Loading...
HomeMy WebLinkAbout52132-Z of SOUly�lo Town of Southold * * P.O. Box 1179 �0 53095 Main Rd °24- UNTO-- Southold, New York 11971 CERTIFICATE OF OCCUPANCY No: 46639 Date: 10/29/2025 THIS CERTIFIES that the building SOLAR PANEL Location of Property: 2350 Clearview Ave Southold, NY 11971 Sec/Block/Lot: 70.4 0-28.3 Conforms substantially to the Application for Building Permit heretofore, filed in this office dated: 07/01/2025 Pursuant to which Building Permit No. 52132 and dated: 07/30/2025 Was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: Roof-mounted solar panels with energy storage system (outdoors) to an existing single- family dwelling as applied for. The certificate is issued to: Gregory Ronan,Anne Ronan Of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL: ELECTRICAL CERTIFICATE: 52132 10/21/2025 PLUMBERS CERTIFICATION: VA/ fjthoize DSnature �aofsootyO TOWN OF SOUTHOLD BUILDING DEPARTMENT • i' TOWN CLERK'S OFFICE coulm. SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 52132 Date: 07/30/2025 Permission is hereby granted to: Gregory 1 Ronan 259 Forest Rd Douglaston, NY 11363 To: install roof-mounted solarpanels and an energystorage system(outdoors)to an existing single-family dwelling as applied for. Premises Located at: 2350 Clearview Ave, Southold, NY 11971 SCTM#70.-10-28.3 Pursuant to application dated 07/01/2025 and approved by the Building Inspector. To expire on 07/30/2027. Contractors: Required Inspections: Fees: SOLAR PANELS $100.00 CO-RESIDENTIAL $100.00 Total 200.00 ------- ------------------ Building Inspector SOUr�QI Town Hall Annex Telephone(631)765-1802 54375 Main Road P.O.Box 1179 CA) • Q Southold,NY 11971-0959 �Q BUILDING DEPARTMENT TOWN OF SOUTHOLD CERTIFICATE OF ELECTRICAL COMPLIANCE SITE LOCATION Issued To: Gregory J Ronan Address: 2350 Clearview Ave City: Southold St: NY Zip: 11971 Building Permit* 52132 Section: 70 Block: 10 Lot: 28.3 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE Contractor: Electrician: Jason Kane Inc License No: 51331ME SITE DETAILS Office Use Only Indoor FV Basement (- Service Solar I✓ Outdoor (✓ 1st Floor F Pool r Spa F Renovation 2nd Floor F Hot Tub F- Generator F Survey Attic I Garage Battery Storage ri rFv INVENTORY Service 1 ph F'' Heat Duplec Recpt Ceiling Fixtures Bath Exhaust Fan Service 3 ph F'' Hot Water GFCI Recpt Wall Fixtures Smoke Detectors Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors Sub Panel A/C Blower Range Recpt Ceiling Fan Combo Smoke/CO Transfer Switch UC Lights Dryer Recpt Emergency Strobe Heat Detectors Disconnect Switches 4'LED Exit Fixtures Other Equipment: 8.2kW Roof Mounted PV Solar Energy System w/ (20) HanwhaQcellQpeakMLG10+ TS 41 OW Modules, 200A Backup Gateway, E-Stop Switch, (1)Tesla Powerwall 3 Notes: Solar & Battery Storage Inspector Signature: X Date: October 21, 2025 Sean Devlin Electrical inspector sean.devlina-town.southold.ny.us 2350ClearviewAveSo la r&Batt Of SOUIyOIo T WN OF SOUTHOLD BUILDING DEPT. °`y�o�►���� 631-765-1802 INSPECTION [ ] FOUNDATION 1ST/ REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE "& CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) /kfLECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: ��� /h LP)WMAO A/-i rl unq-e-7 Q! L-44 � e r i �s c c E e e-3 k G o l.� h7a rom DATE INSPECTOR ho�aOF SOUTyolo ` � ' C)wv V f" TOWN �F SOUTHOLD B L ING DEFT. Comm ' 631-765-1602 INSPECTION [ ] FOUNDATION 1 ST/ REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION.. [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O ( ] RENTAL REMARKS: LAa 611 Cktn DATE INSPECTORS at souryo / # # TOWN OF SOUTHOLD "BUILDING DEPT. o � 631-765-1802 yl � INSPECTION . [ ] FOUNDATION'1 ST/REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] SULATIOWCAULKING [ ] FRAMING/STRAPPING 1%4FINALS01 ✓ 9 S [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] 'FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ]. CODE VIOLATION [ ] PRE C/O [ ]. RENTAL REM KS: l DATE ypYS . INSPECTO OE SOGT,�o� TOWN OF SOUTHOLD BUILDING DEPT. o � 631-765-1802 INSPECTION [ ] FOUNDATION 1 ST/ REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] SULATION/CAULKING [ ] FRAMING /STRAPPING [ .FINAL501trv-ft q j 4� j ]" FIREPLACE & CHIMNEY [" ] FIRE SAFETY INSPECTION [ ]" FIRE RESISTANT CONSTRUCTION ;` [ ] FIRE RESISTANT.PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ . ] CODE VIOLATION [ ] PRE C/O " [ ] RENTAL REMARKS: bAww AA- Aimt 6rpAt Jv DATE YI INSPECTOR OE SOUTyolo 5 r # N�F SOUTHOLD BUILDING DEPT. TO 631-765-1802 INSPECTION [ ] FOUNDATION 1ST/ REBAR [ ] ROUGH PLBG. [ . ] FOUNDATION 2ND [- ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] .FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: C9 . DATE (.) '2, INSPECTOR St 13 2 T E S L F f 1 Tesla Road,Austin,TX 78725 P 650 681 5100 F 650 681 5101 Project/Job# JB-1193200-00 Installation Approval Letter 0 CT 2 1 2025a Project: Gregory Ronan Residence 2350 Clearview Ave Southold,NY 11971 Date of Review 2025-08-19 -O�A`;-;o Permit# 52132 Date of Install 2025-08-19 AHJ Southold Town SC Office Bethpage Design Criteria: Applicable Codes 2020 RCNYS/BCNYS/EBCNYS with 2020 NYSUCS,ASCE 7-16,and 2018 NDS Risk Category II -Wind Speed 130 mph(3-s Gust-Vult),Exposure Category C,Directional Procedure for Rooftop Solar Panels Ground Snow Load 25 psf To Whom It May Concern, have reviewed the PV installation that was specified for this project to certify that the installation was completed in conformance with the permitted plans and manufacturer's specifications.The review is limited to mounting hardware and the loading on the structure directly supporting the installed array(s).Permitted plans and certification letter were stamped and signed by a professional engineer. certify that the system(s)currently installed sufficiently comply with the design criteria listed above and permitted plans,and any minor structural or layout changes are also compliant with the referenced code(s). Should you have any further questions or requirements pertaining to this project,please do not hesitate to contact me. DF NfWY A H NCO 0* r ck� [0'�it011y signed n ' _2 an 2 820 F 111173 �� e ja§�zF'I s�oroo' op'��FESSIONP�� . 4 VL At, ' vs .# ' µ� t _ a ► w + FIELD INSPECTION REPORT 7DATE COMMENTS FOUNDATION (IST) ... ......... -------------------------------------- -- ----------- FOUNDATION (2ND) O C/I ROUGH FRAMING & PLUMBING 04 INSULATION PER N. Y. STATE ENERGY CODE ---------- I f 4 -Ave, 0( A ......... FINAL ADDITIONAL COMMENTS cl -k ------------- 0 j ID X ---------- ......------ ------ -------- ........... ------- ............... ------- --------------- ---------- pro TOWN OF SOUTHOLD - BUILDING DEPARTMENT Town Hall Annex 54375 Main Road P. O. Box 1179 Southold, NY 11971-0959 Telephone (631) 765-1802 Fax (631) 765-9502 https://www.southoldtownny.gov Date Received APPLICATION FOR BUILDING PERMIT E [mg E For Office Use Only z 0 PERMIT NO. S Building Inspector: J U L 1 2025 Apphcatrons and fauns mus the,filled-bbt,n their entirety =Incomplete z Building DsPartment the owner,3an' Town Of Southold D a t e: C's 7", ""7 Alf i i1l - AN JIM '40mom Name: 6re-qory Ronan SCTM # 1000- 070,00 - 10, Loo - '0-as. 0o Project Address: '0 Clingrvieui Ave S:5�kold AN 11q-71 a3s Phone#: Email: om cl 1-7. 7 9 -7 -I?)Lt L4 .9nor!/romf) �)Adny c Mailing Address: cP-350 Cleckrvicui 14v-,,o- &%Tthoid. NY 1197/ gZ�Z V'.ry Name: -T,;vioHv Aai,-%d Mailing Address: 1,5 (;rumr�f\ RC Sul� 400 '&--4V09e �Y 1171 Phone#: 0 15 — Email: BeAaa RTIC04e-�Rla -Com q�- V 41;N A-4 Zr, ,rq- IFORMA10 ' Name: Ryan /Vcro Mailing Address: 13qqo SVV La -z- C4 OT ve-f40n 0 P- c?7007 Phone#: Email: *1 tolo �aoa Ckns k aDJaarvn(orP, com -,C RA NFORMATION: Name: Mailing Address: 15 Gr-Limrnan R-d W Sui4e460 1PQ e- IJ Y Phone#:631-b3b-q,37'7 (AM' Email:BHTPoqe,?-T-r-D-L-SIQ DESCRIPTION OF.PROPOSED CONSTRUC 10 DNewStructure DAddition DAlteration DRepair ':]Demolition Estimated Cost of Project- )LLOther ns a I 6ban o� 26 ReoflunuakdSolar Pezoeir -AI Pe"CA),ak $ .31 1 3 , 00 Will the lot be re-graded? [:]Yes N/0 Will excess fill be removed from premises? 0Yes X 0 I R'iY,INI1701KIWATON Existing use of property: 1'Res IJe l-ket Intended use of property: Zone or use district in which premises is situated: Are there any covenants and restrictions o>Jth respect to this property? :_'Yes T`o IF YES, PROVIDIE A COPY. T Chec#Qox After,Readi lg; The owner/coeetractgrMaslfrrpcpfe�slsl la tasponsiWt fwnR deatnage aesd atoenl wate on r 4ssues is provided Icy t}iaptee 236 0/tfie Towe Cade;JIAIR:tCRTION IS HEREBY MADE to ehe Bulldkn=Oepartmen6 fQ►the tssua,sCt of a ButldinR Penrik purstiaeK tq file Btiildin Zone' Ordinaneeof tfit Towrtot Souehald,SufCotk,County,NewYotkc and offer apptieablekzM,,Orduia *orftukatloiis,for ilia eonEtn Ctfo dt 6 iNdlnrs, �Pp-2%7,b lkcablt taxes,ardiiianc�es,biiilda+afe as a Ckass It rtfisdeeiteanoipi rxuarit tq Section 210.45:of:the'kVgvi York State'Penak law:. Application Submitted By(print name): y� _ ez►��f] Authorized Ag jnt ❑Owner I Signature of Applicant: ��, �"[- .