HomeMy WebLinkAbout50123-Z ho�aof SOUTyo`o Town of Southold
* * P.O. Box 1179
2� �0 53095 Main Rd
����ou►m.`' Southold, New York 11971
CERTIFICATE OF OCCUPANCY
No: 46358 Date: 07/31/2025
THIS CERTIFIES that the building Wireless Modifications
Location of Property: 21855 CR 48 Cutchogue, NY 11935
Sec/Block/Lot: 96.4-19.1
Conforms substantially to the Application for Building Permit heretofore, filed in this office dated: 11/17/2023
Pursuant to which Building Permit No. 50123 and dated: 07/31/2025
Was issued, and conforms to all of the requirements of the applicable provisions of the law.
The occupancy for which this certificate is issued is:
Modification to existing wireless communication facility for T-Mobile as applied for.
The certificate is issued to: Jax Post LLC
Of the aforesaid building.
SUFFOLK COUNTY DEPARTMENT OF HEALTH APPROVAL:
ELECTRICAL CERTIFICATE: 50123 02/28/2025
PLUMBERS CERTIFICATION:
Aut or zed Signature
TOWN OF SOUTHOLD
BUILDING DEPARTMENT
y x TOWN CLERK'S OFFICE
"o • SOUTHOLD, NY
y�ol
,BUILDING PERMIT
(THIS PERMIT MUST BE KEPT ON THE PREMISES
WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS
UNTIL FULL COMPLETION OF THE WORK AUTHORIZED)
Permit#: 60123 Date: 12/13/2023
Permission is hereby granted to:
Junge, Arthur
6 Tulane Rd
Glen Cove, NY 11642
To: Modify an existing wireless communication facility to upgrade the existing T-Mobile
antennas and ground equipment as applied for as per Planning approvals.
At premises located at:
21855 CR 48, Cutchogue
SCTM #473889
Sec/Block/Lot# 96.-1-19.1
Pursuant to application dated 11/17/2023 and approved by the Building Inspector.
To expire on 6/13/2025.
Fees:
WIRELESS COMMUNICATIONS -MODIFICATIONS $500.00
ELECTRIC $150.00
CO-COMMERCIAL $100.00
Total: $750.00
Building Inspector
�NofSO& TOWN OF SOUTHOLD
BUILDING DEPARTMENT
• TOWN CLERK'S OFFICE
SOUTHOLD, NY
BUILDING PERMIT
RENEWED
(THIS PERMIT MUST BE KEPT ON THE PREMISES
WITH ONE SET OF APPROVED PLANS AND SPECIFICATIONS
UNTIL FULL COMPLETION OF THE WORK AUTHORIZED)
Permit#: 44232 Date: 09/30/2019
Permission is hereby granted to: Renewal Date: 05/29/2025
Jax Post LLC
6 Tulane Rd
Glen Cove, NY 11542
To:
Existing wireless communication modification:T-Mobile (3) new antennas, (3) Remote units&(1)
hybrid cable as applied for.
Premises Located at:
21855 CR 48, Cutchogue, NY 11935
SCTM#96.-1-19.1
Pursuant to application dated 07/26/2019 and approved by the Building Inspector.
To expire on 03/31/2021.
Contractors:
Fees:
Renewal Fee $225.00
Total $225.00
Building Inspector
pF SOUr�QI
0
Town Hall Annex Telephone(631)765-1802
54375 Main Road
P.O.Box 1179 G • Q
Southold,NY 11971-0959 �Q
UNT`1,�
BUILDING DEPARTMENT
TOWN OF SOUTHOLD
CERTIFICATE OF ELECTRICAL COMPLIANCE
SITE LOCATION
Issued To: Arthur Junge
Address: 21855 Cr 48 City: Cutchogue St: NY Zip: 11935
Building Permit#: 50123 Section: 96 Block: 1 Lot: 19.1
WAS EXAMINED AND FOUND TO BE IN COMPLIANCE WITH THE NATIONAL ELECTRIC CODE
Contractor: Electrician: Milicia Electric Corp. License No: 5244ME
SITE DETAILS
Office Use Only
Indoor F Basement r Service I— Solar F
Outdoor 1st Floor (— Pool r Spa 17
Renovation 1- 2nd Floor I— Hot Tub (- Generator F
Surrey ri Attic Garage Battery Storage [—
INVENTORY
Service 1 ph 1- Heat Duplec Recpt Ceiling Fixtures Bath Exhaust Fan
Service 3 ph [- Hot Water GFCI Recpt Wall Fixtures Smoke Detectors
Main Panel A/C Condenser Single Recpt Recessed Fixtures CO Detectors
Sub Panel A/C Blower Range Recpt Ceiling Fan Combo Smoke/CO
Transfer Switch UC Lights Dryer Recpt Emergency Strobe Heat Detectors
Disconnect Switches 4'LED Exit Fixtures
Other Equipment: 6160 Cabinet w/ 125A Feed
Notes: Wireless
Inspector Signature: X Date: February 28, 2025
Sean Devlin
Electrical Inspector sean.deviin(aD-town.southold.ny.us
21855CR486160Cabinet
�O�aOF SOUTyo� --
} # TOWN OF SOUTHOLD BUILDING DEPT.
`yco 631-765-1802
Sloy�
INSPECTION
[ ] FOUNDATION 1ST [ ] ROUGH PLBG.
[ ] FOUNDATION 2ND [ ] SULATION/ HULKING
[ ] FRAMING /STRAPPING [ FINAL ��✓ P,d�
[ ] FIREPLACE & CHIMNEY [ ] FIRE SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION [ ] FIRE RESISTANT PENETRATION
[ ] ELECTRICAL (ROUGH) [ ] ELECTRICAL (FINAL)
[ ] CODE VIOLATION [ ] PRE C/O [ ] RENTAL
REMARKS:
-� wv W�Al
DATE INSPECTO
#a0F SOUTya# i <2,1
Tr WN THOLD ILDING DEPT.
O SOU
631-765-1802
INSPECTION
[ ] FOUNDATION 1 ST/ REBAR [ ] ROUGH PLBG.
[ ] FOUNDATION 2ND [ ] INSULATION/CAULKING
[ ] FRAMING /STRAPPING [ ] .FINAL
[ ] FIREPLACE & CHIMNEY [ ] FIRE.SAFETY INSPECTION
[ ] FIRE RESISTANT CONSTRUCTION. [ ] FIRE RESISTANT PENETRATION -
[ ] ELECTRICAL (ROUGH) ELECTRICAL (FINAL)
[ ] CODE VIOLATION 141 PRE C/O [ ] RENTAL
REMARKS: l e
DATE INSPECTOR
TOTALLY COMMITTED.
July 22, 2025
Town of Southold E C E n W E
Building Department `� U
54375 Route 25
Southold, NY 11971 J U L 2 8 2025
Subject: Certificate of Compliance Building Department
T-Mobile Wireless Site Number: 1_113544A Town of Southold
Building Permit Numbers: 44232 and 50123
Crown Site Number: 806579
Site Address: 21855 Country Road
Southold, NY 11935
Dear Inspector,
In accordance with the New York State Building Code, TKK Engineering DPC has performed a final
inspection of the T-Mobile Wireless equipment upgrade at the above-referenced location. The
purpose of the inspection was to establish compliance of the completed project with applicable
provisions of the State Building Code and the approved design plans entitled "NY Cutchogue 958280",
Site No: L113544A, dated 09/28/2023.
The scope of work consisted of removing (6)antennas, (2)ground equipment cabinets and installing
(6)Antennas, (3)RRHs, and (2)ground equipment cabinets.
Based on visual observations of the T-Mobile Wireless equipment upgrade, I have determined that all
proposed improvements have been installed in accordance with the State Building Code and the
documents submitted to the city and are substantially complete.
Respectfully submitted,
TICK Engineering DPC
of Nz
CO
2�F0 09197
AROFfSS IONS'\
Krupakaran Kolandaivelu, P.E.
VP of Fnainaarinrr
6095 Marshalee Drive + Suite 300 + Elkridge,MD 21075 + www.networkbuilding.com
5n�a�
MAILING ADDRESS:
PLANNING BOARD MEMBERS o�*�F SQ�ryOl Southold,M old, NY 11971
Chairman ~
t [ OFFICE LOCATION:
MIAJEALOUS-DANK y Town Hall Annex
PIERCE RAFFERTY G. �Q 54375 State Route 25
MARTIN H.SIDOR ��� (cor. Main Rd. &Youngs Ave.)
DONALD J.WILCENSIG y�'DUNT`I, Southold, NY
Telephone: 631 765-1938
www.southoldtownny.gov
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
MEMORANDUM
To: Michael J. Verity, Chief Building Inspector
From: Heather M. Lanza, AICP, Planning Director
Date: April 28, 2025
Re: Planning Department Report
Wireless Upgrade: T-Mobile at Junge
21855 Country Road, Cutchogue
SCTM#1000-96.-1-19.1
The Planning Board has found that the requirements of the above-referenced T-Mobile
modifications and up-grades have been completed based on the site inspection made
April 24, 2025. The improvements are in compliance with the General Requirements of
§280-70 and the Planning Department Report dated December 13, 2023; therefore, we
recommend a Certificate of Occupancy be issued for this application.
Thank you for your cooperation.
' APR 2 8 2025
LELD INSPECTION REPORT DATE COMMENTS
v 'ro
FOUNDATION (IST)
--------------------------------
C
FOUNDATION (2ND)
z
O
_ H
ROUGH FRAMING&
PLUMBING
1
r
t�
INSULATION PER N.Y. H
STATE ENERGY CODE
f�
FINAL
L
I
r•
ADDITIONAL COMMENTS\
0
QLZV1QninjinAd• f rn
b
x
d
ro
H
Now
TOWN OF SOUTHOLD—BUILDING DEPARTMENT
Town Hall Annex 54375 Main Road P. O. Box 1179 Southold,NY 11971-0959
Telephone(631) 765-1802 Fax (631) 765-9502 hgps://www.southoldtownny.gov
Date Received
APPLICATION FOR BUILDING PERMIT
For Office Use Only PERMIT NO. O Building Inspector: NOV I q 1-7
2023
App(icatr�rts and fnrrras niut be filled auk in the►r entirety Incomplete 3
L Duilding Department
appticattbns wilC nit lae accepted{11�1here-the Applicant is tfat ttie avuner an o 'Town of Southold
Qwner�`s Au�`horix�tadri foirsrr>i 4p�g��?1 shail�oe�camptetecf �' ,i ����x ���n����
4
Date:
Name:Arthur V. Jungetand Valerie Lassen SCTM#i000-096-00-01-00-019-001
Project Address:21855 County Road,Cutchogu,e
Phone#: Email:
Mailing Address:6 Tulane Rd, Glen Cove, NY 1 1 542-201 0
Name:Marie Russo/Highlander,Consultants Inc
Mailing Address:155 Carleton Ave, East. Islip, NY 11730
Phone#:516-810-1117 Email:mrusso ha?.._.ig hlanderinc.com
«..,.. ., 1. ...
Name TKK Engineering r
Mailing Address:6095' Marshalee Dr, Elkridge,. MD 21075
Phone#:410-712-7092 Email:
,..�,: Ms.,. � .,,, ,r.v. •.::k .._ .s,rtik_.s`=i .�`,,,..�. ., '-�.:: '... ...tx. .�,.��,€s '` �._ � e a i��.,x �5,,,,�� s: a
Name Comcell Construction Corp.w .
Mailing Address:1373 Lincoln Ave, Holbrook, NY„w11741
Phone#:631-654-5915 Email:MikeA@com cell corn
❑New Structure ❑Addition ®Alteration ❑Repair ®Demolition Estimated Cost of Project:
20therupgrade to cell site per attached plans $
Will the lot be re-graded? ❑Yes RNo Will excess fill be removed from premises? ❑Yes RNo
1
PROPER-TV INFORMATION
Existing use of property:communications Intended use of property:Coi°1 munications
Zone or use district in which premises is situated: Are there any covenants and restrictions with respect to
this property? OYes®No IF YES,PROVIDE A COPY.
N Check Brix After Reading: The owner/contractor/design.professional is responsible for-all drainage and stonn water.issues as provided by
Chapter23liof the'rown Code,APPLICATION IS.HEREBY MADE to the Building Department for the issuance of 0,Building Permitpursuanttothe Building Zone
Ordinance of the Town of Southotd;;Suffolk,tounty,Neal York and other applicable Laws,Ordinances or Regulations,forthe construction.of buildings,
additions,alterations or for removal or demolition as herein described.The applicant agrees to complyavith all`applicable twos,ordinances,building code,
housing code and regulations and to admit'authorized inspectors on,premises and.la buildings)for necessary inspections.False statements made herein are
punishable as a Class-A misdemeanorpursuant to Section 210AS ofthe New York State Penal Law
Application Submitted By(print name):Merie Russo ®Authorized Agent ❑Owner
Signature of Applicant: Date:
STATE OF NEW YORK)
SS:
COUNTY OF Suffolk
Marie Ru So being duly sworn,deposes and says that(s)he is the applicant
(Name of individual signing contract)above named, ,
(S)he is theAgent for T-Mobile Northeast LLC
(Contractor,Agent,Corporate Officer,etc.)
of said owner or owners,and Is duly authorized to perform or have performed the said work and to make and file this
application;that all statements contained in this application are true to the best of his/her knowledge and belief;and
that the work will be performed in the manner set forth in the application file therewith.
Sworn before me this
day of .20
Notary Public
PROPERTY OWNER AUTHORIZATION
(Where the applicant is not the owner)
Arthur V.Junge,by Crown Castle
Towers 09 LLC,his attorney-in-fact,by
I, Jenifer Bachi residing at 909 Cedar Lane,Norristown,PA
do hereby authorize Marie .Russo to apply on
my b o T wn of Southold Building Department for approval as described herein.
iIJ11A 11/6/23
Own gnature Date
Arthur V. Junge,by Crown Castle Towers 09 LLC,his attorney-in-fact,by Jenifer Bachi,Site Acquisition Speci 'st
Print Owner's Name
2
ECEpv L
Q
FEB 1 1
S�EFp(�c BUILDIN DEPARTMENT- Electrical Inspector
Building pepartm id TOWN OF SOUTHOLD
i'o of Southold
co '` own Hall Annex- 54375 Main Road - PO Box 1179
o • Southold, New York 11971-0959
'jfj0 ap! Telephone (631) 765-1802 - FAX (631) 765-9502
iamesha-southoldtownny.gov— seand(@-southoldtownny.aov
APPLICATION FOR ELECTRICAL INSPECTION
ELECTRICIAN INFORMATION (All Information Required) Date: 02/11/2025
Company Name: Milicia Electric Corp.
Electrician's Name: Frank Milicia
License No.: 5244ME Elec. email:jlavalle@miliciaelectric.com
Elec. Phone No: 631-694-0751 01 request an email copy of Certificate of Compliance
Elec. Address.: 87 Eads Street, West Babylon, NY 11704
JOB SITE INFORMATION (All Information Required)
Name: T-Mobile L113544A
Address: 21855 CR 48, Cutchogue, NY 11935
Cross Street: Cox Lane and Church Lane
Phone No.: 516-523-5991
Bldg.Permit#: 50123 email: chris.ross@completedevs.com
Tax Map District: 1000 Section:96 Block: 1 Lot: 19.1
BRIEF DESCRIPTION OF WORK, INCLUDE SQUARE FOOTAGE (Please Print Clearly):
125A feed to cellular equipment cabinet
Square Footage:
Circle All That.Apply:
Is job ready for inspection?: ❑� YES ❑ NO ❑Rough In 0 Final
Do you need a Temp Certificate?: ❑ YES ❑� NO Issued On
Temp Information: (All information required)
Service Size❑1 Ph❑3 Ph Size: A # Meters Old Meter#
❑New Service❑Fire Reconnect❑Flood Reconnect❑Service Reconnect❑Underground❑Overhead
# Underground Laterals 1 FJ2 H Frame Pole Work done on Service? Y N
Additional Information:
PAYMENT DUE WITH APPLICATION �° i
� CIEpv 11;
FEB
11 2025
� �1�FEpL.1,cO BUILDINf DEPARTMENT- Electrical Inspector
�
O , Building ),partroen TOWN OF SOUTHOLD
Tow of Southold
own Hall Annex- 54375 Main Road - PO Box 1179
Southold, New York 11971-0959
oy,�Od wt.
Telephone (631) 765-1802 - FAX (631) 765-9502
amesh(@.southoldtownny.gov — seanda_southoldtownny.aov
APPLICATION FOR ELECTRICAL INSPECTION
ELECTRICIAN INFORMATION (All Information Required) Date: 02/11/2025
Company Name: Milicia Electric Corp.
Electrician's Name: Frank Milicia
License No.: 5244ME Elec. email:jlavalle@miliciaelectric.com
Elec. Phone No: 631-694-0751 211 request an email copy of Certificate of Compliance
Elec. Address.: 87 Eads Street, West Babylon, NY 11704
JOB SITE INFORMATION (All Information Required)
Name: T-Mobile LI13544A
Address: 21855 CR 48, Cutchogue, NY 11935
Cross Street: Cox Lane and Church Lane
Phone No.: 516-523-5991
Bldg.Permit#: 50123 email: chris.ross@completedevs.com
Tax Map District: 1000 Section: 96 Block: 1 Lot: 19.1
BRIEF DESCRIPTION OF WORK, INCLUDE SQUARE FOOTAGE (Please Print Clearly):
125A feed to cellular equipment cabinet
Square Footage:
Circle All That Apply:
Is job ready for inspection?: 0 YES❑ NO ❑Rough In ❑✓ Final
Do you need a Temp Certificate?: ❑ YES F&_/�NO Issued On
Temp Information: (All information required)
Service Size❑1 Ph❑3 Ph Size: A # Meters Old Meter#
❑New Service❑Fire Reconnect❑Flood Reconnect❑Service Reconnect❑Underground❑Overhead
# Underground Laterals 0 1 n2 H Frame Pole Work done on Service? Y MN
Additional Information:
PAYMENT Dl7>E`11UI.TH APPLICATION
PERMIT# Address:
Switches
Outlets
GFI's
Surface
Sconces
H H's
UC Lts Fridge HW POOL
Fans Mini Fr. WAD Panel
Pump
Exhaust Oven Sump Heater
Trnsfmr
Smokes DW Generator Salt Gen.
Carbon Micro GrbDis Water Bond
Lights
Heat Pucks ERV
HOT TUB/SPA
Inst Hot DeHum Transfer Disc
Combo Cooktop Minisplit Blower
AC AH Hood Blower
Service Amps Have Used
Sub Amps Have Used
Comments
MAILING ADDRESS:
PLANDONALD O J.� Southold,D MEMBERS OQf so P.O. ox 1179
NY 1 971
Chair
OFFICE LOCATION:
JAMES H.RICH III y Town Hall Annex
MARTIN SIDOR �� 54375 State Route 25
PIERCE RAFFERTY 0 (cor. Main Rd. &Youngs Ave.)
AMELIA JEALOUS-DANK COU Southold,NY
Telephone: 631 765-1938
www.southoldtownny.gov
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
MEMORANDUM
"' , DEC 1 3 2023
To: Michael J. Verity, Chief Building.Inspector r�
Tf
From: Heather M. Lanza, AICP, Planning.Director'�V •
Date: December 13, 2023
Re: Planning Department Report
Wireless Upgrade: T-Mobile at Junge
21855 Country-Road; Cutchogue
SCTM#1000-96.-1-191.1
The Planning Department has conducted a review of the proposed upgrade to an
existing wireless communication facility pursuant to §280-74 B (2). The proposal is to
upgrade the existing T-Mobile antennas and ground equipment at the site referenced
above.
We have received a report from our wireless:technical consultant, CityScape Inc.
(attached), which recommends the upgrades be_approved as proposed,.
In addition, the proposal is.in compliance with the General Requirements of§280770,
complies with §280-71 (A)(2)(b) as it causes essentially no visible change to the
exterior,'and the base station equipment conforms with §280-71(A)(2)(a)[2]. Therefore,
site plan review by the Planning Board is not required.
We recommend a Building Permit be issued for-'this application as soon as possible to
meet the Federal shot clock for approvals of wireless facilities. No further review is
required from Planning for this upgrade.
Thank you for your cooperation.
Laserfiche File: Planning Department/Applications/Site Plans (SP)/Pre-
submission/1000-96.4-19.1 (3)
MAILING ADDRESS:
PLANNING BOARD ME:X1-3ERS ��®f SQ P.O. Box 1179
P.O.
/ Southold,NY 11971
DONALD J.WILCENSKI �® �®
Chair
' OFFICE LOCATION:
JAMES H. RICH III Town Hall Annex
MARTIN SIDOR �® 54375 State Route 25
PIERCE RAFFERTY ®��, (cor.Main Rd. &Youngs Ave.)
AMELIA JEALOUS-DANK CO ,� Southold, NY
Telephone: 631 765-1938
E �jr ll �: www.southoldtownny.gov
' PLANNING BOARD OFFICE
DEC 2 7 2023 'L;J;
TOWN OF SOUTHOLD
MEMORANDUM "
To: Michael J. Verity, Chief Building Inspector
V
From: Heather M. Lanza, AICP, Planning Director'
Date: December 13, 2023
Re: Planning Department Report
Wireless Upgrade: T-Mobile at Junge
21855 Country Road, Cutchogue
SCTM#1000-96.-1-19.1
The Planning Department has conducted a review of the proposed upgrade to an
existing wireless communication facility pursuant to §280-74 B (2). The proposal is to
upgrade the existing T-Mobile antennas and ground equipment at the site referenced
above.
We have received a report from our wireless technical consultant, CityScape Inc.
(attached), which recommends the upgrades be approved as proposed.
In addition, the proposal is in compliance with the General Requirements of§280-70,
complies with §280-71 (A)(2)(b) as it causes essentially no visible change to the
exterior, and the base station equipment conforms with §280-71(A)(2)(a)[2]. Therefore,
site plan review by the Planning Board is not required.
We recommend a Building Permit be issued for this application as soon as possible to
meet the Federal shot clock for approvals of wireless facilities. No further review is
required from Planning for this upgrade.
Thank you for your cooperation.
Laserfiche File: Planning Department/Applications/Site Plans (SP)/Pre-
submission/1000-96.4-19.1 (3)
Town of Southold, New York cHyscape
C O N S U L T A N T S , I N C
Telecommunications Site Review 2423 S.Orange Ave#317
Modification Application Orlando,FL 32806
Tel:877.438.2851 Fax:877.220.4593
December 11, 2023 RECEIVED
Mara Cerezo, Planner
Town of Southold Annex Building DEC 122023
54375 Main Road Southold Town
Southold,NY 11971 Planning Board
PROVIDERAD/NAME: T-Mobile/LI13544A/Cutchogue
TOWER OWNER/ID/NAME: Crown Castle/BU#806579/NY Cutchogue 958280
ADDRESS: 21855 Country Road 48, Cutchogue,NY 11935
LATITUDE: 41° 1' 56.29"N LONGITUDE: -72'29' 50.29"W
SCTM#: 1000-96-1-19
Dear Ms. Cerezo,
At your request, on behalf of the Town of Southold("the Town"), CityScape Consultants,
Inc. ("CityScape"), in its capacity as telecommunications consultant for the Town,has considered
the merits of the above-referenced application submitted on behalf of T-Mobile ("Applicant") to
modify its equipment on an existing one hundred eight-foot, eleven-inch (108' 11") monopole
tower(126' 5" at top of highest appurtenance). The tower is owned by Crown Castle and located
at 21855 Country Road 48, Cutchogue,New York,see Figure 1.
Support Structure&Equipment
Per the submitted construction drawings (CDs)' the Applicant proposes to remove six (6)
antennas and three (3) tower mounted amplifiers and add six (6) antennas and three (3) remote
radio units (RRUs) as detailed in the table below. All work will be done at the ninety (90) foot
(centerline of the antennas) elevation of the tower,see Figures 2 and 3.
TOWER MOUNTED EQUIPMENT
# FINAL Configuration
9 Antennas:3)APXVAARR24_43-U-NA20;3)VV-65B-R1;3)AIR 6419 1341
3 RRUs:3)4460 132/1325 1366;3)4449 B71 B85A
9 Cables:6)1-5/8"coax;3)1-5/8"hybrid
Also proposed,are the removal of two(2)cables to be replaced with three(3)hybrid cables
connecting the tower mounted equipment to the ground equipment. All other ground work is
minimal and any equipment connections will take place within existing cabinets in the existing
lease area,see Figure 4.
I CDs prepared by NB+C(TKK Engineering DPQ Rev 0,dated 09/28/23,signed and sealed by a New York
registered Professional Engineer.
Town of Southold—SCTM#1000-96-1-19 Ckyscape
T-Mobile/LI13544A
Page C ON S U L T ANTS . I N C.
Structural Analysis
The Applicant submitted a Structural Analysis Report prepared by Morrison Hershfield,
dated September 6,2023. The report used TIA-222-H,Risk Category II and Exposure Category C
standards and concluded,the tower and its foundation have sufficient capacity to carry the existing
and proposed load configuration without modification. The max structure rating is 79.3% out of
an allowable 105%which is determined to be structurally compliant,see Figure 5. It is shown that
all lines for this proposed modification are inside the monopole, however it is noted that lines to
the one hundred seven (107) foot level are shown to be outside the monopole but those are not
related to this application,see Figure 6.
RF Exposure Safety
To verify RF exposure safety, a Radio Frequency-Eletromagnetic Energy (RF-EME)
Compliance Report, prepared by Pinnacle Telecom Group, dated December 4, 2023 was
submitted, see Figure 7. The report is an analysis of the predicted RF exposure levels of the
existing providers on the tower. This analysis takes into account the RF effects of the Applicant's
along with AT&T, Metro PCS and Verizon Wireless showing existing antenna operations at the
site. At street level, at the site, the maximum RF calculations is 27.9859% of the FCC general
population MPE limit which is well below the allowable limit for compliance.
The results of the FCC RF compliance assessment in this case are as follows:
❑ At street level,the conservatively calculated maximum RF level from the
combination of proposed and existing antenna operations at the site is
V.9859 percent of the FCC general population MPE limit—well below the
100-percent reference for compliance. In other words, the worst-case
calculated RF level — intentionally and significantly overstated by the
calculations—is still more than three times below the FCC limit for safe, ,
continuous exposure of the general public.
❑ The results of the analysis provide a clear demonstration that the RF levels
from the combination of proposed and existing antenna operations will
satisfy the criteria for controlling potential human exposure to RF fields,and
the antenna operations will be in full compliance with the FCC regulations
and limits concerning RF safety. Moreover, because of the conservative
methodology and operational assumptions applied in the analysis, RF
levels actually caused by the antennas will be even less significant than the
calculation results here indicate.
Town of Southold—SCTM#1000-96-1-.19 CRYScape
T-Mobile/LI13544A
Page CON SULTANTS , INC".
i
Summary Approval Recommended
CityScape verified this application to be an eligible facilities request and meets the
definition of a non-substantial change ("substantial change" being defined in 47 CFR
§1.6100(b)(7) of the FCC Rules). Therefore, this application qualifies for streamlined processing
at staff level under 47 CFR §1.6100(c) and CityScape recommends approval of the application.
I certify that, to the best of my knowledge, all the information included herein is accurate
at the time of this report. CityScape only works for public entities and has unbiased opinions. All
reviews are based on technical merit without prejudice per prevailing laws and codes. Regarding
the structural analysis reports, CityScape verified that the proposed appurtenances shown by
Applicant's construction drawings were listed in the structural reports, but did not.independently
verify the calculations, statements or the appropriateness of the analysis criteria contained therein.
Town staff should verify compliance with applicable building and fire codes prior to issuance of a
permit for this modification.
Respectfully submitted,
Elizabeth Herington-Smith
Engineering Manager
CityScape Consultants, Inc.
Town of Southold-SCTM#1000-96-1-19 cKyscape
T-Mobile/LI13544A
Page 4 CON S U LTA N T S , I NC .
r
t
i -
i
t
r � t
r
Figure 1 -Site Location Map
Town of Southold—SCTM#1000-96-1-19 CkyScape
T-Mobile/LI13544A
Pages C ON S U L T A N T S , I N C.
T-MOBILE EQUIPMENT
ANTENNA CL•90 TOP OF HIGHEST APPUERTENANCE A T
MOUNT C-8B
ELEV.- 126'-5'
[ANY AND ALL TOWER
MOUNTED EQUIPMENT MUST
NOT TRAP OR INTERFERE W/
EXISTING SAFELY CLIMB -
I
TOP Oi MONOPOLE
ELEV.- IDB'-6'
EXISTING
ELEV.
EXISTING MCL
ELEV.- 10776'
NEW T-MOBILE EQUIPMENT
3 ERICSSON-AIR 6419 1141 ANTEN TOP OF T-MOBILE ANTENNA
J COMMSCOPE-W-659-RI AMEN
S)ERICSSON-4450 B2/B25 066 RR ELEV, 94'-0'
INSTALLED ON EXISTING MOUNTSM
1 ,I E%ISPNG T-MOBILE ACL
ELEV,m 90'-0'
(E)T-MOBILE EQUIPMENT _ _ BOTTOM OF T-MOBILE ANTENNA A
(3)RFS(- ERICSSON 4449 BL71 BBSAENNA R-111 _ _ ELEV..8'-0'
INSTALLED ON EXISTING MOUNTS
E%ISTING MCL A
ELLV..78'-0'
E%ISTING MCL A
(
(
I
)
)
(
(
(
(
(
(E) 108'-6'MONOPoLE )
I
NEW 7-MOBILE FEEDLINE
(3)HYBRID CABLE(1-5/87
(E)T-MOBILE FEEOUNES
(6)COAX CABLES(1-5/8")
i I
52.5 FT AMSL
Figure 2—Elevation Drawing of Structure
Town of Southold-SCTM#1000-96-1-19 CkyScape
T-Mobile/LI13544A
Page CONSULTANTS INC .
