Loading...
HomeMy WebLinkAbout51219-Z *0 satut o`o Town of Southold * * P.O. Box 1179 +� c 53095 Main Rd UN" Southold, New York 11971 CERTIFICATE OF OCCUPANCY No: 46522 Date: 09/24/2025 THIS CERTIFIES that the building GENERATOR Location of Property: 5920 Indian Neck Ln Peconic, NY 11958 Sec/Block/Lot: . 98.-5-17.4 Conforms substantially to the Application for Building Permit heretofore,filed in this office dated: 05/28/2024 Pursuant to which Building Permit No. 51219 and dated: 09/26/2024 Was issued, and conforms to all of the requirements of the applicable provisions of the law. The occupancy for which this certificate is issued is: "As built" accessory generator as applied for. The certificate is issued to: Francis Lupinacci ,Jennifer Lupinacci Of the aforesaid building. SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL: ELECTRICAL CERTIFICATE: 51219 9/22/2025 PLUMBERS CERTIFICATION: Auth e Sign ture 3,�OFSOpIYG TOWN OF SOUTHOLD BUILDING DEPARTMENT `� • TOWN CLERK'S OFFICE SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 51219 Date: 09/26/2024 Permission is hereby granted to: Francis E Lupinacci 18 Sunflower Dr Upper Saddle River, NJ 07458 To: legalize "as built" generator as applied for. Premises Located at: 5920 Indian Neck Ln, Peconic, NY 11958 SCTM#98.-5-17.4 Pursuant to application dated 05/28/2024 and approved by the Building Inspector. To expire on 09/28/2026. Contractors: Required Inspections: Fees: As Built Generator $250.00 ELECTRIC -Residential $200.00 CO-RESIDENTIAL $100.00 Total S550.00 --- ---------------------- Building Inspector. o��OF SO!/r�ol � o Town Hall Annex Telephone(631)765-1802 54375 Main Road P.O.Box 1179 G Southold,NY 11971-0959 Jamesh _southoldtownny.gov COUNT`(, BUILDING DEPARTMENT TOWN OF SOUTHOLD CERTIFICATE OF ELECTRICAL COMPLIANCE SITE LOCATION Issued To: Frank Lupinacci Address: 5920 Indian Neck Lane city,Peconic st: New York zip: 11958 Building Permit#: 51219 Section: 98 Block: 5 Lot: 17.4 WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE Contractor: Home Owner Electrician: License No: SITE DETAILS Office Use Only Residential Indoor Basement Service Commerical Outdoor 1st Floor Pool New Renovation 2nd Floor Hot Tub Addition Survey Attic Garage INVENTORY Service 1 ph Heat Duplec Recpt Ceiling Fixtures Bath Exhaust Fan Service 3 ph Hot Water GFCI Recpt Wall Fixtures Smoke Detectors Main Panel A/C Condenser Single Recpt Recessed Fixtures CO2 Detectors Sub Panel A/C Blower Range Recpt Ceiling Fan Combo Smoke/CO Transfer Switch UC Lights Dryer Recpt Emergency Strobe Heat Detectors Disconnect Switches 4'LED Exit Fixtures Sump-Pump Other Equipment: 1 14kw generac generator with 60amp breaker, 1 14 space transfer switch Notes: GENERATOR Inspector Signature: Date: September 22, 2025 5920 indian neck In � o TownHaRAnam TckThoae(631)765-18. 54375 Main Road Fax(631)765-9502 P.O.Box 1179 Southold,NY I MI-0959 ,a 0 Cato BUILDING DEPA.RTWI T TOWN OF SOUMOLD CERTIFICATION Datr.: � Building Permit No. I r - z ' Owner. (Please print) Plumber. (Please print) I certify that the solder used in toe water supply system contains less than 2/10 of 1% lea(L ` luasl)erj Sigvmftlre) Sworn to before m•--this day of 20'a- SUSAN A.PJ720 / N lic;State of New York. o Pub No.01R161M49 QWfied in�1ch�20;0( Nntary Public: ��u '/��' County #a0fS0!/TyO S�a�g C.579�0 zv TOWN OF SOUTHOLD BUILDING DEPT. cou 631-765-1802 INSPECTION [ ] FOUNDATION 1ST/ REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING/STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [A ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: VI.?_J e M if r a,vi c d s cowye c f' a� �a DATE 3 �� INSPECTOR Of SOUlyO� * # TOWN OF SOUTH.OLD BUILDING DEPT. / °ycourm, 631-765-1802 INSPECTION [ ] FOUNDATION 1 ST/ REBAR [ ] ROUGH PLBG. ] FOUNDATION 2ND [ ] SULATION/CAULKING [ ] FRAMING /STRAPPING [ FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [. ] ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O. [ ] RENTAL REMARKS: nNkA/hpk"- _� IN 4v it 100% Jon 1 V V DATE o INSPECTOR pE SO(/TyOlo � �9 ! - ' �'v L(�/V 1 V gxJ< # OWN O SOUTHOLD BUILDING DEPT. 631-765-1802 P TI INS EC N O [ ] FOUNDATION 1 ST/ REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] .FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL REMARKS: u i i Gg&wAtDgZ &L2 . s DATE INSPECTOR Are �"pF SOUIyOIo 6 l oQ / / 6oYcV0 J of I&Lpt W e C,f G Do * TOWN OF SOUTHOLD BUILDING DEPT. 'oum, 631-765-1802 INSPECTION [ ] FOUNDATION 1 ST/ REBAR [ ] ROUGH PLBG. [ ] FOUNDATION 2ND [ ] INSULATION/CAULKING [ ] FRAMING /STRAPPING [ ] FINAL [ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION- [ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION [ ] ELECTRICAL (ROUGH) [kJ ELECTRICAL (FINAL) [ ] CODE VIOLATION [ ] PRE C/O [ ]. RENTAL REMARKS: 0 � Av� DATE INSPECTOR i r i I• NG 1 .1 WN OFF M � •1 1 t, J U L 2 '2025 Building Cepartmm-mt. n T n of Ste•::?,,. !,� i MELD INSPECTION REPORT DATE COMMENTS b FOUNDATION (1ST) — 3 ----h-------------------------------- �C :FOUNDATION (2ND) . � z cn CPS t,20UGH FRAMING& PLUMBING — t f r INSULATION PER N.Y. STATE ENERGY CODE l � v � r, ' 6�s c • h k. y FINAL O — ADDITIONAL COMMENTS o --- - •z . , rn ln• r � O Y d ��FFaIK��r oG• TOWN OF SOUTHOLD— BUILDING DEPARTMENT Town Hall Annex 54375 Main Road P. O.-Box 1179 Southold, NY 11971-0959 Q a oti ' Telephone (631) 765-1802 Fax (631) 765-9502 https://www.southoldtownny.gov APPLICATION FOR BUILDING PERMIT Date Received h For Office Use Only 1 ,`° "°:.r`P? '+1 i� S pERMITN0. S1A 41 Building Inspector: MAY 2 3 2024 Applications and forms must'be filled out in'their.entirety.Incomplete applicaiions will not be accepted.'Where the Applicant is not the owner,an pwneesAuthorization'form(Page.?)shall'be.cornpleted. Date: A, OWNERS)OF PROPERTY;, N a rne:� L_A1p!AJ A C C. ! SCTM#1000- Project Address: 51 2_0 ZZW i A IQ E5--L tC 11AJ . phone #: �c�6 ® 5-75 Email: �f � diOdl �Z MaiIing Add ress: �M�I� ` C"4 ,CONTACT PERSON: Name w NAailing Address: 1() 4S C) ��L_6 L41J, Phone#: G-3, � -2_�8- SO8® Email: v� �.0 d?l_ w$ c3ae� S Co . C DESIGN PROFESSIONAL INFORMATION: Name: Mailing Address: Phone#: Email: CONTRACTOR INFORMATION:-: Name C—ea", Mailing Address: Phone#: Email: DESCRIPTION OF PROPOSED CONSTRUCTION []New Structure ❑Addition ❑Alteration []Repair' ❑Demolition Estimated Cost of Project: Will the lot be re-graded? ❑Yes 2<0 Will excess fill be removed from premises? ❑Yes w o 1 PROPERTY INFORMATION . Existing use of property: Intended use of property: Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to this property? ❑Yes [2 o IF YES, PROVIDE A COPY. iiig r. Check Box After Reading:,'The:owner/contractor/design professional is responsible for all drainage and storm water issues as provlded':by`- Chapter 236 of the Town Code 'APPLICATION IS HEREBY MADE to the Building able Department O dmances or Re ulat oance of esa for,the co construction of build- 'for the issu -Permit pursuant,to the aiding Zane g gs Ordinance of the Town of southold,Suffolk,County,NewaYork and otherapp_ additions,.alterations or for removal.or demolition arherein described o ed and iritbuild ng(s)forrnecessaryply With 'inspeictions(False statements made here n ere housing code end regulations'and to admit authorised inspecto premises punishable as a Ciass A'rriisdemeano'p trsuant to Section 210.45 of the New York State Penal Law. Authorized Agent ❑Owner Application Submitted By(print n e): OZ Date: + Signature of Applicant: STATE OF NEW YORK) SS: COUNTY 0Fq� ' being duly sworn, deposes and says that (s)he is the applicant 1 V1 DV�� (Name of individual signing contract) above named, (S)he is the (Contractor,Agent, Corporate Officer, etc.) of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and belief; and that the work will be performed in the manner set forth in the application file therewith: Sworn before me this of /0G , C day 20 Not lti, ,ublic .•`yAATERp��'% DL' i01�01Miia '• Nowy Pubs;9t a of *(rplalC r *� NO.010kMM IC t2ualttle I htSufFA CoWW PRO OWNER AUTHORIZATION',,�,'!�iw•ro�;'�'�� Cotilinhiionl 05/r��®ER. I1n c %illlllil' 13/20�5 (Where the applicant is not the owner) I UCj esiding at j I, do hereby authorize to apply on I my behalf to the Town of Southold Building Department for approval as described herein. I Date Owner's Signature Print Owner's Name 2 I Mr. Frank Lupinacci 18 Sunflower Drive Upper Saddle River, NJ 07458 Date: April 17, 2024 To Whom It May Concern: I, Mr. Frank Lupinacci, hereby authorize Mr. Thomas M. Ludlow to act on my behalf in all matters concerning the permitting of my project located at 5920 Indian Neck Ln., Peconic, NY 11958. The tax map number is 1000- 98-5-17.4. Please direct any questions or correspondence pertaining to the project toward Mr. Ludlow at 105 Ole Jule Ln., Mattituck, NY 11952-Telephone (631) 298-5080. Sincerely, C� �yos�¢fpt,t•`o� BUILDING DEPARTMENT- Electrical Inspector y� TOWN OF SOUTHOLD o =` Town Hall Annex- 54375 Main Road - PO Box 1179 Southold, New York 11971-0959 41 Telephone (631) 765-1802 - FAX (631) 765-9502 jamesh(aD-southoldtownny.gov — seand(aD-southoldtownny.gov APPLICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (All Information Required) Date: Company Name: -F�i A C L_v N A c_ l � Electrician's Name: License No.: Elec. email: Elec. Phone No: ❑I request an email copy of Certificate of Compliance Elec. Address.: JOB SITE INFORMATION (All Information Required) Name: N A CC I Address: 59 N D ti A N- trLl� LW Cross Street: 5 Phone No.: _ Bldg.Permit#: 61 D- IL I email: Tax Map District: 1000 Section: TZ Block: t� Lot: is-7 BRIEF DESCRIPTION OF WORK, INCLUDE SQUARE FOOTAGE (Please Print Clearly): r N c7 Square Footage: Circle All That Apply: Is job ready for inspection?: [3/YESE] NO ❑Rough In Final Do you need a Temp Certificate?: ❑ YES ❑ NO Issued On Temp Information: (All information required) Service SizeL] Ph❑3 Ph Size: 2.00 A # Meters Old Meter# ❑New Service❑Fire Reconnect❑Flood Reconnect❑Service Reconnect❑Underground❑Overhead # Underground Laterals 1 2 D H Frame Pole Work done on Service? Y F1N Additional Information: PAYMENT DUE WITH APPLICATION oS�FFp� C BUILDING DEPARTMENT- Electrical Inspector TOWN OF SOUTHOLD CD Town Town Hall Annex - 54375-Main Road - PO Box 1179 Southold, New York 11971-0959 4"�' apt ' Telephone (631) 765-1802 - FAX (631) 765-9502 jamesh(cr-southoldtownny gov - seand(cr-southoldtownny.gov APPLICATION FOR ELECTRICAL INSPECTION ELECTRICIAN INFORMATION (All information Required) Date: 7- 1-5 --Z 4— Company Name: ���, C L-ve I N A c-, l �� Electrician's Name: License No.: Elec. email: Elec. Phone No: ❑1 request an email copy of Certificate of Compliance Elec. Address.: JOB SITE INFORMATION (All Information Required) Name: N A C I v . Address: 59 Z,0 D At•� Cross Street: S Phone No.: _ c�& C� Bldg-Permit#: Sl �- email: Tax Map District: 1000 Section: `a Block: t Lot: 9-7, BRIEF DESCRIPTION OF WORK, INCLUDE SQUARE FOOTAGE (Please Print Clearly): >=� 15 r N (7 &LrN(, A Square Footage: Circle All That Apply: Is job ready for inspection?: E3/YESF-] NO ❑Rough In [21F/inal Do you need a Temp Certificate?: .