�� Date: �. � u 7-S A STATE OF NEW YORK) SS: COUNTY OF S+uf¢rbI K ) f'i-eevi being duly sworn, deposes and says that(s)he is the applicant (Name of individual signing contract) above named, (S)he is the CO. )r 15 a: c C. Contrac ,Agent, orpor to Officer, etc.) of said owner or owners, and is duly aNLniivni7Frto perform or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and belief; and that the work will be performed in the mariner set forth in the application file therewith. Sworn before me this day of JLcne , Z0 AA �>Lj_,L I--- Notar is PATRICIA M. ZULLO NOTARY PUBLIC-STATE OF NEW No.0lZUo01ZU00015k39 YOWkOPERTY OWNER AUTHORIZATION Qualified in Suffolk County (Where the applicant is not the owner) My Corn mission Expires 02-15-2027 i, c7legg!5t 204-14til residing at E J C ggaryieLu Ave do hereby authorize saro)oid ! ltma '^ -pew aw. to apply on � my iaif to the Tow thold Building Department for approval as described herein. Ow is nature Date C �- ���'� Prr t O ner's Name 2 4�Sf�FEpj��aG BUILDING DEPARTMENT- Electrical Inspector TOWN OF SOUTHOLD Town Hall Annex - 54375 Main Road - PO Box 1179 ` Southold, New York 11971-0959 Telephone (631) 765-1802 - FAX (631) 765-9502 jamesh(cb_southoldtownny.gov — seand(a southoldtownny.clov APPLICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (Ail Information Required) Date: Z3 —Z _02,h) Company Name: Trion Kctoe- c Electrician's Name: JOL—'sorx Ccc� License No.: Me 513.31 Elec. email: j Kanlr CD Elec. Phone No: I� 306 - 01-a ❑I request an email copy of Certificate of Compliance Elec. Address.: ja7 VVa S+fJV RCtS — P� I)0 .,4 //,5! JOB SITE INFORMATION (All Information Required) Name: U a t� Address: �50 VI,e e�`� , �`�/ Cross Street: Phone No.: ql -1 - 797 . 1344 Bldg.Permit #: 6 o21 -31�_ email: Tax Map District: 1000 Section: ®70e ®b Block: lo.I)O Lot: BRIEF DESCRIPTION OF WORK, INCLUDE SQUARE FOOTAGE (Please P int Clearly): a a© z (,1Wn tr4J �D Ia® Parma l S' $`.QU I Tes(ci P&L,�e(k% er1f Square Footage: Circle All That Apply: Is job ready for inspection?: YES �NO O Rough In F Final Do you need a Temp Certificate?: Rr YES ❑ NO Issued On Temp Information: (All information required) Service Size❑1 Ph 03 Ph Size: A # Meters Old Meter# ❑New Service0 Fire Reconnect ElFlood Reconnect OService Reconnect OUnderground Noverhead # Underground Laterals D 1 2 H Frame Pole Work done on Service? Y N Additional Information: PAYMENT DUE WITH APPLICATION 15 Grumman Road ill Suite 400, Bethpage, NY 11714 P. 631.358.0673 Town of Southold Building Dept Annex 54375 Main Road PO BOX 1179 Southold NY 11971 631-765-1802 'RE: Installation of(20) Roof Mounted Solar Panels 8.2 kw and 1 Tesla Powerwall 13.5 kwh Homeowner: Gregory Ronan Address: 2350 Clearview Ave Southold NY 11971 Tax Map: 1000-070.00-10.00-028.003 Job# 1193200 CHECK#: lvc) Az-c- AMOUNT: $ I am the applicant Patti Zullo with Tesla Energy Operations, Inc. My contact information: Phone. 631-636-4277 Email. BethpagePIC@tesla.ocm Mailing Address. Tesla Energy Inc. 15 Grumman Rd W, Suite 400, Bethpage NY 11714 Please contact me if there is anything else that you need. Also, if you could contact us when the Permit is ready, and someone from Tesla will come in to pick it up. Thank you, Patti Zullo T = 5 L n Energy Price Override Tool 's Gregory Ronan Job Number:JB-1193200-00 ¢ gregoryronan@hotmail.com Reservation Number: EN8755244 2350 Clearview Ave,Southold, NY 11971, USA fi PSE&G-Long Island (999475) t 'V Design 8.200 kW+1 Powerwall+1 FPrimary Created: 6/27/2025 'ateway 1457 kWh/yr, 89% Offset Create New Quote Pricing 05/14/20: Quote Confirmed: 6/27/2025 Pricing 05/14/2025 d System Cost Panels $4,788.88 Inverter $1,216.22 Balance Of System $582.77 Mounting Hardware $1,089.53 Installation $15,253.48 Miscellaneous $2,407.12 8.2 kW Discount -$820.00 Referral Bonus -$400.00 Tax $0.00 Subtotal $24,118.00 )werwall System Cost 1 Powerwall 3 $8,200.00 Accessories $200.00 Installation Fee $6,400.00 1 Powerwall Gateway $900.00 Bundling Discount -$4,900.00 Tax $0.00 Subtotal $10,800.00 ayment Details Deposit -$100.00 Progress Payment -$1,000.00 Subtotal -$1,100.00 :bates to Contract NYSERDA Storage Incentive -250/kwh -$3,375.00 abates to Customer Tesla VPP with PSEG Long Island Estimated 3 Year Value- -$473.85 11.7/kw h NY Solar Tax Credit-25% ® -$5,000.00 US Federal Tax Credit- 30% -$9,320.74 rtal Contract Price - $34;918 aQ )tal Amount Due ® �J $31,543.00 , at Cost �$16,748.41 '15 Grumman Roar! W Suite 400, Bethpage, NY 11714 P. 631.358.0673 STATEMENT OF COST Total Amount: $31,,543.00 I am the applicant Patti Zullo with Tesla Energy. My contact information is: Phone. 631-636-4277 Email. BethpagePIC@@Tesla.com Mailing Address. Tesla Energy Inc. 15 Grumman Rd W, Suite 400, Bethpage NY 11714 Regards, v4; e� a e x� 1 Testa Road,Austin,TX 78725 e P 650 681 5100 F 650 6816101 Version#698.6-1 WS(4) PIL June 21,2025 Certification Letter Project/Job#1193200 Project Address: Ronan Residence 2350 Clearview Ave Southold,NY 11971 AHJ Southold Town Testa Operations Center Bethpage Design Criteria: -Applicable Codes=2020 RCNYS/BCNYS/EBCNYS with 2020 NYSUCS,ASCE 7-16,and 2018 NDS -Risk Category=II -Wind Speed=130 mph(3-s Gust-Vult),Exposure Category C,Directional Procedure for Rooftop Solar Panels -Ground Snow Load=25 psf -MP1:RDL=11 psf,RSL=17.1 psf,PVSL=9.3 psf -MP3:RDL=11 psf,RLL=18.5 psf,PVSL=13.3 psf -MP2:RDL=11 psf,RLL=18.5 psf,PVSL=13 psf Note: Per IBC 1613.1; Seismic check is not required because Ss=0.178<0.4g and Seismic Design Category(SDC)=B<D To Whom It May Concern, A jobsite survey of the existing framing system of the address indicated above was performed by a site survey team from Testa.Structural evaluation was based on site observations and the design criteria listed above. Based on this evaluation,I certify that the alteration to the existing structure by installation of the PV system meets the prescriptive compliance requirements of the applicable building provisions referenced above. Additionally, I certify that the PV module assembly including all standoffs supporting it have been reviewed to be In accordance with the manufacturer's specifications and to meet and/or exceed all requirements set forth by the referenced codes for loading. The PV assembly hardware specifications are contained in the plans/docs submitted for approval. of NEW j, CAP kH NCO ��� W FO 11173 t�= A FESSIONP� L ' .. =STRUCTURAL ANALYSIS,.$HARDWARE DESIGMRESULTS SUMMARY 1-TABLES; Design Standard ASCE 7-16 .Table,26.9 T Ultimate Wind Speed V-Ult 130 mph Fig 26 5 113 ry w $ection,261 _. Ground Snow Load ,.. _. _,P9.. ._.__. __ ._ _. .25.0 psfplume MP Name MP1 MP3 MP2 Roofing Comp Roof Camp Roof' ;`Comp Roof „ > 0 ZS Comp V4 with ZS Comp V4 with ZS Comp V4 with e Standoff rn Flashing Insert Flashing Insert Flashing Insert .y C '..'Pitch 381 . 24°� 25° SURLL:PV 9.3 psf 13.3 psf 13.0 psf •SURLL Non-PV 17:1 psU, 18.5 sf 18.5 Psf Edge Zone Width 6.3 ft 6.3 ft 6.3 ft MP Name 111111131 MP3 MP2 Applied Wind Zone WZ1;2e:2r WZ1,2e' „ WZ7,2e Wind Pressure 21.3 psf -21.4 psf -21.4 psf X-S acin 64 fi4" 641. •;• X-Cantilever 24" 24" 24" : 41a 41" e Y-Cantilever NA NA NA J _ Uplift DCR 79,5% 79.5%, ` XS acin 32" 32" 32" X=Cantllever _. 15' 15,, Y-S acin 74' 74" 74" L Y-Cantilever" -NA " <,. NA NA Uplift DCR 72.0% 71.8% 71.8% Layout `Sta ered; Staggered ji Staggered Applied Wind Zone" WZ2n,3r WZ2n,"2r,'3e xa WZ2n,2r,3e° ,, _ Wind Pressure -25.3 Psf -30.9 psf -30.9 psf XS acin 64„. 48 '`, 48" X-Cantilever 22" 18" 18" v Y-Spacing ':, 41 .,, 41 All' ; Y-Cantilever NA NA NA Uplift DCW ° 88.1% X-S acin 32" 16" 16" X-Cantilever 12 �- t Y-S acin 74" 74" 74' 0 :..,.Y-Cantilever NA NA ;;..; ,NA .. Uplift DCR 86.4% 53.0% 53.0% Layout' 'Staggered Staggered ,'; Staggered. Ap fsWZ3e WZ3r;r x;: ;-WZ3r ,. Iled Wlnd Zone Wind Pressure -31.3 psf -34.8 psf -34.8 psf m X-Spacing 48 AB" ; 48" X-Cantilever 18" 16" 16 v Y-SPacing „ 41'. 41' ., a Y-Cantilever NA NA NA Uplift DCR 89.8% ' '99.8%, % 99.9%1, X-S acin 16" 16" 16" Xantilever„ 10" g 9„ t Y-S acin 74" 74" 74" a° Y-Cantilever ;,,DNA NA, _' .�. �NA Uplift DCR 54.1% 60.1% 60.1% Layout Sta ered. Sta ered Sta ered 1.X and Y are maximums that are always relative to the structure framing that supports the PV. X is across framing members and Y is along framing members. 2.Where resent,the 9teen and red hatching in Applied Wind Zone rows corresponds to hatching on the Site Plan page of the Ian set. MP Name MP1 MP3 MP2 Member'. Member Impact" Member,impact'{ Member Impact° Evaluation , Check OK Check OK Check OK " Results EQUIPMENT IS NOT TO SCALE, FOR ILLUSTRATIVE PURPOSES ONLY. AC DISCONNECT - GATEWAY E—STOP . co 7 '1� `�'i_,'.'r �'n� �'-`y'• �.