HomeMy WebLinkAboutTR-4245 Albert J. Krupski,President Town Hall
John Holzapfel,vice President y� 53095 Main Road
William G. Albertson Co Z P.O. Box 1179
Martin H. Garrell O� �� Southold, New York 11971
Peter Wenczel 'jIp! �.a� Telephone (516) 765-1892
Fax (516) 765-1823
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
May 31, 1994
En-Consultants, Inc.
1.329 North. Sea Road
Southampton, NY 11968
RE: Barbara Cieplinski
SCTM #1.000-89-3-9 & P/O 8.1
Dear Mr. Haje:
The following action was taken by the Southold Town Board of
Trustees on Thursday, May 26, 1994;
RESOLVED that the Southold Town Board of Trustees grants an
amendment to permit #4245 to install a 4' X 210' wood chip path,.
a 4.' X 130' catwalk, a 4' X 93 open pile dock, a 4' X 16 ' ramp,
a• 6 ' X 20 ' float and two pilings and to plant the existing foot
path with Baccharis Halimifolia on 4' centers. Located 720
Orchard Lane, Southold.
If you have any questions, please do not hesitate to contact
this office.
S' cerely
Albert J. Krupski, Jr.
President, Board of Trustees
AJK:jmd
TRUSTEES y0 G
John riot.Bredeneyer,III,President c SUPERVISOR
Henry P. Smith,Vice President ON Z SCOTT L HARRIS
Albeit J.KrupsK Jr. d
John L Bednosld,Jr. �'• O� Town Hall
John B.Tuthill Ol �'� 53095 Main Road
BOARD OF TOWN TRUSTEES P.O.Box 1179
Telephone(516)765-1892 Southold,New York 11971
Fax(516)765-1823 TOWN OF SOUMOLD
COASTAL EROSION MANAGEMENT PERMIT APPLICATION
TOWN WETLANDS PERMIT APPLICATION
TRUSTEE LANDS PERMIT APPLICATION
Office Use Only:
#Coastal Erosion Permit Application
Wetland Permit Application ( Q
Trustee Lands Permit Application
randfather
Completed Apps. Date:ej,kp� SEP Q
jffarianceiRequiredi
Neighbors notified Dater T®WN OF SOUT14
SEQRA Type jL
LD
Coord. Review-apt. ,mand. c(�p3 ' Date Rec. by Office-I.
RSEQRA
nsp. comp. /date:q-a.?y,
Determin. /date: 9 --16'- Y.3
Public Hearing/date: r -d i-- Y j
Findings: Q
Permit Vote: (0N)
Special Conditions:
(also see file)
Application Number; SCTM #1000- 89-3-9 & n/o 8 .1
Project Name (If any)
Date Prepared: September 2, 1993
Applicant: Er,-Consultants, Inc.
Address: 1329 North Sea. Road, Southampton, New York 11968
Phone ( )
Interest: (owner, consultant,lessee,etc. ) Consultant
Owner of Property: Barbara Cieplinski
Address _ 50 Oxford Road, Southport, CT
Phone ( 203 ) 259-5370
Subject Property Location: Orchard Lane,_ Southold; New York
SCTM #1000-89-3-9 & p/o 8 .1 •2, / c¢
( Provide LILCO Pole #, Distance to cross Streets if not an
locat=on map)
rTrg-r r T C` .Tr/,rrr 1 T71r�T.TTT
Yds'. to be excavated: n Yds. to be filled:
banner in which materia will be removed or deposited:
Width of canal, creek or bay fronting property: 550± �
Depth at low tide: varies Aver. rise in tide: 21 -611
Distance to nearest channel: unknown Distance project
extends beyond similar projects in area: unknown
Area zoning: R-1 Land area in acres: -
Is project for private or business use: priva e
Intended use of property: one family r si
Describe known prior operations conducted an premises:
Construction of one family dwelling
Has any prior license or permit been issued to erect structures,
dredge, or deposit fill on said premises: unknown
Has any license or permit ever been revoked or suspended by a
Governmental Agency:
Project Description
The project description must also include plans for reclamation
of land disturbed during construction- of the principle and
accessory structures and underground structures- (i.e. , pipeline
and septic system; make additional attachments if necessary) .
SEE ATTACHED
Authorization (Where the applicant is not the owner)
I Barbara Cieplinski residing at 50 Oxford Road
(Print-owner of subject property) (Mailing address-phone)
Southport, Connecticut 06490 ( 203 ) 259-5370
do hereby authorize Roy L. Haje to apply for
Coastal Erosion permit( s) from the Southold Town Trustees
Signature
THIS IS NOT A PERMIT
Albert J. Krupski, President Q`�guFFU(��,4 Town Hall
John Holzapfel,Vice President Gy1 53095 Main Road
William G.,Albertson Co Z P.O. Box 1179
Martin H. Garrell O Southold,New York 11971
Peter Wenzel y'jlp! �.aQ! Telephone(516) 765-1892
Fax (516) 765-1823
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
July 28, 1995
En-Consultants Inc.
Mr. Roy Haje
1329 North Sea Road
Southampton NY 11968
Re: BARBARA CIEPLINSKI
SCTM #89-3-9
Dear Mr. Haje,
The following action was taken by the Board of Trustees at their
regular meeting of July 27, 1995:
RESOLVED that the Southold Town Board of Trustees approve an
Amendment to Permit #4245 to decrease the size of the dock as
follows: construct a combination upland fixed walk and fixed
pier extending into the waterway whose over all dimensions will
be 41 X 1861 . A 32" X 16' ramp will be attached to the outer
end of the fixed pier and will rest upon a 61 X 10' float
secured by 1- 2 pile dolphin: A second float whose dimensions
are 6' X 20 will extend southward off the first float and will
also be secured by 1- 2 pile dolphin..
If you have any questions, please call our office.
Very truly yours,
Albert J. Yaps i, J
President,. Board of Trustees
AJK/djh
cc. CAC
Albert J. Kru pski President O Town Hall
G
John Holzapfel, Vice President �. yl' 53095 Main Road
William G. Albertso P.O. Box 1179
Martin H. e� �; v �Cy Southold. New York.11971
Peter W Telephone (516) 765-1892
Q 1995 - Fax (516) 765-1823
A�
OF TOWN TRUSTEES
TOWN OF SOUTHOLD
TO: _R A R R'a R A MPPI TNSK1
Please be advised that your application, dated May 9,. 1995
has bee reviewed by this Board, at the regular meeting of
July 27. 1995 and the following action was taken:
( XXi Application Approved. (see below)
( ) Application Denied. (see below)
( ) Application Tabled. (See below)
If you application is approved as noted above, a permit fee is
now due. Make check or money order payable to the' Southold Town
Trustees. The fee is computed below according to the schedule
of rates as set forth int he sintruction sheet.
The following fee must be paid within 90 days or reapplication
including fees will be necessary.
COMMENTS AND REMARKS: DED.UCTED $40 for Amendment Fee
Calculated at 1994 price fee
COMPUTATION OF PERMIT FEES: Pier: 4' X 60' = 240' X $.j.= $190.00
Ramp: 2.667'. X 16' = 42.6721 X $�t= $&r 3 !
Float: 6' X 10' = 60' X $. = $U0.00
Float: 6' X 20' = $120' X $a: _ $2YO..00
TOTAL FEES DUE: $ 885.34 Minus $40 Amendment Fee
SIGNED: --
PRESIDENT, BOARD OF TRUSTEES
BY: J. /
CLERK OF TOWN TRU TEES
0195
J
05_9 -1'995 01:45F 1N FFOM EN-CbNc�L[Li`IT � IPJ TO 765313E P.01
ENVIRONMENTAL
SERVICES
E!OWNOF
1995
UTHOLD
® N L S, t o ---
--'nk
1329 N HTH SEA ROAD, SOU`l-€ AMP t ON, NEW YORK 115)68 51 2183-6360
F X NO. 516-283-6135
May 9, 1995
BY IMIL
Board of Town Trustees
Town of Southold
Town Hall
53o95 Main Road
Southold, New York 11971
RE: BARB QTEPLINaK1__- _#1000-89.-3-_a_..Y Plo
Dear Trustees:
in acc•ordanoe with an agreement made between the
-pplioant and the Board we wash to amend the applioaetion
as follows: construct a combination upland fixed wall
and f i xed pier extending into the waterway whose overall
dimensions will be 41 X 1861 . A 3211 X 161 ramp laill be
attached to the outer end of the fined pier and will rest
upon a 61 X 101 float secured by (1) 2--pile dolphiTI. A
second float whose dimensions are 61 X 20' will extend
southward off the first float and will also be secured by
(1.) 2-pile dolphin.