/ S(E_)-T_---MOBLE ANTENNA TO BE REMOVED
AI 20,AZIMUTH C3 TOTAL,-AIR21 KRC118023-1-02A94P
(3 TOTAL,I PER SECTOR)
A2 (E)T-NOBILE AMENNA TO BE REMOVED
E IGSSON-NR21 KRCIIS023-1-.B2P_84A
I (3 TOTAL 1 PER SECTOR)
A3
C4
}
A4
(E)T-MOBILE ANTENNA TO REMAIN
RFS-APXVMRR24_43-U-NA20
(3 TOTAL.I PER SECTOR)
1
I
1 ILU
CS (111 1111.1 1 11
(GAMMA)
260'AZIMUTH
(E)108'-6'MONOPOLE-------C2 `\
B2
(BETA)
140 AZIMUTH
(E)PLATFORM MOUNT TO REMAN B3 \
CI
TPo)N STYLE IS AAWS�BE REMOVED
(3 TOTAL.1 PER SECTOR)
EXISTING ANTENNA LAYOUT 'NI
2 SCALE: NOT TO SCALE
At / (M T-MOBILE ANTENNA
MMSCOPE-W-658-111
(3 TOTAL 1 PER SECTOR)
A2 (ALPHA)
20'AZIMUTH
(N)T-MOBILE RRH
ERICSSON-4460 82/325 866
C4 III 2'>f A3 (3 TOTAL 1 PER SECTOR)
A4
T-MOBILE ANTENNA
RFS-AP kV AARR24_43-U-NA20 r
(3 TOTAL.1 PER SECTOR) /
C3
1
B7
(GAMMA)
_ "0'AZIMUTH
(E)108'-6-MONOPOLE- ,\
C2
E12
(N)T-MOBILE ANTENNA
14V AZIMUTH (3 TOTAL.
-AIR SEC 841
(3 TOTAL 1 PER SECTOR)
(E)PLATFORM MOUNT-� - 83 \
C7
84
3 FINAL ANTENNA LAYOUT N
SCALE: NOT TO SCALE
��� (
Figure 3—Existing and Proposed Antenna Configuration
Town of Southold—SCTM#1000-96-1-19 ckyscape
T-Mobile/LI13544A
Pagel C O N S U L T A N T S I N C.
(E) T—MOBILE
6'-9'x16=-10'
EQUIPMENT PAD
Q
Q Q Q +
F + + + 441 + @ +
+ + f
Q N + + +
Q Q Q Q + + +
+ + +
Q + + +
Q + + +
+ + +
1)T-MOBILE CABINET + + +
ERICSSON - 6160
+ _}. (E) T-MOBILE FEEDLINES TO B
ra '" + + I (2) HYBRID CABLES
NEW T-MOBILE FEEDLINE
+ (3) HYBRID CABLES (1-5/
3'-4"± + F
(E) T-MOBILE FEEDLINES
+ (6) COAX CABLES (1-5/8
Q Q' } } + 1 f + (E) T-MOBILE ICE
OBILE BATTERY CABINET BRIDGE t18'-O"
ERICSSON - B160 O i ) +
+ }I +
Q + 1 +I +
I `:
+ f- I+ +
3,_7„t s + 1 +1 + -I- +
Q
j
+ 1 + I + + + + +
Q + FI I{ - + +---r +_�.
,I U
+ 1+ 1\ + +--T +. ��— +
• Q \�`� him + + +
Q Q
Q Q
aF1
I
UPGRADE CABINET BREAKER-
TO 15OAMP, 2-POLE BREAKER
Q t a
i
I Q
I
Figure 4—Existing and Proposed Ground Configuration
Town of Southold-SCTM#1000-96-1-19 Ckyscape
T-Mobile/LI13544A
Page C ON S U L T ANTS , I N C.
m�
Date: September 06,2023 MORRISON HERSHFIELD
Morrison Hershfield
1455 Lincoln Parkway,Suite 500
Atlanta,GA 30346
(770)379-8500
Subject. Structural Analysis Report
Carrier Designation: T-Mobile Co-Locate
Site Number: L113544A
Site Name: Cutchogue
Crown Castle Designation., BU Number: 806579
Site Name: NY Cutchogue 958280
JDE Job Number: 2100709
Work Order Number: 2255576
Order Number: 656006 Rev.0
Engineering Firm Designation: Morrison Hershfield Project Number. CN7-595R2/2300001
Site Data: 21855 Country RD,Cutchogue,Suffolk County,NY 11935-
Latitude 410 1'46.57",Longitude-720 29'50.29"
108.5 Foot—EEI Monopole Tower
Morrison Hershfield is pleased to submit this"Structural Analysis Report"to determine the structural integrity
of the above-meritioned tower.
The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we have
determined the tower stress level for the structure and foundation,under the following load case,to be:
LC7:Proposed Equipment Configuration Sufficient Capacity
This analysis utilizes an ultimate 3-second gust wind speed of 127 mph as required by the 2020 New York State.
Uniform Code. Applicable Standard references and design criteria are listed in Section 2-Analysis Criteria.
Respectfully submitted by:
OF NE`VY
p10E CpO�O,p
igitall ed by
G.Lance Cooke,P.E.(NY License No.89337) ` oke
Senior Engineer 08ate, .09.06
O 089339
v
9�FESSIONP
EXP 5/30125
tnxTower Report-version 8.1.1.0
Figure 5—Structural Analysis Cover Page
l
Town of Southold-SCTM#1000-96-1-19 ckyscape
T-Mobile/LI13544A
Page C ON S U L T ANTS , I N C .
GWOM wW
PM
((ona�m�amrt MOM ...so 'o'))na ooamom cawar-w a)n•caaR�
{i3,irm�mrtwa ���� pR rRiu
<(p+-�A'ro jai R urn • .: ')
f��/B'm m R 1lY6
\ 1
N � � °W� I 1 • OMMMEGUMM
iti VTLrdL
oim RiDU
areas a.WWm ro•a&C ersnim.
Figure 6—Feedline Placement Per Structural Analysis
i
Town of Southold—SCTM#1000-96-1-19 CHYSCape
T-Mobile/LI13544A
Page10 CONSULTANTS INC .
PINNACE TTEIECOM GROUP
Professional and Technical Services
roman c&Mft
ANTENNA SITE FCC RF COMPLIANCE
ASSESSMENT ANd REPORT ,
FOR MUNICIPAL SUbmISSION
PREPAREd FOR
ToMObi[E NORThEAST LLC
SITE LIM44A
21M COUNTRy RoAd
CUTChOqUE, NY
DECEMbER 4, 2023
14 RidgEdA1E AVENUE - SUITE 260 • CEdAR KNolls, NJ 07927 • 973,451.1630
Figure 7—RF Exposure Compliance Report Cover Page
W
GRANT OF EA
THIS GRANT OF EASEMENT (the "Easement") is ma a effective this day of
2013, by and between ARTHUR V. JUNGE"*("Grantor"), and CROWN
CASTLE TOWERS 09 LLC,a Delaware limited liability company ("Grantee").
�A�u In 'r1; 11 Q m��n 3S� '
1. Deseriptio_ n ofrantor s Proae G rky. Grantor is the owner o that cerfain lan�and
premises in Cutchogue, County of Suffolk, State of New York,by grant or conveyance described
in the Suffolk County Clerk's Office ("Clerk's Office") in Liber 10321, Page 162. The
description of said property is attached hereto as Exhibit"A"(hereinafter"Grantor's Property").
2. Description of Easement. For good and valuable consideration, the sufficiency of
which the parties hereby acknowledge, Grantor grants and conveys unto Grantee, its successors
and assigns, forever, an exclusive, perpetual easement for the use of a portion of Grantor's
Property, that portion being shown as the "Tower Easement" in the survey attached hereto as
Exhibit "B" and described as the "Tower Easement" by metes and bounds in Exhibit "C"
attached hereto (the "Easement Area"). The Easement Area shall also include (a)a perpetual
right-of-way for ingress and egress, seven days per week, twenty-four hours per day, on foot or
motor vehicle,including trucks, along a twenty foot wide right-of-way together with the right to
install, replace and maintain above and below ground utility wires, poles, cables, fiber, conduit
and pipes as more fully shown as the "20' Access;Easement" onAIR "B" and described as
the "20 Foot Wide Access Easement"on Exhibit"C" (the"Access Easement"), together with an
exclusive, perpetual right-of-way for the installation, replacement, and maintenance of utility
wires, poles,cables, conduits and pipes, in that location more particularly shown as the "Utility
Easement"in the survey attached hereto as Exhibit"B" and described as the "Utility Easement"
by metes and bounds in Exhibit "C"; (b)any portion of Grantor's Property on which
communications facilities exist on the date of this Easement (even if not described in the Lease
Agreement as that term is defined in Section 3 of this Easement). In the event Grantee or any
public utility is unable or unwilling to use the easements described in subsection (a)above,
Grantor hereby agrees to grant an additional right-of-way, in form satisfactory to Grantee, to
Grantee or at Grantee's request,directly to a public utility,at no cost and in a location acceptable
to Grantee.
3. Assignment of Lease Agreement. The parties hereby acknowledge (a) that
certain Option and Lease Agreement dated June 3, 1991, by and between New York SMSA
Limited Partnership, as lessee, and Grantor, as lessor, as amended by that Amendment to Lease
Agreement dated July 12,2005, a memorandum of which is recorded in Liber D00012412 Page
954 in the Clerk's Office; (b) that certain Site Lease with Option dated August 2, 2002,by and *I ber-P)321
between Grantor, as lessor, and Omnipoint Facilities Network 2, LLC, by Omnipoint 900P 1(p2
Communications, Inc.; (c)that certain N.Y. Land Lease Agreement dated November 29, 2004,
by and between Grantor, as lessor, and Cellular Telephone Company d/b/a AT&T Wireless, a ,
New York partnership, by LIN Cellular Communications Corporation, a New York corporation,
as lessee; and (d) that certain Communications Site Lease Agreement between MetroPCS New
York, LLC, as lessee, and Grantor, as lessor, last executed on July 16, 2009 (each a "Lease
Agreement" and collectively, the "Lease Agreements'), each said Lease Agreement being
attached hereto as Exhibit"D". The lessees under the Lease Agreements are hereinafter referred
to individually as "Lessee" and collectively as the "Lessees". As used herein, the term"Lease
NY Cutchogue
BU 806579 2
' r
Agreement" or "Lease Agreements" shall include any amendments or addendums to said
agreements. Simultaneously with entering into this Grant of Easement, Grantor and Grantee are
entering into separate assignment agreements to be recorded in the Registry by which Grantor
shall assign all of its right, title and interest in the Lease Agreements to Grantee (the
"Assignment"). Grantor warrants that Grantor has delivered to Grantee true and correct copies
of the Lease Agreements. To Grantor's best knowledge, no party to the Lease Agreements has
breached or is in default of its obligations under the Lease Agreements and no party has
requested or discussed a modification of the Lease Agreements (including a reduction in rent) or
termination now or in the future,
4. Grantor's Obtinations With Respect to the Lease Aareements. From and after
the date hereof and continuing until this Easement is terminated(if ever), Grantor shall not,other
than to the extent required herein or requested in writing by Grantee,exercise or enjoy any of the
rights or remedies of the lessor under the Lease Agreements. Grantor shall notify Grantee in
writing within five (5) calendar days of Grantor's receipt of any payment in respect of rent,
income, charges, interest, penalties, fees and other revenue payable by the Lessees, and Grantor
shall forward such payment to Grantee within said five(5)day period. In the event that Grantor
fails to forward to Grantee any payment as provided hereunder, Grantee shall have the right to
collect such payment from Grantor together with interest on such payment at the greater of the
(i)the rate provided by statute where the Easement is located or (ii) 12%per annum (calculated
from the date five(5)days after Grantor receives such payment until Grantor pays such sums due
to Grantee) and shall have a lien against Grantor's Property with respect thereto. Grantor shall,
however, continue to pay, perform,and otherwise discharge all obligations and liabilities of the
lessor under the Lease Agreements with respect to Grantor's Property, whether arising prior to,
on, or after the date hereof. Without limiting the generality of the foregoing, Grantor shall:
(a)fully, faithfully and timely perform all covenants to be performed by the Grantor under the
Lease Agreements; (b)promptly pay all mortgages, loans, liens, judgments and all real estate,
personal income and other taxes that may become due with respect to Grantor's Property;
(c)promptly execute, without any additional consideration, all letters of authorizations, permits,
applications or other documents required for Grantee to fully enjoy the Easement or the Lease
Agreements; (d)not suffer or allow any breach, default or event of default by the Grantor to
occur under the Lease Agreements; and (e)not take any action for the purpose of, or with the
effect of, inducing or causing the Lessees not to exercise a right to renew or extend the Lease
Agreements. Failure to comply,in whole or in part with this Section shall constitute a default by
Grantor of the terms hereof and entitle Grantee to the remedies provided in Section 15 of this j
Easement.
5. Permitted Uses, The Easement Area shall be used for constructing, maintaining
and operating communications facilities and energy generation facilities for energy to be used on
and off the Easement Area, including without limitation, tower structures, antenna support
structures, cabinets, meter boards, buildings, antennas, cables, equipment and uses incidental
thereto including those necessary for Grantee's compliance with its obligations under the Lease
Agreements (the "Permitted Use"). No facilities or structures installed or constructed on the
Easement Area by Grantee shall constitute a fixture, but shall remain the personal property of
Grantee. Grantor acknowledges that Grantor has no right to object to or approve any
improvements to be constructed on the Easement Area. If requested by Grantee, Grantor will
execute, at Grantee's sole cost and expense, all documents required by any governmental
NY Cutchogue
BU 806579 3
i
authority in.connection with any development of, or construction on, the Easement Area,
including documents necessary to petition the appropriate public bodies for certificates, permits,
licenses and other approvals deemed necessary by Grantee in Grantee's absolute discretion to
utilize the Easement Area for the Permitted Use Grantor agrees t�be ex,�pplicapt�
m^ a»-a—FrM- " m f"Y3" 4 eaIAT
r uested by Grantee �he� e i;tag � ' ss, r �
Qr a 'Cn antor shall be entitled to no further consideration with respect
to any of the foregoing matters. Grantor shall take no action that would adversely affect the
status of the Easement Area with respect to the Permitted Use.
6. Perpetual Easement. This Easement and Grantee's rights and privileges hereunder
shall be perpetual and may be terminated only as provided for herein.
7. Purchase Price, Down Payment and Installment Payments. The purchase price
for the rights and interest granted to Grantee pursuant to this Easement is One Million Eight
Hundred Seventy Thousand Dollars ($1,870,000.00) ("Purchase Price"). Upon full execution of
this Easement by both parties, Grantee shall pay a down payment on the Purchase Price in the
amount set forth in Exhibit "E" attached hereto (the "Down Payment"). Thereafter, Grantee
shall pay the_remainder of the Purchase Price in monthly installment payments (each an
"Installment Payment"). The due dates, amounts, and number of Installment Payments are set
forth in the payment schedule in Exhibit "E". Grantee shall have the right to pay off the
remaining balance of the Purchase Price(the"Payoff Amount") at any time,without premium or i
penalty, in accordance with the payment schedule in Exhibit "E", and upon payment of the
Payoff Amount, no further Installment Payments shall be due to Grantor. Grantor and Grantee
agree that all rights granted to Grantee in this Easement shall be fully vested in Grantee upon full
execution of this Easement by both parties even though the Purchase Price will be paid in
installments.
S. Grantee's.Rieht to Terminate. Grantee shall have the unilateral right,but not the
obligation, to terminate this Easement for any reason. Upon termination of this Easement, (i)if
the Lease Agreements are then in effect, the rights and obligations as lessor under the Lease
Agreements shall revert to Grantor, (ii)'Grantor may retain the Down Payment and any
Installment Payments paid to Grantor prior to such termination, (iii)Grantee shall be relieved of
any obligation to pay the remaining balance of the Purchase Price, and Grantee shall not owe any
Installment Payments due after the date of termination, and (iv)the parties shall have no further
obligations to each other;provided,however,that if Grantee installed any buildings, structures or
equipment upon the Easement Area, Grantee shall, within a reasonable time, remove all of its
building(s),tower and above ground property and restore the surface of the Easement Area to its
original condition prior to any such installment, reasonable wear and tear excepted. Any
buildings, structures or equipment installed or constructed upon the Easement Area by Lessees,
or those holding by, through and under Lessees, shall be subject to the terms and conditions of
the Lease Agreements. Said termination shall be effective upon Grantee providing written notice
J
of termination to Grantor.
9. Hazardous Materials.
NY Cutchogue
BU 806579 4
�.� tom'•
e
IN WITNESS WHEREOF, Grantor and Grantee,having read the foregoing and intending
to be legally bound hereby, have executed this Grant of Easement as of the day and year first
written above.
GRANTOR:
(SEA
L)
)
Arthur V.Junge,
STATE OF }
)ss..
COUNTY OF }
On the !day of J ujv\p in the year 2013, before me, the undersigned, a Notary
Public in and for said State, personally appeared Arthur V. Junge, personally known to me or
proved to me on the basis of satisfactory evidence to be the individual whose name is subscribed
to the within Grant of Easement and acknowledged to me that he/she executed the same in
his/her capacity, and that by his/her signature on the Grant of Easement, the individual, or the
person upon behalf of which the individual acted,executed the instrument.
By: �U'Aqe
Print Name:
Notary Publics�.
My Commission Expires; 0 .4 3zso .
[affix notary stamp or seal]
O:g`iA►TF� y$
Q
NY Cutchogue
BU 806579 13
s
IN WITNESS WHEREOF, Grantor and Grantee, having read the foregoing and intending
to be legally bound hereby,have executed this Grant of Easement as of the day and year first
written above.
GRANTEE:
Crown Castle Towers 09 LLC,
a Delawo limited liability company
By: (SEAL)
Print Name: F,t t-
Title:
STATE OF T�CI45 )
SS,
COUNTY OFA•s W
On the day of c t%C in the year 2013 before me, the undersigned,
personally appeared 'fit Ar af#�tVU1L [name], personally known to me or
proved to me on the basis of satisfactory evidence to be the individual whose name is subscribed
to the within Grant of Easement and acknowledged to me that she/he executed the same in .
her/his capacity as rVQ ' _[title] of Crown Castle Towers 09
LLC, a Delaware limited liability company, and that by his/her signature on the Grant of
Easement, the individual, or the person upon behalf of which the individual acted, executed
the Grant of,)P,asejnent.
J
By.
Print Name:
Title: td,1W'r C EVI AIAT02
My Commission Expires: 3 a.S'iti
[affix notary stamp or seal]
ro0o"�?Y��i^� KELSER RONNETTE MCMILLER
Notary Public,state of Texas
=�. My Commission Expires
J''''�;►;�' March 25,2014
yhunq
NY Cutchogue
BU 806579 14
-V
From: Michaelis,Jessica
Sent: Thursday, November 30, 2023 10:48 AM
To: Westermann, Caitlin
Subject: FW: NY Southold 1000-96.-1-19.1 T-Mobile 21855 County Rd application (1113544)
Attachments: 806579-NY-CUTCHOGUE-958280-FCD_REV-0-09.28.2023.sss.pdf, 806579-SA.pdf
P81 HLjMT-1'8CjM
RECEIVE®
N V 3 0 2023
From: Marie Russo<mrusso@high landerinc.com> Southold Town
Sent:Thursday, November 30,2023 10:17 AM Planning Board
To: Elizabeth Herington-Smith<elizabeth@cityscapegov.com> q6. — I — lc( . I
Cc:Cerezo, Mara <marac@southoldtownny.gov>; Michaelis,Jessica <jessica.michaelis@town.southold.ny.us>
Subject: RE: NY Southold 1000-96.-1-19.1 T-Mobile 21855 County Rd application (1113544)
Hi Elizabeth,
Attached you will find the CDs together with the structural analysis. I should have the EME�report today at which time I
will send it right over.
I am hoping this will help for your continued review of this site.
Thanks,
Marie
From: Elizabeth Herington-Smith,<elizabeth@cityscapegov.com>
Sent:Tuesday, November 28, 2023 8:42 AM
To: Marie Russo<mrusso@highlanderinc.com>
Cc:Cerezo, Mara<marac@southoldtownny.gov>; Michaelis,Jessica <iessica.michaelis@town.southold.nv.us>
Subject: NY Southold 1000-96.-1-19.1 T-Mobile 21855 County Rd application
Good morning,
Cityscape is reviewing the application submitted to the Town of Southold and the application is incomplete.We are in
need of a structural analysis and an FCC Compliance Assessment/Report.Also, if you would email the CDs along with the
other items it would be appreciated. Once we get the requested documents we can begin our review. Please let me
know if you have any questions.
Best regards, Elizabeth
Elizabeth Herington-Smith
VP/General Manager I
Direct Line:561-541-3104
CITYSCAPE CONSULTANTS,INC.
Toll Free: 877-438-2851
www.cityscapegov.com
� 1 -
p!3 �L Mi $G MG
■
RECEIVED
Date: September 06, 2023 NOV 3 0 2023 MORRISON HERSHFIELD
Morrison Hershfield
Southold Town 1455 Lincoln Parkway, Suite 500
Planning Board Atlanta, GA 30346
c16. _ I — (a - ' (770)379-8500
Subject. Structural Analysis Report
Carrier Designation: T-Mobile Co-Locate
Site Number: L113544A
Site Name: Cutchogue
Crown Castle Designation: BU Number: 806579
Site Name: NY Cutchogue 958280
JDE Job Number: 2100709
Work Order Number: 2255576
Order Number: 656006 Rev. 0
Engineering Firm Designation: Morrison Hershfield Project Number: CN7-595R2/2300001
Site Data: 21855 Country RD, Cutchogue, Suffolk County, NY 11935-
Latitude 41° 1'46.57", Longitude-72°29'50.29"
108.5 Foot—EEI Monopole Tower
Morrison Hershfield is pleased to submit this "Structural Analysis Report" to determine the structural integrity
of the above-mentioned tower.
The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we have
determined the tower stress level for the structure and foundation, under the following load case, to be:
LC7: Proposed Equipment Configuration Sufficient Capacity
This analysis utilizes an ultimate 3-second gust wind speed of 127 mph as required by the 2020 New York State
Uniform Code. Applicable Standard references and design criteria are listed in Section 2-Analysis Criteria.
Respectfully submitted by:
OF NE►NY
�NGE Cp�
r- igitall §J ed by
G. Lance Cooke, P.E. (NY License No. 89337) . La oke
ate* .09.06
Senior Engineer 08• T00'
4 08933-
v
A9° Es S 1o�P
EXP 5/30125
tnxTower Report-version 8.1.1.0
TABLE OF CONTENTS
1) INTRODUCTION
2)ANALYSIS CRITERIA
Table 1 - Proposed Equipment Configuration
Table 2-Other Considered Equipment
3)ANALYSIS PROCEDURE
Table 3- Documents Provided
3.1)Analysis Method
3.2)Assumptions
4)ANALYSIS RESULTS
Table 4-Section Capacity(Summary)
Table 5-Tower Component Stresses vs. Capacity- LC7
4.1) Recommendations
5)APPENDIX A
tnxTower Output
6)APPENDIX B
Base Level Drawing
7)APPENDIX C
Additional Calculations
tnxTower Report-version 8.1.1.0
t September 06, 2023
108.5 Ft Monopole Tower Structural Analysis CCI BU No 806579
Project Number CN7-595R2/2300001, Order 656006, Revision 0 Page 3
1) INTRODUCTION
r
This tower is a 100 ft Monopole tower designed by Engineered Endeavors, Inc., and later modified by adding a
8.5 ft extension for a total height of 108.5 ft.
The tower was modified multiple times to accommodate additional loading. All the modifications are considered
in this analysis per their respective PMI reports.
2)ANALYSIS CRITERIA
TIA-222 Revision: TIA-222-H
Risk Category: II
Wind Speed: 127 mph
Exposure Category: C
Topographic Factor: 1
Ice Thickness: 1 in
Wind Speed with Ice: 50 mph
Service Wind Speed: 60 mph
Table 1 -Proposed Equipment Configuration
{ , Center ,Number I Number 'Feed
Mountings Line ; Antenna Line .
of � Antenna.Model ; of Feed
Level (ft)I Elevation ' Manufacturer, Size
(ft) Antennas Lines : (in)
3 I commscope I VV-65B-R1_TMO w/Mount Pipe
3 ericsson AIR 6419 B41_TMO_CCIV2
w/Mount Pipe
90.0 3 rfs celwave APXVAARR24_43-U-NA20 w/Mount Pipe
88.0 9 1-5/8
3 ericsson RADIO 4449 B71 B85A T-MOBILE
3 ericsson RADIO 4460 132/625 B66_TMO
1 88.0 1 _ Platform Mount
[LP 303-1 KCKR-HR-1]
Table 2 -Other Considered Equipment
Center Number Number' Feed
Mounting; Line Antenna i
of Antenna Model of Feed) Line ;
Level(ft)' Elevation Antennas Manufacturer Lines ; Size(in)i
eft)
119.0 I 1 1 andrew ! DB810E-PS
107.0 117.0 1 . dbspectra DS7A08F36U-N 1 17/88
107.0 1 combilent CP00732 1 1/2
2 - Side Arm Mount[SO 702-1]
3 css X7CAP-480-V w/Mount Pipe
I 6 andrew SBNHH-1D65Aw/Mount Pipe
3 samsung RFV01U-D1A
105.0 telecommunications 1 6 7/8
j 102.0 3 samsung RFV01U-D2A 3 1-1/4
telecommunications
3 raycap RXXDC-3315-PF-48
102.0 1 _ Platform Mount
[LP 303-1_KCKR-HR-1]
tnxTower Report-version 8.1.1.0
September 06, 2023
108.5 Ft Monopole Tower Structural Analysis CCI BU No 806579
Project Number CN7-595R2/2300001, Order 656006, Revision 0 Page 4
- Center
Mounting; Line Number Antenna i ; i Number, Feed
Level ft .Elevation °f ; Manufacturer ' Antenna Model of Feed " Line
( ), ! i • Lines 'Antennas, Size(in)
i
78.0 + 80.0 12 decibel DB845N65ZAXT w/Mount Pipe
78.0 1 - Platform Mount[LP 305-1]
9 commscope NNHH-65A-R4 w/Mount Pipe
3 alcatel lucent RRH4X25-WCS /
3 alcatel lucent B25 RRH4x30 12 7/8
70.0 70.0 3 nokia BAND 5 AHCA RRH4X40 4 3/4
2 3/8
3 nokia AHLBA 2 2C
2 raycap DC6-48-60-18-8F
1 - T-Arm Mount [TA 602-3]
3)ANALYSIS PROCEDURE
Table 3-Documents Provided
Document Reference Source
4-GEOTECHNICAL REPORTS I 949960 CCISITES
4-TOWER FOUNDATION DRAWINGS/DESIGN/SPECS 260900 CCISITES
4-TOWER MANUFACTURER DRAWINGS 642734 CCISITES
4-TOWER REINFORCEMENT DESIGN/DRAWINGS/DATA 2619474 CCISITES
4-POST-MODIFICATION INSPECTION 2710931 CCISITES
4-TOWER REINFORCEMENT DESIGN/DRAWINGS/DATA 2861710 CCISITES i
4-POST-MODIFICATION INSPECTION 3385255 CCISITES
4-TOWER REINFORCEMENT DESIGN/DRAWINGS/DATA 3406575 CCISITES
4-POST-MODIFICATION INSPECTION 4896512 CCISITES
3.1) Analysis Method
tnxTower(version 8.1.1.0), a commercially available analysis software package, was used to create a
three-dimensional model of the tower and calculate member stresses for various loading cases.
Selected output from the analysis is included in Appendix A. When applicable, Crown Castle has
calculated and provided the effective area for panel antennas using approved methods following the
intent of the TIA-222 standard.
tnxTower was used to determine the loads on the modified structure. Additional calculations were
performed to determine the stresses in the pole and in the reinforcing elements.These calculations are
presented in Appendix C.
3.2) Assumptions
1) Tower and structures were maintained in accordance with the TIA-222 Standard.
2) The configuration of antennas, transmission cables, mounts and other appurtenances are as
specified in Tables 1 and 2 and the referenced drawings.'
