTED ON THE NORTH SIDE OUTSIDE WALL. TAX MAP: 1 000-074.00-0 1 .00-0 1 0.000 Zoho Sign Document ID:2A768FFA-71LO9EQ3A-RVXYJZNVQMLYGURN181PZUVAV2EL8—GNY CONSTRUCTION SUMMARY LEGEND DE51GN4DRAFTING15Y: (4) UNITS OF ENPHASE IQ BATTERY 5P 5KWH BATTERY EXISTING UTILITY METER ELEMENT ENERGY LLC MAINENERGY STORAGE UNITS ON THE OUTSIDE H—FRAME ®NEW SERVICE PANEL REVIEW BY J.M.NABCEP CERTIFIE NEW PV SUB-PANELS 051 1 1 2-1 29 (DIMENSIONS: 21.65" X 38.58" X 7.4") A/C DISCONNECT COMBINER CONSTRUCTION NOTES INVERTERS PEV1510N5 GND ELECTRODE 1.) ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. PV MODULE DE5CRIMON DATE REV 2.) ALL OUTDOOR EQUIPMENT SHALL BE RAIN—TIGHT WITH MINIMUM NEMA 3R RATING. ORJGINAL 12-23-2024 3.) ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION. N ENPHASE IQ BATTERY 5P UNIT RACKING RAIL REVI510N 03-07-2025 A 4.) THE LOCATION OF BESS SYSTEM IS COMPLIANT WITH THE SECTION R327 OF THE INTERNATIONAL RESIDENTIAL TYPICAL o ATTACHMENT POINT RfV1510N 03-19-2025 B CODE, AS AMENDED BY THE NEW YORK STATE UNIFORM CODE. ---RAFTERS 5.) THE BESS IS NOT INSTALLED IN A LOCATION SUBJECT TO VEHICLE DAMAGE. -*-ROOF PITCH ANGLE fflSUNRUN METER N 4 ENPHA5E IQ BATTERY 5P UNIT5 ®VENT 0PLUMBING VENT 4'-2" 5'- ®SKY LIGHT CONTRACTOR MCHIMNEY 3)2x6 COMPOSITE MINGLES ELEMENT ENERGY, LLC. S/L �F3C MOOD CONDITION SPfg2_ spa 0 POTENTIAL SHADING ISSUES 7470 SOUND AVE �1T055 0TRIM/REMOVE AS NECESSAR MATTITUCK, NY 1195 11'_11y�" LICENSE # G74G I-HI LICENSE# 52059-ME ( 'OF NEW sg0 A Gs0,P lit N ULINE 4.5'BOLLARD5 0 N V m io 5/8`VIALL GYPSUM TYP. 103445 MECHANICALLY FASTENFD N AR� SsloNP� M I PROJECT NAME .O N N ^ N O O wwT) �., UQ � ry cl, �W ZJ - o LU -------------------NM W Z '-a U/ LU Ln I N? L . GARAGE Q 0 ® 5/8" CLG GYPSUM O m U MECHANICALLY FASTENED - W zo N � N MEC GYPSUM SHEET NAME MECHANICNIC ALLY fAS`ENCD FLOOR PLAN LO 1'-7Y" SUP PANEL 3" TYP. DRAWING SCALE 2>2x6 �2)2x6 SPF1 6„ MIN.-9 x 8 O.H-D Pfl2 SPF12 SPf112 N.T.S. 6'-6" 5HEET NUMBER FEXISTING GARAGE PLAN] (SACLE:1/4" = 1'-0") IEQUIPMENT MOUNT PLAN] PV-3 TAX MAP: 1000-074.00-0 1 .00-010.000 Zoho Sign Document ID:2A768FFA-71 L09EQ3A-RVXYJZNVQMLYGURN1 81 PZUVAV2EL8_GNY DESIGN 4 DRAFTING BY: ELEMENT ENERGY LLC REVIEW BY J.M.NABCEP CERTIFIE 05 1 1 1 2-1 29 REVISIONS DE5CRIPTION DATE REV MAIN BREAKER - TO UTILITY GRD ORIGINAL 12-23-2024 TO CSR BREAKER 240V,N 125A UV151ON 03-07-2025 A PRE-INSTALLED BREAKER , N REV1510N 03-19-2025 B OR GATEWAY(N)ENPHASE IQ SYSTEM CONTROLLER 3 24OV, 20A DIRI��� UlIUTY METER 120/240 VAC, 200 A PASSTHROUGH RATED 1-PHASE.240 V NEMA 3R,UL LISTED 1 N 2-POLE BREAKER r— -------------� WITH HOLD-DOWN KIT I I 240 V. BOA I I N MAW (E)SOLAR ARRAY ON MAIN HOUSE 9.6 kW SERVICE CONTRACTOR (24) QCELL Q.PEAK DUO BLK ML-G10+400 WATT PV MODULES 2-POLE BREAKER I I V—DISCONNECT (2)STRINGS OF(12) MICRO-INVERTERS 2040 , �o A' ELEMENT ENERGY, LLC. !(2) MODULE TYPICAL) STRINGS TOTAL 240 V, 40 WITH HOLD-DOWN KIT-... 7470 SOUND AVE w, i ' ' MATTITUCK, NY 1 195 STRING #1 _ ' ' I I LICENSE # G74G I -HI - - ENPHASE 4 ENPHASE IQ BATTERY SP UNITS w I I 1 1 BRANCH 1 1 1 1 1 i t 1 ^� I I LICENSE # 52G89-ME TERMINATOR I I NICE TYPICAL I PANEL B 1 aiac-ur,n,,os osc 1-PH, 3-W 240 VAC �OF NEIV STRING #2 I N , N I �P% Qg0 ACO GZ D,p MICRO-INVERTER 21 r---- -- ---J ENPHASE IQBPWS-72-2-US I G — -- - ---- -- G 240 VAC,1.21 A f6D C I r g•: ILL rsiEEM s u us o�' I , , I I i i , i ----� I m w I ENPHASE BRANCH TYPICAL I I CIRCUIT CABLE TYPICAL I I , ,�MAINI ZN "-"`, I I 5 1 BREAKER I I I I I I 24OV, 60A O �03443 I A (E) AC COMBINER BOX 4 I-------- --O I j 1 1 i Rp�SS10NP�. I GATEWAY COMMS 240 VAC'80 A I I I I 1-PH,3-W I EXISTING GROUNDING NEMA 3R, UL LISTED I I I I N t G t (2)20 A DOUBLE POLE BREAKERS I I I I 240 VAC, 60A I — ElEC1R0DE SYSTEM O A V I I I i G Li� OAD pCAKP1LLUP i _ PROJECT NAME ri III I I III I------ I I I RAPID SHUTDOWN SW I CH I W LU 1�n 600 I-------------- ----------------------------t I ENPHASE VDC. 16A I U Q I I IP66/NEMA 4X, I W —I — I I UL1741 PVRSE I Q I W z Z I D_/ U-.I U I I z = z In Om O-------------------------------------------------------- -------------J SHEET NAME ELECTRICAL NOTES GENERAL NOTES 1.) ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL, AND LABELED FOR ITS APPLICATION. 1.) THE BESS PROVIDES MONITORING AND BALANCING CELL ELECTRICAL DIAGRAM 2.) ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600 V AND 90-C WET ENVIRONMENT. VOLTAGES, CURRENTS, 3.) WIRING, CONDUIT, AND RACEWAYS MOUNTED ON ROOFTOPS SHALL BE ROUTED DIRECTLY TO, AND LOCATED AS CLOSE AS POSSIBLE TO THE NEAREST RIDGE, HIP, OR VALLEY. AND TEMPERATURES WITHIN THE MANUFACTURER'S 4.) WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL COMPLY WITH NEC 110.26. SPECIFICATION THROUGH WEB AND MOBILE APPLICATIONS. STANDARDS. 5.) DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS. CONTRACTOR SHALL FURNISH ALL NECESSARY OUTLETS, SUPPORTS, FITTINGS AND ACESSORIES TO FULFILL APPLICABLE CODES AND 2.) THE BESS SYSTEM SHALL TRANSMIT ALARM SIGNAL 6.) WHERE SIZES OF JUNCTION BOXES, RACEWAYS, AND CONDUITS ARE NOT SPECIFIED, THE CONTRACTOR SHALL SIZE THEM ACCORDINGLY. VIA MOBILE PORTAL IF POTENTIALLY HAZARDOUS DRAWING SCALETEMPERATURES OR OTHER CONDITIONS SUCH AS SHORT 7.) ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE. CIRCUITS, OVER VOLTAGE OR UNDER VOLTAGE ARE B.) MODULE GROUNDING CLIPS TO BE INSTALLED BETWEEN MODULE FRAME AND MODULE SUPPORT RAIL, PER THE GROUNDING CLIP MANUFACTURER'S INSTRUCTION. DETECTED. N .T.5. 9.) MODULE SUPPORT RAIL TO BE BONDED TO CONTINUOUS COPPER G.E.C. VIA WEEB LUG OR ILSCO GBL-4DBT LAY—IN LUG. 3.) CONDUIT AND CONDUCTORS SPECIFICATIONS ARE 10.) THE POLARITY OF THE GROUNDED CONDUCTORS IS (positive/negative) BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT OR MEANT TO LIMIT UP—SIZING AS REQUIRED BY FIELD 10.) THE DC SIDE OF THE PV SYSTEM IS UNGROUNDED AND SHALL COMPLY WITH NEC 690.35. CONDITIONS. SHEET NUMBER 11.) THE INSTALLATION COMPLIES WITH R327 ENERGY STORAGE SYSTEMS. 