Permit#: 52893 Date: 04/21/2026
Permission is hereby granted to:
Marco Sacchi
19 Greenview Ave
Princeton, NJ 08542
To:
install hot tub as applied for. Must maintain minimum 15'setbacks to lot lines.
Premises Located at:
100 Arrowhead Ln, Peconic, NY 11958
SCTM#98.-2-2.1
Pursuant to application dated 04/08/2026 and approved by the Building Inspector.
To expire on 04/20/2028.
Contractors:
Required Inspections:
FOOTING/REBAR, ELECTRICAL- ROUGH, ELECTRICAL- FINAL, DRAINAGE, FINAL,
Fees:
SWIMMING POOLS-ABOVE-GROUND WITH REQUIRED FENCING $300.00
CO Swimming Pool $100.00
Total $400.00
����� raiiding Inspector �� �
TOWN OF SOUTHOLD—BUILDING DEPARTMENT
Town Hall Annex 54375 Main Road P. O. Box 1179 Southold,NY 11971-0959
Telephone (631) 765-1802 Fax(631) 765-9502 litter//NKy outlioldtown .go
Date Received
APPLICATION FOR BUILDING PERMIT
For Office Use Only
PERMIT NO. 5-2 Building Inspector......
Applications and forms must be filled out in their entirety.Incomplete
applications will not be accepted. Where the Applicant Is not the owner,an
Owner's Authorization form(Page 2)shall be completed.
Date: vl' g 2-6
OWNER(S)OF PROPERTY:
Name: hNZC6 S SCTM#1000- u— 1
a
Project Address:
Phone#: co(A
sS2 3 Email:
Mailing Address: �� L V ILA
CONTACT PERSON:
Name:
Mailing Address:
Phone
DESIGN PROFESSIONAL INFORMATION:
Name:,
Mailing Address:
Phone#: Email;
CONTRACTOR INFORMATION:
Name:.
Mailing Address:
Phone#: : m=
DESCRIPTION OF PROPOSED CONSTRUCTION
❑New Structure ❑Addition ❑Alteration ❑Repair ❑Demolition Estimated Cost of Project:
Other $
Will the lot be re-graded? ❑YesXNo Will excess fill be removed from premises? ❑Yes KNo
1
PROPERTY INFORMATION
Existing use of property: JZ _SkbbNJT1 Intended use of property:
Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to
this property? DYesMNo IF YES, PROVIDE A COPY.
❑ Check Box After Reading: The owner/contractor/design professional is responsible for all drainage and storm water issues as provided by
Chapter 236 of the Town Code. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building zone
ordinance of the Town of Southold,Suffolk,County,New York and other applicable Laws,Ordinances or Regulations,for the construction of buildings,
additions,alterations or for removal or demolition as herein described.The applicant agrees to comply with all applicable laws,ordinances,building code,
housing code and regulations and to admit authorized inspector:on premises and in building(s)for necessary inspections.False statements made herein are
punishable as a Class A misdemeanor pursuant to Section 210AS of the New York State Penal Law.
Application Submitted By(print name): `(v 1 ❑Authorized Agent O
Signature of Applicant: Date:
CONNIE D.BUNCH
Notary Public,State of New York
STATE OF NEW YORK) No.01 BU6185050
SS: Qualified In Suffolk County
COUNTY OF ) Commission Expire$April 14,2
being duly sworn, deposes and says that(s)he is the applicant
(Name of individual signing contract) above named,
(S)he is the
(Contractor,Agent,Corporate Officer,etc.)
of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this
application;that all statements contained in this application are true to the best of his/her knowledge and belief;and
that the work will be performed in the manner set forth in the application file therewith.