This analysis may be affected if any assumptions are not valid or have been made in error. Morrison
Hershfield should be notified to determine the effect on the structural integrity of the tower.
tnxTower Report-version 8.1.1.0
September 06, 2023
108.5 Ft Monopole Tower Structural Analysis CCI BU No 806579
Project Number CN7-595R212300001, Order 656006, Revision 0 Page 5
4)ANALYSIS RESULTS
Table 4-Section Capacity(Summary)
Section: Component i
No. Elevation(ft) Type Size Critical Element /o Capacity 4 Pass/Fail
-
L1 1108.5-103.5 I Pole I TP12xl2x0.375 Pole I 6.3 I Pass
L2 103.5-100.5 Pole I TP12xl2x0.375 Pole 19.5 Pass
L3 100.5-100 Pole TP14.5x12x0.375 Pole 15.1 Pass
L4 100-95 Pole TP15.643x14.5x0.1875 Pole 27.6 Pass
L5 95-90 Pole TP16.785x15.643x0.1875 Pole 38.0 Pass
L6 90-85 Pole TP17.928x16.785x0.1875 Pole 55.1 Pass
L7 85-82.08 Pole TP18.595x17.928x0.1875 Pole 64.2 Pass
L8 82.08-81.83 1 Pole+Reinf. TP18.653x18.595x0.7875 Reinf. 12 Bolt-Shaft Bearing 25.5 Pass
L9 81.83-76.83 1 Pole+Reinf. TP19.795xl8.653x0.7375 Reinf. 12 Tension Rupture 30.8 Pass
L10 76.83-73.58 1 Pole+'Reinf. I TP21.26x19.795x0.7125 Reinf. 12 Tension Rupture 35.8 Pass
1_11 173.58-68.58 1 Pole+Reinf. TP21.282x20.163x0.7813 Reinf. 12 Tension Rupture 39.3 Pass
L12 68.58-63.58 Pole+Reinf. TP22.402x21.282x0.7563 Reinf. 12 Tension Rupture 46.8 Pass
L13 63.58-58.58 Pole+Reinf. TP23.52lx22.402x0.7188 Reinf.12 Tension Rupture 53.5 Pass
L14 158.58-53.58 1 Pole+Reinf. TP24.64x23.521x0.6938 Reinf.12 Tension Rupture 59.6 Pass
L15 53.58-48.58 1 Pole+Reinf. TP25.76x24.64x0.6688 Reinf. 12 Tension Rupture 65.2 Pass
L16 48.58-43.58 1 Pole+Reinf. TP26.879x25.76x0.6563 Reinf. 12 Tension Rupture 70.3 Pass
L17 43.58-38.58 1 Pole+Reinf. TP27.998x26.879x0.6313 Reinf.12 Tension Rupture 74.9 Pass
L18 38.58-38.07 Pole+Reinf. TP29.037x27.998x0.6313 Reinf.12 Tension Rupture 75.3 Pass
L19 38.07-32.94 Pole+Reinf. TP28.688x27.55x0.8125 Reinf.12 Tension Rupture 63.7 Pass
L20 32.94-30 Pole+Reinf. TP29.34lx28.688x0.8 Reinf. 12 Tension Rupture 65.7 Pass
L21 30-29.75 Pole+Reinf. TP29.397x29.34lx0.8125 Reinf. 13 Tension Rupture 61.1 Pass
L22 29.75-28.75 1 Pole+Reinf. TP29.618x29.3970.8125 Reinf. 13 Tension Rupture 61.7 Pass
L23 28.75-28.4 Pole+Reinf. TP29.696x29.618x0.9125 Reinf. 12 Tension Rupture 58.5 Pass
L24 28.4-28.17 Pole+Reinf. TP29.747x29.696x0.9125 Reinf. 12 Tension Rupture 58.6 Pass
L25 28.17-27.92 1 Pole+Reinf. TP29.803x29.747x0.9125 Reinf. 12 Tension Rupture 58
�8= Pass
L26 27.92-27.67 1 Pole+Reinf. TP29.858x29.803x0.925 Reinf. 12 Tension Rupture 58.8 Pass
L27 127.67-26.83 1 Pole+Reinf. TP30.045x29.858x0.9125 Reinf. 12 Tension Rupture 59.3 Pass
L28 1 26.83-26.58 1 Pole+Reinf. TP30.1x30.045x0.9875 Reinf.8 Bolt Shear 57.9 Pass
L29 126.58-21.58 1 Pole+Reinf. TP31.21x30.1x0.95 Reinf.8 Tension Rupture 57.5 Pass
L30 121.58-16.58 1 Pole+Reinf. TP32.32x31.21x0.9125 Reinf.8 Tension Rupture 59.9 Pass
L31 116.58-16.16 1 Pole+Reinf. TP32.413z32.32x0.9125 Reinf.8 Tension Rupture 60.1 Pass
L32 16.16-15.91 1 Pole+Reinf. TP32.469x32.413x0.9125 Reinf.8 Tension Rupture 60.2 Pass
L33 15.91 -14 Pole+Reinf. TP32.892x32.469x0.9125 Reinf.8 Tension Rupture 61.1 Pass
L34 14-13.75 Pole+Reinf. TP32.948x32.892xl.1875 Reinf.8 Tension Rupture 52.8 Pass
L35 13.75-12.92 1 Pole+Reinf. TP33.132x32.948xl.1625 Reinf.8 Tension Rupture 53.2 Pass
L36 12.92-12.67 1 Pole+Reinf. TP33.188x33.132xl.2125 Reinf.8 Tension Rupture 52.0 Pass
L37 12.67-8.75 Pole+Reinf. TP34.058x33.188x0.9375 Pole 53.6 Pass
r L38 8.75-8.5 Pole+Reinf. TP34.113x34.0580.9 Reinf.9 Tension Rupture 1 58.3 Pass
L39 8.5-8.25 Pole+Reinf. TP34.169x34.113x0.8875 Reinf.9 Tension Rupture 58.4 Pass
L40 8.25-8 Pole+Reinf. TP34.224x34.169x0.8875 Reinf.9 Tension Rupture 60.9 Pass
L41 8-6 Pole+Reinf. TP34.668x34.224x0.8875 Reinf.9 Tension Rupture 61.7 Pass
tnxTower Report-version 8.1.1.0
I
September 06, 2023
108.5 Ft Monopole Tower Structural Analysis CC/BU No 806579
Project Number CN7-595R2/2300001, Order 656006, Revision 0 Page 6
Section: Component Size Critical Element I %Ca aci Ii Pass/Fail
No. Elevation(ft)' Type ! P tY
L42 I 6-5.75 I Pole+Reinf. I TP34.724x34.668xl.1375 I Reinf.8 Tension Rupture I 55.4 I Pass
L43 5.75-5.44 Pole+Reinf. TP34.793x34.724x1.3125 Reinf.8 Tension Rupture 50.0 Pass
L44 5.44-5.19 Pole+Reinf. TP34.848x34.793xl.3125 Reinf.8 Tension Rupture 50.1 Pass
L45 5.19-4.42 Pole+Reinf. TP35:019x34.848z1.2875 Reinf.8 Tension Rupture 50.4 Pass
L46 4.42-4.17 Pole#Reinf. TP35.074x35.019xl.0375 Reinf. 1 Compression 60.1 Pass
L47 4.17-4 Pole+Reinf. TP35.112x35.074xl.0375 Reinf. 1 Compression 60.2 Pass
L48 4-3.75 Pole+Reinf. TP35.168x35.112x1.1625 Reinf. 1 Compression 55.4 Pass
L49 3.75-0 Pole+Reinf. TP36x35.168xl.2625 Reinf.2 Weldment 58.2 Pass
Summary
Pole \ 64.2 Pass
Reinforcement 75.3 Pass
Overall 75.3 Pass
Table 5-Tower Component Stresses vs. Capacity-LC7
Notes { Component Elevation (ft) %Capacity Pass/Fail
1 Flange Connection l 100 I 11.0 Pass
1 Anchor Rods 0 67.6 Pass
1 Base-Plate 79.3 Pass
1 Base Foundation (Structure) 0 52.4 Pass
1 Base Foundation (Soil Interaction) 56.8 Pass
Structure Rating(max from.all components)_ 79.3%"
Notes:
1) See additional documentation in "Appendix C - Additional Calculations" for calculations supporting the % capacity
consumed.
2) 'Rating per TIA-222-H,Section 15.5.
4.1) Recommendations
The tower and its foundation have sufficient capacity to.carry the proposed load configuration. No
modifications are required at this time.
i \
tnxTower Report-version 8.1.1.0
t11VT I 8C I MC
RECEIVED ,OA�
Date: July 6, 2023 NOV 2 8 2023 GPD Engineering and Architecture
Professional Corporation
Southold Town 520 South Main St; Suite 2531
P Akron, OH 44311
Planning Board
(216) 927-8663
Subject: Structural Analysis Report
Carrier Designation: T-Mobile Co-Locate
Site Number: LI13411 B
Crown Castle Designation: BU Number: 825717
Site Name: Mattituck
JDE Job Number: 684772
Work Order Number: 2242232
Order Number: 584825 Rev. 14
Engineering Firm Designation: GPD Project Number: 2023777.825717.04
Site Data: 12585 Sound Ave., Mattituck, NY 11952, Suffolk County
Latitude 400 59'27.84", Longitude-72°32'17.94"
100 Foot—PennSummit Concealment Tower
We are pleased to submit this "Structural Analysis Report" to determine the structural integrity of the above
mentioned tower.
The purpose of the analysis is to determine acceptability of the tower stress level. Based on our analysis we
have determined the tower stress level for the structure and foundation, under the following load case, to be:
LC7: Proposed Equipment Configuration Sufficient Capacity
This analysis utilizes an ultimate 3-second gust wind speed of 128 mph as required by the 2020 New York State
Uniform Code.Applicable Standard references and design criteria are listed in Section 2-Analysis Criteria.
Structural analysis prepared by: Parker Graf
Vim- A W-LA I,f=MrlAflly
Respectfully submitted by: F N��
Christopher J. Scheks, P.E. -�-L
New York#: 093566-1 o8358g
7/6/2023
520 South Main Street.Suite 2531.Akron,Ohio 44311 .330-572-2100.Fax 330-572-2101.www.GPDGroup.com
GPD Engineering And Architecture Professional Corporation
100 Ft Concealment Tower Si ___o4al Analysis July 6, 2023
Project Number 2023777.825717.04, Order 584825, Revision 14 CCI BU No 825717
Page 2
TABLE OF CONTENTS
1) INTRODUCTION
2)ANALYSIS CRITERIA
Table 1 - Proposed Equipment Configuration
Table 2-Other Considered Equipment
3)ANALYSIS PROCEDURE
Table 3- Documents Provided
3.1)Analysis Method
3.2)Assumptions
4)ANALYSIS RESULTS
Table 4- Section Capacity(Summary)
Table 5-Tower Components vs. Capacity
4.1) Recommendations
5)APPENDIX A
tnxTower Output
6)APPENDIX B
Base Level Drawing
7)APPENDIX C
Additional Calculations
tnxTower Report-version 8.1.1.0
100 Ft Concealment Tower S ._ 'Aral Analysis
_ July 6, 2023
Project Number 2023777.825717.04, Order 584825, Revision 14 CC/BU No 825717
Page 3
1)INTRODUCTION
This is a 1100 A concealment tower designed by PennSummit. in February of 2004.
2)ANALYSIS CRITERIA
TIA-222 Revision: TIA-222-H
Risk Category: II
Wind Speed: 128 mph
Exposure Category:, C
Topographic Factor: 1
Ice Thickness: 1 in
Wind Speed with Ice: 50 mph
Service Wind Speed: 60 mph
Table 1 - Proposed Equipment Configuration
Center
Number Number Feed
9'
Mountin " Line: of Antenna' i
Antenna Model of Feed Line
Level (ft); Elevation Manufacturer
(ft) Antennas Lines . Size(in)
II,
95.0.. 95.0 I 3 ( Commscope I._ FW-65A-R3 12
85.0 85.0 3 Commscope FW-65A-R3 12 7/8
Table 2—Other Considered Equipment
Center Number. Number Feed
Mounting, Line of Antenna Antenna Model of Feed Line
Level (ft) Elevation Manufacturer
(ft) Antennas Lines Size(in),
95.0 95.0 -1 I - 25.625"0 x 10' Concealment Shroud -
85.0 85.0 1 - 26.625"0 x 10' Concealment Shroud - -
3 JMA Wireless _ MX08FRO665-21
3 Fujitsu TA08025-13605
75.0 75.0 r 3 1 Fujitsu I TA08025-13604 1 1-3/8
F 1-1 Raycap RDIDC-9181-PF-48
r 1 Site Pro 1 6CHMT
r
tnxTower Report-version 8.1.1.0
100 Ft Concealment Tower S+a.-. :aral Analysis July 6, 2023
Project Number 2023777.825717.04, Order 584825, Revision 14 CC/BU No 825717
Page 4
3)ANALYSIS PROCEDURE
' Table 3-Documents Provided '
Document Reference Source
Original Tower Drawings 3478552 CCISites
Foundation Drawings 3960738 CCISites
Geotechnical•Report 3478551 CCISites
3.1) Analysis Method
tnxTower(version 8.1.1.0), a commercially available analysis software package, was used to create a
three-dimensional model of the tower and calculate member stresses for various loading cases.
Selected output from the analysis is included in Appendix A. When applicable, Crown Castle has
calculated and provided the effective area for panel antennas using approved methods following the
intent of the of the TIA-222 standard.
3.2) Assumptions
1) The tower and structures were maintained in accordance with the TIA-222 standard.
2) The configuration of antennas, transmission cables, mounts and other appurtenances are as
specified in Tables 1 and 2 and the referenced drawings.
This analysis may be affected if any assumptions or items in Table 3 are not valid or have been made
in error. GPD should be notified to determine the effect on the structural integrity of the tower.
f
tnxTower Report-version 8.1.1.0
100 Ft Concealment Tower Su.._.¢iral Analysis -' July 6, 2023
Project Number 2023777.825717.04, Order 584825, Revision 14 CC/BU No 825717
Page 5
4)ANALYSIS RESULTS
Table 4-Section Capacity(Summary)
Section Component Critical SF*P_allow' %
Elevation(ft); Size P(I), Pass l Fail
No. Type j Element; (K) Capacity
L1 I 100-80 I Pole L TP6x6x0.5 1 I -1.57 I 612.32 I 12.0 Pass
L2 80-40.75 Pole TP32.516x26.63x0.2188 2 -6.88 1350.54 15.1 Pass
L3 40.75-0 Pole TP38.19x31.441 x0.25 3 -12.91 1849.23 29.6 Pass
1
- Summary ELC: LC7
Pole(0) 29.6 Pass
Rating= 29.6 Pass
i
Table 5-Tower Component Stresses vs. Capacity—LC7
Notes - Component Elevation (ft) %Capacity Pass/Fail
112 Flange Bolts 80.0 5.5 Pass
1,2 Anchor Rods 0 47.1 Pass
1,2 Base Plate 0 42.4 Pass
1,2 Base Foundation 0 18.5 Pass
Structural
1,2 Base Foundation 0 48.1 Pass
Soil Interaction
Structure Rating.(max from all components)_ : '48.1%
Notes:
1) See additional documentation in"Appendix C—Additional Calculations"for calculations supporting the%capacity
consumed.
2) Rating per TIA-222-H Section 15.5
4.1) Recommendations
The tower and its foundation have sufficient capacity to carry the proposed load configuration. No
modifications are required at this time.
r
tnxTower Report-version 8.1.1.0
100 Ft Concealment Tower S'i,__viral Analysis July 6, 2023
Project Number 2023777.825717.04, Order 584825, Revision 14 CCI BU No 825717
Page 6
L
APPENDIX A
TNXTOWER OUTPUT
tnxTower Report-version 8.1.1.0
MATERIAL STRENGTH
GRADE Fy Fu GRADE I Fly Fu
o ASTM A513 75 ksi 85 ksi A60765 65 ksi 80 ksi
D.O.M.
n o 0 0
° TOWER DESIGN NOTES
1. Tower is located in Suffolk County,New York.
2. Tower designed for Exposure C to the TIA-222-H Standard.
3. Tower designed for a 128 mph basic wind in accordance with the TIA-222-H Standard.
4. Tower is also designed for a 50 mph basic wind with 1.00 in ice.Ice is considered to
increase in thickness with height.
80.0« 5. Deflections are based upon a 60 mph wind.
6. Tower Risk Category II.
7. Topographic Category 1 with Crest Height of 0.0000 ft
4 t 8. TOWER RATING:29.6%
0
a
<
� mmo � I' ll
N ry N f0 N N
it
I O
'Il
I' ll.I III
li
40.8It I
I
IljI�'
. I
I
I I
ALL REACTIONS
ARE FACTORED
m AXIAL
o m it 18K
SHEAR \ MOMENT
2 KL, y 130 kip-ft
TORQUE 0 kip-ft
50 mph WIND-1.0000 in ICE
I.
AXIAL
13K
SHEAqMOMENT
8 K_(_ ` 455 kip-ft
0.0 It
TORQUE 0 kip-ft
t REACTIONS-128 mph WIND
w ? _
E a E
i
GPD lib'BU#:825717/Mattituck
520 South Main Street Suite 2531 Pliel2023777.825717.04
-- client Crown Castle Drawn by: raf AlAkron, Ohio 44311 P9
Phone:(330)572-2100 Code:TIA-222-H Dale:07/06/23 scale: i
FAX: 330 572-2101 Path.TAC—WVIs N1 sl.uaura1100 sm, 11M RwM uoea azsznFa Dwg No
0' - 100,
Round it App In Face App Out Fat;, Truss Leg
Face A Face B Face C
100.0000 100.0,
95.0000 95.0000
------------------------- 85.0000 ------------------------- 85.0000 ,
80.0000 80.00,
75.0000 75.0000
v
C
C
i+ Q
w/ m
U n
J
N O
N
m m
40.7500 A
------------ ------------------------- ----- ------------V- ----- 4075�
y J
a
Co
Co
N_
D
U
0.0000 0.000,
GPD eb'BU#:825717/Mattituck
R 520 South Main Street Suite 2531 project 2023777.825717.04
Client:Crown Castle Drawn by: rat App'd:
Akron, Ohio 44311 Pg
Phone:(330)572-2100 code:TIA-222-H Date:07/06/23 scale: i
FAX: 330 572-2101 Path:TAC.%257MM sw—noo swm,M Re OW'M,,' azs11 ca Dwg No
i
Am ANN,
Job Page
tnxT Tower BU#: 825717/ Mattituck 1 of 6
GPD Project Date
520 South Main Street Suite 2531 2023777.825717.04 16:30:09 07/06/23
Akron,Ohio 44311 Client Designed by
Phone:(330)572-2100 Crown Castle
FAX.-(330)572-2101 pgraf
t
Tower Input Data
The tower is a monopole.
This tower is designed using the TIA-222-H standard.
The following design criteria apply:
Tower is located in Suffolk County,New York.
Tower base elevation above sea level:7.0000 ft.
Basic wind speed of 128 mph.
Risk Category II.
Exposure Category C.
Simplified Topographic Factor Procedure for wind speed-up calculations is used.
Topographic Category: 1.
Crest Height: 0.0000 ft.
Nominal ice thickness of 1.0000 in.
Ice thickness is considered to increase with height.
Ice density of 56.00 pcf.
A wind'speed of 50 mph is used in combination with ice.
Temperature drop of 50'F.
Deflections calculated using a wind speed of 60 mph.
A non-linear(P-delta)analysis was used.
Pressures are calculated at each section.
Stress ratio used in pole design is 1.
Tower analysis based on target reliabilities in accordance with Annex S.
Load Modification Factors used:Ke,(FW)=0.95,Kes(ti)=0.85.
Maximum demand-capacity ratio is: 1.05.
Local bending stresses due to climbing loads,feed line supports,and appurtenance mounts are not considered.
Options
Consider Moments-Legs Distribute Leg Loads As Uniform Use ASCE 10 X-Brace Ly Rules
Consider Moments-Horizontals Assume Legs Pinned Calculate Redundant Bracing Forces
Consider Moments-Diagonals Assume Rigid Index Plate Ignore Redundant Members in FEA
Use Moment Magnification 11 Use Clear Spans For WindArea SR Leg Bolts Resist Compression
Use Code Stress Ratios Use Clear Spans For KL/r All Leg Panels Have Same Allowable
Use Code Safety Factors-Guys Retension Guys To Initial Tension Offset Girt At Foundation
Escalate Ice Bypass Mast Stability Checks Consider Feed Line Torque
Always Use Max Kz 11 Use Azimuth Dish Coefficients Include Angle Block Shear Check
Use Special Wind Profile Project Wind Area of Appurt. Use TIA-222-H Bracing Resist.Exemption
Include Bolts In Member Capacity Autocalc Torque Arm Areas Use TIA_-222-H Tension Splice Exemption
Leg Bolts Are At Top Of Section Add IBC.6D+W Combination �-
Secondary Horizontal Braces Leg Sort Capacity Reports By Component Include Shear-Torsion Interaction
Use Diamond Inner Bracing(4 Sided) Triangulate Diamond Inner Bracing Always Use Sub-Critical Flow
SR Members Have Cut Ends Treat Feed Line Bundles As Cylinder Use Top Mounted Sockets
SR Members Are Concentric Ignore KL/ry For 60 Deg.Angle Legs Pole Without Linear Attachments
Pole With Shroud Or No Appurtenances
Outside and Inside Corner Radii Are
Known
tnxTower - Job BU M 825717/Mattituck Page 2 of 6
GPD Project Date
520 South Main Street Suite 2531 2023777.825717.04 16:30:09 07/06/23
Akron,Ohio 44311 Client Designed by
Phone:(330)572-2100 Crown Castle
FAX.-(330)572-2101 pgraf
Tapered Pole Section Geometry
Section Elevation Section Splice Number Top Bottom Wall Bend Pole Grade
Length Length of Diameter Diameter Thickness Radius
ft ft ft Sides in in in in
L I 100.0000-80.00 20.0000 0.00 Round 6.0000 6.0000 0.5000 ASTM A513
00 D.O.M.
(75 ksi)
L2 80.0000-40.750 39.2500 4.25 18 26.6300 32.5160 0.2188 0.8752 A607-65
0 (65 ksi)
L3 40.7500-0.0000 45.0000 18 31.4410 38.1900 1 0.2500 1.0000 A607-65
(65 ksi)
Tapered Pole Properties
erties
Section Tip Dia. Area 1 r C 1/C J XQ w w/t
in in in in in in3 in° in2 in
L1 6.0000 8.6394 32.9376 1.9526 3.0000 10.9792 65.8753 4.3171 0.0000 0
6.0000 8.6394 32.9376 1.9526 3.0000 10.9792 65.8753 4.3171 0.0000 0
L2 27.0071 18.3418 1616.4270 9.3760 13.5280 119.4872 3234.9809 9.1727 4.3018 19.661
32.9839 22.4295 2955.8767 11.4655 16.5181 178.9474 5915.6427 11.2169 5.3377 24.395
L3 32.5347 24.7501 3042.0915 11.0728 15.9720 190.4637 6088.1859 12.3774 5.0936 20.374
38.7406 30.1054 5474.9021 13.4687 19.4005 282.2039 10957.0083 15.0556 6.2814 25.126
Tower Gusset Gusset Gusset Grade Adjust.Factor Adjust. Weight Mult. Double Angle Double Angle Double Angle
Elevation Area Thickness Af Factor Stitch Bolt Stitch Bolt Stitch Bolt
(per face) Ar Spacing Spacing Spacing
Diagonals Horizontals Redundants
ft ftz in in in in
L1 1 0 1
100.0000-80.0
000
L2 1 1 1
80.0000-40.75
00
L3 1 1 1
40.7500-0.000
0
Feed Line/Linear Appurtenances - Entered As Area
Description Face Allow Exclude Component Placement Total CAAA Weight
or Shield From Type Number
Leg Torque ft ft2/ft klf
Calculation
LCF78-50A(7/8") C No No Inside Pole 95.0000- 12 No Ice 0.0000 0.00
0.0000 1/2"Ice 0.0000 0.00
1"Ice 0.0000 0.00
LCF78-50A(7/8") C No No Inside Pole 85.0000- 12 No Ice 0.0000. 0.00
0.0000 1/2"Ice 0.0000 0.00
P Ice 0.0000 0.00
CUI2PSM9P8XXX( A No No Inside Pole 75.0000- 1 No Ice 0.0000 0.00
1-3/8) 0.0000 1/2"Ice 0.0000 0.00
1"Ice 0.0000 0.00
1'Job / Page
tnxTower BU#: 825717/Mattituck 3 of 6
GPD Project Date
520 South Main Street Suite 2531 2023777.825717.04 16:30:09 07/06/23
Akron,Ohio 44311 Client Designed by
Phone:(330)572-2100 Crown Castle
FAX.-(330)572-2101 pgraf
Discrete Tower Loads
Description Face Offset Offsets: Azimuth Placement CAAA CA, Weight
or Type Horz Adjustment Front Side
Leg Lateral
Vert
ft o ft ftz ft2 K
ft
ft
FVV-65A-R3 w/Mount Pipe A From Leg 0.5000 0.60 95.0000 No Ice 0.0000 0.0000 0.07
0.00 1/2"Ice 0.0000 0.0000 0.12
0.00 V Ice 0.0000 0.0000 0.18
FV V-65A-R3 w/Mount Pipe B From Leg 0.5000 0.00 95.0000 No Ice 0.0000 0.0000 0.07
0.00 1/2"Ice 0.0000 0.0000 0.12
0.00 P Ice 0.0000 0.0000 0.18
FVV-65A-R3 w/Mount Pipe C From Leg 0.5000 0.00 95.0000 No Ice 0.0000 0.0000 0.07
0.00 1/2"Ice 0.0000 0.0000 0.12
0.00 P Ice 0.0000 0.0000 0.18
FVV-65A-R3 w/Mount Pipe A From Leg 0.5000 0.00 85.0000 No Ice 0.0000 0.0000 0.07
0.00 1/2"Ice 0.0000 0.0000 0.12
0.00 V Ice 0.0000 0.0000 0.18
FVV-65A-R3 w/Mount Pipe B From Leg 0.5000 0.00 85.0000 No Ice 0.0000 0.0000 0.07
0.00 1/2"Ice 0.0000 0.0000 0.12
0.00 V Ice 0.0000 0.0000 0.18
FVV-65A-R3 w/Mount Pipe C From Leg 0.5000 0.00 85.0000 No Ice 0.0000 0.0000 0.07
0.00 1/2"Ice 0.0000 0.0000 0.12
0.00 V Ice 0.0000 0.0000 0.18
MX08FRO665-21 w/Mount A From Leg 1.0000 0.00 75.0000 No Ice 8.0094 4.2326 0.11
Pipe 0.00 1/2"Ice 8.5180 4.6887 0.19
0.00 V Ice 9.0375 5.1558 0.29
MX08FR0665-21 w/Mount B From Leg 1.0000 0.00 75.0000 No Ice 8.0094 4.2326 0.11
Pipe 0.00 1/2"Ice 8.5180 4.6887 0.19
0.00 I"Ice 9.0375 5.1558 0.29
MX08FRO665-21 w/Mount C From Leg 1.0000 0.00 75.0000 No Ice 8.0094 4.2326 0.11
Pipe 0.00 1/2"Ice 8.5180 4.6887 0.19
0.00 V Ice 9.0375 5.1558 0.29
TA08025-13604 A From Leg 1.0000 0.00 75.0000 No Ice 1.9635 0.9811 0.06
0.00 1/2"Ice 2.1378 1.1117 0.08
0.00 V Ice 2.3195 1.2496 0.10
TA08025-13605 A From Leg 1.0000 0.00 75.0000 No Ice 1.9635 1.1295 0.08
0.00 1/2"Ice 2.1378 1.2666 0.09
0.00 V Ice 2.3195 1.4112 0.11
TA08025-13604 B From Leg 1.0000 0.00 75.0000 No Ice 1.9635 0.9811 0.06
0.00 1/2"Ice 2.1378 1.1117 0.08
0.00 V Ice 2.3195 1.2496 0.10
TA08025-13605 B From Leg 1.0000 0.00 75.0000 No Ice 1.9635 1.1295 0.08
0.00 1/2"Ice 2.1378 1.2666 0.09
0.00 P Ice 2.3195 1.4112 0.11
TA08025-13605 C From Leg 1.0000 0.00 75.0000 No Ice 1.9635 1.1295 0.08
0.00 1/2"Ice 2.1378 1.2666 0.09
0.00 V Ice 2.3195 1.4112 0.11
TA08025-13604 C From Leg 1.0000 0.00 75.0000 No Ice 1.9635 0.9811 0.06
0.00 1/2"Ice 2.1378 1.1117 0.08
0.00 P Ice 2.3195 1.2496 0.10
RDIDC-9181-PF-48 A From Leg 1.0000 0.00 75.0000 No Ice 2.5610 1.3374 0.02
0.00 1/2"Ice 2.7600 1.4935 0.04
0.00 V Ice 2.9665 1.6570 0.07
SitePro 1 6CHMT C None 0.00 75.0000 No Ice 3.1700 3.1700 0.27
1/2"Ice 3.7900 3.7900 0.32
1"Ice 4.4100 4.4100 0.38
2.375"x 10'Mount Pipe A From Leg 1.0000 0.00 75.0000 No Ice 2.3750 2.3750 0.07
0.00 1/2"Ice 3.4031 3.4031 0.09
0.00 P Ice 4.4479 4.4479 0.11
,,iJob
tnxT`ower BU #: 825717/ Mattituck Page4 of 6
GPD
Project Date
520 South Main Street Suite 2531 2023777.825717.04 16:30:09 07/06/23
Akron,Ohio 44311 Client Designed by
Phone:(330)572-2100 Crown Castle
FAX.•(330)572-2101 pgraf
Description Face Offset Offsets: Azimuth Placement CAAA CAAA Weight
or Type Horz Adjustment Front Side
Leg Lateral
Vert
ft o ft ft2 ft, K
ft
ft
2.375"x 10'Mount Pipe B From Leg 1.0000 0.00 75.0000 No Ice 2.3750 2.3750 0.07
0.00 1/2"Ice 3.4031 3.4031 0.09
0.00 V Ice 4.4479 4.4479 0.11
2.375"x 10'Mount Pipe C From Leg 1.0000 0.00 75.0000 No Ice 2.3750 2.3750 0.07
0.00 1/2"Ice 3.4031 3.4031 0.09
0.00 V Ice 4.4479 4.4479 0.11
Canister Load C None 0.00 100.0000 No Ice 4.8047 4.8047 0.07
1/2"Ice 12.2031 12.2031 0.15
P Ice 12.6615 12.6615 0.23
Canister Load2 C - None 0.00 90.0000 No Ice 9.7969 9.7969 0.16
1/2"Ice 24.8646 24.8646 0.32
1"Ice 25.7813 25.7813 0.49
Canister Load3 C None 0.00 80.0000 No Ice 4.9922 4.9922 0.49
1/2"Ice 12.6615 12.6615 0.57
1"Ice 13.1198 13.1198 0.66
Maximum Tower Deflections - Service Wind
Section Elevation Horz. Gov. Tilt Twist
No. Deflection Load
ft in Comb. o °
L1 100-80 3.81 39 0.37 0.00
L2 80-40.75 2.43 39 0.23 0.00
L3 45-0 0.91 39 0.17 0.00
Critical Deflections and Radius of Curvature - Service Wind
Elevation Appurtenance Gov. Deflection Tilt Twist Radius of
Load Curvature
ft Comb. in o oft
100.0000 Canister Loadl 39 3.81 0.37 0.00 40070
95.0000 FVV-65A-R3 w/Mount Pipe 39 3.45 0.33 0.00 40070
90.0000 Canister Load2 39 3.09 0.29 0.00 20035
85.0000 FVV-65A-R3 w/Mount Pipe 39 2.75 0.26 0.00 13356
80.0000 Canister Load3 39 2.43 0.23 0.00 10582
75.0000 MX08FRO665-21 w/Mount Pipe 39 2.14 0.21 0.00 10765
Maximum Tower Deflections - Design Wind
Section Elevation Horz. Gov. Tilt Twist
No. Deflection Load
ft in Comb. °
L1 100-80 18.47 2 1.79 0.00
L2 80-40.75 11.77 2 1.11 0.00
L3 45-0 4.39 2 0.83 0.00
.Job g
tnxTower BU#: 825717/Mattituck Page
of 6
GPD Project Date
520 South Main Street Suite 2531 2023777.825717.04 16:30:09 07/06/23
Akron,Ohio 44311 Client Designed by
Phone:(330)572-2100 Crown Castle
FAX.-(330)572-2101 pgraf
Critical Deflections and Radius of Curvature - Design Wind
Elevation Appurtenance Gov. Deflection Tilt Twist Radius of
Load Curvature
ft Comb. in oft
100.0000 Canister Load 2 18.47 1.79 0.00 8248
95.0000 FVV-65A-R3 w/Mount Pipe 2 16.70 1.59 0.00 8248
90.0000 Canister Load2 2 14.97 1.41 0.00 4124
85.0000 FVV-65A-R3 w/Mount Pipe 2 13.32 1.24 0.00 2749
80.0000 Canister Load3 2 11.77 1.11 0.00 2178
75.0000 MX08FRO665-21 w/Mount Pipe 2 10.36 1.01 0.00 2216
Compression Checks
Pole Design Data
Section Elevation Size L L Kl/r A P. OP Ratio
No. P.