_av this project is less extensive that, t r; , of x vg i n=l
approval., would you kindly refund any edxoesa �s..
Ver truly yours,
V�C-MICZ7T
Roy L. Haje
President
RLHsrm
EnCloti l-::
CC: Ba, oara `:ieplinski
0'-:7-09-199E 01:46PM FROM EPA-CCINSULT4; TS, INC TO ?6S3136 P.02
PA
fo
r.<C-D�A
e
Ye
yi
i
f�
Boa y- �r Tom. J3.,z P�•�rt-g-� r�
ft,Ig An.So: PortVA-T7�
��K rM' Dv rJ14(--i7
- 'OZO R,41 PCB-;.
05-09-1995 01;46PIl FROM EN-C17HSbL'TANTS} IHC TO 7653136 P.t _
.V
4�
1
V A
It 4
Iry
At
1
P
�• �ev
r
ODO f as�c'w.w'
TOTAL P.O3
Paul and Rosemarie Birman
260 Sunset Way
Southold NY 11971
Tel: (516) 765-2081 Fax: (516) 765 3749
May 4 1995
MAY
Town of Southold Trustees
Southold Town Hall
Southold NY 11971 Whim 6F SOUTHOL
To whom it may concern,
I am writing about an urgent matter involving construction
of a new dock on the edge of Cedar Beach Harbor.
The persons doing the construction are Frank and Barbara
Cieplinski of Clearview Road. I understand that they have
proper permits for the work.
I believe the permits were issued in error for the following
reasons:
1 . Cedar Beach Harbor is a round shallow body of water
with a narrow channel running along the north western shore.
At low tide, the center of the harbor is a mud flat with an
1 .5 to 2 ft deep channel about 15-25 ft wide, immediately
adjacent to the shore. This channel runs parallel to the
shore, within 5-ft of the shore. This narrow channel
running close inshore is the only way in or out of the
eastern fingers of Cedar Beach Harbor.
2 . The dock that is under construction is supposed to be
93 ft long with ramp and float extending from the end.
Construction has begun and the channel is already partly
blocked.
3. It is clear that the proposed dock, ramp and float will
completely block the only channel from Cedar Beach Harbor to
Peconic Bay.
4. There are 10-15 boatsmen with docks and boats that will
be cutoff from our only outlet into the Peconic bays if the
proposed dock is built as planned. My home is on Canoe
Inlet. My boat is a 24 ft walkaround that draws 20" . As it
stands, in the center of the channel I touch bottom at low
tide. There is no way to navigate outside the channel.
Other sail and power boats are kept in Dryad's Bay, also
upstream of the dock under construction.
..3
5 . Also cutoff will be the Suffolk County Marine Institute
at Cedar Beach.
6. It would appear that whoever designed the dock for the
Cieplinskis was not familiar with the nature of this harbor.
The same appears true of the official who issued the permit.
The dock will be useless for them as well, as its end will
be right in the middle of the mud flat, unfit for docking a
boat of any type.
I petition the Board of Trustees to immediately halt
construction before our only channel is entirely blocked and
withdraw the permit. The site should be surveyed (sounded)
so that the Cieplinski dock can be scaled back to a
dimension that will permit passing traffic and which will
place their own boat in navigable water. This will likely
be only 3-5 ft. . . a MUCH less costly construction than they
have presently planned. Additionally, pilings already sunk
into the channel must be removed.
Alternatively, a new channel must be dredged to route boat
traffic around this 93 ft fixed dock (plus ramp and float) .
Than you for your attention to this matter.
Si ere y
Paul and Rosemarie Birman
cc Mr. Frank Licari
Mr. Robert Gazza
Mr. Vincent Stefanelli
Mr. John Gormley
Mr. John Fiore
Mr. Laurence Simon
ENVIRONMENTAL
D C� SERVICES
--Y,- MAY 3 11994
T010 OF Sot-
OLD _
EN-CONSULTANTS, INC.
1329 NORTH SEA ROAD, SOUTHAMPTON, NEW YORK 11968 516-283-6360
FAX NO. 516-283-6136
May 26, 1994
TO: Jill
Southold Town Trustees
FROM: RoseMarie
En-Consultants, Inc.
RE: Barbara Cieplinski
Orchard Lane, Southold ��
Enclosed please find check #5246 in the amount of $40. 00,
for the additional application fee for the above-
referenced application, as per your request.
Should you require any additional information, please do
not hesitate to call.
Agenda
May 24, 1994
�Y
RECOMMENDATION OF REQUESTS FOR LETTERS OF NON-JURISDICTION
NJ-8
Moved by Allan Connell, seconded by Betty Wells, it was
RESOLVED to recommend to the Southold Town Board of Trustees DENIAL of the
request for a letter of Non-Jurisdiction of SUSAN TSAVARIS .30-2-53 to construct a 15'
x 30' inground pool beyond the 75' setback from high water line on Long Island Sound.
Denial is recommended because, although the location of the pool itself is not
within Trustees' jurisdiction, the required fence would be within Trustees' jurisdiction
according to information supplied by the. applicant. Due to the fence's proposed location
a Wetland Application should be required and the application should show the Coastal
Zone Hazard line.
2170 The Strand, East Marion
Vote of Council: Ayes: All
Motion carried.
RECOMMENDATION OF REQUESTS TO AMEND PERMITS
A-5
Moved by Stephen Angell, seconded by Bruce Loucka, it was
RESOLVED to recommend to the Southold Town Board of Trustees APPROVAL WITH
PROVISIONS of the request to amend the permit of BARBARA CIEPLINSKI 89-3-9 & p/o
8. to relocate structure slightly northward and reoriented to reach a 3' depth in
accordance with NYS DEC requirements.
As stated in the CAC's original recommendation concerning this application, approval
is recommended provided the project does not block the navigation of the neighbors. The
Trustees' may wish to have the Bay Constable make a determination as to the fullest limit
possible without causing obstruction.
Orchard Lane, Southold
Page 5
' ��SpFFO(��
Albert J. Krupski, President �O OG Town Hall
John Holzapfel, Vice President y�c 53095 Main Road
William G. Albertson P.O. Box 1179
Martin H. Garrell Oy �.F Southold, New York 11971.
Peter Wenczel 'A �.a0 Telephone (516) 765-1892
Fax (516) 765-1823
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
May 17, 1994
Bruce Loucka
Southold Town Conservation Advisory Council
Southold Town Hall
Main Road
Southold, NY 11971
Dear Loucka,
Transmitted herewith are the following applications for a
wetland permit:
William Childs SCTM #145-4-2.1
Oscar Blevins SCTM #104-5-23
Donald Bayles SCTM #57-1-16.1
Barbara Cieplinski SCTM #89-3-9 & p/o 8.1
Theresa Casamisina SCTM #57-2-19
Cindy Benedetto SCTM #35-5-26
Ann Berryman SCTM #18-2-1
Susan Tsavaris SCTM #30-2-53
Linton Duell SCTM #24-2-12
Pierre Gazarian SCTM #26-2-47
David & Ann Air SCTM #24-1-27
Please prepare a written report of findings and
recommendations with respect to these. applications.
ry tru y' ourss,
ln
Albert J. Krupski, Jr.
President, Board of Trustees
AJK/djh
U L5 IJ U L5 NVIRONMENTAL
APR 2 8 1994 SERVICES
TOWN OF SOI THOLQ
EN-CONSULTANTS, INC. t
1329 NORTH SEA ROAD, SOUTHAMPTON, NEW YORK 11968 516-283-6360
FAX NO. 516-283-6136
April 26, 1994
Southold Town Trustees
Town Hall
53095 Main Road
P.O. Box 1179
Southold, New York 11971
RE: BARBARA CIEPLINSKI, SCTM #89-3-9 & P/O 8 . 1
Dear Trustees:
You approved construction of a walkway and dock by your
_Permit #4245. Subsequent to that,. the New York State DEC
required the structure to be relocated slightly northward
and reoriented to reach a 3 ' depth. A copy of their
permit and the plan on which it is based is attached. In
order that all permits coincide, would you kindly modify
your permit accordingly.
