Loading...
HomeMy WebLinkAbout52379-Z TOWN OF SOUTHOLD BUILDING DEPARTMENT SOUTHOLD, NY BUILDING PERMIT (THIS PERMIT MUST BE KEPT ON THE PREMISES WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS UNTIL FULL COMPLETION OF THE WORK AUTHORIZED) Permit#: 52379 Date: 10/20/2025 Permission is hereby granted to: No Fork Building Co LLC 850 Lincoln Ave Ste 10 Bohemia, NY 11716 To: Construct a new single-family dwelling to include an HVAC system, breezeway and garage as applied for per SCHD approval. Premises Located at: 1015 Wildberry Ln, Southold, NY 11971 SCTM#51.-3-12.14 Pursuant to application dated 08/29/2025 and approved by the Building Inspector. To expire on 10/20/2027. Contractors: Required Inspections: Fees: Single Family Dwelling-NEW $3,743.50 CO Single Family Dwelling-New $100.00 Total $3,843.50 Building Inspector .M TOWN OF SOUTHOLD—BUILDING DEPARTMENT Town Hall Annex 54375 Main Road P. O. Box 1179 Southold,NY 11971-0959 M Telephone (631) 765-1802 Fax (631) 765-9502 htt :l www.southoldtow o% Date Received APPLICATION FOR BUILDING PERMIT For Office Use Only PERMIT 1\105�� 9 _ Building Inspector: A U ' 2 2025 Applications and forms must be filled out in their entirety. Incomplete applications will not be accepted. Where the Applicant is not the owner,an Owner's Authorization form(Page 2)shall be completed. Date:8/20/2025 OWNER(S)OF PROPERTY: Name:Jonathan Grano - North Fork Building Co. LLC. SCTM # 1000-051 .00-03.00-012.014 Project Address: 1015 Wildberry Lane, Southold NY 11971 Phone#:631-241-7612 Email:Jon@northforkbuildingcompany.com Mailing Address:850 Lincoln Avenue, Unit 10 Bohemia, NY 11716 CONTACT PERSON: Name: Robert Conway - Bello Architects Mailing Address: 6334 Northern Blvd. East Norwich NY 11732 Phone#:516-509-3846 Email: Rob@JoeBelloArchitects.com DESIGN PROFESSIONAL INFORMATION: Name:Joseph Bello - Bello Architects Mailing Address: 6334 Northern Blvd. East Norwich NY 11732 Phone#:516-509-3846 Email: Rob@JoeBelloArchitects.com CONTRACTOR INFORMATION: Name:Jonathan Grano - North Fork Building Co. LLC. Mailing Address:850 Lincoln Avenue, Unit 10 Bohemia, NY 11716 Phone#:631-241-7612 1 Email:Jon@northforkbuiIdingcompany.com DESCRIPTION OF PROPOSED CONSTRUCTION ®New Structure ❑Addition ❑Alteration ❑Repair ❑Demolition Estimated Cost of Project: ❑Other $ 1,900,000.00 Will the lot be re-graded? RYes ONO Will excess fill be removed from premises? ❑Yes ®No 1 PROPERTY INFORMATION Existing use of property: Vacant Land Intended use of property:Single Family Residence Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to A_C this property? ❑Yes ®No IF YES, PROVIDE A COPY. B Check Box After Reading: The owner/contractor/design professional is responsible for all drainage and storm water issues as provided by Chapter 236 of the Town Code. APPLICATION IS HEREBY MADE to the Building Department for the issuance of a Building Permit pursuant to the Building Zone Ordinance of the Town of Southold,Suffolk,County,New York and other applicable Laws,Ordinances or Regulations,for the construction of buildings, additions,alterations or for removal or demolition as herein described.The applicant agrees to comply with all applicable laws,ordinances,building code, housing code and regulations and to admit authorized inspectors on premises and In building(s)for necessary inspections.False statements made herein are punishable as a Class A misdemeanor pursuant to Section 210.45 of the New York State Penal Law. Application Submitted By(pri t name):Robert