APPLICATION/PER�"iUT FOR HIGHWAY EXCAVA"1"ION AND REPAIR
APPLICATION IS HEREBY made to the Superintendent of Highways of the Town of Southold for the issuance of an Excavation Pertut
pursuant to Chapter 237 of the Code of the Town of Southold, Suffolk County,New York, and other applicable la,vs,ordinances or
regulations for each individual contiguous excavation project herein described, The applicant agrees to comply with all applicable laws,
ordinances,codes and regulations, the attached"General Conditions of Permit"and"Special Conditions",if any and to permit authorized
inspectors to make necessary inspections of the job site.
Print or Type
R.
w......w ...
Keshla Black (516)452-3374//liper mlts@natlonalgnd.com Keyspan Gas East Corp d/b/a National Grid//25 Hub Drive. Melville, 47
Name of Applicant Phone Number Address of Applicant
Phone Numbe.'.._.. Address of Contractor
Name of Con.., . ..... ........ ...._.... ..
k actor »
Name of Property..Owner Requesting Service(if applicable)........... Address
_..... _.
ldress of Owner
...... .,....� ...,.., .... jacking�.�. ` ...... _P........ .., ..�P Rd Love L� (see sketch)
Pike St_Westphalia Rd,Love Ln (1)105 trench (33)3 xS mac leslholes,(4)3'x5 drill pits (4)8 x5 gas pits (U 40'x 0 ackm rt 8 )20 x10 receivingit on Pike St Westphalia hall a
P
Work Description and Location(Street Number,Hamlet,Cross Street)
(a) Is constriction located within 75 feet of tidal wetlands? *Yes No
*If yes, other Town permits may he required.
.... ........................_._._._......_........._., ....... ..
NOTE: All information requested by this Signature of Applicant
Application/Permit Form is 1/23/2025
Required for a complete application!
Date
5. (a) Attached plot plan to reasonably and adequately describe the proposed work. Provide accurate schematic site plan showing the
location of all proposed excavations and relationship to adjoining premises,public streets or areas,and give a detailed description of
all site and pavement restoration work.
(h) Attach all other necessary permits and licenses for this project.
(c) Work covered by this application inay not conunence before issuance of a Highway Excavation Permit by the Town Clerk.
6. fax Map No.: District 1000 , Section Block ........_ Lot
7. Starting Date: TBD by K.Mcgough Completion Date: TB y Mcgough
................................. I D...b K.... .....__ ...
8. Work Schedule: Phase Completion 'Date
Excavation Work Schedule
....... ...
Facility Installation _. .. ........... .. ....... Must be provided
Backfill& Completion _ .... for consideration as a
Pavement Replacement w Complete Application.
9. Under which authority is application being madL y P national grid
ke.. s an...d/b/..a.......... _... ....� .... . __ .................. ................
See Town Code Chapter 237(E)-Provide Resolution by,or authority from,the l_ttility being modified
10. Estimated Cost of Proposed Work: S
11. Reinarks: Mandated bare main replacement
.... .... ....
D_39 1 of 3
12, Insurance Coverage;(Attach Copy)
(a) 111SUfanCC Company
(b) Policy
(r)State whether policy of certification on file with the Highway Department:
(d)Coverage required extended to the Tnwn:
Any Loss including Bodily injury,property or commercial injury caused by or attributable to the work performed:
$1,000,COO per Occurrence and S 2,000,000 general aggregate,
13, Security;
(a)Surety Bond or Certified Check provided in the total Anr oust of$
(b)Maintenance Bond provided:- -- 2 years or years.
14, Fces for Applications and permits:
Basic Application:Fee for Each Project Location - $500.00
A Project Location would include each Bull Hole and/or every road opening or excavation within any
50' Radius whether or not they mav be inter-connected by open trench or directionai boring
The I.C.Ull number of Project Locations shall be subject to the approval of the Highway Superintendent.
Al. /Service Connections excavations @,$50 00
No,
A 2. J Additional Excavations same service @$20-00
0.