12.) CONDUIT AND CONDUCTORS SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP—SIZING AS REQUIRED BY FIELD CONDITIONS. ALL CONDUCTORS NOT UNDER PV-4 . 1 ARRAY ARE TO BE IN CONDUIT MINIMUM 7/8" ABOVE ROOF. TAX MAP: 1000-074.00-0 I .00-0 10.000 Zoho Sign Document ID:2A768FFA-71LO9EQ3A-RVXYJZNVQMLYGURN181PZUVAV2EL8_GNY DESIGN 4 DRAFTING BY: ELEMENT ENERGY LLC REVIEW BY J.M.NABCEP CERTIFIE 051 I 1 2-1 29 REV1510N5 WIRE CALCULATION DE5CRIPTION DATE REV ORIGINAL" 12-23-2024 STARTING STARTING TEMPERATURE ADJUSTMENT MAXIMUM REVISION 03-07-2025 A CONDUCTOR CONDUCTOR CONDUIT ALLOWABLE TEMPERATURE CURRENT CORRECTION FACTOR FOR ADJUSTED CURRENT FEV151ON 03-19-2025 B TAG QTY. SIZE (AWG) DESCRIPTION SIZE & AMPACITY RATING ('C) APPLIED TO FACTOR MORE THAN 3 CONDUCTOR APPLIED TO TYPE 310.15(B)(16) ONDUCTORS CONDUCTORS RACEWAY 310.15(B)(2)(a) 31015()(3)(a) AMPACITY N RACEWAY 3 g THWN-2 COPPER- (L1,L2,N) 1 3/4" PVC 55 90' 31.92 0.96 1 52.80 39.90 THWN-2 BARE COPPER-(GROUND) CONTRACTOR 1 8 ELEMENT ENERGY, LLC. 3 4 THWN-2 COPPER- (L1,L2,N) 7470 SOUND AVE 2 1-1/4" PVC 95 90' 64.0 0.96 1 91.20 80.00 IMATTITLICK, NY 1 1952 1 8 THWN-2 BARE COPPER-(GROUND) LICENSE# G74G I-HI 2 12 THWN COPPER- (L1,L2) LICENSE # 52G89-ME 3 1/2" PVC 30 90' 0.02 0.96 1 28.80 0.03 1 8 THWN-2 BARE COPPER-(GROUND) 3 2 THWN-2 COPPER- (L1,L2,N) ��Q��o A OF rc s��p IV 4 1-1/4" PVC 130 90' 93.04 0.96 1 124.80 116.30 a a 1 8 THWN-2 BARE COPPER-(GROUND) e y 5 3 6 THWN COPPER- (L1,L2,N) N 15 3/4" PVC 75 90' - 0.96 1 72.00 60 Fo 103443 1 8 THWN-2 BARE COPPER-(GROUND) ,o RO�SS►( PROJECT NAME W z Z Q LU W � Z � LU Ztf) Z O OmW - D_ SHEET NAME ELECTRICAL NOTES GENERAL NOTES 1.) ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL, AND LABELED FOR ITS APPLICATION. 1.) THE BESS PROVIDES MONITORING AND BALANCING CELL 2.) ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600 V AND 90-C WET ENVIRONMENT. VOLTAGES, CURRENTS, ELECTRICAL DIAGRAM 3. WIRING, CONDUIT, AND RACEWAYS MOUNTED ON ROOFTOPS SHALL BE ROUTED DIRECTLY TO, AND LOCATED AS CLOSE AS POSSIBLE TO THE NEAREST RIDGE, HIP, OR VALLEY. AND TEMPERATURES WITHIN THE MANUFACTURER'S SPECIFICATION THROUGH WEB AND MOBILE APPLICATIONS. 4.) WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL COMPLY WITH NEC 110.26. N THE HEAT DETECTOR OR HEAT ALARM SHALL BE 5. DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS. CONTRACTOR SHALL FURNISH ALL NECESSARY OUTLETS, SUPPORTS, FITTINGS AND ACESSORIES TO FULFILL APPLICABLE CODES AND INSTALLED AND INTERCONNECTED WITH SMOKE ALARM AND STANDARDS. THE BESS SYSTEM SHALL TRANSMIT AN ALARM SIGNAL DRAWING SCALE 6.) WHERE SIZES OF JUNCTION BOXES, RACEWAYS, AND CONDUITS ARE NOT SPECIFIED, THE CONTRACTOR SHALL SIZE THEM ACCORDINGLY. VIA MOBILE PORTAL OR THE SMOKE AND/OR HEAT 7.) ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE. ALARM/DETECTOR IF POTENTIALLY HAZARDOUS ^I .�. . 8.) MODULE GROUNDING CLIPS TO BE INSTALLED BETWEEN MODULE FRAME AND MODULE SUPPORT RAIL, PER THE GROUNDING CLIP MANUFACTURER'S INSTRUCTION. TEMPERATURES OR OTHER CONDITIONS SUCH AS SHORT I V 9.) MODULE SUPPORT RAIL TO BE BONDED TO CONTINUOUS COPPER G.E.C. VIA WEEB LUG OR ILSCO GBL-4DBT LAY-IN LUG. CIRCUITS, OVER VOLTAGE OR UNDER VOLTAGE ARE 10.) THE POLARITY OF THE GROUNDED CONDUCTORS IS (positive/negative) DETECTED. OR 3.) CONDUIT AND CONDUCTORS SPECIFICATIONS ARE 10.) THE DC SIDE OF THE PV SYSTEM IS UNGROUNDED AND SHALL COMPLY WITH NEC 690.35. BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT SHEET NUMBER 11.) THE INSTALLATION COMPLIES WITH R327 ENERGY STORAGE SYSTEMS. MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD 12.) CONDUIT AND CONDUCTORS SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS. ALL CONDUCTORS NOT UNDER CONDITIONS. F /-4. 2 WITH ARRAY ARE TO BE IN CONDUIT MINIMUM 7/8" ABOVE ROOF PROPER JUNCTION BOX AT EACH END. �/ TAX MAP: 1000-074.00-0 I .00-010.000 Q �.aic� k Ir� G � II G �ai �� f Y z } ✓ d f s�3 y � ✓/ rs� � j ✓ y y �' y < a i ✓✓ ✓," � ' � � ✓G f ! •a:-x{•.; �'?•:yam j f Y.� ✓ ✓,// � � � ✓,.� r✓ f � �` .74 gg 4 .a ✓' � f s .f �' �'� r l II I I I II I II II I II I II I II I I IIIII II I II I II I II I'II III ✓�3'✓ 140-00279-06 ✓ To install the Enphase IQ Battery 5P and the wall-mount bracket,read and follow all warnings and instructions in this guide.Safety warnings are listed at the end of this guide.These instructions are not meant to be a complete explanation of how to design and install an energy storage system.All installations must comply with national and local codes and standards.Only Enphase-certified installers shall install, troubleshoot,or replace IQ Battery 5P. The IQ Battery 5P system includes the battery cell pack with integrated IQ Microinverters(SKU:IQ8D-BAT-240)and the battery management system(BMS).The system requires IQ Combiner 5/5C and IQ System Controller 3/3G for the backup operation. The IQ Gateway measures PV production,IQ Battery 5P charge/discharge power,and home energy consumption,and it senses when it is optimal to charge or discharge the battery so that energy is stored when it is abundant and used when it is scarce.The IQ Battery 5P system provides backup power with Enphase IQ System Controller 3/3G. � ✓ r� r "fir« ��� ��� �� s MMM ,��9�� Y Q� ' ��'�� �>*of a � � ✓ ��✓````✓ � ✓'��b� # f +' '' .off yytn"t d" u' .� t✓.� G� A sa' g ✓✓ �.}"�''✓'�#{6 e 'jt'�n Y'�rh ✓a�� ���� ''lea' r _r' Y'. Y✓t b�k ✓ � ✓ � ✓ s ✓ ti M ✓ y gga ✓l � 3�' }�� �s� ��;fix r ✓,✓�,.✓>�7`� 2 � ✓ Y ��� �' ..,5,✓j, � ✓ ✓✓ ;'� as ' �.9Y �c� ✓�''���s�' � ' �� � ��`` ?��✓�.n's�fro" ° ✓ �yc .��-� �S� hi y' � ✓ ✓'' �'+ ' _.:. !