❑ YES ❑ NO Issued On Temp Information: '(All information,required) Service Size 1 Ph❑3 Ph Size: ZUy A # Meters Old Meter# QNew Service❑Fire ReconnectE]Flood ReconnectOService ReconnectOUnderground❑Overhead # Underground Laterals 1 FJ2 H Frame Pole Work done on Service? Y N Additional Information: PAYMENT DUE WITH APPLICATION �1 PERMIT# Address: Switches Outlets GFI's Surface Sconces H H's UC Lts Fridge HW POOL Fans Mini Fr. W/D PanelPump Exhaust Oven Sump Heater Trnsfmr Smokes DW Generator Salt Gen. Carbon Micro GrbDis Water Bond Lights Heat Pucks ERV HOT TUB/SPA Inst Hot DeHum Transfer Disc Combo Cooktop Minisplit Blower AC AH Hood Blower Service Amps Have Used Sub Amps Have Used Comments [ L4 �W o4 ARr ft-a�-e r Iq , ' 0 APP4GRGOVEDS AS NOTED B.P.t S* �E BY. NOTIFY BUILDING DEPARTMENT AT 631.765.1802 8AM TO 4PM FOR THE FOLLOWING INSPECTIONS: 1. FOUNDATION-TWOREOUIRED FOR POURED CONCRETE 2. ROUGH-FRAMING&PLUMBING 3. INSULATION 4, FINAL-CONSTRUCTION MUST BE COMPLETE FOR C.O. ALL CONSTRUCTION SHALL MEET THE REQUIREMENTS OF THE CODES OF NEW YORK STATE. NOT RESPONSIBLE FOR DESIGN OR CONSTRUCTON ERRORS ELECTRICAL INSPECTION REQUIRED COMPLY WITH ALL CODES OF VIEW YORK STATE &TOWN CODES AS REQUIRED AND CONDITIONS OF SOUTHO TOWN ZBA SOUTH TOWN PLANNING BOARD SO OLD TOWN TRUSTEES N,Y ,DEC UTHOLD HPC D OCCUPANCY OIL USE IS UNLAWFUL WITHOUT CERTIFICATi- OF OCCUPANCY U91 V,3A c L t Z5 q ?_0 ANC)1 A �j ' ' j v _-. , � � , , ,�Y—.,,,,.,,( -,,,� k „_, c � , v 1. ,:T'�� , I1 �­ � 1 . ,N, ', 7", ,�JTT,STALLATION . ,� ,� � .,, ��,,��i,��,,,,�"-',�"".' "' .",�,� xi I I . -I I $,, - ' ' � u I 'll . . I , 1 , " " _�, 1­1 - , ",, - � G:U 1 D�E:L I N .- ���,,,t;�_ !,_�: E S ak" , i -1, � 11 " ", , I R � , 3 \ , 4 ,, 7 t z € L f S 7: sd e � " _�- " k r 2 a '� 5 g,n' ,r *,. yv % ­­,__ "�� �:,� . A,7i7ir-cooled Generators � _ 1 , "�V. n N L" �i�',%��,��i�`, - ' � " ­., rI_.rIII :? _ � I'll ,,I= E ,zA" QJ, """'g: - D d e k S _ k fC 'i - ( I' ri a k X a y k : k I'_ S a - F i€ i;IIVI,�­�I,I� \�, k ,t k r€ k kg i , : .cam x xr: y abi j k k�,I`­1y'"€E a ' -€ e4 k"4 k ° -s a ai'i 3 iti k k:C 3 p .., -�t�� 6 a j � S E£ 'r, �'a nk , t,6k 'S'X 1 a E - �, e s, k€a11:' i "'. �',­­�i! ,�,,�,,\ ��,J,�, ",6 5 ,6 �, `�.v.." ', <� e ,`�£z n, ��,,�,DF,'I a #; 1 'P , ''cC x I }'p10 �' r � r ?; 'C a a­,,�gt',­�",Ua t;. ," '_ ", '111 !1� ! , , ......1. zx- �U� n7a ��t3 - � i ' a5+�� ?"��..c , ,�1!1: I'll,� i?!, � ,X + g £,t S. C '�E � 'N. kr � � '' 1 -�,I­­ "' ' ,,5 �, I� ,��!,���,���,,,,,�,',','�,,,,,,--""�,',;,',"",�,,�,,,�,,��3', `tT� -�� tir"" i"',", & L �' c,"- a d xf a C 1 ,, tY x, FE : i ui, 3 r x, s}r 2 �a A .t a d t x-,"'4 !''£". '�`." f[[ y g ,W , �a a }k 1 r't t ..,t'Y F,x 1 , a 7_ ,3`g it &.aa1" . i,105 a .-"`5" �+ ' 4� g�"xs X. �7 y'r',fU. x✓- y rav ,7«3a.'s xr s x°rrk at E,y�a'f r+ ... x'X ra- a. ;cri 'g' 'id rN' ",P' "+. " yqC % � ,`X i -a, y7/..,<a..... - 'Ill "s M�I£ g': G I'll + a n w I7 g3.�_ s. .�. ' A £L 2 'X &_ t 5 aY i 1 'C15fi k a P`3 c r ."1 i `7c, c ti F r `�, s s a $ ,.; 5 fi`u",,y, " £a L &;F11 ! t r � t - t xc z `{ t x 3��,k F `i 3 xy ys { r t T �f 7 n s7ls S'X 3 k a i s� L a -k t.d x g C a d' - a r'F rh, za ? ec a *3:"x`i £"RP ­'£, ,6 i 4, E „, { 'xv� rc{ .a °£ k € r �II.Er Fa,' v,, ,gi i _ tx v11 'Inz �k% �,i r 1.1 r"xi 4 d a ern i s 5 a 'o- �"t a` i!ir 3'-,�,. rx� } ems '' + Y'I M. r RlI4t,. r € "• r`y�,rx A c:s �iii . "g 6i Y , t i� xs ah.t�S_ `g { £ x� " X z ,r E 1 �,a „gq i�c k �, v s s F r 4 E'a i r`3 } G z y% g '€rrtr ,c s! '£ , .„r r to 3- �X asa C j� s, a` x� - C. 9a.,i' e- ", 'x F? �' zE �.5'".?"e2 r5 a '�rI '� �"`�' s k 'ryft�t e. a.c �'�,- 17" 2a 1.4t U r '�" '. z '� "firs r a ,.: 3 & s �.4wa ! ^x R7a.0 8u- , s s,, t,$ : s., ya-o- '� r4 ~t� 2x tip.��;,§T �' 2 it :,`#s y 5�,& `p F..I 'w to .S a y , w ? g f st 1 n x R , �� x e , 'a, isI � '& "M � "ty,, ; a E, i�` Xz tr a`€ ,v - vw A, +. :a, § tcgr ' a,. 9' a c 1E '�X Da Y'"at 1 X'x t § s; v d '9'€.s v� __ d� s a C s i- r x1 r - t s ;a`c"� zs r: a s § " ; a *�rx$' t F + k `a -�- 5 SgY�3 a'. r ;. � - :r,- i`�^�r,� "n�2 k :-fl ,� � ', d ,1 y B y"�t z r€ E - u1 i - E s a „>x s g F ? E �. 7`-3x- £ q x: q „II F€ -.s .v S .F I,a S't"I s.s ,y a n - h la `g£ tiX ?2 1 7`rl k t Y N .I.AD �Si: `i r E a, d R.ti 7 9 � ,k, "�; S v F r 3 � x }uzy xtk�m .k" y xH vs ',gg ,z nV ?Tbg S4 �, v 8_ t k g\_ -? 55� xG xs ar,2,r '� T r}d 6 f 3 n n#g ,3 r f .aa• rY'' n�C,£,'{r5 .-'fig ,� t 5.c i q'9s a`P 5 ad #*A 'V'IM g 1 r eft .:,+���` �`•a -'I'll, �4*id z s :,sa c �� IN x:T`.s V�`.W & iF;0, ?�4 Mc s '"'',rzs t - ,� iC 3' � §' a+- fig. `.t "` s' € f -r; s > '� ,•7}s '3E :Y tfYipp '' v .r �y t*a; [,`t>:tz �e'�.es�v..§ rr#g, 3 a�LS ' �'2g 4`7l 4i a1 TaT3fffi�sS �, t ' C { 8 . S %3 L -i ,1�*: w -C•�c a r fi ;' 'a tr �+ wi tr' x ;�y* s � s�e � ,,z` x ' �� h � a^"" '' ' a,, r'X�zfr ' # ,r .c' vu t� 3'+ Z ' Sf �`*r ta4t s . .a� 47a dr a x q3 f � �� I , �ea� r 12,116 t ,.-,l n 7 s. }s "`6 Y5t €Z „jSsG t , s`r 9a z _ f E y,XPf. ' yde4 �r `" ies�. 'r ry F IIIt'r 1. s,£y,,,?r'4,�`. ,...I f F ghX ,g�"� ¢ ,r .,,b v G.rs;�� - �a„erg�r'"a `fi �"di z ,, #+,Xc `��"s,',3�+ +z t,• t Y - �#`T�? r I"666 '61 y d k x �x "�a S L a rL WWI� i3tPhtM r °u-rx s�e n Zr'. ` ',kg S-3,,,,.X � �F a t x s g ��1, Sri rai » i� f'' 1,'& ri vy `x .;k,,<»� r's,: a w nv ,*, rn +?`Cj;E r + t"a t , r s S ,a +s .r k" g s a�X '2< 3 _a tk?r yF ,. gA l yg ..tMr p` v � s ,�z.,; i�s�S ,}dr , 6 g i+Cs.Eg r�.. 's:n',`.�.+sir P� za."s.�F;xf 3+�d3.>,.r�.71:•�#,y,`fir���;rH'` Y"* ,x'rz,._` ..z 3.:7�1�1i1<j+r �'s; t, & ,L", a��E,M3 a r "2<.P+' 5$,Y.hEy§q�y5"`w<K, i -o'6",� .. x''a,k '} 5' r z &incfi 4t' f ,""'g,; r-f y •^vr r'�L. j� i y -` x$ t.:vr§ qa,z ;ro,s"{��,�r' - i sk 5+w4 ' �' V i r. h a rk a a`< a` :j l sf ;-(g S, 4 ',f ,.� s,,v +nF. «.,,; u. s 4 a ��k€i r s .s r, `1 '4 kn w t'a:. ,, ,.v;�,a,+u N"7 a,•ya ta'c�#.7 t r x"'i ct4 4 ms 3R�` V�^z` s F ��i9 R s + e 4E %aa,s �}.e r v'£: "d Y' Iaa l..- : C % ¢ $° a ti 'y g'7`` 9.' p ".g,a to A '•{q'+d "fit.�"k, }tv a, I ® v F,tr a raa$, ,taw'.4 gv'`z g�.; a dt„ 9§11 '? 8 a,, t�4.x i a f '4r: P .zg ,xt s y as �sx ,,{ t #.a a+ + .: �11 :,Lzw.^' €, , 1-IN x`� r < ,, e 7 -+s sa{7 r k z r ,+ a ak s'a i a�a '§ N f ..' s" -,a „. i � ' ¢ } { E E a �,, F. a 1" ` gf, ..r, { ,t+ 4 2�ag1 Ps E r,�F " aa� r' c. �, }�* ��MA I � -'-" ,p , � - NOT INTENDED FOR,USE WCR'TICAL LIFE�SUPP,O�T �� x r ! � { , c fpta r � � , r APPLICATION111, ? g'.'h?, a �.k`� '� s r ia,' a ..1' ,f'�11 �c, �'.��G i S'k °�}#fi, °�_.g;� �' � yZ, <, €?z' �`€,`?�„j5i ,'i % �, ¢ ��, �� k �� ;THIS PR-11 QDUCT CANBE,INSTALI;ED BY Tf E1HOME04(N R �� 44 01g66 _� � €' M �HOUV�IIER IF�1 C?[l RE CINCOMFORnT BLE WITH'T klSFCILLS�" t'"F"'t.`��I ,A7a, ?" 7 - '"' ..g,•^?"G',��id^�,<:. § k •:a1 a0 •• -� `�' ,`.,.• ,„t, x3k, s ,mow , ..,.„k A,rr=: $ �.:. .},"I fig° r ,, rE„�N;,; `ORFTOOLSYREQUIREDHAVE A QUALIFIED ELECTRICIAN OR3 ` `r .... # � i I.1� ., � 4RCONTRACTOR PERFORiVI T EMI STALLATION 3 � � S �THISyMANUAI�Ml1ST 3E USED`LIN CONJII tCrTtON � y' Pk p 'r&i,�R... < . ., _ � K t z- d« . , �s :; ,._ .�•. ,R rc#°.xX;!x.,: C ,..E� �xt _ ,deE>,2-k �. s £ , i C .._.. ,efit r a. IIIfITHFTI{EAPPROPRIATE OWNER'S MANUAL rDEADLY EXt�AU5f FUMESI 0UTD00R�INSTALLATION ONLYI, ,,,, . i'. 0.77 ,x � , x�t. �,h' -..., •a�,axv.:.,, z a' �C666 C ,� 8x:,;. t`"Cry v i 'x +'v`�'» k37g x'a+X€s 'a$a• �`' cam:, x a1 �w 1-1 '� .try d R, :1� ,_� `� z i ,agr x.a gr"t✓a T vc s a k t4, �'a�{ &: '"a`i ,£ � -z' .a k:_. y. a $°,' h• .s• ,,. a" �•�' y # '-<:�+:� t "g as s t',Sty i �; 3 " FP}S z' s, 2� #. r:;ry F,i k C s,« RA 7 4W T S v a ,.e• w 'te FTv .� �s4� •P ? E¢�� a�!e&ut`�e�s§..> �.,i'.,,;e..a= 3 ,' .;�..... .: `,` ?..�i. ,s.' r.;� �� `.�.P'�'.. `r z' A:�., :�a s<.. 