Ver trul� yours,
Rol.�Haje y
President
RLH: jhg
Enclosures
cc: Barbara Cieplinski
1�
tp
,
or�,1P
4
lb
k �
� 0
a
v
hQv Jr o
AP \V V
0 4P
(00 0P
P a�
A
o°
\?Al ,.
Pl2o Po s.c O PRT H � DocK Fort
�3�+R a,�'�A Cic p i•v s,�i o.,
oR <H H��ao2
4 t So LJ Ho`0, Sur-�o�•C
5 He F-r v7ofoZ 3��5-�yy
-31
F r 0 /r op
3'wJannP -s r ► Yw\I E
J e
06
OK
4icico' .. q 4 30' h
If, ¢I Ens
SEA, `O Sir oc
� J
n n - 000..
i SUF1=oLK �d.
a °
V �h v 3 F./,R G 5't'Ro r'+ MAP
o Y
rs
cr�aN S Q EN-CONSULTANT'S INC- .
M
G/.vt I37-9- NORTH SEA RD,
'V W c nO HAM'UON iV, Y. 11968
4
4
0
OL /YdT S:
0
c w PAR Po S.�: PR►CIA T,c
y` 3cA^ 016cK
lL R OJA c 4,1V
FEET I k a° / /Yl f1PI< I7e t7wvq 4-D
O 30 6o n d . j/rC7'pp r�}�rNlfq,JlC' .
� P/2d Po s.c'O PR�'H � DocK' Fc�rZ
�/4R4i4?fj C/cpL/^/ Ste/ oti
Q Cc OF} !Z �cFlCH /-l42�C3o2
o 'G w s HC 6 -T-
v
/ PR D
G`e g c,
-- P
&'Y.?O" ')A"r
'NLI;K I�
o J/r v N
G�� 9,G4C4 ~�
oP
�ap.t
E W� YW, IE
M Qdc2
Q o, IyA
Jk
3 j
E F L •� � j
J Pa.. ' �' e a
P
•l'AHW
h� W•r <� f
Deif'ic!//f i EDAEZ`a ti Pa a CEo�
ice
dL2 4 aGhf d
f
�k J
�uFFa�KCa, 9f}4STRo/`7
111AP aq / ':3000'
/ CXIST/NG FoDT PATi•� To $C Pd AOI—rF �J
wi�,N aA<cHfiR/S y/ O.C .
C l/
F
I/
Z ►f �dT�S:
N D A T-urt:/-1 i.c-)
PvR PO 5.t-c: PR I aATC
° A 0oc<
3 R_ odA���,r — a�.�rE A s
( � FEEr Am/q�K me t�0Af LD
" O 30 bo d , {/1CTA/: r-4P.1,v ,J,�
P/?oPo s.c O PR7-H Oocl< Fd/2
`� r3f+R4�rzA C/�.Pc./ter srC/ o�
�
T-
A0 9/.2 S/43
i G (Z W-9-9/93, 3//5-1sy
Albert J. Krupski, President �O�' . OG Town Hall
John Holzapfel, Vice President o y�c 53095 Main Road
P.O. Box 11:79
William G. Albertson z
Southold,.New York:1 1971°
Martin H. Garrell
Peter Wenzel y'llp! �� Telephone (516) 765-1892
Fax (516) 765-1823
BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
TO: R A R R A R A (~TFPT 11 SX1
Please be advised that your application, dated May 9,. 1995
has bee reviewed by this Board, at the regular meeting of
Jul_ 27, 1995 and the following action was taken:
( XXi Application Approved. (see below)
( ) Application Denied. (see below)
( ) Application Tabled. (See below)
If you application is approved as noted above, a permit fee is
now due. Make check or money order payable to the Southold Town
Trustees. The fee is computed below according to the schedule.
of rates as set forth int he sintruction sheet.
The following fee must be paid within 90 days or reapplication
including fees will be necessary_
COMMENTS AND REMARKS: DEDUCTED $40 for Amendment Fee
Calcuated at 1994 price fee bUF -T'O 'l&QSr t5 CtefeCL--
COMPUTATION OF PERMIT FEES: Pier: 4' X 60' = 240' X $2 = $W'4'b.00
Ramp: 2.667' X 16' = 42.672' X
Float: 6' X 10' = 60' X $a., $120.00
Float: 6' X 291 = $120' X %2%00
Minus $40 Amendment Fee
TOTAL FEES DUE: $ 885.34.
SIGNED:
PRESIDENT, BOARD OF TRUSTEES
BY: tJ��� I J.
CL OF OWN TRUSTEES
6/95
PROJECT DESCRIPTION
RE: BARBARA CIEPLINSKI
Construct a timber dock consisting of a 4 ' x 100 ' fixed
elevated (3 '-6" above grade of marsh) walkway; 3 ' x 16 '
ramp; 6 ' x 20 ' float secured by (2) 8" � pilings.
i4-16.4(2/87)—Text 12 -
PROJECT I.D.NUMBER 617.21 SEOR
Appendix C
State Environmental Quality Review
SHORT ENVIRONMENTAL ASSESSMENT FORM
For UNUSTEO ACTIONS Only
PART I—PROJECT INFORMATION (To be completed by Applicant or Project sponsor)
1. APPLICANT!SPONSOR 2. PROJECT NAME
Barbara .Cie linski by En-Consultants, Inc.
3. PROJECT LOCATION:
Municipality Southold County Suffolk
4. PRECISE LOCATION(Street address and road Intersections,prominent landmarks,etc.,or provide map)
Orchard Lane
Southold, New York 11971
SCTM # 1000-89-3-9 & p/o 8 .1
5. IS P��RvvOII POSED ACTION:
ICI New ❑Expansion ❑Modificationialteration
6. DESCRIBE PROJECT BRIEFLY:
SEE ATTACHED
7. AMOUNT OF LAND AFFECTED:
Initially adW Ultimately 90 ,11 4 S r ft-apK
S. WILL PROPOSED ACTION COMPLY WITH EXISTING ZONING OR OTHER EXISTING LAND USE RESTRICTIONS?
KI Yes ❑No If No,describe briefly
9. WHAT IS PRESENT LAND USE IN VICINITY OF PROJECT?
Ii Residential ❑Industrial ❑Commercial ❑Agriculture ❑Park/Forestlopen space ❑Other
Describe:
10. DOES ACTION INVOLVE A PERMIT APPROVAL,OR FUNDING, NOW OR ULTIMATELY FROM ANY OTHER GOVERNMENTAL AGENCY(FEDERAL,
STATE OR LOCAL)?
Z Yes ❑No If es, list agency(s)and permitlapprovals
DOS, COE and Sou hold Trustees
11. DOES ANY ASPECT OF THE ACTION HAVE A CURRENTLY VAUD PERMIT OR APPROVAL?'
❑Yes ®No If yes,list agency name and permitlapproval
12. AS A RESULT OF PROPOSED ACTION WILL EXISTING PERMIT/APPROVAL REQUIRE MODIFICATION?
❑Yes [ZNo
I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE TO THE BEST OF MY KNOWLEDGE
Applicantisponsor name: Barbara Cie ' ski y En-Consultatns, Inc. Date: September 2, 9�
i
Signature:
If the action is in the Coastal Area, and you are a state agency, complete the
Coastal Assessment Form before proceeding with this assessment
OVER
1
PROJECT DESCRIPTION
RE: BARBARA CIEPLINSKI
Construct a timber dock consisting of a 4 ' x 100 ' fixed
elevated (3 ' -6" above grade of marsh) walkway; 3 ' x 16 '
ramp; 61 x 20 ' float secured by (2) 81' ,sd pilings.
ti
a
COUNTY OF SUFFOLK )
STATE OF NEW YORE{ )
--=@,Naaara_Cl eran.k; BEING DULY SWORN DEPOSES
AND SAYS THAT HE IS THE APPLICANT FOR THE ABOVE DESCRIBED PER14ITS, AND
THAT ALL STATEM'""' S CONTAINED HEREIN ARE TRUE TO THE HEST OF HIS KNOWLEDGE
AND BELIEF, AND THAT WORT{ WILL HE DONE IN THE MANNER SET FORTH IN THIS
APPLICATION AND AS MAY BE APPROVEDBY THE TOWN BOARD OF THE TOWN OF
SOUTHOLD. THE APPLICANT AGREES TO HOLD THE TOWN OF SOUTHOLD AND THE TOWN
TRUSTEES HARMLESS AND FREE FROM ANY AND ALL DAMAGES AND CLAIMS ARISING
UNDER OR HY VIRTUE OF SAID PERMIT, IF GRANTED.