_.,i'�*� r s,��....e.,,w>..._..,.a..u,..��+ .sa t�f � �`�.��_.,u�.�w>a.,.a.6;.;..'-s,....,>,>.w.��<e.✓... >..,>�a..,.a.,�.e.�.�: Table of contents What is in the box Section D Tools/additional items required Close and energize the system Unboxing IQ Battery 513 Disassembly of IQ Battery 513 cover Section A Disengaging Anchor Clip Mounting the product Configure and activate Plan a location for the Operation IQ Batteries Step 1:Minimum clearance LED overview Spacing requirements Operating mode and set points Step 2:Mounting surface Troubleshooting Step 3:Install the bottom mounting bracket Safety and the top shield Revision history Section B Installing IQ Battery 513 Prepare to install IQ Battery 5P on the bottom mounting bracket Installation of Anchor Clip Section C Wiring Install conduit and field wiring Control(CTRL)Wiring between system components Cable routing and closing the wiring cover IQ Battery 513 Quick Install Guide 3 t What is in the box ID cover IQ Battery 5P Top shield :3 r1 \\\ CV r a a 4� > Bottom c°� mounting bracket o \ j (to be installed U j first on the wall) M5 M4 M5 ID Cover Anchor clip Quick Install Guide Seismic screw Grounding screw Grounding screw i s ' f n:• DESCRIPTION 11 QUANTITY IQ Battery 5P B05-T02-USOO-1-3 1 ID cover,two conduit covers B05-CX-0550-0 1 Bottom mounting bracket&top shield B05-WB-0543-0 1 M5 Seismic screw 2 M4 Grounding screw 2 M5 ID Cover Grounding screw 2 Anchor clip 2 Quick Install Guide 1 PCS disclaimer label 1 Wall drill template 2 Cable tie 8 CTRL connector 1 CTRL connector with resistor 1 4 IQ Battery 5P Quick Install Guide 2 ' Tools/additional items required S. NO ITEM NAME QUANTITY SOURCE Conduit(rigid,EMT,PVC or liquid-tight)up to 32 mm(1-1/4") 1 As required Provided by the installer for side entry and up to 19 mm(3/4")for rear entry Conduit fittings and tools,UL rated hubs are required for all installations 2 As required Provided by the installer and must be NEMA Type 3R certified when installing outdoors 3 Drill 1 Provided by the installer 4 5/32"pilot bit(or metric equivalent) 1 Provided by the installer 5 Screwdriver 1 Provided by the installer 6 Wrench 1 Provided by the installer 7 Socket wrench 1 Provided by the installer 8 Torque wrench 1 Provided by the installer 9 Level 1 Provided by the installer 10 Conductor stripper 1 Provided by the installer 11 Stud finder(if required) 1 Provided by the installer 12 Copper conductors-No.10-3 AWG(11 mm or 7/16"strip length)(rated at 90oC)for terminals As required Provided by the installer 13 i Control cable(CTRL-SC3-NA-01) As required Enphase store Personal protective equipment for handling lithium batteries 14 As required Provided by the installer as required by local safety standards 15 Protective gloves for protection against sharp edges As required Provided by the installer #20(5/16")lag bolts or screws to install the bottom mounting bracket.Slots are Single stud Dual stud 16 9.2 mm(0.36")for the wall mount and 11.2 mm(inclined slots)forthe pedestal. mounting mounting Provided by the installer Check with a structural engineer and local standards for requirements (Min.3) (Min.4) Single stud, Dual stud 1X'screws to fasten the top shield on the wall.Use 17 mounting mounting Provided by the installer standard screws only(head thickness<5mm) (Min.6) (Min.6) 18 Washers As required Provided by the installer 19 IQ Battery 5P lifting handles.Includes one left-side and one 1 Enphase Store/provided right-side lifting handle(IQBATTERY-HNDL-5) by the installer IQ Battery 5P Quick Install Guide 5 Tools/additional items required NOTE:The Enphase IQ Battery 5P system requires an internet connection through the IQ Gateway in the IQ Combiner.Failure to maintain an internet connection may have an impact on the warranty.See enphase.com/warranty for full terms. The IQ Battery 5P and IQ System Controller are both connected to the IQ Gateway and communicate using communication control cables.The Enphase PV system communicates to the IQ Gateway using powerline communication. Verify that the main service is 120/240 VAC,not 208/120 VAC. IQ Batteries cannot be installed where L1 to L2 measures 208 VAC. NOTE:The rated energy capacity of the battery is 5.0 kWh. Install the PV system and the IQ Combiner as directed in the Enphase installation manuals. 6 IQ Battery 5P Quick Install Guide f + Unboxing IQ Battery 5P I Before you iunbox IQ Battery 5P,check the"Energize By"label on Q Do not lift the IQ Battery 5P using microinverters or the the shipping box to verify that the IQ Battery(ies)will be installed by plastic behind the microinverters.This may damage the unit the date shown.If the date has passed,contact your distributor for permanently. next steps. Always use handles to lift the IQ Battery 5P. Remove the upper packaging cover and follow the steps as shown in the following image: I I !Remove the six Remove the exterior Remove the four corner Remove the top plastic strips cardboard box lid guards shield ® O O O I Remove the Remove the bottom Remove the other paper tray Remove the paper tray mounting bracket to reveal the battery cover IQ Battery 5P cover O 1, Remove the two paper Remove the IQ Battery 5P Recycle packaging according trays using lifting handles to local guidelines i Inspect theI packaging and the IQ Battery(ies)for any signs of Q Risk of injury.Take care when lifting.The IQ Battery 5P unit is damage,such as cracks,dents,or electrolyte leaks.Do not install heavy(66.25 kg/146.05 lb)and requires two people to lift it. or use the IQ Battery(ies)if it has been dropped or damaged in any way.If it is damaged,contact your distributor for replacement. Q Do not lift the packaging with the battery inside after the plastic strips are cut. i i i IQ Battery 5P,Quick Install Guide 7 , 