ft ft ft in2 K K op
L1 100-80(1) TP6x6x0.5 20.0000 0.0000 0.0 8.6394 -1.57 583.16 0.003
L2 80-40.75(2) TP32.516x26.63x0.2188 39.2500 0.0000 0.0 21.9869 -6.88 1286.23 0.005
L3 40.75-0(3) TP38.1901.4410.25 45.0000 0.0000 0.0 30.1054 -12.91 1761.17 0.007
Pole Bending Design Data
Section Elevation Size M., OMI Ratio MY om}y Ratio
No. m- M„Y
ft kip ft kip ft OM., kip-ft kip-ft rpm v
Ll 100-80(1) 'TP6x6x0.5 10.54 85.31 0.124 0.00 85.31 0.000
L2 80-40.75(2) TP32.516x26.63x0.2188 142.42 931.98 0.153 0.00 931.98 0.000
L3 40.75-0(3) TP38.1901.4410.25 454.56 1498.78 0.303 0.00 1498.78 0.000
Pole Shear Design Data
Section Elevation Size Actual 0V° Ratio Actual OT Ratio
No. V V„ T. T„
ft K K 0V kip-ft kip ft OT
L1 100-80(1) TP6x6x0.5 0.79 174.95 0.005 0.00 84.60 0.000
L2 80-40.75(2) TP32.516x26.63x0.2188 5.33 385.87 0.014 0.00 1069.87 0.000
L3 40.75-0(3) TP38.19x31.44lx0.25 8.46 528.35 0.016 0.00 1755.49 0.000
„'Job Page
WxTower BU#: 825717/Mattituck 6 of 6
GPD Project Date
520 South Main Street Suite 2531 2023777.825717.04 16:30:09 07/06/23
Akron,Ohio 44311 Client Designed by
Phone:(330)572-2100 Crown Castle
FAX. 330)572-2101 pgraf
Pole Interaction Design Data
Section Elevation Ratio Ratio Ratio Ratio Ratio Comb. Allow. Criteria
No. P. M. M y V. T. Stress Stress
ft op OM., rpm' 0V OT Ratio Ratio
L1 100-80(1) 0.003 0.124 0.000 0.005 0.000 0.126 1.050 4.8.2
L2 80-40.75(2) 0.005 0.153 0.000 0.014 0.000 0.158 1.050 4.8.2
L3 40.75-0(3) 0.007 0.303 0.000 0.016 0.000 0.311 1.050 4.8.2
Section Capacity Table
Section Elevation Component Size Critical P aParraw % Pass
No. .rt Type Element K K Capacity Fail
L1 100-80 Pole TP6x6x0.5 1 -1.57 612.32 12.0 Pass
L2 80-40.75 Pole TP32.516x26.63x0.2188 2 -6.88 1350.54 15.1 Pass
L3 40.75-0 Pole TP38.1901.4410.25 3 -12.91 1849.23 29.6 Pass
Summary ELC: LC7
Pole(L3) 29.6 Pass
Rating= 29.6 Pass
100 Ft Concealment Tower S+�.- .siral Analysis July 6, 2023
Project Number 2023777.825717.04, Order 584825, Revision 14 CCI BU No 825717
Page 7
r
APPENDIX B
BASE LEVEL DRAWING J
tnxTower Report'-version,8.1.1.0
CROWN REGION ADDRESS
USA
((OTHER QON71ID EQUIPMENT)
(1) 1-s/s•TO 7s FT LEVEL • °' I I Q
•00000 d $7YIfif
DRAWN BY: SAT _
JPROPOSEUIPMENT CONFIGURATION) CHECKED BY:SAC
12)7/8
•TO
85 FT LEVEL DRAWING DATE:15105113
D EQUIPMENT
12)7/B•TO 95 FT LEVEL
SITE NUMBER:
SITE NAME--
SITE NAME
MatUmck
BUSINESS UNIT NUMBER
825717
SITE ADDRESS
12585 Sound Ave.
MATTITUCK.NY 11952
SUFFOLK COUNTY
USA
SHEET TITLE
BASE LEVEL
SHEET NUMBER
"Ts Al-0
PLOT DATE: IM12015 FILE NAME' 025717 BASELEVEL.dxg
100 Ft Concealment Tower S�,—,r-ral Analysis July 6, 2023
Project Number 2023777.825717.04, Order 584825, Revision 14 CC/BU No 825717
Page 8
r
4
APPENDIX C
ADDITIONAL CALCULATIONS
I
tnxTower Report-version 8.1.1.0
M Flagpole i CROWN
Site Data CASTLE
BUN:82571T
Site Name:I Mattituck
Order N:1584825 Rev.14
Code
Code:; TIA-222-H
Ice Thickness: 1 in SPINE
Windspeed(V): 128 mph
Ice Wind Speed(V):a 501 mph I STIFFENER
(TY
Exposure Category:( C FLANGE BOLT HOLES
(T1'r3)
Topographic Feature: N/
Risk Category:i II1
I FLANGE PLATE
Tower Information
Total Tower Height: 1001 ft
Base Tower Height:j_ 80 ft
FLANGE PLATE
Total Canister Length: 20 ft (TVPE4:SOLIDITY RATIO 0.55)
Number of Canister Assembly
Sections:, 2
Number of Mating Mating
Canister Canister Flange Flange Plate Canister
Canister Section Assembly Assembly Ventilated Manufacturer': Sides Plate Plate Plate Solidity Weight Weight Vent
Number': Length(ft): Diameter(in): Canister: Canister Tvoe: Thickness Diameter Ratio (Kip): (Kip) Length(ft):
Section
in a: in
1 10 �25.625 No Round 4 0.13 24.75 0.55 0.019 0.134 0-0-
2 10 '26.625 No Round, 4 2.50 26.1875 1 0.55 1 0.420 0.139 0-0
'Sections are numbered from the top of the tower down
'Select manufacturer if available for vented canister.Leave blank to autocalculate Of values.
3 Mating Flange Plate Thickness at the bottom of canister section
Flag on Tower: No
Truck Ball an Tower: No
Geometry:Base Tower+Spine 825717.eri (lost saved 0710610.24 am)
Bottom Wall
Pole Height Above Section Lap Splice Diameter Thickness Bend Pole
Base(ft) Length(ft) Length(ft) Number of Sides Top Diameter(in) (in) (in) Radius(in) Material Delete
ASTM A513
100 20 0 0 6 6 0.5 n/a D.O.M. (x]
80 39.25 4.25 1 18 26.63 1 32.516 0.2188 0.8752 A607-65 (x]
45 45 0 1 18 31.441 1 38.19 0.25 1 A607-65 (x]
Page 1 of 2 I CCIFlagpole Tool(2.3.4)
e Loads:CFAF for Canister Assembly
Canister
Apply CFAF at C C CFAF Canister Assembly
Canister Loading Elevation(z) CFAF CFAF z CFAF 1"Ice(ftz) CFAF F z F F z Assembly weight
(ft) No Ice(ft z) 1/2"Ice(ft) 2"Ice(ft) 4"Ice(ft) weight No 1/2"Ice
Ice(Kip) Ki
pl—
Canister Load 1 100 4.805 12.203 12.661 13.578 15.411 0.067 0.147
Canister Load 2 90 9.797 24.865 25.781 27.615 31.281 0.156 0.318
Canister Load 3 80 4.992 12.661 13.120 14.036 15.870 0.490 0.573
Deflection Check Required: Yes Import Deflection Results
3%Spine Deflection Check
Allowable(3%)Horizontal Spine Actual Sufficient/Insufficient
Deflection(inches) Deflectiont
(inches)
7.200 1.382 Sufficient
Relative deflection under service level wind speed
Page 2 of 2 CCIFlagpole Tool(2.3.4)
Monopole Flange Plate Connection Elevation=80 ft. CROWN
CASTLE
BU# 825717 lied Loads
Site Name Mattituck Moment(kip-ft)1 10.54
Order tl 584825 Rev.14 Axial Force(kips)1 1.57
Shear Force(kips)1 0.79
TIA-222Revision H 'TIA-222-H Section 15.5 Applied
Top Plate-External Bottom Plate-Internal
Connection Properties
Bolt Data
(6)1-1/8"0 bolts(A325 N;Fy=81 ksi,Fu=120 ksi)on 20"BC
Top Plate Data Bottom Plate Data
25.75"OD x 2.5"Plate(A572-50;Fy=50 ksi,Fu=65 ksi) 6.125"ID x 2.5"Plate(A572-50;Fy=50 ksi,Fu=65 ksi)
Top Stiffener Data Bottom Stiffener Data
N/A N/A
Top Pole Data Bottom Pole Data
6"x 0.5"round pole(ASTM A513 D.O.M.;Fy=75 ksi,Fu=85 ksi) 26.63"x 0.2188"18-sided pole(A607-65;Fy=65 ksi,Fu=80 ksi)
Analysis Results
Bolt Capacity
Max Load(kips) 3.95
Allowable(kips) 68.67
Stress Rating: 5.5% Pass
Top Plate Capacity Bottom Plate Capacity
Max Stress(ksi): Max Stress(ksi):
Allowable Stress(ksi): Allowable Stress(ksi):
Stress Rating: N/A Stress Rating: N/A
Tension Side Stress Rating: N/A Tension Side Stress Rating: N/A
CClplate-Version 4.1.2 Analysis Date:7/6/2023
Monopole Base Plate Connection CROWN
CASTLE
MIMI
BU# 825717
Site Name .Mattituck
Order# 584825 Rev.14
O
TIA-222 Revision H
Grout Considered: No
I.,(in) 2.125
i
Moment(kip-ft) 454.56
Axial Force(kips) 12.91
Shear Force(kips) 8.46
'TIA-222-H Section 15.5 Applied
o. .o
Connection Properties Analysis kesults
Anchor Rod Data Anchor Rod Summary (units of kips,kip-in)
(4)2-1/4"A bolts(A615-75 N;Fy=75 ksi,Fu=100 ksi)on 44"BC Pu—t=120.61 �Pn_t=243.75 Stress Rating
Vu=2.12 �Vn=149.1 47.1%
Base Plate Data Mu=n/a cWn=n/a Pass
43"W x 1.75"Plate(A572-55;Fy=55 ksi,Fu=70 ksi); Clip:6 in
Base Plate Summary
Stiffener Data Max Stress(ksi): 22.06 (Flexural)
N/A Allowable Stress(ksi): 49.5
l Stress Rating: 42.451. Pass
Pole Data
38.19"x 0.25"18-sided pole(A607-65;Fy=65 ksi,Fu=80 ksi)
CCiplate-Version 4.1.2 Analysis Date:7/6/2023
Drilled Pier Foundation
CROWN
BU#: 825717 CASTLE
Site Name: Mattituck C)c
Order Number: 584825 Rev.14
TIA-222 Revison: H Check Limitation
Tower Type: Monopole - Apply TIA-222-H Section 15.5
NIA
Analysis Results Additional Longitudinal Rebar
Applied Loads Soil Lateral Check Compression uplift Input Effective Depths else Actual):
Camp. Uplift D_o(ft from TOC) 5.68 Shear Design Options
Moment(kip-ft) 4551 Soil Safety Factorl 3.52 - Check Shear along Depth of Pier [�]
Axial Force(kips) 131 Max Moment(kip-ft)1 496.68 Utilize Shear-Friction Methodology:
Shear Force(kips) 81 Rating*1 36.0% 1 Override Critical De nth: "-
Soil Vertical Check Compression Uplift Go to Soil Calculations
Material Properties Skin Friction(kips) 101.64 -
Concrete Stren th,fc: 3 ksi End Bearing(kips) 58.40 -
Rebar Strength,F : 60 ksi Weight of Concrete(kips) 67.89 -
Tie Yield Strength,F : 401 ksi Total Capacity(kips) 160.04 -
Axial(kips) 80.89 -
Pier Design Data Rebar&Pier Options Rating* 48.1% -
Depth 17 ft Reinforced Concrete Flexure Compression Uplift
Ext.Above Grade 0.5 ft Embedded Pole inputs Critical Depth(ft from TOC)1 5.65 1 `
Pier Section 1 Belled Pier inputs Critical Moment(kip-ft)1 496.68 1From 0.5'above grade to 17'belowgrade Critical Moment Capacityl 3306.56 1 -
Pier Diameter 6 ft Rating*1 14.3%
Rebar Quantity 16 Reinforced Concrete Shear Compression Uplift
Rebar Size 11 Critical Depth(ft from TOC) 12.49 -
Clear Cover to Ties 4 in Critical Shear(kip) 86.43
Tie Size 5 Critical Shear Capacityl 446.14 _
Tie Spacing 18 in Rating*1 18.5% 1 -
Structural Foundation Rating' 18.5%
Soil Interaction Rating*1 48.1%
*Rating perTIA-222-H Section 15.5
Soil Profile
1
Groundwater Depth I 7 I #of Layers 1 4
Angle of
Calculated Calculated Ultimate Skin Ultimate Skin Ult.Gross
Top Thicknessy,n Ymocrcte Cohesion Ultimate Skin Ultimate Skin Friction Comp Bearing SPT Blow
Layer (ft) Bottom(ft) (ft) (per (pc (ksf) Friction Friction Comp Friction Uplift Override Friction Uplift Capacity Count Soil Type
(degrees) (ksf) (ksf) Iksf) Override(ksf) (ksf)
1 0 4.167 4.167 110 150 0 0 0.000 0.000 0.00 0.00 Cohesionless
2 4.1671 71 2.833 1101 150 0 30 0.000 0.000 0.42 0.42 Cohesionless
31 71 101 3 47.61 87.6 0 301 0.0001 0.0001 0.601 0.601 Cohesionless
4 10 17 7 47.6 87.6 0 30 0.000 0.000 0.60 0.60 2.754 Cohesionless
Version 5.0.5
I
JNSCE ASCE 7 Hazards Report
AMERICAN SOCIETY OF CIVIL ENGINEERS
Address: Standard: ASCE/SEl7-16 Latitude: 40.991067
No Address at This Location Risk Category: II Longitude: -72.538317
Soil Class: D- Default(see Elevation: 7.64205802669808 ft(NAVD
Section 11.4.3) 88)
ti
�" ff°� ,-� �q"S..' s � '• � �',��»�, .,,, e.�3`.�y'sm .$F`;-�. �� :F //`/.�'�>�t%Kr/ �"y% /h/,//� l�f�i'�'ri%✓�i,���;/l �'/�'h� /�, ;'•
..�'� � �- ��,- <n �+' �'•, � 4�� �"" .�& n iJi"'' fir% ���/�A�' r��!�'y/i/�''�!r%/ ,!✓'/�; ef�"'�✓`Ja"l'�
y,i,� ♦ �:�'�- �,.;�� i '-� ^f %��15� i/rr/.!Vie!a�%'i7'/� r,'�'���'./'� �� "/ y/i/f.���i.f, �/ ✓ i:
.z. ��. �ff t � 5 ?..,.H''. � s.� a: ,� V� ..6 .*�„ h, r-/-rr���'��.rfi f� }' //'!��.' .�lJ'.l! /1,�.:✓ .' �"��.1� .?%
;. �'�i5 .da''' �✓y� .� ! � _ � ,;✓l,F/,/ f✓ ! �,,%I ys�✓%J.r/���✓!�/',a'/'��z:�{ �Tr%¢r Y�,la
•'i`��- '. V'r �*��n Y� '�".: » `" �, �/ .♦ s� /���/ ��✓�;//r�ss� �r r✓ 1r-� y,Stt.�' / kuk! �t rii
.f •.� ,.?'- ,,'C+ '�. ° ♦ `, .,- ,r' '' ify �✓// � / f �/' a r J //,/r r�,y a't / r/
� .1 'f ``r
r'` "�,� ty'� •' r tom= » !� ,a �$:: r �� ✓'�!�%✓✓`i / J✓ Y /�/ ��/�- !
�
//
:; ,-,y �. ". S ♦ �; * f a r / !✓� ✓! �✓l�
5<✓ir r,♦<w 'ii``v. ! ''gE. F ✓,�' .�;'.. �� / /Miry ✓ /..
✓�.,✓t �'. ±Y;• '`- yr Ys, s»�� ,�'' ' rll;/t'� <% /%y r%f/!/ply %y/i ' ✓'_./%f`//./ ^13,
� -r` r 7� s� * ♦ �-, ♦�<,�- ♦:;._� � -. f/ r✓r/:///// .//�<. ,% ✓`/1y� l '/ y/ /j,a9rfyl,''x F
v '�"y -♦,.y� < y »rx.�° r/✓'�X! ! � tf/ /�/ll�/. �- �'2' 'f'/ �� 1'y 5 ,Ar��r
� ;S ✓� (. 1, / l'//r� IRO M
r .f-y've 2: � •' � ; �,<.x "`' �aA �!Fr'/xR, '��! � f/`/�f�
r .< ,'y4 ♦yr.,ly {Y ✓ * �! qf/ / ✓� yy./ r Jj✓ .<�A�yl, / /y/yryl<'. I
gs.» v✓ / tat - r /r-,�/,! /p F �yy✓.`/�;
;� ✓r/ wt< 'u '� ,.r` s ♦♦ y/!N'M'w ! ,y _ fy% /�fr -'';
'`�ri%r,`�✓°`;� r * � �r.,/yYH * - ',rt' « `3�S � f i ,�i &yGmglj n � 4.,y l� // /;/; f' ,i/''ly trosy, `
/�s f� ..,x`� � , �9T '�" 'fit w ♦ °" �>� t :- 's rx°y ! �v l���F /r / r F r,'" y �
x�,* �' r'�* '� � �✓ ;;� »» � � `�,.�y' nor as -"� `f/f�/�% Qr�� ! xir,'�,runr ss�:. t �,�=x; .
,�� �'-w ,;g+r�*°aFs ♦ �tx �arjr s � s`•, y�/� � ,,, � '"G {�s ✓����////,� ` rri ° i ,��
"n•, Ri ♦!� r r�, ��,�%;,yaAi.�a•-.v C .,a1µ•rk':n :'�„a' � !�// � ✓!F/ r ✓yrf ✓i ,� 'n�If9
`� r>'' Y�'h,. !ry» ;.y � -. ,3's �:3� Y� ?mc� 3' ` ti:<� s , l,,r r✓%/`r/ d¢ �rl'`r::'//
��� �� ��4 � -� da"°«."` .w rq .a ✓� < .. } !✓ i t . � € ry// /.' ✓r�,TUw�F M,.,,,�..�5i¢ i -<
of �`s3 ' s��;< ,. :- ! 3 j" r ;•< ss+a ! r y.'" 4`d�H3r�r[cl�,0'�f= y
r-n-1r �/�3�
Wind
Results:
Wind Speed 128 Vmph
10-year MRI 76 Vmph
25-year MRI 87 Vmph
50-year MRI 98 Vmph
100-year MRI 105 Vmph
Data Source: ASCE/SEI 7-16, Fig. 26.5-1 B and Figs. CC.2-1—CC.2-4, and Section 26.5.2
Date Accessed: Thu Jul 06 2023
Value provided is 3-second gust wind speeds at 33 ft above ground for Exposure C Category, based on linear
interpolation between contours. Wind speeds are interpolated in accordance with the 7-16 Standard. Wind speeds
correspond to approximately a 7% probability of exceedance in 50 years (annual exceedance probability=
0.00143, MRI = 700 years).
Site is in a hurricane-prone region as defined in ASCE/SEI 7-16 Section 26.2. Glazed openings need not be
protected against wind-borne debris.
https:/Iasce7hazardtool.online/ Page 1 of 3 Thu Jul 06 2023
ASCE
AMERICAN SOCIETY OF CIVIL ENGINEERS
Seismic D- Default(see Section 11.4.3)
Site Soil Class:
Results:
SS 0.174 So, 0.079
S, 0.049 T L 6
Fa 1.6 PGA : 0.094
F„ 2.4 PGA M : 0.151
SMS 0.278 FPGA 1.6
SM, 0.118 le 1
SoS 0.185 C 0.7
Seismic Design Category: B
cso MCER Response Spectrum Design Response Spectrum
0..20...; .__. ....
l
a25 ,EE I . ... .... ... _..
Q20y ........ -...,_.., ....,,,.
a16
a
._ itt3€3 y /
00 ..
0.€4..
➢{ �y �F✓ '+'' CiG... / s/
0. �d jf7v9 a'y h
Q 1 2 3 s 5 6 7 0 1 2 u 4 5 6 7
Sa(g)vs T(s) Sa(9)vs T(s)
MCER Vertical Response Spectrum Design Vertical Response Spectrum
a16 3 01t
+
0..14 ; 010..j
s
0.10
0.0 � € 06.�c��
C1.f36
41
0.04
✓'e./l �5�5 y% �� ��'9��9y/_.�'.�'3,���j . R.I.RJiA,.,
0.02 . _ ��., ,_._. �s_� 0-02
€S 0.5 1..0 -5 2.0 C} 0.5 1.0 1.5 2-0
Sa(9)vs T(s) Sa(g)vs T(s)
Data Accessed: Thu Jul 06 2023
Date Source:
USGS Seismic Design Maps based on ASCE/SEI 7-16 and ASCE/SEI 7-16 Table 1.5-2.Additional data for
site-specific ground motion procedures in accordance with ASCE/SEI 7-16 Ch. 21 are available from USGS.
https:Hasce7hazardtool.online/ Page 2 of 3 Thu Jul 06 2023
-ASCE"
AMERICAN SOCIETY OF CIVIL ENGINEERS
Ice
Results:
Ice Thickness: 1.00 in.
Concurrent Temperature: 15 F
Gust Speed 50 mph
Data Source: Standard ASCE/SEI 7-16, Figs. 10-2 through 10-8
Date Accessed: Thu Jul 06 2023
Ice thicknesses on structures in exposed locations at elevations higher than the surrounding terrain and in valleys
and gorges may exceed the mapped values.
Values provided are equivalent radial ice thicknesses due to freezing rain with concurrent 3-second gust speeds,
for a 500-year mean recurrence interval, and temperatures concurrent with ice thicknesses due to freezing rain.
Thicknesses for ice accretions caused by other sources shall be obtained from local meteorological studies. Ice
thicknesses in exposed locations at elevations higher than the surrounding terrain and in valleys and gorges may
exceed the mapped values.
i
The ASCE 7 Hazard Tool is provided for your convenience,for informational purposes only,and is provided"as is"and without warranties of
any kind.The location data included herein has been obtained from information developed,produced,and maintained by third party providers;
or has been extrapolated from maps incorporated in the ASCE 7 standard.While ASCE has made every effort to use data obtained from
reliable sources or methodologies,ASCE does not make any representations or warranties as to the accuracy,completeness,reliability,
currency,or quality of any data provided herein.Any third-party links provided by this Tool should not be construed as an endorsement,
affiliation,relationship,or sponsorship of such third-party content by or from ASCE.
ASCE does not intend,nor should anyone interpret,the results provided by this Tool to replace the sound judgment of a competent
professional,having knowledge and experience in the appropriate field(s)of practice,nor to substitute for the standard of care required of such
professionals in interpreting and applying the contents of this Tool or the ASCE 7 standard.
In using this Tool,you expressly assume all risks associated with your use. Under no circumstances shall ASCE or its officers,directors,
employees,members,affiliates,or agents be liable to you or any other person for any direct,indirect,special,incidental,or consequential
damages arising from or related to your use of,or reliance on,the Tool or any information obtained therein.To the fullest extent permitted by
law,you agree to release and hold harmless ASCE from any and all liability of any nature arising out of or resulting from any use of data
provided by the ASCE 7 Hazard Tool.
https://asce7hazardtool.online/ Page 3 of 3 Thu Jul 06 2023
Highlander Consultants, Inc.
November 14,2023
Svl�f`
Building Department P1l Re mIC
RECEIVE
Town of Southold
PO Box 1179
Southold, NY 11971 NOV 21 2023
Sout o d Town
Re:Application for building permit Planning Board
Applicant:T-Mobile Northeast LLC(1-I13544)
Cr
Premises: Celltower �� _
21855 County Rd,Cutchogue
SCTM#:0100-00-01-00-019-001
Dear Sir/Madam:
Enclosed herewith you will find the following in regard to the application for a building permit for T-
Mobile upgrade to it's existing telecommunications facility at the above-named site:
1. Application for building permit signed by Crown Castle as they have the power of attorney,
attached,from the property owner Arthur V Junge
2. Application for electrical inspection noting the electrician to be determined once building permit
issued
3. Check in the amount of$4000 for the technical consultant review
4. Filing fee check in the amount of$375(Accessory:$125; Electrical$150;COO commercial$100)
5. Certificates of Workers Compensation Insurance, Disability Insurance and Liability Insurance for
general contractor, Milicia Electric Corp.
6. Four(4)sets of signed and sealed construction drawings for T-Mobile
Please advise when building permit is ready.
Thank you for your courtesy and cooperation in this matter.
Very truly yours,
rie
155 Carleton Avenue, East Islip,New York 11730
Telephone: (631) 581-8105 Fax: (631) 581-8205
4
OFFICE LOCATION:
Town Hall Annex MAILING ADDRESS
'y P.O. Box 1179
54375 State Route 25
(cor. Main Rd.&Youngs Ave.) j� Southold,NY 11971
Southold, �� - Telephone: 631-765-1938
www.southoldtownny.gov
PLANNING BOARD OFFICE
TOWN OF SOUTHOLD
MEMORANDUM
To: Accounting
From: Planning Department
Date: November 21,. 2023 '
Re: Check
The attached check is a Consultant Escrow Fee for the project review listed below.
Please deposit into B691 Deferred Revenue Account.
Thank you.
Applicant/Project Tax Map # Amount Check Date/No.
Name & Type
T-Mobile Wireless Upgrades at 96.-1-19.1 $4,000.00 11/14/23 -#7782
Junge Highlander Consultants
Highlander Consultants Inc. PEOPLES UNITED BANK, NA 7782
155 Carleton Avenue 3880 Veterans Memorial Highway
East Islip, NY 11730 Bohemia, NY 11716 50-546/214
PAY
TO THE
ORD OF $ V
DOLLARS
A
f�
MEMO
L� AU ORVED SIGNATURE
�, / �`f �
• f r, .
i
GRANT OF EASEMENT
THIS GRANT OF EASEMENT (the "Easement') is ma a effective this day of
2013, by and between ARTHUR V. JUNGE'I("Grantor"), and CROWN
CASTLE TOWERS 09 LLC,a Delaware limited liability company("Grantee").
