Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
52384-Z
hoAaof Soto/ Town of Southold * * P.O. Box 1179 53095 Main Rd ki Southold, New York 11971 CERTIFICATE OF OCCUPANCY No: 47008 Date: 04/29/2026 THIS CERTIFIES that the building BATTERY STORAGE Location of Property: 815 Rosenburiz Rd East Marion, NY 11939 Sec/Block/Lot: 21.4-2 5.1 Conforms substantially to the Application for Building Permit heretofore,filed in this office dated: 09/08/2025 Pursuant to which Building Permit No. 52384 and dated: 10/22/2025 Was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: Battery energy storage system to the exterior of an existing single-family .dwelling as applied for. The certificate is issued to: Maggi-Meg Reed ,Michael Schubert Of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL: ELECTRICAL CERTIFICATE: 114476 11/20/2025 PLUMBERS CERTIFICATION: Aut ed S gnature ofsaaTy° TOWN OF.SOUTHOLD BUILDING DEPARTMENT SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 52384 ` Date: 10/22/2025 Permission is hereby granted to: Maggi-Meg Reed 43 Sidney PI Brooklyn, NY 11201 To: Install a battery'energy storage system to the exterior of an existing single-family dwelling as applied for per manufacturers installation manual. Premises Located at: 815 Rosenburg Rd, East Marion, NY 11939 SCTM#21.4-25.1 Pursuant to application dated 09/08/2025 and approved by the Building Inspector. To expire on 10/22/2027. Contractors: Required Inspections: Fees: Battery Storage $100.00 CO-RESIDENTIAL $100.00 Total $200.00 Building Inspector �� ♦ 1�' 1� i' r NASSAU �.. . ELECTRICA'L NOV 21 2025 � " S U F F 0 L K INSPECTORS 159 Route 25A, Building 1 Suite B Miller Place, NY 11764 Telephone: 631 495 8136 - Fax: 631 509 4538 • E-Mail: Requests@SuffolkBEI.com CERTIFICATE OF ELECTRICAL COMPLIANCE Applicant: Element Energy LLC Certificate No.: 114476 Rough In Inspection Date: Final Inspection Date: Nov 20,2025 I Application No.: 9674946203[ Building Permit No.: 52384 County Tax Map No.: 1000 021.00 01.00 025.001 LIPA Solar App No.: PAM-2025-391966, �. I This Certificate of Electrical Compliance is limited to the inspection and compliance of electrical equipment and/or work described below, installed on behalf of the applicant named above, located at the premise of and not after the final inspection date above: Owner: MAGGI-MEG REED I Site Location: 815 FIRE ROAD, EAST MARION, NY 11939 I Owner's Address(if different): Qx Residential FlIndoor Basement Service Shed ❑Commercial x❑Outdoor ❑First Floor ❑Pool Hottub ! I New ❑Renovation Second Floor ❑Attic/3rd Floor Garage Addition Survey PV Solar ❑Generator Conversion ❑Signs �x Battery Storage Other: INVENTORY i Single Phase Heat Duplex Recpt Ceiling Fixture Dual Func Breaker Three Phase Hot Water GFCI Recpt� Wall Fixture Smoke Main Panel AC Cond Single Recpt Recessed Fixture CO Detect Sub Panel AC Blower Range Recpt� LED Lighting Smoke CO Combo Transformer Appliance CktO Dryer Recpt� Emergency Time Clock PI Disconnect�l Switches Twist Lock Exit Fixtures Pumps GFCI Breaker Heat Pump Electric Heat Pool Luminaire0 Exhaust Fan Other Equipment:Battery System Size:10 kWh Qty:1 Desc:Enphase IQ Battery 10C The electrical work and/or equipment described above were inspected and was found to be in compliance with local, state and national electrical code requirements and this office. i Applicant: Element Energy LLC License No.: 52689-ME Date Printed: Nov 20, 2025 Inspected I Signature: pF SOUTyOIo # TOWN OF SOUTHOLD BUILDING DEPT. 631-765-1802 sv3�� INSPECTION [ ] FOUNDATION 1 ST/ REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] SULATION/CAULKING [ ] FRAMING /STRAPPING [ FINAL���GI' lq�'�'rQ0 [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: W4 (2,, aK) DATE INSPECTOR FIELD INSPECTION REPORT DATE COMMENTS FOUNDATION (1ST) H ------------------------------------ W C FOUNDATION (2ND) � U� o H ROUGH FRAMING& PLUMBING S'H � r INSULATION PER N.Y. y STATE ENERGY CODE `f l � 17 FINAL CD ADDITIONAL COMMENTS J $ Z 5 2PA O t� zi 2� cke o n _ z �;cl rn A O ►moo � o � z } x H - x d r� b H TOWN OF SOUTIHOLD - BUILDin,"C DEPARTMENT To yrHa,H Annex 54375 Main Road P. 0. Box 1179 Southold. NY 1 1 97 1-0959 -,, Teie done ('63)1) 765-180-2 Fax (631) 765-9502 -o,n Date Received APPLICATION FOR BUILDING PERMIT E C E For Office Use Onty PERMIT INO. Building inspector:_ S E P 8 2025 j f Applications and forms must be filled cut in their entirety incomplete acipficaticris will not be accepted. Where he Applicant,is r�vt t�he Building Department vwneF,an Totyn of Southold Tow-rn,fPzge 2�shall be cc mpleted. Date: 9 /111cw"s owm-H�5)OF-PRfOPERT—ya- ame: SUM#100()- 0a 00 -61 00 Project Address: Phone#: Email: Mailing Address: CONTACT PEM111 is - Name: Lo Mailing Address: -7, 4 av Y,-.) q Phone#: -392 1-70LJ Email,- Name: Mailing Address: Phone#: Ern H. CONTRACTOR MFOWATW?k Name: Y-,q Ll Mailing Address: 4V � b avyJ )MA,44 Ema Phone#: 2) DESCRIPM,ON OF PROPOSED CONSTR.UCT�1,0N, E]Neyv Structure ElAddition DAlteration epair ElDernolition Estimat-4 Cost:of Project. ther 1 1 v $ t Will the lot be re-graded? E]Yes;gNo Will excess fill be removed from premises? E]Yes)010 PROPERTY INFORMATION Existing use of property: Rom_ Intended use of property: �La� Zone or edistrict in which premises is situated: Are there any covenQntsand restrictions with respect to this property? El!es IF YES, PROVIDE A COPY. Check Box After Reading: The owner/contractor/design professional Is responsible for all drainage and storm water issues as provided by Chapter Z36 of the Town Code.APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold,Suffolk,County,New York and other applicable Laws,Ordinances or Regulations,for the construction of buildings, additions,alterations orfor removal or demolition as herein described.The applicant agrees to comply with all applicable laws,ordinances,building code, housing code and regulations and to admit authorized inspectors on premises and in building(s)for necessary inspections.False statements made herein are punishable as a Class A misdemeanor pursuant to Section WAS of the New York State Penal taw. Application Submitted By(print e):Lorraine DiPenta @Authorized Agent ❑Owner Signature of Applicant: `,f Date: STATE OF NEW YORK) SS: COUNTY OF Suffolk ) Lorraine Di Penta being duly sworn, deposes and says that(s)he is the applicant (Name of individual signing contract)above named, (S)he is the Contractor (Contractor,Agent,Corporate Officer,etc.) of said owner or owners,and is duly authorized to perform or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and belief;and that the work will be performed in the manner set forth in the application file therewith. Sworn before me this 3 day of �-r- �� ,20 7-5 Npgry Public PROPERTY OWNER AUTHORIZATION (Where the applicant is not the owner) I; �'-'� ► r..�'1�1-�� J�-�1 -� residing atUC 5 uscnbe� Ca,5� m Ali on `'/e l l ado hereby authorize '�r�1`i�� �11'c/1- -�/ E 1tmC�lk �n(�`Jtb apply on 1 my beh the Town of Southold Building Department for approval as described h rein. X � � Z�z Owner's Signature LOU19 J ROhffle Notary Public,State of New York No.01 R06314813 Qualified in Suffolk County Print Owner's Name Commission Expires November 17i 20,, 2 Town of Southold August 28th, 2025 Building Department Town Hall Annex ' 54375 Main Road P.O. Box 1179 Southold, New York 11971-0959 Subject: Battery Energy Storage System at the Schubert Residence. 815 Rosenburg Rd. East Marion. NY 11939 To Town of Southold: I hereby affirm that, following a comprehensive professional evaluation, the plans for the installation of the Battery Energy Storage System (BESS) complies with the 2020 Residential Code of New York State, the 2020 Building Code of New York State, the 2020 Fire Code of New York State, the 2017 National Electric Code, ASCE 7-16, and other relevant industry standards and regulations. This certification is provided in strict adherence to the governing regulations and standards applicable to such installations. The locations and connections detailed in the submitted plans have undergone thorough scrutiny and are confirmed to align with the requisite codes and standards. The proposed BESS, utilizing Lithium Iron Phosphate technology, adheres to UL9540A standards, ensuring it does not exhibit thermal runaway. In my professional opinion, derived from the site inspection and detailed analysis, the proposed BESS and the accompanying enclosure system demonstrate structural adequacy to withstand the reactions associated with the BESS. Please contact me if you have any questions or comments about the above. Sincerely, Gennaro Anthony Giustra. P.E. OF NEw�� o A Great Eastern Services, Inc. * PO Box 240 ;IZ3A 1c, 24 Harvey Rd i z Riverhead, NY 11901 703446 Mobile: 631.235.0189 A�ofiEss►oNP�' Email: jerrygiustra@gmail.com - ENPHASE. NORTH AMERICA IQ Battery 10C The IQ Battery 1OC all-in-one AC-coupled system is compact,powerful, reliable,and safe.It has a total usable capacity'of 10.0 kWh and includes , i four embedded,grid-forming microinverters with a 7.08 kVA continuous power rating.It provides backup capability,and installers can quickly PHASE design the right system size to meet the customer's needs. Key,specifications • • ® Powerful Rated(continuous)output power 7.08 kVA' Rated output current(@240 VL_LAC-) 29.5 A' Provides 56 A peak current for three seconds Rated neutral current(@120 VL-M AC-) 24 A' Includes four embedded IQBB Microinverters Interconnection Single-phase Most powerful microinverter with Nominal voltage 120/240 VAC- up to 2.1 kVA continuous power Nominal frequency 60 Hz C✓ Reliable Usable capacity 10.0 kWh' Cools passively with no moving Ambient operating temperature range -20'C to 50°C(-4°F to 122°F) parts or fans (charging)' Non-condensing Uses wired communication for fast and consistent connection Ambient operating temperature range -20•C to 55•C(-4•F to 131•F) Updates software and firmware (discharging)' Non-condensing remotely Chemistry Lithium iron phosphate(LFP) p Simple Wall-mount or pedestal-mount(sold Mounting Fully integrated AC Battery system separately) with neutral forming capabilities • Installs and commissions easily Product dimensions F_� Offers homeowners remote monitoring and control from the �. Enphase App • Field replaceable components - h 24.5" Safe I Evaluated to UL 9540A,the highest 2228 14.4" __ industry standard for battery safety 4' Uses LFP chemistry for maximum safety and longevity The 4"clearances on the sides and the top are per the UL 9540A evaluation,Enphase recommends 8"for ease of service. ••Follow the local and national regulations while planning.A 15"clearance in the front is recommended for ease of service. 