Sworn before me this
ay of ��) 20CD '��
� &Lf
Notary Public
PROPERTY OWNER AUTHORIZATION
(Where the applicant is not the owner)
1, residing at
w do hereby authorize .-to apply on
my behalf to the Town of Southold Building Department for approval as described herein„
Owner's Signature Date
Print Owner's Name
2
J-200
5.0 General Electrical Safety Instructions
Your new Jacuzzi spa is equipped with a "state-of-the-art"
equipment system. It contains the most advanced safety
and self-protective equipment in the industry.
Nonetheless, this spa must be installed properly to insure Li\
dependable usage. Please contact your dealer or local
building department should you have any questions regarding your
installation.
Proper grounding is extremely important. Jacuzzi spas are equipped with
a current collector system. A pressure wire connector is provided on the
surface of the control box, located outside the equipment door (page
16) to permit connection of a bonding wire between this point and any
ground metal equipment, metal water pipe or conduit within 5 feet (1.5m)
of the spa„ or copper clad grounding rod buried within 5 feet (1.5m) of the
spa. Bonding wire must be at least No. 8 AWG (8.4 rnm2) solid copper
wire. This is a most important safety assurance feature. Before installing
this spa, check with the local building department to insure installation
conforms to local building codes. RETAIN STORM WATER RUNOFF
PURSUANT TO CHAPTER 236
120/240 Volt Convertible Models OF THE TOWN CODE.
A spa connected to a 120 VAC electrical service must be located close
enough to a grounded, grounding-type electrical outlet so that the
included 10-foot (3m) power cord can be plugged directly into it. DO NOT
USE AN EXTENSION CORD as this could cause damage to the spa's
equipment due to insufficient voltage. The power supplied to this spa
must be a dedicated circuit with no other appliances or lights sharing the
power provided by the circuit.
IMPORTANT NOTE: All Jacuzzi® Hot Tubs are specifically designed for
portability and movement. Engineered to be freestanding, portable and
accessible with no fixed position. These products comply with all relevant
directives and standards for portable spas. These units should be
properly installed by a certified installing electrician to the recommended
service box (GFCl/RCD) as per local regulations. They can be easi
moved r rN �.O �POOL T BODE
'a UPON COMPLETION
BEFORE"WATER"
COMPLY WITH ALL CCI�F OF
F� BY NEW YORK STATE&TOWN CODES
NOTIFY BUILDING DEPARTMENT AT ASR
EQUIRED CONDITIONS OF
631-765-1802 8AM TO 4PM FOR THE
FOLLOWING INSPECTIONS: LD TOWN ZSA
I. FOUNDATION-TWO REQUIREDL TOM PLANNING SC
ARD
FOR POURED CONCRETE1 � E
2. ROUGH—FRAMING&PLUMBING
3. INSULATION DEC
4. FINAL-CONSTRUCTION MUST8"100POCCUPANCY BE COMPLETE FOR C.O. LD
SM
'„,
ALL CONSTRUCTION SHALL MEET THE rA USE ,�'"
REQUIREMENTS OF THE CODES OF NEW
YORK STATE. NOT RESPONSIBLE FOR WITHOUT CERTIFICAI'&,,
2 DESIGN OR CONSTRUCTON ERRORS INSPECTION REQUIRED
4
J-200
6.0 Power Requirements
Jacuzzi spas are designed to provide optimum performance and flexibility
of use when connected to the maximum electrical service listed below.
Minor circuit board modifications can be performed to allow your new spa
to accept an electrical service other than the factory operation setting. The
electrical wiring of this spa must meet the requirements of the National
Electrical Code/USA(NEC) and/or any applicable state or local codes.
Note: Refer to pages 55-58 for circuit board configuration details or
contact your authorized Jacuzzi dealer.
North American J-215/J-225 Convertible Models . i
120V/15A* 240V 0 * 24 V/40A**
Circuit Breaker: 15A, 1-Pole 30A, 2-Pole 40A, 2-Pole
Number of Wires: 3 (15A GFCI 4 (Hard Wire 4 (Hard Wire
Cord US Only) Only)
Only`)
Frequency: 60 Hz 60 Hz 60 Hz
Current Draw: 12A 20A 31A
* In 15A/30A configuration, the heater will ot-o while the jets
pump is running in high speed, Me fact2LY Seffiag is
** In 40A configuration, the heater te while the jets pump is
running in high speed.