��115s r1; �1 � mCcO NH 3g
1. Description of Grantor's Prop�111�u1�n erty. Grantor is tie owner oil that certain lSa5and
premises in Cutchogue, County of Suffolk, State of New York,by grant or conveyance described
in the Suffolk County Clerk's Office ("Clerk's Office") in Liber 10321, Page 162. The
description of said property is attached hereto as Exhibit"A"(hereinafter"Grantor's Property").
2. Description of Easement. For good and valuable consideration, the sufficiency of
which the parties hereby acknowledge, Grantor grants and conveys unto Grantee, its successors
and assigns, forever,.an exclusive, perpetual easement for the use of a portion of Grantor's
Property, that portion being shown as the "Tower Easement" in the survey attached hereto as
Exhibit "B" and described as the "Tower Easement" by metes and bounds in Exhibit "C"
attached hereto (the "Easement Area"). The Easement Area shall also include (a)a perpetual
right-of-way for ingress and egress, seven days per week, twenty-four hours per day, on foot or
motor vehicle,including trucks, along a twenty foot wide right-of-way together with the right to
install, replace and maintain above and below ground utility wires, poles, cables, fiber, conduit
and pipes as more fully shown as the "20' Access Easement" on Exhibit 'B" and described as
the"20 Foot Wide Access Easement"on Exhibit"C"(the"Access Easement"), together with an
exclusive, perpetual right-of-way for the installation, replacement, and maintenance of utility
wires, poles,cables, conduits and pipes, in that location more particularly shown as the "Utility
Easement"in the survey attached hereto as Exhibit"B" and described as the "Utility Easement"
by metes and bounds in Exhibit "C"; (b)any portion of Grantor's Property on which
communications facilities exist on the date of this Easement (even if not described in the Lease
Agreement as that term is defined in Section 3 of this Easement). In the event Grantee or any
public utility is unable or unwilling to use the easements described in subsection (a)above,
Grantor hereby agrees to grant an additional right-of-way, in form satisfactory to Grantee, to
Grantee or at Grantee's request,directly to a public utility,at no cost and in a location acceptable
to Grantee.
3. Assignment of Lease Agreement. The parties hereby acknowledge (a) that
certain Option and Lease Agreement dated June 3, 1991, by and between New York SMSA
Limited Partnership, as lessee, and Grantor, as lessor, as amended by that Amendment to Lease
Agreement dated July 12,2005, a memorandum of which is recorded in Liber D00012412 Page
954 in the Clerk's Office; (b)that certain Site Lease with Option dated August 2, 2002,by and �.i'la2rlt� 2�
between Grantor, as lessor, and Omnipoint Facilities Network 2, LLC, by Omnipoint 900P !(02
Communications, Inc.; (c)that certain N.Y. Land Lease Agreement dated November 29, 2004, �77''
by and between Grantor, as lessor, and Cellular Telephone Company d/b/a AT&T Wireless, a
New York partnership, by LIN Cellular Communications Corporation, a New York corporation,
as lessee; and (d) that certain Communications Site Lease Agreement between MetroPCS New
York, LLC, as lessee, and Grantor, as lessor, last executed on July 16, 2009 (each a "Lease
Agreement" and collectively,.the "Lease Agreements'), each said Lease Agrlement being
attached hereto as Exhibit"D". The lessees under the Lease Agreements are hereinafter referred
to individually as "Lessee" and collectively as the "Lessees". As used herein, the term"Lease
NY Cutchogue
BU 806579 2
00
Agreement" or "Lease Agreements" shall include any amendments or addendums to said
agreements. Simultaneously with entering into this Grant of Easement, Grantor and Grantee are
entering into separate assignment agreements to be recorded in the Registry by which Grantor
shall assign all of its right, title and interest in the Lease Agreements to Grantee (the
"Assignment"). Grantor warrants that Grantor has delivered to Grantee true and correct copies
of the Lease Agreements. To Grantor's best knowledge, no party to the Lease Agreements has
breached or is in default of its obligations under the Lease Agreements and no party has
requested or discussed a modification of the Lease Agreements(including a reduction in rent) or
termination now or in the future,
4. Grantor's Obligations With Respect to the Lease Agreements. From and after
the date hereof and continuing until this Easement is terminated(if ever),Grantor shall not,other
than to the extent required herein or requested in writing by Grantee,exercise or enjoy any of the
rights or remedies of the lessor under the Lease Agreements. Grantor shall notify Grantee in
writing within five (5) calendar days of Grantor's receipt of any payment in respect of rent,
income, charges, interest, penalties, fees and other revenue payable by the Lessees, and Grantor
shall forward such payment to Grantee within said five(5)day period. In the event that Grantor
fails to forward to Grantee any payment as provided hereunder, Grantee shall have the right to
collect such payment from Grantor together with interest on such payment at the greater of the
(i)the rate provided by statute where the Easement is located or (ii) 12%per annum (calculated
from the date five(5)days after Grantor receives such payment until Grantor pays such sums due
to Grantee) and shall have a lien against Grantor's Property with respect thereto, Grantor shall,
however, continue to pay, perform, and otherwise discharge all obligations and liabilities of the
lessor under the Lease Agreements with respect to Grantor's Property,whether arising prior to,
on, or after the date hereof. Without limiting the generality of the foregoing, Grantor shall:
(a)fully, faithfully and timely perform all covenants to be performed by the Grantor under the
Lease Agreements; (b)promptly pay all mortgages, loans, liens,judgments and all real estate,
personal income and other taxes that may become due with respect to Grantor's Property;
(c)promptly execute, without any additional consideration, all letters of authorizations, permits,
applications or other documents required for Grantee to fully enjoy the Easement or the Lease
Agreements; (d)not suffer or allow any breach, default or event of default by the Grantor to
occur under the Lease Agreements; and (e)not take any action for the purpose of, or with the
effect of, inducing or causing the Lessees not to exercise a right to renew or extend the Lease
Agreements. Failure to comply,in whole or in part with this Section shall constitute a default by
Grantor of the terms hereof and entitle Grantee to the remedies provided in Section 15 of this
Easement.
5. Permitted Uses. The Easement Area shall be used for constructing, maintaining
and operating communications facilities and energy generation facilities for energy to be used on
and off the Easement Area, including without limitation, tower structures, antenna support
structures, cabinets, meter boards, buildings, antennas, cables, equipment and uses incidental
thereto including those necessary for Grantee's compliance with its obligations under the Lease
Agreements (the "Permitted Use"). No facilities or structures'installed or constructed on the
Easement Area by Grantee shall constitute a fixture,!but shall remain the personal property of
Grantee. Grantor acknowledges that Grantor has' no right to object to or approve any
improvements to be constructed on the Easement Area. If requested by Grantee, Grantor will
execute, at Grantee's sole cost and expense, all documents required by any governmental
NY Cutchogue
BU 806579 3
00
authority in connection with any development of, or construction on, the Easement Area,
including documents necessary to petition the appropriate public bodies for certificates,permits,
licenses and other approvals deemed necessary by Grantee in Grantee's absolute discretion to
utilize the Easement Area for the Permitted Use Grantor agrees to be named applWattt if
re nested by pC3rantee � iheefi ' �rgoiiatree3 apiirtsCxaraiter
k-rantor's;attorney��in�ac�3,ta����e� �e�aE,Y1� �zs��applic��Zr�n�,�p��i����enses-�;anc�ather
ti2soat7► l�eIGrantux shall be entitled to no further consideration with respect
to any of the foregoing matters. Grantor shall take no action that would adversely affect the
status of the Easement Area with respect to the Permitted Use.
6. Perpetual Easement. This Easement and Grantee's rights and privileges hereunder
shall be perpetual and may be terminated only as provided for herein.
7. Purchase Price, Down Payment and Installment Payments. The purchase price
for the rights and interest granted to Grantee pursuant to this Easement is One Million Eight
Hundred Seventy Thousand Dollars ($I,870,000,00) ("Purchase Price"), Upon full execution of
this Easement by both parties, Grantee shall pay a down payment on the Purchase Price in the
amount set forth in Exhibit "E" attached hereto (the "Down'Payment"). Thereafter, Grantee
shall pay the remainder of the Purchase Price in monthly installment payments (each an
"Installment Payment"). The due dates, amounts, and number of Installment Payments are set
forth in the payment schedule in Exhibit "E". Grantee shall have the right to pay off the
remaining balance of the Purchase Price(the"Payoff Amount")at any time,without premium or i
penalty, in accordance with the payment schedule in Exhibit "E", and upon payment of the
Payoff Amount, no further Installment Payments shall be due to Grantor, Grantor and Grantee
agree that all rights granted to Grantee in this Easement,shall be fully vested in Grantee upon full
execution of this Easement by both parties even though the Purchase Price will be paid in
installments.
8. Grantee's-Right to Terminate. Grantee shall have the unilateral right,but not the
obligation, to terminate this Easement for any reason. Upon termination of this Easement, (i)if
the Lease Agreements are then in effect, the rights and obligations as lessor under the Lease
Agreements shall revert to Grantor, (ii)'Grantor may retain the Down Payment and any
Installment Payments paid to Grantor prior to such termination, (iii)Grantee shall be relieved of
any obligation to pay the remaining balance of the Purchase Price, and Grantee shall not owe any
Installment Payments due after the date of termination, and (iv)the parties shall have no further
obligations to each other;provided,however,that if Grantee installed any buildings, structures or
equipment upon the Easement Area, Grantee shall, within a reasonable time, remove all of its
building(s),tower and above ground property and restore the surface of the Easement Area to its
original condition prior to any such installment, reasonable wear and tear excepted. Any
buildings, structures or equipment installed or constructed upon the Easement Area by Lessees,
or those holding by, through and under Lessees, shall be subject to the terms and conditions of
the Lease Agreements. Said termination shall be effective upon Grantee providing written notice
of termination to Grantor.
9. Hazardous Materials.
NY Cutchogue
BU 806579 4
IN WITNESS WHEREOF, Grantor and Grantee,having read the foregoing and intending
to be legally bound hereby, have executed this Grant of Easement as of the day and year first
written above.
GRANTOR:
V
(SEAL)
Arthur V.Junge
STATE OF }
}5S.:
COUNTY OF }
On the &day of Jk,,,np in the year 201'3, before me, the undersigned, a Notary
Public in and for said State, personally appeared Arthur V. Junge, personally known to me or
proved to me on the basis of satisfactory evidence to be the individual whose name is subscribed
to the within Grant of Easement and acknowledged to me ,that he/she executed the same in
his/her capacity, and that by his/her signature on the Grant of Easement, the individual, or the
person upon behalf of which the individual acted,executed the instrument.
By: k�L . �U-KQ*-
Print Name: ,
_
Notary Public �. b ..-
My Commission Expires:
[affix notary stamp or seal]
O!A'MJ/4//���/i
AN
NY Cutchogue
BU 806579 13
IN WITNESS WHEREOF,Grantor and Grantee,,having read the foregoing and intending
to be legally bound hereby,have executed this Grant of Easement as of the day and year first
written above,
GRANTEE:
Crown Castle Towers 09 LLC,
a Delaw limited liability company
By: Tv��'"'",.-- (SEAL)
Print Name: 2LftkN1G.
Tide.
STATE OF �EkI45 )
)SS'
COUNTY OF ? �
On the day of leer in the year 2013 before me, the undersigned,
personally appeared $t�_jj3bMIC [name],personally known to me or
proved to me on the basis of satisfactory evidence to be the individual whose name is subscribed
to the within Grant of Easement and acknowledged to me that she/he executed the same in .
her/his capacity.as r-ke _ [title] of Crown Castle Towers 09
LLC, a Delaware limited liability company, and that, by his/her signature on the Grant of
Easement, the individual, or the person upon behalf of whibh the individual acted, executed
the Grant of ase ent,.
By:
Print Name: &Mru,,,67 -
Title: PAD W-r Cesolz.Df MAJOR
My Commission Expires: 3 a 5•iti
[affix notary'stamp or seal]
KEISER RONNETTE MCMILLER
"= Notary Public,State of Texas
My Commission Expires ;
Match 25,2014
NY Cutchope
BU 806579 14
APPROVED AS NOTED
DATE;I2-I R3_B.P# 5 0 l a 3 COMPLY WITH ALL CODES OF
FEE C)00 O0 NEW YORK STATE&TOWN CODES
----- BY: AS REQUIRED AND CONDITIONS OF
NOTIFY BUILDING DEPARTMENT AT $000LD TOWN.ZBA
631-765-1802 8AM TO 4PM FOR THE
FOLLOWING INSPECTIONS: laZLI� Z�;SW ���� NING BOARD
FOUNDATION-TWO REQUIRED
SOUTHOLpTOM TRUSTEES
FOR POURED CONCRETE ILM of
ROUGH-FRAMING&PLUMBING SOUTNOLDHPC
INSULATION SCHD
FINAL-CONSTRUCTION MUST
BE COMPLETE FOR C.O.
ALL CONSTRUCTION SHALL MEET THE
REQUIREMENTS OF THE CODES OF NEW
YORK STATE. NOT RESPONSIBLE FOR
DESIGN OR CONSTRUCTION ERRORS
OCCUPANCY OR
Additional Certification USE IS UNLAINLFUL
May Be Required. WITHOUT CERTIFICATE
OF OCCUPANCY
ELECTRICAL,
INSPECTION REQUIRED
Y ,
RECEIVE® xT. a 'a 0 a q
Mobi
le
NOVA 202
2 1 3 4 SYLVAN XVAY
PARSIPPANY,NJ 07054
- Southold Town
Planning Board
T-MOBILE SITE NUMBER:LI13544A BUSINESS UNIT #: 806579 CROWN
21855 CONTY T-MOBILE SITE NAME: CUTCHOGUE SITE ADDRESS: CUTCHO UERNY1195 D CC CASTLE
SITE TYPE: MONOPOLE COUNTY: SUFFOLK
TOWER HEIGHT: 1081-611 -JURISDICTION: SUFFOLK COUNTY x,
TOTALLY COMMITTED.
TKK ENGINEERING DPC
266
T-MOBILE ANCHOR SITE CONFIGURATION: 67E5D998E 6160 NY��5 AT HAUEE DRIVE TICN E3DO ET94
6095 MARSHALEE DRNE,SUITE 300
ELKRIDGE,MD 21075
(410)712-7092
SITE INFORMATION DRAWING INDEX LOCATION MAP
CROWN CASTLE USA INC. NY CUTCHOGUE 958280 SHEET# _SHEET DESCRIPTION
SITE NAME: ato rrr a T-MOBILE SITE NUMBER.
T-1 TITLE SHEET r I
SITE ADDRESS: 21855 COUNTRY ROAD LI13544A
CUTCHOGUE,NY 11935 T-2 GENERAL NOTES F orb f a tit a F d
COUNTY: SUFFOLK C-1.1 OVERALL SITE PLAN (V ;'
MAP/PARCEL#: 1000096000100019001 C-1.2 SITE PLAN&ENLARGED SITE PLAN
AREA OF CONSTRUCTION: EXISTING C-2 FINAL ELEVATION&ANTENNA PLAINS / r NY CUTCHOGUE 958280
LATITUDE: 41-1'46.57"
LONGITUDE: 72°29'50.29" C-3 ANTENNA&CABLE SCHEDULE r #
LAT/LONG TYPE: NAD83 C-4 PLUBING DIAGRAM irk F 21855 COUNTRYROAD
GROUND ELEVATION: 52.5 FT C-5 CABINET SPECS i UTCHOGUE,NY 11935
CURRENT ZONING: INDUSTRIAL C
JURISDICTION: SUFFOLK COUNTY C-6 EQUIPMENT SPECS EXISTING 108'-611 MONOPOLE
OCCUPANCY CLASSIFICATION: U E-1 AC PANEL SCHEDULES&ONE LINE DIAGRAMf t
TYPE OF CONSTRUCTION: IIB G-1 ANTENNA GROUNDING DIAGRAM
A.D.A.COMPLIANCE: FACILITY IS UNMANNED AND NOT FOR G-2 GROUNDING DETAILS
HUMAN HABITATION
PROPERTY OWNER: ARTHUR JUNGE,VALERIE LASSER
G-3 GROUNDING DETAILS
r
ISSUE FOR:
TBD DATE DRWN ISSUED
DES./Q
x
TED zozs
OV 09/28/ BC FOR CONSTRUCTION AI
TOWER OWNER CROWN CASTLE r
2000 CORPORATE DRIVE
:: c set
CANONSBURG,PA 15317
}ta x4 Farm
,d
CARRIER/APPLICANT: T-MOBILE ALL DRAWINGS CONTAINED HEREIN ARE FORMATTED FOR NO SCALE �
4 SYLVAN WAY X34.CONTRACTOR SHALL VERIFY ALL PLANS AND EXISTIN
PARSIPPANY,NJ 07054 DIMENSIONS AND CONDITIONS ON THE JOB SITE AND SHALL
IMMEDIATELY NOTIFY THE ENGINEER IN WRITING OFANY APPLICABLE CODES/REFERENCE APPROVALS
ELECTRIC PROVIDER: LONG ISLAND POWER AUTHORITY DISCREPANCIES BEFORE PROCEEDING WITH THE WORK OR
631-755-6000 BE RESPONSIBLE FOR SAME. DOCUMENTS
TELCO PROVIDER VERIZON APPROVAL SIGNATURE DATE
877-728-6101 PROJECT DESCRIPTION ALL MIRK SHALL BE PERFORMED AND MATERIALS INSTALLED IN ACCORDANCE OF NEIy
WITH THE CURRENT EDITIONS OF THE FOLLOWING CODES AS ADOPTED BY PROPERTY OWNER OR REP.
THE LOCAL GOVERNING AUTHORITIES.NOTHING IN THESE PLAINS IS TO BE
PROJECT TEAM THE PURPOSE OF THIS PROJECT IS TO ENHANCE CONSTRUED TO PERMIT WORK NOT CONFORMING TO'I'HESE CODES:
BROADBAND CONNECTIVITY AND CAPACITY TO THE, CODE TYPE CODE LAND USE PLANNER
ABcEFIRbL CROWN CASTLE USA INC.
EXISTING ELIGIBLE WIRELESS FACILITY. BUILDING 2020IBC
MECHANICAL 2020IMC T-MOBILE ``b °s44Ta
2000 CORPORATE DRIVE TOWER SCOPE OF WORK: ELECTRICAL 2020 NEC �fESS101��"�
CANONSBURG,PA 15317 •REMOVE(6)ANTENNAS
CROWNAE.APPROVAL@CROWNCASTLE.COM •REMOVE(3)TMAs OPERATIONS 69128=23
•REMOVE(2)HYBRID CABLES
CROWN CASTLE 1200 MACARTHUR BLVD,SUITE 200 •INSTALL(6)ANTENNAS REFERENCE DOCUMENTS:
RP
USA INC.DISTRICT MAHWAH, 07430 •INSTALL(3)RRHs
� 1 5 STRUCTURAL ANALYSIS: BY OTHERS
CONTACTS: •INSTALL(3) - /8"HYBRID CABLES DATED:
NETWORK
TBD-PROJECT MANAGER GROUND SCOPE OF WORK MOUNT ANALYSIS: TRYLON PETER ANGELO LUDAS,P.E.
TBD •REMOVE(2)EXISTING EQUIPMENT CABINETS DATED: 09/01/23 BACKHAUL STATE OF NEW YORK
•REMOVE(6)EMSTL14G RRHs RFDS REVISION: 5
PROFESSIONAL ENGINEER
•REMOVE(1)EXISTING DUW30 DATED: 07/31/23 LICENSE#094478
TBD-CONSTRUCTION MANAGER •INSTALL(1)B160 BATTERY CABINET CONSTRUCTION MANAGER
TBD .INSTALL(1)6160 EQUIPMENT CABINET ORDER ID: 656006
•INSTALL(1)RBS6601 REVISION: 0
•INSTALL(1)RP6651 ___.IT�sriviourioNOF[n�vroanhviso __.-
UNLESS THEY ARE ACTING UNDERTHE DIRECTION
OFA LICENSED PROFESSIONAL ENGINEER,
TO ALTERTHZ DOCUBIEN r.
THE PARTIES ABOVE HEREBY APPROVE AND ACCEPT THESE DOCUMENTS IN SHEET NUMBER REVISION:
NOTE: CALL,NEW YORK ONE CALL AND AUTHORIZE THE CONTRACTOR TO PROCEED WITH THE
PRIOR TO ACCESSING/ENTERING THE SITE YOU MUST (80 CONSTRUCTION DESCRIBED HEREIN.ALL CONSTRUCTION DOCUMENTS 0
WORKING
p
CONTACT'THE CROWN NOC AT(800)788-7011&CROWN � CALL 3 W W 62 ORKING DAYS ARE SUBJECT TO REVIEW BY THE LOCAL BUILDING DEPARTMENT AND
CONSTRUCTION MANAGER BEFORE YOU DIG! ANY CHANGES AND MODIFICATIONS THEY MAY IMPOSE. T- 1
CROWN CASTLE USA INC SITE ACTIVITY REQUIREMENTS' GENERAL NOTES: ELECTRICAL INSTALLATION NOTES:
1. NOTICE TO PROCEED- NO WORK SHALL COMMENCE PRIOR TO CROWN CASTLE USA INC. WRITTEN NOTICE 1. FOR THE PURPOSE OF CONSTRUCTION DRAWING, THE FOLLOWING DEFINITIONS SHALL APPLY: •
TO PROCEED NTP AND THE ISSUANCE OF A PURCHASE ORDER. PRIOR TO ACCESSING ENTERING THE CONTRACTOR: GENERAL CONTRACTOR RESPONSIBLE FOR CONSTRUCTION 1. ALL ELECTRICAL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, NEC AND ALL APPLICABLE f'�
( ) / CARRIER: T-MOBILE FEDERAL, STATE, AND LOCAL CODES/ORDINANCES. * � ��{"'�r ■
SITE YOU MUST CONTACT THE CROWN CASTLE USA INC. NOC AT 800-788-7011 & THE CROWN CASTLE TOWER OWNER: CROWN CASTLE USA INC. 2. CONDUIT ROUTINGS ARE SCHEMATIC. CONTRACTOR SHALL INSTALL CONDUITS SO THAT ACCESS TO EQUIPMENT IS NOT BLOCKED „ii/YYY...iiR TTN// V
USA INC. CONSTRUCTION MANAGER. 2. THESE DRAWINGS HAVE BEEN PREPARED USING STANDARDS OF PROFESSIONAL CARE AND COMPLETENESS NORMALLY AND TRIP HAZARDS ARE ELIMINATED.
2. 'LOOK UP" - CROWN CASTLE USA INC. SAFETY CUMB REQUIREMENT: EXERCISED UNDER SIMILAR CIRCUMSTANCES BY REPUTABLE ENGINEERS IN THIS OR SIMILAR LOCALITIES. IT IS 3. WIRING, RACEWAY AND SUPPORT METHODS AND MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF THE NEC. 4 SYLVAN\nAY
THE INTEGRITY OF THE SAFETY CUMB AND ALL COMPONENTS OF THE CLIMBING FACILITY SHALL BE ASSUMED THAT THE WORK DEPICTED WILL BE PERFORMED BY AN EXPERIENCED CONTRACTOR AND/OR WORKPEOPLE 4. ALL CIRCUITS SHALL BE SEGREGATED AND MAINTAIN MINIMUM CABLE SEPARATION AS REQUIRED BY THE NEC.
CONSIDERED DURING ALL STAGES OF DESIGN, INSTALLATION, AND INSPECTION. TOWER MODIFICATION, MOUNT WHO HAVE A WORKING KNOWLEDGE OF THE APPLICABLE CODE STANDARDS AND REQUIREMENTS AND OF INDUSTRY 4.1. ALL EQUIPMENT SHALL BEAR THE UNDERWRITERS LABORATORIES LABEL OF APPROVAL, AND SHALL CONFORM TO PARSIPPANY,NJ 07054
REINFORCEMENTS, AND/OR EQUIPMENT INSTALLATIONS SHALL NOT COMPROMISE THE INTEGRITY OR ACCEPTED STANDARD GOOD PRACTICE. AS NOT EVERY CONDITION OR ELEMENT IS (OR CAN BE) EXPLICITLY SHOWN REQUIREMENT OF THE NATIONAL ELECTRICAL CODE.
FUNCTIONAL USE OF THE SAFETY CLIMB OR ANY COMPONENTS OF THE CLIMBING FACILITY ON THE ON THESE DRAWINGS, THE CONTRACTOR SHALL USE INDUSTRY ACCEPTED STANDARD GOOD PRACTICE FOR 4.2. ALL OVERCURRENT DEVICES SHALL HAVE AN INTERRUPTING CURRENT RATING THAT SHALL BE GREATER THAN THE SHORT
STRUCTURE. THIS SHALL INCLUDE, BUT NOT BE LIMITED TO: PINCHING OF THE WIRE ROPE, BENDING OF MISCELLANEOUS WORK NOT EXPLICITLY SHOWN. CIRCUIT CURRENT TO WHICH THEY ARE SUBJECTED, 22,000 AIC MINIMUM. VERYIFY AVAILABLE SHORT CIRCUIT CURRENT DOES
THE WIRE ROPE FROM ITS SUPPORTS, DIRECT CONTACT OR CLOSE PROXIMITY TO THE WIRE ROPE WHICH 3. THESE DRAWINGS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATE,Tl4 QAA-OR METHODS OF NOT EXCEED THE RATING OF ELECTRICAL EQUIPMENT IN ACCORDANCE WITH ARTICLE 110.24 NEC OR THE MOST CURRENT
MAY CAUSE FRICTIONAL WEAR, IMPACT TO THE ANCHORAGE POINTS IN ANY WAY, OR TO IMPEDE/BLOCK ITS CONSTRUCTION. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE COF,(STR1J4'1'},QN •FANS, METHODS, ADOPTED CODE PRE THE GOVERNING JURISDICTION.
INTENDED USE. ANY COMPROMISED SAFETY CLIMB, INCLUDING EXISTING CONDITIONS MUST BE TAGGED OUT TECHNIQUES, SEQUENCES,AND PROCEDURES. THE CONTRACTOR SHALL PROM 'BALL MEAS,,.R _NECESSARY FOR 5. EACH END OF EVERY POWER PHASE CONDUCTOR, GROUNDING CONDUCTOR, AND TELCO CONDUCTOR OR CABLE SHALL BEOR%All
AND REPORTED TO YOUR CROWN CASTLE USA INC. POC OR CALL THE NOC TO GENERATE A SAFETY CUMB PROTECTION Of LIFE AND PROPERTY DURING CONSTRUCTION. SUCH MEASURES,SHALL JNCLUQW'BUT NOT BE LIMITED LABELED WITH COLOR-CODED INSULATION OR ELECTRICAL TAPE (3M BRAND, 1/2"PLASTIC ELECTRICAL TAPE WITH UV CROWN
MAINTENANCE AND CONTRACTOR NOTICE TICKET. TO, BRACING, FORMWORK. SHORING, ETC. SITE VISITS BY THE ENGINEER OR.HISf2J°PRESENTA .WILL NOT INCLUDE PROTECTION, OR EQUAL). THE IDENTIFICATION METHOD SHALL CONFORM WITH NEC AND OSHA
3. PRIOR TO THE START OF CONSTRUCTION,ALL REQUIRED JURISDICTIONAL PERMITS SHALL BE OBTAINED. INSPECTION OF THESE ITEMS AND IS FOR STRUCTURAL OBSERVATION OF ffl,4 fFINISHEO,STRUCTURE?ONLY. 6. ALL ELECTRICAL COMPONENTS SHALL BE CLEARLY LABELED WITH LAMICOID TAGS SHOWING THEIR RATED VOLTAGE, PHASE
4. NOTES AND DETAILS IN THE CONSTRUCTION DRAWINGS SHALL TAKE PRECWpENCE'-OVER GENERAL,NCTES AND TYPICAL CONFIGURATION, WIRE CONFIGURATION, POWER OR AMPACITY RATING AND BRANCH CIRCUIT ID NUMBERS CASTLE
THIS INCLUDES, BUT IS NOT LIMITED TO, BUILDING, ELECTRICAL, MECHANICAL, FIRE, FLOOD ZONE, (i.e. PANEL BOARD AND
DETAILS. WHERE NO DETAILS ARE SHOWN, CONSTRUCTION SHALL CONFCRM"f6 SIMILAR WORKryQIJ THE PROJECT, CIRCUIT ID'S ENVIRONMENTAL,AND ZONING.AFTER ONSITE ACTIVITIES AND CONSTRUCTION ARE COMPLETED, ALL ).
REQUIRED PERMITS SHALL BE SATISFIED AND CLOSED OUT ACCORDING TO LOCAL JURISDICTIONAL AND/OR AS PROVIDED FOR IN THE CONTRACT DOCUMENTS. WHERE,°j 1,CR PANCJ}r5 OCCUR 8ET. %PLANS, DETAILS, 7, PANEL BOARDS (ID NUMBERS) SHALL BE CLEARLY LABELED WITH PLASTIC LABELS.
REQUIREMENTS. GENERAL NOTES, AND SPECIFICATIONS, THE GREATER, MORE STRICTIREQUIREMENTS.BRAE[GpVERi•T IF FURTHER g. ALL TIE WRAPS SHALL BE CUT FLUSH WITH APPROVED CUTTING TOOL TO REMOVE SHARP EDGES.