IN COMPLETING THIS APPLICATION, I HEREBY AUTHORIZE THE TRUSTEES, THEIR
AGENT OR REPRESENTATIVE, TO ENTER ONTO MY PROPERTY TO INSPECT THE PREMISES
IN CONJUNCTION WITH REVIEW OF THIS APPLICATION.
Signature Of Applicant
SWORN TO BEFORE ME THIS - DAY O 19
4TYPUBLIC
566i 'i£HOUVW S3HldX3 -WW00'kW. '
0I71711d AHVION
aNb'"12ib'� •3 kNVW
EXAMINED BY
APPROVED
DISAPPROVED
CONDITIONS ( If any)
SIGNATURE OF CHAIRMAN
COMPUTATION OF FEES
Approved 2/27/85
TRUSTEES - ti ,�:_, a��✓q SUPERVISOR
John M.`Bredemeyer, III. President �� �'�` SCOTT L.HARRIS
Albert J. Kru ski, Jr., Vice
p ce President = _
Henry P. Smith s ,� Town Hall
O "�� wy
John B. Tuthill .•i,1 ': :'` ,.`, 53095 Main Road
William G. Albertson �' f�^j ;� y� r P.O. Box 1179
Telephone (516) 765-1892 '
Southold, New York 11971
Fax (516) 765-1823 BOARD OF TOWN TRUSTEES
• TOWN OF SOUTHOLD
30 year Maintenance Agreement
Erosion Protection Structures
Chapter 37 Southold .Town Code
Southold Trustees as Administrator
I (we) Barbara .Cieplinski
type or print name(s)
the own rs of record of property at: '72o Qitll�Il�Gr.�l Qom.,
15b, 4411140111111 ,C.t
(type or print stteet address) SCT-M- #1000-
in applying for a Coastal Erosion permit for an Erosion
Protection Structure do hereby agree to a 30 year maintenance
program for a structure commonly known as a
of as shown on the attached
feet of length
licensed survey of the as-built structure.
It is my/our understanding that we are to maintain this
structure with materials designed to endure 30 years and or
equivalent to the original approved structure and that for any
maintenance which involves more than 5% in length of this
structure we are to give prior written notice to the
administrator, waiting for -their approval in all but true
emergency situation's which would seriously endanger life,
property and important coastal natural resource features such as
bluffs or wetlands. We further understand that failure to
maintain the structure could result in a requirement to post a
bond and or have the repairs ordered as a lien against the
property upon a finding by the Trustees 'Lhai. said lack of
maintenance would risk life, property or important natural
resources features including protected, rare or threatened
animals and plants.
Notarized Signature of owner of record
SWORN TO BEFORE ME THIS DAY OF ,19
�E. GARLAND
NOT L-BLIC Y PUBLIC
MY COMM.EXPIRES MARCH 31, 1995
Please submit three copies of a licensed land survey made within
one year of the original construction. This maintenance
agreement shall only be valid upon the final approval of the
administrator. Subsequent owners may apply to the Southold Town
Trustees to re-authorize this maintenance agreement.
TO WHOM IT MAY CONCERN:
This letter will authorize En-Consultants, Incorporated,
to apply for permits on my behalf.
PART 1—PROJECT INFORMATION
Prepared by Project Sponsor
NOTICE: This document is designed to assist in determining whether the action proposed may have a significant effect
on the environment. Please complete the entire form, Parts A through E. Answers to these questions will be considered
as part of the application for approval and may be subject to further verification and public review. Provide any additional
information you believe will be needed to complete Parts 2 and 3.
It is expected that completion of the full EAF will be dependent on information currently available and will not involve
new studies, research or investigation. If information requiring such additional work is unavailable, so indicate and specify
each instance.
NAME OF ACTION
LOCATION OF ACTION (Include Street Address, Municipality and County)
orchard Lane Southold, SuffolkptNew York
NAME OF APPLICANTISPONSOR BUSINESS TELEPHONE
En-Consultants, Inc. t516 ) 283-6360
ADDRESS
1329 North Sea Road
CITY/PO STATE ZIP CODE
Southampton NY 11968
NAME OF OWNER(If different) BUSINESS TELEPHONE
Barbara Cieplinski ( 203) 259-5370
ADDRESS i
50 Oxford Road i.
CITY/PO STATE ZIP CODE
Southport CT i06490
DESCRIPTION OF ACTION !
� I
I
SEE ATTACHED I
j I
i
Please Complete Each Question—Indicate N.A. if not applicable
A. Site Description -
Physical setting of overall project, both developed and undeveloped areas.
1. Present land use: -Urban !_`Industrial -Commercial NlResidential (suburban) -Rural (non-farm)
Forest -Agriculture =Other
2. Total acreage of project area: 1 _ 1 acres.
APPROXIMATE ACREAGE PRESENTLY AFTER COMPLETION
Meadow or Brushland (Non-agricultural) acres acres
Forested . 5 acres •S acres
Agricultural (Includes orchards. cropland, pasture, etc.) acres acres
Wetland (Freshwater or tidal as per Articles 24, 25 of ECL) • 4 acres •4 acres
Water Surface Area acres acres
Unvegetated (Rock, earth or fill) acres acres
Roads, buildings and other paved surfaces rpl acres rpi� acres
Other (Indicate type) Landscaped .1 acres .1 acres
3. What is predominant soil type(s) on project site? Loam
a. Soil drainage: RWell drained Cg % of site =Moderately well drained % of site
EPoorly drained 40 % of site
b. If any agricultural land is involved, how many acres of soil are classified within soil group 1 through 4 of the NYS
Land Classification System? N/A acres. (See 1 `:)'(-RR 370).
4. Are there bedrock outcroppings on project site? o
What is deoth to bedrock?
5: Approximate percentage of proposed F_ ct site with slopes: MO-10% 10( _% ❑10-15% %
1115% or greater %
6. Is project substantially contiguous to, or contain a building, site, or district, listed on the State or the National
Registers of Historic Places? []Yes ONo
7. Is project substantially contiguous to a site listed on the Register of National Natural Landmarks? []Yes KNo
8. What is the depth of the water table? a (in feet) (at work site)
9. Is site located over a primary, principal, or sole source aquifer? 41Yes ❑No
10. Do hunting, fishing or shell fishing opportunities presently exist in the project area? 99Yes ❑No
11. Does project site contain any species of plant or animal life that is identified as threatened or endangered?
❑Yes 91No According to Rr%y L.TH_J®
Identify each species
12. Are there any unique or unusual land forms on the project site? (i.e., cliffs, dunes, other geological formations).
[]Yes ONo Describe
13. Is the project site presently used by the community or neighborhood as an open space or recreation area?
❑Yes X)No If yes, explain
14. Does the present site include scenic views known to be important to the community?
❑Yes ®No
15. Streams within or contiguous to project area:
a. Name of Stream and name of River to which it is tributary
16. Lakes, ponds, wetland areas within or contiguous to project area:
a. Name Cedar Beach Harbor b. Size (In acres) 100+
17. Is the site served by existing public utilities? ❑Yes INNo
a) If Yes, does sufficient capacity exist to allow connection? ❑Yes []No
b). If Yes, will improvements be necessary to allow connection? []Yes ONo
18. Is the site located in an agricultural district certified pursuant to Agriculture and Markets Law, Article 25-AA,
Section 303 and 304? ❑Yes ZXNo
19. Is the site located in or substantially contiguous to a Critical Environmental Area designated pursuant to Article 8
of the ECL, and 6 NYCRR 617? ENYes []No
20. Has the site ever been used for the disposal of solid or hazardous wastes? ❑Yes LYNo
B. Project Description
1. Physical dimensions and scale of project (fill in dimensions as appropriate)
a. Total contiguous acreage owned or controlled by project sponsor 1 1 acres.
b. Project acreage to be developed:, no chanSJ&res initially; acres ultimately.
c. Project acreage to remain undeveloped no changPacres.
d. Length of project, in miles: p// (If appropriate)
e. If the project is an expansion, indicate percent of expansion proposed N/A %;
f. Number of off-street parking spaces existing 2 ; proposed 2
g. Maximum vehicular trips generated per hour 5 (no chang-q)bn completion of project)?
h. If residential: Number and type of housing units:
One Family Two Family Multiple Family Condominium
Initially 1
Ultimately 1
i. Dimensions (in feet) of largest proposed structure See prho�g%?;;t descr�i�t length.
j. Linear feet of frontage along a public thoroughfare project will occupy is? ft.