**CAUTION: (For a 4-wire 240 VAC Heater Operation): Make
certain wires are connected exactly as shown in Figure D (page 17)
before applying power. Failure to do so will result in damage to the
circuit board and/or related components and void the manufacturer's
warranty.
North American J-235/J-245/J-285 Models . i
24 V 40 * 240V/5Q6** 240YI60A
Circuit Breaker (2-Pole): 40A 50A 60A
Number of Wires: 3 3 3
Frequency: 60 Hz 60 Hz 60 Hz
Current Draw: 26A 36A 45A
* In 40A configuration, the heater will al while either jets
pump is running in high speed. Note:pump 2 runs only in high
speed.
** In 50A configuration, the heater Will not p2r while both jets
pumps are running in high speed.
Note: pump 2 runs only in high speed.
*** In 60A configuration the heater will o122ratil while both jets pumps
are running in high speed.
13
J-200
7.0 Electrical Wiring Instructions
IMPORTANT NOTICE: The electrical wiring of this spa must Mr X
meet the requirements of the National Electrical Code/USA
(NEC) and/or any applicable state or local codes. The
electrical circuit must be installed by a qualified electrician
and approved by a local building/electrical inspection authority.
1. Convertible 120/240V Power Models:
• iL DANGER: TO DECREASE THE RISK OF SHOCK,
PRODUCT DAMAGE OR ELECTRICAL FIRE.
120V "Plug-in" Operation: This spa must operate on the supplied
120V GFCI cord at its original length or must be hard-wired for longer
runs. NEVER USE AN EXTENSION CORD FOR ANY REASON!
• Convertible 1201240V heater Operation: The included 120V
GFCI cord must be discarded for 240V heater operation. This spa
must be hard wired. Supplying power to either configuration above
which is not in accordance with these instructions will void both the
independent testing agency listing and the manufacturer's warranty.
2. Qedirated 230Y--240Y
No plug-in connections or
extension cords are to be used in conjunction with the operation
of this spa. Supplying power to the spa which is not in accordance
with these instructions will void both the independent testing agency
listing and the manufacturer's warranty.
3. The power supplied to this spa must be a dedicated circuit with no
other appliances or lights sharing the power provided by the circuit.
4. To determine the current, voltage and wire size required, refer to
Section 6.0 "Power Requirements" (page 13).
• Wire size must be appropriate per NEC/USA and/or local codes.
• The spa controller's terminal block will accept a maximum wire size
of 6 AWG (10 mm2).
5. The electrical supply for this product must include a suitably rated
switch or circuit breaker to open all ungrounded supply conductors
to comply with Article 422.20 of the National Electrical Code/USA,
ANSI/NFPA 70. The disconnecting means must be readily accessible
to the spa's occupant but installed at least 5 feet (1.5m) from spa
water.
6. The electrical circuit supplied for the spa must include a suitable
ground fault circuit interrupter (GFCI) as required by NEC/USAArticle
680.42.
7. The electrical supply for this product must include a suitably rated
isolating switch and circuit breaker to comply with local electrical
regulations. This RCD/GFCI circuit breaker must be installed at the
power supply in the house electrical box.