1 1 1 WARNING! California Proposition 65 Engine exhaust and some of its constituents are known to the state of California to cause cancer, birth defects,and other reproductive harm. WARNING! California Proposition 65 This product contains or emits chemicals known to the state of California to cause cancer, birth defects,and other reproductive harm. Table of Contents Section 1 —Safety Rules&General Information.....................................................................................................................................2 1.1 ' Introduction.....:......................................................................................................................:................................................2 1.2 Safety Rules...........................................................................................................................................................................3 1.3 General Rules........................................................................................................................................................................4 Section 2—Unpacking/Inspection/Familiarization...................................................................................................................................6 2.1 Required Tools.......................................................................................................................................................................6 2.2 Unpacking...............................................................................................................................................................................7 2.3 Parts Shipped Loose..............................................................................................................................................................9 Section 3—Site Selection and Preparation...........................................................................................................................................10 3.1 Site Selection.......................................................................................................................................................................10 3.2 Site Preparation....................................................................................................................................................................12 Section4—Generator Placement..........................................................................................................................................................13 4.1 Generator Placement...........................................................................................................................................................13 Section 5—Fuel Conversion/Gas Requirements/Connections..............................................................................................................15 5.1 Fuel Conversion...................................................................................................................................................................15 5.2 Fuel Requirements and Recommendations.........................................................................................................................16 5.3 Fuel Consumption................................................................................................................................................................17 5.4 Fuel Line Sizing....................................................................................................................................................................17 5.5 Installing and Connecting Gas Lines...............................................:....................................................................................18 Section 6—Electrical Connections........................................................................................................................................................21 6.1 Generator Connections.........................................................................................................................................................21 6.2 Control Wiring.......................................................................................................................................................................21 6.3 Main AC Wiring.....................................................................................................................................................................22 6.4 Battery Requirements...........................................................................................................................................................23 6.5 Battery Installation................................................................................................................................................................23 Section 7—Control Panel/Activation/Start-up/Testing...........................................................................................................................24 7.1 Control Panel Interface.........................................................................................................................................................24 7.2 Generator Activation.............................................................................................................................................................25 7.3 Before Initial Start-up............................................................................................................................................................25 7.4 Check Manual Transfer Switch Operation............................................................................................................................27 7.5 Electrical Checks..................................................................................................................................................................27 7.6 Generator Tests Under Load................................................................................................................................................28 7.7 Checking Automatic Operation.............................................................................................................................................28 7.8 Installation Summary............................................................................................................................................................29 Section8—Troubleshooting..................................................................................................................................................................30 Section9—Quick Reference Guide.......................................................................................................................................................31 Section10—Accessories.......................................................................................................................................................................32 Section11—Notes..................................................................................................................................................................................33 Section12—Interconnection Diagram...................................................................................................................................................34 Section13—Installation Diagram..........................................................................................................................................................36 1 Section 1 Safety Rules & General Information 1.1 INTRODUCTION Thank you for purchasing this compact,high performance,air-cooled,engine-driven generator.It is designed to automatically supply electrical power to operate critical loads during a utility power failure. This unit is factory installed in an all-weather,metal enclosure that is intended exclusively for outdoor installation.This generator will operate using either vapor withdrawn liquid propane(LP)or natural gas(NG). NOTE: When sized properly,this generator is suitable for supplying typical residential loads such as Induction Motors(sump pumps,refrigerators, air conditioners,furnaces,etc.),Electronic Components(computer,monitor,TV,etc.),Lighting Loads and Microwaves. 1.1.1 READ THIS MANUAL THOROUGHLY If any portion of this manual is not understood,contact the nearest Dealer for starting,operating and servicing procedures. Throughout this publication and on tags and decals affixed to the generator,DANGER,WARNING,CAUTION and NOTE blocks are used to alert personnel to special instructions about a particular operation that may be hazardous if performed incorrectly or carelessly.Observe them carefully. Their definitions are as follows: r INDICATES A HAZARDOUS SITUATION OR ACTION WHICH,IF NOT AVOIDED,WILL RESULT IN DEATH OR SERIOUS INJURY. rwARNIH :�E Indicates a hazardous situation or action which,if not avoided,could result in death or serious injury. A CAUTION! Indicates a hazardous situation or action which,if not avoided,could result in minor or moderate injury. NOTE: Notes contain additional information important to a procedure and will be found within the regular text body of this manual. These safety warnings cannot eliminate the hazards that they indicate.Common sense and strict compliance with the special instructions while performing the action or service are essential to preventing accidents. Four commonly used safety symbols accompany the DANGER,WARNING and CAUTION blocks.The type of information each indicates is as follows: AThis symbol points out important safety information that,if not followed,could endanger personal safety and/or property of others. AThis symbol points out potential explosion hazard. ®This symbol points out potential fire hazard. AThis symbol points out potential electrical shock hazard. The operator is responsible for proper and safe use of the equipment.The manufacturer strongly recommends that if the operator is also the owner, to read their Owner's Manual and thoroughly understand all instructions before using this equipment.The manufacturer also strongly recommends instructing other users to properly start and operate the unit.This prepares them if they need to operate the equipment in an emergency. 