'Refer to the following page for more details. ©2025 Enphase Energy.All rights reserved.Enphase,the a and CC logos,la and certain other marks listed at DSH-00565-6.0-EN-2025-07-31 httos://enohase.com/trademark-usage-guidelines are trademarks of Enphase Energy,Inc.in the U.S.and other countries.Data subject to change. fPIroduct details IQBATTERV-10C-1P-NA Name IQ Battery 10C The IQ Battery 10C system with integrated IQ Microinverters(SKU:IQBBL,IQBBN) with a battery management system(BMS)as part of IQBL Microinverters,includes: Description Two 5 kWh battery units(ordering SKU:B05-001-US00-1-3-DOM). One IQ Battery 10CS cover kit with cover,interconnect cables and accessories(Ordering SKU:B10CS-NC-0708-0-DOM). Model Number IQBATTERY-10C-1P-NA2 Ordering SKU Standard Domestic 5 kWh battery unit 805-001-US00-1-3 B05-COI-US00-1-3-DOM IQ Battery 10C cover kit B10C-NC-0708-0 B10C-NC-0708-0-DOM Limited warranty IQ Battery 10C unit 60%capacity,up to 15 years,or 6,000 cycles" • •• Rated(continuous)output power 7.08 kVAS Nominal voltage/range 240/211-264 VAC- Nominal frequency/range 60/57-63 Hz Rated output current(@240 VL-LAC-) 29.5 A Rated neutral current(@240 VIL-NAC-) 24 A Peak output current(@240 VIL-LAC-) 56 A(three seconds),44.8 A(ten seconds) Power Start capability Up to 90 A LRA7 Power factor(adjustable) 0.85 leading...0.85 lagging Maximum conductor size supported 3 AWG 40 A OCPD,requires a minimum of 8 AWG for one IQ Battery 10C Overcurrent protection device(OCPD) or 80 A OCPD,requires a minimum of 4 AWG for two or more IQ Battery 1008 Interconnection Single-phase AC round-trip efficiency9 90% Total capacity70 10.0 kWh Usable capacity" 10.0 kWh DC round-trip efficiency 96% Nominal DC voltage 76.8 V Maximum DC voltage 86.4 V 'The model number is used on the product nameplate,Certificate of Compliance,and in official regulatory listings(e.g.,California Energy Commission).For all interconnection applications and permitting processes,please ensure that the model number is used—not the ordering SKU. Whichever occurs first.Restrictions apply. 4 Supported in both grid-connected and backup/off-grid operations. =7.08 WA,29.5 A for the balanced 240 VL-L loads. °A maximum of 24 A,120 Vt N unbalanced loads can be supported along with 5.5 A,240 V�L loads. 'Power Start capability may vary. °More than two IQ Battery 10C on a 4 AWG circuit protected by 80 A OCPD requires setting Power Control System:IQ Battery Oversubscription. 'AC to the battery to AC at 50%power rating. 10 The IQ Battery IOC is typically shipped with a state of charge(SoC)between 20%and 30%to ensure safe transportation and optimal battery health during storage and handling. "The battery's usable capacity supports loads and turns PV on(when off-grid),in normal daily operation.The usable capacity includes a safety-critical limit of 2%that safeguards the customer's asset in case of a long-duration grid outage.An additional 3%capacity is maintained for battery electronic sustenance at night.Refer to https://link.enphase.com/igbattery_usable-capacity-en-na for more Information. DSH-00565-6.0-EN-2025-07-31 Ambient operating temperature range -20°C to 50°C(-4°F to 122°F) (charging)12 non-condensing Ambient operating temperature range -20°C to 55°C(-4°F to 131°F) (discharging)13 non-condensing Optimum operating temperature range 0°C to 30°C(32°F to 86°F)14 Chemistry Lithium iron phosphate(LFP) Mechanical data Dimensions(H x W x D) 621 mm x 708 mm x 365 mm(24.5 in x 28 in x 14.4 in) Maximum lifting weight 57 kg(125 lb) Total installed weight for 144 kg(317 lb) Enclosure Outdoor-NEMA 3R Cooling Natural convection Altitude15 Up to 3,000 meters(9,842 feet) Mounting Wall-mount or pedestal-mount(sold separately) Features and compliance Compatibility Compatible with IQ and M Series Microinverters,IQ Meter Collar,IQ Combiner 6C, and IQ Gateway for grid-tied and backup operations. Communication Wired control communication Services Backup,Self-Consumption,TOU,and NEM integrity Monitoring Enphase Installer Platform and Enphase App monitoring options;API integration CA Rule 21(UL 1741-SA),IEEE 1547:2018(UL 1741-SB,3rd Ed.)CAN/CSA C22.2 No. 107.1-16 Compliance UL 954076,UL 9540AT7,UN 38.3,UL 1998,UL 991,NEMA Type 3R,AC156 EMI:47 CFR, Part 15,Class B,ICES 003 Cell module:UL 1973,UN 38.3 Inverters:UL 62109-1,IEC 62109-2 What's in the box There are a total of three boxes;two boxes contain the 5.0 kWh battery units,and the third box contains the IQ Battery 10C cover kit. 5.0 kWh battery unit Battery units Two 5.0 kWh battery units of IQ Battery 10C Mounting bracket Two mounting brackets for mounting the batteries on the wall Seismic screws Four seismic screws for securing the battery unit on the mounting bracket Twelve M8 hexagonal Phillips screws with washers for mounting the second wall Mounting bracket fasteners bracket on the preinstalled battery unit Drill template Two drill templates to mark drilling points and conduit entry locations on the wall 10 Battery 10C cover kit "A reduction in charging power occurs at temperatures below 15°C and above 45°C. A reduction in discharging power occurs at temperatures below 0°C and above 50°C. Keeping the battery in this temperature range maximizes the battery life. "Refer to the data sheet for all components used with the IQ Battery IOC to determine the maximum altitude.For example,the IQ Battery 10C has a maximum altitude limit of 3,000 meters,while the IQ Meter Collar has a limit of 2,500 meters.When used together,the maximum altitude Is restricted to 2,500 meters. 1B Following local standards,choose a non-habitable Indoor location(like a 2-car garage)or an outdoor location where the ambient temperature and humidity are within-20°C to 55°C(-4°F to 131°F) and 5%to 95%RH,non-condensing.Avoid direct sunlight to ensure the temperature stays in the optimal operating range.This ensures charging and discharging currents are not de-rated due to temperature. "Evaluated to UL 9540A for thermal runaway fire propagation and reduced separation distance as required in 2021 IRC R328.3.1,2021 IFC 1207.1.5,and 2023 NFPA 85515.3.1 and 9.1.5.Follow all Installation instructions and local codes and requirements of the Authority Having Jurisdiction(AHJ)when installing the Enphase Energy System. DS H-00565-6.0-EN-2025-07-31 in;the,box Cover One cover for IQ Battery 10C One interconnect power cable assembly for internally connecting two battery units Interconnect power cable of IQ Battery 10C One interconnect control cable assembly for internally connecting two battery units Interconnect control cable of IQ Battery 10C,having one preinstalled control connector(without resistor)at one end Control connector with resistor One spare control connector with resistor for control wiring Raceway adapter Two raceway adapters for routing cables internally between two battery units Cable holder Two cable holders for cable management in wiring compartments Conduit covers One left-side and one right-side conduit cover to close unused conduit openings Cover locking screw Four cover lockings screws for securing the covers. Quick install.guide(QIG) QIG for IQ Battery unit installation instructions Optional accessories and replacementparts IQBBL-RMA IQBBL Microinverter for field replacement IQBBN-RMA 108BN Microinverter for field replacement B05-COI-US00-1-3-RMA IQ Battery 10C 5.0 kWh battery unit for field replacement B10C-CX-0709-0 IQ Battery 10C cover for field replacement B05C-WB-0662-0 IQ Battery 10C wall bracket for field replacement B10C-PI-0550-0 IQ Battery 10C Pedestal Mount B05C-LH-0180-0 IQ Battery 10C Lifting Handles.Includes one left-side and one right-side lifting handle B05C-ACFB-0138-0 IQ Battery 10C AC filter board for field replacement B05C-NCANB-068-0 IQ Battery 10C control communication board for field replacement B05C-CS-0161-0 IQ Battery 10C control switch for field replacement B05C-NLTB-051-0 IQ Battery 10C live and neutral terminal block for field replacement B05C-NGTB-051-0 IQ Battery 10C ground terminal block for field replacement B05C-NJTB-027-0 IQ Battery 10C jumper for the terminal block for field replacement B05C-NETB-049-0 IQ Battery 10C end stop and end cap of terminal block for field replacement B10C-PIC-0350-0 IQ Battery 10C Interconnect power cable for field replacement B10C-CIC-0300-0 IQ Battery 10C Interconnect control cable for field replacement B05C-CP-031-0 IQ Battery 10C conduit plug(large)for field replacement B05C-CP-026-0 IQ Battery 10C conduit plug(small)for field replacement B05C-CH-0132-0 IQ Battery 10C cable holder for field replacement B10C-RA-050-0 IQ Battery 10C raceway adapter for field replacement B05C-CC-090-0 IQ Battery 10C conduit cover for field replacement B05C-WC-0620-0 IQ Battery 10C wiring cover for field replacement B05C-CAT-0100-0 IQ Battery 10C internal cables to connect AC filter board and terminal blocks DSH-00565-6.0-EN-2025-07-31 Components of the Enphase Energy System ----- IQ Microinverters IQ Combiner 6C IQ Series Microinverters pack IQ Combiner 6C consolidates more power into less space interconnection equipment into a than other rooftop solar systems single enclosure and streamlines and make rooftop solar more IQ Series Microinverters and productive,reliable,smart,and IQ Battery 10C installation safe. by providing a consistent,pre- wired solution for residential applications. IQ Meter Collar IQ Battery 10C accessories IQ Meter Collar enables full home q IQ Battery 10C Lifting Handles backup with IQ Battery 10C, are reusable and ease o Enphase PV,and IQ Combiner 6C. . , the installation process.The -� - IQ Battery 10C Pedestal Mount enables floor mounting of the IQ Battery 10C. DSN-00565-6.0-EN-2025-07-31 Revision history Revision Date Description DSH-00565-6.0 July 2025 Added the domestic SKUs. DSH-00565-5.0 July 2025 Updated the description of the"Product details"section. Added a note to the total capacity in the"Battery"section. Updated the peak current. Updated the discharging power temperature range. Added the footnote in the altitude data. DSH-00565-4.0 May 2025 Two additional SKUs were added to"Optional accessories and replacement parts." Updated the clearance dimensions from 6"to 4"in the product dimensions image. DSH-00565-3.0 March 2025 Editorial updates. DSH-00565-2.0 February 2025 Updated the specifications for order code details. DSH-00565-1.0 November 2024 Preliminary release. DSH-00565-6.0-EN-2025-07-31 [7 DE51GN t DRAFTING BY: SCOPE OF WORK ELEMENT ENERGYLLC TO INSTALL A 10 kWh BATTERY ENERGY STORAGE SYSTEM AT SCHUBERT RESIDENCE, REVIEW BY J.M.NABCEP CERTIFIE 051112-129 LOCATED AT 815 ROSENBERG RD, EAST MARION, NY I 1939. THIS BATTERY ENERGY STORAGE SYSTEM WILL BE INTERCONNECTED WITH THE UTILITY GRID THROUGH THE EXISTING ELECTRICAL SERVICE EQUIPMENT. _ REVISIONS DE5GRIFTION DATE 'REV ORIGINAL 05-22-2025 SYSTEM RATING I O kWh 7rmnan's 0 e Beach,\. _ EQUIPMENT SUMMARY = Orient I UNIT OF ENPHASE IQ BATTERY I OC I OkWh BATTERY ENERGY STORAGE East Marion , S h E ET INDEX CONTRACTOR 25 . PV-I COVER Inlet Pond l- Long Beach ELEMENT ENERGY, LLC. Pv-2 SITE PLAN ecurtyPark 0 y> earu9ncno�5� 7470 SOUND AVE PV-3 FLOOR PLAN MATTITUCK, NY 1195 PV-4.1-4.2 ELECTRICAL DIAGRAM PROJECT LOCATION LICENSE# G74G I-HI LICENSE # 52G89-ME GOVERNING CODES X, OF NEw1- 2017 NATIONAL ELECTRICAL CODE. `Q� 0 A sOO,� * i1 2020 RESIDENTIAL CODE OF NEW YORK STATE. 