4. ALL CONSTRUCTION MEANS AND METHODS; INCLUDING BUT NOT LIMITED TO, ERECTION PLANS, RIGGING CLARIFICATION IS REQUIRED CONTACT THE ENGINEER OF RECOROZ`2' " „1 9. ALL POWER AND EQUIPMENT GROUND WIRING IN TUBING OR CONDUIT SHALL BE SINGLE COPPER CONDUCTOR 14 OR LARGER
PLANS, CLIMBING PLANS, AND RESCUE PLANS SHALL BE THE RESPONSIBILITY OF THE GENERAL 5. SUBSTANTIAL EFFORT HAS BEEN MADE TO PROVIDE ACCURATE..01tdWNSIDNS ANB MEASUREMENT$ON ti't-IEp DRAWINGS TO WITH TYPE THHW, THWN, THWN-2, XHHW, XHHW-2, THW, THW-2, RHW, OR RHW-2 INSULATION UNLESS OTHERWISE SPECIFIED.)
CONTRACTOR RESPONSIBLE FOR THE EXECUTION OF THE WORK CONTAINED HEREIN, AND SHALL MEET ASSIST IN THE FABRICATION AND/OR PLACEMENT OF CONS,T{�UCTf,ON:.ELEMENTS BUT,Tf iS THE;,S6 A&ONSIBILTTY 10. SUPPLEMENTAL EQUIPMENT GROUND WIRING LOCATED INDOORS SHALL BE SINGLE COPPER CONDUCTOR (#6 OR LARGER) WITH
ANSI/ABBE A10.48 (LATEST EDITION); FEDERAL, STATE, AND LOCAL REGULATIONS; AND ANY APPLICABLE OF THE CONTRACTOR TO FIELD VERIFY THE DIMENSIONS,..M,EAS`U1IE�MENT$ ANJIfOR;;:CLEARANCES SHOYJN,1 THE TYPE THHW, THWN, THWN-2, XHHW, XHHW-2,THW, THW-2, RHW, OR RHW-2 INSULATION UNLESS OTHERWISE SPECIFIED. "` tlx
INDUSTRY CONSENSUS STANDARDS RELATED TO THE CONSTRUCTION ACTIVITIES BEING PERFORMED. ALL CONSTRUCTION DRAWINGS PRIOR TO FABRICATION OR cljft' ,�QF ANY;NEW OR-EX4$71NG CON5n2UCTID1d eEL;EMENTS. 11. POWER AND CONTROL WIRING IN FLEXIBLE CORD SHALL BE MULTI-CONDUCTOR, TYPE SCOW CORD (#14 OR LARGER) UNLESS
RIGGING PLANS SHALL ADHERE TO ANSI/ASSE A10.48 (LATEST EDITION) AND CROWN CASTLE USA INC. IF IT IS DETERMINED THAT THERE ARE DISCREPANCIES.ANE'eJt7fi CONFk1C35 WITk THE,CONSTRUCTON DRAWINGS THE OTHERWISE SPECIFIED.
STANDARD CED-STD-10253, INCLUDING THE REQUIRED INVOLVEMENT OF A QUALIFIED ENGINEER FOR ENG6. PRIOR OF RECORD 13 TO OF NOTIFIED ODI OON•AS POSSIBLE 12. POWER AND CONTROL WIRING FOR USE IN CABLE TRAY SHALL BE MULTI-CONDUCTOR, TYPE TC CABLE (#14 OR LARGER),WITH
THE NG C0NT)ZAGTOR'SHALC;VISTT THE.:CF1.k SL7E IQ F,RMICW2IE.,,YITH THE p p� P �qu C CLASS N CONSTRUCTION, TO CERTIFY THE SUPPORTING STRUCTURE(S) IN ACCORDANCE WITH ANSI/TIA-322 TYPE THHW. THWN, THWN-2, XHHW, XHHW-2, THW, THW-2, RHW, OR RHW-2 INSULATION UNLESS OTHERWISE SPECIFIED. TOTALLY �rOO"01",ITT6Q
(LATEST EDITION). EXISTING CONDITIONS AND TO CONFIRM THAT THE rvORt�CAN BE ACCOMPLi5HEd Q5 SHOWN.ON THE CONSTRUCTION 13. ALL POWER AND GROUNDING CONNECTIONS SHALL BE CRIMP-STYLE, COMPRESSION WIRE LUGS AND WIRE NUTS BY THOMAS AND
DRAWINGS. ANY DISCREPANCY FOUND SHALL 81?BROUGHT... THE ATTENTION OF CROWN GA5fLE TICK ENGINEERING DPC
5. ALL SITE WORK TO COMPLY WITH OAS-STD-10068 "INSTALLATION STANDARDS FOR CONSTRUCTION 7. ALL MATERIALS FURNISHED AND INSTALLED SHATtI BE IN.STR1C{ACCORQANCE.VYITH_CALL AP.Rf_IGABLE CODES 7 BETTS (OR EQUAL). LUGS AND WIRE NUTS SHALL BE RATED FOR OPERATION NOT LESS THAN 75- C (90- C IF AVAILABLE). PSC#123266
ACTIVITIES ON CROWN CASTLE USA INC. TOWER SITE"AND LATEST VERSION OF ANSI/TIA-1019-A-2012
REGULATIONS AND ORDINANCES. CONTRACTOR SNACC ISSUE'FlL1 0PRCPRWTS'NOTIGE5 AND'COMPLY WITH AI,4 ilJiWS, 14. RACEWAY AND CABLE TRAY SHALL BE LISTED OR LABELED FOR ELECTRICAL USE IN ACCORDANCE WITH NEMA, UL. ANSI/IEEE xr cexrmurwx ocnurxowunox xo.oaarss
STANDARD FOR INSTALLATION, ALTERATION, AND MAINTENANCE OF ANTENNA SUPPORTING STRUCTURES AND ORDINANCES, RULES, REGULATIONS AND Y,AWEUk.':ORDERS OFt qNY}�t1BUC AUTHORV-REGARDING THE pEREORMANCE AND NEC. 6D95 MARSHALEE DRIVE,SUITE 300
ANTENNAS.' OF THE WORK.ALL WORK CARRIED CUT SHAk.L COMPLY WITH ALL gPPl'CABkE MUNICJPAL A1.ND�;'(17TLITY COMPANY 15. ELECTRICAL METALLIC TUBING (EMT), INTERMEDIATE METAL CONDUIT(INC), OR RIGID METAL CONDUIT (RMC) SHALL BE USED FOR ELKRIDGE,MD 21075
6. IF THE SPECIFIED EQUIPMENT CAN NOT BE INSTALLED AS SHOWN ON THESE DRAWINGS,THE CONTRACTOR SPECIFICATIONS AND LOCAL JURISDICTIONAL CODES ORDINANCES:Ail Ct1A(?PLICABLEJ;i2EGULATfON$; 1 �_, EXPOSED INDOOR LOCATIONS. (410)712gO92
SHALL PROPOSE AN ALTERNATIVE INSTALLATION FOR APPROVAL BY CROWN CASTLE USA INC. PRIOR TO 8. UNLESS NOTED OTHERWISE, THE WOgi(C� RALL:iNCEUDE F,U1.RNISHfNG.MAfERIAtb ,EQUIPMENT.APPURTENAh10ES AND.-., 16. ELECTRICAL METALLIC TUBING (EMT) OR METAL-CLAD CABLE (MC)SHALL BE USED FOR CONCEALED INDOOR LOCATIONS.
PROCEEDING WITH ANY SUCH CHANGE OF INSTALLATION. LABOR NECESSARY TO COMPLETE BALL3NSTALLATfONS AS 1ND(CATED ONTH):BRAWJNGS �'r +�*' 17. SCHEDULE 40 PVC UNDERGROUND ON STRAIGHTS AND SCHEDULE 80 PVC FOR ALL ELBOWS/90s AND ALL APPROVED ABOVE
7. ALL MATERIALS FURNISHED AND INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE 9. THE CONTRACTOR SHALL INSTALL�}4AIL:?£QUiPMEN'I"?NR MATERIALS 111 AC.CORpANGE.WIT{1 MAP}UF,ACTISRERFS 41' GRADE PVC CONDUIT.
CODES, REGULATIONS AND ORDINANCES. CONTRACTOR SHALL ISSUE ALL APPROPRIATE NOTICES AND RECOMMENDATIONS UNLESS SPECIFf�,&EY,VATE15:.QTNERW& - 18. LIQUID-TIGHT FLEXIBLE METALLIC CONDUIT (LIQUID-TITE FLEX) SHALL BE USED INDOORS AND OUTDOORS,WHERE VIBRATION
COMPLY WITH ALL LAWS, ORDINANCES, RULES, REGULATIONS AND LAWFUL ORDERS OF ANY PUBLIC 10. IF THE SPECIFIED EQUIPMENT CAN.NYST 8W iN$TI)tJ,Wp A1S,SHOWN ON.THk'SE RRAWINQS THE CONTRACTOR SHALL OCCURS OR FLEXIBILITY IS NEEDED.
AUTHORITY REGARDING THE PERFORMANCE OF THE WORK. ALL WORK CARRIED OUT SHALL COMPLY WITH PROPOSE AN ALTERNATIVE INSTALLATTQN POR:APPROVAC BY THE CARRIER AND CROWN CAS'TL�y`VRIOR TO PROCEEDING 19. CONDUIT AND TUBING FITTINGS SHALL BE THREADED OR COMPRESSION-TYPE AND APPROVED FOR THE LOCATION USED. SET ALL APPLICABLE MUNICIPAL AND UTILITY COMPANY SPECIFICATIONS AND LOCAL JURISDICTIONAL CODES, WITH ANY SUCH CHANGE OF INSTALLATION. 'y „� SCREW FITTINGS ARE NOT ACCEPTABLE. T-MOBILE'
TT L
SITE NUMBER
ORDINANCES AND APPLICABLE REGULATIONS. 11. CONTRACTOR IS TO PERFORM A SITE INVESTIGATION Tt}fB I$7A DETERMINE THE BEST#20LIti1.Ny:µC�`OF ALL CONDUITS FOR 20. CABINETS, BOXES AND WIRE WAYS SHALL BE LABELED FOR ELECTRICAL USE IN ACCORDANCE WITH NEMA, UL, ANSI/IEEE AND ,1 POWER, AND TELCO AND FOR GROUNDING CABLE;5 J15 sNQWN IN THE POWER 7ELCC ADD Fsl;QUNDING PLAN THE NEC. LI13544A
12. THE CONTRACTOR SHALL PROTECT EXISTING IMP
8. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS UNLESS SPECIFICALLY STATED OTHERWISE. DRAWINGS. 21. WIREWAYS SHALL BE METAL WITH AN ENAMEL FINISH AND INCLUDE A HINGED COVER, DESIGNED TO SWING OPEN DOWNWARDS
,RV,l Ety1ENTS-PAVEMENTS:CURBS fANpSCA.}tSG AND STRUCTURES. ANY (WIREMOLD SPECMATE WIREWAY).
9. THE CONTRACTOR SHALL CONTACT UTILITY LOCATING SERVICES PRIOR TO THE START OF CONSTRUCTION. DAMAGED PART SHALL BE REPAIRED AT CONTRACTOR S UVENSW Tfl THE SAT}SFACTKIN•QF L^ROWN CASTLE USA INC. 22. SLOTTED WIRING DUCT SHALL BE PVC AND INCLUDE COVER (PANDUIT TYPE E OR EQUAL).
10. ALL EXISTING ACTIVE SEWER, WATER, GAS, ELECTRIC AND OTHER UTILITIES WHERE ENCOUNTERED IN THE 13. CONTRACTOR SHALL LEGALLY AND PROPERLY DISP05F OF.ALL,SCRAP 1MATWRIAkS Sl3GH�4$z' OAXIAL CABLES AND 23. CONDUITS SHALL BE FASTENED SECURELY IN PLACE WITH APPROVED NON-PERFORATED STRAPS AND HANGERS. EXPLOSIVE BU#•806579
WORK, SHALL BE PROTECTED AT ALL TIMES AND WHERE REQUIRED FOR THE PROPER EXECUTION OF THE OTHER ITEMS REMOVED FROM THE EXISTING FACE[£'! ANTENNAS REMOVawB SHACC:6E R ( ED TO THE OWNERS DEVICES (i.e. POWDER-ACTUATED) FOR ATTACHING HANGERS TO STRUCTURE WILL NOT BE PERMITTED. CLOSELY FOLLOW THE
EXCAVATING
E
WORK, SHALL BE RELOCATED AS DIRECTED BY CONTRACTOR. EXTREME CAUTION SHOULD BE USED BY THE DESIGNATED LOCATION, %ta'i LINES-OF THE STRUCTURE, MAINTAIN CLOSE PROXIMITY TO THE STRUCTURE AND KEEP CONDUITS IN TIGHT ENVELOPES. CHANGES NY CUTCHOGUE 958280
CONTRACTOR WHEN
r=
OR DRILLING PIERS AROUNDN T OR EAR UTILITIES. CONTRACTOR SHALL 14. CONTRACTOR SHALL LEAVE PREMISES IN CLEANI,:CONO1TiON.'TRASIi ANp l)EDRIS SHOULD BE REMOVED FROM SITE ON L{p{�AI}TECTIO.fi1'70 ROUTE AROUND OBSTACLES SHALL BE MADE WITH CONDUIT OUTLET BODIES. CONDUIT SHALL BE INSTALLED IN
PROVIDE SAFETY TRAINING FOR THE WORKING CREW. THIS WILL INCLUDE BUT NOT BE LIMITED TO A) FALL A DAILY BASIS. q�NK'ATggjJk WORKMANLIKE MANNER. PARALLEL AND PERPENDICULAR TO STRUCTURE WALL AND CEILING LINES. ALL CONDUIT
PROTECTION B) CONFINED SPACE C) ELECTRICAL SAFETY D)TRENCHING AND EXCAVATION E) StMA48E FISHED TO CLEAR OBSTRUCTIONS. ENDS OF CONDUITS SHALL BE TEMPORARILY CAPPED FLUSH TO FINISH GRADE TO p
CONSTRUCTION SAFETY PROCEDURES. 2105[ COUNTRY ROAD
"`""` w"��°+2 7`F 4h a a'n,„ j* ''pR£VENT CONCRETE, PLASTER OR DIRT FROM ENTERING. CONDUITS SHALL BE RIGIDLY CLAMPED TO BOXES BY GALVANIZED O 5 COUNTRY 11. ALL SITE WORK SHALL BE AS INDICATED ON THE STAMPED CONSTRUCTION DRAWINGS AND PROJECT .r::.w :iq; " G i a y t i !MALLEABLE IRON BUSHING ON INSIDE AND GALVANIZED MALLEABLE IRON LOCKNUT ON OUTSIDE AND INSIDE.
SPECIFICATIONS, !ATEST APPROVED REVISION. IS{{yy 4 t 7,7 r i- �', 1 '
CflNG1 "TE, FOUNDATI4NSr Al � fC)RGING ST, L T ..skn 24 €j)UIPMENT CABINETS, TERMINAL BOXES, JUNCTION BOXES AND PULL BOXES SHALL BE GALVANIZED OR EPDXY-COATED SHEET CUTCHOGUE NY 11935
12. CONTRACTOR SHALL KEEP THE SITE FREE FROM ACCUMULATING WASTE MATERIAL, DEBRIS,AND TRASH AT r �`- a�• as µ '•' s .3 + ^`
r '^ m ,ry �` "-STEEL. SHALL MEET OR EXCEED UL 50 AND BE RATED NEMA 1 (OR BETTER) FOR INTERIOR LOCATIONS AND NEMA 3R (OR
ry.
w
THE COMPLETION OF THE WORK, IF NECESSARY, RUBBISH, STUMPS, DEBRIS, STICKS, STONES AND OTHER ,+::'- ; M. .: t f;.. VY�r_� ✓s. ,+t ? .`.BETTER) FOR EXTERIOR LOCATIONS.
REFUSE SHALL BE REMOVED FROM THE SITE AND DISPOSED OF LEGALLY. T ;.Attf;3'CONCRETE WORK":,$111{Lky,>SE,',rIN ACCORDAPTs;�{y} a)'};E AGiO7„Q;Ei-318, ACI 336 P,STMasIB�, ASIMi TBg AA1� "?6. METAL RECEPTACLE, SWITCH AND DEVICE BOXES SHALL BE GALVANIZED, EPDXY-COATED OR NON-CORRODING; SHALL MEET OR
13. ALL EXISTING INACTIVE SEWER, WATER, GAS, ELECTRIC AND OTHER UTILITIES, WHICH INTERFERE WITH THE i,'{} DESIGN AND CQ.T�ST."'4.`;UOcIQ.N'SPECIFICATION:� SRAST'.-1f} PLAE^F,`%CONCRETE. ky, �,:.1 ,i a - EXCEED UL 514A AND NEMA OS 1 AND BE RATED NEMA 1 OR BETTER FOR INTERIOR LOCATIONS AND WEATHER PROTECTED EXISTING 1081-6I MONOPOLE
EXECUTION OF THE WORK, SHALL BE REMOVED AND/OR CAPPED, PLUGGED OR OTHERWISE DISCONTINUED r'TkJNt ESS NOTED OTFJgW{SE $OIL BEARING PRESS(JT W.�{}$E�D FOR ETWSSIG OF SLABS AND'WOUt T)ATIONS 1 `.1 ,t1fAF„D �; y;..(Wp OR BETTER) FOR EXTERIOR LOCATIONS. ( )
AT POINTS WHICH WILL NOT INTERFERE WITH THE EXECUTION OF THE WORK, SUBJECT TO THE APPROVALS+TO.��BE 1000 psf a ;°a•5; ,f,y: r k„t ,y n3v S1'rr ,, .�, 26'^NONMETAWC RECEPTACLE, SWITCH ANO DEVICE BOXES SHALL MEET OR EXCEED NEMA OS 2 (NEWEST REVISION) AND BE RATED
OF CONTRACTOR, TOWER OWNER, CROWN CASTLE USA INC.,AND/OR LOCAL UTILITIES. - ,tit AL�-' CONCRETE SHH(p�LLL HfVE,yA.MINIMUM COMPRESSF{+E,ST7,2EN+}Tki>{£c�kOF 3000 psi AT 2G_,1TgY$uUNLESS�a�t.}OTEt'k.'� u '' EMA 1 OR BETTER FOR INTERIOR LOCATIONS AND WEATHER PROTECTED WP OR BETTER FOR EXTERIOR LOCATIONS.
14. THE CONTRACTOR SHALL PROVIDE SITE SIGNAGE IN ACCORDANCE WITH THE TECHNICAL SPECIFICATION FOR .Q'fHERWISE. NO MQ{2F�,;'(kfAi'F,,.,90 MINUTES SHALt,",:,�E .,E^FROIWJA C,T{x`DME TO TIME OF'f'CACI•MWNT UNL">n;SS,,w.3 ( ) ( )
SITE SIGNAGE REQUIRED BY LOCAL JURISDICTION AND SIGNAGE REQUIRED ON INDIVIDUAL PIECES OF t�, },WPROVED BY THE;ENG1N£Ej2gOF RECORD,TI:'MP,ERAR T�1C{E OE: Q CRETE'.SHALL NQT^, OEEA:$bf AT$`J7 :%QF ' '2� .'filiE CONTRACTOR SHALL NOTIFY AND OBTAIN NECESSARY AUTHORIZATION FROM THE CARRIER AND/OR CROWN CASTLE USA INC.
EQUIPMENT, ROOMS, AND SHELTERS. 1ALACEMENT. �r ' 'i!..w. n �' C R i•. -y `� E TML D£FORE COMMENCING WORK ON THE AC POWER DISTRIBUTION PANELS.
v4 k,'',i s x: 4!" "` sl�.xl` T '^ a "' CONTRACTOR SHALL PROVIDE NECESSARY TAGGING ON THE BREAKERS, CABLES AND DISTRIBUTION PANELS IN ACCORDANCE
15. THE SITE SHALL BE GRADED TO CAUSE SURFACE WATER TO FLOW AWAY FROM THE CARRIER'S EQUIPMENT E:.: d ,{,CONCRETE EJ(POSEDt ('7,,FRrcp*£r-'11�g1"/OYCL$S,SHfti,t:CONTAIN1R1F,T's' P,AiNfN`Gtglyf;Tlk7U}2ESfiAMOUI�'T('iF*=,A,TCd,,.: C E H THE APPLICABLE CODES AND STANDARDS TO SAFEGUARD LIFE AND PROPERTY. ISSUED FOR
AND TOWER AREAS. ET142�A1NME:N7"T€?HE i9A8ED pA}IwIZF�_.OF A7'Z•iREGA'T AND'.F3 CLA55':E1fPOSURE�,Y)jY„..,56VWRE). CEMENT"USED TO BE �y29:q"INSTALL LAMICOID LABEL ON THE METER CENTER TO SHOW "T-MOBILE". Dom,
16. THE SUB GRADE SHALL BE COMPACTED AND BROUGHT TO A SMOOTH UNIFORM GRADE PRIOR TO FINISHED a'' �`" TYPE`( O,RTTA-O CEMF.,i1,'i'W{jHAMAY.'f61UM t!�!tITE`R TO DEMENT RA7Lb r,eW/)CbF,Q�45: '"" REV DATE DAWR3 I DESCBIP'IIO?� /Q
SURFACE APPLICATION. ; 5 I }Akft''$TEEL Rk'IFItEORCINGSEJAU2 OON(YR{A,:TO°`ASTM g615.ALL.WELDED`WIRE"FABRIC(WINE) SHALL CONFORM TO ASTM 30. ALL EMPTY/SPARE CONDUITS THAT ARE INSTALLED ARE TO HAVE A METERED MULE TAPE PULL CORD INSTALLED. 0 09/28/2023 BC FOR CONSTRUCTION AT
17. THE AREAS OF THE OWNERS PROPERTY DISTURBED BY THE WORK AND NOT COVERED BY THE TOWER ' ,,.M' 'X S A4Lw;�,SPF:1`CES SHALL BE CLASS° B TENSION SPLICES; UNLESS NOTED OTHERWISE.ALL HOOK %SHAL1;`":BE
a E} CONDUCTOR COLOR COD-
EQUIPMENT OR DRIVEWAY, SHALL BE GRADED TO A UNIFORM SLOPE, AND STABILIZED TO PREVENT TANDARD 90 DEGREE HOOKS UNLESS NOTED OTHERWISE. YIELD STREN67F} (F,y)OF STANDARD D IRMWW7:BARS ARE
EROSION AS SPECIFIED ON THE CONSTRUCTION DRAWINGS AND/OR PROJECT SPECIFICATIONS_ AS FOLLOWS: ""f-',: -�t �:, J- SYSTEM CONDUCTOR COLOR
18. CONTRACTOR SHALL MINIMIZE DISTURBANCE TO EXISTING SITE DURING CONSTRUCTION. EROSION CONTROL #4 BARS AND SMALLER - 'a_ "� s a - +(O R5r'l'*� '� r i i
MEASURES, IF REQUIRED DURING CONSTRUCTION, SHALL BE IN CONFORMANCE WITH THE LOCAL GUIDELINES #5 BARS AND LARGER ,^4 a�" t $xiG,.,cst A PHASE BLACK
FOR EROSION AND SEDIMENT CONTROL 6 ONEDRAWINGS:G MINIMU} ONC�RCTE.COVER SHAtx.$'yPROVICYFyR,(YCC:REi13F`ORG).t+}G_;�L, UNL`E5'Sr7fWN OTHERWISE 120/240V, 10 B PHASE RED APWA UNIFORM COLOR CODE:
19. THE CONTRACTOR SHALL PROTECT EXISTING IMPROVEMENTS, PAVEMENTS, CURBS, LANDSCAPING AND ,i7 '�� �r t :F' NEUTRAL WHITE
STRUCTURES.ANY DAMAGED PART SHALL BE REPAIRED AT CONTRACTOR'S EXPENSE TO THE SATISFACTION CONCRETE CAST AGAINST ANp TSERMANENTLY TWSGQ7?SEU fT0 ETi(,T}L�. y 3 .T ;�r ''
OF OWNER. CONCRETE EXPOSED TO`T ffffgOR WEATHER hx .� sa s �'y r< s "� 4. GROUND GREEN WHITE PROPOSED EXCAVATION
6 BARS AND A PHASE BLACK
20. CONTRACTOR SHALL LEGALLY AND PROPERLY DISPOSE OF ALL SCRAP MATERIALS SUCH AS COAXIAL # 1,ARE;2,
#5 BARS AND SM CABLES AND OTHER ITEMS REMOVED FROM THE EXISTING FACILTY. ANTENNAS REMOVED SHALL BE ALkE{,y B PHASE RED ri r. «'` w t j T� "� "' SN- J�, ''"'. TEMPORARY SURVEY MARKINGS
CONCRETE NOT EXPOSWR T`0 EARTH.OR WEA 120/208V, 30 C PHASE BLUE
RETURNED TO THE OWNER'S DESIGNATED LOCATION. d
21. CONTRACTOR SHALL LEAVE PREMISES IN CLEAN CONDITION. TRASH AND DEBRIS SHOULD BE REMOVED SLAB AND WACO, Ft . . . . ter ,� -^ (4.. NEUTRAL WHITE ELECTRIC POWER LINES,CABLES,
FROM SITE ON A DAILY BASIS. BEAMS AND 9,9OLUJMNS't' :.. I£ '>' s =1/2" K ,- _ ®CONDUIT,AND LIGHTING CABLES
22. NO FILL OR EMBANKMENT MATERIAL SHALL BE PLACED ON FROZEN GROUND. FROZEN MATERIALS, SNOW 7. A TOOLED EDGE OR fC ,I'4f CHAMFER S(A;LL BE. ROV1D0AT'Atl €XPOSED EDGES OF CON4'13ETE}:UNLESS NOTED GROUND GREEN GAS OIL, STEAM, PETROLEUM, OR OF Nf
OR ICE SHALL NOT BE PLACED IN ANY FILL OR EMBANKMENT. OTHERWISE, IN AC;OEANGE�WITH ACl-301. ['fD�l 4 2,, .�y . . e A PHASE BROWN YEU'OW`1 GASEOUS MATERIALS S� 4W
a143u •,�1ak "'>' 8 PHASE ORANGE OR PURPLE / COMMUNICATION, ALARM OR SIGNAL LINES, yP Pub
277/48OV, 30 C PHASE YELLOW CABLES, OR CONDUIT AND TRAFFIC LOOPS >}
GREENFIELD GROUNDING NOTES: q.} "' NEUTRAL GREY POTABLE WATER
x
r GROUND GREEN SLURRY LINESRECLAIMED.WATER, IRRIGATION, AND
1, ALL GROUND ELECTRODE SYSTEMS (INCLUDING TELECOMMUNICATION, RADIO, LIGHTNING PROTECTION AND AC POWER GES'S) SHALL BE BONDED TOGETHER AT OR E{FLOW GRADE "fWQi OR MORE COPPER BONDING CONDUCTORS IN POS (+) RED'• 004478
ACCORDANCE WITH THE NEC. �4 OC VOLTAGE (-) FES '
2. THE CONTRACTOR SHALL PERFORM IEEE FALL-OF-POTENTAL RESISTANCE TO EARTH TESTING (PER IEEE 1100 AND 81) FOR GROUND ELECTlfOG�1E SYSTEMS--THE CONTRACTOR ST1A�" NEG BLACK•• S10�A
,URNISH AND INSTALL SUPPLEMENTAL GROUND • SEE NEC 210.5(C)(1) AND (2) SEWERS AND DRAIN LINES
ELECTRODES AS NEEDED TO ACHIEVE A TEST RESULT OF 5 OHMS OR LESS. '
3. THE CONTRACTOR IS RESPONSIBLE FOR PROPERLY SEQUENCING GROUNDING AND UNDERGROUND CONDUIT INSTALLATION AS TO PREVENT AFN`G, :bs$OF CO[�RiNU1TY IN:.THE GROU�IDSFIG.'SYSTEM OR DAMAGE TO THE CONDUIT AND PROVIDE "• POLARITY MARKED AT TERMINATION 091282023
TESTING RESULTS.
4. METAL CONDUIT AND TRAY SHALL BE GROUNDED AND MADE ELECTRICALLY CONTINUOUS WITH LISTED BONDING FITTINGS OR BY BONDING{A8ROSS TINE'D15CQNTINURY WITH #8 COP R WIRE UL APPROVED GROUNDING TYPE CONDUIT ABBREVIATIONS:
CLAMPS.
5. METAL RACEWAY SHALL NOT BE USED AS THE NEC REQUIRED EQUIPMENT GROUND CONDUCTOR. STRANDED COPPER CONDUCTORS WITH TfREEN:INSULATJON-'SIZED IN.ACCDROA�lG`&WITH THE NEC, SHALL BE FURNISHED AND INSTALLED
WITH THE POWER CIRCUITS TO BTS EQUIPMENT. - ANT ANTENNA
6. EACH CABINET FRAME SHALL BE DIRECTLY CONNECTED TO THE MASTER GROUND BAR WITH GREEN INSULATED SUPPLEMENTAL EOUIPMET4Ti GROUND WIRW5 '#6 STRANOEB COPT)ER CjR LARGER FOR INDOOR BTS; #2 BARE SOLID TINNED (E) EXISTING �a ®®® ggg���
COPPER FOR OUTDOOR BTS. d } ya i: FIF FACILITY INTERFACE FRAME R A I V E® PETER ANGELO LUDAS,P.E.