� --�, ,. `� is ,,,,,,.*-_,,:_- ,.yr.�►�.�-1�..�.¢:+►�.— P OWE R WA L L I t � r T,, � `Lt�.r•��s u � 11 CUSTOMER: DESCRIPTION: DESIGN: CONFIDENTIAL — THE INFORMATION HEREIN JOB NUMBER: J g-119 3 2 0 0 00 Alberto Bravo CONTAINED SHALL NOT BE USED FOR THE Gregory Ronan 8.2 KW PV ARRAY T 5 L n BENEFIT OF ANYONE EXCEPT TESLA INC.. NOR MOUNTING SYSTEM: SHALL IT BE DISCLOSED IN WHOLE OR IN ZS comp V4 w Flashing—Insert 2350 Clearview Ave 13.5 KWH ENERGY STORAGE SYSTEM PART TO OTHERS OUTSIDE THE RECIPIENTS Southold, NY 11971 ORGANIZATION, EXCEPT IN CONNECTION WITH MODULES: THE SALE AND USE OF THE RESPECTIVE (20) Hanwha 0 Cells Q.PEAK DUO BILK ML—G10+/TS 410 PAGE NAME: SHEET: REV DATE: TESLA EQUIPMENT, WITHOUT THE WRITTEN PERMISSION of TESLA INC. Teslo Powerwall 3 240V 1707000—XX—Y 11.5 kW 13.5 kWh 1N1Q 9177971344 WALL MOUNTED EQUIPMENT INFORMATION 7 A 6/26/2025 la POWERWALL FASTENER SCHEDULE' POWERWALL INSTALLATION INFORMATION: FASTENERS PER WALL TYPE MODEL DIAMETER EMBEDMENT CORNER ESR# UNISTRUT REQUIRED? WOOD STUD WOOD SCREW Ya"m 2)¢- , NA YES ❑ NO 1 . POWERWALLS TO BE INSTALLED PER FASTENER SCHEDULE BASED ON WALL TYPE CONCRETE CONCRETE SCREW Y4"0 x 2? NA NA OR CMU AND SITE SPECIFIC CONDITIONS. CONCRETE SIMSPON TTEN HD �- 2] ESR-2713 (CONCRETE) NA OR CMU ESR-1056 (CMU) 2. DO NOT MOUNT BELOW OR ABOVE WINDOWS OF THE SAME STORY. CONCRETE HILTI KH-EZ A" 21 ESR-3027 (CONCRETE) NA OR CMU ESR-3056 (CMU) 3. IF LOCATION NEEDS TO BE CHANGED, PLEASE CONTACT DESIGN TEAM. BRICK HILTI KWIK CONN II A , NA NA 4. ANY UNUSUAL FRAMING NEAR THE POWERWALL THAT MAY COMPROMISE THE WALL BRICK HIT MESH SLEEVE Y ESR-4143 (BRICK) NA STRUCTURAL INTEGRITY SHALL BE RELAYED TO THE DESIGN TEAM PRIOR TO INSTALL. `°`° `ERNE° NO SHEET METAL SCREWS Y:m 3• NA YES ❑ STEEL 5. WHEN INSTALLING POWERWALL+ THE INVERTER IS A SINGLE UNIT AND CANNOT BE 1. INSTALLER TO CHOOSE FASTENER BASED ON FIELD CONDITIONS, WALL TYPE, AND EASE OF INSTALL 2. 1 CONCRETE & CMU NON-ESR FASTENER CAN BE USED WHEN UNIT(S) ARE MOUNTED ON THE GROUND AND SEISMIC SS (SRA STACKED. WHEN INSTALLING A STACKED ARRANGMENT ONLY ONE POWERWALL+ AND AT SHORT PERIOD) IS AT OR BELOW _ 1.25. , 3. 1 CONCRETE & CMU ESR FASTENER CAN BE USED WHEN UNITS) ARE MOUNTED ON THE GROUND AND SEISMIC SS (SRA AT ONE ADDITIONAL POWERWALL CAN BE INSTALLED. THE LARGEST STACKING SHORT PERIOD) IS BELOW S6 = 2.5 AND REGIONAL WIND SPEED (3-SECOND GUST) IS AT OR BELOW 170MPH 4. COLD FORMED STEELL MINIMUM IMUM 25 GAUGE REQUIRES 3 FASTENERS PER CORNER, BUT 1 FASTENER PER CORNER CAN BE USED CONFIGURATIONS ALLOWED BY THE MOUNTING BRACKETS ARE 3 POWERWALL UNITS WHEN STEEL STUDS ARE 8 GAUGE OR THICKER OR 1 POWERWALL+ AND 1 POWERWALL UNIT WHEN BOX IS CHECKED DIVERSITECH PAD ACP24362 IS APPROVED FOR A SINGLE OUTDOOR POWERWALL GROUND MOUNT AND DIVERSITECH PAD ACP36362 IS APPROVED FOR UP TO 2 STACKED USING A POWERWALL+ AND A POWERWALL UNIT OR 2 POWERWALL UNITS REFER TO FASTENER SCHEDULE FOR NUMBER OF FASTENERS POWERWALL UNIT PER CORNER WALL EXAMPLE ONE FASTENER o o a IN ANY HOLE PER CORNER EXAMPLE TWO FASTENERS o®o IN ANY HOLE PER CORNER FASTENER TO WALL PER FASTENER SCHEDULE POWERWALL+ �� OF NEW y + + WALL BRACKET Q N O L)) A NG� �� (N) POWERWALL BRACKET, POWERWALL UNIT NOT * * SHOWN FOR CLARITY r ck: C7 -LAJ `rF� 111173 � + WALL ATTACHMENT: WALL MOUNT SIDE VIEW ONE POWERWALL NTS ESS'lI ATTACHMENT: FRONT VIEW POWERWALL NTS CUSTOMER: DESCRIPTION: DESIGN: CONTAINED SHALL NOT BE USED FOR THE J B-119 3 2 0 0 00 CONFIDENTIAL THE INFORMATION HEREIN JOB NUMBER: Gregory Ronan 8.2 KW PV ARRAY Alberto Bravo F 5 L n BENEFIT OF ANYONE EXCEPT TESLA INC., NOR MOUNTING SYSTEM: 2350 Clearview Ave 13.5 KWH ENERGY STORAGE SYSTEM SHALL IT BE DISCLOSED IN WHOLE OR IN ZS Comp V4 wFlashing—Insert PART TO OTHERS OUTSIDE THE RECIPIENTS MODULES: SOUtI10�d NY 11971 - ORGANIZATION, EXCEPT IN CONNECTION WITH r THE SALE AND USE OF THE RESPECTIVE (20) Honwho Q Cells Q.PEAK DUO BLK ML—G10+/TS 410 PAGE NAME: SHEET: REV: DATE TESLA EQUIPMENT, WITHOUT THE WRITTEN INVERTER: PERMISSION OF TESLA INC. TeSlo POWerWall 3 [240VI # 1707000—XX—Y 11.5 kW 13.5 kWh 9177971344 POWERWALL MOUNTING DETAILS 6 A 6/26/2025 ABBREVIATIONS ELECTRICAL NOTES JURISDICTION NOTES A AMPERE AC ALTERNATING CURRENT BLDG 1. THIS SYSTEM IS GRID—INTERTIED VIA A UL—LISTED BUILDING CONIC CONCRETE DC DIRECT CURRENT POWER—CONDITIONING INVERTER. ALL WORK TO COMPLY WITH SECTION R327 OF THE 2020 RESIDENTIAL CODE OF NYS. EGC EQUIPMENT GROUNDING CONDUCTOR (E) 2. A NATIONALLY — RECOGNIZED TESTING EXISTING EMT ELECTRICAL METALLIC TUBING FSB LABORATORY SHALL LIST ALL EQUIPMENT IN FIRE SET—BACK GALV GALVANIZED GEC GROUNDING COMPLIANCE WITH ART. 110.3. ELECTRODE CONDUCTOR GND GROUND HDG HOT 3. WHERE ALL TERMINALS OF THE DISCONNECTING COMPLY WITH ALL CODES OF DIPPED GALVANIZED I CURRENT Imp CURRENT AT MEANS MAY BE ENERGIZED IN THE OPEN POSITION, NEW YORK STATE&TOWN CODES MAX POWER Isc SHORT CIRCUIT CURRENT kVA A SIGN WILL BE PROVIDED WARNING OF THE AS KILOVOLT AMPERE kW KILOWATT LBW LOAD HAZARDS PER ART. 690.17. AP 0 EQ AS NOTED REQUIRED AND CO ITIONS OF BEARING WALL MIN MINIMUM (N) NEW NEUT 4. EACH UNGROUNDED CONDUCTOR OF THE $Q(Jj} ZM NEUTRAL NTS NOT TO SCALE OC ON CENTER PL MULTIWIRE BRANCH CIRCUIT WILL BE IDENTIFIED BY �( ,2SRIP*,� PROPERTY LINE POI POINT OF INTERCONNECTION PHASE AND SYSTEM PER ART. 210.5. PV PHOTOVOLTAIC SCH SCHEDULE S STAINLESS 5. CIRCUITS OVER 250V TO GROUND SHALL COMPLY RE TQyy�TT STEEL STC STANDARD TESTING CONDITIONS TYP WITH ART. 250.97, 250.92(B). NOTIFY BUILDING DEPARTMENTAT N.Y, TYPICAL UPS UNINTERRUPTIBLE POWER SUPPLY V 6. DC CONDUCTORS EITHER DO NOT ENTER BUILDING 431-74554802 8AM TO 4PM FOR THE W VOLT Vmp VOLTAGE AT MAX POWER Voc VOLTAGE OR ARE RUN IN METALLIC RACEWAYS OR FOLLOWING INSPECTIONS: AT OPEN CIRCUIT W WATT 3R NEMA 3R, RAINTIGHT ENCLOSURES TO THE FIRST ACCESSIBLE DC A., FOUNDATION-TWO REQUIRED DISCONNECTING MEANS PER ART. 690.31(E). FOR POURED CONCRETE 7. ALL WIRES SHALL BE PROVIDED WITH STRAIN ROUGH-FRAMING&PLUMBING RELIEF AT ALL ENTRY INTO BOXES AS REQUIRED BY INSULATION UL LISTING. 4. FINAL-CONSTRUCTION MUST OCCUPANCY OR 8. MODULE FRAMES SHALL BE GROUNDED AT THE UL BE COMPLETE FOR C.O. USE IS UNLAWFUL — LISTED LOCATION PROVIDED BY THE #I L CONSTRUCTION SHALL MEET THE MANUFACTURER USING UL LISTED GROUNDING IFEOUIREMENTSOF THE CODES OFNEW WITHOUT CERTIFICATE HARDWARE. 1(ORK STATE. NOT RESPONSIBLE FOR O� OCCUPANCY 9. MODULE FRAMES, RAIL, AND POSTS SHALL BE BONDED WITH EQUIPMENT GROUND CONDUCTORS. tWW_ORGONSTHUCTONEFIROAS ELECTRICAL INSPECTION REQUIRED VICINITY MAP INDEX Sheet 1 COVER SHEET Sheet 2 SITE PLAN • Sheet 3 STRUCTURAL VIEWS Sheet 4 UPLIFT CALCULATIONS LICENSE GENERAL NOTES Sheet 5 THREE LINE DIAGRAM Sheet 6 POWERWALL MOUNTING DETAILS 1. ALL WORK SHALL COMPLY WITH THE 2020 NYS Sheet 7 WALL MOUNTED EQUIPMENT INFORMATION UNIFORM CODE. Cutsheets Attached 2. ALL ELECTRICAL WORK SHALL COMPLY WITH THE 2017 NATIONAL ELECTRIC CODE. 3. ALL WORK SHALL COMPLY WITH THE 2020 NYS FIRE CODE. MODULE GROUNDING METHOD: ZEP SOLAR 4. ALL WORK SHALL COMPLY WITH THE 2020 BUILDING CODE OF NYS. REV BY DATE COMMENTS AHJ: Southold Town 5. ALL WORK SHALL COMPLY WITH THE 2020 • REV A BRAVO 6/26/2025 CHANGED PW LOCATION RESIDENTIAL CODE OF NYS. 6. ALL WORK SHALL COMPLY WITH THE 2020 w UTILITY: PSE&G—Long Island EXISTING BUILDING CODE OF NYS. CONFIDENTIAL - THE INFORMATION HEREIN JOB NUMBER: J B-1193200 00 CUSTOMER: DESCRIPTION: DESIGN: CONTAINED SHALL NOT BE USED FOR THE Gregory Ronan 8.2 KW PV ARRAY Alberto BravoBENEFIT O ANYONE EXCEPT T 5 L n SHALL ITBEDISCLOSEDN MOLE OR IN NOR MOUNTING SYSTEM: 2350 Clearview Ave 13.5 KWH ENERGY STORAGE SYSTEM PART TO OTHERS OUTSIDE THE RECIPIENTS ZS Comp V4 wFlashing—Insert ORGANIZATION, EXCEPT IN CONNECTION WITH MODULES: Southold, NY 11971 THE SALE AND USE OF THE RESPECTIVE (20) Hanwho Q Cells Q.PEAK DUO BLK ML—G10+/TS 410 TESLA EQUIPMENT, WITHOUT THE WRITTEN PAGE NAME: SHEET: REV: DATE: PERMISSION OF TESLA INC. INVERTER. 