2020 BUILDING CODE OF NEW YORK STATE. n w 2020 FIRE CODE OF NEW YORK STATE. tir i Z ASCE 7-1 G AND NFPA-70. M UNDERWRITERS LABORATORIES(UL)STANDARDS �O 103443 <G� OSHA 29 CFR 1 910.2G9 AROFESSIONP GENERAL NOTES PROJECT NAME 1. CONTRACTOR SHALL CHECK AND VERIFY ALL CONDITIONS AT m THE SITE PRIOR TO STARTING TO WORK AND SHALL FAMILIARIZE w m HIMSELF WITH THE INTENT OF THESE PLANS AND MAKE WORK z C AGREE THE SAME. AERIAL VIEW Lu _ 2. CONTRACTOR OR OWNER SHALL OBTAIN ALL REQUIRED — C) APPROVALS, PERMITS, CERTIFICATES OF OCCUPANCY, 10. CONTRACTOR TO EFFECT AND MAINTAIN INSURANCE, I.E. TOWN :COM M ENT5 AND APPROVAL STAMP w ED z INSPECTION APPROVALS, ETC., FOR WORK PERFORMED FROM m z CONTRACTORS LIABILITY, WORKMAN'S COMPENSATION, - w z AGENCIES HAVING JURISDICTION THEREOF, IF REQUIRED. COMPLETED OPERATION, ETC. ADEQUATE FOR THE PURPOSES APPROVED AS NOTED 0) 0 3. ALL WORK SHALL CONFORM TO CONSTRUCTION CODE AND w O Cz ALL RULES AND REGULATIONS OF THE RESPONSIBLE OF TH15 PROJECT AND FURNISH PROOF OF SAME PRIOR TO COMPLY WITH ALL CODES OF cz Q COMMENCING WITH WORK. 2 JURISDICTION. NEW YORK STATE&TOWN CODES . D as a5B.R# a = 4. IF IN THE COURSE OF CONSTRUCTION A CONDITION EXISTS I I . EACH SUBCONTRACTOR SHALL BE RESPONSIBLE FOR DA �- MAINTAINING SAFETY ON THE JOB SITE DURING THE AS REQ IRED AND CONDITIONS OF a3 Q WHICH DISAGREES WITH THAT AS INDICATED ON THESE PLANS, CONSTRUCTION PHASE TO COMPLY WITH THE REGULATIONS FE oo'oo BY: w THE CONTRACTOR SHALL STOP WORK AND NOTIFY THE -SOUtHOLOTOiNNZB ENGINEER. SHOULD HE FAIL TO FOLLOW THIS PROCEDURE AND AND REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND1� pp�, NOTIFYBUtLDINGDEPARTMENTAT CONTINUE WITH THE WORK, H SHALL A55UME ALL HEALTH ADMINISTRATION. THIS SHALL INCLUDE, BUT ARE NOT �1JUI�M1IIYIUY11�11AMYIN�WIif1{f LIMITED TO: PROVIDING FOR ADEQUATE AND PROPER BRACING, �Nrt �''M 631-765-18028AMTO4PM FOR THE RESPONSIBILITY AND LIABILITY EREA-3G SAFETY RAILINGS AND SECURE FOOTINGS FOR ALL TEMPORARY ' + , FOLLOWING INSPECTIONS: FABRICATED AND INSTALLED A5 P LATEST ST A.1.5.0 SKEET NAME 5. ALL STRUCTURAL STEEL SHALL E AND SHALL BE SCAFFOLDING, STAIRS, ETC.. AS WELL AS PERMANENT COVER CONSTRUCTION. FOUNDATION-TWO REQUIRED SPECIFICATIONS.G. ALL ELECTRICAL WORK SHALL BE BARD Of f IRE1 2. FIGURED DIMENSIONS SHALL GOVERN. DO NOT SCALE + FOR POURED CONCRETE G. ALL ELECTRICAL WORK SHALL BE OF FIRE DRAWINGS, WHERE DIMENSIONS ARE ESTABLISHED BY EXISTING - . UNDERWRITERS APPROVED AND IN ACCORDANCE WITH N.E.C. t- CONDITIONS. EACH CONTRACTOR SHALL VERIFY EXISTING 7. CODES REGULATIONS ROUGH-FRAMING&PLUMBING CONDITIONS PRIOR TO ORDERING MATERIALS AND INSULATION ANY DEVIATION FROM THESE PLANS WITH THE WRITTEN COMMENCING WITH WORK. ELECTRICAL DRAw11dG SCALE CONSENT OF THE ENGINEER WILL NEGATE THE ENGINEERS 13. CONTRACTOR TO REMOVE ALL DEBRIS CREATED BY THIS FINAL-CONSTRUCTION MUST CERTIFICATION OF THESE PLANS. K FROM THE SITE AND DISPOSE OF IN A LEGAL MANNER ON INSPECTION REQUIRED BE FORC-O. (5. THESE DRAWINGS AS INSTRUCMENTS OF SERVICE ARE AND WORK, N ,T,5. SHALL REMAIN THE PROPERTY OF THE ENGINEER WHETHER THE A WEEKLY BASIS OR SOONER IF CONDITIONS WARRANT. PROJECT FOR WHICH THEY ARE MADE IS EXECUTED OR NOT. 14. AT THE COMPLETION OF WORK, THE SITE TO BE CLEARED Addf onal ALL CONSTRUCTION SHALL MEET THE THEY ARE NOT TO BE USED ON ANY OTHER PROJECTS OR OF ALL DEBRIS AND EXCESS MATERIALS. THE FACILITY IS TO BE REQUIREMENTS OF THE CODES OF NEW LEFT BROOM CLEAN AND WORK IS TO BE COMPLETED TO THE Cer ffication YORK STATE NOT RESPONSIBLE FOR EXTENSIONS TO THIS PROJECT SHEET NUMBER 5. CONTRACTOR SHALL PROTECT, PATCH AND REPAIR ALL TOTAL SATISFACTION OF THE OWNER PRIOR TO RELEASE OF v _ DESIGN OR CONSTRUCTION ERRORS FINAL PAYMENT. Marl_ $e Retj>triY'�d. p\ /_ I EXISTING WORK ADJACENT TO HIS WORK, OR DAMAGED AS I V RESULT OF HIS WORK. —— -- —_ — --- TAX MAP: 1 000-02 1 .00-01 .00-025.001 LEGEND DESIGN d DRAFTING BY: ®o EASTING UTILITY METER MAIN SERVICE PANEL MENT ENERGY LLC NEW PV SUB-PANELS REVIEW BY05.I N2BC29 CERTIFIE A/C DISCONNECT COMBINER INVERTERS GND ELECTRODE REVISIONS DE5CRIPTION DATE REV PV MODULE ORIGINAL 05-22-2025 RACKING RAIL o ATTACHMENT POINT ---RAFTERS ♦ROOF PITCH ANGLE (E) MAIN SERVICE PANEL 59SUNRUN METER (N) BATTERY BACK—UP LOAD PANEL ®VENT OPLUMBING VENT MAIN HOUSE ®SKY LIGHT EXISTING PV PANEL TYP. CONTRACTOR ®CHIMNEY ®COMPOSITE SHINGLES ELEMENT ENERGY; LLC. GOOD CONDITION POTENTIAL SHADING ISSUES 7470 SOUND AVE ❑TRIM/REMOVE AS NECESSARY MATTITUCr,, NY 1 1 95 LICENSE# G74G I-HI LICENSE # 52G89-ME HIEEEF pF NFty Y O LU r ' I f� I LU 11 d L Z N 70344 J 40'� ARoss%o�'P� PV/BESS DISCONNECT (NEC690, NEC706) [NE PROJECT NAME L�L U �Lu � L LL LL.I W z O Lu O cQc I G Q ILJ SHEET NAME N SITE PLAN o° 1 ° DRAWING SCALE p g0 CONSTRUCTION NOTES �2'►0°4 120° 3/32" = I '-0" ° °� A5g° 1 .) ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE 2A� AST MANUFACTURER5 INSTALLATION INSTRUCTIONS. S 5HEET NUMBER R 2.) ALL OUTDOOR EQUIPMENT SHALL BE RAINTIGHT WITH MINIMUM NEMA 3 RATING. p\ /_ 3.)ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION. I V 4.) THE BATTERY ENERGY STORAGE UNIT SHALL BE MOUNTED ON THE NORTH SIDE OUTSIDE WALL. TAX MAP: 1 000-02 1 .00-0 1 .00-025.00 I .I .CONSTRUCTION SUMMARY CONSTRUCTION NOTES LEGEND DE51GNtDKAF7ING5Y: (1) UNIT OF ENPHASE IQ BATTERY 10C 1 OKWH BATTERY 1.) ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. MAIN UTILITY METER ELEMENT ENERGY LLC MAIN SERVICE PANEL REVIEW BY J.M.NABCEF CERTIFIE ENERGY STORAGE UNIT ON THE OUTSIDE WALL 2.) ALL OUTDOOR EQUIPMENT SHALL BE RAIN—TIGHT WITH MINIMUM NEMA 3R RATING. NEW PV SUB-PANELS 051 1 1 2-1 29 (DIMENSIONS: 24.5" X 28" X 14.4") 3.) ALL LOCATIONS ARE APPROXIMATE AND REQUIRE FIELD VERIFICATION. A/C DISCONNECT 4.) THE LOCATION OF BESS SYSTEM IS COMPLIANT WITH THE SECTION R327 OF THE INTERNATIONAL RESIDENTIAL CODE, AS AMENDED BY THE INVERTERS NEW YORK STATE UNIFORM CODE. CND ELECTRODE REVISIONS 5.) THE BESS IS NOT INSTALLED IN A LOCATION SUBJECT TO VEHICLE DAMAGE. MNPV MODULE oescwPrloN DATE Rev 6.) MINIMUM REQUIRED CLEARANCE FOR THE BATTERY UNIT IS 6" AS IT IS UL9540A COMPLIANT. —RACKING RAIL ORIGINAL 06-22-2025 7.) BATTERY SHALL BE LOCATED AT LEAST 3 FT AWAY FROM ALL DOORS AND WINDOWS INTO DWELLING. 8.) ALL EQUIPMENT SHOULD BE A MINIMUM OF 3 FT FROM GAS METER. o ATTACHMENT POINT ---RAFTERS ROOF PITCH ANGLE SUNRUN METER ®VENT 0PLUMBING VENT ®SKY LIGHT CONTRACTOR ®CHIMNEY ®COMPOSITE SHINGLES ELEMENT ENERGY, LLC. GOOD CONDITION 7470 SOUND AVE ❑POTENTIAL SHADING ISSUES TRIM/REMOVE AS NECESSARY MATTITUCK, NY 1 195 LICENSE# G74G I-HI LICENSE # 52G89-ME OF NEW P PROA DLO • • s i -MIN. 6' m w 6" MIN.- Z 70344 3'- A�OFESSIONP� D6" MIN.------ 6" MIN. PROJECT NAME co -MIN. 6" U c Zcz — Lu 6" MIN._ Lu } � CD Z F w0 — Li� / Q In � W 5HEETNAME BESS FLOOR PLAN DRAWING 5CALE [BESS EQUIPMENT PLAN - TOP VIEW] [WALL-MOUNT PLAN FOR BESS] 3/ 1 611 = 1 '—O'I 5HEET NUMBER PV-3 TAX MAP: 1 000-02 1 .00-01 .00-025.001 GENERAL NOTES (N) (1) ENPHASE IQ COMBINER 6C WITH ENPHASE IQ GATEWAY TO UTILITY GRID DE51GN 4 DRAFTING BY: 1.) THE BESS PROVIDES MONITORING AND BALANCING CELL o (N) PV 20A/2P (2) 20A & (1) 40A / 240VAC CIRCUIT BREAKERS, 125 RATED ELEMENT ENERGY LLC VOLTAGES, CURRENTS, °o �� (N) BESS 4OA/2P REVIEW BY J.M.NABCEP CERTIFIE AND TEMPERATURES WITHIN THE MANUFACTURER'S ° 1 N 051 1 1 2-1 29 SPECIFICATION THROUGH WEB AND MOBILE APPLICATIONS. 0 BI—DIRECTIONAL UTILI2. THE BESS SYSTEM SHALL TRANSMIT AN ALARM SIGNAL (N) PV 20A/2P / O o PSEG MET9674912157 ) PSEG ACCT/9674946203 VIA MOBILE PORTAL IF POTENTIALLY HAZARDOUS 1-PHASE, 240 V REVISIONS TEMPERATURES OR OTHER CONDITIONS SUCH AS SHORT t N DE5CRIFMON DATE REV CIRCUITS, OVER VOLTAGE OR UNDER VOLTAGE ARE DETECTED. (E) AC DISCONNECT POINT OF INTERCONNECTION ORIGINAL oa-zz-zozs 3.) CONDUIT AND CONDUCTORS SPECIFICATIONS ARE BASED ° SO D D222NRB �Cj j of ua��DUCTORS "1 240 VAC,EO A SHALL NOT EXCEED 10 FT ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO NEMA 3k UL LISTED LIMIT UP—SIZING AS REQUIRED BY FIELD CONDITIONS. (E)(2)40"R)SES 1 N 40 A 1 1 (E) MAIN SERVICE (N) PRE-INSTALLED 60A/2P IS CONNECT 0 240 V, 200 A N N LOAD r ---- a -- ---, CONTROLLER BACKFEED 1 N ; s s j CONTRACTOR LUG D O O 0 i i 1 ELEMENT ENERGY, LLC. O I r________ �I 7470 SOUND AVE I 1 N (N) (1) ENPHASE IQ METER COLLAR I 1 1 (E) MAIN SERVICE PANEL IMATTITUCK, NY 1195 IN FORM 2S METER PAN I LICENSE # G74G I -HI I IQ GATEWAY i i 1-P vac W LICENSE # 52G89-ME j I N 200 A PV1 PV2 PV3 PV4 BAT1 BAT2 EVC i 4 i c I OF NFW LI LI LI LI LI FL lu LI 01 AG L------------------- c,� h. I 1 j I m w I z 2 3 I I EXISTING GROUNDING O 70344'5 � !G� E) SOLAR ARRAY ON MAIN HOUSE 10.54 kWDC I 1 1 ELECTRODE SYSTEM AROFESSIONP�' 31) EXISTING PV PANELS, QCELL Q.PEAK DUO BLK-G6+ 340W I I - STRING #1 I I I I 1 1 (N) MAIN PROJECT NAME 1 1 j I DISCONNECT - - • • • = i I (N) PV OA/2P TO HOUSE 240Vu60 A Lu m ------------------- - CL/ 1-PH, 3-W LLJ U — 240 VAC, 60A OR BETTER �_ 02 I I I N (N) BESS Lu ED E Z ENPHASE BRANCH I I I G i BACK-UP LOAD CIRCUIT CABLE TYPICAL I (N) 1OkWh BATTERY ENERGY STORAGE SYSTEM I I PANEL W Z STRING #21 (1) ENPHASE IQ BATTERY 10C UNIT I I I �2 n Q ---------------------------- --------- ---------J z Ln I � � Q LLI MICRO-INVERTER ENPHASE IQ7-6D-2-US 240 VAC, 1.0 A 97X CEC-WEIGHTED EFF. NEW 6. UL LISTED 5HEET NAME ELECTRICAL NOTES TYPICAL 1.) ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL, AND LABELED FOR ITS APPLICATION. ELECTRICAL DIAGRAM 2.) ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600 V AND 90'C WET ENVIRONMENT. 3.) WIRING, CONDUIT, AND RACEWAYS MOUNTED ON ROOFTOPS SHALL BE ROUTED DIRECTLY TO, AND LOCATED AS CLOSE AS POSSIBLE TO THE NEAREST RIDGE, HIP, OR VALLEY. 4.) WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL COMPLY WITH NEC 110.26. 5.) DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS. CONTRACTOR SHALL FURNISH ALL NECESSARY OUTLETS, SUPPORTS, FITTINGS AND ACESSORIES TO FULFILL APPLICABLE CODES AND STANDARDS. DRAWING 5CALE 6.) WHERE SIZES OF JUNCTION BOXES, RACEWAYS, AND CONDUITS ARE NOT SPECIFIED, THE CONTRACTOR SHALL SIZE THEM ACCORDINGLY. 7.) ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE. 8.) MODULE GROUNDING CLIPS TO BE INSTALLED BETWEEN MODULE FRAME AND MODULE SUPPORT RAIL, PER THE GROUNDING CLIP MANUFACTURER'S INSTRUCTION. N .T.S- 9.) MODULE SUPPORT RAIL TO BE BONDED TO CONTINUOUS COPPER G.E.C. VIA WEEB LUG OR ILSCO GBL-4DBT LAY—IN LUG. 10.) THE POLARITY OF THE GROUNDED CONDUCTORS IS (positive/negative) OR 10.) THE DC SIDE OF THE PV SYSTEM IS UNGROUNDED AND SHALL COMPLY WITH NEC 690.35. 5HEET NUMBER 11.) THE INSTALLATION COMPLIES WITH R327 ENERGY STORAGE SYSTEMS. 