Loading...
HomeMy WebLinkAboutPBA-04/20/2026 PLANNING BOARD MEMBERS MAILING ADDRESS: P.O.Box 1179 JAMES H.RICH III Southold,NY 11971 CHAIRMAN wt OFFICE LOCATION: MIA JEAOUS-DANK Town Hall Annex DONALD J.WILCENSKI 54375 State Route 25 MARTIN SIDOR Southold,NY 11971 PIERCE RAFFERTY tw �" Telephone:631-765-1938 I Y www.southoldtownny.gov SPECIAL MEETING AGENDA Monday, April 20, 2026 5:00 p.m. Options for public attendance: ♦ In person: Location: Southold Town Recreation Center, 970 Peconic Lane, Peconic or ♦ To join via computer Click Here or Online at the website zoom.us Click "Join a Meeting" Meeting ID: 816 3785 9337 Password: 620179 ♦ Join by telephone: Call 1 (646) 931-3860 Enter Meeting ID and password when prompted (same as above) Southold Town Planning Board Special Meeting —April 20, 2026 — Page 2 SITE PLAN APPLICATIONS DETERMINATION SMB Apartments — This site plan proposes a new 7,061-square-foot multiple dwelling with six units on a 1.6-acre property with an existing mixed-use building in the Hamlet Business (HB) Zoning District. The property is located at 56025 NYS Route 25, Southold. SCTM#1000-63.-3-26 OFFICE LOCATION: MAILING ADDRESS: Town Hall Annex , P.O. Box 1179 54375 State Route 25 Southold, NY 11971 (cor. Main Rd. &Youngs Ave.) Southold, NY � � I� ,' Telephone: 631 765-1938 w w w.southoldtownny.gov PLANNING BOARD OFFICE TOWN OF SOUTHOLD April 21, 2026 Ms. Patricia C. Moore, Esq. 51020 Main Road Southold, NY 11971 Re: Site Plan Approval — SMB Apartments Located at 56025 Main Road, Southold SCTM#1000-63.-3-26 Zoning District: HB Dear Ms. Moore: The following resolutions were adopted at a meeting of the Southold Town Planning Board on Monday, April 20, 2026: WHEREAS, this Site Plan application proposes the construction of a 7,061-sf multiple dwelling with six units on a 68,901 sq. ft. parcel with an existing two-story mixed-use building (with retail use on the first floor and two apartments on the second floor) in the Hamlet Business "HB" Zoning District, Southold; and WHEREAS, on October 16, 2023 Patricia Moore, authorized agent, submitted a Site Plan Application for review; and WHEREAS, on November 13, 2023, the Southold Town Planning Board found the application incomplete; and WHEREAS, the Southold Town Zoning Board of Appeals must review the proposed project for a variance for linear footage pursuant to § 280-107; and WHEREAS, the Zoning Board of Appeals held a public hearing on November 2, 2023; and 1 SMB Apartments I April 21, 2026 WHEREAS, on November 16, 2023, the Southold Town Zoning Board of Appeals (ZBA) granted the building length variance as noted in the ZBA File #7845; and WHEREAS, on March 11, 2024, Patricia Moore, authorized agent, submitted application materials; and WHEREAS, at the March 11, 2024 work session, the Planning Board established that the application would be officially accepted as complete for review once the remaining identified materials were filed with the Department; and WHEREAS, on July 30, 2024, Patricia Moore, authorized agent, submitted application materials: and WHEREAS, on September 20, 2024, Planning Department staff, the Chief Building Inspector/Acting Fire Marshal, and representatives from the Southold Fire District met to address logistical challenges regarding fire safety and emergency vehicle access due to existing site constraints; and WHEREAS, on October 2, 2024, Planning Department staff and the applicant's authorized agent met to review and address the preliminary safety comments provided by the Fire Marshal and Southold Fire District; and WHEREAS, on October 7, 2024, the Southold Town Planning Board found the application complete for review; and WHEREAS, on October 7, 2024, at their public meeting, the Southold Town Planning Board, pursuant to State Environmental Quality Review Act (SEQRA) 6 NYCRR, Part 617, classified the proposed action as an Unlisted Action as it does not meet any of the thresholds of a Type I Action, nor does it meet any of the criteria on the Type II list of actions; and WHEREAS, on October 7, 2024, at their public meeting, the Southold Town Planning Board set the Public Hearing for December 2, 2024; and WHEREAS, on October 16, 2024, the Planning Board, pursuant to Southold Town Code §280-131 C, distributed the application to the required agencies for their comments; and WHEREAS, on October 17, 2024, the Southold Town Code Enforcement officer verified that there were no open violations