1.1.2 HOW TO OBTAIN SERVICE When the generator requires servicing or repairs,contact a Dealer for assistance.Service technicians are factory-trained and are capable of handling all service needs.For assistance locating a dealer,call 1-888-436-3722. When contacting a Dealer about parts and service,always supply the complete model number and serial number of the unit as given on its data decal, which is located on the generator.See section'The Generator"for decal location. Model No. Serial No. 2 1.2 SAFETYRULES Save These Instructions—The manufacturer suggests that these rules for safe operation be copied and posted near the unit's installation site.Safety should be stressed to all operators and potential operators of this equipment. Study these SAFETY RULES carefully before installing,operating or servicing this equipment.Become familiar with this Installation Manual and with the unit.The generator can operate safely,efficiently and reliably only if it is properly installed,operated and maintained.Many accidents are caused by failing to follow simple and fundamental rules or precautions. The manufacturer cannot anticipate every possible circumstance that might involve a hazard.The warnings in this manual and on tags and decals affixed to the unit are,therefore,not all-inclusive.If using a procedure,work method or operating technique the manufacturer does not specifically recommend,ensure that it is safe for others.Also,make sure the procedure,work method or operating technique utilized does not render the generator unsafe. ADespite the safe design of this generator,operating this equipment imprudently,neglecting its maintenance or being careless can cause possible injury or death.Permit only responsible and capable persons to install,operate and maintain this equipment. Potentially lethal voltages are generated by these machines.Ensure all steps are taken to render the machine safe before attempt- ing to work on the generator. AParts of the generator are rotating and/or hot during operation.Exercise care near running generators. AInstallation must always comply with applicable codes,standards,laws and regulations. AA running generator gives off carbon monoxide,an odorless,colorless poison gas.Breathing in carbon monoxide can cause head- aches,fatigue,dizziness,nausea,vomitting,confusion,fainting,siezures or death. 1.2.1 GENERAL HAZARDS ■ For safety reasons,the manufacturer recommends that this equipment be installed by a Service Dealer or other competent,qualified electrician or installation technician who is familiar with applicable codes,standards and regulations.The operator also must comply with all such codes, standards and regulations.Only an Authorized Service Dealer is allowed to perform warranty service on this unit. The engine exhaust fumes contain carbon monoxide,which can be DEADLY.This dangerous gas,if breathed in sufficient concentrations,can cause unconsciousness or even death.Do NOT alter or add to the exhaust system or do anything that might render the system unsafe or in noncompliance with applicable codes and standards. Install a battery-operated carbon monoxide alarm indoors,according to manufacturer's instructions/recommendations. - Adequate,unobstructed flow of cooling and ventilating air is critical to correct generator operation.Do not alter the installation or permit even partial blockage of ventilation provisions,as this can seriously affect safe operation of the generator.The generator MUST be installed and operated outdoors only. - Keep hands,feet,clothing,etc.,away from drive belts,fans,and other moving or hot parts.Never remove any drive belt or fan guard while the unit is operating. When working on this equipment,remain alert at all times.Never work on the equipment when physically or mentally fatigued. Inspect the generator regularly,and contact the nearest Dealer for parts needing repair or replacement. Before performing any maintenance on the generator,disconnect its battery cables to prevent accidental start up.Disconnect the cable from the battery post indicated by a NEGATIVE,NEG or(—)first,then remove the POSITIVE,POS or(+)cable.When reconnecting the cables,connect the POSITIVE cable first,the NEGATIVE cable last. • Never use the generator or any of its parts as a step.Stepping on the unit can stress and break parts,and may result in dangerous operating conditions from leaking exhaust gases,fuel leakage,oil leakage,etc. 3 ` 1.2.2 ELECTRICAL HAZARDS • /.II generators covered by this manual produce dangerous electrical voltages and can cause fatal electrical shock.Utility power delivers extremely high and dangerous voltages to the transfer switch,as does the standby generator when it is in operation.Avoid contact with bare wires, terminals,connections,etc.,while the unit is running.Ensure all appropriate covers,guards and barriers are in place,secured and/or locked before operating the generator.If work must be done around an operating unit,stand on an insulated,dry surface to reduce shock hazard. • Do not handle any kind of electrical device while standing in water,while barefoot,or while hands or feet are wet.DANGEROUS ELECTRICAL SHOCK MAY RESULT. • The National Electrical Code(NEC)requires the frame and external electrically conductive parts of the generator to be connected to an approved earth ground.Local electrical codes also may require proper grounding of the generator electrical system. • After installing this home standby electrical system,the generator may crank and start at any time without warning.When this occurs,load circuits are transferred to the STANDBY(generator)power source.To prevent possible injury if such a start and transfer occur,always set the generator to the OFF mode,remove the 7.5 Amp fuse from the generator control panel,and disconnect the battery before working on equipment. • In case of accident caused by electric shock,immediately shut down the source of electrical power.If this is not possible,attempt to free the victim from the live conductor.AVOID DIRECT CONTACT WITH THE VICTIM.Use a nonconducting implement,such as a dry rope or board,to free the victim from the live conductor.If the victim is unconscious,apply first aid and get immediate medical help. • Never wear jewelry when working on this equipment.Jewelry can conduct electricity resulting in electric shock,or may get caught in moving components causing injury. 1.2.3 FIRE HAZARDS • For fire safety,the generator must be installed and maintained properly.Installation must always comply with applicable codes,standards,laws and regulations.Adhere strictly to local,state and national electrical and building codes.Comply with regulations the Occupational Safety and Health Administration(OSHA)has established.Also,ensure that the generator is installed in accordance with the manufacturer's instructions and recommendations.Following proper installation,do nothing that might alter a safe installation and render the unit in noncompliance with the aforementioned codes,standards,laws and regulations. • Keep a fire extinguisher near the generator at all times.Extinguishers rated"ABC"by the National Fire Protection Association are appropriate for use on the standby electric system.Keep the extinguisher properly charged and be familiar with its use.Consult the local fire department with any questions pertaining to fire extinguishers. 1.2.4 EXPLOSION HAZARDS • Do not smoke around the generator.Wipe up any fuel or oil spills immediately.Ensure that no combustible materials are left in the generator compartment,or on or near the generator,as FIRE or EXPLOSION may result.Keep the area surrounding the generator clean and free from debris. • Gaseous fluids such as natural gas and liquid propane(LP)gas are extremely EXPLOSIVE.Install the fuel supply system according to applicable fuel-gas codes.Before placing the home standby electric system into service,fuel system lines must be properly purged and leak tested according to applicable code.After installation,inspect the fuel system periodically for leaks.No leakage is permitted. 1.3 GENERAL RULES • Follow all safety precautions in the Owner's Manual,Installation Guidelines manual and other documents included with your equipment. • Refer to NFPA 70E for safety equipment required when working with alive system. • Never energize a new system without opening all disconnects and breakers. • Always consult your local code for additional requirements for the area in which the unit is being installed. AM1AR [ N `' AImproper installation can result in personal injury and damage to the generator.It may also result in the warranty being suspended or voided.All the instructions listed below must be followed including location clearances and pipe sizes. 1.3.1 BEFORE YOU BEGIN Contact the local inspector or City Hall to be aware of all federal,state and local codes that could impact the installation.Secure all required permits before starting the job. Carefully read and follow all of the procedures and safety precautions detailed in the installation guide.If any portion of the installation manual, technical manual or other factory-supplied documents is not completely understood,contact a dealer for assistance. Fully comply with all relevant NEC,NFPA and OSHA standards as well as all federal,state and local building and electric codes.As with any generator,this unit must be installed in accordance with current NFPA 37 and NFPA 70 standards as well as any other federal,state,and local codes for minimum distances from other structures. Verify the capacity of the natural gas meter or the LP tank in regards to providing sufficient fuel for both the generator and other household and operating appliances. 4 1.3.2 NEC REQUIREMENTS Local code enforcement may require that Arc Fault Circuit Interrupters(AFCIs)be incorporated into the transfer switch distribution panel.The Transfer Switch provided with this generator has a distribution panel that will accept AFCIs(pre-wired transfer switches only). Siemens Part No.Q115AF-15A or Q120AF-20A can be obtained from a local electrical wholesaler and will simply replace any of the single pole circuit breakers supplied in the pre-wired transfer switch distribution panel. 