D Trench Excavations 18";n depth or less
Total Lineal Footage of E'xcavatioii; , ,,, L.F. Cci-,,,$10,0 0 S
C, Trench Excavations 18" in depth to 5' in depth
Total Lineal Footage of Excavation; -- I-F. $30.00 S
D, 'I'Terich Excavations 5' in depth and over
Total Lineal Footage of Excavation: L.F, $50.00
E. Utility Repair Excavations @$1,000,00/Each
No,
Additional Repairs of Same Service @$500.00/Fach
Nr
TOTAL$
Official Notice to public utilities-proof must be prodded and V
Shall be attached to this application prior to issuanca of permit, 4ws:�
Authorization is hereby granted to the Town Clerk of the Town of Southold to issue a Highway Excavation perruit to;. �k
in accordance with 04,
this application and subject to the"General Conditions"and"Special Conditions"of permit(if any)attached hereto.
sup ER iN,rr-,-NT)ENT OF HIGHWAYS
a was TOWN OF 1"., 7, Mli?, �1mv YORK
D,11XJ �,J
n
k� Wii�7
Da�e Ret;e�ved by 0ie 'I own Ck�k -S- 4 Daw
Dare 14 [lomnit No, �52)
NOTE-: Permit expires one(1)year from date of issuance
No work to start without 24 hour notice to Superintendent of Highways.
Permit must be available at all times for inspection,on site, (luring construction
D-39 2 of 3
Copy Distribution: Permit# L . .........
Highway Department
Engineer(with page 3)
Applicant
Town Clerk (Original)
INSPECTOR'S RECORDS
Inspection Date Findings (use code) Applicant Notified
yt
...........
end
........................ ..................
3 rd
01
.............. (To Permit Clerk)
REMARKS
CODE
113 improper Barricades
IL Improper Lights
ST Sunken Trench or Excavation
UTM Unable to Measure(due to backfilling)
BUC Building Under Construction
WIP Work In Prowess
DB Improper Backfill(too high,not sufficient)
FIFS Inspector Holding for Final Settlement of Excavation
RFR Ready for Repair
D-39 3 of 3
GENERAL CQN,I)ITION'S OF PERMIT
APPLICATION/PERTMIT FOR HIGHWAY EXCAVATION AND REPAIR
I. Permittee's Coutnictors to Comply Nvith Perinit Reguireineuts: The Perri'llittee is responsible for-
informing its independent contractors, employees, agents and assigns of their responsibility to comply with
this permit, including all special/site specific and general conditions Imposed by the Highway
Superintendent while acting as the permittee's agent with respect to the permitted activities, and such
persons shall be required to comply with all permit requirements.
2, No Ri dit to 'ri-esli,ass or interfere with Private Propertv Rig[its: This permit does not convey to the
pen-nittee any right to trespass upon the lands of adjacent property owners in order to perform the permitted
work nor does it authorize the impairment of any rights, title, or interest in real or personal property field or
vested in a person not a party to the permit,
3 Protection of the Highway and Future Highway Maintenance: If future operations or highway,
maintenance projects by the Town of Southold require an alteration in the position of the utility., structure
or work herein authorized, or if, in the opinion of the Highway Superintendent the work performed under-
this permit shall cause unreasonable obstruction to required highway maintenance or endanger the health,
safety and/or welfare of'vehicular or pedestrian traffic,this pen-nit shall be revoked and the utility,
structure. fill, excavation, or other modification of the highway hereby authorized shalt not be completed.
Additionally, the permit may be revoked if the Highway Superintendent finds that the issuance of the
permit was illegal or unauthorized or that the applicant failed to comply with any of the terms and
conditions of the pennit or Chapter 237 of the Town Code.
4, Revocation of the Permit In the Hidiwav Sueerintemignt:.If the Highway Superintendent deems it
necessary to revoke this permit and the project hereby authorized has not been completed, the applicant
shall,without expense to the Town and to such extent and in such time and manner as the Superintendent
may require, remove all or any portion Of the uncompleted utility, structure or fill and restore the site to its
former condition.
5, Notice of(.7onimencervient: At least 24 hours prior to commencement of the project. the permittee and/or
contractor shall notify the Town Highway Department in writing that they are fully aware of and
understand all terms and project conditions of this perinIt. Upon completion of the work..the contractor
shall provide photographs of the completed work to the Town Highway Department and request a Final
inspection.
6. Storaf-ye offouinnient& Materials: The storage of construction equipment and/or materials shall be
confined within the project work area and"'or adjacent areas where permission; legal access has been
obtained in a manner that does not interfere with normal highway traffic.