on the subject parcel; and WHEREAS, on October 21, 2024, the New York State Department of Transportation reviewed the proposed application and determined revisions were required; and WHEREAS, on October 28, 2024, the Town of Southold Local Waterfront Revitalization Program (LWRP) Coordinator reviewed the proposed project and recommended the project to be found consistent with Southold Town LWRP; and 2 SMB Apartments I April 21, 2026 WHEREAS, on November 18, 2024, the Suffolk County Planning Commission reviewed the proposed project and determined it to be a matter for local determination as there appears to be no significant county-wide or inter-community impacts; and WHEREAS, on November 22, 2024, the Architectural Review Committee provided comments; and WHEREAS, on December 2, 2024, the Southold Town Engineer reviewed the proposed application and determined revisions were required in order for the site plan to meet the minimum requirements of Chapter 236 for Storm Water Management; and WHEREAS, on December 2, 2024, the Southold Town Planning Board, as Lead Agency pursuant to SEQRA, made a determination of non-significance for the proposed action and granted a Negative Declaration after a coordinated review; and WHEREAS, on December 2, 2024, the Planning Board held and closed the public hearing for the proposed action; and WHEREAS, at their work session on February 10, 2025, the Planning Board reviewed the proposed application, along with comments from referral agencies, and required revisions to the site plan to make it comply with various applicable sections of the Town Code; and WHEREAS, on February 25, 2025, the Southold Town Board adopted Resolution No. 2025-190, authorizing the transfer of 2.78 Sanitary Flow Credits (SFC) from the Town's SFC Bank to the applicant for the proposed development at 56025 Main Road, Southold (SCTM# 1000-63.-3-26), to support the creation of six apartments, including three affordable units; and WHEREAS, following a site meeting between the applicant and the Southold Fire District on September 20, 2024, the Fire District issued a formal response to the Planning Board on May 6, 2025, outlining specific requirements for emergency access and site safety; and WHEREAS, on September 3, 2025, Patricia Moore, authorized agent, submitted the required revised application materials; and WHEREAS, on November 18, 2025, the Planning Board reviewed the submitted materials and required corrections to comply with various applicable sections of the Town Code; and WHEREAS, on January 20, 2026, Patricia Moore, authorized agent, submitted revised plans; and 3 SMB Apartments I April 21, 2026 WHEREAS, on February 2, 2026, the Planning Board distributed the revised application to the Town Engineer and Fire Marshal for comment; and WHEREAS, on February 6, 2026, the Southold Town Engineer reviewed the revised plans and determined revisions were required in order for the site plan to meet the minimum requirements of Chapter 236 for Storm Water Management; and WHEREAS, on February 10, 2026, Patricia Moore, authorized agent, submitted the required materials; and WHEREAS, on February 10, 2026, the Southold Town Fire Marshal reviewed and determined that there was adequate fire protection, emergency egress, and emergency access to the site; and WHEREAS, March 2, 2026, the Southold Town Engineer reviewed the proposed application and determined the site plan met the minimum requirements of Chapter 236 for Storm Water Management; and WHEREAS, on March 20, 2026, the Suffolk County Department of Health Services issued wastewater approval for construction, reference # C-24-0120 with design flow of 1,350 GPD for "Apartments"; and WHEREAS, on April 17, 2026, the Southold Town Chief Building Inspector reviewed and certified the proposed use is permitted in the Hamlet Business (HB) Zoning District; and WHEREAS, on April 20, 2026, the Southold Town Planning Board determined that all applicable requirements of the Site Plan Regulations, Article XXIV, §280 — Site Plan Approval of the Town of Southold, have been met; therefore be it RESOLVED, that the Southold Town Planning Board hereby finds the application consistent with the Local Waterfront Revitalization Program; and be it further RESOLVED, that the Southold Town Planning Board hereby grants Approval with Conditions of the site plan entitled "56025 Main Road (State Route 25)" prepared by Eric M. Hanninen, Licensed Professional