91 77971 344 Tesla Powerwall 3 240V 1707000—XX—Y 11.5 kW 13.5 kWh COVER SHEET 1 A 6/26/2025 HATCHING INDICATES WIND PRESSURE MP1 AZIMUTH:86 ARRAY AZIMUTH: 86 ZONES. SEE THE STANDOFF SPACING MATERIAL:COMP SHINGLE STORY: 2 STORIES AND LAYOUT TABLE FOR MORE 5 INFORMATION. MP2 AZIMUTH: 176 ARRAY AZIMUTH: 176 MATERIAL:COMP SHINGLE STORY: 2 STORIES PITCH: 240 :1 :1 Front Of House .. •' ^�w MP3 AZIMUTH: 176 ARRAY AZIMUTH: 176 36" FSB : ''; . Sv MATERIAL:COMP SHINGLE STORY: 2 STORIES -- - } (E)DRIVEWAY To 2350 CI Ave "Ui I ESS I LEGEND AC E-stop (E) UTILITY SERVICE METER I B 2 — •" '• ", EXTERNAL DISCONNECT SWITCHDISTRIBUTION PANEL O 36" FSB I C AC DISCONNECT E© EMERGENCY STOP DEVICE I ® GATEWAY ENERGY STORAGE SYSTEM 36" SB TEWAY m I IL_ ' I IW T i t�dW T ; Ln m I I I JVG . . , � WARNING LABELS PROVIDED AT APPLICABLE EQUIPMEN "' _ * ° - '� STANDOFF LOCATIONS r. W COND IT RUN wUl E::: GATEyFENCE ° / }•' �' `- == U G HEAT PRODUCING VENTS ARE RED d MP5 -n ,, FO 1 1173 r=� Ln I : ; — ,r ; '. A �� ,; 11 INTERIOR EQUIPMENT / CONDUIT IS DASHED I Sv __- -_ Sv N -� TOTAL ARRAY AREA (SF): 434 SITE PLAN N TOTAL ROOF AREA (SF): 3530 Scale:1/16" = 1' w E TOTAL ARRAY AREA IS a 12.29 01' 16' 32' PERCENT OF TOTAL ROOF AREA IS CONnDENTIAL- THE INFORMATION HEREIN JGB NUMBER J B-119 3 2 0 0 0 0 CUmOm . T"• DESIGN: _ CONTAINED SHALL NOT E USED FOR THE Gregory Ronan 8.2 KW PV ARRAY Alberto Bravo T 5 L n BENEFIT of ANYONE EXCEPT TESLA INC., NOR .s>s�M: 2350 Clearview Ave SHALL IT BE DISCLOSED IN WHOLE OR IN ZS Cop V4 w Flashing-Insert 13.5 KWH ENERGY STORAGE SYSTEM PART TO OTHERS OUTSIDE THE RECIPIENT'S THEORGANIZATION, n�o USE IN CONISPEcmE�TM (20 anwho Q Cells Q.PEAK DUO BLK ML-G10+/TS 410 Southold, NY 11971 TESLA EQUIPMENT, WITHOUT THE WRITTEN IN�R PAGE NAME: SHEET. REV. DATE- PERMISSION OF TESLA INC. a Powerwall 3 [240VI # 1707000-XX-Y 11.5 kW 13.5 kWh 9177971344 SITE PLAN 2 A 6/26/2025 S1 (N) PV MODULE (E) MOUNTING PLANE (MP) sv : TYPICAL PV SIDE VIEW NTS. PV MODULE 5/16"x1.5" BOLT WITH 5/16" FLAT WASHER INSTALLATION ORDER ZEP ROCKIT 1 OCATE FRAMING MEMBER, MAR ZEP LEVELING FOOT ( ) HOLE LOCATION, AND DRILL ZEP ARRAY SKIRT PILOT HOLE. --------- --- -------- ZEP MOUNTING BLOCK (4) ATTACH FLASHING INSERT TO ZEP FLASHING INSERT (3) (2) MOUNTING BLOCK AND ATTACH TO FRAMING MEMBER USING LA (E) COMP. SHINGLE SCREW. �P�E 01 (1) 2�"MIN. 1 AN Nif N O (E) ROOF DECKING (2) INJECT SEALANT INTO FLASHING * (3) INSERT PORT, WHICH SPREADS SEALANT EVENLY OVER THE '- 5/16 DIA STAINLESS LOWEST MODULE SUBSEQUENT MODULES c) Ck-- STEEL LAG SCREW ROOF PENETRATION. 2 INSTAL LEVELING FOOT ON TOP (E) FRAMING MEMBER STANDOFF C(4) NTING BLOCK 11 SECURELOF �UFASTEN WITH BOLT. S1 11 i Scale: 1 1/2 = 1 CONFlDENTI&-THE INFORMATION HEREIN mmmBERJ B-119 3 2 0 0 00 CONTAINED SHALL NOT BE OSED FOR THE Gregory Ronan 8.2 KW PV ARRAY DAlberto BravoBENEFIT OF ANYONE — -- SHALL IT BE DISCIZED�OIX ORESLAC ZS Comp Y00Ni srompp V4 w Flashing—Insert 2350 Clearview Ave 13.5 KWH ENERGY STORAGE SYSTEM T S. 5 L n PART TD OTHERS OUTSIDE THE RECIPIENT'S ORGANIZATION,EXCEPT IN I;QNI=ON WITH MODUNMs: Southold, NY 11971 THE SASE AND USE OF THE RWECTTVE (20) Hanwha Q Cells Q.PEAK DUO BLK ML—G10+ TS 410 TESTA EQUIPMENT,PATHOUT TID WRITTEN INVERTER: PAGE NAME SHEET REV DALE POUSSION OF TESTA INC. Tesla Powerwall 3 r240VI # 1707000-XX-Y 11.5 kW 13.5 kWh 9177971344 STRUCTURAL VIEWS 3 A 6/26/2025 ,bndts spedlb Daelp a1t«ia UP Specific Dedp intarmaVm Desir Cods ASCE 7-16 AP Nano lW1 YP2 YP3 Pock CatmM 6 Tahls 1.54 Rooting Camp 2&4a Carp 9dngis COMP 9&* Wftate Tend Sped V-let 130 4 1609A Standoff ZS camp V4 s 2S canp V4. ZS cmp V4. Eq—cotem C Seatbn 26.7 flmhig-iaat yang�mse�t ttmhmg-b t Pitch 38 25 24 Qaund Stro.laud pg 25 Tabb 7-1 91ft:PV 9.2 13.0 13.3 Sl AIJ-Non--PV 17.1 110 1&5 Edge Zane NO &3 it 8.3 It U 1t Arlm th a6 178 176 States 2 2 2 Raftr Siss/Spacing ado 016.OC 240 ales-OC 240 016-OC `timA wcIn 2xs 016-oO 2ca air oC w we oC Stmdoff Spodng and layout 1P Name wi MP2 1123 Applied Mind Zone% 1.2A 2r 1,26 1,2e Mind Premm -21.27 -21.44 -21.44 Law-am X-fig 64 64 64 xLWACQPO-cm 24 24 24 Undsoape Y-*cin9 41 41 41 Y Cwthm - - - Partra X-Spooing 32 32 32 PorUdt X-Cmt%W 15 15 15 Portrait Y-Spactg 74 74 74 Patron Y-Cant[im - - - L%vA StMered St"wed Staggaad Applied M1nd Zane, Mind Pressers -25.26 -3m -3D.89 L-dwaps X-4aft 64 48 48 Lawwwo x-cmBhra 22 1e 1a LandoccPs Y-900ft 41 41 41 Y-CmBns - - - PatraR x-Spachg 32 1e 16 Parhalt x-ants, 12 10 10 PatmR Y-Sparing 74 74 74 Portrait Y-Cantu - - LcWA Staggered Staggered Staggered �N �,��y 0 Applied Wbd Z"w% 3s 3r 3r wind Prarae -31.24 -34.6I -34.81 * Lmdee"X-Wft 48 48 48 r 'I x-cm 1a 16 16 C) a tu Y-Spaa v 41 41 41 Cn - FO 1 73 C� Paw"x-*CN 1s 16 16 AS1CNP�'� Portrait Y--Spacing 74 74 74 Portrait Y-canwom I - - - laymt I Staggerd I Staggered Staggered NOW 1.X aid Y am mo dinums that am dwW rdaft to tha stractwe hm bg that uppaln the PV.X b ocrm rafters and Y Is dung ragas, 2.Hatchbg In App6Ad Mind Zara rota mode to hotftq m Site Pbru CONFIDENTIAL-THE INI'MATION HEREIN IM4 NIA a J B-1193200 00 CU5IDNER DESCRIPTION. D�(N, CONTAINED SHALL NOT EXCEPT ABET)FOR THE Gregory Ronan 8.2 KW PV ARRAY Alberto Bravo T + 5 L n SHALL T BE DISCLM IN I N NORS Camp ` 2350 Clearview Ave 13.5 KWH ENERGY STORAGE SYSTEM PART TO 01MS OUTSIDE THE RECIPIENTS S Camp V4 wFlashing—Insert ORGANIZATION,EXCEPT IN CONNECTION WITH ULES Southold, NY 11971 THE SALE AND USE of THE RESPECIVE 0) Hanwho Q Cells Q.PEAK DUO BLK ML—G10+ TS 410 TESLA EQUIPMENT, WITHOUT THE WRITTEN PAGE NAME SHEET.. REM: DATE PERw'ss'°"of TESLA INC. sla Powerwall 3 240V 1707000—XX—Y 11.5 kW 13.5 kWh 9177971344 UPLIFT CALCULATIONS 4 A 6/26/2025 (N) 200A INTERNAL EXTERNAL Testa Powerwall 3 EGC ON ROOF TO BE ROUTED WHERE NOT SUBJECT TO PHYSICAL DAMAGE. (E) WIRING BACKUP GATEWAY LOAD CENTER DISCONNECT SWITCH E—Stop WHEN ROUTED SUBJECT TO PHYSICAL DAMAGE THE SIZE MUST BE INCREASED AlB 12Y Tire C TO #6 SOLID BARE COPPER. 200A 2P 60A2P L J 1 S1 u� 2 1 S2A f ❑o ❑E S2B 00 4 T TO 120/240V 200A 2P SINGLE PHASE UTILITY SERVICE i (E) LOADS (E) 200A DISTRIBUTION PANEL Panel Limit feature for Powerwall unit(s) to be utilized PCS Controlled Current Setting: (Panel Rating * 0.8) = 160A (200A Busbar) r——————————————————---- ---- - - - %2v Emergency Stop Button (E—Stop) • Rapid Shutdown Initiation Device per Article 690.12(C) of the NECThe maximum Output current from this system towards • Disconnecting Means as defined in Article 100 of the NECthe main anel is controlled electronicall Refer t0 • Connection to generation sources with 12V, 1A communication wire Py L—————————————————————————————-----_j manufacturer's instructions for more information." Ref Qty Description Ref Type Qty Size (AWG, Cu) EGC (AWG, Cu) Conduit Isc (ADC) Imp (ADC) Product String Module per MCI per Voc* Vmp Mounting 1 Breaker, 60A/2P, 2 Spaces 1 PV Wire 2 #10 SBC #06 3/4" EMT 11.20 10.89 Ref Ref String String (VDC) (VDC) Plane A 1 200A Main Circuit Breaker, 2—Pole, 240V, 1OkAIC 2 PV Wire 2 10 SBC 6 S2B 6 2 300.84 225.84 MP1 # 11Q 3/4" EMT 22.40 21.78 1 Tesla #18410OD—XX—Y: Back—up Gateway 3.0 NA for PW B �" C S2A 6 2 300.84 225.84 MIDI 1 Disconnect; 60A, 240Vac, Non—Fusible, NEMA 3R: 2P, 2W, Lockable TABLE S1 8 3 401.12 301.12 MP3,MP2 B 4#2/0 #4/0 Min EGC Conduit Length Imp Vmp 1 Ground/Neutral Kit; 60-100A, General Duty(DG) Ref Type Qty (Al) (AWG, Cu) (Cu) (Al) (ft) (AAC) (VAC) C 1 Tesla Powerwall 3 [240V] # 1707000—XX—Y 11.5 kW/ 13.5 kWh 3 THWN-2 3 10 PVC Jacketed MC 1" EMT 5ft 48 240 1. GROUND NEUTRAL BOND TO BE COMPLETED IN SERVICE EQUIPMENT (A) 1 MC4—EVO 2 Y CONNECTOR, PLUG (MALE) # 2. CONDUIT RUNS MAY BE CONDENSED DUE TO SITE CONDITIONS AND/OR p 4 THWN-2 3 #06 2' PVC 2" PVC 5ft - 240 INSTALLATION EASE. ALL CONDUIT FILL DERATES AND PROPER CALCULATIONS 1 MC4-EV02 Y CONNECTOR, SOCKET(FEMALE) HAVE BEEN COMPLETED PER NEC CHAPTER 9, TABLE 4. E 7 ASY, MCI-2, 1000V 3. SOLAR SHUTDOWN DEVICE TO BE INSTALLED FOR SYSTEM RAPID SHUTDOWN (RSD) IN ACCORDANCE WITH ARTICLE 690 OF THE APPLICABLE NEC. F 1 UL 508 Emergency Stop Device - NEMA 4X 4. CONDUIT TYPE CAN CHANGE DUE TO SITE CONDITIONS AND WILL FOLLOW THE NEC REQUIREMENTS FOR THAT CONDUIT TYPE. e eti � Main Panel Rating (E) 200A Honwho Q Cells Q.PEAK DUO BLK ML—G10+/TS Main Breaker (E) 200A 410: PV Mod, 41OW, 385.9PTC, ZEP, Blk Frm, Rating BilkBacksht, MC4, 1kV General Notes DC Ungrounded Qty 20 Inverters Voc 45.37 Panel Number B20404OCT Vmp 37.64 Meter Number 98366965 Isc and Imp are in the DC Conductor Table Service Entrance Underground CONFIDENTIAL— THE INFORMATION HEREIN JOB NUMBER: J B-119 3 2 0 0 00 CUSTOMER: DESCRIPTION: DESIGN: CONTAINED SHALL NOT BE USED FOR THE Gregory Ronan 8.2 KW PV ARRAY Alberto Bravo T 5 L n BENEFIT OF ANYONE EXCEPT TESLA INC., NOR MOUNTING SYSTEM: SHALL IT BE DISCLOSED IN WHOLE OR IN zS Comp v4 w Flashing—Insert 2350 Clearview Ave 13.5 KWH ENERGY STORAGE SYSTEM PART TO OTHERS OUTSIDE THE RECIPIENTSORGANIZA MODULES: Southold, NY 11971 THE SALE nAND USE EOF PT ITHE RESPECTIVE N CONNECTION WITH (20) Hanwha Q Cells Q.PEAK DUO BLK ML—G10+/TS 410 TESLA EQUIPMENT, WITHOUT THE WRIITEN PAGE NAME: SHEET: REV: DATE: PERMISSION OF TESLA INC. INVERTER' 91 77971 344 5 A 6 26 2025 Testa Powerwall 3 240v 1707000—XX—Y 11.5 kW 13.5 kWh THREE LINE DIAGRAM / / POWERWALL INSTALLATION INFORMATION: POWERWALL FASTENER SCHEDULEWALL TYPE MODEL DIAMETER EMBEDMENT FASTENERS PER CORNER ESR# UNISTRUT REQUIRED? WOOD SND WOOD SCREW wo , NA YES ❑ NO 1. - POWERWALLS TO BE INSTALLED PER FASTENER SCHEDULE BASED ON WALL TYPE O �,� Y;scmw , , . 22 NA NA AND SITE SPECIFIC CONDITIONS. OR= 7I W %ti 0;. 