1.3.3 STANDARDS INDEX Applicable national,state or local laws,codes and regulations pertaining to the installation of engine-generator power systems must be strictly complied with.Always use the current acceptable version or edition of the applicable code or standard which applies to your jurisdiction.In the absence of pertinent local laws and standards,the following published booklets may be used as a guide (these apply to localities which recognize NFPA and IBC): 1. National Fire Protection Association(NFPA)70:The NATIONAL ELECTRIC CODE(NEC) 2. NFPA 10:Standard for Portable Fire Extinguishers* 3. NFPA 30:Flammable And Combustible Liquids Code 4. NFPA 37:Standard for Stationary Combustion Engines And Gas Turbines 5. NFPA 54:National Fuel Gas Code* 6. NFPA 58:Standard for Storage And Handling Of Liquefied Petroleum Gases 7. NFPA 68:Standard On Explosion Protection By Deflagration Venting 8. NFPA 70E:Standard For Electrical Safety In The Workplace 9. NFPA 99:Health Care Facilities Code 10. NFPA 101:Life Safety Code* 11. NFPA 110:Standard for Emergency and Standby Power Systems 12. NFPA 211:Standard for Chimneys,Fireplaces,Vents,and Solid Fuel Burning Appliances 13. NFPA 220:Standard on Types of Building Construction 14. NFPA 5000:Building Code 15. International Building Code** 16. Agricultural Wiring Handbook*** 17. ASAE EP-364.2 Installation and Maintenance of Farm Standby Electric Power**** This list is not all-inclusive.Check with the Authority Having Local Jurisdiction(AHJ)for any local codes or standards which may be applicable to your jurisdiction.The above listed standards are available from the following internet sources: *www.nfpa.org **www.lecsafe.org ***www.rerc.org Rural Electricity Resource Council P.O.Box 309 Wilmington,OH 45177-0309 ****www.asabe.org American Society of Agricultural&Biological Engineers 2950 Niles Road,St.Joseph,MI 9085 AThe installation of this product must comply strictly with applicable codes,standards and regulations.This product can be installed by the homeowner.However,if you are uncomfortable with the skills or tools required,have a qualified electrician or contractor perform the Installation. PERFORM THE INSTALLATION IN ONLY 6 STEPS! STEP 1 - Unpacking I Inspection 1 Familiarization STEP 2 - Site Selection and Preparation STEP 3 - Generator Placement STEP 4 - Gas Requirements Connections 1 Fuel Conversion STEP 5 - Electrical Connections STEP 6 - Control Panel Activation 1 Start-up 1 Testing 5 QIf this generator is used to power electrical load circuits normally powered by a utility power source,it is required by code to install a transfer switch.The transfer switch must effectively isolate the electrical system from the utility distribution system when the generator is operating(NEC 700,701 &702).Failure to isolate an electrical system by such means will result in damage to the gen- erator and also may result in injury or death to utility power workers due to backfeed of electrical energy Having reviewed SAFETY/ GENERAL INFORMATION r proceed to Step 1: SECTION 2 - UNPACKING /INSPECTION/FAMILIARIZATION Section 2 Unpacking / Inspection / Familiarization NOTE: After unpacking,carefully inspect the contents for damage.It is advised to unpack and inspect the unit immediately upon delivery to detect any damage that may have occured in transit.Any claims for shipping damage need to be filed as soon as possible with the freight carrier.This is especially important if the generator will not be installed for a period of time. • This standby generator set is ready for installation with a factory supplied and pre-mounted base pad and has a weather protective enclosure that is intended for outdoor installation only. • This UL listed standby generator set may be packaged with an automatic transfer switch with built-in load center.The combination transfer switch and load center is pre-wired with a two foot and 30 foot conduit.The pre-wired switch is rated for indoor use only.Circuit breakers for emergency circuit connections are included(if equipped). • This UL listed,2-pole switch is rated at 50, 100 or 200 Amps,Service Rated at 250 volts maximum.The 200 Amp transfer switch is for indoor/ outdoor use(if equipped). If any loss or damage is noted at time of delivery,have the person(s)making the delivery note all damage on the freight bill or affix their signature under the consignor's memo of loss or damage. If a loss or damage is noted after delivery,separate the damaged materials and contact the carrier for claim procedures. "Concealed damage"is understood to mean damage to the contents of a package that is not evident at the time of delivery,but is discovered later. 2.1 REQUIRED TOOLS • General SAE and Metric hand tools — Wrenches Sockets — Screwdrivers • Standard electrician's hand tools — Drill and bits for mounting and routing conduits • 4mm Allen wrench(for access to customer connections) • 3/16 Allen wrench(test port on fuel regulator) • Manometer(for fuel pressure checks) • Meter capable of measuring AC/DC Voltage and Frequency 6 ' 2.2 UNPACKING 1.- With the box removed,you can see that this unit came with an automatic transfer switch.The transfer switch is an option and may not be included. 2. Remove the wood frame and lift the transfer switch,if present,off the top of the generator. t r;. Figure 2.1 —Crated Generator 3. Remove bolts and clamps.Exercise caution when removing the generator.Dragging it off the pallet WILL damage the base.The generator must be lifted from the wooden pallet to remove. r, REMOVE CRATING CLAMPS(4) Figure 2.2—Generator on Pallet 4. The lid will be locked.A set of keys is located behind the breaker door.Open the breaker door and cut the zip tie to remove the keys.Use the keys to open the lid of the generator. � a Figure 2.3—Circuit Breaker Box and Keys(as shipped) 7 5. There are two locks securing the lid,one on each side.To properly open the lid,press down on the lid above the side lock and unlock the latch. Repeat for the other side.If pressure is not applied from the top,the lid may appear stuck.NOTE:Always verify that the side locks are unlocked before attempting to lift the lid. 6. Once the lid is open,remove the front access panel by lifting it up and out.Also remove the black panel over top of the customer connection area. 7. Perform a visual inspection for any hidden freight damage. � y Figure 2.4—Inspecting for damage 8. Figure 2.5 illustrates the following: — Customer connection area(underneath and behind the control panel) — Fuel regulator — Battery compartment — Location of"Loose Shipped Parts" CONNECTION AREA(UNDER CONTROL PANEL) i Nyd ULATOR 4 E Y � { BATTERY COMPARTMENT Figure 2.5—Customer Connection Area/Loose Parts Location s 81T tW t TROL W#BEN CONDUIT HOLE w/CAP PLUG Fgi'm � d9 `^ ry 4 2E3 kW MAI A COUTR{JL WI G C}NDUIT HOLE w/CAP PLUG 'K R, ,�,�. BASE FASCIA(IF EQUIPPED) Figure 2.6—Generator Back View 1.3 PARTS SHIPPED LOOSE Rubber Mounts(only for units that include fascia) - Flex Fuel Line Battery Terminal Cap • Wire Shielding to separate AC from DC control wires Main Line Circuit Breaker(MLCB)Terminal Caps • Wire Nuts(for pre-wired switches only) Main Line Circuit Breaker(MLCB)Locking Mechanism - Install/Owner's Manual(not shown)(CD if applicable) • Keys FLEX FUEL LINE (tywrapped to battery cable oralternator bolt) RUBBER MOUNTS ! BATTERY WIRE SHIELDING -TERMINAL CAP MLCB TERMINAL CAPS@NiIW " MLCB LOCKING MECHANISM ' WIRE NUTS KEYS Figure 2.7—Loose Parts With the UNPACKING /INSPECTION/FAMILIARIZATION completed, proceed to Step 2: SECTION 3 SITE SELECTION and PREPARATION 9 Section 3 Site Selection and Preparation 3.1, SITE SELECTION No operable windows or openings in the wall permitted within 5 ft(1.52 m)from any point of the generator. !(1524 mm) Existing Wall 18 In(457 mm) 60 in(1524 mm) ` Minimum Distance ' Clearance from operable 36 in Top of Generator 36 in windows,doors or any (914 mm) (914 mm) openings in the wall. Clearance from the ends and front of the generator must be 36 in(914 mm).This would include shrubs, bushes or trees.Clearance at the top should be a These guidelines are based upon fire 36 in testing of the generator enclosure and (914 mm) minimum of 6 in(1524 mm)from any structure, overhang or projections ojections from the wall.The generator the manufacturer's requirement for air should not be placed under a deck or other structure flow for proper operation.Local codes that is closed in and would limit or constrain air flow. may be different and more restrictive NOTE: Removable fence panels for servicing cannot be than what is described here. placed less than 18 in(457 mm)in front of the generator. 60 in(1524 mm) Minimum 60 in(1524 mm) Recommended Minimum From Ends Generator 18 in (457 mm) Minimum NOTE: The generator can be placed under decks or structures as long as all clearances are met and local building codes are followed. Figure 3A —Installation Guidelines 10 Install the generator set,in its protective enclosure,outdoors,where adequate cooling and ventilating air is always available(Figure 1.9).Consider these factors: - The installation of the generator must comply strictly with NFPA 37,NFPA 54,NFPA 58 and NFPA 70 standards. - Install the unit where air inlet and outlet openings will not become obstructed by leaves,grass,snow,etc.If prevailing winds will cause blowing or drifting,consider using a windbreak to protect the unit. - Install the generator on high ground where water levels will not rise and endanger it.It should not operate in or be subjected to standing water. - Allow sufficient room on all sides of the generator for maintenance and servicing.This unit must be installed in accordance with current applicable NFPA 37 and NFPA 70 standards,as well as any other federal,state and local codes for minimum distances from other structures.DO NOT install under wooden decks or structures unless there is at least 5 ft(1.52 m)of clearance above the generator,3 ft(.91 m)of clearance on sides and front,and a minimum of 18 in(457 mm)of clearance at the back of the unit. - Install the unit where rain gutter down spouts,roof run-off,landscape irrigation,water sprinklers or sump pump discharge does not flood the unit or spray the enclosure,including any air inlet or outlet openings. - Install the unit where services will not be affected or obstructed,including concealed,underground or covered services such as electrical,fuel, phone,air conditioning or irrigation.This could affect Warranty Coverage. - Where strong prevailing winds blow from one direction,face the generator air inlet openings to the prevailing winds. - Install the generator as close as possible to the fuel supply to reduce the length of piping.REMEMBER THAT LAWS OR CODES MAY REGULATE THE DISTANCE AND LOCATION. - Install the generator as close as possible to the transfer switch.REMEMBER THAT LAWS OR CODES MAY REGULATE THE DISTANCE AND LOCATION. - The generator must be installed on a level surface.The generator must be level within a 0.5 in(13 mm)all around. - The generator is typically placed on pea gravel,crushed stone or a concrete pad.Check local codes to see what type is required.If a concrete pad is required,all federal,state and local codes should be followed. 