Engineer, dated January 30, 2024 and last revised February 9, 2026, and authorizes the Chairman to endorse the plans listed below: Sheet 1: Cover Sheet Sheet 2: Existing Site Conditions & Demolition Plan Sheet 3: NYSDOT Erosion and Sediment Control and WZTC Plan Sheet 4: Proposed Site Plan and Grading/Alignment Plan Sheet 5: Enlarged Site and Alignment Plan Sheet 6: Drainage Plan and Watershed Plan Sheet 7: Sanitary Plan and Utility/Landscaping Plan Sheet 8: Onsite Details Sheet 9: NYSDOT and Erosion/Sediment Details 4 SMB Apartments I April 21, 2026 Sheet 10: Maintenance and Protection of Traffic Notes Sheet 11: Maintenance and Protection of Traffic Tables and Legends Sheet 12: Maintenance and Protection of Traffic Sign Plan Sheet 13: Maintenance and Protection of Traffic Sign Plan Continued and Control Plan Sheet REN-1: Proposed Renderings (Prepared by Kenneth R. Garvin, RA. Dated: 07/23/2024, Last Revised: 07/25/2025) Sheet A101: Ground FI. Plan &Typical Unit Plan (Prepared by Kenneth R. Garvin, RA. Dated: 07/23/2024, Last Revised: 02/09/2026) Sheet A102: Roof Plan (Prepared by Kenneth R. Garvin, RA. Dated: 07/23/2024, Last Revised: 07/25/2025) Sheet A104: Exterior Elevations (Prepared by Kenneth R. Garvin, RA. Dated: 07/23/2024, Last Revised: 07/25/2025) Conditions of Approval: Conditions to be fulfilled prior to building permits being issued: 1. Obtain a Highway Work Permit from the New York State Department of Transportation (NYSDOT) and provide (1) print of the approved plan including the seal, stamp, and signature of the NYSDOT to the Planning Department. Condition to be fulfilled prior to any clearing, grading or construction: 1. Preconstruction Meeting: Preceding the commencement of any clearing, grading, or construction on site, a preconstruction meeting shall be coordinated with the Southold Town Planning Department and Southold Town Engineer prior to any'action taken on site. Ongoing Conditions of Approval: 1. A minimum clear width of no less than five (5) feet shall be maintained as an unobstructed emergency access aisle behind the rear of the building. This area shall remain free of all temporary or permanent obstructions, including but not limited to planters, furniture, or storage, to ensure continuous emergency egress at all times. 2. All aspects of the project shall be constructed and maintained substantially in accordance with the approved site plan including the architectural drawings. Please note the following requirements in the Southold Town Code relating to Site Plans: 1. Any new lighting fixtures beyond those approved as part of the Lighting Plan must conform to the Code and may require Planning Board approval depending on their number, size, intensity and location. Fixtures shall be shielded so the light source is not visible from adjacent properties and roadways and shall focus and direct the light in such a manner as to contain the light and glare within property boundaries and conform to §172 of the Town Code. 5 SMB Apartments I April 21, 2026 2. Proposed storm water run-off containment systems must be inspected by the Town Engineer at the time of installation. Please call the Southold Town Engineer prior to beginning this work. 3. Approved Site Plans are valid for eighteen months from the date of approval, within which time all proposed work must be completed, unless the Planning Board grants an extension. 4. Any changes from the Approved Site Plan shall require Planning Board approval. 5. Prior to the issuance of a Certificate of Occupancy, the Planning Board must inspect the site to ensure it is in conformity with the Approved Site Plan, and issue a Final Site Inspection approval letter. Should the site be found not in conformance with the Approved Site Plan, no Certificate of Occupancy may be issued unless the Planning Board approves the changes to the plan. A copy of the Approved Site Plan is enclosed for your records. One copy will also be sent to the Building Department and the Town Engineer. If you have any questions regarding the above, please contact this office. Respectfully, James H. Rich, III Chairman Encls. cc: Michael Verity, Chief Building Inspector Michael Collins, Town Engineer By signing this letter, the applicant acknowledges that there are Town Code requirements and conditions, including those listed above, that must be satisfied prior to the issuance of a Certificate of Occupancy. Print name: , Applicant Signature: Date: 6