Loading...
HomeMy WebLinkAbout52439-Z TOWN OF SOUTHOLD BUILDING DEPARTMENT SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 52439 Date: 11/07/2025 Permission is hereby granted to: George Dapontes c/o Maria Dougherty East Elmhurst, NY 11370 To: Construct a new single-family dwelling with breezeway to detached garage and HVAC system as applied for per SCHD approvals. Premises Located at: 1050 Tasker Ln, Greenport, NY 11944 SCTM#33.-4-36 Pursuant to application dated 09/30/2025 and approved by the Building Inspector. To expire on 11/07/2027. Contractors: Required Inspections: Fees: Single Family Dwelling-NEW $3,289.00 CO Single Family Dwelling-New $100.00 Total $3,389.00 Building Inspector 1de� qw4 TOWN OF SOUTHOLD —BUILDING DEPARTMENT Town Hall Annex 54375 Main Road P. O. Box 1179 Southold,NY 11971-0959 Telephone (631) 765-1802 Fax (631) 765-9502 tt s; southold�tonm g v rtN Date Received APPLICATION FOR BUILDING PERMIT For Office Use Only E C E E PERMIT NO. 1 1 Building Inspector., S E P 3 0 2125 Applications and forms must be filled out in their entirety. Incomplete applications will not be accepted. Where the Applicant Is not the owner,an Building D P rtm nt Owner's Authorization form(Page 2)shall be completed. Town of Southold Date:SEPTEMBER 29, 2025 OWNER(S)OF PROPERTY: Name: DARIUS MROCZKOWSKI SCTM # 1000-033.00-04.00-036.000 11 Project Address: 1050 TASKER LANE GREENPORT, NY Phone#:516-807-4411 Email: RUSHBUILDINC@GMAIL.COM Mailing Address: 11 LIVINGSTON STREET BAY SHORE, NY 11706 CONTACT PERSON: Name:MICHAEL ORLANDO Mailing Address: 11 LIVINGSTON STREET BAY SHORE, NY 11706 Phone#:5� �fb _ a3 _39c,1 Email:RUSHBUILDINC@GMAIL.COM DESIGN PROFESSIONAL INFORMATION: Name:TODD O'CONNELL Mailing Address: 1200 VETERANS HWY SUITE 120 HAUPPAUGE, NY 11788 Phone#:631 .650.6666 Email:PERMITS@TOCARCHITECTS.COM CONTRACTOR INFORMATION: Name: iDgfl if 5 -L (� ( 0 Z-k J Mailing Address: H (,1V1 n 5 5)-, Y n Phone#: �-j S. -- ?(I, —q -1 b Email: DESCRIPTION OF PROPOSED CONSTRUCTION i ®New Structure ❑Addition ❑Alteration ❑Repair ❑Demolition Estimated cost of Project: ❑Other $ 1,000,000.00 Will the lot be re-graded? Dyes igNo Will excess fill be removed from premises? ®Yes El No 1 PROPERTY INFORMATION Existing use of property:VACANT Intended use of property: RESIDENTIAL Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to R4 0 this property? ❑Yes ®No IF YES, PROVIDE A COPY. 8 Check Box After Reading: The owner/contractor/design professional is responsible for all drainage and storm water issues as provided by Chapter 236 of the Town Code. APPLICATION IS HEREBY MADE to the Building Department for the Issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold,Suffolk,County,New York and other applicable Laws,Ordinances or Regulations,for the construction of buildings, additions,alterations or for removal or demolition as herein described.The applicant agrees to comply with all applicable laws,ordinances,building code, housing code and regulations and to admit authorized Inspectors on premises and in building(s)for necessary inspections.False statements made herein are punishable as a Class A misdemeanor pursuant to Section 210.45 of the New York State Penal Law. Application Submitted By(print name): M, E kl 0�� � Authorized Agent ❑Owner Signature of Applicant: Date: �- STATE OF NEW YORK) SS: COUNTY OF 0 A^ being duly sworn, deposes and says that(s)he is the applicant (Name of individual signing contract) above named, (S)he is the (Contrcto Agent,' rporate Officer, etc.) of said owner or owners, and is duly authorized to Dp