13
2. How much°natural material (i.e., rock, earth, etc.) will be removed from the site? g tons/cubic yards
3. Will disturbed areas be reclaimed? ❑Yes ❑No 99N/A
a. If yes, for what intended purpose is the site being reclaimed?
b. Will topsoil be stockpiled for reclamation? ❑Yes ❑No
c. Will upper subsoil be stockpiled for reclamation? ❑Yes ❑No
4. How many acres of vegetation (trees, shrubs, ground covers) will be removed from site? 0 acres.
5. Will any mature forest (over 100 years old) or other locally-important vegetation be removed by this project?
❑Yes MNo
6. If single phase project: Anticipated period of construction months, (including demolition).
7. If multi-phased:
a. Total number of phases anticipated (number).
b. Anticipated date of commencement phase 1 month year, (including demolition).
c. Approximate completion date of final phase month year.
d. Is phase 1 functionally dependent on subsequent phases? ❑Yes ❑No
8. Will blasting occur during construction? ❑Yes Z N o
9. Number of jobs generated: during construction 3 ; after project is complete 0
10. Number of jobs eliminated by this project 0
11. Will project require relocation of any projects or facilities? '::]Yes ®No If yes, explain
12. Is surface liquid waste disposal involved? `Yes No
a. If yes, indicate type of waste (sewage, industrial, etc.) and amount
b. Name of water body into which effluent will be discharged
13. Is subsurface liquid waste disposal involved? ❑Yes �N o Type
14. Will surface area of an existing water body increase or decrease by proposal? CYes nNo
Explain
15. Is project or any portion of project located in a 100 year flood plain? ®Yes ❑No
16. Will the project generate solid waste? ❑Yes 2No
a. If yes, what is the amount per month tons
b. If yes, will an existing solid waste facility be used? GYes ❑No
c. If yes, give name ; location
d. Will any wastes not go into a sewage disposal system or into a sanitary landfill? ❑Yes ❑No
e. If Yes, explain
17. Will the project involve the disposal of solid waste? -Yes 5JNo
a. If yes, what is the anticipated rate of disposal? tons/month.
b. If yes, what is the anticipated site life? years.
18. Will project use herbicides or pesticides? Eyes KNo
19. Will project routinely produce odors (more than one hour per day)? ❑Yes ®No
20. Will project produce operating noise exceeding the local ambient noise levels? ❑Yes KNo
21. Will project result in an increase in energy use? Yes KNo
If yes , indicate type(s)
22. If water supply is from wells, indicate pumping capacity NA gallons/minute.
23. Total anticipated water usage per day N/A gallons;day.
24. Does project involve Local, State or Federal funding! -Yes 15C,No
!t Yes. expiain
r
25. Approvals Required:
Submittal
Type Date
City, Town, Village Board []Yes ❑No
City, Town, Village Planning Board ❑Yes ❑No
City, Town Zoning Board Dyes ❑No
City, County Health Department []Yes ❑No
Other Local Agencies MYes ❑No Snutholrl Trust-Pea 09/93
Other Regional Agencies ❑Yes ❑No
State Agencies CRYes ❑No nFr' Tw 09/93
Federal Agencies Eyes ❑No CnR PROT in 09/93
C. Zoning and Planning Information
1 . Does proposed action involve a planning or zoning decision? 6Yes []No
If Yes, indicate decision required:
❑zoning amendment ❑zoning variance ❑special use permit ❑subdivision ❑site plan
❑new/revision of master plan ❑resource management plan Inother Wetlands
2. What is the zoning class ification(s)of the site? R-1
3. What is the maximum potential development of the site if developed as permitted by the present zoning?
l one family dwelling
4. What is the proposed zoning of the site? N/A
5. What is the maximum potential development of the site if developed as permitted by the proposed zoning?
N/a
6. 'Is the proposed action consistent with the recommended uses in adopted local land use plans? IXYes ❑No
7. What are the predominant land use(s) and zoning classifications within a '/4 mile radius of proposed action?
R-1 , One family dwellings
8. Is the proposed action compatible with adjoining/surrounding land uses within a '/4 mile? Eyes ❑No
9. If the proposed action is the subdivision of land, how many lots are proposed? —N,ZA,
a. What is the minimum lot size proposed?
10. Will proposed action require any authorization(s) for the formation of sewer or water districts? ❑Yes ONo
11 . Will the proposed action create a demand for any community provided services (recreation, education, police,
fic2 protection)? ❑Yes [NNo
a. If yes, is existing capacity sufficient to handle projected demand? ❑Yes []No
12. Will the proposed action result in the generation of traffic significantly above present levels? Dyes X]No
a. If yes, is the existing road network adequate to handle the additional traffic? ❑Yes ❑No
D. Informational Details
Attach any additional information as may be needed to clarify your project. If there are or may be any adverse
impacts associated with your proposal, please discuss such impacts and the measures which you propose to mitigate or
avoid them.
E. Verification
I certify'that the info r tion pr a above is true to the best of my knowledge.
Applicant/Sponsor Name — Cate 9/7/93
Signature Title PraG;_rlr-nt
If the action is in the Coastal Are and you area state agency, complete the Coastal Assessment Form before proceeding
with this assessment.
3
Paul and Rosemarie Birman
.260 Sunset Way
Southold NY 11971
Tel: (516) 765-2081 Fax: (516) 765 3149
May 4 1995 . 1 51995
Town of Southold Trustees �""y^
Southold Town Hall - -
Southold NY 11971
To whom it may concern,
I am writing about an urgent matter involving construction
of a new dock on the edge of Cedar Beach Harbor.
The persons doing the construction are Frank and Barbara
Cieplinski of Clearview Road. I understand that they have
proper permits for the work.
I believe the permits were issued in error for the following
reasons:
1. Cedar Beach Harbor is a round shallow body of water
with a narrow channel running along the north western shore.
At low tide, the center of the harbor is a mud flat with an
1.5 to 2 ft deep channel about 15-25 ft wide, immediately
adjacent to the shore. This channel runs parallel to the
shore, within 5-ft of the shore. This narrow channel
running close inshore is the only way in or out of the
eastern fingers of Cedar Beach Harbor.
2 . The dock that is under construction is supposed to be
93 ft long with ramp and float extending from the end.
Construction has begun and the channel is already partly
blocked.
3. It is clear that the proposed dock, ramp and float will
completely block the only channel from Cedar Beach Harbor to
Peconic Bay.
4. There are 10-15 boatsmen with docks and boats that will
be cutoff from our only outlet into the Peconic bays if the
proposed dock is built as planned. My home is on Canoe
Inlet. My boat is a 24 ft walkaround that draws 20" . As it
stands, in the center of the channel I touch bottom at low
tide. There is no way to navigate outside the channel.
Other sail and power boats are kept in Dryad's Bay, also
upstream of the dock under construction.
,
5. Also cutoff will be the Suffolk County Marine Institute
at Cedar Beach.