14
Jacuzzi J-285
Specifications
Seating Capacity........ 6-7 Adults
Dimensions........................ ,...89"x 89"x 36" (226 cm x 226 cm x 91 cm); 1 �-
For Complete Dimensions, See page 82 E •`�
Dry Weight..................................777 Ibs (352 kg)
Filled Weight (Spa Volume) ...—4,905 Ibs (2,225 kg)
Filled Weight(Average Fill)....,..3,821 Ibs (1,733 kg) B G: ,
Water Capacity (Spa Volume)...495 US gallons (1,874 Liters)
Water Capacity (Average Fill)—365 US gallons (1,382 Liters)
Electronic Controls ...................Solid state electronic controls with LED readout,
programmable temperature,filtration, and heat
cycles NOW
Pump 1....................--................North America (60 Hz): 2-Speed, 4.5 HP brake,
2.5 HP continuous, 56 Frame
Export (50 Hz): ..............2-Speed,2.0 HP continuous
Pump 2........................................North America (60 Hz): 1-Speed, 4.8 HP brake, 2.5 HP continuous, 56 Frame
Export (50 Hz): .............. 1-Speed, 2.0 HP continuous
Circulation Pump.......................No
TotalJets....................................42
Seat A Jets .................................2 SL Directional, 4 SL3R Rotational
Seat B Jets.................................2 SL5 Directional
Seat C Jets.................................2 SL Directional, 1 SL3 Directional, 8 SLR Rotational
Seat D Jets................................. 1 SL5 Directional
Seat E Jets .................................2 SL Directional, 6 SL3 Directional
Seat F Jets..................................4 SL3R Rotational, 2 SLSR Rotational
Footwell (G)................................8 SL Directional
Massage Selectors....................None
Air Controls................................2
Water Management System......One 50 ft2 filter cartridge on jets pump 1, ClearRay Active Oxygen®System
Export (50 Hz): ...............ClearRay@ UV-C System
LED Lighting..............................LED Lighting System (Interior Surround); Standard Exterior Light
Cabinet Colors.........................,..Smoked, Charcoal
Acrylic Colors............................Platinum, Silver Pearl, Monaco, Midnight, Porcelain (while quantities last)
Headrests...................................4
Waterfall .....................................One independent flow rate (on or off) adjustment; powered by the pump 1
Heater: ........................................ North America (60 Hz): 5.5 kW, High Flow
Export (50 Hz): ..............High Flow, 2.7 kW
Electrical Requirements: ..........North America (60 Hz): 240 VAC@40A, 50A or 60A
Export (50 Hz): 220-240 VAC@1x16A, 1x32A or 2 out of 3-phase (see
manual) or suitably rated circuit breaker to comply with local electrical
codes. Certain countries may require dual power inputs; two GFCI RCD
breakers are required for this configuration.
Warranty*....................................North America (60 Hz): 5 Years Shell„ 3 Years Shell Surface, 3 Years
Plumbing Component Leaks, 3 Years Equipment and Controls, 1 Year
Cabinet, 1 Year Jets
Export (50 Hz): 5 Years Shell, 3 Years Shell Surface, 3 Years Plumbing
Component Leaks, 3 Years Equipment and Controls, 1 Year Cabinet,
1 Year Jets
Special Features (Optional)......SmartTub® Module
Audio System (Optional)...........N/A
`(See Warranty Document for Specific Details) Dimensions/Specifications are Subject to Change Without Notice
52
Jacuzzi J-288
Operation/Seat Depths
', ,may ♦ ��,
fj ♦ i
o.
! * " ' ✓♦L'►♦lam
1 �y
♦ Group A Jets are
o always on when
♦ � ` Pump 1 is running.
µF %nij;N� p
W% ��
' /Z %% Group B Jets are
always on when
l ♦, Pump 2 is running.