3.1.1 INSTALLATION GUIDELINES FOR STATIONARY AIR-COOLED 8, 11, 13, 14, 15,16, 17 AND 20 KW GENERATORS The National Fire Protection Association has a standard for the installation and use of stationary combustion engines.That standard is NFPA 37,its requirements limit the spacing of an enclosed generator set from a structure or wall(Figure 1.10). NFPA 37,Section 4.1.4,Engines Located Outdoors:Engines,and their weatherproof housings if provided,that are installed outdoors shall be located at least 5 ft(1.52 m)from openings in walls and at least 5 ft(1.52 m)from structures having combustible walls.A minimum separation shall not be required where either of the following conditions exist: 1. The adjacent wall of the structure has a fire resistance rating of at least 1 hour. 2. The weatherproof enclosure is constructed of noncombustible materials and it has been demonstrated that a fire within the enclosure will not ignite combustible materials outside the enclosure. Annex A—Explanatory Material A4.1.4(2)Means of demonstrating compliance are by means of full scale fire test or by calculation procedures. Because of the limited spaces that are frequently available for installation,it has become apparent that exception(2)would be beneficial for many residential and commercial installations.With that in mind,the manufacturer contracted with an independent testing laboratory to run full scale fire tests to assure that the enclosure will not ignite combustible materials outside the enclosure. NOTE: Southwest Research Institute tesing approves 18 in(457 mm)installation minimum from structure.Southwest Research is a nationally recognized third party testing and listing agency. The criteria was to determine the worst case fire scenario within the generator and to determine the ignitability of items outside the engine enclosure at various distances.The enclosure is constructed of non-combustible materials,and the results and conclusions from the independent testing lab indicated that any fire within the generator enclosure would not pose any ignition risk to nearby combustibles or structures,with or without fire service personnel response. 11 Sj w LISTED�� Southwest Re strtute San MtordoNo, Taxes SwRl ID No. 13204-01-01 Stationary Engine Generator Assembly MODEL NUMBER TBA Manufactured By Oenerso Power Systems. Inc. WNteweter. WI Compliant with Clause (2) of Section 4.1.4 of NFPA 37 Figure 3.2—Southwest Research Institute Decal (located inside the generator, next to the generator's data decal) http://www.swri.org/4org/dOl/fire/listiab/listprod/director.htm Based on this testing and the requirements of NFPA 37,Sec 4.1.4,the guidelines for installation of the generators listed above are changed to 18 in(457 mm)from the back side of the generator to a stationary wall or building.For adequate maintenance and airflow clearance,the area above the generator should be at least 5 ft(1.52 m)with a minimum of 3 ft(.91 m)at the front and ends of the enclosure.This would include trees,bushes and shrubs.Vegetation not in compliance with these clearance parameters could obstruct air flow.In addition,exhaust fumes from the generator could inhibit plant growth.See Figure 3.1 and the installation drawing within the owner's manual for details. Generator exhaust contains DEADLY carbon monoxide gas.This dangerous gas can cause unconsciousness or death.Do not place the unit near windows,doors,fresh air intakes(furnaces,etc.)or any openings in the building or structure,including windows and doors of an attached garage. AWARNI 5, AIf the generator is not set to the OFF mode,it can crank and start as soon as the battery cables are connected.If the utility power supply is not turned off,sparking can occur at the battery posts and cause an explosion. 3.2 SITE PREPARATION Locate the mounting area as close as possible to the transfer switch and fuel supply. Leave adequate room around the area for service access(check local code),and place high enough to keep rising water from reaching the generator. Choose an open space that will provide adequate and unobstructed airflow. • Place the unit so air vents won't become clogged with leaves,grass,snow or debris.Make sure exhaust fumes will not enter the building through eaves,windows,ventilation fans or other air intakes(see the"Site Selection"section). • Select the type of base,gravel or concrete,as desired or as required by local laws or codes.Verify your local requirements before selecting. 3.2.1 CRUSHED STONE OR GRAVEL • Dig a rectangular area approximately 5 in(127 mm)deep and about 6 in(152 mm)longer and wider than the footprint of the generator.Cover with polyurethane film,if desired,and fill with pea gravel or crushed stone.Compact and level the stone.A concrete pad can be poured if desired or required.The pad should be 4-5 in(102-127 mm)thick and extend 6 in(152 mm)beyond the outside of the generator in all directions. NOTE: If a concrete pad is required,follow all applicable Federal,State or local codes. 12 $+ d yx Figure 3.3—Compacted Gravel Site Figure 3.4—Concrete Pad Site After completing your SITE SELECTION and PREPARATION, time for Step 3: SECTION 4 - GENERATOR PLACEMENT Section 4 Generator Placement 4.1 GENERATOR PLACEMENT With the Site Selection and Preparation performed,proceed with placement and installation of the generator itself. All of the air-cooled generators come with a composite pad.The composite pad elevates the generator and helps prevent water from pooling around the bottom of the generator(Figure 3.1).You can place the generator with a composite pad on 4 in(102 mm)of pea gravel that is compacted or on a concrete pad.Check local codes to see what type of site base is required.If a concrete pad is required,all federal,state and local codes should be followed.Place the generator on its mounting pad and position correctly as per the dimensional information given in Section 2. NOTE: Generator must be level within 0.5 in(13 mm). 13 4b} t3 b rc x346 a � au Sit, V 4.. b.-My, 3a �d , ati n daay�� Kxw r ' " Kx max ii I Y Figure 4.1 —Composite pad When mounting the generator to concrete,there are four mounting holes available for securing the generator,if codes require(two holes inside the front of the generator compartment and two holes in the back).See Figure 3.2. ......_ ......_...._. _._..........._ ....... } i M Figure 4.2—Mounting Hole Location 3.2.2 FASCIA INSTALLATION (IF APPLICABLE) Locate the four(4)threaded black rubber bumpers located in the Owner's manual bag. • Remove the four(4)bumpers from the bag and screw them into threaded holes located inside the end pieces of the fascia(two each)opposite one another(A). • Once the bumpers are installed,snap one of the end pieces into one of the front/rear pieces of fascia.Repeat this action with the other two remaining pieces of fascia.NOTE:Do not assemble all four pieces together at this point(B). • Place both assemblies at the base of the generator and fit the rubber bumpers into the lifting holes in the generator base P. • Once aligned,snap together the two remaining connection points. 14 B A C Figure 3.5—Fascia Installation After completing GENERATOR PLACEMENT, proceed to Step 4: SECTION 5 — FUEL CONVERSION/ GAS REQUIREMENTS / CONNECTIONS Section 5 Fuel Conversion / Gas Requirements / Connections 5.1 FUEL CONVERSION The generator was configured for natural gas operation at the factory.Press and turn fuel knob 1800 to switch over to LP Vapor. NOTE:The orange fuel conversion knob is located on the top of the fuel mixer on the V twin engine and under the fuel mixer on the single cylinder engine. Press and turn the fuel knob towards the marked fuel source arrow until it stops.Fuel knob will rotate 1800 and slide into the mixer body when converting to LP. 15 FUEL KNOB LOCATIONS SHOWN FROM GENERATOR AIR BOX SIDE VIEW 8 kW GENERATOR FUEL KNOB 11-20 kW GENERATORS ORANGE FUEL FUELKNOB CONVERSION KNOB Figure 5.1 —Fuel Conversion Knob Location for Single and Twin Cylinder Generators 5.2 FUEL REQUIREMENTS AND RECOMMENDATIONS With LP gas,use only the vapor withdrawal system.This type of system uses the vapors formed above the liquid fuel in the storage tank. The engine has been fitted with a fuel carburetion system that meets the specifications of the 1997 California Air Resources Board for tamper-proof dual fuel systems.The unit will run on natural gas or LP gas,but it has been factory set to run on natural gas.Should the primary fuel need to be changed to LP gas,the fuel system needs to be reconfigured.See the Fuel Conversion section for instructions on converting the fuel system. Recommended fuels should have a Btu content of at least 1,000 Btus per cubic foot(37.26 megajoules per cubic meter)for natural gas;or at least 2,500 Btus per cubic foot(93.15 megajoules per cubic meter)for LP gas.Ask the fuel supplier for the Btu content of the fuel. Required fuel pressure for natural gas is 3.5-7"water column(7-13 mm mercury).Required fuel pressure for for liquid propane vapor is 10.12"water column(19-22 mm mercury).The primary regulator for the propane supply is NOT INCLUDED with the generator. NOTE: All pipe sizing,construction and layout must comply with NFPA 54 for natural gas applications and NFPA 58 for liquid propane applications.Once the generator is installed,verify that the fuel pressure NEVER drops below it's required fuel pressure rating.For fur- ther information regarding NFPA requirements refer to their website at www.nfpa.org. Prior to installation of the generator,the installer should consult local fuel suppliers or the fire marshal to check codes and regulations for proper installation.Local codes will mandate correct routing of gaseous fuel line piping around gardens,shrubs and other landscaping to prevent any damage. Special considerations should be given when installing the unit where local conditions include flooding,tornados,hurricanes,earthquakes and unstable ground for the flexibility and strength of piping and their connections. Use an approved pipe sealant or joint compound on all threaded fittings. All installed gaseous fuel piping must be purged and leak tested prior to initial start-up in accordance with local codes,standards and regulations. 