0 OWI CRUD N, 2. DO NOT MOUNT BELOW OR ABOVE WINDOWS OF THE SAME STORY. CONCRM OR CMRLn M—a wo ,>�• 3 t 3. IF LOCATION NEEDS TO BE CHANGED, PLEASE CONTACT DESIGN TEAM. M= Nan MICCONN o n. ,#• NA 4. ANY UNUSUAL FRAMING NEAR THE POWERWALL THAT MAY COMPROMISE THE WALL ma wNMNSLINVE xo ER-4I43cWXIO STRUCTURAL INTEGRITY SHALL BE RELAYED TO THE DESIGN TEAM PRIOR TO INSTALL. ' " >z� �` ❑ NO 5. WHEN INSTALLING POWERWALL+ THE INVERTER IS A SINGLE UNIT AND CANNOT BE 2. 1 CO1. NCRETE & CMU NOR TO CHOOSE N FASTENER FASTENER CAN BASED ON BE USED WHEN NITSNDITIONS, WALL )ARE MOUNTED ON E, AND EASE OF INSTALL GROUND AND SEISMIC SS (SPA STACKED. WHEN INSTALLING A STACKED ARRANGMENT ONLY ONE POWERWALL+ AND AT SHORT PERIOD) IS AT OR BELOW S. = 1.25. � 3. 1 CONCRETE & CMU ESR FASTENER CAN BE USED WHEN UNIT(S) ARE MOUNTED ON THE GROUND AND SEISMIC SS (SRA AT ONE ADDITIONAL POWERWALL CAN BE INSTALLED. THE LARGEST STACKING SHORT PERIOD) IS AT OR BELOW SS = 2.5 AND REGIONAL WIND SPEED (3—SECOND GUST) IS AT OR BELOW 170MPH 4. COLD FORMED STEEL MINIMUM 25 GAUGE REQUIRES 3 FASTENERS PER CORNER, BUT 1 FASTENER PER CORNER CAN BE USED CONFIGURATIONS ALLOWED BY THE MOUNTING BRACKETS ARE 3 POWERWALL UNITS WHEN STEEL STUDS ARE 8 GAUGE OR THICKER OR 1 POWERWALL+ AND 1 POWERWALL UNIT WHEN BOX IS CHECKED DIVERSTTECH PAD ACP24362 IS APPROVED FOR Q A SINGLE OUTDOOR POWERWALL GROUND MOUNT AND DIVERSITECH PAD ACP36362 IS APPROVED FOR UP TO 2 STACKED USING A POWERWALL+ AND A POWERWALL UNIT OR 2 POWERWALL UNITS REFER TO FASTENER SCHEDULE FOR NUMBER OF FASTENERS POWERWALL UNIT PER CORNER WALL EXAMPLE ONE FASTENER o o o IN ANY HOLE PER CORNER EXAMPLE TWO FASTENERS o p o p IN ANY HOLE PER CORNER FASTENER SCHEDULE of NEWN p y O POWERWALL+ WALL BRACKET * + + POWERWALLERW POWERWALL RA NOTE' Z SHOWN FOR CLARITY 1� ' • ' CFO 11173 Q '� OFESSI��P + + G� WALE. ATTACHMENT: WALL MOUNT SIDE VIEW ONE POWERWALL WS ATTACHMENT: FRONT VIEW POWERWALL NTS CONFIDEN71AL—THE INFORMATION HEREIN F(20) MBER J B-119 3 2 0 0 0 0 a)STOMET; DESMPIW- DESIGN: CONTAINED SHALL NOT BE USED FOR THE Gregory Ronan 8.2 KW PV ARRAY Alberto Bravo 'r' �' Jc L n BETIEFIT OF ANYONE EXCEPT TESLA INC.. NORNG SMM S SHALL IT BE DISCLOSED IN WHOLE OR IN CompV4 w Flashing—Insert 2350 Clearview Ave 13.5 KWH ENERGY STORAGE SYSTEM PART TO OTHERS OUTSIDE THE RECIPIENT'SORGAN Southold NY 11971 THE SALE AND uSE OF IN RESPECTIVEwTMHanwha Q Cells Q.PEAK DUO BLK ML—G10+ TS 410 MU EQUIPMENT, MHOUT Tiff WRITTEN PAGE NAME: SHEET: RM.. DATE PERMISSION aF,> INC. a Powerwall 3 240v 1707000—Xx—Y 11.5 kW 13.5 kWh 9177971344 POWERWALL MOUNTING DETAILS 6 A 6/26/2025 POWERWALL INSTALLATION . INFORMATION: POWERWALL FASTENER sCHEDULEI WALL TYPE MODEL DIAMETER EMBEDMENT FASTENERS PER ESR# UNISTRUT REQUIRED? CORNER WOOD STUD WOOD SCREW Y•'0 2>¢" 1 NA YES NO 2 1 . POWERWALLS TO BE INSTALLED PER FASTENER SCHEDULE BASED ON WALL TYPE CONCRETE OR CMU CONCRETE SCREW Y•"0 11¢" 2' NA NA ANDSITE SPECIFIC CONDITIONS. CONCRETE SIMSPON TTTEN HD '0 94' 23 ESR-2713 (CONCRETE) NA OR CMU ESR-1056 (CMU) 2. DO NOT MOUNT BELOW OR ABOVE WINDOWS OF THE SAME STORY. CONCRETE HILT] KH—EZ '® ,%" 2� ESR-3027 (CONCRETE) NA OR CMU ESR-3056 (CMU) 3. IF LOCATION NEEDS TO BE CHANGED, PLEASE CONTACT DESIGN TEAM. BRICK HILTI KWIK CONN II Y"0 ,�• NA NA 4. ANY UNUSUAL FRAMING NEAR THE POWERWALL THAT MAY COMPROMISE THE WALL BRICK HIT MESH SLEEVE A"O 3)b• 1 ESR-4143 (BRICK) NA STRUCTURAL INTEGRITY SHALL BE RELAYED TO THE DESIGN TEAM PRIOR TO INSTALL. COLD STEELEL E NO 0 SHEET METAL SCREWS Y."0 Uf' 3` NA YES 1. I 5. WHEN INSTALLING POWERWALL+ THE INVERTER IS A SINGLE UNIT AND CANNOT BE 2. 1N STALLER CONCRETE & CMU NON-ESR FASTENER CAN TO CHOOSE FASTENER BASED ONEBD TIONS USED I WHEN, WALL TYPE, AND EASE OF INSTALL UNIT(S) ARE MOUNTED ON THE GROUND AND SEISMIC SS (SRA STACKED. WHEN INSTALLING A STACKED ARRANGMENT ONLY ONE POWERWALL+ AND AT SHORT PERIOD) IS AT OR BELOW S5 = 1.25. , 3. 1 CONCRETE & CMU ESR FASTENER CAN BE USED WHEN UNIT(S) ARE MOUNTED ON THE GROUND AND SEISMIC SS (SRA AT ONE ADDITIONAL POWERWALL CAN BE INSTALLED. THE LARGEST STACKING SHORT PERIOD) IS AT OR BELOW SS = 2.5 AND REGIONAL WIND SPEED (3-SECOND GUST) IS AT OR BELOW 170MPH 4. COLD FORMED STEEL MINIMUM 25 GAUGE REQUIRES 3 FASTENERS PER CORNER, BUT 1 FASTENER PER CORNER CAN BE USED CONFIGURATIONS ALLOWED BY THE MOUNTING BRACKETS ARE 3 POWERWALL UNITS WHEN STEEL STUDS ARE B GAUGE OR THICKER OR 1 POWERWALL+ AND 1 POWERWALL UNIT WHEN BOX IS CHECKED DIVERSITECH PAD ACP24362 IS APPROVED FOR 0 A SINGLE OUTDOOR POWERWALL GROUND MOUNT AND DIVERSITECH PAD ACP36362 IS APPROVED FOR UP TO 2 STACKED USING A POWERWALL+ AND A POWERWALL UNIT OR 2 POWERWALL UNITS REFER TO FASTENER SCHEDULE POWERWALL UNIT FOR NUMBER OF FASTENERS PER CORNER WALL EXAMPLE ONE FASTENER o o®o IN ANY HOLE PER CORNER EXAMPLE TWO FASTENERS o®o Q IN ANY HOLE PER CORNER FASTENER TO WALL PER FASTENER SCHEDULE POWERWALL+ OF NEWy + + WALL BRACKET , �.�p N NCO (N) POWERWALL BRACKET, * * POWERWALL UNIT NOT SHOWN FOR CLARITY • r r� a n W F 111173 �� + WALL ATTACHMENT: WALL MOUNT oA�OFESSIONP�"� SIDE VIEW ONE POWERWALL ATTACHMENT: FRONT VIEW POWERWALL NTS CONFIDENTIAL- THE INFORMATION HEREIN [INVERTER: NUMBER: J B-119 3 2 0 0 00 CUSTOMER: DESCRIPTION: DESIGN: CONTAINED SHALL NOT BE USED FOR THE Gregory Ronan 8.2 KW PV ARRAY Alberto Bravo T 5 L n BENEFIT OF ANYONE EXCEPT TESLA INC., NOR TING SYSTEM: SHALL IT BE DISCLOSED IN WHOLE OR IN Comp v4 w Flashing—Insert 2350 Clearview Ave 13.5 KWH ENERGY STORAGE SYSTEM PART TO OTHERS OUTSIDE THE RECIPIENTS LES: Southold, N Y 119 71 ORGANIZATION, EXCEPT IN CONNECTION WITH THE SALE AND USE OF THE RESPECTIVE 0) Hanwho Q Cells Q.PEAK DUO BILK ML—G10+/TS 410 PAGE NAME SHEET: REV: DATE: TESLA EQUIPMENT, WITHOUT THE WRITTEN PERMISSION OF TESLA INC. slo POwerwall 3 240v 1707000—XX—Y 11.5 kW 13.5 kWh 9177971344 POWERWALL MOUNTING DETAILS 6 A 6/26/2025 EQUIPMENT,IS NOT TO SCALE, FOR ILLUSTRATIVE PURPOSES ONLY. e i AC DISCONNECT .. F UU -V E—STOP �, GATEWAY POWERWALL —�!�"''� . , - "€:i, � , " •»�- �,r Via'': `. , ,, �- 'r'� Lie . -.<.. � ate,'-. � s � .•<......a �� x�_ :r,. ",+,+ t e , y y ; �a Y Y J t17 r 4� CONFIDENTIAL - THE INFORMATION HEREIN JOB NUMBER: J B—1193200 O O CUSTOMER: DESCRIPTION: DESIGN: CONTAINED SHALL NOT USED FOR THE Gregory Ronan 8.2 KW PV ARRAY Alberto Bravo T 5 L n BENEFIT OF ANYONE EXCEPT PT TESLA INC., NOR MOUNTING SYSTEM: SHALL IT BE DISCLOSED IN WHOLE OR IN zS comp v4 w Flashing—Insert 2350 Clearview Ave 13.5 KWH ENERGY STORAGE SYSTEM — PART TO OTHERS OUTSIDE THE RECIPIENTS NODDLES: Southold NY 11971 ORGANIZATION, EXCEPT IN CONNECTION WITH , THE SALE AND USE OF THE RESPECTIVE (20) Hanwha Q Cells Q.PEAK DUO BLK ML—G10+/TS 410 TESLA EQUIPMENT, WITHOUT THE WRITTEN INVERTER: PAGE NAME: SHEET: REV: DATE: PERMISSION OF TESLA INC. Tesla POwerwall 3 240v 1707000—XX—Y 11.5 kW 13.5 kWh 9177971344 WALL MOUNTED EQUIPMENT INFORMATION 7 A 6/26/2025 Label Label Location: Label Location: WARNING:PHOTOVOLTAIC POWER SOURCE ; WARNING • O SOLAR PV SYSTEM (INV) Per Code: Per Code: EQUIPPED RAPID Per Cocle.- POWER SOURCE SHUTDOWN ' 0 OUTPUT CONNECTION 0 • ' 0 ' Label Location: DO NOT RELOCATETAN RAPT PHOTOVOLTAIC DC THIS OVERCURRENT DEVICESMTCH TO THE DISCONNECTPer Code: = ' 9 SYS`MKAZAN T DUCE" HE 1�3 MAXIMUM VOLTAGELabel Location: WARN I N G Per ••- MAXIMUM CIRCUIT CURRENT Per Code THIS EQUIPMENT FED BY MULTIPLE SOURCES.TOTAL MAX RATED OUTPUT CURRENT 690.53RATING OF ALL OVER CURRENT OF THE CHARGE CONTROLLER DEVICES,EXCLUDING MAIN OR DC-TO-DC CONVERTER SUPPLY OVERCURRENT DEVICE. (IF INSTALLED) SHALL NOT EXCEED AMPACITY OFBUSBAR Label • • PHOTOVOLTAIC AC (POI) Label Location: DISCONNECTPer Code: CAUTION '• ' 13 DUAL POWER SOURCE Per Code: SECOND SOURCE IS PHOTOVOLTAIC SYSTEM Label • • MAXIMUM AC A •• OPERATING CURRENT Per •�_ MAXIMUM AC LabelLocation: OPERATING VOLTAGE V 690.54 PHOTOVOLTAIC POINT OF • Per Code: INTERCONNECTION WARNING: ELECTRIC SHOCK HAZARD. DO NOT TOUCH '' '' 0.13.13 TERMINALS.TERMINALS ON BOTH THE LINE AND LOAD SIDE Label Location: MAY BE ENERGIZED IN THE OPEN PV SYSTEM POSITION. FOR SERVICE DISCONNECT FOR DE-ENERGIZE BOTH SOURCE UTILITY OPERATION AND MAIN BREAKER. PV POWER SOURCE MAXIMUM AC A OPERATING CURRENT MAXIMUM AC OPERATING VOLTAGE V Label • • WARNING ' Per ..- ELECTRIC SHOCK HAZARD DO NOT TOUCH TERMINALS 690 ` RAPID SHUTDOWN Label Location: a • AConduit D • nnect TERMINALS ON BOTH LINE AND • • LOAD SIDES MAY BE ENERGIZED SWITCH FOR Per ••-: (CB): Combiner Box IN THE OPEN POSITION SOLAR PV SYSTEM 0 • Panel DC Disconnect Conduit(IC). Interior Run (INV): Inverter With Integrated DC Disconnect •.• Center (M): Utility Meter •• Point .- Label Label •n: Label Location: BACKI;P LOAD CENTER CAUTION Per ••_ TRI POWER SOURCE Per Code: 408.4 SECOND SOURCE IS PHOTOVOLTAIC SYSTEM 1 THIRD SOURCE IRV ENERGY STORAGE SYSTEM Label • • CAUTION DO NOT ADD NEW LOADS Per ••' ' WARNING ' Per ..