or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and belief; and that the work will be performed in the manner set forth in the application file therewith. Sworn before me this day of 20 9— Notary Public MIGDALIA A ROQUE NOTARY PUBLIC,STATE OF NEW YORK QUALIFIED I01R061773781COUNTY NO. PROPERTY OWNER AUTHORIZATION COMMISSION EXPIRES 11/29/&Z'? (Where the applicant is not the owner) I, residing at do hereby authorize to apply on my behalf to the Town of Southold Building Department for approval as described herein. Owner's Signature Date Print Owner's Name 2 'r� mnmmw�m Town Hall Annexe �� Telephone(631)765-1802 '� 631 54375 Main Road �,„ Fax( )765-9502 P. O. Box 1179 Southold, NY 11971-0959 � BUILDING DEPARTMENT N01ICF O.FUT.ILIZA.TION OF TRUSS TYPE CONSTRUCTION PRE-ENGINEERED WOOD CONSTRUCTION AND/OR TIMBER CONSTRUCTION Date: Owner: .mm� � Q G... _o .. ,vi C7 Location of Property: — Please take notice that the (check applicable line): y ..... New commercial or residential structure Addition to existing commercial or residential structure . mm Rehabilitation to an existing commercial or residential structure to be constructed or performed at the subject property reference above will utilize (check applicable line): _ Truss type construction (TT) Pre-engineered wood construction (PW) Timber construction (TC) in the following location(s) (check applicable line): „ Floor framing, including girders and beams (F) Roof framing (R) Floor and roof framing (FR) Signature: Name (person submitting this form): --.........................a_w. . ._ _.._......__ . ._ . .. . _......... Capacity (check applicable line): Owner Owner representative TrussReg15.docx Effective 1/1/2015 L111,11, I'll, r REScheckoWeb" Compliance Certificate Project Information Project Title: 1050 Tasker Lane Energy Code: 2018 IECC Location: Greenport, New York Construction Type: Single Family Project Type: New Construction Project Sub Type: None Conditioned Floor Area: 4414 ft2 Glazing Area: 23% Climate Zone: 4a (5572 HDD) Project No: 1759047 All Electric: false Is Renewable: false Has Battery: false Has Charger: false Has Heat Pump false Construction Site: Owner/Agent: Designer/Contractor: 1050 Tasker Lane Mike Orlando Greenport, NY 11944 516-238-3946 m.orlando@aol.com Project Notes: Envelope Assemblies Prop. Req. Assembly Gross Area or Cavity Cont. U- U- Prop. Req. Perimeter R-Value R-Value Factor/ Factor/ UA UA F-Factor F-Factor Ceiling:Cathedral Ceiling 2258 30.0 0.0 0.034 0.026 77 59 Floor:All-Wood Joist/Truss 80 21.0 0.0 0.044 0.047 4 4 Wall: Wood Frame, 16"o,c. 3160 19.0 0.0 0.060 0.060 144 144 Window:Vinyl Frame 503 0.300 0.320 151 161 SHGC: 0.3 Door 1: Solid Door(under 21 0.140 0.320 3 7 50%glazing) Door 1:Glass Door(over 229 0.300 0.320 69 73 50%glazing) SHGC: 0.3 Wall 1: Wood Frame, 16" 250 13.0 0.0 0.082 0.060 19 14 o.c. Door: Solid Door(under 21 0.140 0.320 3 7 50%glazing) Basement Wall:Solid 1580 13.0 0.0 0,054 0.059 81 89 Concrete or Masonry Wall height: 10.00 Insulation depth: 10.00' Insulation position: Integral Insulation Window:Vinyl Frame 56 0.300 0.320 17 18 SHGC: 0.3 Door: Solid Door(under 21 0.140 0.320 3 7 50%glazing) MEHIMEMENEMSEM The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules, It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Slab-on-grade tradeoffs are no longer considered in the UA or performance compliance path in REScheck. Each slab-on-grade assembly in the specified climate zone must meet the minimum energy code insulation R-value and depth requirements. Compliance Statement The proposed building design described here is