Conway - Bello Architects Authorized Agent Downer Signature of Applicant: - Date: 8/20/2025 STATE OF NEW YORK) SS: COUNTY OF Robert Conway being duly sworn, deposes and says that (s)he is the applicant (Name of individual signing contract) above named, (S)he is the Agent (Contractor, Agent, Corporate Officer, etc.) of said owner or owners, and is duly authorized to perform or have performed the said work and to make and file this application;that all statements contained in this application are true to the best of his/her knowledge and belief; and that the work will be performed in the manner set forth in the application file therewith. Alisa Lucchi-Clofalo Sworn before me this Notary Public State of NY Ivo.01LU6344683 n� y n Expires Qualified in Nassau County L� da of 20 L Pxpires 07-11-2028 Not P'ubl' A,N PROPERTY OWNER AUTHORIZATION (Where the applicant is not the owner) Jonathan Grano residing at 850 Lincoln Avenue, Unit 10 Bohemia, NY 11716 I, do hereby authorize Robert Conway - Bello Architects to apply on my bew,alf1to the Town of Southold Building Department for approval as described herein. 77 Owner's Signature Date Jonathan Grano Print Owner's Name 2 Building De artrnent Applicatio AUTHORIZATION (Where the Applicant is not the Owner) I, Jonathan Grano,North pork Building Co LLC residing at 850 Lincoln Avenue,Unit 10 Bohemia,NY 11716 (Print property owner's name) (Mailing Address) do hereby authorize Robert Conway-Bello Architects (Agent) to apply on my behalf to the Southold Building Department. t1er's Signature) ( ate) ,jQ0 A 5j (Print Owner's Name) rM lk Town Hall Annex �" Telephone(631)765-1802 Fax 765-9502 54375 Main Roads (631) P.O. Box 1179 Southold NY 11971-0959 p'k J a BUILDING DEPARTMENT NOTICE OF UTILIZATION OF TRUSS TYPE CONSTRICTION PRE-ENGINEERED WOOD CONSTRUCTION AND/OR TIMBER CONSTRUCTION' Date: 8/20/2025 Owner: Jonathan Grano - North Fork Building Co LLC Location Of Pro pert 1015 Wildberry Lane, Southold NY 11971 Please take notice that the (check applicable line): X New commercial or residential structure Addition to existing commercial or residential structure Rehabilitation to an existing commercial or residential structure to be constructed or performed at the subject property reference above will utilize (check applicable line): Truss type construction (TT) X Pre-engineered wood construction (PW) Timber construction (TC) in the following location(s) (check applicable line): mIT_mm � Floor framing, including girders and beams (F) ................— Roof framing (R) X Floor and roof framing (FR) Signature: Name (person ubmitting this form): Robert Conway- Bello Architects Capacity(check applicable line): Owner X Owner representative TrussReg15.docx Effective 1/1/2015 tl' GeneratedSoftware Compliance Certificate Project Wildberry Lane Lot 8 Energy Code: 2018 IECC Location: Southold, New York Construction Type: Single-family Project Type: New Construction Project SubType: None Conditioned Floor Area: 5,924 ft2 Glazing Area 22% Climate Zone: 4 (5572 HDD) Permit Date: Permit Number: All Electric false Is Renewable false Has Charger false Has Battery: false Has Heat Pump: false Construction Site: Owner/Agent: Designer/Contractor: Wildberry Lane Lot 8 Jonathan Grano Southold, NY 11971 J.Grano Contracting 850 Lincoln Avenue Unit 10 Bohemia,NY 11716 631-244-6911 jon@jgranocontracting.com Compliance: 6.5%Better Than Code Maximum UA: 845 Your UA: 790 Maximum SHGC: 0.40 Your SHGC: 0.30 The%Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off ruPes. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. 51 allr-o n o aarde tradeoffs a it rnua daaurger coin;aida:lire d In the UA or W)eii P`ornnair c:e crxnlp ulnae path in REScheick. IC ach Ma b-on-aurae n:ss irnITuNy Ginn the spe dfied Cfi fua t(2 zone must meet the rrfliininiu.nn energy code urn^M,dllr:tio n 114,vMue :and&p4111 requpo eirirraints. Envel-ope -sernblie Hot Roof: Cathedral Ceiling 2,422 38.0 0.0 0.027 0.026 65 63 AGW Main: Wood Frame, 16"o.c. 4,562 19.0 0.0 0.060 0.060 212 212 Front Door:Solid Door(under 50%glazing) 45 0.350 0.320 16 14 Windows: Vinyl Frame 984 0.300 0.320 295 315 SHGC: 0.30 Gable Walls:Wood Frame, 16"D.C. 528 21.0 0.0 0.057 0.060 30 32 Project Title: Wildberry Lane Lot 8 Report date: 07/22/25 Data filename: Page 1 of10 FDW Main:Solid Concrete or Masonry Wall height: 10.6' 2,899 0.0 14.0 0.047 0.059 129 163 Depth below grade: 8.8' Insulation depth: 10.6' Windows: Vinyl Frame 144 0.300 0.320 43 46 SHGC: 0.30 Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2018 IECC requirements in REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Gerson Rubio, P.E. 7/28/2025 Name-Title Signature Date Project Title: Wildberry Lane Lot 8 Report date: 07/22/25 Data filename: Page 2 of10 SoftwareVersionInspection Checklist Energy Code: 2018 IECC Requirements: 100.0% were addressed directly in the REScheck software Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section Plans Verified Field Verified # Pre-Inspection/Plan Review Value Value Complies? Comments/Assumptions 103.1, documentation drawings and demonstrate � � Elp�mplie.� q�.. _. . ❑Co s Requirement will b �met e . es Not [PR111 energy code compliance for the 41 building envelope.Thermal ❑Not Observable envelope represented on ❑Not Applicable construction documents. 103.1, Construction drawings and ❑Complies Requirement will be met. 103.2, documentation demonstrate ❑Does Not 403.7 energy code compliance for [PR311 lighting and mechanical systems. ❑Not Observable Systems serving multiple ❑Not Applicable dwelling units must demonstrate compliance with the IECC Commercial Provisions. _ _ 302.1, _ Heatingand cooling equipment is Heating: Heating: � qqq gg: � ting• ❑Complies Requirement will be met. 403.7 sized per ACCA Manual S based Btu/hr Btu/hr []Does Not [PR212 on loads calculated per ACCA Cooling: Cooling: []Not Observable Manual➢ear other methods Btu/hr Btu/hr approved by the code official. []Not Applicable Additional Comments/Assumptions: 1 I High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impart(Tier 3) Project Title: Wildberry Lane Lot 8 Report date: 07/22/25 Data filename: Page 3 of10 Section Plans Verified Field Verified & Re ID Foundation Inspection Value Value Complies? Comments/Assumptions �#• _ 402.1.1 conditioned sulation alue.V11h wall_ R-- R- ❑Complies t table for [F0411 insulation s used,ver basement Envelope Assemblies Where interior R_ R_ ❑Does Not values. ifitation may need to occur during []Not Observable :Insulation Inspection.Not ❑Not Applicable required in warm-humid locations in Climate Zone 3. . . r 303.2 Conditioned basement wall []Complies Requirement will be met. [F05]1 insulation installed per ❑Does Not V manufacturer's instructions. ❑Not Observable ❑Not Applicable 402.2.9 Conditioned basement wall ft ft ❑Complies See the Envelope Assemblies [F0611 insulation depth of burial or ❑Does Not table for values. distance from top of wall. ❑Not Observable ❑Not Applicable 303.2.1 A protective covering is