- THIS EQUIPMENT FED BY Label Location: MULTIPLE SOURCES.TOTAL RATING OF ALL OVER CURRENT CAUTION DEVICES,EXCLUDING MAIN THIS PANEL HAS SPLICED FEEDPer Code.- 312.8.A.3SHALL NOT EXCEED AMPACITY OF BUSBAR. LOCATION OF DISCONNECT AT ENERGY STORAGE BACKUP LOAD PANEL NOMINAL ESS VOLTAGE- 12Qr240V Label • ' • Label Location: (MSP) CAUTION Per Code: DUAL POWER SOURCE Per ••-: 706.7.D • •- marked in field per code) SECONDSOURCE IS 1 ARC FAULT CLEARING ENERGY STORAGE SYSTEM TIME FROM ESS: 67mS Label Location: DATE OF CALCULATION: ENERGY STORAGE SYSTEM ON SITE LOCATED WITHIN LINE OE SIGHT Per Code: 1• Label • • ENERGY STORAGE SYSTEM ON SITE LOCATED ON ADJACENT WALLPerCode: 70• Label.71 • • (MSENERGY STORAGE SYSTEM ON SITE ' LOCATED ON OPPOSITE WALL Code: 70• Label • • (MSENERGY STORAGE SYSTEM ON SITE ' LOCATED INSIDE Per ••- 1• ' AC Disconnect Backup Load Center (MSP): Main Service Panel NEC 2017D- Label QYEAK DUO BLK QYEAK DUO BLK ML-G10+ SERIES ■Mechanical Specification -------ML-GI 0+ SERIES Q s Format 74.40 x 41.2 in x mm x(including frame) V " i P QC@ I I$ (1890 mm x 1046 mm x 4o mm) Weight 5 1.8 lbs(23.5 kg) -z z:razs Front Cover 0.13 in(3.2 mm)thermally pre-stressed glass with 385-415 Wp 1132 Cells anti-reflection ositeilmechnology Back Cover Composite film 21.0% Maximum Module Efficiency Frame Black anodised aluminium Cell 6 x 22 monocrystalline Q.ANTUM solar half cells r1 Junction box 2.09-3.98 in x 1.26-2.36 in x 0.59-0.71 in 4 ~A-a-:{o�HatA) (53-101 mm x 32-60 mm x 15-18 mm),IP67,with bypass diodes Cable 4mm2Solarcable;(+)>_522in(1325mm),I-)z52.2in(1325mm) Connector Staubli MC4;IP68 MODEL WEAK DUO BLK ML-G10+/TS ■ Electrical Characteristics POWER CLASS 385 390 395 400 405 410 415 MINIMUM PERFORMANCE AT STANDARD TEST CONDITIONS,STC1(POWER TOLERANCE+5 W/-0 W) Power at MPP' PmD IW] 385 390 395 400 405 410 415 Breaking the 21%efficiency barrier E Short Circuit Current' lu [A] 11.04 11.07 11.10 11.14 11.17 1120 11.23 E Open Circuit Voltage' Voc IV] 45.19 45.23 4527 4S.3 4S.34 45.37 45.41 Q.ANTUM DUO Z Technology with zero gap cell layout Current at MPP i"w [A] 10.59 10.65 10.71 10.77 10.83 10.89 10.95 boosts module efficiency up to 21.0%. Voltage at MPP vm, IV] 36.36 36.62 36.88 37.13 37.39 37.64 37.89 Efficiency' TI I%] z 19.5 z 19.7 Z 20.0 z 202 z 20.5 z 20.7 z 21.0 A reliable investment MINIMUM PERFORMANCE AT NORMAL OPERATING CONDITIONS,NMOTa Inclusive 25-year product warranty and 25-year linear Power at MPP pPnDD IW] 288.8 292.6 296.3 300.1 303.8 307.6 311.3 warra�my performance warranty'. �• E Short Circuit Current Iu [A] 8.90 8.92 8.95 8.97 9.00 9.03 9.05 £ Open Circuit Voltage V°, IV] 42.62 42.65 42.69 42.72 42.76 42.79 42.83 c 0 Current at MPP I- [A] 8.35 8.41 8.46 8.51 8.57 8.62 8.68 Enduring high performance Voltage at MPP V_ IV] 34.59 34.81 35.03 35.25 35.46 35.68 3S.89 Long-term yield security with Anti LeTID Technology, 'Measurement tolerances P_±3%;I,,;Vor±5%at STC:1000 W/m',25±2°C,AM 1.5 according to IEC 60904-3•a800 W/m2,NMOT,spectrum AM 1.5 Qcells Anti PID Technology2 and Hot-Spot Protect. Qcells PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE �w=a, 1 At least 98%of nominal power Innovative all-weather technology aR - ^,.u-ab =�� during first year.Thereafter max. '' w as --------------- 0.5%degradation per year.At i Optimal yields,whatever the weather with excellent low-light o least 93.5%of nominal power lad --+----- ------ up to 10 years.At least 86%of and temperature behaviour i w y� nominal power up to 25 years. F G o as All data within measurement 90 W o tolerances.Full warranties in Zep compatibleTM frame design a termsaccordancewiththewarranty so Z g s terms of the Qcells sales High-tech black Zep CompatibleTM frame,for improved cd �o as 10 1$ zs organisation ofyour respective add Wo IND aesthetics,easy installation and increased safety. YEARS country. IRRADIANCE IW/m'] 'Standard terms of guarantee for the 5 PV companies with the Typical modde performance under low inadcame conditions m highest production capacity in 2021(February 2021) comparison to 5TC conditions(25°C.1000 W/m'). The most thorough testing TEMPERATURE COEFFICIENTS " s programme in the industry Temperature Coefficient ofl,, a [%/K] +0.04 i Temperature Coefficient ofV, (3 [%/K] -0.27 Temperature Coefficient of PMDD y [%/K] -0.34 Nominal Module Operating Temperature NMOT rF] 109±SA Qcells is the first solar module manufacturer to pass the (43±3°C) most comprehensive quality programme in the industry:The new'Quality ControlledPV^of the independent certification ■ Properties for System Design institute TUV Rheinland. Maximum System Voltage V,Ys M 1000(IEC)/1000(UL) PV module classification Class II Maximum Series Fuse Rating [A DC] 20 Fire Rating based on ANSI/UL 61730 TYPE 2 w Max.Design Load,Push/Pull' [Ibs/ft'] 85(4080 Pa)/85(4080Pal Permitted Module Temperature -40°F up to+185°F o 'See data sheet on rear for further information. o 'APT test conditions according to IEC/TS 628041:2015,method A(-1500V,96 h) Max.Test Load,Push/Pull' [Ibs/ft'7 128(6120 Da)/128(6120 Pa) on Continuous Duty (-40'C up to+85°C) See Installation Manual ■Qualifications and Certificates 3 UL61730-1&UL61730-2,CE-compliant, Quality Controlled PV-TUV Rheinland, IEC 61215:2016,IEC 61730:2016, onR•ze U.S.Patent No.9,893,215(solar cells), 21 - edP1DP �* 1I5 1��11a10}n O Nr O N The ideal solution for: ;2..... Rooftop arrays on Rooftop arrays on •° usA 4/e :F ,y� `Contact your Qcells Sales Representative for details regarding the module's eligibility to be Buy American Act(BAA)compliant. residential buildings commercial/industrial °'^m• buildings Qcells pursues minimizing paper output in consideration of the global environment. Note.Installation mstnuct,ors most be followed.contact technical semce ro,further informaton on app,o edmstallation ofthis product. Powerwall 3 Powerwall 3 Technical Specifications Power Everything System Technical Model Number 1707000-xx-y Specifications Nominal Grid Voltage(Input&Output) 120/240 VAC Powerwall 3 is a fully integrated solar and battery system, designed to accelerate the transition to sustainable energy. Grid Type Split phase Customers can receive whole home backup, cost savings, and energy independence by producing and consuming their Frequency 60 Hz own energy while participating in grid services. Once installed, customers can manage their system using the Tesla App to Nominal Battery Energy 13.5 kWh AC, customize system behavior to meet their energy goals. Nominal Output Power(AC) 5.8 kW 7.6 kW 10 kW 11.5 kW Powerwall 3 achieves this by supporting up to 20 kW DC of solar and providing up to 11.5 kW AC of continuous power per Maximum Apparent Power 5,800 VA 7,600 VA 10,000 VA 11,500 VA unit. It has the ability to start heavy loads rated up to 185 LRA, meaning a single unit can support the power needs of most Maximum Continuous Current 24 A 31.7 A 41.7 A 48 A homes. Powerwall 3 Expansions make it easier and more affordable to scale up customers` systems to meet their current or Overcurrent Protection Device 30 A 40 A 60 A 60 A future needs. Powerwall 3 is designed for fast and efficient installations, modular system expansion, and simple connection to any electrical service. Configurable Maximum Continuous Discharge 15.4 kW 3 Power Off-Grid(PV Only,-20°C to 25°C) Maximum Continuous Charge Current/Power 20.8 A AC/5 kW (Powerwall 3 only) Maximum Continuous Charge Current/Power 33.3 A AC/8 kW (Powerwall 3 with up to(3)Expansion units) Output Power Factor Rating 0-1(Grid Code configurable) Maximum Output Fault Current(1 s) 160 A 11. Maximum Short-Circuit Current Rating 10 kA Load Start Capability 185 LRA Solar to Battery to Home/Grid Efficiency 89%' Solar to Home/Grid Efficiency 97.5%5 ',. Power Scalability Up to 4 Powerwall 3 units supported Energy Scalability Up to 3 Expansion units(for a maximum total of 7 units) Supported Islanding Devices Gateway 3,Backup Switch,Backup Gateway 2 Connectivity Wi-Fi(2.4 and 5 GHz),Ethernet,Cellular(LTE/4G6) Hardware Interface Dry contact relay,Rapid Shutdown(RSD)certified switch and 2-pin connector,RS-485 for meters AC Metering Revenue Grade(+/-0.5%,ANSI C12.20) Protections Integrated arc fault circuit interrupter(AFCI),Isolation Monitor Interrupter(IMI),PV Rapid Shutdown(RSD)using Tesla Mid-Circuit Interrupters Customer Interface Tesla Mobile App Warranty 10 years 'Values provided for 25°C(77°F),at beginning of life.3.3 kW charge/discharge power. 'See Powerwall 3 Installation Manual for fuse requirements if using fuse for overcurrent protection. 3If enabling the 15.4 kW off-grid maximum continuous discharge power,Powerwall 3 must be installed with an 80 A breaker and appropriately sized conductors. `Typical solar shifting use case. STested using CEC weighted efficiency methodology. 