16 U FUEL CONSUMPTION NOTE: Required fuel pressure for natural gas is 3.5-7 in water column(7-13 mm mercury).The required fuel pressure for LP Vapor is 10.12 in water column(19-22 mm mercury). These are approximate values,use the appropriate spec sheet or owner's manual for specific values. Nat.Gas LP Vapor Unit 1/2 Load Full Load 1/2 Load Full Load 7/8kW 78/2.21 121/3.43 0.87/3.29 1.42/5.37 10/11 kW 124/3.51 195/5.52 1.18/4.45 1.92/7.28 13/13kW 157/4.45 255/7.22 1.64/6.2 2.95/11.15 14/14kW 177/5.01 279/7.9 1.85/6.99 3.07/11.61 15/15kW 185/5.24 296/8.38 1.83/6.91 2.86/10.82 16/16kW 193/5.47 312/8.83 1.9/7.2 3.19/12.07 16/17M 193/5.47 312/8.83 1.99/7.53 3.57/13.53 18/20 kW 205/5.8 308/8.72 2.08/7.87 3.85/14.57 'Natural gas is in cubic feet per hour/cubic meters per hour. LP is in gallons per hour/liters per hour. "'Values given are approximate. Verify that gas meter is capable of providing enough fuel flow to include household appliances and all other loads. ®Gaseous fuels such as natural gas and liquid propane(LP)gas are highly explosive.Even the slightest spark can ignite such fuels and cause an explosion.No leakage of fuel is permitted.Natural gas,which is lighter than air,tends to collect in high areas.LP gas is heavier than air and tends to settle in low areas. NOTE: A minimum of one approved full flow manual shut-off valve must be installed in the gaseous fuel supply line.The valve must be easily accessible.Local codes determine the proper location. NOTE: THE GAS SUPPLY AND PIPE MUST BE SIZED AT 100% LOAD BTU /MEGAJOULE RATING. 5.4 FUEL LINE SIZING • First,determine what size pipe is required.Refer to NFPA 54 for NG or NFPA 58 for LP for further information. • Always refer to the owner's manual for the proper BTU/megajoule and required gas pressures.To calculate BTU or Megajoules: — Natural Gas: BTU=Cubic feet/hour x 1000 Megajoules=Cubic meters/hour x 37.26 — Liquid Propane Vapor: BTU=Cubic feet/hour x 2500 Megajoules=Cubic meters/hour x 93.15 • Start by measuring the distance from the generator to the gas source.The generator should be plumbed directly from the source,not off the end of an existing system. • When measuring the pipe length,add 2.5 ft(.76 m)for every angle or bend in the pipe and add that to the overall pipe distance. 17 5.4.1 NATURAL GAS PIPE SIZING To properly use this chart,find the kW rating of the generator in the left column,and trace to the right.The number to the right is the maximum length (measured in feet/meters)allowed for the pipe sizes on top.The pipe sizes are measured by inside diameter(ID)to include any fittings,valves (must be full flow),elbows,tees or angles.Add 2.5 ft(.76 m)per any bend,tee or angle in the pipe to the overall distance. Pipe Size(in./mm) Pipe Size(in./mm) kW .75/19 1 l 25 1.25132 1.5/38 2151 kW .75 l 19 1/25 1.25/32 1.5/38 78 55J167&` 20016fl96t, $20J2494 �� .,, ° ,t7.8x ,.., 20T,61� 6011829 =# )75/534w: Q- 1 .- 4t1, 11 2016.1 85/25.91 370/112.78 800/243.84 11 30/9.14 125/38.1 200/60.96 45/7A.6$r z 545 66 2, VIP �)75)53.341 f314 ;, 16-17 40/12.19 190 157.91 425 1129.54 16-20 10/3.05 60/18.29 125/38.1 u20 � ._r 20I6 13Q l 9 62 305't 92 96 94s/288'04° farStG p s t res Bela+ rqf water caltlr n{9_ii merWffi) ownto€ot5,kf�watec," a G( ltln For 5.7'of water column(9-13mm mercury) 5.4.2 LP VAPOR PIPE SIZING To properly use this chart,find the kW rating of the generator in the left column,and trace to the right.The number to the right is the maximum length (measured in feet/meters)allowed for the pipe sizes on top.The pipe sizes are measured by inside diameter(ID)to include any fittings,valves (must be full flow),elbows,tees or angles.Add 2.5ft.(.76m)per any bend,tee or angle in the pipe to the overall distance. NOTE:Pipe sizes are using a second stage regulator. NOTE:The minimum LP tank size is 250.gallons(946 L),unless unit calculations dictate use of a larger tank.Vertical tanks,which are measured in pounds(or kilograms),will not usually meet the minimum tank size requirement.A 1050 lb(476 kg)vertical tank size minimum is required. Pipe Size(!n./mm) kW .75/19 1/25 1.25132 `, °7.81651,5Q 29 "y:;570/173 7.4 0 I;,....,` 11 70/21.33 255/77.72 1000/304.8 16-17 25/7.62 130/39.62 540/164.59 5.4.3 GAS INSTALLATION SUMMARY GAS PIPE SIZING IS ONE OF THE MOST COMMONLY MADE MISTAKES.A PROPERLY SIZED GAS PIPE IS CRITI- CAL TO THE PROPER OPERATION OF THE GENERATOR. THE GENERATOR INLET SIZE HAS NO BEARING ON THE PROPER GAS PIPE SIZE. NOTE: THE GAS SUPPLY AND PIPE MUST BE SIZED AT 100% LOAD BTU/MEGAJOULE RATING. 5.5 INSTALLING & CONNECTING GAS LINES 1. Both natural gas and LP Vapor are highly volatile substances,so strict adherence to all safety procedures,codes,standards and regulations is essential. Gas line connections should be made by a certified plumber familiar with local codes.Always use AGA-approved gas pipe and a quality pipe sealant or joint compound. Verify the capacity of the natural gas meter or the LP tank in regards to providing sufficient fuel for both the generator and other operating appliances. Fuel Regulator installed per laws or regulator manufacturer's specifications AGA approved gas pipe Flexible fuel line - Do not bend!!! - Do not attach directly to generator - Check all connections for leaks Sediment trap near generator(if applicable or required by code) Full flow rated shut-off near generator per local jurisdiction or code 18 2. Most applications will require an external manual full flow shutoff valve on the fuel line. � r u9 ° Figure 5.2—Full Flow Shutoff Valve 3. When connecting the gas line to the generator, use the provided section of UL Listed or AGA-approved flexible fuel line in accordance with local regulations.The purpose of the flexible fuel line is to ensure that vibration from the generator does not cause a gas leak at one of the connection points,so it's important that the line be installed with as few bends as possible.Configure the sediment trap(if applicable or required by code) as illustrated. 17 y Figure 5.3—Sediment Trap d Figure 5.4—Incorrect Routing of Flexible Hose 19 4. Neverbend the flexible fuel line to avoid using an elbow.Bending the flexible line decreases its ability to absorb vibrations and defeats its purpose,as well as constricts the actual fuel flow.See Figure 5.5. 5. 'Check for leaks by spraying all connection points with a soap solution made of dishwashing soap and water.You should not see the solution be "blown away"or form"bubbles".Next,check the gas pressure at the regulator in the generator by following these steps. — Close gas supply valve. — Remove the top gas pressure test port from the regulator(see Figure 5.6)and install the gas pressure tester(manometer). — Open the gas supply valve and ensure that the pressure is within the specified values. NOTE: See owner's manual or spec sheet for proper fuel pressure specifications.If the gas pressure is not within specifications,contact the local gas supplier. 4) Close gas valve when completed. a Top Gas Pressure Test Port Fuel Regulator .: Gas Pressure u, z Manometer Figure 5.5—Checking Pressure with Manometer BTU and Pressure Decal Check Distance with Gas Provider Size Meter for Generator Load Plus ALL j Appliances Loads I.M Flex Fuel Line Safety Shut-off with Pressure Port For Underground Installations,Verify NG-BTU=Cubic feet/hour X 1000 Piping System for Code Compliance Megajoules=Cubic meters/hour X 37.26 Size gas pipe with Pipe Sizing Guide or to local codes. Figure 5.6—Typical Natural Gas Vapor Installation 20 Primary Regulator Per LP Provider BTU and Pressure Decal Check Distance with LP Provider Size tank Larae Enouah to provide required BTUs Check distance with for Generator and ALL o Regulator Manufacturer I Connected Appliance I Loads.Be sure to eonect 1 for Weather Evaporation. L= o Fuel Tank Flex Fuel Line Full Flow Safely Shut-off High Pressure Pipe with Pressure Port sized per LP Provider Secondary-vented Regulator LP-BTU=Cubic feetthour X 2500 Megajoules=Cubic metersihour X 93.15 Size gas pipe from secondary regulator with Pipe Sizing Guide or to local codes. Figure 5.7—Typical LP Vapor Installation NOTE: When sizing a secondary regulator for LP or high pressure natural gas applications be sure to note the maximum individual load capabilities which will be lower than total capacity.This could impact generator starting performance if sized too small. NOTE: It is not recommended to reduce the fuel pipe size exiting the secondary regulator unless necessary to accommodate the Y or'/<" flexible fuel line that is shipped with the generator.This may potentially cause starting or performance issues. After completing GAS REQUIREMENTS / CONNECTIONS / FUEL CONVERSION, it's time for Step 5: SECTION 6 — ELECTRICAL CONNECTIONS Section 6 Electrical Connections 6.1 GENERATOR CONNECTIONS NOTE: Control wiring may be already wired on pre-wired generators.If so,tighten the T whip conduit inside of the enclosure.If not,wiring must be in accordance with local jurisdiction and codes. 1. Remove the appropriate Main AC/Control Wiring Knock-out Plug from the back of the generator. 