consistent with the building plans,specifications, and other calculations submitted with the permit application.The proposed building has been designed to meet the 2018 IECC requirements in REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Matthew Larva -HERS Rater 9/23/25 Name - Title Signature Date Inspection Checklist Energy Code: 2018 IECC Requirements: 95%were addressed directly in the RESCheCk software Text in the "Comments/Assumptions"column is provided by the user in the REScheck Requirements screen. For each requirement,the user certifies that a code requirement will be met and how that is documented,or that an exception is being claimed.Where compliance is itemized in a separate table,a reference to that table is provided. Pre-inspection/Plan Review Section Plans Field # Verified Verified & Req.ID Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions 103.1, Construction drawings and Cj Complies 103.2 documentation demonstrate [PR111 energy code co mpl'iance for the Does Not build envelope.Thermal Comply envelope represented on Not construction documents, servable Q Not Applicable 1, Construction drawings and ?Q Complies 103. demonstrate Does Not 403.7 energy code compliance for o [PR3]1 lighting and mechanical Comply systems, Systems serving, RNot multiple dwelling units must servable demonstrate compliance with the IECC Commercial Provisions. Q Not Applicable 302.1, Heating and coolin equipment Heating: Heating O Complies i based on loads calculated per O Does Not 403.7 is size per ACCA anua S �Etu/hr Btu/hr p [PR2] ACCA Manual] or other mthods u.� � J Comply i approved by the cocle offirial. pCooling: 'Cooling: Q Not l �h. .. a/h ' Observable Q Not 4pplicable Additional Comments/Assumptions: (Tier 9 p pact(Tier 3) 1 Hi h Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Im Foundation inspection d Verified Verified E 13 Foundation d t�er Inspection ei ._..,_ Complies? Carmert lAssurptiors . ,,. xker�ordtive � I extends, Complies xception.�,,,ew�._._u_. p �covering � p � :Requirement ]f O ] p ,us not applicable. a minimum of 6 in. below grade, Comply 1 Not servable PNot pplicable 403.9 ,,.,,w o Snow-and ice-melting system Q Complies [F012)a controls installed. Does Not Comply Q Not Observable Q Not Applicable 402.1.1 Conditioned basement wall Complies See the Envelooe [FO4]1 insulation R-value,Where R —J R Assemblies table for interior insulation is used, _ Does Not values verification may need to occur R' ..... R' ........m Comply 1 i during Insulation Inspection, Not Not rvagu�red pn warm-humid servable locations in Climate Zone 3. Not Pplicable 303.2 Conditioned basement wall Complies [FO5]1 insulation installed per manufacturer's instructions. Does Not omply 1 i Not servable Not pplicable i 402.2.9 Conditioned basement wall O Complies See the Envelope [FO6]1 insulation depth of burial or ��ft ft Does Not Assemblies table for distance from top of wall �m I values py j [2Not servable Not Applicable Additional Comments/Assumptions: J 1 High Impact(Tier 1) � 2 Medium Impact(Tier 2) 3 LLow Impa . . ....3) ._ _ � m, ct(Tier 3) Framing / Rough-In Inspection S�cti'on Plans Fiel # Framing!/'IOU h4n, Verifted Verified d & Req.10 inspect,019 Value Value Complies? Comments/Assumptions 1402.1.1. i Door U-factor. U Complies See the Envelope, 4023.4 O1 Assemblies table for [FR111 Does Not values Comply Not Observable Not pplicable 402.1.1, Glazing U-factor(area-weighted U= U= 0 Complies See the Envelope 402.3.1. average). Does Not Assemblies table for P 1402.3.3. 