12.) CONDUIT AND CONDUCTORS SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP—SIZING AS REQUIRED BY FIELD CONDITIONS. ALL CONDUCTORS NOT UNDER PV—4. ARRAY ARE TO BE IN CONDUIT MINIMUM 7/8" ABOVE ROOF. TAX MAP: 1000-02 I .00-OI .00-025.001 DESIGN 4 DRAFTING BY: �\ ELEMENT ENERGY LLC REVIEW BY J.M.NABCEP CERTIFIE O51 1 1 2-1 29 WIRE CALCULATION STARTING ADJUSTMENT MAXIMUM REV1510N5 MIN. STARTING TEMPERATURE DE5CRIFTION DATE REV CURRENT FACTOR FOR ADJUSTED CURRENT CONDUCTOR CONDUCTOR CONDUIT ALLOWABLE TEMPERATURE CORRECTION ESTIMATED VOLTAGE OPJGINAL 08-22-2025 TAG DESCRIPTION APPLIED TO MORE THAN 3 CONDUCTOR APPLIED TO QTY. SIZE (AWG) SIZE & AMPACITY RATING ('C) CONDUCTORS FACTOR CONDUCTORS AMPACITY CONDUCTORS DISTANCE (FT) DROP (%) TYPE 310.15(B)(16) IN RACEWAY 310.15(B)(2)(a) 310.15(B)(3)(a) IN RACEWAY 4 12 THWN-2 COPPER- (L1,L2,N) I 1 1 8 THWN-2 BARE 3/4" PVC 30 90' 16 0.84 1 25.20 20.00 110.00 2.77 j COPPER-(GROUND) 3 8 THWN COPPER- (L1,L2) CONTRACTOR 2 1 8 THWN-2 BARE 3/4" PVC 55 90' 29.5 0.96 1 52.80 36.88 20.00 0.28 ELEMENT ENERGY, E COPPER-(GROUND) MATT TO CK,, NY IA 95 LICENSE# G74G I-HI 3 6 THWN-2 COPPER- (L1,L2,N) LICENSE# 52G89-ME 3 1 8 THWN-2 BARE 3/4" PVC 75 90' 60 0.96 1 72.00 - 20.00 1.99 COPPER-(GROUND) OF NEW), pg0 A 3 6 THWN-2 COPPER- (L1,L2,N) (09 * s 4 THWN-2 BARE 3/4" PVC 75 90° 60 0.96 1 72.00 - 20.00 0.00 W 1 8 COPPER-(GROUND) �O 103443 �Z ARO P� 3 6 THWN-2 COPPER- (L1,L2,N) �ss�oN 5 1 8 THWN-2 BARE 3/4" PVC 75 90' 29.5 0.96 1 72.00 36.88 20 0.17 COPPER-(GROUND) PROJECT NAME 3 6 THWN-2 COPPER- (L1,L2,N) v o 6 1 8 THWN-2 BARE 3/4" PVC 75 90' 29.5 0.96 1 72.00 36.88 10 0.49 w COPPER-(GROUND) w m z � zz w w0cz m < _ L_ � 00Q w GENERAL NOTES SPIFFY NAME ELECTRICAL NOTES 1.) THE BESS PROVIDES MONITORING AND BALANCING CELL 1.) ALL EQUIPMENT TO BE LISTED BY UL OR OTHER NRTL, AND LABELED FOR ITS APPLICATION. VOLTAGES, CURRENTS, ELECTRICAL DIAGRAM 2.) ALL CONDUCTORS SHALL BE COPPER, RATED FOR 600 V AND 90-C WET ENVIRONMENT. AND TEMPERATURES WITHIN THE MANUFACTURER'S 3.) WIRING, CONDUIT, AND RACEWAYS MOUNTED ON ROOFTOPS SHALL BE ROUTED DIRECTLY TO, AND LOCATED AS CLOSE AS POSSIBLE TO THE NEAREST RIDGE, HIP, OR VALLEY. SPECIFICATION THROUGH WEB AND MOBILE APPLICATIONS. 4.) WORKING CLEARANCES AROUND ALL NEW AND EXISTING ELECTRICAL EQUIPMENT SHALL COMPLY WITH NEC 110.26. 2.) THE HEAT DETECTOR OR HEAT ALARM SHALL BE 5.) DRAWINGS INDICATE THE GENERAL ARRANGEMENT OF SYSTEMS. CONTRACTOR SHALL FURNISH ALL NECESSARY OUTLETS, SUPPORTS, FITTINGS AND ACESSORIES TO FULFILL APPLICABLE CODES AND INSTALLED AND INTERCONNECTED WITH SMOKE ALARM AND STANDARDS. THE BESS SYSTEM SHALL TRANSMIT AN ALARM SIGNAL DRAWING SCALE 6.) WHERE SIZES OF JUNCTION BOXES, RACEWAYS, AND CONDUITS ARE NOT SPECIFIED, THE CONTRACTOR SHALL SIZE THEM ACCORDINGLY. VIA MOBILE PORTAL OR THE SMOKE AND/OR HEAT 7.) ALL WIRE TERMINATIONS SHALL BE APPROPRIATELY LABELED AND READILY VISIBLE. ALARM/DETECTOR IF POTENTIALLY HAZARDOUS n . 8.) MODULE GROUNDING CLIPS TO BE INSTALLED BETWEEN MODULE FRAME AND MODULE SUPPORT RAIL, PER THE GROUNDING CLIP MANUFACTURER'S INSTRUCTION. TEMPERATURES OR OTHER CONDITIONS SUCH AS SHORT I V 9.) MODULE SUPPORT RAIL TO BE BONDED TO CONTINUOUS COPPER G.E.C. VIA WEEB LUG OR ILSCO GBL-4DBT LAY-IN LUG. CIRCUITS, OVER VOLTAGE OR UNDER VOLTAGE ARE 10.) THE POLARITY OF THE GROUNDED CONDUCTORS IS (positive/negative) DETECTED. OR 3.) CONDUIT AND CONDUCTORS SPECIFICATIONS ARE 10.) THE DC SIDE OF THE PV SYSTEM IS UNGROUNDED AND SHALL COMPLY WITH NEC 690.35. BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT 5MEET NUMBER 11.) THE INSTALLATION COMPLIES WITH R327 ENERGY STORAGE SYSTEMS. MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD \ / 12.) CONDUIT AND CONDUCTORS SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONS. ALL CONDUCTORS NOT UNDER CONDITIONS. P V -4. 2 ARRAY ARE TO BE IN CONDUIT MINIMUM 7/8" ABOVE ROOF WITH PROPER JUNCTION BOX AT EACH END. TAX MAP: 1000-02 1 .00-01 .00-025.00 1 0 i f �_ d IQ Battery 10C Scan for the latest guide t c. MODEL - 1 1 _ - VERSIONi JANUARY 2025 140-00379-02 This page is left blank intentionally. i EN-2 Contents 1. Safety information 5 1.1. Safety and advisory symbols 5 1.2. Safety instructions 5 2. Introduction 8 3.IQ Battery 10C installation scenarios 9 4.What's in the box 11 4.1.What's in each 5 kWh battery unit box(BO5-001-US00-1-3) 11 4.2.What's in cover kit box(B10C-NC-0708-0) 11 5.Tools required 12 6.Additional items required 12 7. Unboxing the IQ.Battery 10C 13 8. Planning installation layout 14 8.1. Choosing a location for the IQ Battery array 14 8.2. Minimum clearance 15 8.3. Mounting surface 15 8.4.Installing the handles and lifting the 5 kWh unit 16 8.5. Removing the wiring cover 16 8.6.Selecting the conduit entry point and drilling 17 9. Mounting battery units on the wall 18 10. Wiring 22 10.1.Connecting the interconnect power cables 22 10.2.Connecting the interconnect control cable 23 10.3.Wiring the Control(CTRL)cable between system components 23 10.4.Connecting the field power cables 25 11. Closing and energizing the unit 27 11.1. Closing the wiring cover 27 11.2.Connecting battery DC connectors 28 11.3.Attaching the cover assembly 28 11.4.Connecting the control switch and energizing the unit 29 EN-3 1 12. De-energizing the unit and removing the cover 31 12.1.Disconnecting 10 Battery 10C control switch and de-energizing the unit 31 12.2. Removing the 10 Battery 10C cover 32 13. Operation 34 13.1. Configuring and activating the unit 34 13.2. LED overview _ 35 13.3. Operating mode and set points . 36 13.4.Troubleshooting _ 36 Revision history 37 EN-4 1. Safety information Evacuate personnel to a safe area and keep unauthorized personnel away. • Isolate the spill area to a minimum distance of 75 feet IMPORTANT SAFETY INSTRUCTIONS.SAVE THESE (25 m). INSTRUCTIONS. Eliminate all ignition sources(no smoking,sparks, This guide contains important instructions that you must flames,or hot equipment)in the immediate area follow during the installation and maintenance of the Enphase around the spill. IQ Battery(ies).Failing to follow any of these instructions may Do not touch or walk through spilled material. void the warranty(onphase.com/warranty).Refer to the MSDS Avoid breathing vapors.Ensure adequate ventilation. document and safety datasheet at enphase.com/en-us.Read Use personal protective equipment. these instructions carefully and retain them for future use.if Emergency telephone number(ChemTel)•inside the ownership of IQ Battery 10C is transferred,then these United States Territories and Canada:(800) instructions must be included. 255-3924 Outside United States Territories and In case of fire or other emergency Canada:+01(813)248-0585 In all cases: 1.1 Safety and advisory symbols • If safe to do so,switch off the AC breaker for the DANGER:This indicates a hazardous situation,which,if IQ Battery 10C circuit,and if a disconnect switch is present, A� not avoided,will result in death or serious injury. switch off the AC disconnect for the IQ Battery 10C circuit. WARNING:This indicates a situation where failure to • Contact the fire department or other required emergency A follow instructions may be a safety hazard or cause response team.Evacuate the area. equipment malfunction.Use extreme caution and follow • Contact Enphase Support by calling(877)797-4743 and instructions carefully. selecting option 2,or by visiting https://enphase.com./ NOTE:This indicates information particularly important O contact/support. for optimal system operation.Follow instructions carefully. In case of fire: • When safe,use a fire extinguisher.Suitable types are 1.2 Safety instructions A,B,and C dry chemical fire extinguishers.Additional Q DANGER:Risk of electric shock.Risk of fire.Only extinguishing media include carbon dioxide or alcohol- qualified electricians should install,troubleshoot,or resistant foams. replace the IQ Battery(ies). In case of flooding: Q DANGER:Risk of fire or explosion.Only qualified personnel using personal protective equipment(PPE) Stay out of the water if any part of the IQ Battery(ies)or should transport or handle the IQ Battery(ies). wiring is submerged. Q DANGER:Risk of explosion.Do not dispose of • If possible,protect the system by finding and stopping the IQ Battery(ies)in a fire or by burning.The IQ Battery(ies) source of the water and pumping it away. can explode. • If water has contacted the battery,call your installer to Q DANGER:Risk of fire or explosion.This product is arrange an inspection.If you are sure that water has never designed for stationary installation only and should be used accordingly.It is not designed for mobile contacted the battery,let the area dry completely before applications such as installation on vehicles and trailers use. and should not be used in such applications. In case of unusual noise,smell,or smoke: Q DANGER:Risk of fire.During use,when stored,or during transport,keep the IQ Battery(ies)in an area that is • Ensure nothing is in contact with the IQ Battery(ies)or in the well-ventilated and protected from the elements,where venting area of the IQ Battery(ies). the ambient temperature and humidity are within-4'F • Ventilate the room. to 131°F(-20°C to 55°C)and 5%to 95%RH,non- condensing,preferably out of direct sunlight.Do not In case of electrolyte exposure: install the IQ Battery(ies)at elevations over 9,842 feet (3,000 m)above sea level. The Enphase IQ Battery 10C has a lithium iron phosphate(LFP) battery that contains organic electrolytes and is sealed in a DANGER:Risk of fire.If the IQ Battery(ies)generate Q smoke,remove AC power from the Enphase system protective case.The leaked electrolyte is toxic and flammable. and turn the control switch to the off position so that The leaked electrolyte is colorless and has a sweet odor. charging/discharging stops. Electrolyte fluid tends to evaporate quickly,leaving behind a DANGER:Risk of electric shock.Do not use Enphase white grainy substance.If an odor is obvious,proceed to the ® equipment in a manner not specified by the following steps: manufacturer.Doing so may cause death or injury to persons or damage to equipment. DANGER:DO NOT TOUCH OR INGEST ANY LIQUID SUSPECTED TO BE BATTERY ELECTROLYTE. Q DANGER:Risk of electric shock. not install the IQ Battery(ies)without first removing AC power from the EN-5 photovoltaic system.Disconnect the power coming from Q WARNING:Risk of injury and equipment damage. the photovoltaics before servicing or installing. Do not lift the IQ Battery 10C battery units by holding ® DANGER:Risk of electric shock.Always de-energize the onto the microinverters.This may damage the unit AC branch circuit during an emergency and/or before permanently. servicing the IQ Battery(ies). Do not lift the packaging with the battery inside after ® DANGER:Risk of electric shock.Risk of high