'The customer is expected to provide internet connectivity for Powerwall 3;cellular should not be used as the primary mode of connectivity.Cellular connectivity subject to network operator service coverage and signal strength. 2024 2024 _ , Powerwall 3 Technical Specifications Powerwall 3 Technical Specifications Solar Technical Maximum Solar STC Input 20 kW Mechanical Dimensions 1105 x 609 x 193 mm(43.5 x 24 x 7.6 in) Specifications Withstand Voltage 600 V DC Specifications Total Weight of Installed Unit 132 kg(291.2lb) PV DC Input Voltage Range 60—550 V DC Weight of Powerwall 3 124 kg(272.5 lb) PV DC MPPT Voltage Range 60—480 V DC Weight of Glass Front Cover 6.5 kg(14.5 lb) MPPTs 6 Weight of Wall Bracket 1.9 kg(4.2 lb) Maximum Current per MPPT(I,nP) 13 A 7 Mounting Options Floor or wall mount Maximum Short Circuit Current per MPPT(Ise) 15 A' 'These dimensions include the glass front cover being installed on Powerwall 3. Where the DC input current exceeds the MPPT rating,a jumper can be used to combine two MPPTs into a single input to intake DC current up to 26 A IMP/30 A I,, 0 00 4 O Environmental Operating Temperature —200C to 50°C(-4°F to 122°F)a Specifications Operating Humidity(RH) Up to 100%,condensing Storage Temperature —20°C to 30°C(-4°F to 86°F),up to 95%RH,non- condensing,State of Energy(SOE):25%initial 1105 Maximum Elevation 3000 m(9843 ft) Environment Indoor and outdoor rated Enclosure Rating NEMA 3R Ingress Rating IP67(Battery&Power Electronics) IP55(Wiring Compartment) Pollution Rating PD3 Operating Noise @ 1 m <50 db(A)typical mm <62 db(A)maximum 609 mm -►{I e Performance may be de-rated at operating temperatures above 40°C(104°F). Compliance Certifications UL 1741, UL 9540,UL 9540A,UL 3741,UL 1741 PCS, UL 1741 SA,UL 1741 SB,UL 1973,UL 1699B,UL 1998, Information CSA C22.2 No.0.8,CSA C22.2 No.107.1,CSA C22.2 No. 330,CSA 22.3 No.9,IEEE 1547,IEEE 1547A, IEEE 1547.1, CA Rule No.21 Grid Connection United States and Canada Emissions FCC Part 15 Class B,ICES 003 Environmental RoHS Directive 2011/65/EU Seismic AC156,IEEE 693-2005(high) Fire Testing Meets the unit level performance criteria of UL 9540A 2024 Powerwall 3 Datasheet 2024 Powerwall 3 Datasheet Powerwall 3 Expansion Technical Specifications Powerwall 3 Example System Configurations Battery Technical Model Number 1807000-xx-y Powerwall 3 with Gateway 3 Specifications Nominal Battery Energy 13.5 kWh Whole Home Backup I I Voltage Range 52-92 V DC" I I "Powerwall 3 Expansion units are connected in parallel and are not field serviceable. I Solar Q � Environmental Operating Temperature —200 C to 500 C(-40 F to 1220 F),z Meter Specifications Operating Humidity(RH) Up to 100%,condensing Grid Meter socket panel Gateway 3 Load center Storage Temperature —200C to 300C(-4°F to 86°F),up to 95%RH, non- condensing,State of Energy(SOE):25%initial _n Maximum Elevation 3000 m(9843 ft) Environment Indoor and outdoor rated Backup loads Powerwall 3 Enclosure Rating NEMA 3R Ingress Rating IP67 Pollution Rating PD3 Powerwall 3 with Backup Switch t2 Performance may be de-rated at operating temperatures above 40°C(104°F). (Opnona,— Whole Home Backup I i Certifications UL 1973,UL 9540 Backup Switch Compliance Solar I Information Meter Grid Meter socket panel Load center I Mechanical Dimensions 1105 x 609 x 168 mm _n Specifications (43.5 x 24 x 6.6 in)13 \/ = Total Weight of Wall- 118.5 kg(261.2 lb) Backup loads Powerwall 3 Mounted Expansion Unit Weight of Expansion Unit 110 kg(242.5 lb) 0 Weight of Glass Front 6.5 kg(14.5 lb) Cover Powerwall 3 with Backup Gateway 2 Weight of Wall Bracket 1.9 kg(4.2 lb) I oer.onai— 1105 Partial Home Backup I' i Weight of Expansion 0.7 kg(1.5 lb) I C I Accessories Mounting Options Floor or wall mount Utility Meter Solar I Stacking Capability Up to(3)Expansion units Main (Floor Mount Only) behind a Powerwall 3 __ Breaker Compatibility with Only compatible with Other Systems Powerwall 3 Connection to Powerwall 3 Expansion Grid Meter load center Backup Gateway 2 Load center Powerwall 3 or Expansions glass �168, O 609 mm 'I 13These dimensions include the lass front cover beingmm installed on Powerwall 3 Expansion. SSS 14The Powerwall 3 Expansion harness is a listed component of Non-essential loads Backup loads Powerwall 3 the UL 9540 certification. 2024 _ . . 2024 Powerwall 3 Datasheet Powerwall 3 Example System Configurations Powerwall 3 with Gateway 3 ;�-' (1) Powerwall 3 with(3) Expansion Units �� Solar I � 4 ® Meter Grid Meter socket panel Gateway 3 Load center Backup loads Powerwall 3 Powerwall 3 Expansion 'P 4 Powerwall3 Powerwall3 Expansion Expansion Powerwall 3 with Backup Switch (4)Powerwall 3 Units with(3) Expansion Units(Maximum System Size) Backup Switch Solar Solar Solar Solar ® Meter =_ _= Q 4 P Grid Meter socket panel Load center Generation panel Backup loads Powerwall3 Powerwall3 Powerwall3 Powerwall3 Powerwall3 Powerwall3 Powerwall3 Expansion Expansion Expansion 2024 Powerwall 3 Datasheet 2024 Powerwall 3 Datasheet PV HAZARD CONTROL SYSTEM I BIPV PV HAZARD CONTROL SYSTEM I GENERIC PV ARRAY UL 3741 REPORT DATE 01-27-23 UL 3741 REPORT DATE 01-27-23 Tesla Inverter Based PVHCS, Consisting of Tesla Inverters,Tesla MCI and other PV RAPID SHUTDOWN ARRAY PV RAPID SHUTDOWN ARRAY listed components to create the system WARNING:To reduce the risk of injury, read all instructions. WARNING:To reduce the risk of injury,read all instructions. PV HAZARD CONTROL EQUIPMENT AND COMPONENTS PV HAZARD CONTROL EQUIPMENT AND COMPONENTS Function Manufacturer Model No. Firmware Versions Certification Standard Function Manufacturer Model No. Firmware Versions and Checksums Certification Standard and Checksums PVRSE Mid Circuit Tesla MCI-1,MCI-2 N/A UL 1741 PVRSE Inverter,Powerwall+,or 7.6 kW: 15380001 V4,CEA4F802 Interrupter(MCI) Powerwall 3 Tesla 3.8 kW: 15340001 V4,FF7BE4E1 UL 1741,UL 1998, 7.6 kW:15380001 V4,CEA4F802 7.6 kW: 18500001 V4,CEA4F802 PVRSS/PVRSE Inverter,Powerwall+,or Tesla 3.8 kW:15340001 V4,FF7BE4E1 UL 1741, 1998 11.5 kW:17070001 V1,0x3282A1 Powerwall 3 7.6 kW:18500001 V4,CEA4F802 PVRSS/PVRSE 11.5 kW:17070001 V1,0x3282A1 Mid Circuit Interrupter(MCI) Tesla MCI-1,MCI-2 N/A UL 1741 PVRSE PV Module Tesla SR60T1,SR72T1, N/A UL 61730 The PVHC PV modules must be listed by a NRTL to UL 1703 and/or UL 61730-1 and UL 61730-2(excluding Class 0 SR72T2,SR72T3R PV Modules and Class I). PVHCS Initiator Dedicated PV system AC circuit breaker or AC disconnect switch,labeled per NEC 690.12 N/A The PV mounting system must comply with one of the following: (PV Inverter) requirements. PV Mounting System Listed by NRTL to UL 2703 and rated for use with the specific PV modules noted above. PVHCS Initiator Emergency stop device(NISD)-Listed"Emergency Stop Button"or"Emergency Stop UL 508 or UL 60947 The non-certified combinations of mounting and PV modules shall be evaluated for loading,mounting and (Powerwall+,Powerwall 3) Device"or"Emergency Stop Unit". Parts 1,5-1 and 5-5 grounding per the NEC and other applicable installation codes. The following PV connectors may be used to connect to the Tesla MCIs: PVHCS Initiator On/Off Enable switch located on Powerwall 3,when labeled as Rapid Shutdown initiator per UL 1741 Staubli type PV-KST4/611-UR or type PV-KST4-EVO2(male), (Powerwall 3) NEC 690.12 requirements PV Connectors Staubli type PV-KBT4/611-UR or PV-KBT4-EV02(female), • Staubli Branch Socket PV-AZB4 and Branch Plug PV-AZS4, Applies to variations of this part number with suffix of two numbers and one letter. Connectors evaluated by an NRTL for intermatabilitytyith the connectors above. Note:PVHCS installation requirements may reduce the effective equipment and component ratings below the individual equipment and component PVHCS Initiator Dedicated PV system AC circuit breaker or AC disconnect switch,labeled per NEC N/A PVRSE ratings in order to achieve PVHCS shock hazard reduction requirements. (PV Inverter) 690.12 requirements. PVHCS Initiator Emergency stop device(NISD)-Listed"Emergency Stop Button"or"Emergency Stop UL 508 or UL 60947 Parts PVHCS INSTALLATION REQUIREMENTS (Powerwall+,Powerwall 3) Device"or"Emergency Stop Unit". 1,5-1 and 5-5. Max System Voltage 600 VDc PVHCS Initiator On/Off Enable switch located on Powerwall 3,when labeled as Rapid Shutdown initiator UL 1741 (Powerwall 3) per NEC 690.12 requirements PVHCS Maximum Circuit Voltage(Array Internal Voltage After Actuation) 165 VDc(cold weather open circuit) 'Applies to variations of this part number with suffix of two numbers and one letter. Max Series-Connected Panels Between MCls: 10 Note:PVHCS installation requirements may reduce the effective equipment and component ratings below the individual equipment and component PVRSE ratings in order to achieve PVHCS shock hazard reduction requirements. OTHER INSTALLATION INSTRUCTIONS PVHCS INSTALLATION REQUIREMENTS 1.An MCI must be connected to one end of each series string or mounting plane sub-array string. Max System Voltage 600 VDc 2.Verification that MCIs are installed with 10 or fewer modules between MCIs shall be documented for inspection, by voltage PVHCS Maximum Circuit Voltage(Array Internal Voltage After Actuation) 165 VDc(cold weather open circuit) measurement logs and/or as-built string layout diagrams. OTHER INSTALLATION INSTRUCTIONS 3. For PV Inverter:The PVHCS initiator(AC breaker or switch)shall be sized and installed in accordance with NEC requirements.The 1.An MCI must be connected to one end of each series string or mounting plane sub-array string. specific part shall be identified on the as-built system drawings. 