HomeMy WebLinkAboutPipes Neck Road End & Bridge Reconstruction - FEMA Estimates SCOTT A. RUSSELL JAMES A. RICHTER, R.A. SUPERVISOR MICHAEL M. COLLINS, P.E. TOWN HALL - 53095 MAIN ROAD Tel. (631) - 765 – 1560 TOWN OF SOUTHOLD, NEW YORK 11971 Fax. (631) - 765 - 9015 OFFICE OF THE ENGINEER TOWN OF SOUTHOLD Pipes Neck Road End & Bridge Reconstruction, Greenport: FEMA Classification - Category “ C “ Description Project to replace Pre-Existing Timber Bridge Deck and Concrete Abutments damaged by Hurricane Sandy. This Bridge system is the only Public access to Town Owned Parkland. The Existing Asphalt Road End & Parking Area is to be Reconstructed to meet the minimum requirements of Town Highway Specifications. Provide new Guard Rail to replace existing Guard Rail damaged by storm. Remove Storm related Debris. PROJECT ESTIMATE: Repair to Pre-Storm Conditions • Engineering – Coordination of DEC Permit - Permit Pending 35 Hours @ $ 75.00 / Hr. = $ 2,625.00 • Removal & Disposal of Concrete, Asphalt & Bridge Timber Debris. = $ 8,000.00 • Reconstruct Concrete Abutment to match pre-existing structure = $ 18,000.00 Item to include 3- 12” Diameter Piles @ 20 L.F. with 24” Thick Concrete Pile Cap and Foundation • Reconstruct Timber Bridge Deck to meet DEC Regulations = $ 15,000.00 • Saw Cutting Asphalt – 50L.F. @ $ 10.00 / L.F. = $ 500.00 • Construct New Timber Guard Rail System 30 L.F. x $ 50 / L.F. = $ 1,500.00 • Stone Rip Rap - 50 Ton @ $ 39 / Ton = $ 1,950.00 • Filter Cloth – 1 Roll @ $ 800 / Roll = $ 800.00 • 3/4" Blue Stone Blend – 50 C.Y. @ $ 40.00 / C.Y. = $ 2,000.00 • New Asphalt – 50 Tons @ $ 75.00 / Ton = $ 3,750.00 • Beach Grass Plantings - 2,000 Plants @ $ 0.20 / Plant = $ 400.00 • In-House Labor Force - Highway Crew Day = $ 3,500 / day (Estimated) Crew = 1 Forman – 2 HEO’s & 3 AEO’s With Equipment (ie., 1 Pick Up Truck, 1 Excavator, 1 Pay-Loader, 3 Dump Trucks ) 16 Crew Days @ $ 3,500 / day = $ 56,000.00 Total Estimate: = $110,525.00 ALTERNATE # 1 FEMA Classification - Category “ G “ Description Project to replace Pre-Existing Timber Bridge Deck and Concrete Abutments damaged by Hurricane Sandy. This Bridge system is the only Public access to Town Owned Parkland. The Existing Asphalt Road End & Parking Area is to be Reconstructed to meet the minimum requirements of Town Highway Specifications. Provide new Guard Rail to replace existing Guard Rail damaged by storm. Remove Storm related Debris. PROJECT ESTIMATE: Mitigation – Construct New Timber Bridge Structure • Engineering – Coordination of DEC Permit - Permit Pending 15 Hours @ $ 75.00 / Hr. = $ 1,125.00 • Removal & Disposal of Both Concrete Abutments, Including Deteriorated Asphalt Pavement & Bridge Timber Debris. = $ 12,000.00 • Install new Timber Pile Bridge Deck (See attached Sketch Plan) Main Bridge Piling – 8 @ $ 1,000 = $ 8,000 Ramp / Walkway Piling – 10 @ $ 500 = $ 5,000 Timber Girders, Framing & Carriage Bolts = $ 8,000 Total = $ 48,000.00 Code Compliant Decking = $ 15,000 Code Compliant Hand Rail System = $ 12,000 • Saw Cutting Asphalt – 50L.F. @ $ 10.00 / L.F. = $ 500.00 • Construct New Timber Guard Rail System 30 L.F. x $ 50 / L.F. = $ 1,500.00 • Armor Stone – 50 Ton @ $ 48 / Ton = $ 2,400.00 • Excavator Equipment– 3.5 Days @ $ 1,417.50 / Day = $ 4,961.25 • Bedding Stone & Rip Rap - 50 Ton @ $ 39 / Ton = $ 1,950.00 • Filter Cloth – 1 Roll @ $ 800 / Roll = $ 800.00 • 3/4" Blue Stone Blend – 50 C.Y. @ $ 40.00 / C.Y. = $ 2,000.00 • New Asphalt – 50 Tons @ $ 75.00 / Ton = $ 3,750.00 • Beach Grass Plantings - 2,000 Plants @ $ 0.20 / Plant = $ 400.00 • In-House Labor Force - Highway Crew Day = $ 3,500 / day (Estimated) Crew = 1 Forman – 2 HEO’s & 3 AEO’s With Equipment (ie., 1 Pick Up Truck, 1 Excavator, 1 Pay-Loader, 3 Dump Trucks ) 5 Crew Days @ $ 3,500 / day = $ 17,500.00 Total Estimate: = $ 96,886.25