short- the plastic straps are cut. circuit current.Observe the following precautions when Do not mount an IQ Battery 10C on a bracket that is working on batteries: not properly mounted. • Remove watches,rings,or other metal objects. Q WARNING:Multiple risks.While drilling,make sure not to • Use tools with insulated handles. drill into electric wiring or water pipes in the wall. • Wear insulating gloves and boots. Q WARNING:Risk of equipment damage.Use an electric • Do not lay tools or metal parts on top of batteries. drive;do not use impact drives/impact'drills while tightening fasteners provided along with the product. ADANGER:Risk of electric shock.Risk of fire.Do not work Ensure that fasteners are torqued to the recommended alone.Someone should be in the range of your voice or limits. close enough to come to your aid when you work with or near electrical equipment. Q WARNING:Risk of injury.Wear personal protective Qequipment for handling lithium batteries as required by DANGER:Risk of fire.Do not allow or place flammable, local safety standards during installation and handling of sparking,or explosive items near the IQ Battery(ies). IQ Battery. ® DANGER:Risk of electric shock.In areas where flooding Q WARNING:Limitation of use.Your IQ Battery 10C is possible,install the IQ Battery0es)at a height that unit is not intended for use as a primary or backup prevents water ingress. power source for life-support systems,other medical QDANGER:Risk of electric shock.AC voltage is present at equipment,or any other use where product failure could the output when the DC switch is on. lead to injury,loss of life,or catastrophic property DANGER:Risk of electric shock.Branch circuit Q damage.Enphase disclaims any and all liability arising out of any suchuse of your IQ Battery 10C unit.Further, protection must be off before switching DC power on Enphase reserves the right to refuse to provide support or off. in connection with any such use and disclaims any and _ DANGER,Risk of-electric shock.-The DC•switch must be a(I liabilityarising out of Enphase's provision of,or refusal in the OFF position for shipping and service. to provide support for your IQ Battery 10C device in QWARNING:Multiple risks.Follow all local standards such circumstances. and regulations set forth by the Utility companies and Q WARNING:When placing the IQ Battery(ies)in storage, Authority Having Jurisdiction(AHJ}, ensure that AC power is not present and that the DC switch is in the OFF state(LED not on).While in QWARNING:Risks of electric shock,energy hazard;and chernicalhazard.Do not disassemble. storage,damage to the battery can occur from over- discharge.If the battery state of charge falls to 0%,the QWARNING:Risk of equipment damage.During use, IQ Battery(ies)can be damaged or destroyed.Because storage,transport,or installation,always keep the of this,the IQ Battery(ies)must only be stored for a IQ Battery0es)in an upright position. limited amount of time. QWARNING:You must install the IQ Battery(ies)only on a The iQ Battery(ies)must be installed and energized suitable wall using an Enphase mounting bracket. by the"Must Energize By"date on the shipping box WARNING:Before installing or using the IQ Battery(ies), label. read all instructions and cautionary markings in this The IQ Battery(ies)must have a SoC(State of guide and on the equipment. Charge)of no more than•30 rb when placed in. storage.To do this,the IQ Battery(ies)must be QWARNING:Do not install or use the IQ Battery0es)if it switched OFF when it reaches 30%SoC. has been damaged in any way. If the IQ Battery(ies)has already been installed,it QWARNING:Do not exceed the maximum number(1)of must be discharged to 3091 SoC and be switched IQ Battery 10C withoutPCS or maximum number.(2)of OFF prior to uninstalling.A battery in OFF state can IQ Battery 10C with PCS in a 40 A AC branch circuit be stored for a maximum of two months from the time it was switched OFF. QWARNING:Do not exceed the maximum number(2)of NOTE:Inspect the packaging and the IQ Battery(ies) IQ Battery 10C without PCS or maximum number(4)of O for any signs of damage,such as cracks,dents,or IQ Battery 10C with PCS on 80 A ACbranch circuit. electrolyte leaks.Do not install or use the IQ Battery(ies) QWARNING:Do not sit on,step on,place objects on,or if it has been dropped or damaged in any way.If it is insert objects into the IQ Battery0es). damaged,contact your distributor for replacement. QWARNING:Do not place beverages or liquid containers O NOTE:These mounting instructions are for the on top of the IQ Battery(ies).Do not expose the included mounting bracket only.If you wish to install IQ Battery(ies)to liquids or flooding. IQ Battery 10C in a floor-mount configuration,order aWARNING;Risk of injury and equipment damage.The the pedestal accessory(B05C-PI-0550-0)and refer to t total lifting weight is 125.6 lb(57 kg).Handles(SKU: he floor-mount instructions shipped with the product. B05C-LH-0180-0)must be used while lifting the battery. This product must be installed with clearance at the Two-person manual lifting is allowed only if permitted by left,right,top,bottom,and front,as shown in section local laws.Otherwise,use mechanical lifting. -minimum clearances. EN-6 ONOTE:Perform installation and wiring,including protection against lightning and resulting voltage surges, in accordance with all applicable local electrical codes and standards. ONOTE:Using unapproved attachments or accessories could result in damage or injury. ONOTE:Install properly rated overcurrent protection as part of the system installation. ONOTE:To ensure optimal reliability and to meet warranty requirements,the IQ Battery(ies)must be installed and/or stored according to the instructions in this guide. ONOTE:The Enphase IQ Battery 10C system requires an Internet connection through the IQ Gateway Metered located inside IQ Combiner 6C.Failure to maintain an internet connection may have an impact on the warranty.See http://www.enphase.com/warranty for full terms. ONOTE:When replacing the Enphase IQ Battery(ies),you must replace it with an IQ Battery(ies)of the same type With the same AC current rating. ONOTE:When disconnected and stored,no automatic charge of the battery is possible. ONOTE:Properly mount the IQ Battery(ies).Ensure that the mounting location is structurally suited to bearing the weight of the 10 Battery(ies). ONOTE:During use,storage,and transport,keep the IQ Battery(ies): • Properly ventilated.. • Away from the water,other liquids,heat,sparks,and direct sunlight. • Away from excessive dust,corrosive and explosive gases like ammonia,and oil smoke. • Away from direct exposure to gas exhaust,such as from motor vehicles. • Free of vibrations. • Away from falling or moving objects,including motor vehicles.If mounted in the path of a motor vehicle, we recommend 36 in(914 mm)minimum mounting height. • At an elevation of less than 9,842 feet(3,000 m) above sea level. • In a location compliant with fire safety regulations. • In a location compliant with local building codes and standards. ONOTE:Conditions for the IQ Battery 10C installation site also apply to storage conditions. ONOTE:Enphase Energy System requires a utility grid connection for commissioning and operation. ONOTE:Recycle packaging according to local guidelines. Environmental Protection ELECTRONIC DEVICE:DO NOT THROW AWAY. Waste electrical products should not be disposed of with household waste. Proper disposal of batteries is required.Refer to your local codes for disposal requirements. EN-7 2. Introduction To install the Enphase IQ Battery 10C,read and follow all warnings and instructions in this quick installation guide(QIG).Safety warnings are listed at the start of this guide.These instructions are not meant to be a complete explanation of how to design and install an energy storage system.All installations must comply with national and local codes and standards.Only Enphase-certified installers shall install,troubleshoot,or replace the iQ Battery 10C. The IQ Battery 10C system includes the battery cell pack with integrated IQ Microinverters(SKU:IQ8BL,IQ8BN)and the battery management system(BMS).The system requires IQ Combiner 6C and IQ Meter Collar for the backup operation.The IQ.Gateway inside the combiner.measures PV production,IQ Battery 10C charge/discharge power,and home energy,consumption,and it senses when it is optimal to charge or discharge the battery so that energy is stored when it is abundant and used when it is scarce. Key specifications Rated(continuous)output power 7.08"kVA Rated output current(@240 VL-LAC-) . 29.5 A! Rated neutral, urrent;(@720 V N AC-) ' 24 A? _. . _. Interconnection "Single-phase Nominal voltage y Nominal frequency 60 Hz Usable capacity3 10.0 kWh Ambient operating temperature range(charging)4 4°F to 122°F(-20°Cto 50'C)Non-condensing Ambient operating temperature,range(discharging}5 4 F to 131°F,(-20 C to,55°C)Non condensin r ri ,( Chemistry Lithium iron phosphate(LFP) Mountrng" -' Wall-mountori pedesta{-mount(soIdseparately) Dimensions(H x W.D) 24.5 in=28 in■14.4 in(621 mm x 708 mm x 362 mm) Maximum lifting weight 1251b;(57 kg),. Total installed weight 317 lb(144 kg) t 7.08 kVA,29.5 A for the balanced 240V L-L loads. 2 A maximum of 24 A,120V L-N unbalanced loads can be supported along with 5.5 A,240V L-L loads. 3 The battery's usable capacity supports loads,and turns PV on(when off-grid),in normal.daily operation.The usable capacity includes a safety critical limit of 2%that safeguards the customer's asset in case of a long-duration grid outage.An additional 3%capacity is maintained for powering battery electronics at night.Refer to http://link.enphase.com/lgbattery_usable_capacity-en-na for more information. A reduction in charging power occurs at temperatures below 15'C and above45°C. s A reduction in discharging power occurs at temperatures below 5°C and above 50'C. EN-8 i I. 1 3. IQ Battery 10C installation scenarios This section provides details on IQ Battery 10C installation scenarios. IQ Series Microinverters IQ Battery IOC IQ Battery 10C (up to 2 units) (up to 2 units) 1 l y ae a IQ Combiner 6C ............ �a nk I E I( Legend � \,�'�o�" � Cwmpme&Greurdcunapctx vaE ) l 10 EM Charger GroundeerWuctor(nouveg GoofN,n—.ded .�1,6 c,{ --- Flald wrretl<ontluC.ars Contra v.inn Power Wl6ComTun'lRtien �.�®..:.�,:.µme•_ Grid Main load center Utility meter Home loads n..i.r . 6--j Figure 1:Grid tied system-PV+Battery only with main load center IQ Series Microinverters IQ Battery 10C IQ Battery 10C (up to 2 units) (up to 2 units) 1 'LED p .' e s t-•" IQ Combiner 6C If .l 7 { I .j Legend ,, Equipment Groundco<ulutor yt f„'".ez p i IC EV Ohergar G—deonduoror(neaud) I 9 " owmooler. nded tom=A 3 ED5 Non backup Control wiring )` 33 �! ..... heavy loads .._.. ('o+;e=Weeonanen:caebn Main load center IQ Meter Collar 4' { behind the Grid Bac up i �tr- utility motor Home loads I. Figure 2:Grid forming system-10 Meter Collar behind utility meter in a meter socket ONOTE:Refer to the IQ Combiner 6C(SKU:X-I0-AW-240-6C)quick install guide for details on combiner connections. EN-9 IQ Series Microinverters IQ Battery 10C IQ Battery IOC (up to 2 units) (up to 2 units) i IQ Combiner 6C ' t i�.... ......