7. CONNECTIONS TO THE GROUND BUS SHALL NOT BE DOUBLED UP OR STACKED BACK TO BACK CONNECTIONS ON OPPOSITE SIDE OF�HE GROUND TdUS ARE PERMITTER k"^t �;i: GENT GENERATOR ®®®® '�s STATE OF NEW YORK
8. ALL EXTERIOR GROUND CONDUCTORS BETWEEN EQUIPMENT/GROUND BARS AND THE GROUND RING SHALL BE #2 SOLID TINNED COP,'ER UNkESS OTHERWISE)NDICATER GPS GLOBAL POSITIONING SYSTEM
9. ALUMINUM CONDUCTOR OR COPPER CLAD STEEL CONDUCTOR SHALL NOT BE USED FOR GROUNDING CONNECTIONS. - py'^ r� r GSM GLOBAL SYSTEM FOR MOBILE PROFESSIONAL ENGINEER
10. USE OF 90' BENDS IN THE PROTECTION GROUNDING CONDUCTORS SHALL BE AVOIDED WHEN 45' BENDS CAN BE ADEQUATELY SUP T LTE LONG TERM EVOLUTION N 0 V 21 2023 LICENSE#094478
11. EXOTHERMIC WELDS SHALL BE USED FOR ALL GROUNDING CONNECTIONS BELOW GRADE. " y t3 P>i1 r a`I ,�, l�,-s„�': 1 Q"�� MGB MASTER GROUND BAR
12. ALL GROUND CONNECTIONS ABOVE GRADE (INTERIOR AND EXTERIOR) SHALL BE FORMED USING HIGH PRESS CRIMPS. L r C K_ f:.- -` MW MICROWAVE
13. COMPRESSION GROUND CONNECTIONS MAY BE REPLACED BY EXOTHERMIC WELD CONNECTIONS. `"c'" 2*:-n h�, " - N NEW
14. ICE BRIDGE BONDING CONDUCTORS SHALL BE EXOTHERMICALLY BONDED OR BOLTED TO THE BRIDGE AND THE TOWER GROUND BAR. NEC NEC NATIONAL ELECTRIC CODE
15. APPROVED ANTIOXIDANT COATINGS (i.e. CONDUCTIVE GEL OR PASTE) SHALL BE USED ON ALL COMPRESSION AND BOLTED GROUND CONNECTIONS. (P) PROPOSED Southold Town 16. ALL EXTERIOR GROUND CONNECTIONS SHALL BE COATED WITH A CORROSION RESISTANT MATERIAL. PP POWER PLANT ITISAVIOIATIONOFLAWFORIuiV'YPERSOV,
17. MISCELLANEOUS ELECTRICAL AND NON-ELECTRICAL METAL BOXES, FRAMES AND SUPPORTS SHALL BE BONDED TO THE GROUND RING, IN ACCORDANCE WITH THE NEC. QTY QUANTITY Planning Board UNLESS THEY ARE ACTING UNDER THE DIRECTION
18. BOND ALL METALLIC OBJECTS WITHIN 6 It OF MAIN GROUND RING WITH (1) #2 BARE SOLID TINNED COPPER GROUND CONDUCTOR. RECT RECTIFIER OPA LICENSED PROI'P_SSIONALENGINEER,
19. GROUND CONDUCTORS USED FOR THE FACILITY GROUNDING AND LIGHTNING PROTECTION SYSTEMS SHALL NOT BE ROUTED THROUGH METALLIC 013JECTS THAT FORM A RING AROUND THE CONDUCTOR, SUCH AS METAWC CONDUITS, R13S RADIO BASE STATION TO ALTER THIS DOCLM[L"r.
METAL SUPPORT CLIPS OR SLEEVES THROUGH WALLS OR FLOORS. WHEN IT IS REQUIRED TO BE HOUSED IN CONDUIT TO MEET CODE REQUIREMENTS OR LOCAL CONDITIONS, NON-METALLIC MATERIAL SUCH AS PVC CONDUIT SHALL BE RE-r REMOTE ELECTRIC TILT
USED. WHERE USE OF METAL CONDUIT IS UNAVOIDABLE (i.e., NONMETALLIC CONDUIT PROHIBITED BY LOCAL CODE) THE GROUND CONDUCTOR SHALL BE BONDED TO EACH END OF THE METAL CONDUIT. RFDS RADIO FREQUENCY DATA SHEET
20. ALL GROUNDS THAT TRANSITION FROM BELOW GRADE TO ABOVE GRADE MUST BE #2 BARE SOLID TINNED COPPER IN 3/4' NON-METALLIC, FLEXIBLE CONDUIT FROM 24" BELOW GRADE TO WITHIN 3"TO 6" OF CAD-WELD TERMINATION RRH REMOTE RADIO HEAD SHEET NUMBER: REVISION:
POINT. THE EXPOSED END OF THE CONDUIT MUST BE SEALED WITH SILICONE CAULK. (ADD TRANSITIONING GROUND STANDARD DETAIL AS WELL). RRU REMOTE RADIO UNIT
D SMART INTEGRATED DEVICE
^21. BUILDINGS WHERE THE MAIN GROUNDING CONDUCTORS ARE REQUIRED TO BE ROUTED TO GRADE, THE CONTRACTOR SHALL ROUTE TWO GROUNDING CONDUCTORS FROM THE ROOFTOP, TOWERS,AND WATER TOWERS GROUNDING RING,TO SIA SLA TOWER MOUNTED AMPLIFIER T-2
U
THE EXISTING GROUNDING SYSTEM, THE GROUNDING CONDUCTORS SHALL NOT BE SMALLER THAN 2/0 COPPER. ROOFTOP GROUNDING RING SHALL BE BONDED TO THE EXISTING GROUNDING SYSTEM, THE BUILDING STEEL COLUMNS, TYP TYPICAL
LIGHTNING PROTECTION SYSTEM, AND BUILDING MAIN WATER LINE (FERROUS OR NONFERROUS METAL PIPING ONLY). UNITSTS UNIVERSAL MOBILE TELECOMMUNICATIONS SYSTEM
W.P. WORK POINT
SIT PAN DIC IM R:
PROPERTY LINES AND STRUCTURES HAVE •
BEEN DIGHI FROM PREVIOUS PLAN / ^ �i ■ ■ ■
SETS OR FROMOM ASSESSORS MAPS. ■ O,J` 1/ ` \ /, ■. ■
CROWN CASTLE USA INC. HAS NOT
COMPLETED A SITE SURVEY AND
THEREFORE MAKES NO CLAIMS AS TO EXISTING BUILDING
THE ACCURACY OF INFORMATION \ 4 SYLVAN WAY
DEPICTED ON THIS SHEET , \ PARSIPPANY,NJ 07054
CROWN
' CASTLE
k\ \ EXISTING BUILDING x
/ \\ TOTALLY, ENGINEERINGCOMMITTED.
PC TKK DPC
F PSC IM23266
FloeJy 6095 MARSHALEE DRIVE,SUITE 3W
ELKRIOGE,MD 21075
Nf (410)712-7092
(E) 106'-5" MONOPOLE \
// ,•I—ti,'`` (E) COMPOUND
/ T-MOBILE SITE NUMBER
/ (E) T—MOBILE PAD \ / LI13544A
\` // BU#:806579
-qC�FSS NY CUTCHOGUE 958280
/ \ ,
21855 COUNTRY ROAD
CUTCHOGUE,NY 11935
/ APN: 1000096000100019001 EXISTING 108'-6"MONOPOLE
/ ZONING: INDUSTRIAL /
EXISTING BUILDING ISSUED FOR:
REV DATE DTRWN DFSCRIMON DPS./QA
a
/ \ � 0 09/26/2023 j DC POR CONSTRUC770N j Al
\\` / CO i )
CO O
M /
00
zz
/< / �6
09447"
oenenoz3
/
\ / / PETERATE OF W YORKL E P.E.
/ \
PROFESSIONAL�ENG78 ENGINEER
LICENSE �4
RECEIVED
VIOLA170N OF LAW FOR ANY PERSON,-----
/ / UNLESS 1TIEY ARE
/ / D A.G LNDEA11IED.ON
FSOGEER,NOV 2 OFALICENSEPROFSNIN TO AL7ER1711S D0CUND:SI:
Southold Town F(f—
NUMBERREVISION:
OVERALL SITE PLANSCALE:
20 =z0'-o (FuuslzE) Planning Board O' 10 0 20' 1'=40'-D"(11x17)
nri
III sMobile 0 x 4
4 SYLVAN WAY
PARSIPPANY,NJ 07054
(E) T-MOBILE
6'-9"x16'-10"
EQUIPMENT PAD
CROWN
t,0 CASTLE
a
as a +
(E) FENCE
r -i' 'h
�X
�1C1C-)(-I(a-)( X-X-X-X -X.-X-XX T + . ...
TOTALLY COMMITTEE).
(E) 108'-6" MONOPOLE x iO TKK ENGINEERING OPC
(Ej _(E) GENERATOR Q Q Q _ _ _ L P PSC 9123266
CONCRETE a Q xv cexrme4rrox ov aunroxwlnox xo.om6res
PAD (E) ICE BRIDGE I 6095 MARSHALEE DRIVE,SUITE 300
w ELKRIDGE,MD 21075
X �.< x Q I (410)712-7092
E T-MOBILE Ia1\\ ,., ]` s i /, a
() x w �' "�'� - (N)T-MOBILE CABINET 1
6'-9"x16'-10" •.<' �. I ERICSSON - GIGO -
EQUIPMENT PAD n 1 .�. y _�-
; , Y� k T-MOBILE SITE NUMBER
+ _- _ (E) T-MOBILE FEEDUNES TO BE REMOVED
HYBRID
(2) CABLES LI13544A
� 1, =
+ -1" '' NEW T-MOBILE FEEDUNE
X y -, a fi b. (3) HYBRID CABLES (1-5/8') BU#:806579
p nr tr. t• (E) T-MOBILE FEEDLINES TO REMAIN
(6) COAX CABLES (1-5/8") NY CUTCHOGUE 958280
X-X-X-X (E) SHELTER x 'f° ` III-
_ t (E) T-MOBILE ICE
X I (N)T-MOBILE BATTERY CABINET rnI y )'- r BRIDGE t18'-0" 21855 COUNTRY ROAD
< ERICSSON - 8160 Q a .,
(E) SHELTER X ,h-, 1+ CUTCHOGUE,NY 11935
EXISTING 108'-6"MONOPOLE
° .a va •ice` ® X a 2 !J t l :4�` Y ,6k. + T _
I+ -i-
A. +,a x I '•3,-7"t '' - YI Y4";�' r L : i- 1 -i'1 _� ..z_ + i
E)•CONCRETE PAD �E-CONCRETE PAD (E) UTILITY FRAME x Q Q 1 1 5t Fx it,��„ + +
` 4. ,a O \\ (IYP) s : 1 +1� + l ISSUED FOR:
J ,
e. RIPTION DES./Q
REV DATE DRIVN DESC
ONCR E PAD °° I
J .. . ir' 0 09/28/2023 EC FOR CONSTRUCTION AI
x a\\\ (E) CONCRETE PAD' I Q Q
aX—� x j XXX
—�
1/ % I X� Q a I
i
UPGRADE CABINET BREAKER - Q
�TO 150AMP, 2-POLE BREAKER ' I OF N
9�
t d �
1
°P
094418
✓t.. �fESS101M�'
RECEIVED
EC IV 09/28/2023
' NOV 21 2023
PETER ANGELO LUDAS,P.E.
Southold Town STATE OF NEW YORK
Planning Board PROFESSIONAL ENGINEER
g LICENSE#094478
----I -IS-A --_-_------- - --- ---
IT IS A V IOLATION OP LAW FOR ANl'PERSON,
UNLESS THEY ARE ACTING UNDERTHE DEWCFION
OFA LICENSED PROFESSIONAL ENGINEER,
TX)ALTER THIS DOCLIDIENT.
SITE PLAN /f ENLARGED SITE PLAN
SCALE: 4.. '2,. �. ,,:..4' 3/32"--1'-0'(1Uz17)IZE) /� SCALE: �. ..,fi...,..� ..,1' 3/8"=1'-0'((FULL SIZE) /i SHEET NUMBER REVISION:
C-1 .2 o
T-MOBILE EQUIPMENT
ANTENNA CL, 90 TOP Of HIGHEST APPUERTENANCE / (E)T-MOBILE ANTENNA TO BE REMOVED
MOUNT CL• 88 J. Al 'ALPHA) (3 TOTAL,
- AIR21 SECTOR)
023-1_B2A�4P m Mo ile
ELEV. = 126'-5° 20'AZIMUTH (3 TOTAL, 1 PER SECTOR) ■ Q ■ *Mobiles
(0.J� s ■ ■
ANY AND ALL TOWER A2 (E)T-MOBILE ANTENNA TO BE REMOVED
MOUNTED EQUIPMENT MUST ERICSSON - AIR21 KRC118023-1-B2P-B4A 4 SYLVAN WAY
TRAP OR INTERFERE W/ (3 TOTAL. 1 PER SECTOR)
EXISTING SAFETY CLIMB PARSIPPANY,NJ 07054
A
C4 3
A4
TOP OF MONOPOLE (E) T-MOBILE ANTENNA TO REMAIN '.f " ' CROWN
ELEV. = 108'-6. RFS - APXVAARR24-43-U-NA20 i
(3 TOTAL, 1 PER SECTOR) CASTLE
EXISTING MCL
ELEV. = 107-0°
F
EXISTING MCL C3 i
f
ELEV. = 1 %2 '
u H
(GAMMA) ii➢➢
NEW T-MOBILE EQUIPMENT ��260' AZIMUTH TOTALLY COMMITTEM
(3) ERICSSON -AIR 6419 B41 ANTENNAS TOP OF T-MOBILE ANTENNA `\ PSC 9123266
(3)COMMSCOPE - W-65B-R1 ANTENNAS TICK ENGINEERING DPC
(3) ERICSSON - 4460 B2/B25 866 RRHs ELEV. = 94'-0" E 108'-6" MONOPOLE xranvu:gnox oswumeSwiroS wo.notem
() 6095 MARSHALEE DRIVE.SUITE 300
INSTALLED ON EXISTING MOUNTS CW ;{ C2
oI EXISTING T-MOBILE ACL "�. B2 EL(41D0) 2 D0 76
ELEV. = 90'-0" RECEIVED
(E) T-MOBILE EQUIPMENT BOTTOM OF T-MOBILE ANTENNA
(3) RFS - APXVAARR24-43-U-NA20 ANTENNAS
(3) ERICSSON - 4449 B71 BBSA RRHs ELEV. = 86'-0"
All
(BETA)
INSTALLED ON EXISTING MOUNTS ,40' AZIMUTH NOV 21 2023
(E) PLATFORM MOUNT TO REMAIN B3 \ T-MOBILE SITE NUMBER
Southold Town LI13544A
EXISTING MCL
ELEV. = 78'-0" Planning Board
BU#:806579
B4 L(E)T-MOBILE TMA TO BE REMOVED NY CUTCHOGUE 958280
TWIN STYLE 18 AWS
(3 TOTAL, 1 PER SECTOR)
EXISTING MCL
21855 COUNTRY ROAD
CUTCHOGUE,NY 11935
EXISTING ANTENNA LAYOUT �J
2 SCALE: NOT TO SCALE EXISTING 108'-6"MONOPOLE
I
Al (N)T-MOBILE ANTENNA ISSUED FOR
i COMMSCOPE-W-65B-R1
(3 TOTAL, 1 PER SECTOR) REV; DATE I DRWN I DPSCRIMON DCS./Qn
A2 ALPHA 0 '09/28/2023; RC ,POR CONSTRUCTION j AI
I
20' AZIMUTH (N)T-MOBILE RRH �—
ERICSSON -4460 B2/B25 866 ( ,
A3 (3 TOTAL, 1 PER SECTOR)
C4 _T
A4
I
I (E) T-MOBILE ANTENNA O
RFS - APXVAARR24-43-U-NA20
(3 TOTAL, 1 PER SECTOR) /
I S
(E) 108'-6"MONOPOLE f4 ".L qF.O ((y,/.
C3
_i- BI
NEW T-MOBILE FEEDUNE � 0944T0
(3) HYBRID CABLE (1-5/8-) -�260' AZIMUTH TfESS10��'
I \(E) T-MOBILE FEEDLINES (E) 108'-6" MONOPOLE 09128R023
(6) COAX CABLES (1-5/8")
C2
B2
i
(BETA) ERICSSONB1 AJARNT8419 841 NA PETER ANGELO LUDAS,P.E.
\
140' AZIMUTH (3 TOTAL, 1 PER SECTOR) STATE O NEW PORK PROFESSIONAL ENGINEER
(E) PLATFORM MOUNT 83 LICENSE#094478
C1
-IT TS A VIOLITION OP L1W POR ANY PERSON,
52.5 FT AMSL UNLFSSTITEYAREACMGUNDERTHEDlliFiC170N
OFA LICEAISED PROPFSSIONALENGINEER
B4 TOALTER'TIIIS DOCU7.83NT.
SHEET NUMBER REVISION:
�1 FINAL ELEVATION rz FINAL ANTENNA LAYOUT N
I SCALE: NOT TO SCALE `7 SCALE: NOT TO SCALE C-2 0
nm
,or amMobile■ aa
4SYLVAN WAY
ANTENNA SCHEDULE
PARSIPPANY,NJ 07054
SECTOR POS. TECHNOLOGY RAD AZIMUTH ANTENNA ANTENNA MODEL MECH. ELECT. TOWER MOUNTED FEEDLINE TYPE
CENTER MANUFACTURER TILT TILT EQUIPMENT
ALPHA Al — — — — — — — — (2) 1-5/8" COAX CROWN
ALPHA A2 N25 90 20' ERICSSON AIR 6419 B41 0' 0' — (1) 1-5/8" HYBRID CAST L E
ALPHA A3 L21. L19, N19, G19 90 20' COMMSCOPE W-658—Rl 0' 0' (1) NEW ERICSSON — 4460 82/B25 866 RRH
ALPHA A4 L6, N6. L7 90 20' RFS APXVAARR24-43—U—NA20 0' 0' (1) EXISTING ERICSSON — 4449 B71 B85A RRH —
BETA B7 — — — — — — — — (2) 1-5/8" COAX
BETA B2 N25 90 140' ERICSSON AIR 6419 841 0' 0' — (1) 1-5/8" HYBRID TOTALLY COMMITTED
BETA B3 L21, 1-19, N19, G19 90 140' COMMSCOPE W-65B—R1 0' 0' (1) NEW ERICSSON — 4460 82/025 B66 RRH — TICK ENGINEERING DPC
PSG#123266
BETA 84 L6, N6. L7 90 140' RFS APXVAARR24-43—U—NA20 0' 0' (1) EXISTING ERICSSON — 4449 B71 B85A RRH — wDemn:—No ANrxGN WGN M.DMa
6095 MARSHALEE DRIVE,SUITE 300
ELKRIDGE,MD 21075
(410)712-7092
GAMMA C1 — — — — — — — — (2) 1-5/8" COAX
GAMMA C2 N25 90 269 ERICSSON AIR 6419 B41 0' 0' — (1) 1-5/8" HYBRID
GAMMA C3 L21, L19, N19, G19 90 269 COMMSCOPE W-658—Rl 0' 0' (1) NEW ERICSSON — 4460 B2/B25 B66 RRH — T—MOBILE SITE
,,II NUMBER
GAMMA C4 L6, N6, L7 90 260' RFS APXVAARR24-43—U—NA20 0' 0' (1) EXISTING ERICSSON — 4449 B71 B85A RRH — LI13544A
E C I ®9 BU#:806579
NY CUTCHOGUE 958280
` NOV 21 2023
21855 COUNTRY ROAD
Southold Town CUTCHOGUE,NY 11935
ANTENNA AND CABLE SCHEDULE Planning Board
I SCALE: NOT TO SCALE EXISTING 108'-6"MONOPOLE
ISSUED FOR:
REV' DATE DRWN DESCRIPTION DES./Q
0 109/28/2023! BC FOR CONSTRUCTION AI
I
i
I
f �
i
I i
MOUNTING BRACKET y P�
(SUPPLIED W/ANTENNA)
m ti
094418
fEBS 101��'
ANTENNA 09/28/2023
MOUNTING PIPE NEW
ANTENNA
INSTALLER NOTE: PETER ANGELO LUDAS,P.E.
STATE OF NEW YORK
1.ALL PIPES, BRACKETS, AND MISCELLANEOUS I PROFESSIONAL ENGINEER
HARDWARE TO BE GALVANIZED UNLESS I
LICENSE#094478
NOTED OTHERWISE.
MOUNTING BRACKET ______
(SUPPLIED W/ ANTENNA) IT IS A VIOLATION OF LAW FOR ANY PERSON,
UNLESS THEY ARE ACTING UNDER THE DIRECTION
OF A LICENSED PROFESSIONAL ENGINEER,
TO ALTERTMS DOCUMENNT.
��ANTENNA MOUNTING DETAIL SBEETNUMBER: REVISION:
L
SCALE: NOT TO SCALE C-3
0 ,
C . mMobile • a
4 SYLVAN WAY
PARSIPPANY,NJ 07054
CROWN
CASTLE
q n 4 m x e a nrr rtt C *.a
TOTALLY COMMITTEQ
TIDC ENGINEERING DPC
PSC 612326E
—muiurron ov aurxc�nou xn owerm
6095 MARSHALEE DRIVE,SUITE 300
ELKRIDGE.MD 21075
ns � y
kwi
(alo)712-7o92
� I MU" h' mg a 7 f. T-MOBILE
LI13544A UMBER
u '
:rT� , BU#:806579
iN NY CUTCHOGUE 958280
A
21855 COUNTRY ROAD
}4 r. CUTCHOGUE,NY 11935
EXISTING 108-6 MONOPOLE
t,�^�^��, s,dE._. V��m7a� "�u✓,r� i�`�'4 � , 4d'��,'�l r u, �F
p
� �j�°wA>w ktff49?�n7�fa 1 ,^yr !d
a W1, e d,a Lr wsa
,x ISSUED FOR:
REV DATE DRWN I DESCRIPTION DES./Q.
0 09/28/2023; EC FOR CONSTRUCTION AT
sg—
I
- i
i I
I;
„� OF NEIy
�" � - j T �fESS10t1Iv
- 09=023
PETER ANGELO LUDAS,P.E.
STATE OF NEW YORK
p� E C E I V PROFESSIONAL ENGINEER
1�¢� LICENSE#094478
r1PLUMBING DIAGRAM NOV 21 2023
SCALE: NOT TO SCALE ITISAVIOLITIONOFLAWFORAWPERSON, —
UNLESS THEY ARE ACITNG UNDERTHE DRtEM011
OPA LICENSED PROFESSIONALENGMEER,
Southold Town TO ALTERTHIS DOCUAMN''T.
Planning Board
SHEET NUMBER REVISION:
C-4 o
EQUIPMENT NOTES: EQUIPMENT NOTES:
HEIGHTxWIDTHxDEPTH: 63.0'x 26.0" x 34.0" HEIGHTxWIDTHxDEPTH: 63.0"x 26.0"x 28.0"
EMPTY: 320 LBS (1600.Omm x 660.0mm x 711.0mm)
WEIGHT
(EMPTY):
) WEIGHT (EMPTY): 295 LBS (134 kg) `m, W Mobile , ■ 0
WEIGHT (FULLY LOADED W/ BATTERIES): 1500 LBS O000 00
WEIGHT (FULLY LOADED W/ BATTERIES): 2000 LBS (908 kg)
® 4 SYLVANT \VAY
O PARSIPPANY,NJ 07054
2" KNOCKOUTS WITH LBs FOR ALARM
l CABLE AND TEMP SENSOR ROUTING. 0 UPPER REAR CENTER WORK BEST FOR 0 ® ppp���+++ v� E.) CROWN
THIS INSTALL FOR EASE OF INSTALL AND 1'�
REPLACEMENT IN THE EVENT OF FAILURE.
CONDUIT MUST BE PROPERLY SECURED 0
CASTLE
TO PREVENT DAMAGE TO CABINETS AND — cc
KOV2023
OR CABLING
OO OO
2 KNOCKOUTS WITH RIGID CONDUIT 0 0 Southold TwYll _ ,,,.�
AND LB FOR 3/0 BATTERY CABLE
INSTALL, AND AUX POWER CABLE. �4 a Plannin Board
OUTSIDE KNOCKOUTS EWORKOBEST FORALL �/ 9Nazi
ROUTING BETWEEN MACRO CABINETS BON O 02" KNOCKOUTS FOR AAV AND FIER— Q �Q O0 O TOTALLY COP�WIITTE�.
SITE. LB WITH RIGID CONDUIT IS TKK ENGINEERING OPC
PREFERRED. PSC#123266
"cv,NruuanoN W AurxoA =N No. 6M
6095 MARSHALEE DRIVE,SUITE 300
2" KNOCKOUTS AT LOWER REAR OF THE
ISO VIEW ISO VIEW EUKRIDGE,MD 21075
CABINET INTENDED FOR HYBRID/MLE (410)712-7092
CABLES
OO OO OO OO
T-MOBILE SITE NUMBER
REAR VIEW REAR VIEW LI13544A
BU#:806579
NY CUTCHOGUE 958280
21855 COUNTRY ROAD
CUTCHOGUE,NY 11935
EXISTING 108'-6"MONOPOLE
ISSUED FOR:
mow j REV• DATE DRXVN I DESCRIPTION DES./Q
'":•�:,, ".vt, 0 09/28/20Zi I BC FOR CONSTRUCTION AI
PLAN VIEW PLAN VIEW
OF NFh
)O
2" KNOCKOUT, UNUSED ON THIS 00 00 00 00 00 00
SITE FOR DEDICATED CIRCUIT TO ggl SERVICE OUTLET " ` DEDICATED 1'FOR O y O =
"I GNSS/GPS KNOCKOUT ON
2" KNOCKOUT ON LEFT HAND a` -:T'a O RIGHT HAND SIDE OF THE � fESS101��'
SIDE OF CABINET USED AC CABINET, RECOMMEND USING
POWER, WITH RIGID CONDUIT AND O LL, RATHER THAN LB OR 90
LR. PENETRATION IS DIRECTLY O DUE TO CLOSE PROXIMITY 09128I2023
TO B160 BATTERY CABINET.
BELOW ACCU O
4" RIGID OR FLEX CONDUIT
2" KNOCKOUT, UNUSED ON THIS MAY BE USED.
SfTE FOR DEDICATED CIRCUIT TO O
SERVICE OUTLET O
O x. PETER ANGELO LUDAS,P.E.
9µ O O 2.1
Q STATE OF NEW YORK
® D ® PROFESSIONALCE SE#094478 ENGINEER
2" KNOCKOUT ON LEFT BOTTOM O O O O rF€ O O O Po UNUSABLE 2" 0000 O O O®O O
SIDE OF CABINET FOR
INTER—BASEBAND CABINET KNOCKOUTS DUE TO
CONNECTING.A RIGID OR CLOSE PROXIMITY TO
FLEXIBLE CONDUIT WITH AN LR LEFT VIEW FRONT VIEW RIGHT VIEW 61so CABINET LEFT VIEW FRONT VIEW RIGHT VIEW
WILL BE USED WHEN RUNNING UN
THIS CONDUIT TO THE LEGACY IT i5 r1 VIOLATION OF Lr1W FOR ANY PERSON,
LESS THEY ARE ACTING UNDERTRE DIRECTION
6131. 6102, ODE OR MUAC
OFA LICENSED PROFESSIONAL
TO ALTER THIS DOCU.MEIT.