2. Install the conduit and Main AC and Control Wires between the generator and the transfer switch.See Figure 2.6 for knockout locations(verify specific transfer switch wiring/connections per model). NOTE: These wiring connections may be present on pre-wired models. NOTE: This wiring can be run in the same conduit if the appropriate insulation rated wire is used. 3. Seal the conduit at the generator and in compliance with any codes. 4. Strip the insulation from the ends of the wires.Do not remove excessive insulation. 5. To connect the control wires,push down on the spring loaded connection point with a flat head screwdriver,insert wire and release. NOTE: No wire insulation should be in the connection point,only bare wire. 21 6.2 CONTROL WIRING Control Wire Recommended Length and Size Maximum Wire Length Recommended Wire Size 1-115 ft (1-35 m) No. 18 AWG 116-185 ft (36-56 m) No. 16 AWG 186-295 ft (57-89 m) No.14 AWG 296-460 ft (90-140 m) No.12 AWG CONTROL PANEL CONNECTIONS Terminal Numbering Decal Wire Numbers A YELLOW#1 &#2 N1 &N2-240 VAC-Sensing for Utility Dropout and Pickup B BLUE#3 T1 -Fused 120VAC for Battery Charger (see NOTE) C BLACK#3 0-DC (-) Common Ground Wire D RED#4 194-DC(+) 12 VDC for Transfer Controls E WHITE#5 23-Transfer Control Signal Wire SPRING LOADED CONNECTION POINTS A LARGE NEUTRAL LUG TORQUE SPEC B. �t;>� �� 210 TO 14AWG 120 IN-LB(13.56 N-M) ('see note below) w OPTIONALALARM RELAY CONTACTS (Normally Open) } 4-6 AWG 35 IN-LB(3.95 N-M), a! 8 AWG 25 IN-LB(2.82 N-M), y 10-14 AWG 20 IN-LB(2.26 N-M) LARGE GROUND LUG TORQUE SPEC E �' �u' 210 TO 14AWG 120 IN-LB(13.56 N-M) Figure 6.1 —Control Wiring (found behind control board) NOTE:*Wires 23,194 and 0 must be run through the provided wire shielding provided in the manual bag to separate the low voltage from the high voltage wires unless the requirement of 300.3(c)(1)of the NEC are met(see the Parts Shipped Loose section). NOTE: Must be connected to keep battery charged whether unit is running or not. 6.3 MAIN AC WIRING r Figure 6.2—Main AC Wiring 22 NOTE: Main AC wiring must be in accordance with local jurisdiction and codes. 6. ,Strip the insulation off the wire ends.Do not remove excessive insulation. 7. Remove the two cap plugs located behind the breaker door and to the right of the Main Breaker. 8. Loosen the lugs of the Main Breaker through the access holes. 9. Insert a power wire(E1 or E2)through the opening in the back cover and into the bottom lug.Torque to the proper specification. NOTE: There are three(3)screws inside the top of the breaker panel(behind the breaker door).Removing these screws will allow the entire breaker box to be carefully pulled out.When reinstalling,be certain that the tabs on the bottom lock into place. 10. Connect the Neutral wire to the Neutral Lug and torque to the required specification.See Figure 6.1. 11. Connect the Ground wire to the Ground Lug and torque to the required specification.See Figure 6.1. NOTE:Neutral Bonding-For installations that require the neutral to be bonded to the ground,this is to be done on the customer connec- tions terminals inside the generator.Connect a suitably sized wire from the neutral bar to the ground bar.This is normally required when the generator is the source in a separately derived system. It is not required when the generator is a backup source in a utility supplied electrical system with a 2-pole transfer switch.See Figure 6.1. NOTE: Torque all wiring lugs,bus bars and connection points to the proper torque specifications.Torque specifications for the Main Line Circuit Breaker(MLCB)can be found on a decal located on the inside of the Main Line Circuit Breaker Door. 6.4 BATTERY REQUIREMENTS Group 26R,12V,525 CCA(Minimum CCA) 6.5 BATTERY INSTALLATION Fill the battery with the proper electrolyte fluid if necessary and have the battery fully charged before installing it. Before installing and connecting the battery,complete the following steps: 1. Verify that the generator has been turned OFF. 2. Turn off utility power supply to the transfer switch. 3. Remove the 7.5 Amp fuse from the generator control panel. Battery cables were factory connected at the generator.See Figure 6.3.Connect cables to.battery posts as follows: 4. Connect the red battery cable(from starter contactor)to the battery post indicated by a positive,POS or(+). 5. Connect the black battery cable(from frame ground)to the battery post indicated by a negative,NEG or(—). 6. Install the red battery post cover(included). NOTE: Dielectric grease should be used on battery posts to aid in the prevention of corrosion. NOTE: Damage will result if battery connections are made in reverse. BLACK LEAD /(FROM FRAME) RED LEAD (FROM STARTER CONTACTOR) RED BATTERY BLACK Figure 6.3—Battery Cable Connections NOTE: In areas where temperatures regularly fall below 32°F(0°C),it is recommended that a pad type battery heater be installed to aid in cold climate starting.This.is available as a cold weather kit through an authorized service dealer. 23 With the ELECTRICAL CONNECTIONS completed, proceed to the final step - Step 6: SECTION 7 — CONTROL PANEL /ACTIVATION/ START-UP/ TESTING Section 7 Control Panel /Activation / Start-up / Testing 7.1 CONTROL PANEL INTERFACE 7.1.1 USING THE AUTO I MANUAL I OFF BUTTONS(FIGURE 7.1) A WARNING!: With the AUTO button pushed in,the engine may crank and start at any time without warning.Such automatic starting occurs when utility power source voltage droops below a preset level or during the normal exercise cycle.To prevent possible injury that might be caused by such sudden starts,always push the OFF button,remove the fuses,and disconnect the battery before working on or around the generator or transfer switch.Then,place a"DO NOT OPERATE"tag on the generator panel and on the transfer switch. 1. "OFF"Button—This button shuts down the engine and prevents automatic operation. 2. "MANUAL"Button—This button cranks and starts the engine.Transfer to standby power will not occur unless there is a utility failure. 3. "AUTO"Button—Selecting this button activates fully automatic system operation.It also allows the unit to automatically start and exercise the engine every seven days with the setting of the exercise timer(see the Setting the Exercise Timer section). a AUTO 11=1 MANUAL a OFF ENTER ESCAPE Figure 7.1 —8/11113/14/15/16/17/20 kW Generator Control Panel 24 A Display Interface Menus The LCD display is organized as detailed below: The"Home"page is the default page that will be displayed if no keys are pressed for five(5)minutes.This page normally shows the current Status message and the current date and time.The highest priority active Alarm and/or Warning will be automatically posted on this page as well, and the backlight will flash when such an event is detected.In the case of multiple Alarms or Warnings,only the first message will be displayed.To clear an Alarm or Warning,press the OFF button and then press the ENTER key. The display backlight is normally off.If the user presses any key,the backlight will come on automatically and remain on for 30 seconds after the last key was pressed. • The"Main Menu"page will allow the user to navigate to all other pages or sub-menus by using the Up/Down and Enter keys.This page can be accessed at any time with several presses of the Escape key.Each press of the Escape key takes you back to the previous menu until the main menu is reached.This page displays the following options:HISTORY,STATUS,EDIT AND DEBUG.(See the Menu System Diagram in the Owner's Manual).) 7.2 GENERATOR ACTIVATION When battery power is applied to the generator during the installation process,the controller will light up.However,the generator still needs to be activated before it will automatically run in the event of a power outage. Activating the generator is a simple,one-time process that is guided by the controller screen prompts.Once the product is activated,the controller screen will not prompt you to activate again,even if you disconnect the generator battery. After obtaining your activation code,please complete the following steps at the generator's control panel in the Activation Chart. Upon first power up of the generator,the display interface will begin an installation wizard.The installation wizard will.prompt the user to set the minimum settings to operate the generator.These settings are:Current Date/Time and Exercise DaytTime.The maintenance intervals will be initialized when the exercise time is entered. The exercise settings can be changed at any time via the"EDIT"menu. If the 12 volt battery is disconnected or the fuse removed,the installation wizard will operate upon power restoration.The only difference is the display will only prompt the customer for the current Time and Date. 7.2.1 SETTING THE EXERCISE TIMER This generator is equipped with an exercise timer. Once it is set,the generator will start and exercise every seven days,on the day of the week and at the time of day specified.During this exercise period,the unit runs for approximately 12 minutes and then shuts down. Transfer of loads to the generator output does not occur during the exercise cycle unless utility power is lost. IF THE INSTALLER TESTS THE GENERATOR PRIOR TO INSTALLATION,PRESS THE"ENTER"BUTTON TO SKIP SETTING UP THE EXERCISE TIMER. 17 and 20 kW units can run at 2,400 rpm while exercising.While providing the necessary periodic exercise operation,the lower rpm also reduces fuel consumption,engine wear and noise. NOTE: The exerciser will operate only when the generator is placed in the AUTO mode and will not work unless this procedure is per- formed.The current date/time will need to be reset every time the 12 volt battery is disconnected and then reconnected,and/or when the fuse is removed. 7.3 BEFORE INITIAL START-UP NOTE: These units have been run and tested at the factory prior to being shipped and do not require any type of break-in. A CAUTION! ANever operate the engine with the oil level below the"Add"mark on the dipstick.Doing this could damage the engine. NOTE: This unit comes filled with 30 weight organic oil from the factory.Check the oil level and add the appropriate viscosity and amount if necessary. 25