installed [ Complies Requirement will be met. [F01112 to protect exposed exterior ❑Does Not insulation and extends a minimum of 6 in. below grade. ❑Not Observable []Not Applicable 403.9 Snow-and ice-melting system ❑Complies Requirement will be met. [FO12]2 controls installed. ❑Does Not 4W ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Wildberry Lane Lot 8 Report date: 07/22/25 Data filename: Page 4 of10 Section Plans Verified Field Verified # Framing/ Rough-In Inspection Value Value Complies? Comments/Assumptions & Re ID 402 _ Door U-factor.. U- ._ _. ......_ .._ U ,.. .. ❑Complie.� Envelope table for w _ 5 See the Envelopepe Assemblies 402.3.4 ❑Does Not s' [FR1]1 ❑Not Observable ❑Not Applicable g g ❑Complies See the Envelope Assemblies 402.1.1, :Glazing U-factor(area-weighted U- U- 402.3.1, average). ❑Does Not table for values. 402.3.3, ❑ 402.5 Not Observable [FR2]1 ❑Not Applicable ....... 303.1.3 U-factors of fenestration products ❑Complies Requirement will be met. [FR4]1 :are determined in accordance []Does Not , with the NFRC test procedure or ❑Not Observable taken from the default table. ❑Not Applicable 402.4.1.1 Air barrier and thermal barrier ❑Complies Requirement will be met. [FR23]1 installed per manufacturer's []Does Not to" instructions. ❑Not Observable . ❑Not Applicable 402.4.3 Fenestration that is not site built -�m ❑Complies Requirement will be met. [FR20]1 is listed and labeled as meeting ❑Does Not A.AMA/WDMA/CSA 101/l.5.2/A440 ❑Not Observable or has infiltration rates per NFRC 400 that do not exceed code ❑Not Applicable limits. 402.4.5 IC-rated recessed lighting fixtures ❑Complies :Requirement will be met. [FR16]2 sealed at housing/interior finish []Does Not and labeled to indicate:52.0 cfm leakage at 75 Pa. ❑Not Observable ❑Not Applicable 403.3.1 Supply and return ducts in attics ❑Complies Exception: Ducts located [FR12]1 insulated >= R-8 where duct is []Does Not completely inside the >= 3 inches in diameter and >= building envelope. ' R-6 where < 3 inches.Supply and []Not Observable return ducts in other portions of ❑Not Applicable the building insulated >= R-6 for diameter>= 3 inches and R-4.2 for< 3 inches in diameter. 403.3.2 Ducts,air handlers and filter ❑Complies Requirement will be met. [FR13]1 boxes are sealed with ❑Does Not joints/seams compliant with International Mechanical Code or ❑Not Observable International Residential Code, as ❑Not Applicable applicable. 403.3.5 Building cavities are not used as ❑Complies Requirement will be met i[FR15]3 ducts or plenums. []Does Not []Not Observable ❑Not Applicable 403.4 HVAC piping conveying fluids R- R ❑Complies Requirement will be met. [FR17]2 above 105 QF or chilled fluids []Does Not below 55 QF are insulated to zR- ❑ 3 Not Observable ❑Not Applicable 4..e. ,... ................................................. 03.4.1 :Protection of insulation on HVAC ❑Complies .Requirement will be met. [FR24]1 piping. ❑Does Not ❑Not Observable ❑Not Applicable 403.5.3 Hot water pipes are insulated to R- R ❑Complies Requirement will be met. [FR18]2 >_R-3. ❑Does Not << '❑Not Observable ❑Not Applicable g p Medium Impact(Tier 2) 3 Low Impact(Tier 3) 1 Hi h Im act(Tier 1) 2„ r � Project Title: Wildberry Lane Lot 8 Report date: 07/22/25 Data filename: Page 5 of10 Section Plans Verified Field Verified # Framing/Rough-In Inspection Value Value Complies? Comments/Assumptions & Req IDww 4016 installed c or , q . �p3, �s Automaticnoall outdoor dampers are � c�mpli��� �gravity p '�Requirement will be met. Does N intakes and exhausts. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: C l High Impact (Tier 1) �2 ,Medium Impact(Tier 2) 3 ILow Impact(Tier 3) Project Title: Wildberry Lane Lot 8 Report date: 07/22/25 Data filename: Page 6 of10 section Plans Verified Field Verified # Insulation Inspection Value Value Complies? Comments/Assumptions kFte .ID . _....�_,. ...-_-.... .. ..�..... _�m_....._......._..._._....... .. N._ �._._,.._ .. 303.1 All installed insulation is labeled ❑Complies Requirement will be met. [IN13]2 or the installed R-values ❑Does Not provided. ❑Not Observable ❑Not Applicable Wall insulation R-value.If this is a R- R- '❑Complies See the Envelope Assemblies 402.2.5, mass wall with at least 1/2 of the ❑ Wood ❑ Wood ❑Does Not table For values. 402.2.6 wall insulation on the wall ❑ Mass ❑ Mass []Not Observable [IN3]1 exterior,the exterior insulation PP requirement applies (FR10). ❑ Steel ❑ Steel ❑Not Applicable � �303.2 Wall insulation is installed per ❑Complies Requirement will be met. [IN411 manufacturer's instructions. []Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: ��High impact(Tier 1) 2 .Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Wildberry Lane Lot 8 Report date: 07/22/25 Data filename: Page 7 of10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Reg.I D -�R- R- ❑Complies See the Envelope _ 402.1.1, Ceiling insulation R-value. _ � �- Assemblies 402.2.1, ❑ Wood ❑ Wood ❑Does Not table for values. 402.2.2, ❑ Steel ❑ Steel ❑Not Observable 402.2.6 [Fill' ❑Not Applicable 303.1.1.1, Ceiling insulation installed per ❑Complies Requirement will be met. 303.2 manufacturer's instructions. ❑Does Not [F12]1 Blown insulation marked every 300 ft2. ❑Not Observable ❑Not Applicable 402.2.3 Vented attics with air permeable ❑Complies Exception: Requirement is [F122]2 insulation include baffle adjacent ❑Does Not not applicable. to soffit and eave vents that extends over insulation. [:]Not Observable ❑Not Applicable �402,2*4 Attic access hatch and door R- R- ❑Complies Requirement will be met. [FI311 insulation zR-value of the ❑Does Not :adjacent assembly. ❑Not Observable ❑Not Applicable 402.4.1.2 Blower door test @ 50 Pa. <=5 ACH 50 = ACH 50= ❑Complies Requirement will be met. [FI17]1 ach in Climate Zones 1-2, and ❑Does Not <=3 ach in Climate Zones 3-8. ❑Not Observable ❑Not Applicable 403.3.3 Ducts are pressure tested to cfm/100 cfm/100 ❑Complies Requirement will be met. [F127]1 :determine air leakage with ft2 ft2 ❑Does Not either: Rough-in test:Total leakage measured with a ❑Not Observable pressure differential of 0.1 inch ❑Not Applicable w.g. across the system including :the manufacturer's air handler enclosure if installed at time of test. Postconstruction test:Total leakage measured with a pressure differential of 0.1 inch w.g. across the entire system including the manufacturer's air handler enclosure. 403.3.4 Duct tightness test result of<=4 cfm/100 cfm/100 ❑Complies _ Requirement will be met. [F1411 cfm/100 ft2 across the system or ft2 ft2 ❑Does Not <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough-in [:]Not Observable :tests,verification may need to ❑Not Applicable occur during Framing Inspection. 