1 Section A Mounting the product Choose a location for the IQ Battery array The IQ Battery 5P housing is a NEMA type 3R enclosure.The terminal blocks on the IQ Battery 5P accept a maximum conductor size of 3 AWG for 1-1/1-2 terminals and 8 AWG for the Ground terminal. Enphase IQ Batteries have been evaluated by UL solutions to UL9540A standards for outdoor and non-habitable indoor residential installations.Installations in finished,non-habitable indoor spaces(such as detached and attached garages,utility closets,basements,and storage or utility spaces)shall be permitted. Make sure the installed location can sustain the total weight of the IQ Batteries and mounting bracket.The total weight for IQ Battery 5P,including the IQ Battery 5P unit,cover,and wall-mount bracket,is 78.9 kg (174 lb).The wall must contain blocked studs that can bear the battery weight or be of masonry or other sr�:4b4 suitable structure. Make sure there are no pipes or electrical wires where you plan to drill. Following local standards,choose a well-ventilated,non-habitable indoor location(like a 2-car garage) { or in an outdoor location,which is out of direct sunlight and where the ambient temperature and i humidity are within-4°F to 113°F(-20°C to 45°C)and 5%to 95%RH,non-condensing. 4�17 Consider the dimensions of the IQ Batteries,easy access,height,and cable length when selecting the location. Select a location where you can interconnect the IQ Battery 5P to the IQ System Controller. This product must not be installed at altitudes above 8,200 ft(2,500 m). $8=200ft" Follow all local standards and regulations set forth by the Authority Having Jurisdiction(AHJ). • Up to four IQ Battery 5P units can be daisy-chained on a single branch circuit. IQ System Controller 3/3G supports up to a maximum of 80 A breakers for IQ Battery 5P connection circuit. NOTE:Up to eight IQ Battery 5P units can be daisy-chained on a single branch circuit using battery Max 4 oversubscription PCS. Ensure to add a PCS disclaimer label at all PCS-enabled IQ Battery 5P units,as shown in section D. The maximum conductor size for IQ Battery 5P is 3 AWG,and the maximum breaker rating with this conductor size is 80 A. 8 IQ Battery 5P Quick Install Guide I I I . j, Section A - Mounting the product I I Step'1: II�- Minimum clearance The mounting instructions are for the included wall-mount bracket Q If mounted i only.If you wish to install IQ Battery 5P in a floor-mount configuration, recommend order the pedestal accessory(B05-PI-0550-0)and refer to the floor- the floor. i mount instructions shipped with the product.This product must be I installed with clearance at the left,right,top,bottom,and front,as For IQ Batteries m shown in t`1e figure. between the cove) _---- Keep IQ Battery 5P away from falling or moving objects, including motor vehicles. I \ I ` I 81h t a \ ��� \h 11,111,11111`'f`�f11, I Y ^C's ray, h I I � i I II I NOTE:These are minimum manufacturer clearances for indoor \ and outdoor installation.Make sure to comply with all local compliance and regulation standards. NOTE:Installation handles cannot be used for clearance less than \ 5.5".Installers need to consider adjusting the distance between \\ batteries based on the cable bending radius. I IQ Battery 5P iQuick Install Guide 9 Section A - Mounting the product Spacing requirements Follow the below mentioned clearances to plan the system installation layout. IQ Battery 5P (('' j l•=1 a L"`7 � �G'7 t� IQ Batter SP IQ Batter SP IQ System Controller 3/3G IQ Combiner 5/SC Y Y Y 14.6" 21.65" 10 hJr � ra LV r 0C 5 O C J Di G3 D" GJ Q F n 'I 11 D �0 Nw M F[ {f � a 1 4 , c A DIMENSION DESCRIPTION RECOMMENDED MINIMUM A IQ System Controller 3/3G and IQ Battery 5P wall bracket horizontal spacing 3.315" B-Bottom aligned IQ System Controller 3/3G bottom to IQ Battery 5P wall mount bracket bottom 0.00" B-Center aligned IQ System Controller 3/3G bottom to IQ Battery 5P wall mount bracket bottom 1.26" B-Top aligned IQ System Controller 3/3G bottom to IQ Battery 5P wall mount bracket bottom 2.52" C IQ Battery 5P wall bracket horizontal spacing 3.6Y D IQ Battery 5P wall bracket to IQ Combiner horizontal spacing 3.63 E-Bottom aligned IQ Combiner 5/5C bottom to IQ Battery 5P wall mount bracket bottom 0.00" E-Center aligned IQ Combiner 5/5C bottom to IQ Battery 5P wall mount bracket bottom 8.74" E-Top aligned IQ Combiner 5/5C bottom to IQ Battery 5P wall mount bracket bottom 17.48" F IQ Battery 5P wall bracket vertical spacing 6.57" 10 IQ Battery 5P Quick Install Guide I ENPHASE. ASE. i 4 I r I • 9 , II Powerful QBattery 5 P • Provides 3.84 WA continuous and 7.68 WA peak power The IQ Battery 5P all-in-one AC-coupled system is powerful,reliable,simple,and safe.It - Doubles the available power per kWh has a total usable energy capacity of 5.0 kWh and includes six embedded grid-forming of prior generations of IQ Battery microinverters with a 3.84 kVA continuous power rating.It provides backup capability,and installers can quickly design the right system size to meet the customer needs. - Includes sic embedded IQ8D-BAT (SKU.IQ8D-BAT-240)Mcroinverters Dimensions in inches Reliable • 15-year limited warranty I - Cools passively with no moving parts 0.3,•' i 2t3' —1 7A' I or fans { - Uses wired communication for fast and consistent connection -Updates software and firmware remotely Simple Fully integrated AC battery system "Y` rI fi l n I • Installs and commissions easily ' • Supports Backup,Self-Consumption, _ ---` and time-of-use(TOU)modes o j 20.1. Offers homeowners remote monitoring and control from the EnphaseApp Wall mounted Floor mounted with pedestal Feld replaceable components (sold separately) Safe, - Evaluated to UL 9540A.foir large-scale fire testing and reducedseparation