7, Utility M-,irk-Outs:. The Applicant/Contractor shall be responsible for verification of ail existing utility,
mark-outs and shall take all precautions to protect same. Damage to existing utilities shall be the
responsibility of the contractor and shall be repaired at the contractor's expense.
8, Road Closures: All scheduled road closures must first receive written permission from the Southold Town
Board prior to closing a road. Temporary lane closures may be permitted with the approval of the Highway
Superintendent. This item will included but not be limited to the installation of appropriate signage and
flag men to stop and start traffic to allow for single lane traffic. Road Closures due to unforeseen
emergencies require immediate notification of the Highway Department and shall be firriflied to H-urnediate
and/or expedited restoration of the Work Zone.
9, No Cons ruction Debris in Road Shoulder Area: All Construction Debris shall be removed from the job
site on a daily basis. All stockpiled soil as well as all other project materials that will be staged within the
Right-of Way must be delineated with reflective signage or other means to meet the rnInII11LIm requirements
of the NYS DOT Construction Standards.
GENERAL,C:'ON ITIQNS OF PERtYIIT
APPLICATION/PERIMIT FOR HIGHWAY EXCAVATION AND REPAIR
(Continued)
10. Install.Alaintain Erosion Controls: Required Erosion Control Measures (Ve. silt fencing) is to be placed
on the downslope edge of any disturbed area. This sediment barrier is to be put in place before any
disturbance of the ground occurs and is to be maintained in good functional condition until thick vegetative
cover is established.
11. Clean Fill Ot 1v. All project back-fill shall consist of clean sand, gravel or soil (NOT asphalt, slag, flyash,
broken concrete or demolition debris). All unsuitable soils excavated at the site(i.e. Clay.. Bog, etc.) are to
be removed from the site and not used to backfilI any excavation within a Town Highway.
12. All Areas of Soil Dist irhance : All areas of soil disturbance resulting from the approved project shall be
stabilized to the satisfaction of the Highway Superintendent immediately following project completion. If
the project site remains inactive for more than 48 hours or planting is impractical due to the season, then
the area shall be stabilized with straw, hay mulch and/or jute matting until weather conditions favor
germination.
13. Backlill & C:;on taction of all Excavatimts: Back Fill shall consist of clean fill or soils which exhibit a
well-defined moisture density relationship as determined to be in accordance with ASTMD 698. Fill shall
be placed in maximum lifts of twelve (12") inches thick and shall be mechanically compacted to a Ninety-
five(95°�)percent maximum dry density. Suitable hydraulic compaction by water,jetting at three-foot
intervals will also be permitted subject to a project specific approval by the Highway Superintendent.
14. Restoration of tltc Road Shoulder Area: All man-made improvements located within existing road
shoulder areas must be protected to the greatest extent practical. Items would include but not be limited to
driveway&private road aprons, mail boxes, sprinkler systems, trees and ornamental plantings.
Excavations through driveways and private road pavements must be reconstructed to meet all requirements
of Southold Town Highway Specifications. All pre-existing road shoulder improvements that have been
disturbed during construction must be replaced or repaired by the contractor to the satisfaction of the
Highway Superintendent.
15, Schematic Plans with all Technical information and Scope of Work: To reasonably and adequately
describe the proposed work, accurate schematic site plans must be provided to show or indicate all
proposed construction activity required under this permit. All Pavement surfaces scheduled for excavation
must be saw cut to the full depth of asphalt and concrete pavements. Accurate size of bell holes or width
of trenching must be indicated by dimension or labeling. This schematic site plan must provide details on
all restoration required to meet the requirements of these General Conditions and requirements found in the
Southold Towvii Highway Specifications.
16. Pavement Reconstruction: All Pavement sections must be reconstructed in the following manner.
(Note-When Concrete Pavements are Present-Please reN iew-Restoration requirements witfi the Highway Superintendent)
a) Complete all back-full & soil compaction work as needed to provide a suitable sub-base;
b) Over-cut existing asphalt bell hole or trench by twelve (12") inches on all sides;
c) Install a compacted lift of4"thick Stone Blend base (RCA Blend must meet NYS DOT Specification);
d) Install a two and one half(2.5") inch compacted lift of Asphalt Base Course;
e) Install a one and one half(1.5") inch of Asphalt(Type 6)Wearing Course. (Provide AC at alI joints)
All work listed herein must meet the minimum requirements of the Southold Town Highway
Specifications.