4. For Powerwall+or Powerwall 3:The PVHCS emergency stop initiator shall have the following minimum ratings:Outdoor(Type 3R 2.MCIs shall be installed between series connected module combinations such that the PVHC Maximum Circuit Voltage after actuation is no greater or higher), 12V, 1A, and shall be installed in accordance with NEC requirements.The specific part shall be identified on the as-built than 165V under any circumstances. The installation location coldest anticipated operating ambient temperature shall be used to calculate the PV maximum voltage in accordance with NEC 690.7. system drawings. Refer to the Powerwall installation manual for further details. 3.Verification that the MCIs are installed in accordance with 1)and 2)shall be documented for inspection,by voltage measurement logs and/or as- built string layout diagrams. 4.For PV Inverter:The PVHCS initiator(AC breaker or switch)shall be sized and installed in accordance with NEC requirements. The specific part shall be identified on the as-built system drawings. 5.For Powerwall+and Powerwall 3:The PVHCS emergency stop initiator shall have the following minimum ratings:Outdoor(Type 3R or higher),12V, 1A,and shall be installed in accordance with NEC requirements.The specific part shall be identified on the as-built system drawings.Refer to the Powerwall installation manual for further details. T = S L R TESR-DS-04S1-22 1 T = S L r= TEPV-DS-0023-22 i Gateway 3 Tesla Gateway 3 controls connection to the grid in a Powerwall system,automatically detecting outages and providing seamless transition to backup power. It provides energy monitoring that is used by Powerwall for solar self-consumption,time-based control,and backup operation. Performance Model Number 1841000-01-y AC Meter Revenue accurate(+/- 0.5%) Specifications Nominal Grid Voltage 120/240 V AC Communication CAN Grid Configuration Split phase User Interface Tesla App Grid Frequency 60 Hz Backup Transition Automatic disconnect for seamless backup Continuous Current 200 A -- -- .- ----------- Rating Overcurrent 100-200 A Maximum Supply 22 kA with Square D or Protection Device Service entrance rated Eaton main breaker Eaton CSR, BWH,or BW, or Short Circuit Current Square D QOM breakers 25 kA with Eaton main breaker' Internal Panelboard 200 A IEC Protective Class Class I 8-space/16 circuit breakers --------------- -- -- ------- -- ---- - — -- -- Eaton BR, Siemens QP, or Overvoltage Category Category IV Square D HOM breakers --- - ---- ------------- - -- -------------- - - - ----- - 'Only Eaton CSR or BWH main breakers are 25 kA rated ___ ___ rated to 10-125A Warranty 10 years Environmental Operating Temperature -20oC to 50°C(-4°F to 122°F) Specifications Operating Humidity(RH) Up to 100%,condensing Maximum Elevation 3000 m (9843 ft) _ Environment Indoor and outdoor rated Enclosure Type NEMA 3R Compliance Certifications UL 67, UL 869A, UL 916, UL 1741 PCs, Information — __-- --- -------___-- csA 22.2107.1,csA 22.2 29 -- — ------ Emmissions FCC Part 15, ICES 003 Mechanical Dimensions 660 x 411 x 149 mm Specifications (26 x 16 x 6 in) Weight 16.4 kg (36 lb) T 3 S L R Mounting options Wall mount 660 mm o �411 mm� 149 mm Gateway 3 Datasheet 2023 • Q��MPAT�e ROOFING SYSTEM SPECIFICATIONS GROUND ZEP LEVELING FOOT E`ACOMPA���v Listed to UL 2703 Listed to UL 2703 DESCRIPTION PV mounting solution for composition shingle roofs. Part#850-1511 Part#850-1397 Works with all Zep Compatible Modules. Auto bonding UL-listed hardware creates structural and electrical bond. il— SPECIFICATIONS Designed for pitched roofs. Installs in portrait and landscape orientations. F 1 DC WIRE CLIP HOME RUN CLIP Engineered for spans up to 72"and cantilevers up to 24". Listed to UL 1565 Listed to UL 1565 Part#850-1509 Part#850-1510 ZS Comp has a UL 1703 Class "A" Fire Rating when installed using modules from any manufacturer certified as"Type 1"or"Type 2". 1 Attachment method UL listed to UL 2582 for Wind Driven Rain. ZS Comp supports 50 psf(2400 Pa)front and up to 72 psf(3450 Pa) rear side design load rating for Portrait module orientation per UL 2703. t ZS Comp supports 50 psf(2400 Pa)front side and up to 72 psf(3450 Pa) rear side design ARRAY SKIRT END CAP load rating for Landscape module orientation. Listed to UL 2703 Listed to UL 2703 Engineered for compliance with ASCE 7-05, 7-10, 7-16, and 7-22 wind load requirements. Part#s50-1606 Part#850-1588(Left) i g p Q Part#850-158 (Right) Zep wire management products listed to UL 1565 for wire positioning devices. ZS Comp grounding products are listed to UL 2703 and UL 467. '� ZS Comp bonding products are listed to UL 2703. <I MOUNTING BLOCK FLASHING INSERT 17 SKIRT GRIP INTERLOCK Listed to UL 2703 Listed to UL 2703 and UL 2582 for Wind Driven Rain Listed to UL 2703 Listed to UL 2703 Part#850-1633 Part#850-1628 Part#850-1606 Part#850-1613 CAPTURED WASHER LAG HYBRID INTERLOCK Part#850-1631-002 and#850-1631-004 Listed to UL 2703 Part#850-1281 Q T S L n ZS COMP DATASHEET 2 7 = S L n ZS COMP DATASHEET 3 T = 5 Ln GENERAL NOTES • DRAWING OF STANDARD MCI WIRING DETAIL FOR ANY GIVEN STRING LENGTH • IF INITIATED, RAPID SHUTDOWN OCCURS WITHIN 30 GD SECONDS OF ACTIVATION AND LIMITS VOLTAGE ON THE ROOF TO NO GREATER THAN 165V (690.12.B.2.1) • MID CIRCUIT INTERRUPTER (MCI) IS A UL 1741 PURSE CERTIFIED RAPID SHUTDOWN DEVICE (RSD) DC+ J-BOX J-B0X J-BOX J-BOX J-BOX J-BOX MCI MCI DC- RETROFIT PV MODULES • MCIS ARE LOCATED AT ROOF LEVEL, JUST UNDER THE PV MODULES IN ACCORDANCE WITH 690.12 REQUIREMENTS 1 • THE QUANTITY OF MCIS PER STRING IS DETERMINED BY STRING LENGTH — NUMBER OF MODULES BETWEEN MCI UNITS = 0-3 — MAXIMUM NUMBER OF MODULES PER MCI UNIT = 3 IJ-BOXI J-BOX J-BOX J-BOX — MINIMUM NUMBER MCI UNITS = MODULE COUNT/3 MCI *Exception: Tesla (Longi) modules installed in locations where the max Voc for 3 modules at low design temperature exceeds 165V shall be limited to 2 modules between MCIs. PLEASE REFER TO MCI CUTSHEET AND PVRSA INSERT FOR DC MORE INFORMATION j„ (2)AWG, PV Wire, 600V, Black Solar'Shutdown Device 2 Technical Specifications The Solar Shutdown Device is a Mid-Circuit Interrupter (MCI) and is part of the PV system rapid shutdown (RSD) function in accordance with Article 690 of the applicable NEC. When paired with Powerwall+ or Tesla Solar Inverter, solar array shutdown is initiated by any loss of AC power. Electrical Nominal Input DC Current Rating (IMP) 13 A Specifications Maximum Input Short Circuit Current(Ise) 17 A Maximum System Voltage(PVHCS) 1000 V DC RSD Module Maximum Number of Devices per String 5 Performance Control Power Line Excitation Passive State Normally Open Maximum Power Consumption 7 W Warranty 25 years Environmental Ambient Temperature -45°C to 700C(-49°F to 158'F) Specifications Enclosure Rating NEMA 4X/IP65 Compliance Certifications UL 1741 PVRSE, UL 3741, Information PVRSA(Photovoltaic Rapid Shutdown Array) RSD Initiation Method PV System AC Breaker or Switch Compatible Equipment See Compatibility Table below Mechanical Model Number MCI-2 Specifications Electrical Connections MC4 Connector Housing Plastic Dimensions 173 x 45 x 22 mm (6.8 x 1.8 x 0.9 in) Weight - --120 g (0.26 lb) 173 mm `M1 I s 45 22 mm mm UL 3741 PV Hazard Control (and PVRSA) Compatibility Tesla Solar Roof and Tesla/Zep ZS Arrays using the following modules are certified to UL 3741 and UL 1741 PVRSA when installed with Powerwall+ or Tesla Solar Inverter and Solar Shutdown Devices. See Powerwall+/Tesla Solar Inverter Rapid Shutdown: Module Selection Based on PV Hazard Control System Listing for guidance on installing other modules. Brand Model Required Solar Shutdown Devices Tesla Solar Roof V3 1 Solar Shutdown Device per 10 modules Tesla Tesla TxxxS (where xxx=405 to 450 W, increments of 5) 1 Solar Shutdown Device per 3 modules' Tesla TxxxH (where xxx=395 to 415 W, increments of 5) Hanwha Q.PEAK DUO BLK-G5 or Q.PEAK DUO BLK-G6+ 1 Solar Shutdown Device per 3 modules Exception:Tesla solar modules installed in locations where the max Voc for three modules at low design temperatures exceeds 165 V shall be limited to two modules between Solar Shutdown Devices. January 31,2023 Tesla Solar Shutdown Device 2 Datasheet