Enphase distance as required in 2021 IRC U R328.31,2021 IFC 1207.1.5,and 2023 U L p C NFPA 85515.33 and 91.5? year limited • Uses lithium iron phosphate(LFP) wwranty LISTED UL9540A chemistry for maximum safety and Certified longevity I 'Follow all installation instructions and local codes and requirements of the Authority Having Jurisdiction I ©2024 Enphase Energy.All rights reserved.Enphase,thee and CC logos,ID,and certain other marks listed at (AHJ)when installing Enphase Energy System. https//enphase com/trademark-usage-guidelines are trademarks of Enphase Energy,Inc.in the U.S and other countries.Data subject to change. IQB-5P-DSH-00010-5.0-EN-US-2024-02-16 IQ Battery 5P MODEL NUMBER IQBATTERY-5P-IP-NA The IQ Battery 5P system with integrated IQ Microlnverters and battery management system(BMS)with battery controller. WHAT'S IN THE :r IQ Battery 5P unit IQ Battery 5P unit'(B05-T02-US00-1-3) ID cover and conduit cover IQ Battery 5P cover with two conduit covers for the left and right sides of the unit Bottom mounting bracket and top shield Bottom mo.unt.160bracket,for mounting the battery on the wall.One.top shield is required for UL 9540A M5 seismic screws Two M5 seismic screws for securing the battery unit on the bottom mounting bracket M4 grounding screws Two M4 grounding screws for securing the top shield on the bottom mounting bracket M5 ID cover grounding screws Two M5 ID cover grounding screws for the EMI/EMC requirement Cable ties Six cable ties for securing field cables to the unit Control(CTRU connector Spare CTRL connector without resistor for CTRL wiring Control(CTRU connector with resistor Spare CTRL connectorwith resistor for CTRL wiring Quick install guide(QIG) QIG for IQ Battery unit installation instructions OPTIONAL t IQBD-BAT-RMA IQBD-BAT Microinverter for field replacement 605402-US00-1-3-RMA IQ Battery 513 Battery unit for field replacement B05-CX-0550-0 IQ Battery 5P cover for field replacement BO5-PI-0550-0 IQ Battery 513 pedestal mount 8O5-CP-096-0 10 Battery 513 conduit plates for field replacement Includes one left-side and one right-side conduit plate B05-WB-0543-0 IQ Battery 513 wall bracket for field replacement Includes one bottom mounting bracket and one top shield IQBATTERY-HNDL-5 IQ Battery 5P lifting handles.Includes one left-side and one right-side lifting handle 8O5-ACFB-080-0 IQ Battery 5P AC filter board for field replacement BO5-BMSNA-0490-0 10 Battery 5P EMS board for field replacement BO5-CANB-063-0 10 Battery 513 control communication board:for field replacement B05-NICS-0524-0,BO5-NUCS-0524-0 IQ Battery 5P control switch is preinstalled on the wiring cover for field replacement Rated(continuous)output power 3.84 WA Peak output power 7.68 WA(3 seconds),6.14 WA(10 seconds) Nominal voltage/range 240/211-264 VAC Nominal frequency/range 60/57-63 Hz Rated output current(@240 VAC) 16 A Peak output current(@240 VAC) 32 A(3 seconds),25.6 A(10 seconds) Power Start capability. Up to 48 A LRA3 Power factor(adjustable) 0.85leading_0.85lagging Maximum units per 20 A branch circuit One unit(single-phase) Maximum conductor sae supported 3 AWG Overcurrent protection device(OCPD)for 3 AWG cable 80 A Interconnection Single-phase AC round-trip efficiency' 90% 23upported in both grid-connected and backup/off-grid operations. 3 Power Start capability may vary. •AC to the battery to AC at 50%power rating. IQB-5P-DSH-00010-5.0-EN-US-2024-02-16 i i I r IQIBattery 5P MODEL NUMBER IQBATTERY-5P-IP-NA The IQ Battery 5P system with integrated IQ Microinverters and battery management system(BMS)with battery controller ' WHAT'S IN THE :t IQ Battery SP unit IQ Battery-5P uriit(BOS-T02-US00-1-3) ID cover and conduit cover IQ Battery 5P cover with two conduit covers far the left and right sides of the unit Sottoin mounting bracket and top shield Bottom mountirig:bracket for mounting the battery on the wall.One top shield is required for UL 9540A M5 seismic screws Two M5 seismic screws for securing the battery unit on the bottom mounting bracket M4 grounding screws Two M4 grounding screws for securing the top shield on the bottom mounting bracket M5 ID cover grounding screws Two MS ID cover grounding screws for the EMI/EMC requirement Cable ties Six cable ties for securing field cables to the unit Control(CTRU connector Spare CTRL connector without resistor for CTRL wiring Control(CTRU)connector with resistor Spare CTRL connector with resistor for CTRL wiring Quick install guide(QIG) QIG for IQ Battery unit installation Instructions i OPTIONAL t• AND REPLACEMENT PARTS i 1O8D-BAT-RMA IQBD-BAT Microinverter for field replacement 1305-T02-US00-1-3-RMA IQ Battery 5P Battery unit for field replacement I B05-CX-0550-0 IQ Battery 5P cover for field replacement BO5-PI10550-0 IQ Battery SP pedestal mount B05-CP-096-0 10 Battery SP conduit plates for field replacement Includes one left-side and one right-side conduit plate I B05-WB-0543-0 IQ Battery 5P wall bracket for field replacement Includes one bottom mounting bracket and one top I shield IQBATTERY-HNDL-5 IQ Battery 513 lifting handles.Includes one left-side and one right-side lifting handle B05-ACFB-080-0 IQ Battery 513 AC filter board for field replacement BO5-BMSNA-0490-0 IQ Battery 513 EMS board for field replacement BO5-CANS-063-0 IQ Battery SP control communication board for field replacement i BO5-NICS-0524-0,BO5-NUCS-0524-0 IQ Battery 513 control switch is preinstalled on the wiring cover for field replacement OUTPUTIACI t Rated(continuous)output power 3.84 WA i Peak output power 7.68 WA(3 seconds),6.14 kVA(10 seconds) Nominallvoltage/range 240/211-264 VAC Nominallfrequency/range 60/57-63 Hz Rated output current(@240 VAC) 16 A Peak output current(@240 VAC) 32 A 0 seconds),25.6 A(10 seconds) Power