_.». _� - PVI RiB1Pl514 az' r f 4 Legend ggqq £ C,pxav I( 10 tV Charger , EyklpMontOroiirxiccnductor ip It e� k'i i Grand—d—tm.(nedkwc Sot conductors ouMed �;,I J1. 9,..h circuil breaker a i, Eb Field Non backup .vbed conductors�\ SMP VmY ram heavybads -- emmol vdrLsg i t > ..._ .._._._-....._. ....._ Power Grweommkteoarwn i yyy Main bad center I IQ Meter Collar inform 2S Backup x- meter pan Utility meter Grid Homeloads Figure 3:Grid forming system-10 Meter Collar in a separate meter pan IQ Series Microinverters 10 Battery 10C IQ Battery 10C (up to 2 units) (up to 2 units) 1. I IQ Combiner 6C 44 e i i F QQ0p� It Legend � ,.� 6eeaap i t � � t Ie EV�harger ; Ea;dpnsent Gr dcoMuctrn �Iu_�t�x'���I 1 4 i ;. G>wu+dcoMuctor.(neutrep !� t6 rrsnse�,a, 7d{��� ftsl ;- l=J .fi &Mon e�ra.it brenhu Non backup _�'- reld wiredm:iduc;oa heavy loads Conkei.v,nr� --•x+ ----� I IQ Meter Collar in form 2S Grid QBacup ( melee pen Main load center Utility meter home loads l_ .1'1 __.Tk FAY rl .' Figure 4:Grid forming system-10 Meter Collar in or separate meter part as mains supply is more than 200A ONOTE:Refer to the IQ Combiner 6C(SKU:X-IQ-AM1-240-6C)quick install guide for details on combiner connections. EN-10 4.What's in the box Each 10 Battery 10C(Order Code:IQBATTERY-10C-1P-NA)ships in three separate boxes. • Two boxes—each containing a 5 kWh battery unit(B05-001-US00-1-3) • One box-containing the 10 Battery 10C cover kit(B10C-NC-0708-0) 4.1 What's in each 5 kWh battery unit box(1305-001-US00-1-3) 1 x 5 kWh battery unit 1 x Mounting bracket 1 x Drill template 1■Quick install guide 2 x Seismic screws 6 x M8 hex screws with Preinstalled control washers for second mounting connectors bracket installation(only 6 required) 4.2 What's in cover kit box(B10C-NC-0708-0) 2 x Cable holder 2 x Conduit cover 2 x Raceway adapter Y; iY3' 'ea 3 if •c+ A a3a �F,y f'4 1 x 10 Battery 10C cover Interconnect power cables(L1, Interconnect control cable Control connector with resistor L2,N-4 AWG,GND-8 AWG) with one preinstalled control connector EN-11 5.Tools required Enphase accessory: � AM" �� � � :.>! Lifting handles:B05C-LH-0180-0 Measuring tape Pencil and level Hex drives Screwdriver-At least 8"long Drill Protective gloves Torque wrench Cable stripping tool 6.Additional items required O 6x#20(5/16")lag bolts or screws with washer Conduits and fittings Up to 1.25 in(32 mm) AC breaker-40 A for one to install,the mounting bracket on the wall IQ Battery 10C or 80 A for two IQ Battery 10C(used inside IQ Combiner 6C) z. Dta1n 2 ZEN Shield ,. Copper conductors-No.8-3 AWG(11 mm or Enphase SKU for control cable:CTRL-SC3- 7/16"strip length)(rated at 90"C)for terminals NA-01 ONOTE:Conduit fittings must be NEMA Type 3R certified when installing outdoors: EN-12 7.Unboxing the IQ Battery 10C Each IQ Battery 10C comes with two 5 kWh battery unit boxes and one IQ Battery 10C cover kit box. Before unboxing IQ Battery 10C-5 kWh battery unit,check the"Energize By"label on the shipping box to verify that the IQ Batteries will be installed by the date shown.If the date has passed,contact your distributor for next steps. Follow the steps,as shown in the following image: O : Cut open the straps Remove the top box cover Remove the four corner guards O © O w �� r.,. k� Carefully take out the mounting bracket Remove the top paper tray Open the polythene bag and take out the and keep it aside battery unit with the help of handles ONOTE:Follow the steps mentioned in section 7.4 for handle installation and lifting of the unit. Ensure to take out the accessories bag included in the IQ Battery packaging and store it securely for use during the installation. Inspect the packaging and the IQ Battery(ies)for any signs of damage,such as cracks,dents,or electrolyte leakage.Do not install or use the IQ Battery(ies)if it has been dropped or damaged in any way.If the battery is damaged,contact your distributor for a replacement. QWARNING:Do not lift the IQ Battery 10C by holding onto the microinverters or the wiring compartment section.This may damage the unit permanently.Always use handles(SKU.B05C-LH-0180-0)to lift the IQ Battery 10C. QWARNING:Do not lift the packaging with the battery inside after cutting the plastic straps. EN-13 8. Planning installation layout Planning the installation layout is an important step to make sure the IQ Battery 10C is installed and mounted correctly as per the specifications. 8.1 Choosing a location for the IQ Battery array • IQ Battery 10C is NEMA Type 311 rated and can be installed Indoor or outdoor.The terminal blocks on the IQ Battery 10C accept a maximum conductor size of 3 AWG for L1/L2/N terminals and 8 AWG for the Ground terminal. NOTE:Enphase 10 Batteries have been evaluated to UL 9540A standard for outdoor and non-habitable indoor residential installations.Units are only intended to be installed ' O in attached or detached garages,sheds,and locations more than 152.4 cm(5 ft)from dwelling units,and are not intended for installation in habitable spaces and living spaces in dwelling units. • Make sure the installed location can sustain the total weight of 318 lb(144 kg)per IQ Battery 10C.The wall must contain blocked studs that can bear the battery weight or be made of masonry or other suitable structures. • When installing on a wooden wall,it is suggested to use a flame-inhibition plate between the wooden wall and IQ Battery 10C.Consult the regional building regulations forany additional requirements. • Make sure there are no pipes or electrical wires where you plan to drill. • Provide heat or smoke alarms in residence in accordance with building,fire,and installation codes. Follow local standards-choose a non-habitable indoor location(like.a 2-car garage)or r an outdoor location where the ambient temperature and humidity are within-4°F to 131°F (-20°C to 55°C)and 5%to 95%RH,non-condensing.Avoid direct sunlight to ensure the LI temperature,stays in the optimal operating range.This ensures charging and discharging P Y P P 9 9 r9 currents are not de-rated due.to temperature.The full performance will occur within 59°F to 113°F(15°C to 45"C)while charging and within 41'F to 122°F WC to 50°C)while discharging. Consider the dimensions of the IQ Batteries,easy access,height,and cable length.when y selecting the location. Select a location where you can easily make wiring connections of the IQ Battery IOC to the '-x- IQ Combiner 6C. This product must not be installed at altitudes above 9,842 ft(3,000 m). Follow all local standards and regulations set forth by the Authority Having Jurisdiction (AHJ). • Up to two 10 Battery 10C units can be daisy-chained on a single branch circuit. IQ Combiner 6C supports up to a maximum of 80 A breakers for the IQ Battery 10C connection circuit. NOTE:Up to four IQ Battery 10C units can be daisy-chained on a single branch circuit O✓ using battery oversubscription PCs.Ensure to add a PCs disclaimer label at all PCS- A4a e •in ';r%. enabled IQ Battery 10C units. The maximum conductor size for IQ Battery 10C is 3 AWG for L7/L2/N terminals and 8 AWG for ground'terminals,and the maximum breaker rating.with this conductor size is 80 A. EN-14 8.2 Minimum clearance The mounting instructions provided are for the included mounting bracket only.If you wish to install IQ Battery 10C in a floor-mount configuration,order the pedestal accessory(Order code:B10C-PI-0550-0)and refer to the floor-mount instructions included with that product.This product must be installed with clearance at the left,right,top,bottom,and front of the product,as shown in the figure. QWARNING:If mounted in the path of a motor vehicle,Enphase recommends a minimum mounting height of 36:in(914 mm) above the floor. ONOTE: • The 6"clearances are per the UL 9540A evaluation;Enphase recommends 8"clearances on the side and the top of the unit for ease of service and adequate ventilation.Make sure to comply with all local compliance and regulation standards. • The indicated clearances should be measured with respect to external covers of the units. • Keep the IQ Battery 10C away from falling or moving objects,including motor vehicles. ! 6" � f--- 6„ 15 is n 6•• IQ Battery 10C-Minimum clearance 8.3 Mounting surface ONOTE: • Select a location where the tilt from vertical is less than 5°. • Make sure the mounting surface flatness is within 0.08 in(2 mm)between boundary lines. • Use spacers or unistruts if the undulations are more than 0.08 in(2 mm)deep. Max.-5' r—> � r { ''• jjj 7 ! ]g t "Jul Max.2 mm Max.•5' EN-15 8.4 Installing the handles and lifting the 5 kWh unit ONOTE: • A minimum of two people are required to lift the battery unit. • Use lift assist if manual lifting is not permitted per local or national regulations,lifting weight-125.6 lb(57 kg). 1. Insert and screw the handles onto the battery unit as shown to facilitate lifting the unit. i Hand access slot 8.5 Removing the wiring cover 1. Loosen the four captive screws(torque to 19.5 in-lb or 2.2 N m). n r,� ss 2. Lift the front side of the wiring cover carefully. a 3. Gently slide it forward to disengage it from the latches.Remove the wiring cover and keep it aside. EN-16 y 8.6 Selecting the conduit entry point and drilling ONOTE • All field wiring connections must be done on the wall-side unit only. • Each battery unit has four conduit entry points in the wiring compartment-one on each side and two on the rear. Drilling is required if conduit entry is from the left and/or right sides.Conduit sizes up to 1.25"are supported. The rear side has predrilled 1.25"holes with conduit plugs inserted. • The front side has predrilled 1"holes with conduit plugs inserted. • Removal of wiring cover before drilling is essential t.o avoid damaging components. • Clean any debris inside the wiring compartment after drilling. 1: For side entry,drill the wiring compartment at the marked indentation on wall-side unit only. I}7 [N ~ i ~ Walt-side unit User-side unit fl �, ONOTE:The wall-side and user-side units are identical;it is the placement of the unit that determines whether it is a wall-side or user-side unit. EN-17 2. For rear entry,push the conduit plugs out from inside the wiring compartment. 55.E - � - j' 3. Remove the front conduit plug of the wall-side unit and the rear conduit plugs from the user-side unit to install the raceway adapters. ONOTE:The front conduit plugs of the user-side units should not.be removed. 