403.3.2.1 :Air handler leakage designated ❑Complies Requirement will be met. [F[24]1 by manufacturer at<=2%of ❑Does Not design air flow. ❑Not Observable ❑Not Applicable 1 Programmable thermostats ❑Complies Requirement will be met. [F19]2 installed for control of primary ❑Does Not heating and cooling systems and initially set by manufacturer to ❑Not Observable code specifications. ❑Not Applicable 403.1.2 Heat pump thermostat installed ❑Complies Exception: Requirement is [FI10]2 on heat pumps. ❑Does Not not applicable. []Not Observable ❑Not Applicable 1 Circulating service hot water ❑Complies Requirement will be met. [Flll]2 systems have automatic or ❑Does Not accessible manual controls. []Not Observable ❑Not Applicable 1 High Impact(Tier 1) q 2 ,Medium Impact(Tier 2) 13 JLow Impact(Tier 3) Project Title: Wildberry Lane Lot 8 Report date: 07/22/25 Data filename: Page 8 of10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID _ _ 403.6 1 All llns not mechanical ventilation e tea and liste . ..M. .........._ []Does Not systemp es Requirement will be met. art of t HVAC equipment meet efficacy and air flow limits per Table ❑Not Observable R403.6.1. ❑Not Applicable 403.2 Hot water boilers supplying heat ❑Complies Requirement will be met. [F126]2 through one-or two-pipe heating ❑Does Not systems have outdoor setback control to lower boiler water ❑Not Observable temperature based on outdoor []Not Applicable temperature, 403.5.1 1 Heated water circulation systems . ww . ..__. _.._. ❑Complies Requirement will be met. [F12812 have a circulation pump.The ❑Does Not system return pipe is a dedicated return pipe or a cold water supply []Not Observable pipe.Gravity and thermos- ❑Not Applicable syphon circulation systems are not present. Controls for circulating hot water system pumps start the pump with signal for hot water demand within the occupancy. Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. 403.5.1.2 Electric heat trace systems ❑Complies Exception: Requirement is [F1291� comply with IEEE 515.1 or UL ❑Does Not not applicable. 515.Controls automatically adjust the energy input to the []Not Observable heat tracing to maintain the ❑Not Applicable desired water temperature in the piping. 403.5.2 Demand recirculation water ....... _._....�a.❑Complies Exception: Requirement is [FI30]2 systems have controls that ❑Does Not not applicable. manage operation of the pump and limit the temperature of the []Not Observable water entering the cold water [Not Applicable piping to <= 10412F. 403.5.4 Drain water heat recovery units []Complies Exception: Requirement is [F131]2 tested in accordance with CSA ❑Does Not not applicable. 1355.1. Potable water-side pressure loss of drain water heat [-]Not Observable recovery units < 3 psi for ❑Not Applicable individual units connected to one or two showers. Potable water- side pressure loss of drain water heat recovery units < 2 psi for individual units connected to three or more showers. 1 90%or more of permanent ❑Complies Requirement will be met. [F1611 fixtures have high efficacy lamps. ❑Does Not ❑Not Observable ❑Not,Applicable 404.1.1 Fuel gas lighting systems have m.........._... ❑Complies Exception: Requirement is [F123]3 no continuous pilot light. 1JDoes Not not applicable. ❑Not Observable []Not Applicable ib-d.3 Compliance certificate posted. CMComplies Requirement will be met. [F171I []Does Not ❑Not Observable ❑Not Applicable 1 Hi h Imp g ( ) �edium Impact (Tier 2) T3 Low Impact(Tier 3) _....� act Tier 1 ... 