Start capability Up to 48 A LRA' Power factor(adjustable) 0.85 leading_.0.85lagging Maximum units per 20 A branch circuit One unit(single-phase) Maximum conductor sae supported 3 AWG Overcurrent protection device(OCPD)for 3 AWG cable 80 A i Interconnection Single-phase AC round-trip efficiency' 90% i i I 'Supported in both grid-connected and backup/off-grid operations. Power Start capability may vary. •AC to the battery to AC at 50%power rating. I I I IQB-5P-OSH-00010-5.0-EN-US-2024-02-16 I Total capacity 5.0 kWh Usabl capacity 5.0 kWh DC round-trip efficiency 96% Nominal DC voltage 76.8 V i Maximum DC voltage 86.4 V Ambient operating temperature range(charging) -2O'C to 5O'C(-4'F to 122'F)non-condensing Ambient operating temperature range(discharging) -2O'C to 55'C(-4'F to 131'F)non-condensing Optimum operating temperature range 01C to 301C(32'F to 86'17) Chemistry Lithium iron phosphate(LFP) MECHANICAL DATA Dimensions(H x W x D) 980 mm•550 mm•188 mm(38.6 in•213 in•7.41n) Liftinglweight 66.3 kg(146.1 Ib) Total installed weight 78.9 kg(1741b) Enclosure Outdoor-NEMA 3R IQBD-BAT Microinverter enclosure NEMA type 6 Cooling Natural convection Altitude Up to 2,500 meters(8,202 feet) Mounting Wall-mount or pedestal-mount(sold separately) FEATURES t COMPLIANCE Compatibility Compatible with IQ and M Series Microinverters,IQ System Controller 3/3G,IQ Combiner 5/5C,and IQ Gateway for grid-tied and backup operation I Communication Wired control communication Services Backup,Self-Consumption,TOU,and NEM integrity Monitoring Enphase Installer Platform and Enphase App monitoring options;API integration CA Rule 21(UL 1741-SA),IEEE 1547:2018(UL 1741-SB,3rd Ed.) CAN/CSA C22-2 No.1O7.1-16 UL 95405,UL 9540A,UN 38.3,UL 1998,UL 991,NEMA Type 3R,AC156 Compliance EMI:47 CFR,Part 15,Class B,ICES 003 I Cell module:UL 1973,UN 38.3 Inverters:UL 62109-1,IEC 62109-2 LIMITEIt WARRANTY Limited warranty a6O%capacity,up to 15-year or 6,000 cycles° I °Following local standards,choose a well-ventilated,non-habitable,indoor location like a 2-car garage)or an outdoor location,which Is out of direct sunlight and where the ambient temperature and humidity are within-20'C to 45'C(-4'F to 113`F)and 5%to 95%RH,non-condensing. °Whlchever occurs first.Restrictions apply. I I I I I IOB-5P-DSH-00010-5.0-EN-US-2024-02-16 Revision history REVISION DATE DESCRIPTION DSH-00010-5.0 February 2024 Updated the SKU on page 1. DSH-00010-4.0 November 2023 Updated the"Output(AC)"table. DSH-00010-3.0 September 2023 Updated product images. Editorial updates. DSH-00010-2.0 July 2023 Added battery isometric view on the first page. Editorial updates. DSH-00010-1.0 May 2023 Initial release. ©2024 Enphase Energy.All rights reserved.Enphase,the a and CC logos,lO,and certain other marks listed at https://enphase.com/trademark-usage-Guidelines are trademarks of Enphase Energy,Inc.in the U.S.and other countries.Data subject to change. IOB-5P-DSH-00010-5.0-EN-US-2024-02-16 Revision history I DESCRIPTIONREVISION DATE DSH-00010-5.0 February 2024 Updated the SKU on page 1. DSH-00010-4.0 November 2023 Updated the"Output(AC)"table. DSH-00010-3.0 September 2023 Updated product images. Editorial updates. DSH-00010-2.0 July 202,3 Added battery isometric view on the first page. Editorial updates. 1 _ D4H-00010-1.0 May 2023 Initial release. ,I I I I I 102024 Enphase Energy.All rights reserved.Enphase,the a and CC logos,10,and certain other marks listed at https://enphase.com/trademark-usage-guidelines are trademarks of Enphase Energy,Inc.in the U.S.and other countries.Data subject to change. 1O8-5P-DSH-00010-5.0-EN-US-2024-02-16 I � . I R 0 N R ID G E Flush Mount System 10 yc ICJ. X Y 3't - a Built -for sol@r.°s roofs. IronRidge builds the strongest mounting system for pitched roofs in solar. Every component has been tested to the limit and proven in extreme environments. Our rigorous approach has led to unique structural features, such as curved rails and reinforced flashings, and is also why our products are fully certified, code compliant and backed by a 20-year warranty. i Strength Tested PE Certified ! All components evaluated for superior Pre-stamped engineering letters structural performance. available in most states. i Class A Fire Rating Design Assistant Certified to maintain the fire resistance Online software makes it simple to rating of the existing roof. create, share, and price projects. UCI_ 2703 Listed System 20-Yeas Warranty Entire system and components meet Twice the protection offered by newest effective UL 2703 standard. competitors. XRR8Us /c ----------------------------- ----- '- ' - ----------------_'_________-_- � XR10 Rail //-"lot) Rail XR1000 Rail Bonded Splices 71. A low-profile mounting rail The ultimate residential A heavyweight mounting All rails use internal splices for regions with light snowA solar mounting rail. rail for commercial projects. for seamless connections. • 6'spanning capability \\ - 8'spanning Jca'Pability - 12'spanning capability Self-drilling screws • Moderate load capability Heavy load capability - Extreme load capability Varying versions for rails • Clear and black finish lear and black finish - Clear anodized finish Forms secure bonding - wa/v�s w ��r��mdimB UFOs Stopper Sleeves Grounding Lugs Microinverter Kits 70 Universal Fastening Objects Snap onto the U to turn S to Mount KdkaorPOo0oXR bond modules borails. into o bonded end clamp. equipment ground. Rails. ^ Fully assembled & }ubad ^ Bonds modules torails ~ Low profile ~ Bonds devices 1orails ~ Sing|m, universal size ` Sized to match modules ~ Single tool installation ~ Kit comes assembled ^ Clear and black finish ~ Clear and black finish ` Mounts in any direction ~ Listed to UL27O3 -- Attachments � � w/=p FlashFoot:2 Conduit Mount