17. Trenching of Pavenrent Surfaces Exceeding One Ilnndred lull' Feet in Length:, All trenching of
pavement surfaces exceeding 100' in length must first be reconstructed to meet the requirements of Item
9 16 as noted above. Once all pavement reconstruction is completed to the satisfaction of the Highway
Superintendent, the entire road section and/or width of road over the entire length of trench shall be
repaved with a two (2") inch lift of Asphalt (Type 6) w'earing Course(Typical,shoulder to shoulder).
„ fl
f �
� I
� I
�6`1 ° ....
s= LLi
z z
w r0
w wa ° W w°
> F-(-) C)
a
D Oo z�
w w w a _.
O w z a
w co
cS LU
w 0Z
z
z w "`�,
�,
y
� y
x
� Y
Z ,� \y "�ti�''�,,• ,",�
z W z
ar•; w `,
z V > "d
y
o rz w d 1z,
< UJ O z
> z 2
d w r w
W d w
r z IN
z
Lu \
Lll
W r
Y
d W Ll LL LL W W
� CyC3C7C5CYC3 �
'FO (nCl7co0 (nV7 �
o0000h-
LLJm mco Or 00
n N N
0 cn
U- sill
a a
z �.
W ui
_ `J = '.W CY lh U7 N O O J
U8 X
� � � � Ni� c-io� � oold—
_ OD0m z � etNO
Y W co N z !—
!U— C1 D C7 W `o C0) 11J r
W JAY N tr'yy 'tL H rn-
U oI— � w � zN - J 0- CD
ZW Y coaW�MW pd Y W
W V7 �-- JOCK Q121 W C ( U
Z WCLQ Lli z d
d d Z3� U' > W 0 h Cf7 e}' tI7
� � r
p 5
5
.
1 \c
w 7,
�z
w m w
,r
w v a- J zc�
0 W w CO
— r
C7 W z
C7 Ct �
LU Cn W
1,
z cc u
t
r r \
v r
m �
LU U) w
rL
>z z a-
< I a
w cif 4 ,..
X d z
x
am
LU
W x+
Cr� �
LL
O
N
Lli
Z i>
U) O r
J
Z � C)
� Y Cp to
� f
N � /
Z o Lj—10 (D
u1 w O <
d . tY � Z 0
oo < WEOZO
o
k�
�X
h
k V
w
. w
W F-0 ZF
w m wd az - .
a o ...
-�
m U a-W W O
0 W � Z�
W U) J l 0 W =
p p C7 t
W Uj Z
Z W
rC6 U) Z
�r F
zz w"
Z ,u, >..�
�� W d
L W p
<LLLJ W
C} > ow Z
W CL
Z
LU
Of
LLI ~
Y
c�
W
O
c7
W Z
W W
U) oo
r
f
Or
W p U N
(IJOI— � ® ZN
z z l< -0
w yr
� � W �
Z W J ® p
Li
a0_ oa c� � r
oa- = aowb
Z W `1 Z j<
O o d WEE d z o
a� p— = 3: 0 iS W U
T1O2646871
Town of Southold
Street Pike St
Road Way Openings
Qty Opening Size Sqft
24 3'x3' 216
4 3'x5' 60
1 8'x5' 40
Trench Attributes
LnFt Trench Width Sqft
30 2' 60
Total 376
Street: Westphalia Rd
Road Way Openings
Qty Opening Size Sqft
9 3'x3' 81
2 8'x5' 80
1 200
1 40'x 10' 400
Trench Attributes
LnFt Trench Width Sqft
25 2' 50
Total 811
Street: Love Ln
Road Way Openings
Qty Opening Size Sqft
2 8'x5' 80
Trench Attributes
LnFt Trench Width Sgft
50 2' 100
Total 180
Town of Southold
P.O Box 1179
Southold, NY 11971
* * * RECEIPT * * *
Date: 04/15/26 Receipt#: 354191
Quantity Transactions Reference Subtotal
1 Excavation Permits 1853 $0.00
Total Paid: $0.00
Notes:
Payment Type Amount Paid By
Southold Town Clerk's Office
53095 Main Road, PO Box 1179
Southold, NY 11971
Name: National, Grid - Keyspan Gas East
25 Hub Drive
Melville, NY 11747
Clerk ID: LYNDAR Internal ID: 1853