2 M......, ,., w� ..... Project Title: Wildberry Lane Lot 8 Report date: 07/22/25 Data filename: Page 9 of10 Section Plans Verified Field Verified # Final Inspection Provisions Value Value Complies? Comments/Assumptions & Req.ID _ 303.3 Manufacturer manuals for ❑Complies 'Requirement will' be met. [FI18]3 mechanical and water heating Eboes Not systems have been provided. ❑Not Observable ©Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) �... � . Project Title: Wildberry Lane Lot 8 Report date: 07/22/25 Data filename: Page 10 of10 C2018 IECC Energy �(j Efficiency Cert"Ificate ME= Above-Grade Wall 19.00 Below-Grade Wall 14.00 Floor 0.00 Ceiling / Roof 38.00 Ductwork (unconditioned spaces): Window 0.30 0.30 Door 0.35 SOMALI MIN . . Heating System: Cooling System: Water Heater• Name: Date: Comments A5-13UILT SITE INFORMATION: GRADE EL.28.01± -SUFFOLK COUNTY TAX MAP ID:1 000-5 1-03-1 2.1 4 OF N -PROPOSED 2 STORY HOME ON PREVIOUSLY VACANT LOT. ,, k -NTS- �T M X N N EL TEST HOLE INFORMATION TOTAL OF 6 BEDROOMS y N d -LOT AREA:ACRE 0.551. 24,000 5F. u> LOAM 0W 27,5± PRC?"4f'HDED FY MC DONALD ROWN 5ANJD EL. GE05EPVICE PROPERTY LOCATED AT -PROPERTY LOCATED AT 8 WILDBERRY LANE W m 51LT(M ,5*.. 8 WILDBERRY LANE SOUTHOLD,TOWN OF SOUTHOLD,SUFFOLK COUNTY, NEW YORK NrN' PALE BROWN 5OUTHOLD.NY 1 1 971. yN E -SUBDIVISION:WILDBERRY FIELDS-LOT 8 fN SURVEY PROVIDED BY:YOUNG It YOUNG 03-27-2023 (~`aP) ,j DEPTH O Of FINE SAND EL DATED -VERTICAL DATUM-NAVD'1 985 DATUM � �®4813 ✓� F TEST HOLE 48,0'±OL LIC ER CE SILTY SAND ALLBHOMESTWITHIN 1150LF OF PROPERTY CONNECTED TO PUBLIC WATER SERVICE. F 1(5 ��" HIGHEST EXPECTED q (5M) 1 2.6± GROUNDWATER -NO SURFACE WATER OR WETLANDS WITHIN 300'FROM PROPERTY UNE. t9'N WATER IN STATEMENT: GENERAL NOTE5: BROWN -TEST HOLE SHOWS I. DESIGN FOR UP TO 6-BEDROOM HOME. 51LTY SAND EL. GROUNDWATER ENCOUNTERED AT EL 2. I/A OWT5 SANITARY DESIGN. WATER IN WILDBERRY LANE 3. SITE PLAN AND REFERENCE ELEVATIONS TOB USED FOR I OWT5 SANITARY BROWN FINE CONSTRUCTION ONLY.EXACT PROPERTY BOUNDARIES, UTILITY LOCATIONS ANDD ELEVATIONS MEDIUM L ARE NOT GUARANTEED. TO SAND EL 4.ELEVATIONS 5A5ED ON COUNTY GI5 t ENGINEERS 51TE MEASUREMENTS. m WATER IN 5. ON51TE UTILITY MARK-OUTS TO BE PERFORMED BY CONTRACTOR PRIOR TO PERFORMING SITE BROWN WORK. J Aµ G. SOIL TEST HOLE DATA PROVIDED BY MCDONALD GE05EPVICES 03-09-2023 V N CLAYEY EL � b SAND(5C) 13 0'± 7„EX15TING SANITARY CE55POOL5(5)TO BE PUMPED AND REMOVED AS NECESSARY PER SCDH5 cl N 79. 25' 15' E 12GN' STANDARDS. J v En BEDROOM O COURSE EL .0+ PROP.GAS SER10urNO aaA q E,era 111876't I, ONE(I)PUAJIMACI OOP LOWER,IVENOTANDFUJICONTROLA59EMBLY.E O I BROWN FINEPROPOSED TO (5N WATER.OICOWITERED ELECTRIC SERVICE AT EL 2,.6'±, anNq 3. ONE(])POLYLOK DISTRIBUTION BOX 4.THREE(3)8'DIAMETER BY G DEEP PRECAST LEACHING POOL WITH SLAB. r y 5. ONE(1)8'DIAMETER FUTURE EXPANSION AREA. Z TEST HOLE I N FO RM ATI O N G. ONE(1) ]000 GAL PRECAST SEPTIC TANK FOR 5EA50NAL POOL HOUSE. �tEX Q SCALE: NTS („ 7. ONE(1)8'DIAMETER BY 4'DEEP PRECAST LEACHING POOL FOR SEASONAL POOL HOUSE. J FUTURE EX'PANaK'IM"waCN DRYVVELL'SBY OTHERS GENERAL SANITARY S`N"',6m.4 AND INSTALLATION NOTE5N. I. IJA OWT5 SEPTIC 5Y5TEM LE51GNF'D FOR UP TO G BEDROOM HOME PER SUFFOLK COUNTY m I I y DEPARTMENT OF HEALTH STANDARDS(5CDHS). PROP.8'X6'PRECAST I 1 2. SANITARY GRAVITY DRAIN PIPE TO BE 4-INCH CAST IRON AT FOUNDATION PENETRATION AND Y LEACHING POOL(3X) I F`RIN7!P.PUBLIC WATER SERVICE 4-INCH PVC SDR35 DOWNSTREAM OF FOUNDATION. 