S Bonding Hardware Mal Flash and mount XR R�ils Flas d mount conduit, esign for rapid rail Bond and attach XR Rails /u/ �u��rm wat erproofing. r o v, junction boxes. attachment. bo roof attachments. ~ Twist-on Cap eooea'insia|| ~ Twist-on Cap eases install ^ Secure rail connections ~ T& Square Bolt options ~ Wind-driven rain tested ~ Wind-driven rain tested ~ Slot for vertical adjusting ^ Nut uses 7/1S^socket ^ Mill and black finish ^ Seounaa3/4^or1^oonduit ^ Clear and black finish ^ Assembled and lubricated — Resources ��-----�- ----��____ - Design Assistant NABCEP Certified Training Go from rough layout to fully Earn free continuing education onadito. ' engineered system. For free. while learning more about our systems. � Qa / A low-profile mounting rail The ultimate residential A heavyweight mounting All rails use internal splices for regions,with light snow solar mounting rail. i rail for commercial projects. for seamless connections. 6'spanni.ng capability - 8'spanning capability - 12'spanning capability Self-'drilling screws 7 Moderate load capability - Heavy load capability . Extreme load capability Varying versions for rails Clear and black finish ear and black finish . Clear anodized finish Forms secure banding — — - - r —~~~'d''o UFOs ` Stopper Sleeves Grounding Lugs M0cronventer Kits LUniversal Fastening 8napo����aUFO0u�m Mount K8ksorPQe0oXR bond modules torails. into n bonded end clamp. equipment ground. Rails. ~ Fully assembled & }ubad ~ Bonds modules tnrails ^ Low profile ~ Bonds devices torails - Ging/m, universal size ~ Sized to match modules ` Single tool installation ~ Kit comes assembled ~ Clear and!b|onkfinish ~ Clear and black finish ^ Mounts in any direction ` Listed to UL 2703 /���schrn�n�� � — -- - ------------ -- '------------------ _ __ _-.._ _ ___-- -_ FlashFoot:2' Conduit Mount Banding Hardware AWOL Flash and mount XR Rails Fl��.�dmount conduit, esign for rapid rail Bond and attach XR Rails with superior,waterproofing. or junction boxes. attachment. to roof attachments. ~ Twist-on Cap eao ~ Twist-on Cap eases install ^ Secure rail connections ~ T& Square Bolt options ~ VVind'Urive'/ rain tested ^ VNnd-driven rain tested ~ Slot for vert adjusting.�d�ueting ^ Nut uses 7/1G^ socket ^ Mill and black finish ~ Secures 3/4"or1"conduit ~ Clear and black finish ^ Assembled and lubricated -- R�soupCe� ----- '------------- ----------------- '------------ ---'-----------'---------'----' � Design Assistant NABCEP Certified Training Go from rough layout bofully Earn free continuing education credits, engineered system. For free. while learning more about our systems. S� ENPHASE.' �I 0 IQ8MC Microinverter Our newest I08 Series Microinverters are the industry's first microgrid-forming',software- Easy to install defined microinverters with split-phase power conversion capability to convert DC power to V9i9 and compact with plug- AC power efficiently.The brain of the semiconductor-based microinverter is our proprietary and-play connectors application specific integrated circuit(ASIC),which enables the microinverterto operate in - power lime communication(PLC) grid-tied or off-grid modes.This chip is built in advanced 55 nm technology with high-speed between components digital logic and has superfast response times to changing loads and grid events,alleviating constraints on battery sizing for home energy systems. • Faster installation with simple two wire cabling H'igh productivity and reliabifidy • Produces power even when the grid is t down" - More than one mltiort cumulative hours of testing Part of the EnIphase Energy System, IQ8 Series Microinverters redefine IQ8 Series Microinverters integrate with reliability standards with more than one - Class II double-insulated enclosure the IQ Battery,IQ Gateway,and the million cumulative hours of power-on - Optimized for the latest high-powered Enphase App'monitoring and analysis testing,enabling an industry-leading PV modules software. limited warranty of up to 25 years. Kficrogrid-forming ® - Complies with the latest advanced grid support CERTIFIED - Remote automatic updates for the latest grid requirements - Configurable to support a wide range Connect PV modules quickly and easily IQ8 Series Microinverters are UL Listed of grid profiles to the I08 Series Microinverters that have as PV rapid shutdown equipment and Integrated MC4 connectors. conforms with various regulations when Meets CA Rule 21(UL 1741-SA)and IEEE installed according to the manufacturer's 15472018(UL 1741-SB) instructions. Note: I 1o8 Series Microinverters cannot be mixed together I with previous generations of Enphase microinverters -Only when installed with It]System Controller 2 meets UL7747. (I07 Series,106 Series,and so on)in the same system I I O 2023 Enphase Energy.All rights reserved.Enphase,the a and CC logos,la and certain other marks fisted at https✓/enphase.com/trademark-usace-guidelines are trademarks of Enphase Energy,Inc.to the US and other countries. I06MC-MC4-DSH-00049-20-EN-US-2023-09-11 Data subject to change. IQ8MC Microinverter INPUT DATA(DC) UNITS IQ8MC-72-M-US Commonly used module pairings r W 260-460 Module compatibility To meet compatibility,PV modules must be within the maximum input DC voltage and maximum module I.listed below. Module compatibility can be checked at https://enphase.com/installers/microinverters/calculator. MPPT voltage range V 25-45 Operating range v 18-58 Minimum/Maximum start voltage V 22/58 Max.input DC voltage v 60 Max.continuous operating.DC current A 14 Max.input DC short-circuit current A 25 Max.module I. A 20 Overvoltage class DC port II DC port backfeed current mA 0 PV array configuration Ungrounded array;no additional DC side protection required;AC side protection requires max 