6. ' It would appear that whoever designed the dock for the
Cieplinskis was not familiar with the nature of this harbor.
The same appears true of the official who issued the permit.
The dock will be useless for them as well, as its end will
be right in the middle of the mud flat, unfit for docking a
boat of any type.
I petition the Board of Trustees to immediately halt
construction before our only channel is entirely blocked and
withdraw the permit. The site should be surveyed (sounded)
so that the Cieplinski dock can be scaled back to a
dimension that will permit passing traffic and which will
place their own boat in navigable water. This will likely
be only 3-5 ft. . . a MUCH less costly. construction than they
have presently planned. Additionally, pilings already sunk
into the channel must be removed.
Alternatively, a new channel must be dredged to route boat
traffic around this 93 ft fixed dock (plus ramp and float) .
Than you for your attention to this matter.
Sin re y
aul and emarie Birman
cc Mr. Frank Licari
Mr. Robert Gazza
Mr. Vincent Stefanelli
Mr. John Gormley
Mr. John Fiore
Mr. Laurence Simon
New York State Department of Environmental Conservation
Bu11
nding 40—SUNY, Stony Brook, New York 11790-2356
(516) 444-0365
FAX (516) 444-0373
Thomas C. Jorling
Commissioner
April 15, 1994
Barbara Cieplinski
50 Oxford Road
Southport, CT 06490
RE: 1-4738-00865/00001-0
Dear Ms. Cieplinski:
In conformance with the requirements of the State Uniform
Procedures Act (Article 70, ECL) and its implementing regulations
(6NYCRR, Part 621) we are enclosing your permit. Please read all
conditions carefully. If you are unable to comply with any
conditions, please contact us at the above address.
Also enclosed is a permit sign which is to be conspicuously
posted at the project site and protected from the weather.
Very truly yours,
Darleen Gerbino
Environmental Analyst
DG/nw
enclosure
`�printed on recycled paper
,. NEW Yr� !TATE DEPARTMENT OF ENVIRONMENTAL CONSERVE—1
DEC PE€dMIT NUMBER EFFECTIVE DATE
1-4738-00865/00001-0 April 15, 1994
FACILITY/PROGRAM NUMBER(S) P E I T EXPIRATION DATE(S)
April 30, 1997
Under the Envlranmental
Conservation Law
TYPE OF PERMIT ■ New 0 Renewal 0 Modification 0 Permit to Construct 0 Permit to Operate
0 Article 15, Title 5: Protection 0 6NYCRR 608: Water Quality 0 Article 27, Title 7; 6NYCRR 360:
of Waters Certification Solid Waste Management
0 Article 15, Title 15: Water 0 Article 17, Titles 7, 8: SPDES 0 Article 27, Title 9; 6NYCRR 373:
Supply Hazardous Waste Management
0 Article 19: Air Pollution
0 Article 15, Title IS: Water Control 0 Article 34: Coastal Erosion
Transport Management
0 Article 23, Title 27: Mined Land
0 Article 15, Title IS: Long Reclamation 0 Article 36: Floodplain
Island Wells Management
0 Article 24: Freshwater Wetlands
0 Article 15, Title 27: Wild, 0 Articles 1, 3, 17, 19, 27, 37;
Scenic and Recreational Rivers ■ Article 25: Tidal Wetlands 6NYCRR 380: Radiation Control
0 Other:
PERMIT ISSUED TO TELEPHONE NUMBER
Barbara Cieplinski
ADDRESS OF PERMITTEE
50 Oxford Rd., Southport, CT 06490
CONTACT PERSON FOR PERMITTED WORK TELEPHONE NUMBER
En Consultants: 1329 North Sea Rd., Southampton, NY 11968 (516) 283-6360
NAME AND ADDRESS OF PROJECT/FACILITY
Cieplinski Property - Orchard Lane, Southold
LOCATION OF PROJECT/FACILITY
COUNTY TOWN WATERCOURSE NYTM COORDINATES
Suffolk Southold Cedar Beach Harbor
CEMKIW GF AA-MIM ACTIVITY
Install (1) 41 x 2101 wood chip path, 4+ x 1301 catwalk, 41 x 931 open pile dock, 41 x 16, ramp, ,61 x 20, float, and two
pilings. Plant the existing footpath with Baccharis halimifolia on 41 centers. All work shall be in accordance with
the attached NYSDEC approved plan.
By acceptance of this permit, the permittee agrees that the permit is contingent upon strict compliance with the
ECL, all applicable regulations, the General Conditions specified (see page 2) and any Special Conditions included as part of
this permit.
DEPUTY REGIONAL PERMIT ADMINISTRA- ADDRESS
TOR:
George W. Hammarth Bldg. 40, SUNY, Room 219, Stony Brook, NY 11790-2356
AUTHO I2ED SIGNRE DATE
April 15, 1994
Page 1 of 5
CEN91AL CMDITICNS
Inspections
1 . The permitted site or facility, including relevant records, is subject to in-
inspection at reasonable hours and intervals by an authorized representative of
the Department of Environmental Conservation (the Department) to determine
v%hether the permittee is caTplying with this permit and the ICL. Such represen-
tative may order the v%ork suspended pursuant to ICL 71-0301 and SAPA 401 (3) .
copy of this permit, including all referenced maps, . drawings and special
conditions, must be available for inspection by the Department at all times at
the project site. Failure to produce a copy of the permit upon request by a
Departmnt representative is a violation of this permit.
Pe rmi t Changes and Fkmema I s
2. The Department reserves the right to modify, suspend or revoke this permit Men:
a) the scope of the permitted activity is exceeded or a violation of any
condition of the permit or provisions of the ECL and pertinent regula-
tions is found;
b) the permit v%as obtained by misrepresentation or failure to disclose
relevant facts;
c) new material information is discovered; or
d) envirormental conditions, relevant technology, or applicable law or
regulation have materially changed since the permit was issued.
3. The permittee must submit a separate written application to the Department for
rena%el , modification or transfer of this permit. Such application rrust include
any forms, fees or supplwmntal information the Departrrent requires. Any
renanal , rrodification or transfer granted by the Department must be in writing.
4. The permittee must submit a renwal application at least:
a) 180 days before expiration of permits for State Pollutant Discharge
Elimination System (SPDES) , Hazardous Vlhste lVbnagwmnt Facilities
(FMF) , major Air Pollution Control (APC) and Solid Mste Nbnagarent
Facilities (SW) ; and
b) 30 days before expiration of all other permit types.
5. Unless expressly provided for by the Department, issuance of this permit does
not modify, supersede or rescind any order or determination previously issued by
the Department or any of the terms, conditions or requirements contained in such
order or determination.
Other Legal Cb l i gat i ons of Pewd ttee
6. The permittee has accepted expressly, by the execution of the application, the
full legal responsibility for all damages, direct or indirect, of Matever
nature and by Wwrever suffered, arising out of the project described in this
permit and has agreed to indemify and save harmless the State from suits,
actions, damages and costs of every name and description resulting from this
project.
7. This permit does not convey to the permittee any right to trespass upon the
lands or interfere with the riparian rights of others in order to perform the
permitted v%ork nor does it authorize the irrpa i rment of any rights, title, or
interest in real or personal property held or vested in a person not a party to
the permit.
8. The permittee is responsible for obtaining any other permits, approvals, lands,
easements and rights-of v%ey that may be required for this project.