3. I/A OWT5 SHALL BE TESTED FOR WATER TIGHTNESS PRIOR TO ARRIVING ONSITE U51NG THE PROP.BUTION K - LP METHOD APPROVED BY MANUFACTURER. O DISTRIBUTION BOX LL d 1 1I'' Q 4. THE DESIGN ENGINEER SHALL OVERSEE THE OWT5 DURING SYSTEM STARTUP. ' q 5. THE OWT5 INSTALLER SHALL BE LICENSED, HOLD AN ENDORSEMENT FROM 5CDH5 AND BE A = N k FUJI AUTHORIZED INSTALLER. GARAGE G. THE OWTS INSTALLER SHALL REGISTER THE ON51TE TREATMENT SYSTEM WITH 5CDH5. THE PROP.FUJI CEN-8 r DRIVEWAY EL 26,4' unowrs ) DESIGN ENGINEER SHALL PROVIDE CERTIFICATION DOCUMENTS AS REQUIRED BY 5CDH5. O 1 IN�srx n (DRY) 7. AN OPERATION AND MAINTENANCE CONTRACT BETWEEN THE MAINTENANCE PROVIDER AND THE N PROPERTY OWNER SHALL BE PROVIDED TO 5CDHS FOR I/A OWT5. Z FUJI CONTROL PANEL,AND. -.�,„.� ^^' 8. A GARBAGE GRINDER SHALL NOT BE INSTALLED UPSTREAM OF THE OWTS. MAC BLOWER ASSEMBLY ram_ r -- 17„0, ��m /" 9. WATER SOFTENER BACKWASH SHALL NOT BE FLUSHED TO PROPOSED SEPTIC SYSTEM. 10. CONTRACTOR 15 RESPONSIBLE TO OBTAIN TOWN BUILDING PERMITS AS NECESSARY PRIOR TO ^ INSTALLATION OF THE PROPOSED SEPTIC SYSTEM. PROPOSED'1 Aa.ro 1 1. I/A OWT5 TO BE PA551VELY VENTED THROUGH PLUMBING ROOF VENTS, .. 9�. ....... �_ 2S R2.4 LO EL' I rn I - �' LEGEND IRON LF-LINEAR FOOT STORY FRAME i O�z Co-CLEANOUT LP-LEACHING POOL 1 war A O CP-EX15TING SANITARY CE55POOL M P5D MANIFOLD I DWELLING I o qB i CTG-arroGRADE MAX MAXIMUM „ FIRST FLOOR El. = 29.5"' q a' mmOC DB-DI5TRIBUTION BOX MIN-MINIMUM OIJ S"T PROP IF OR , � 11 Del/7 EL-ELEVATION OWN5-ON5ITE WASTEWATER TREATMENT SYSTEM z +"'"""� �Ij� ED-ELECTRIC BOX PT-PERCOLATION TEST wm IIAn m Z r m FLOOR VATION TH TEST OLEm LD;U EX-EXPANSIO!POOL 5CDH5-SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICESI -,y. N m y 3 EXI5-EX15TING 5T SEPTIC TANKa.. ' » 92".0A FFE-FINISHED ELE H02,A p pp p(' ON ,Mr m m �"L JS,p.,,..,. .4. IT.' N..„. .L.�n x w N7.0b" °I it-1 1, GE-GRADE ELEVATION V-VENT MCn ZO qp," �q p .� .- " m G j GM-GAS MAIN TB-THRUST BLOCK LLJ 'qp lines �+$�. 1MM „ A Z�I ",,�- 2 @�J" .{7.t6'��-. 1 •1 -'0 CIO GPD-GALLONS PER DAY TYP-TYPICAL Q qq HEGE-HIGHEST EXPECTED GROUNDWATER WV-WATER VALVE ®q �m O 'I I/A OWNS-INNOVATIVE/ALTERNATIVE OWT5 'WM-WATER METER ® WP t-O.11 „,..,.,.,..,, O 1 I IE-RlVERT ELEVATION Suffolk r z� EL 2910 1 I HOMEPORT ENGINEERING SHALL NOT BE RESPONSIBLE FOR THE CONSTRUCTION MEANS & METHODS U1ILJZED • m 3 PATIO �� hours � I BY THE CONTRACTOR, NOR FOR THE SAFETY OF THE PUBLIC OR CONTRACTOR'S EMPLOYEES. THE ENGINEER CO • Pool PATIO GRADE 1' 1 6 nu ACCORDANCE WITH THE SHALL NOT BE RESPONSIBLE FOR THE FAILURE OF THE CONTRACTOR TO CARRY OUT THE WORK IN } O SUFFOLK COUNTY DEPARTMENT OF HEALTH'S STANDARDS AND REGULATIONS. >_ a I� n m S D ASSOCIATED _ advance, � � III � � � � CONTRACTOR SHALL NOTIFY THE ENGINEER PRIOR TO BACKflLLING OF ALL STRUCTURE AN � N N Nm m� w•W X l N m D PIPING. o < A 1", 5 POOL , ,0 MA4NT'ANN'.10'BETWEEN » a � S CD SANITARY AND WATER „ .�. „, » .Z � LINES , • wm��� m w-, wN I�. Z Y � Na - a EXCAVATION INSPECTIONREQUIRE01 LFOR i m A ,. 4�-PROP,1000 SEPTICTANKALPRECAST p_^ N"lui COUNTYE AR W O HEALTH H SERVICES AR'"�' TA �i 4n q.. UV:.wmm, -�°" SEPTICTANKFOR r� N OL SEASONAL POOL HOUSE APPROVAL �O' ^�1C'IP;U TION FOR A 4 By T '_II IIC�EPA�4'�W�f � T m�g �'uMrr+ ,,, PRROP$"X4 PRECAST �IIIM�W,,,3�...... d"^�u ��.,_0.� !U�VI,,m,"J� .�',"'.VI S� E DATE: LBACHING'P'OOL FOR POOL HOUSE SEASONAL PO&HOU$�,,. SCALI eLza•a VACANT FUTURE'.EXPANSION � - R-25-1155 DESIG 5AN ITARY 51TE PLAN s 79. 25' 15' W NOWORFORMERLY 120.0' DATE 7/22/2025 4. - ..MV o. 1 SHEE SCALE= I :30 Q. MERLO TRAMINER LLC m D i n I irof sio mall�Ceir.ilfhncaaloon IITN.Nlaann°Nab. A���� �� � aq UA �00 L 0 3,0' 60" SnNl�irannT P.E.�alr R.A.S N�r�.ufua;��1uN it �i "" � pan II Na 6� I"he Ianslaa�9�a flo n wind Construction a�af�the Siewaa&, ,(��H;jposa l Systermn � � RE FIREE ��.A�' ' ROM DATE OF'APPROVAL