9. Mounting battery units on the wall This section outlines the mounting requirements,positioning,and safety precautions to ensure proper setup and secure attachment of the IQ Battery 10C to the wall. ONOTE:' • Sii:uniformly distributed#20(5/16")lag bolts or screws with washers are required to support the weight of IQ Battery IOC 317.5 lb(-144 Kgs). • If installed on wooden studs,each stud must have at least three bolts for uniform load distribution on the wail. • The mounting bracket supports 24"and 16"stud spacing. • Single-stud mounting is not supported. 1. .Starting at the installation position closest to the power source,mark a level line on the mounting surface as a guide,at least 7.25" above the floor or ground s O ,o v� ��� -ki 7.25" 2. Align the bottom of the drill template with the mark made and use the drill template to mark the drilling points on the wall.Drill the holes on the mounting surface. QWARNING:Multiple risks.Make sure not to drill into electric wiring or pipes in the wall. S Positioning the mounting bracket 7.25 in from the ground ensures the battery unit is 6 in from the ground. EN-18 G • 4 ....... , r 3. Fasten the mounting bracket to the wall with#20(5/.116")lag bolts or screws with washers. r f a✓..max, �,.,t `3�� 4. Lift the unit using the handles and bring it close to the already mounted mounting bracket.Hold the battery straight,align,and insert four mount bolts on the battery unit into the mounting bracket keyholes and slide it down.Unscrew the handles. ONOTE:Use lift assist to avoid any mishap during lifting. 4 c� - -011 AtMww J3•>R Ly 5. Fasten two seismic screws to the wall-side battery unit.Use,a screwdriver or hex drive(size 0.5 in)extension if required(torque to 75.23 in-lb or 8.5 N m). EN-19 u� cF 6. Use six M8 screws and washers(provided in the accessory kit)to fasten the second mounting bracket to the predefined points on the chassis of the already mounted battery unit(torque to 88.5 in-lb or 10 N m). WVY 7. Lift the unit using the handles and'install the user-side battery unit into the slots on the mounting bracket.Unscrew and remove the handles. 8. Fasten two seismic screws to the user-side battery unit.Use a screwdriver or hex drive(size 0.5 in)extension if required(torque to 75.23 in-lb or 8.5 N m). EN-20 k I° tea� s . r i 7{ �O d # j Ali i S +i11 9. Install raceway adapters between the units by fastening locknuts as shown(torque to 53.1 in-lb or•6 N m). t r1 MI „ Pam- e � - M ONOTE:It is essential to install both raceway adapters for proper cable management and ingress protection. 10. Plug two control switch connectors into the holders to protect it and the cable from pinching during cover installation. ONOTE:Carefully cut the.cable tie used for tying the control switch connector and the battery DC connector before plugging the control switch connector into the holders. Unplugged Pluggedr1. cls L__----__-___ ONOTE: • To prevent the control switch connectors from getting pinched and damaged during ID cover installation,it is essential to plug both connectors prior to installing the cover. • Ensure that all the connectors are latched properly. EN-21 11. Follow the steps below when installing rigid conduits between two IQ Battery 10C units: a. Mount only one IQ Battery 10C on the wall. b. Add rigid conduit to it. c. Adjust the rigid conduit in the first unit as needed,then mount the wall-side unit of the second IQ Battery 10C on the wall to complete the installation. d. Install the user-side unit after adding the conduit between the wall-side units. 10.Wiring This section provides detailed instructions for wiring and connecting components of the IQ Battery 10C system,including interconnect power cables,interconnect control"cables,and field power cables.It outlines the required steps for proper cable routing,terminal connections,torque specifications,and system validation to ensure optimal performance and compliance with safety standards.Key considerations for cable management,resistor placement,and system configuration are also included,making this guide essential for a safe and efficient installation of the IQ Battery 10C and related components. 101 Connecting the interconnect power cables ONOTE: • The interconnect power cables are dual-colored,with L1 marked on the black part and L2 marked on the red part of the cable. • For interconnect power cables the L1 terminal of the wall-side unit connects with the L2 terminal of the user-side unit and the L2 terminal of the wall-side unit connects with the.LYterminal of the user-side unit. Power and control interconnect cables will run through left.and right side raceways.respectively Assemble the cables in following sequence(torque to 22.1 in-lb or 2.5 N m): 1. Route interconnect power cables(L1,L2,N,and GND)through the left raceway adapter. 2. Connecting the short L1-1_2 cable: • Connect red end to the L2 terminal closer to the wall on the wall-side unit. • Connect black end to the L1 terminal closer to the uper on the user-side unit. 3. Connecting the long L1-1_2 cable: • Connect black end to the L1 terminal closer to the wall on the.wall-side unit. • Connect red end to the L2 terminal closer to the user on the user-side unit. 4. Connecting the neutral cable: • Connect it to the N terminal closet to the wall on the wall-side unit. • Connect it to the N terminal closer to the user on the user-side unit. 5. Connecting the ground cable: • Connect it to the ground terminals on both units. Wall-side unit r Left-side Right-side raceway adapter raceway adapter User-side unit EN-22 ONOTE:The ends of Interconnect power cables are labeled with the battery unit location(user-side/wall-side)and respective terminal(L1/1-2).Insert the cables into their respective terminals(as per the label)for accurate and hassle-free installation. 10.2 Connecting the interconnect control cable ONOTE: • The interconnect control cable comes with one preinstalled connector on one end,while the other end is left free for easy routing through the raceway adapter. • Power and control interconnect cables will run through left and right side raceways respectively. 1. Route interconnect control cable through the right side raceway adapter. 2. The interconnect control cable comes stripped on one side and.with a preinstalled connector on the other side.Connect the stripped end of the interconnect control cable to the control connector from the accessory kit(torque to 1.8 in-lb or 0.2 N m). 3. Connect the control connectors installed at the two ends of the interconnect cable on the control communication boards of the wall-side and user-side units. 4. For additional information on control wiring and to remove or add/keep a resistor on the control connector,refer to the section- Wiring the Control(CTRL)cable between system components. Wall-side unit Control communication board Left-side Right-side raceway adapter raceway adapter Control communication board User-side unit 10.3 Wiring the Control(CTRL)cable between system components ONOTE: • The control cable must comply with UL 3003,UL 1277,and UL 83 standards.The Enphase control cable(SKU:CTRL-SC3- NA-01)has optimal impedance and has been validated for optimal system performance.Third-party cables may not have the correct characteristic impedance,and consequently,may not work reliably.Enphase cannot guarantee performance when a third-party control cable is used. • The same conduits can be used for power and control cable routing only when using an Enphase Control Cable. • Refer to the CTRL wiring Ct/C2 label available on the product for easy reference. CTRL WIRING C1/C2` 1 I I I I I . I I I I I I I I I I I I I I ' I I I I I I I I MAX STRIP LENGTH I I I SCALE 1:1 I I ` I I I • Each component at the extreme end of the control network should have one header with a termination resistor installed. EN-23 Figure 5:First and Intermediate control communication boards Figure 6:Last control communication board with resistor Installed on one control connector • Both control connectors(C1/C2)present on the control communication board are identical and can be used interchangeably. • The total length of control wiring across the system cannot exceed 250 feet to ensure the system operates as per specifications. • Make sure the drain wires do not come in contact with any live connection. • Ensure that all five wires(purple-L,orange-H,black-G,red-not used,gray-drain wire)are connected properly to the control connector. • For the control connector of the IQ Meter.Collar,drain wire connection is not required. 1. After routing the control cable,connect it to the connectors(torque to 1.8 in-lb or 0.2 N m). Control W ---Control(H) i otused ✓ ...... ..... sf 2. Plug in the connectors,and termination resistor and connect drain wires depending on the configuration. a. One IQ Battery 10C with IQ Combiner 6C Ia Combiner 6d ea we a sw+cMea -------------- :Legend: rjTermination resistor; Control Cable t x IQ Battery 10C CTRL(L) IQ Meter Collar CTRL(H) ) © Ground 24V DC Drain ---------------------- ONOTE:Use a termination resistor for all the unused control connection points. b. Two IQ Battery 10C units with IQ Combiner 6C EN-24 --------------------- IQ Combiner 6C Legend: rnTermination resistor, Control Cable 1 x IQ Battery 10C 1 x IQ eatte 10C CTRL(L) a, IQ Meter Collar '�", CTRL(ht Ground i Z4V DC i Drain --------------- ONOTE:Use a termination resistor for all the unused control connection points. 10.4 Connecting the field power cables ONOTE: • The maximum conductor size for IQ Battery 10C is 3 AWG for L1/L2/N terminals and 8 AWG for ground terminals. • Interconnect power cable and control cable must be wired for all IQ Battery 10C units at the site before connecting the field power cables. • Cable holders and anchor points are provided on each unit for wire managing the field cables. • Cable ties are available in the accessory kit inside the battery unit packaging box.Anchor the cables as shown to ensure the proper cable routing,avoid wire separation from the terminals,and provide unrestricted access for the wiring cover Assembly. • Make sure no conductor is exposed once the wiring is complete. • A maximum of two IQ Battery 10C can be daisy chained on a single branch circuit. • In the case of only one IQ Battery 10C installation,the conduit entry is required only on one side. • Do not disturb the factory connections on terminal blocks during field wiring. 1. Route field power cables as indicated between the wall-side of two IQ Battery 10C units or between IQ Combiner 6C and the wall-side of IQ Battery 10Cunit. 2. Connect cables to respective terminal blocks(torque to 22.1 in-lb or 2.5 N m). 3. Repeat the above steps for all IQ Battery 10C units at the site and the IQ Combiner 6C. 4. Install cable holder for proper cable management.If required,secure the cables to the anchor points using cable ties. 5. Turn on the AC breaker to which the IQ Battery 10C units are connected.Using a voltmeter,check the voltage across L1-L2(240 A Lt-N(120 V),and L2-N(120 V)terminal blocks to ensure that they are within the operating range mentioned in the data sheet. 