0 values 402.5 mply [FR211 PiNot Observable PNot pplicable 402.4.1.1 Air barrier and thermal barrier complies I[FR2311 installed per manufacturer's Does Not instructions. Pomply PNot servable PNot pplicable 1402.4.3 Fenestration that is not site built Q Complies [FR2011 is listed and labeled as meeting AAMA/WDMA/CSA Does Not 101A.S.2/A440 or has infiltration Pomply rates per NFRC 400 that do not Not exceed code limits. Poservable PNot pplicable 4014,5 IC-rated recessed lighting E3 Complies '(FR1612 fixtures sealed at housing/interior finish and Does Not labeled to indicate:52.0 cfm Complyleakage at 75 Pa. PiNot servable PNot pplicable 403.3.1 1 SUPPI and return ducts in attics Complies [FR1211 Jnsulayed >= R-8 where duct is >= 3 inches in diameter and Po Does Not >= R-6 where< 3 inches. mply Supply and return ducts in other Not portions of the building 9servable insuiated>= R-6 for diameter >= 3 inches and R-4.2 for< 3 Not inches in diameter. Ppplicable 403.3.2 Ducts,air handlers and filter Complies [FR1311 boxes are sealed with joints/seams compliant with 0 Does Not 1 International Mechanical Code Comply I or International Residential Not Code, as applicable. Rservable PNot pplicable _403.3.5 Building cavities are not used as Complies [FR1513 ducts or plenums. PDoes Not omply 9Not servable PNot pplicable ----—----- ------- --------- ectlo�� IFrlawrs i�iv�ldi Rrarning/Rough-On Verified Verified &Re+g.10 Inspection Value ValueComplies? Comments/Assumptions 4073.4 HVAC pipin conveying fluids � O Complies [FR1711 above 105 QF or chilled fluids R � R" below 55 4F are insulated to>_R- Does Not3. 1 j UNot servable pNot pplicable 403.4.1 Protection of insulation on HVAC Cj Complies [FR24]1 piping. Does Not Comply �Not servable ❑Not applicable 53 Hot water pipes are insulated to y p R �U R � Complies [FRp :w >_ -g� R-3, � U I�Does Not j Comply QNot servable �Not pplicable 403,6 Automatic or gravity dampers 0 Complies [FR191 lle n a II outdoor air Does Not stakes a ex hausts. omply PNot servable Not Applicable 303.1.3 U-factors of fenestration O Complies [FR4]1 products are determined in accordance with the NFRC test Q Does Not procedure or taken from the P-Imply default table. Not servable PNot plicable Additional Comments/Assumptions: J i High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Insulation Inspection .._ ._..-.._.. . ...a_.... � �_..._e.w_ ... . .�.. Section Plans Field # Verified Verified & Req.ID Insulation Inspection Value Value Complies? Comments/Assumptions 303.1 All installed insulation is labeled ❑Complies [IN13]2 or the installed R-values provided. ❑Does Not Comply Not servable ❑Not Applicable 402.1 1, Floor insulation R-value. p R, � ❑Complies See the Envelope 402.2 6 R� �.... Assemblies table for os [IN1]1 ❑Wood ❑Wood ❑Dpley Not values ❑Steel ❑Steel CQ Not Observable PpNot plicable 303.2, Floor insulation installed per ❑Complies 402.2,8 manufacturer's instructions and ❑Does Not [IN2]1 in substantial contact with the Com I underside of the subfloor,or P Y floor framing cavity insulation is ( ]Not in contact with the top side of O servable sheathing, or continuous Insulation is installed on the Not underside of floor framing and Applicable extends from the bottom to the top of all perimeter floor framing members. 402.2.5, a mass wall with at least /2 of WJood.;.. O Does Assemblies table 402 1.1, Wall insulation R value. Ifi his is R Complies See the table for q pp ❑ 402.2.6 the wall insulation on the wall ❑ values [IN3]1 exterior, the exterior insulation Mass Mass i Comply requirement applies (FR10), ❑ RNot ❑Steel Steel servable ❑Not Applicable j 303.2 Wall insulation is installed 1 manufacturer's instructions.per 1 Complies [IN4] on �❑Does Not Comply (�Not Observable Not Applicable Additional Comments/Assumptions: f ........ wuuwuwuw nnn mmi 1 Hi h Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Final inspection Provisions Section Plans Field # Verified Verified & Req.ID Final Inspection Provisions Value Value Complies? Comments/Assumptions 402,1 1, Ceiling insulation R-value. ......_, i R � R v I Complies Not See the bl es elope 402.2 1 table for 402.2.2, Q Wood (�Wood valcomply (FI1]1 Q Steel E)Steel ❑Not Observable Q Not i Applicable � .�a. _.._.. . 303.1.1.1. Ceiling insulation installed per Complies 303.2 manufacturer's instructions. [F1211 Blown insulation marked every Does Not 300 ft2, nmply Q Not Observable Not pplicable 403.1.2 Heat pump thermostat installed OComplies Exception: Requirement [FIJO]2 on heat pumps. O Does Not is not applicable. Comply (�Not Observable Q Not Applicable 5.1 Circulating service hot water Complies [FI11]2 systems have automatic or° accessilble manual controls, Does Not Umply q Not Observable Not Applicable 403.6.1 All mechanical ventilation Q Complies [FI2512 system faros not part of tested and listed WAC equipment Does Not meet efficacy and air flow limits Comply per Table R403.6.1. Not servable 0 Not Applicable 403.2 � Hot water'boilers supplying heat Q Complies � [FI2612 through one-or two-pipe heatiny systems have outdoor Does Not setback control to lower boiler Comply water temperature based on ;QNot outdoor temperature. servable ❑Not Applicable e .�.�.�..,�.:.�... ......�.� . ...._._�. 403.5,1.1 Heated water circulation Complies [FI28]2 systems have a circulation Does Not pumpF"I"he system return pipe is Co a dedicated return pipe or a Comply cold water supply pipe.Gravity (�Not and thermos-syphon circulation O servable sCstems are not(present, ontrols for circulating hot Not water system pumps start the pplicable pump with signal for hot water demand within the occu.rpancy, Controls automatically turn off the pump when water is In circulation loop ns at set-point temperature and no demand for hot water exists. 403.5.1.2 Electric heat trace systems Q Complies [F129]2 comply with(IEEE 515,1 or I.Ut 515.Controls automatically ❑Does Not adjust the energy input to the Comply heat tracing to maintain the Not desired water temperature in servable the piping. o Not Applicable Section° � . .u._ .............---Plans —_ Fie. _ Id # Verified Verified & Req.ID Final Inspection Provisions Value Value Complies? Comments/Assumptions 403,5.2 Demand recirculation water Complies [F130]2 systems have controls that manage operation of the.pump Does Not and IImit the temperature of the Comply water entering the cold water Not piping to<= 104°F. servable Not pplicable f it 403.5.4 Drain water heat recovery units Complies [FI31]z tested in accordance with CSA , B55.1. Potable water-side Does Not pressure loss of drain water Comply heat recovery units < 3 psi for o Not individual units connected to Observable one or two showers. Potable water-side pressure loss of drain O Not water heat recovery units < 2 Applicable psi for individual units connected to three or more showers. 404.1 90%or more of permanent Complies [FI6]1 fixtures have high efficacy lamps. Does Not Comply 6Not servable Not Applicable ..404.1,1 Fuel gas lighting systems have Complies [FI23]3 no continuous pilot light. Does Not Comply j Not OOservable I Not Applicable 401.3 Compliance certificate posted. Q Complies [FI7]2 Q Does Not Comply []Not observable Q Not Applicable .............. �. 