Page 2 of 5
95-20-6a(7,92)-25` Tidal Wetlands
ADDITIONAL GENERAL CONDITIONS FOR ARTICLES 15 (Title 5), 24, 25, 34 and 6 NYCRR Part 608 ( )
9. That' if future operations by the State of New York require an al- other environmentally deleterious materials associated with the
teration in the position of the structure or work herein authorized,or project.
if, in the opinion of the Department of Environmental Conservation 13. Any material dredged in the prosecution of the work herein permitted
it shall cause unreasonable obstruction to the free navigation of said shall be removed evenly,without leaving large refuse piles,ridges across
waters or flood flows or endanger the health, safety or welfare of the bed of a waterway or floodplain or deep holes that may have a
the people of the State, or cause loss or destruction of the natural tendency to cause damage to navigable channels or to the banks of
resources of the State,the owner may be ordered by the Department to a waterway.
remove or alter the structural work, obstructions, or hazards caused
14. There shall be iz unreasonable interference with navigation by the work
thereby without expense to the State, and if, upon the expiration or
revocation of this permit, the structure, fill, excavation, or other herein authorized.
modification of the watercourse hereby authorized shall not be com- 15. If upon the expiration or revocation of this permit,the project hereby
pleted, the owners, shall, without expense to the State, and to such authorized has not been completed,the applicant shall,without expense
extent and in such time and manner as the Department of Environmental to the State, and to such extent and in such time and manner as the
Conservation may require,remove all or any portion of the uncompleted Department of Environmental Conservation may require,remove all or
structure or fill and restore to its former condition the navigable any portion of the uncompleted structure or fill and restore the site
and flood capacity of the watercourse.No claim shall be made against to its former condition. No claim shall be made against the State of
the State of New York on account of any such removal or alteration. New York on account of any such removal or alteration.
10. That the State of New York shall in no case be liable for any damage 16. If granted under 6 NYCRR Part 608, the NYS Department of Environ-
or injury to the structure or work herein authorized which may be caused mental Conservation hereby certifies that the subject project will not
by or result from future operations undertaken by the State for the contravene effluent limitations or other limitations or standards under
conservation or improvement of navigation,or for other purposes,and Sections 301, 302, 303, 306 and 307 of the Clean Water Act of 1977
no claim or right to compensation shall accrue from any such damage. (PL 95-217) provided that all of the conditions listed herein are met.
11. Granting of this permit does not relieve the applicant of the responsi- 17. All activities authorized by this permit must be in strict conformance
bility of obtaining any other permission, consent or approval from with the approved plans submitted by the applicant or his agent as part
the U.S. Army Corps of Engineers, U.S. Coast Guard, New York State of the permit application.
Office of General Services or local government which may be required. En-Consultants,
12. All necessary precautions shall be taken to preclude contamination Such approved plans were prepared by
of any wetland or waterway by suspended solids, sediments, fuels, dated 9/1/93 and last revisgo 3/15/94.
solvents, lubricants,epoxy coatings,paints,concrete,leachate or any
SPECIAL CONDITIONS
1. Any debris or excess material from construction of this
project shall be completely removed from. the adjacent area
(upland) and removed to an approved upland area for
disposal. No debris is permitted in tidal wetlands.
2. The storage of construction equipment and materials shall be
confined to 1301 landward of the Spartina alterniflora
boundary.
3 . To protect the values of the tidal wetland, a
permanent vegetated buffer zone shall be established. There
shall be no disturbance to the natural vegetation or
topography 75F landward of the dashed el. 5 contour as
depicted on the Van Tuyl survey last revised on
12/19/91.
4. No fill, other than wood chips, is authorized.
5. There shall be no disturbance to vegetated tidal wetlands or
protected buffer area and/or submerged aquatic vegetation
'tSAV" as a result of the permitted activity. .
6. Dredging is prohibited during any aspect of construction
authorized by this permit.
DEC PERMIT NUMBER
1-4738-00865/00001-0
PROGRAMIFACILITY NUMBER
Page 3 of 5
SUPPLEMMMARY SPECIAL CONDITIONS
The following conditions apply to all permits:
A. A copy of this permit, including all conditions and approved
plans, shall be available at the project site whenever authorized
work is in progress. The permit sign enclosed with the permit
shall be protected from the weather and posted in a conspicuous
location at the work site until all authorized work has been
completed.
B. The permittee shall require that any contractor, project engineer,
or other person responsible for the overall supervision of this
project reads, understands, and complies with this permit and all
its general, special, and supplementary special conditions. Any
failure to comply precisely with all of the terms and conditions
of this permit, unless authorized in writing, shall be treated. as
a violation of the Environmental Conservation Law. If any of the
permit conditions are unclear, the permittee shall contact the
Division of Regulatory Affairs at the address on page one or
telephone (516) 444-0365.
C. If project design modifications become necessary after permit
issuance, the permittee shall submit the appropriate plan changes
for approval by the Regional Permit Administrator prior to
undertaking any such modifications. The permittee is advised that
substantial modification may require submission of a new
application for permit.
D. At least 48 hours prior to commencement of the project, the
permittee and contractor shall sign and return the top portion of
the enclosed notification form certifying that they are fully
aware of and understand all terms and conditions of this permit.
Within 30 days of completion of the permitted work, the bottom
portion of that form shall also be signed and returned, along with
photographs of the completed work and, if required, a survey.
E. For projects involving activities to be undertaken in phases over
a period of more than one year, the permittee shall'notify the
Regional Permit Administrator in writing at least 48 hours prior
to recommencing work in subsequent years.
F. The granting of this permit does not relieve the permittee of the
responsibility of obtaining a grant, easement, or other necessary
approval from the Division of Land Utilization, Office of General
Services, Tower Building, Empire State Plaza, Albany, NY 12242
(516) 474-2195, which may be required for any encroachment upon
State-owned lands underwater.
DEC Permit No. / Page _jof'
P
&'Y a014A-r •
DA2 oprFw lr
�2AQ�Ho Q Y\v I Q
NA �.
r � o
BEAC
H
a
EDA��� Q
i s a a C,EDi
�BEA '� o Sig lCot
2 �Ce
lye
4 ` NYSDUC
AprROVED AS PER TERMS
Al' PdOAicvaft AND CONDITIONS g D�7�s�6
O whew PERMiT� (N�O�. -
kDATE���?�—�—
�uFFa�K4fa. #Ae--aT-Aatl
eSAP aq � 3000'
/ EXISTING Four PA'1"H To $ P4AH-r'E 0
QAccHARIS 'y/ O.C .
OL
4
D Arum;
C ;1 Pv/Z Po 6.4: PFZ I CIA
FEET i rne DOaq a
0 3c 60 d, �,�-rop r—PZ,Nkfq,J1e�
� Pl2oPoscO PR�'f{ � DocK Fc�r2
IC3ARGgRon Ci�P�i^r S,C/ oti
p C'.E O R iRCIL 000 (3.� c.-r H•9 r2.C30 2
a f So v7-HOLOf
o �Gw 5 �G T- �a fat
AR.P A 0 9/a 8/93
I i/aa/93, 311 s/yy
,1
�. eVV A
At
� n
Q
a� vti
T7YSDBC
APPROVED AS PER TLRbLS e`y
AND :ti
CODLT10NS�� r� � �• 00(r
NJ
I
Dt�:bIT .� (� \� JP
�( r 4-
w
v
AP �\`'
P
�• QP
r
� a
0
0
�C� Pl2o Po S.c'O PRT H � �oc�'C Fc�rZ
ch
SHEET o7efe� 3��s�yy
95-20-bf(7/87)-25c NEW wnri STATE DEPARTMENT OF ENVIRONMENTAL CONSEk-3'iON W
SPECIAL CONDITIONS
For Article
25 Tidal Wetlands
( )
7. Floats and ramps may not rest on vegetated tidal wetlands.
8. No permanent structures may be built on dock without first
obtaining Department approval.
9. Dock or timber catwalk shall not be greater than 4 feet in
width and be a minimum of 4 feet above grade* over vegetated
tidal wetlands (* distance is measured from ground to bottom
of dock sheathing) .
10. Docks may not extend laterally beyond property lines, be
placed so that docked boats extend over adjacent property
line, interfere with navigation, or interfere with other
landowners riparian rights.
Supplementary Special Conditions (A) thru (F) attached.
DEC PERMIT NUMBER
1-4738-00865/00001-0
FACILITY ID NUMBER PROGRAM NUMBER
Page 4 of 5
SOUTHOLD TRUSTEES
W o2lL{ .�
Issued Tad . CfEPL/NsKI Date���R�'
Address afte&R-6 4A,u a s e q �He Z. o
THIS NOTICE MUST BE DISPLAYED DURING CONSTRUCTION
-TOWN TRUSTEES OFFICE TOWN OF SOUTHOLD
SOUTHOLD, N.Y. 11971
TEL.: 765-1892
TRUSTEES SUPERVISOR
John M. Bredemeyer, III, President "�p� OG SCOTT L.HARRIS
Albert J. Krupski, Jr., Vice President
Henry R Smith z Town Hall
John B. Tuthill $ 53095 Main Road
William G. Albertson � P.O. Box 1179
Telephone (516) 765-1892 ®1 �a Southold, New York 11971
Fax (516) 765-1923 BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
S.E.Q.R.A.