Air Control 1: Waterfall Valve: Air Control 2:
Opens/Closes Adjust water flow Opens/Closes
Air Inlet to Jet to the waterfall. Air Inlet to Jet
Group A Group B
42 Total Jets
SL Jets (14) 0
SLR Jets(8) SL3 Jets(7) a
SL3R Jets (8)
�1° SL5 Jets (3) 1*,
SL5R Jets (2)
Spa Operation Subject to Change without Notice
Seat DepthsV,, ,,
A= 26.00" (66.04 cm) G = 23.25" (59.06 cm) Listed dimensions 004 "` '
.. " represent distance from �� � i►e
B = 21.75 (55.25 cm) H = 17.25 (43.82 cm} p
C = 25.00" (63.50 cm) I = 30.00" (76.20 cm) top of acrylic to lowest >'
point in seat.Tolerance
D = 21.63" (54.93 cm) ±0.5"(1.27 cm). # 1
E = 27.00" (68.58 cm)
F = 18.00" (45.72 cm)
ar lil � It�
f �► ww
Dimensions/Specifications are Subject to Change Without Notice fax
53
Jacuzzi J-285
Dimensions
FRONT VIEW
To View Tolerance:±0.5"(1.27 cm)
10.501, 26.75" 6,5'
(26.67 cm) '67.95 CM1 .51 cm)
.4 89"(226.0 cm)Shell
7 ---- ---------- -------.........
..................
0.3!
0. k 1 13,25*
(76302.cm) (33.66 cm)
(226.0 cm)
Shell
69.75" (3.18 cm)
#
(175.9 cm)
conduit Conduit
Part Port
RIGHT SIDE VIEW
Control Tolerance:±0.5"(1.27 cm) 4.75"
Panel (12.07 cm)
±0.25"(0.635 cm)
........... ........................
Front
31.25"
(79.38 cm)
Equipment Bay/
Pump Access,Drain, (10.16 c
ClearRay Active Oxygen®
Optional SmartTub@ System ELecTTICAL
26.0- CONDUIT
(66.04 cm)
IMPORTANT!Always measure each hot tub
STOP for exact dimensions BEFORE designing its (::0)
STOP
foundational support and/or decking.
Cabinet Radius:
10.0"(20.32cm) iorz
r TOP VIEW
88.5"
(224.8 cm)
Skirt
84.75"
(215.26 cm)
Kickrail
0,5.
EQUIPMENT BA Y
Electrical conduit from undemeath
(1.27 cm) (not predrlled;measured from edge of kickrail)
_J
37"
(93.98 cm)
84,75"(215.26 cm)Kickrail ------91
88.5"(224.8 cm)Skirt 0
Dimensions/specifications subject to change without notice.Tolerance:±0.5"(1.27 cm)
Dimensions/specifications subject to change without notice.Tolerance±0.5"(1.27 cm)
54
Des gn Frefe{ 3- Ciutificztz—Required. SITE DATA A—
Submit P.E.or a.Cernfication for the EXCAVA710N INSPECTION REQUIRED
h,IDII.D..and C—Ir.cb- fmD le.ag-li3,—I S,
tem i SuRDIVISION-—F OF AMOWHEAo COVE7 FILED IN THE DEFILE OF THE
ILI-F—WMM-073 I FoR SANITARY Sys-i EM A. K OF euffOLK OOVN7r ON TUNE M,i%3 AS FILE NO-3uS
By HEAL DEPARTMENT VERTICAL DATUM NAM(19111) L—d S—"-
DEPM TO GROUNDWATER(—f—1) ','==:=---
-WISr OF BEDROOMS(DESIGN ER—ALEN 0 =6 A—I—I
iKIN-J.WQ—Eb TIA
MOOED VA owns CAP— --.At HEALTH DEPARTMENT USE
TEST HOLE DATA LZA—SYSTE.RKUMED =400 SF5WA
AREA=41,877-1Q-FT.
FROM"VEY PREPARED BY A.SFSWA
FECONID,—uou`,'c' SUPPO;A C0jNTy Do-ART&,IENT Or HEALTH.SER)JICES
s PP LAST DATED IVNE 6,eD14 NOTES
PERMIT FOR APPROVAL OP CONSTRUCTION Fc.4,A
EI,-264 DO' LTfiE-51-1AUBEIAD —NUFA-1-1—ajEANUIA, SINGLE FAmic,REsl�ENcE AND
2.THE DE—ENGINEER.FUjIOcAN VIA REPRESENTATIVE,AM—S C.b...