303.3 Manufacturer manuals for Ocomplies [FI18]3 mechanical and water heating systems have been provided. Does Not Comply O Not Observable Not pp pplicable 402.2.3 Vented adjacent to soffit with air ea eeable e .w 99 Complies Exception: Requirement [FI22] of a p,p cable. vents that extends over Comply insulation. ( J Not Observable O Not Applicable 02,2,4 Attic access hatch and door R( fit QComplies 13]1 insulation_R-value of the b ........m> n adjacent assembly. C Does Not i omply I[—]Not O servable No t Iicable p 50 Pa. [ 117]1 1 2 Blower i Cl in Climate Zones 3 g5 CH 50 C _ Q Does Complies Not u Comply j ❑Not Observable Q Not Applicable ectlorr Plans, Field # Verified Verified Req.10 Final Inspection Provisions Vailue Value Complies? CommentslAssumptions, II - ------------ 1403.3.3 Ducts are aiesstesteto E)Complies[F127]1 determiner leakage with reoh-in test: Total cfm/100 ft2 CfM/100 ft2 Po Does Not mply leakage measured with a pressure differential of,0.1 inch Not w.g,across the system including Uservable the manufacturer's air handier I enclosure if installed at time of Not test. Postconstruction test:Total i iPpplicable leakage measured with a pressure differential of 0,1 inch w.g.across the entire system i including the manufacturer's air handier enclosure. 403.3.4 Duct tiphtness test result of 10 Complies [F1411 <=4 c m1100 ft2 across the I CfM/100 ft2 Does Not system or<=:3 cfm/100 ft2 cfm/100 ft2 without air handier @ 25 Pa.For Imply rough-in tests, verification may Not need to occur du ring Framing able sery inspection, Not plicable Pp 403.3,2.1 Air handler leakage desi vated Complies [F12411 by manufacturer at<=2%of design air flow. Does Not Comply ❑Not observable p P Not plicable 403AJ Programmable thermostats E)Complies IF19p installed for control of primary Does Not heating and coaling systems and initially set b manufacturer Comply to code specificat.Lns, Not Yservable 'P Not p plicable ...................... ........ Additional Comments/Assumptions, F3 Low Impact(Tier 3) High Impact(Tier 1) 2 Medium Impact(Tier 2) Effidency Certificate Above-Grade Wall 19.00 Below-Grade Wall 13.00 Floor 21.00 Ceiling/Roof 30.00 Ductwork(unconditioned spaces): Window 0.30 0.30 Door 0.30 0.30 Skylight 0.00 . . . . i REM Heating System: Cooling System: Water Heater: Name: Date: Comments: DEPARTMENT STANDARDS,REMOVE AND REPLACE UNSUITABLE SOILS WITH SAND AND GRAVEL FOR A DIAMETER OF SIX FEET GREATER THAN THE LEACHING POOL(3'COLLAR), EXTENDING DOWN INTO A MINIMUM OF A 6'STRATA OF ACCEPTABLE SAND AND GRAVEL 10.PVC PIPE TO BE INSTALLED IN ACCORDANCE WITH APPENDIX E OF THE SUFFOLK COUNTY SANITARY CODE 11.PVC PIPE TO CONFORM TO ASTM D-3034,PIPE TO HAVE co SDR CLASSIFICATION OF 35 co NOTE: CLEAN OUT MUST BE INSTALLED ON TREATMENT UNIT INLET LINE o AT FACE OF BUILDING, } IF INSTALLED AT EXTERIOR IT MUST BE TO GRADE. ¢ w z � Q 0 co z N 6i LEGEND o TEST HOLE PROPERTY LINE > w APROX WATER LINE CW— LOCATION L F PROPOSED LEACHING POOL T U, PROPOSED TREATMENT UNIT PROPOSED 50%EXPANTION TANK w Z PROPOSED 24"DISTRIBUTION BLOCK U W w w 2zz UJ o > Qz C/) Wow 0 0 � 0 a_ o C� 0 � k q 'u W�skis" r� Fuji Clean co cQHS APPI Lu � h � ... _ ...... N N o z 9 1E 20 Lu .. p I, 8. N p Q Z C CDw Q aw of W J t IvinI Cb ��n C x q 4Q 60, � DW#1 23.5 do x o o COVERED o / L PORCH ° r / 40.0 C/E 0 k � 12.E m o PROPOSED 1[4 M 2 STORY o , (Z) / a_ - RESIDENCE COVERT Az _ � F.F. EL. 38.5 PORCI 6.0 ,Q a 18.0 cd / l ) M` +35. 3 40.0 W/W PORTICO W/W +3& L WALKWAY \ 8Ox12 1 LL �/ EX. C:) 1/ DW#2 Llj CD x 125. 82 �o �z OH OH OH OH OH OH OH OH pH OH rr� �r �r r-� •\ Irl IrA IT _n ��