6. If the AC voltage is within the normal range mentioned in the datasheet,turn off the power supply and proceed further.If the measured voltage is outside the normal range,check the supply from the mains or correct the field wiring. EN-25 Wall-side unit. Install cable holder after cable routing TO TO Q Combiner 6C/ Q Battery 10C/ IQ Battery 10C . a IQ Combiner 6C Interconnect power-cable (1-1,LZ N,Ground) Interconnect control cable r•: User-side unit cable management Control cable(shown in different colors for distinction . Ground - L7 , L2 Do not disturb internal wiring Neutral To IQ Combiner 6C 3 Figure 7.two 10 Battery 10C units daisy chained ONOTE:The,above image shows field wiring entering through the left side of battery units.it can enter through the right side of battery units as well. EN-26 11. Closing and energizing the unit This section provides step-by-step instructions for closing and energizing the IQ Battery 10C unit.It covers the process of securing the wiring cover,connecting battery DC connectors,attaching the cover assembly,and connecting the control switches.Follow the outlined steps carefully to ensure proper installation and operation of the unit,while adhering to the specified torque requirements and safety precautions. 11.1 Closing the wiring cover 1. Tilt the wiring cover. $ F� 8-= 5 P 2. Slide the wiring cover under the latches. 3. Fasten the four encircled captive screws to close and secure the wiring cover(torque to 19.5 in-lb or 2.2 N m). I t i 1 a T ...... 1 EN-27 11.2 Connecting battery DC connectors Connect all four DC connectors. ONOTE:Carefully cut the cable tie used for tying battery DC connector before connecting them. IT ONOTE:Each 5 kWh battery unit has one DC connector on each side.In total,four DC connectors are present in each IQ Battery 10C. 11.3.Attaching the cover assembly ONOTE: • Ensure that all four DC connectors are properly connected to the microinverters and that both control switch connectors are securely latched into the control switch connector holder on the two mounting brackets. • Ensure that the DC and control switch cable harness are not in the way when sliding the cover over the units. 1. Slide the IQ Battery 10C cover over the battery units. s z MY 2. Move the cover over the latch at the top center and at the bottom on both sides. v EN-28 N V 3. Snap fit conduit plate on the unused opening of the IQ Battery 10C cover. _ gffi EB e I I •.�, t s 4. Fasten the cover locking screws using a torx screwdriver(torque to 53.1 in-lb or 6 N m)to lock the cover in place. O 11.4 Connecting the control switch and energizing the unit ONOTE: • Each IQ Battery 10C has two control switches.One each for the two 5 kWh battery units inside the IQ Battery 10C. • After connecting the control switch,do not leave the battery ON for long periods without AC power connected to avoid draining the battery and damaging it. 1. Open the bottom left side flap of the cover by pulling It with your finger/slot screwdriver using the access slot provided at the center. EN-29 o j q _ i 2. Disconnect the control switch connectors from the control switch connector holder on the mounting brackets. Control switch connector holder �"� -Ki j { ark v: -: `yam • 4 a. _ e ------- ``\ 3. Connect the two control switch connectors to the control switch slots located at the back of the wiring cover,as shown. f 4. Close the flap and confirm that it is properly latched. S. Press.both control switches to turn on the 10 Battery IOC unit. EN-30 Press here TT 12. De-energizing the unit and removing the cover This section provides step-by-step instructions for de=energizing the IQ Battery 10C unit and safely removing its cover.These procedures are intended for maintenance or troubleshooting purposes and are not part of the standard installation process.It is crucial to ensure the,unit is completely de-energized,with all AC breakers and control switches turned off,before proceeding.Follow the instructions carefully to avoid damage to the unit and ensure safety during the process. 12.1 Disconnecting IQ Battery 10C control switch and de-energizing the unit ONOTE:. • These steps are not part of the installation.Refer to these instructions only when battery cover removal is required. • The AC breaker to which IQ Battery 10C is connected must be OFF before disconnecting the control switch connector. • When de-energized(AC breaker to which battery is connected and DC control switch are turned OFF),the LED of the IQ Battery 10C must be OFF. 1. Turn OFF the AC breaker connected to IQ BatteryGes). 2. Turn OFF both the control switches on each unit to de-energize the IQ Battery(ies).Ensure that the LEDs on both units are OFF. A�y� �•' Press here 3. Pullout the left bottom-flap on the cover with your finger/slot screwdriver by accessing the slot provided in between the control switches. EN-31 �s i .......... LA . — 4. Disconnect the control switch connectors from both batteries. 5. Connect the control switch connectors on the respective connector holders available on the mounting brackets. i .:�._ r S S} =k i 12.2 Removing the IQ Battery 10C cover ONOTE: • These steps are not part of the installation.Refer to these instructions only when battery cover removal is required. • IQ Battery 10C must be de-energized before removing the cover. • The control switch connector must be disconnected before removing the cover. • When de-energized(AC breaker to which battery is connected and DC control switch are turned OFF),the LED of the IQ Battery 10C will be OFF. 1. Unscrew the cover locking screws present on both sides.Stop unscrewing once the screw begins to rotate freely,carefully remove it and keep it aside. EN-32 ' _.... 2. Pull out the bottom side flaps with your finger/slot screwdriver by accessing the slot provided above the flaps. 0 E31- s " 99 � 3. Pull the cover bottom snaps(towards the user)(highlighted)on both sides to release the cover. � • ` \y �E 4. Using the hand access,lift and tilt the cover slightly as shown to release the lock. EN-33 OLift here i 1 � ONOTE:Make sure the cover is slightly inclined from the top after step 4. 5. Pull the cover off in the indicated direction and carefully keep it aside without damaging the open flaps. ,"J 13. Operation 13.1 Configuring and activating the unit 1. Use the Enphase Installer App to commission the IQ Battery(ies).Once connected to the IQ Gateway,refer to the Enphase Installer Apo help topics for more information. ( y vy y"✓" Each 5 kWh unit of IQ Battery 10C is provided with two sets of serial number stickers.One set of serial number stickers will be pasted on the bottom right corner of the chassis and the other is provided in the accessory bag. EN-34 IQ Battery 1OC Serial numbers \ F </ - _ nu i i W v Stick an additional set of serial number labels here 2. Peel off the warning sticker after the functional testis complete. pis After the IQ Gateway has detected the IQ Battery0es),the IQ Battery 10C LEDs operate as described in the following section. 13.2 LED overview • After being commissioned,the LED flashes yellow while each 5 kWh unit of IQ Battery 10C boots up.If the LED rapidly flashes green for more than two minutes,the battery is in trickle charge mode and will remain so until it reaches a minimum state of charge(up to 30 minutes). • After the 5 kWh unit is booted up,the LED becomes blue or green,depending on the charge level.if the LED flashes yellow after one hour or changes to a flashing red state,contact Enphase Support at enphase.com/contact/support. DescriptionState Uncommissioned After booting up,the 5 kWh unit has paired with an IQ Gateway Flashing blue '. but has not passed the commissioning three-moray'hand confirm that it is an Enphase device. Flashing green After passing the three-way handshake with the IQ Gateway After commissioning(normal operation) Rapidly flashing yellow. Starting up/establishing communications Red double flash Error.See"Troubleshooting" Solid yellow Not operating due to high temperature.See"Troubleshooting" Idle.Color transitions from blue to green as the state of charge Solid blue or green increases. Check Enphase Installer Platform for charge status. EN-35 After commissioning(normal operation) Softpulseblue . " . Discharging, Soft pulse green Charging Soft'pulse yellow. Sleepmode. Red triple flashes DC switch OFF :Red one-second flash Rapid"shutdown mode - Off Not operating.See"Troubleshooting" 13.3 Operating mode and set points IQ Battery 10C supports multiple storage interactive system modes based on usage. 1. Using the Enphase App,select Menu>Settings>Profile r 2. Select one of three three modes: • Self-Consumption mode(default,no setting change Sta,ni 8unfd 0 required) • Al Optimization • Full Backup SefE-Gansumptie+n Full Backup t*r�azgzv�.s�r��aan'A"==�i�• >ins;i.5 -F.N i'> d�FxY +trlrti; For more information on operation modes,refer to the storage system owner's guide at https://enphase.com/en-us. 13.4 Troubleshooting If the IQ Battery(ies)are not operating correctly,follow these troubleshooting steps.If the issue persists,contact Enphase at https://enphase;com/contact/support 1. if the IQ Battery(les)does not operate,check the temperature in the room and increase cooling and/or ventilation as required. - - --- _Check that'the sides of IQ Battery 10C have at least B"05 cm)clearance from the wall,and the top and bottom have at least 8 (20 cm)clearance from the wall. - — ------ 2. If the IQ Battery 10C LED is off,turnoff the AC breaker.to which 10 Battery 10C is connected on the branch circuit,wait for at least one minute,and turn it back on. ONOTE:IQ Battery 10C has multiple field-replaceable parts.These must be replaced by trained service personnel.Contact Enphase Support before replacing any part. ONOTE:For grid-tied batteries during a brownout or blackout,IQ Battery 10C powers down automatically.This is normal.When power is restored,it automatically starts up again. 3. If you do not see IQ Battery 10C information in the Enphase App,check that the IQ Gateway and the internet connection are working. 4. If the issue persists,contact Enphase Support at https://enphase.com/contact/support EN-36 Revision history DescriptionRevision Date 1 140-00379-02 January 2025 Updated the Wiring the Control(CTRL)cable between system components"section. 140-00379-01 November2024 Initial release. Enphase Support:https://enphase.com/contact/support. EN-37 140-00379-02-EN-2025-01-29 Applicable regions:North America 0 2025 Enphase Energy.All rights reserved.Enphase,the a and CC logos,IQ and certain other marks listed at �ttps://enohase.co trademarkS usage guidelines are trademarks of Enphase Energy,Inc.in the U.S.and other countries.Data subject to change. ENPHASE.