RMESEN'FATII/65 SH—OBSERVE THE INSTALLATION OF OWIS AND
Lb. LEACHING SYSTEM AP VAL FROM ALL THREE NrIM TO MlKFIi1. �'Ne R-23-1719 DATE 4e1Hv
&THESYSTEMSTA 7 ,7#L,,,,'
SUPERVISION OF A FJTIaEAN USA REPRESENTATIVE APPRO
4.AN EXEN TEDOPERATIONAM"INTENANOEIGNTRACTREIWEIFI H Tc)TAL Mxck"m
IAAIN�A�PkOI—AN—Ek—wNcRJAuSTK5u—TrFD THE
1 sum TO
EXPIRES THREE YEARS L IN
SUH���M�AR�ENTQPK��SER� S(SMHS)M�'. F �:)-1 0 Ap-ROVAL
APPROVAL OF THE VA OWTS R Fce—By THE SSILS IN A""""N"al i`—A WITH I]OF THE I.FFOLK 0-1 SANZiARY GORE.
REVISED PLANS
5.FDZ D ROM ELEVATION(S)TO IS VERIFIED BY ARCHITE-
APPROVED 12/2,124
WOODED ENGINEER'S CERTIFICATION
I NERERY CERTIFY—WATER 5LRPLY(5)ANDIM SEWAGE bc—AL
DRAINAGE CALCULATIONS —�M(S) TrIISROJC�Wu*DE53r5NEb V ME-DMFIiiW
DMECTION.B—D uFON A C�uL AND——&Y OF -II.,
AOO SITE AND iw0uNDWATER DOM—NS,Att FACILITI:
L.1
CONFORM THE
IONSTI—N STANDARDS IN EFFEct AS OF
IvaLIAE.—
C,
USE
9
0 ip
ROPOSED SANI
WRW "
NOWA. NYS LeN O A R93 nTOY SYSTEM USE NEW W02,EE`D� —ASIWAbAMS `S ` —
'SS DOV�S E. ,NYS.P.F\=97
S1
SURVEYOR'S CERTIFICATT
VOLUME PROVIDED
I
USENEWb"3 -WEr(EkEWoBIinFYToI,AARCcr SAGCHi- A'
8'K—'DESP MYWELL I FREPA�0 IN—A— C— rsfiSJ
-
v A DIVYTrENEWY—STATFASS
e, Mmume—�O� il d
it ec"'T WEE.Ewo—
{ PROPOSED brA,6, MyweLL cF
05� I40WA.W. NUt.Le.MI45wu
DANIEL A.WEAVER.�.k� I-S,NO.50Tn CAN^
S
PROPOSED'Ti
HmPANVTANK A'z
SURVEY FOR
MARCO SACCHI
V-'k\A
LOTS 39 A 40"MAP OF ARROWHEAD COVE"
at Peconic,Town of Southold
�rers Suffolk County,New York
FOMeI,� �NS I—T
Water Imp.—irt be ,Rgqqodr ' 11 eUSol BUILDING PERMIT
w" yy� TcP5STON �
C.11(631)852-5754.48 h.—in
J A 1,—1000 9a 2.1
d—e,to lifeduha irspodi—(I).
FIELD..YEY.MAFTED
S-E
LEGEND Record of Revisions DATE
q0 .CONCRETE.--T FOUND
-S MONUMENT SET
-otCSPAVEMENT S ec10
cD'.
ON
WoF =WOOD
w,, =WOOD STAKE FOUND FD-*`4i GLASS A�"C—rE I�
SHALI-
B WSS WOOD—.E SF, ce,�ST IN PL-E IN S AD BD 320
END OF o--g.—wb.T= Scale:1"=40'
5HALLON SANITARY SEVeR MANHOLE
JOS, 2023-001W
o
NTH we.