20 A per branch circuit OUTPUT DATA(AC) UNITS 108MC-72-M-US ' @208 VAC Peak output power VA 330 315 Max.continuous output power VA 320 310 Nominal grid voltage(L-L) v 240,split-phase(L-L),180" 208,single-phase(L-L),120" Min✓max.grid voltage 2 v 211-264 183-229 Max.continuous output current A 1",33 149 Nominal frequency Hz 60 Extended frequency range Hz 47-68 AC short circuit fault current over three cycles Arms 2.70 Max.units per 20 A(L-L)branch circuit 3 12 10 Total harmonic distortion % 5 Overvoltage class AC port III AC port backfeed current mA 18 Power factor setting 1:0 Grid-tied power factor(adjustable) 0.85 leading...0.85 lagging Peak efficiency % 97.38 97.23 CEC weighted efficiency % 97.00 96.50 Nighttime power consumption mw 28 25 MECHANICAL DATA UNITS Ambient temperature range -40°CSo 6579(-40"F to 149"F) Relative humidity range 4%to 100%(condensing) DC connector type Staubli MC4 Dimensions(H•W•D);Weight 212 mm(8.31*175 mm(6.9")•30.2 mm(1.2");1.1 kg(2.43 Ibs) Cooling Natural convection-no fans Approved for wet locations;Pollution degree Yes;PD3 Enclosure Class II double-insulated,corrosion-resistant polymeric enclosure Env(ron.category;UV exposure rating NEMA Type 6;outdoor COMPLIANCE CA Rula21(UL 1741-SA),UL 62109-1,IEEE 1547,2018(UL 1741-SB),FCC Part 15 Class B,ICES-0003 Class B,CAN/CSA-C22.2 NO.107.1-01 Certifications This.product is:UL Listed as PV rapid shutdown equipment and conforms with NEC 2014,NEC 2017,and NEC 2020 section 690.12 and C22.1-2018 Rule 64-218 rapid shutdown of PV systems for AC and DC conductors when installed according to manufacturer's instructions. j (1)No enforced DC/AC ratio.Seethe compatibility calculator at https://enphase.com/installem/micminverters/caiculato (2)Nominal voltage range can be extended beyond nominal if required by the utility. (3)Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. IQBMC-MC4-DSH-00049-20-EN-US-2023-09-11 1 IQ8MC Microinverter INPUT DATA(DC) UNITS 108MC-72-M-LIS Commonly,used module pairings W 260-460 Module compatibility To meet compatibility,PV modules must be within the maximum input DC voltage and maximum module I,"listed below. i Module compatibility can be checked at https://enphase.com/installers/microinverters/calculator. MPPT voltage range V 25-45 Operating range y 18-58 1 Minimum/Maximum start voltage V 22/58 Max.input DC voltage V 60 Max.continuous operating DC current A 14 Max.input DC short-circuit current A 25 Max.module 1. A 20 Overvoltage class DC port 11 I DC port backfeed current mA 0 PV array configuration Ungrounded array;no additional DC side protection required;AC side protection requires max 20 A per branch circuit OUTPUT DATA CAC) UNITS IC18MC-72-M-US @240 VAC 108MC-72-M-US @208 VAC Peak output power VA 330 315 Max.continuous output power VA 320 310 Nominal grid voltage(L-L) V 240,split-phase(L-L),180° 208,single-phase(L-L),120° Min./max.grid voltage' v 211-264 183-229 Max.continuous output current A 1.33 149 1 Nominal frequency Hz 60 I ' Extended frequency range Hz 47-68 AC short circuit fault current over three cycles Arms 2.70 Max.units per 20 A(L-L)branch circuit 3 12 10 Total harmonic distortion % <5 Overvoltage class AC port III I AC port backfeed current mA 18 1 Power factor setting 10 Grid-tied power factor(adjustable) 0.85 leading...0.85 lagging I Peak efficiency % 97.38 97.23 CEC weighted efficiency % 97.00 96.50 Nighttime power consumption mW 28 25 MECHANICAL DATA UNITS Ambient temperature range -40-C.to 65'C(-40"F to 149"F) i Relative humidity range 4%to 100%(condensing) 1 DC connector type Stau6il,MC4 Dimensions(H•W x D);Weight 212 mm MY)x 175 mm(6.9")x 302 mm(1.2");1.1 kg(2.43 Ibs) Cooling Natural convection-no fans Approved for wlet locations;Pollution degree Yes;PD3 Enclosure Class II double-insulated,corrosion-resistant polymeric enclosure Environ.category;UV exposure rating NEMA Type 6;outdoor COMPLIANCE CA Rule 21(UL 1741-SA),UL 62109-1,IEEE 1547:2018(UL 1741-SB),FCC Part 15 Class B,ICES-0003 Class B,CAN/CSA-C22.2 NO.107.1-01 Certifications This product is UL Listed as PV rapid shutdown equipment and conforms with NEC 2014,NEC 2017,and NEC 2020 section 690.12 and C22.1-2018 Rule 64-218 rapid shutdown of PV systems for AC and DC conductors when installed according to manufacturer's instructions. 1 1 (1)No enforced OC/AC ratio.See the compatibility calculator at https://enphase.com/installers/microinverters/caiculator. (2)Nominal voltage'range can be extended beyond nominal if required by the utility.(3)Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area IQ6MC-MC4-DSH-00049-2.0-EN-US-2023-09-11 i i Revision history REVISIONDESCRIPTION DSH-00049-2.0 September 2023 Updated module compatibility information I DSH-000,9-1.0 May 2023 Preliminary release li I I I I I ©2023 Enphase Energy.All rights reserved.Enphase,the a and CC logos,IQ and certain other marks listed at httpsJ/enphase com/trademark-usage-quidelines are trademarks of Enphase Energy,Inc.in the US and other countries. I08MC-MC4-DSH-00049-20-EN-US-2023-09-11 Data subject to change. VE ��� S E P 2 3 2025Sul ,F r r ing • � - _. �•1+ris..-....allic's_r�..sr—.WY�Myuw7Mxc: y�.. Nviftlou.a ot�n .nwn / ��1.MliYro.o.c..... f _ Jury of.uDabnti,l `TI o Tu rt,,I.a�onM Of.v.{ e.rw..e.bn�a.r crnw7 ar.,.y.. Dropw,a. , } — - - THIS SERA —D CAUTION IS ALSO SE L� PHOTOVOL7 O'O I 4 `a S .. 4 —, covrun Landis i ,� __�.. ���.. _ ���� r, �.. - _:�. :��, �, _ . ,r ..--� �. w _ `.. � f •, � ��t ., '.. Sa W� y ��� - + to �.1� �` .: ''� -. �.7+.ate I Shutdown34 Enphase Energy System •1 DO NOT WIRE WHEN ENERGIZED 5�•� A SAFETY HgZARD AND RISK .-- .• OF EQUIPMENTDAMgGE. i 1 i 0 1 � Type 4X ' IP66 NW Enphase Energy System Shutdown Switch IF W)NOT I " IEC/A5 60947.3 St.Series DC-PV2 p, Y 9 ryi t[4 *. -ENpHASE t