NEGATIVE DECLARATION
NOTICE OF NO SIGNIFICANT EFFECT ON THE ENVIRONMENT
APPLICATION NO. 1000-89-3-9 & p/o 8. 1 Chapt. 97 - Wetlands
NAME: Barbara Cieplinski Chapt. 37 - Coastal Erosion
DATE: September 30, 1993
RESOLVED that pursuant to Article 8 of the Environmental Conservation
Law, State Environmental Quality Review and 6NYCRR Part 617,
Section 617.10 and Chapter 44 of the Code of the Town of Southold,
notice is hereby .given that the Southold Town Trustees, as Lead
Agency for the action described below, has determined that the
project will not have a significant effect on the environment.
Please take further notice that this declaration should not be
considered a determination made for any other department or agency
which may also have an application pending for the same or similar.
project.
TYPE OF ACTION: Type: II
DESCRIPTION OF ACTION: Applicant requests . permit to construct a
timber dock consisting of a 4' X 100' fixed elevated walkway (elev.
3 ' X 6" above grade of marsh) a 3 ' X 16' ramp and .a 6' X 20' float
secured by (2) 9" pilings. Located Orchard Lane, Southold.
LOCATION: SCTM #1000-98-3-9 & p/o 8.1
REASONS SUPPORTING THIS DETERMINATION:
1. An on site inspection has been conducted by the Board of
Trustees.
2. An environmental assessment, submitted by the applicant and
reviewed and completed by the Board of Trustees, has indicated that
no significant adverse effects to the environment are likely to occur
should the following mitigation measures be implemented.
cc: CAC
r
3
s section 24' landward and backfill scoured void area with
approximately 64 c.y. clean fill from approved source.
Bay Home Road, Southold
Vote of Council: Ayes: All
Motion carried.
i
j.
Moved by John Holzapfel, seconded by Bruce Loucka, it`'was
RESOLVED to recommend to the Southold Town Trustees APPROVAL
WITH STIPULATIONS of the Wetland Application of'- BARBARA
CIEPLINSKI 89-3-9 & p/o 8.1 construct a timber dock consisting of a
-.-4' x 100' fixed elevated (3'6" above grade of marsh) walkway; 3' x
16' ramp; 6' x 20' float secured by (2) 8" pilings.
The CAC recommends approval provided the project does not block
the navigation of adjacent neighbors and the walkway is elevated 4'
above grade of marsh.
Orchard Lane, Southold
. Vote of Council: Ayes: All
Motion carried.
Moved by Stephen Angell, seconded by Patricia Isaksen, it was
RESOLVED to TABLE the Wetland Application of CANDACE CORLETT
99-3-17.1 to construct a 41. x 8' fixed dock leading to a 3' x 10'
ramp leading to a 6' x 10' floating dock in a dredged canal.
Lagoon Lane, Mattituck.
Vote of Council: Ayes: All
Motion carried.
Moved by Bruce Loucka, seconded by John Holzapfel, it was
RESOLVED to recommend to the Southold Town Trustees APPROVAL
WITH A STIPULATION of the Wetland Application of JOYCE R.
ANDERSON 53-4-21 to extend existing southerly return by 101.
Construct new 20' northerly return. Replace tie-rods and deadmen in
existing bulkhead and backfill with 25+/- c.y. of clean sand fill to
be trucked in from upland source and delivered over owner's
property. Remove and replace an existing 4' x 8' stairway.
The Council recommends approval provided a 10' native vegetative
buffer be maintained.
2625 Bayshore Road, Greenport
Vote of Council: Ayes: All
Motion carried.
Moved by Stephen Angell, seconded by Robert Keith, it was
RESOLVED to recommend to the Southold Town Trustees APPROVAL
of the Wetland Application_ of MATT-A-MAR MARINA 114-3-1 to add
a green chain link fence to the existing retaining wall on south side
of property 5' in height, then runs inside property along Wickham
Avenue (east border) to north side.
Wickham Avenue, Mattituck
Vote of Council: Ayes: All
TRUSTEES. OS�FFO(� SUPERVISOR
John M. Bredemeyer, III, President ��, �'p SCOTT L. HARRIS
Albert J. Krupski, Jr., Vice President may' Gym
Henry P. Smith ti Town Hall
John B. Tuthill �y • 53095 Main Road
William G. Albertson P.O. Box 1179
Telephone (516) 765-1892 ,( Southold, New York 11971
Fax (516) 765-1823 BOARD OF TOWN TRUSTEES
TOWN OF SOUTHOLD
October 29, 1993
En-Consultants Inc.
1329 North Sea Road
Southampton NY 11968
Re: Barbara Cieplinski
SCTM #89-3-9 & p/o 8. 1
Dear Mr. Haje,
The following action was taken by the Board of Town Trustees
during its regular meeting held on October 29, 1993 regarding
the above matter:
WHEREAS, En-Consultants, Inc. , on behalf of BARBARA CIEPLINSKI
applied to the SoutholdTown Trustees for a permit under the
provisions of the Wetland Ordinance of the Town of Southold,
application dated September 10, 1993 and,
WHEREAS, said application was referred to the Southold Town
Conservation Advisory Council for their findings and
recommendations, and,
WHEREAS, a public hearing was held by the Town Trustees with
respect to said application on Thursday, October 28, 1993 at
which time all interested persons were given an opportunity to
be heard, and,
WHEREAS, the Board members have personally viewed and are
familiar with the premises in question and the surrounding area.,
and,
WHEREAS, the Board has considered all the testimony and
documentation submitted concerning this application, and,
WHEREAS, the Board has determined that the project as proposed
will not affect the health, safety and general welfare of the
people of the town,
NOW THEREFORE BE IT,
RESOLVED that the Board of Trustees approves the application of
BARBARA CIEPLINSKI to construct a timber dock consisting of a
4' X 100 ' fixed elevated ( 3 ' X 6" above grade of marsh) walkway;
a 3 ' X 16 ' ramp and a 6 ' X 20 ' float secured by (2) 9" pilings,
provided the project does not block the navigation of adjacent
neighbors and walkway is elevated 4' above grade of marsh.
Permit will expire two years from the date it is sighed. Fees
must be paid, if applicable, and permit issued within six
months of the date of this notification. Two inspections are
required and the Trustees are to be notified upon completion of
said project.
Permit will be issued upon payment of the following fees for
work to be done below Mean High Water Mark:
Fees:
Catwalk - 4' X 651: = 260' x $2 = $520
ramp - 31X161 = 481X $2 = $ 96
float - 6' X 20' = 120' X $2 = $240
$856 Due
V y truly yours,
John M. Bredemeyer III
President, Board of .Trustees
JMB/djh
CC. CAC
/oo
. p "do i
Zed V
ell
6 E .4 G �
�h , a
` 'r.T ti l3 l5B 1 ti ,ter
1 P. D R Y11 D s jb e, �f° "+a /7S' v ,6p
l a C o ��j \° o0
`2.r • - /es YAsfn� w o /s9 a tso $ ` 174
kA
17
r: O a �60 o y o 2 t y 7.7
Zed
AO
Z �
�7 e
if
/60
V
Ire
lee
00
6-0
.' �•QJ� bob� " � n �70 �� `�
ti
• oO
pq�
JA
Ira
ti R
�Q' � 41 •a O o ,
a 3
j h
66 i
s•
�46• 72 ^�
o� /✓
L 4 ��•, /tea ,� ,'- � L./�
a
a.
15. 144' F rl
o +
i o
J c + ,
+ _
A ti'd f°°'
�-H N a• 14
�I�/ 6@ ft• //Z
�4S 7- i r bo
9
O " `
Th
50 ..•ter" 1�� Iti I+1
4 4
99 b or t' 9z 1
. 1919
0 9�h 93
� � � Y APPRo IiEQ
FO1N//V A/ .5RO1/V/V