CABINET
(—,1ERICSSON — 6160 r—,--�ERICSSON — B160 SFIEETNUMBER REVISION:
I SCALE: NOT TO SCALE I SCALE: NOT TO SCALE C-5
0 ,
T RECEIVE
NOV 21 2023
T x x Mobile• a
4 SYLVAN WAY
Southold Town PARSIPPANY,NJ 07054
r PROPOSED 1/2" DIAMETER, SIMPSON STRONG-TIE 7y-4.9-
7110-I STRONG-BOLT 2 WEDGE ANCHOR WITH 3-3/4" NOMINAL Planning Board
EMBEDMENT(ICC ESR-3037). TO BE INSTALLED A MINIMUM OF Nombmzb208toWk
(1) IN EACH CORNER OF CABINET. SEE MANUFACTURER'S Imt
OperiabW90to305voc
EQUIPMENT INSTALLATION MANUAL FOR ANCHOR LOCATIONS. IT Emaded:90[o187%C(do-®tedpomo) 7.99 �19.92 -� CROWN
IS ASSUMED THAT CABINET ANCHOR LOCATIONS HAVE BEEN
DESIGNED/REINFORCED BY THE MANUFACTURER TO WITHSTAND tltFte Frequency: 45Po6d}Iz
SHEAR AND UPLIFT FORCES AS CALCULATED IN THIS DESIGN 9 ry- `- CASTLE
Power. 3000WcomM000s(VD W output @ 12MC Inpm)
Power Factor: >0.98(50 Po 100%bd) -`
<8%(50 to 100%food)
EQUIPMENT a
LOCK ! BASE FRAME Efficiency: 969%teat TM
WASHER Ego
' Output VaNa e: d2Po58vdc n 20.5"--�
WASHER / OatpotCarteot: 55A@54Vdc(625Amea@489dc) PLAN
TOTALLY COIWMITTEQ
(-36AA®48vdca[120fecleput) MECHANICAL SPECIFICATIONS/ I C IONS TKK ENGINEERING UPC
%,• lead Regulation: «0.5%(Haut) ..... .._ I 0 AIR641 41 xr CeRrvm�noxsw 0123266
mo •o.omems
H t I -.. - -- - -' HEIGHT: 34.49 NB
° tine Regulation: ct01%(rmtlr) LENGTH: 19.92 IN 6095 MARSHALEE DRNE,SUITE 300
S FRONT WIDTH: 7.99 IN ELKRIDGE,MD 21075
n ymnsieatRespame: s3%fw40m90%imds4
WEIGHT: 81.84 LBS (410)712-7092
MOUNTING KIT: SXK 109 2065/1
volts Band:<53dRm[ WEIGHT: 13.0 LBS
None: wide god:<260mv RMS(10k to IM*)
�•. '
u ' <IWRVptTopk(lakdfrmlOOddEt)
o �. PsophometticNoise. 12mvm T-MOBILE SITE NUMBER
6. 4 v lkoustic 4M @ Im(3Ic),30't LI13544A
a
D'unen�ons mm:41H x 104W 13333 BU#:806579
Inches:1.6Hx4.1W1RID NY CUTCHOGUE 958280
CONCRETE SLAB- WelgM: 1&49(4.04111t)
CABINET ANCHOR DETAIL CORDEX HP 3.OkW ��ERICSSON - AIR 6419 B41 ANTENNA 21855 COUNTRY ROAD
SCALE: NOT TO SCALE 2 SCALE: NOT TO SCALE `� SCALE: NOT TO SCALE CUTCHOGUE,NY 11935
EXISTING 108'-6"MONOPOLE
0 0
ISSUED FOR:
REV I DATE DRWN I DESCRO"110N DFS./QA
I- BASED BOX ASSEMBLY 0 09/28/2023; EC FORCONSIRUCITON AI
4.65"�-----{ 1 12.01"-I I I
I
15.1" t t.9"
POLE DIAMETER: O 15.1"• -)
2.36-4.53"
a MECHANICAL SPECIFICATIONS o O O O O O O B
• 000// DOOOO
COMMSCOPE: W-65B-Rt �` O
HEIGHT: 70.35 IN I OF NRy
WIDTH: 12.01 IN
DEPTH: 4.65 IN
0
12 01• WEIGHT: 41.67 LBS PLAN VIEW X' I
rn
a n PLAN FRONT ELEVATION SIDE ELEVATION `
44T0
SIZE AND WEIGHT TABLE HEAT SHRINK TUBE-� fE8S101�`
6.96" WEIGHT
RRU HEIGHT WIDTH DEPTH osn3rzoz3
` �7q-680.3"MAX ANDREWCA600899A SPECIFICATIONS W/0 BRACKET
HEIGHT: 9.21 IN RADIO 4460 B25+B66 17.0" 15.1" 11.9" 109.0 LBS.
WIDTH: 6.69 IN
ui DEPTH: 12.61 IN HYBRID CABLE
WEIGHT: 4.20 LBS NOTES:
T
• � PETER ANGELO LUDAS,P.E.
1. DO NOT PAINT THE RRU. RRU SOLAR SHIELD CAN BE PAINTED PER MANUFACTURER'S STATE OF NEW YORK
L METHOD OF PROCEDURE. PROFESSIONAL ENGINEER
-� LICENSE W094478
PROPOSED CLAMP KIT
m (ANDREW PART# 6DO899A-2)
m
SIDE FRONT
COMMSCOPE - HCS 2.0 PART 1 IT iSA VIOLATION OFLAIV FOR ANY PERSON,Tu
WEIGHT (WITHOUT MOUNTING HARDWARE): 23.5 LBS. UNLESS ITIEY ARE ACTING UNDERTHE DIT=' ON
SIZE (HxWxD): 14.Oxl6.Ox8.0 IN. OF A LICENSED PROFESSIONAL ENGINEER,
TO ALTERTHIS DOCUDIENC
/--,'\COMMSCOPE - W-65B-R1 ANTENNA ERICSSON - 4460 B2/B25 B66 RRH T-MOBILE BREAKOUT PENDANT LC-6
HEET NUMBER. REVISION:
SCALE: NOT TO SCALE 5 SCALE: NOT TO SCALE 6 SCALE: NOT TO SCALE 0
ar 14 mMobile a x a
EXISTING PANEL SCHEDULE RECEIVED
MAIN BREAKER RATING (A): 200 SYSTEM VOLTAGE (V): 24p PHASE: 1 WIRE: 3 -_, 4 SYLVAN\VAY
BRANCH CB: 30 PARSIPPANY,NJ,07054
C WATTAGE B " LOAD PER )t+__ g WATTAGE C
K CIRCUIT DESCRIPTION POLE R PHASE R POLE CIRCUIT DESCRIPTION K
NOV 21 2023
T C NC K A B A K NC C T
1 0 0 "e o y,k�^y 0 0 2
0" 2 SO �r � too z I,..N(OFF) ..
3 a O � w.,. 0 0 o 4 Southold Town CROWN
5 0 0 0 P 0 0 BN 6
o 2 KNOWN(off) Planning Board
7 a o � �kl�, o 0 o e
UCASTLE
9 o o o i ` o 0 10
( Fh+y 50 2 SURGE PROTECTOR
it D 0 7F s 1~ D 12
13 0 O k+ 180 2. 1 160 0 RECEPTACLE 14
15 0 o 'K+ ;trp 2248 .," 2248 O 16
S p.
17 0 0 1 2248 ",� Y f 2248 o 18 hsc�
rho'1. 4 -MSFING CABINET BREAKER
19 o a 'a U48 224a o 20 EXISTING UTILITY COMPANY t �
21 0 0 �/ 2248 • £ t 2248 0 22
TRANSFORMER TOT�►ILLY COi�ItAITTEQ
23 D o 5 ' r0"ilg 180 �, 20 1 t6o o ••RECEPTACLE 24
fl
25 a o 1'Fd o ,'' .# sT o a 26 TKK ENGINEERING DPC
4+� P6C D723266
27 0 o L o s' o a 28 EXISTING WIRE AND CONDUIT NY-IFF. 'm OF nvrx0luuLnoN N0.B016r63
29 0 0 0 :3 �'ItY7 o 0 30
TOTAL LOADS R'''" 2L 4 "^ 'A- 6095 MARSR DGE DRIVE,SUITE 300
PER PHASE tT"i ELKRIDGE,MD 21075
�� � A (41D)71zaD9z
NOTES e, a676 4676 EXISTING METER ENCLOSURE
--., t �'d ca..mZ'Ln�,F'.�rn
MiEYOVE 41_20A BR6ixER IS POSITION 16-22 SUBTOTAL 125%TOTAL
••REMOVE 1P-20A BREAKER IN POSITION 2< `T�. � ��� O
Q CONTWU0115 ". LOI.%TOGA,
G(VA) L
5 0 NON-CONT OU6(VA) 9352
suBTOTa. `�`. EXISTING WIRE AND CONDUIT
T-MOBILE SITE NUMBER
"..NON-CONPNUWS TOT.A� 38.97
9352 �� TOTAL CONNECTED LOAD(KVA) 9.35 LI13544A
,�m� =PAS GVACOT(w 161.03 F — — --I
EXISTING 240V, POLE, NEMA 313
DISCONNECT. LOCATION OF MAIN BU#:806579
BONDING JUMPER. NY CUTCHOGUE 958280
200 l�l l V V
EXISTING PANEL SCHEDULE L — — J EXISTING WIRE AND CONDUIT 21855 COUNTRY ROAD
CUTCHOGUE,NY 11935
SCALE: NOT TO SCALE
EXISTING 108'-6"MONOPOLE
o 1 N EXISTING 200A, 120/24OV, 1�3W, NEMA 3R, POWER PROTECTION ISSUED FOP-
CABINET (PPC) WITH INTEGRATED MANUAL TRANSFER SWITCH,
FINAL PANEL SCHEDULE I LOAD CENTER, AND FACTORY WIRED GENERATOR INTERFACE FOR REV' DATE DAWN I DESCRIPTION DES./Q
PHASE: 1 WIRE: 3 PORTABLE GENERATOR CONNECTION 0 09/28/20131 BC FOR CONSTRUCTION Al
MAIN BREAKER RATING (A): 200 SYSTEM VOLTAGE (V): 240 BRANCH CB: 30
LOA D PER
C WATTAGE B ,. x B WATTAGE C
K CIRCUIT DESCRIPTION POLE R PHASE ; R POLE CIRCUIT DESCRIPTION K
T C NC K A B K NC C T
I
1 0 0 9� 0 0 a 2
OFF 2 50 +ry ("'�"10a 2 UNKNOWN(OFF)
3 O o 14 � o rT, 0 0 4 INSTALL NEW 150A, 2-POLE BREAKER
5 0 0 )eta o '1-"-T,„ y y o O 6 I (OCCUPIES 4 SPACES) IN PPC
60 2 UNKNOWN(OFF)
7 0 0 "x' 0 �(. 0 0 8
9 0 0 o o 0 10 150/2
�yy " ?8) 50 2 SURGE PROTECTOR
11 a 0 E 0 �`�,�^ 0 0 12
13 0 0 8D 1 b 20 1 In 0 RECEPTACLE 14
15 0 0 L.1�' 3285 >r' 3285 o 16
17 0 a £ 3285N A �+�{ 1. 4 3285 0 -.1.OABINET 18
19 0 011 3285 3285 0 20
21 a 0 �. 3285Td�{( Z�'€ 3205 0 22
231 o 360 k-. 20 1 3. 0 ••6160 CFGI 24 � '9447e
k4 (3) 1/0 WITH #6 GROUND FESS1
25 a o 0
,,,;- d,, o 0 26 IN 1-1/2" CONDUIT
27 O o it dt?y, 0 `� 0 0 26 �- —I 09I2MO23
29 D o "= 0 $, ,+n fqt' O 0 30 `
EXISTING 1. ALL NEW CONDUCTORS TO BE INSTALLED SHALL BE
BTS CABINET I COPPER. ALL CONDUCTORS SHALL BE THHW, THWN,
NOTES - 6750 693D aft, y J 13�>, 1,a .17�,a THWN-2, XHHW, XHHW-2,THIN, THW-2, RHW, OR RHW-2
. .Prx M x.
•INSTALL 1)NEW 4P-150A BREAKER MR PROPOSED 6160 CABINET ° L_ J UNLESS NOTED OTHERWISE.
( �,:; SVBTGTAL 125%TOTAL
••INSTALL(1)NEW 1P-20A BREAKER FOR PROPOSED 6160 GFCI 1 t( coNRNuous cO OUS(VA) 0 PETER ANGELO LUDAS,P.E.
t,k toox roTa. 2. CONTRACTOR IS TO FIELD VERIFY ALL EXISTING ITEMS SHOWN
0 's NON-C—LIOUS(VA) 13680 ON THE ELECTRICAL ONE-LINE DIAGRAM AND NOTIFY THE STATE OF NEW YORK
ENGINEER OF ANY DISCREPANCIES. PROFESSIONAL ENGINEER
TOTAL�+%NON�CONTINU0B6 9 `
A CONNECTED
ED L 13.68 3. ALL GROUNDING AND BONDING PER THE NEC. LICENSE#094478
13680 ?I. TOTAL CONNECTEa LOAD(WA) 13.6$
SPARE cwacm(A) 143.00
IT IS A VIOLATION OF LAW FOR ANY PERSON,
UNLESS THEY ARE ACTING UNDER THE DIRECTION
OF A LICENSED PROFESSIONAL ENGINEER,
TO ALTER THIS DOCUAfENT.
2 FINAL PANEL SCHEDULE ONE LINE DIAGRAM SHEET NUMBER REVISION:
SCALE: NOT TO SCALE 3 SCALE: NOT TO SCALE E-1
O
Inn
ur IN 11 Hea a a
Mobi
4SYLVAN WAY
PARSIPPANY,NJ 07054
CROWN
I ' CCCASTLE
1p
TOTALLY COMMITTED
RECEIVED
D 7 TICK ENGINEERING DPC
PSC#123266
I I prceRnvp;�Trox av elnxnpwnop pa owares
I 0095 MARSHALEE DRIVE,SUITE 300.
1, �/1 f� ELKRIDGE.MD 21075
(E) MOUNT PIPE (TIP) O• 2 1 2023 (410)712-7092
NEW RRH (TYP) ALPHA BETA GAMMA (E) RRH (TYP)
SoUthOTd ►ow*n J
Planning Board
T-MOBILE SITE NUMBER
NEW RRH (TYP) (E) ANTENNA (TYP) LI13544A
BU#:806579
Y CUTCHOGUE 958280
! I i ' ! I 21855 COUNTRY ROAD
i
IV
CUTCHOGUE,NY 11935
EXISTING 108'-6"MONOPOLE
ISSUED FOR:
REV DATE DRWN I DESCRIPTION DES./Q
{ R 1 0 09/26/2023 BC FOR CONSTRUCTION Al
GROUND WIRE (TYP)
i
LSECTOR GROUND BAR (3 TOTAL) o::e,:e::e: :o UPPER TOWER GROUND BAR
OF MEy.
NOTE:
ALL NEW GROUNDS TO BE #6 STRANDED
COPPER WITH GREEN INSULATION UNLESS E'p 09447e
NOTED OTHERWISE. FESSIO��'
09/2M23
(-,I�ANTENNA GROUNDING DIAGRAM
SCALE: NOT TO SCALE PETER ANGELO LUDAS,P.E.
STATE OF NEW YORK
PROFESSIONAL ENGINEER
LICENSE#094478
TT IS A VIOLATION OF LAW FOR ANY PERSON,
UNLESS THEY ARE ACTING UNDER THE DIRECTION
OF LICENSED PROFESSIONAL ENGINEER,
TO ALTER TUIS DOCUMENT.
SHEET NUMBER REVISION:
G- 1 0 -
8" PVC PLUG
�y yy TO ANTENNA COAX TO ANTENNA COAX 8" PVC PLUG CPLG. (THRD.)
T/FINISH GRADE a j *Mobile
y le i a a
COPPER/GALVANIZED GROUND BAR COPPER/GALVANIZED GROUND BAR v
4 SYLVAL�T\1VAY
H PARSIPPANY,NJ 07054
o l o� o }0 0 0 0 0 o a o 0 0 0 0 0 0 4roo ,
000000000 0�;0 00000000000000 0000000000SUBGRADE
C1D0 O0 0 0 0 0 0 0 0 0 0 0 O N
R #2 SOLID (TEST LOOP)
//2 SOLID TINNED COPPER z CROWN
CONDUCTOR TO TOWER/SHELTER z NOTCH SIDES OF 8" PVC SCH 40 PIPEff
TWO HOLE LONG BARREL TWO HOLE LONG BARREL COMPRESSION LUG GROUND RING (2 TYP. FOR N GROUND
ALLOW EXIT/ENTRANCE OF CASTLE
COMPRESSION LUG (TYP) (TYP) BOTTOM GROUND BAR ONLY) Wo EXOTHERMIC WELD GROUND RING WIRE
w
NOTES,' NOTES' I I—I II II— I— —I
1. DOUBLING UP "OR STACKING" OF CONNECTIONS IS NOT PERMITTED. 1. EXTERIOR ANTIOXIDANT JOINT COMPOUND TO BE USED ON ALL EXTERIOR CONNECTIONS. TRENCH BOTTOM
2. EXTERIOR ANTIOXIDANT JOINT COMPOUND TO BE USED ON ALL EXTERIOR CONNECTIONS. 2. GROUND BAR SHALL NOT BE ISOLATED FROM TOWER. MOUNT DIRECTLY TO TOWER STEEL (TOWER ONLY).
2/0 TINNED CU EXTERNAL
3. GROUND BAR SHALL NOT BE ISOLATED FROM TOWER. MOUNT DIRECTLY TO ANTENNA MOUNT STEEL. 3. GROUND BAR SHALL BE ISOLATED FROM BUILDING OR SHELTER. CADWELD TEST LOOP TO TOWER GROUND RING WIRE
GROUND RING WIRE
NOTES, 5/8" 0 x 10'-0" LONG COPPER CLAD GROUND ROD TOTALLY COMMITTED
TKK ENGINEERING DPC
1. GROUND ROD SHALL BE DRIVEN VERTICALLY, NOT TO EXCEED 45 DEGREES FROM THE PSG 9123266
VERTICAL WCers MTWNoc•ureaFvV Nano GM
2. GROUND WIRE SHALL BE MIN. 30" BELOW GRADE OR 6' BELOW FROST LINE. 6095 MARSHALEE DRIVE,SUITE 300
(WHICH EVER IS GREATER)AS PER N.E.C. ARTICLE 250-50(D) ELKRIDGE,MD 21075
(410)712-7092
K-_,--�ANTENNA SECTOR GROUND BAR DETAIL (-,,�TOWER/SHELTER GROUND BAR DETAIL INSPECTION WELL DETAIL
SCALE: NOT TO SCALE L)SCALE: NOT TO SCALE 3 SCALE: NOT TO SCALE T-MOBILE SITE NUMBER
LI13544A
BU#:806579
NY CUTCHOGUE 958280
STAINLESS STEEL BOLT R C E WED
NNNN D 21855 COUNTRY ROAD
TO TOWER MOUNTED EQUIPMENT STAINLESS STEEL
FLAT WASHER , CUTCHOGUE,NY 11935
TO ANTENNAryP) MONOPOLE 2-HOLE CRIMP/ (1YP) I NOV 21 2023
fL COMPRESSION - f
ANTENNA GROUND BAR CONNECTOR _ JI EXISTING 1081-6"MONOPOLE
LOCATED AT MCL
(BONDED TO TOWER STEEL) GROUND Southold Town
STANDARD COAX I I 2 HOLE LUG (TYP) BAR Planning Board
CABLE GROUND KIT
(TYP) STAINLESS STEEL
FLAT WASHER ISSUED FOR:
$6 STRANDED CU WIRE WITH STAINLESS STEEL (TYP
GREEN. 600, THWN BELLVILLE WASHER ::��54 STAINLESS STEEL NUT 6" WIDE METALLIC HTEL REV' DATE DRWN DESCRIPTION DES./Q
INSULATION (OR AS PROVIDED I (TYP) (TYP) GRADE WARNING/LOCATOR TAPE AT I
WITH GROUND KIT) (TYP) SINGLE CONNECTOR AT GROUND BARS / 12" DEPTH 0 i 09/26/20231 11C POR CONSTRUCTION AT
N I
W
STAINLESS STEEL BOLT
MECHANICAL CONNECTION
(TIP) STAINLESS STEEL
COAX CABLE COAX GROUND BAR WITH FLAT WASHER o EXOTHERMIC WELD
\ INSULATORS, CONNECTED
(TYP FOR ALL) , DIRECTLY TO THE BOTTOM DRAGON TOOTH WASHER vwWi
OF MONOPOLE. SEE NOTE 1. (TYP)
STEEL
TO BTS EQUIPMENT VIA LLII 2/O TINNED BARE
TRAY OR ICE BRIDGE 'I .' I.
COPPER WIRE 2-HOLE CRIMP/ GROUND RING //2 COPPER WIRE OF N
MONOPOLE PIER COMPRESSION STAINLESS STEEL fW
CONNECTOR FLAT WASHER SOLID, TINNED FOR CARRIER AND ICE
GROUND WIRE (TYP)
BRIDGE GROUND LOOP'
GROUND WIRE ,1 '1 SEE NOTE 3 STAINLESS STEEL STAINLESS STEEL NUT GROUND RING 2/0 FOR `Yf
NOTE 3 \ BELLVILLE WASHER (TYP) TOWER GROUND LOOP _
INSPECTION WELL SINGLE CONNECTOR AT STEEL OBJECTS ' 09441%
EXOTHERMIC WELD (TYP) FESS101��
NOTES: STAINLESS STEEL
SELF-DRILLING STAINLESS STEEL 09rZaD23
1. NUMBER OF GROUNDING BARS MAY VARY DEPENDING ON THE TYPE OF TOWER, ANTENNA METAL SCREW FLAT WASHER
LOCATIONS AND CONNECTION ORIENTATION. COAXIAL CABLES EXCEEDING 200 FEET ON THE (TYP) (TYP) GROUND ROD COPPER
TOWER SHALL HAVE GROUND KITS AT THE MIDPOINT. PROVIDE AS REQUIRED. CLAD STEEL ROD W/MIN.
5/8 0 x 10'-0"LONG
2. ONLY MECHANICAL CONNECTIONS ARE ALLOWED TO BE MADE IT CROWN CASTLE USA INC. 2-HOLE CRIMP/
TOWERS. ALL MECHANICAL CONNECTIONS SHALL BE TREATED WITH AN ANTI-OXIDANT COATING. COMPRESSION
CONNECTOR PETER ANGELO LUDAS,P.E.
3. ALL TOWER GROUNDING SYSTEMS SHALL COMPLY WITH THE REQUIREMENTS OF THE STATE OF NEW YORK
RECOGNIZED EDITION OF ANSI/TIA 222 AND NFPA 780. METALLIC OBJECT NOTES:
DRAGON TOOTH
WASHER PROFESSIONAL ENGINEER
(TYP) 1. GROUND ROD SHALL BE DRIVEN VERTICALLY, NOT TO EXCEED 45 DEGREES FROM THE LICENSE#094478
VERTICAL
SINGLE CONNECTOR AT METALLIC/STEEL OBJECTS 2. GROUND WIRE SHALL BE MIN. 30" BELOW GRADE OR 6" BELOW FROST LINE.
(WHICH EVER IS GREATER) AS PER N.E.C. ARTICLE 250-50(D)
IT IS A VIOLATION OF LAW FOR ANY PERSON,
UNLESS THEY ARE ACTING UNDER THE DIRECTION
/-TYPICAL ANTENNA CABLE GROUNDING HARDWARE DETAIL FOR EXTERIOR CONNECTIONS GROUND ROD DETAIL rG-2
F A LICENSED PROFESSIONAL ENGINEER,
A TO ALTER THIS DOCUM&N-1'.
SCALE: NOT TO SCALE 5 SCALE: NOT TO SCALE 6 SCALE: NOT TO SCALE
SHEET NUMBER REVISION:
0 --Ij
-
010
WIRE SIZE BURNDY LUG BOLT SIZE
#6 AWG GREEN INSULATED YA6C-2TC38 3/8" - 16 NC S 2 BOLT *Mobile a , a
TYPE HS TYPE 2-YA-2 TYPE XA TYPE YA-2 TYPE GY #2 AWG SOLID TINNED YA3C-2TC38 3/8" - 16 NC S 2 BOLT !aJ■
#2 AWG STRANDED YA2C-2TC38 3/8" - 16 NC S 2 BOLT 4 SYLVAN WAY
PARSIPPANY,NJ 07054
#2/0 AWG STRANDED YA26-2TC38 3/8" - 16 NC S 2 BOLT
#4/0 AWG STRANDED YA28-2N 1/2" - 16 NC S 2 BOLT
TYPE W TYPE VN' TYPE NC TYPE SSTYPE GR_ BURNDY GROUND LUG W/ HEAT SHRINK CROWN
LONG BARREL
(SEE CHART) (C ) CASTLE
NUT GROUNDING
UUU (TYP) CONDUCTOR
LOCK WASHER
(TYP)
TYPE S TYPE VB TYPE aT TYPE GT' tw
NOTE: GROUND BAR BOLT
1. ERICO EXOTHERMIC "MOLD TYPES" SHOWN HERE ARE EXAMPLES. CONSULT WITH CONSTRUCTION MANAGER FOR SPECIFIC (SEE CHART) TOTALLY COMMITTEQ
MOLDS TO BE USED FOR THIS PROJECT. (TYP) TKK ENGINEERING DPC
2. MOLD TYPE ONLY TO BE USED BELOW GRADE WHEN CONNECTING GROUND RING TO GROUND ROD. PSC#123266
BURNDY TWO HOLE LUG W/ NY CEiR61C�Tm-OF AVrNOit1LTON NC.00/M
LONG BARREL 6095 MARSHALEE DRIVE,SUITE 300
(SEE CHART) ELKRIOGE,MD 21075
CADWELD GROUNDING CONNECTIONS (410)712-7092
'I BARE WIRE TO BE
SCALE: NOT TO SCALE NO-OX AT BOTH ENDS
STRANDED (GREEN INSULATED) ONLY FOR #6 AWG
TO ANTENNAS (SEE CHART) T-MOBILE SITE NUMBER
WEATHERPROOFING KIT LI13544A
(SEE NOTE 3)
ANTENNA CABLE jKIT
TX1/RX1 WEATHERPROOFING BU#:806579
(TYP) NOTES: NY CUTCHOGUE 958280
GROUND KIT 1. ALL GROUNDING LUGS ARE TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS.
COAX JUMPER (TYP.) (TYP) ALL HARDWARE BOLTS, NUTS. LOCK WASHERS SHALL BE STAINLESS STEEL ALL C TT T� ROAD
HARDWARE ARE TO BE AS FOLLOWS: BOLT, FLAT WASHER,GROUND BAR, GROUND LUG, 21855 COUNTRY 1\OAV
FLAT WASHER AND NUT. O
WEATHERPROOFING #6 AWc MECHANICAL LUG CONNECTION CUTCHOGUE,NY 11935
#6 AWG STRANDED COPPER GROUND WIRE (TYP. SEE NOTE 2 SCALE: NOT TO SCALE
(GROUNDED TO GROUND BAR). SEE NOTE 1 & 2 COPPER/GALVANIZED
COAX GROUND BAR EXISTING 108'-6"MONOPOLEBONDED DIRECTLY TOWER
CABLE GROUND KITCABLE CONNECTOR AMENNA CA #6 AWG MIN. FROM ANTENNA
CABLE GROUND KITTO BTS EQUIPMENT (T A ` ISSUED FOR:
NOTES,
1. DO NOT INSTALL CABLE GROUND KIT AT A BEND AND ALWAYS DIRECT GROUND REV DATE DRWN DESCRIPTION DES./Q
WIRE DOWN TO GROUND BAR. NOTES. 0 109/28/20231 BC FOR CONSTRUCTION Al
2. GROUNDING KIT SHALL BE TYPE AND PART NUMBER AS SUPPLIED OR
RECOMMENDED BY CABLE MANUFACTURER. 1. DO NOT INSTALL CABLE GROUND KIT AT A BEND AND ALWAYS DIRECT GROUND
WIRE DOWN TO ANTENNA GROUND BAR. GROUND BAR ON SHELTER. ICE I
3. WEATHER PROOFING SHALL BE TWO-PART TAPE KIT, COLD SHRINK SHALL NOT BRIDGE, OR ON ANTENNA TOWER
BE USED. 2. WEATHER PROOFING SHALL BE TWO-PART TAPE KIT. COLD SHRINK SHALL NOT BE
USED.
CABLE GROUND KIT CONNECTION
QO 00 0 0�00 0 O
SCALE: NOT TO SCALE QO OO O QO O QO O QO O O 00
4 GROUND CABLE CONNECTION
SCALE: NOT TO SCALE
® -TWO HOLE LUG, OR GROUNDING SHALL BE
3/8-11x1"TAMPER EXOTHERMIC WELD TO BE USED ELIMINATED WHEN GROUND BAR 010�
RESISTANT BOLT WITH #2 AWG BARE CONDUCTOR IS ELECTRICALLY BONDED TO �Q O�
(TYP) WIRE TO BUILDING SERVICE METAL TOWER y
INSULATORS GROUND OR GROUND RING �}
SEE NOTE 2.
(TYP) y =
0 ® GROUNDWIRE INSTALLATION �`� 09447S
WALL BRACKET 0 `-"I I01�S'
p 0 NOTE: MINIMUM OF S/6 NUT SCALE: NOT TO SCALE
0 0 3 THREADS IS BE (TYP) 09/28/2023
VISIBLE
0 0 0 (TYP) S/SO 0 WAS SPLIT
0 0 2 HOLE LONG WASHER
O p BARREL TINNED (TYP) #CONDUIT FROM 24"2 nNNED SOLID IN 3 BELOW OGRADEUID GTO HT PIPE
UNIVERSAL COPPER SOLID COPPER
0 GROUND BAR (4"x2O-) LUG S/S FLAT WITHIN 3"TO 6" OF CAD-WELD i PETER ANGELO LUDAS,P.E.
(TYP) WASHER TERMINATION POINT. EXPOSED END OF > >'.; '-'�- i STATE OF NEW YORK
LOCK WASHER ® (TYP) THE LIQUID TIGHT CONDUIT MUST BE —. ! I.= i
P/N M10 SEALED WITH SILICONE CAULK. tP'; I PROFESSIONAL ENGINEER
(TYP) .� . NOV 21 ���� i LICENSE#094478
TWO-HOLE .-
COMPRESSION LUG TIN COATED SOUD CADWELD
COPPER BUS BAR �)
NOTES: S/S FLAT
WASHER :. i11a= L— �
1. DOWN LEAD (HOME RUN) CONDUCTORS ARE NOT TO BE INSTALLED ON CROWN CASTLE (TYP) - SOUfhOld TOWn
CHERRY INSULATOR --1 IT IS VIOLATION OF LAW FOR ANY PERSON,
USA INC. TOWER, PER THE GROUNDING DOWN CONDUCTOR POLICY QAS-STD-10091. NO INSTALLED IF REQUIREDII :;i UNLESS THEY ARE ACTING UNDERTHE DIRECTION
MODIFICATION OR DRILLING TO TOWER STEEL IS ALLOWED IN ANY FORM OR FASHION, S/S BOLT TIE INTO EXISTING GROUND RING �! "',`I'•1= Plannln Board OF LICP.NSED PROFESSIONAL ENGINEER,
CAD-WELDING ON THE TOWER AND/OR IN THE AIR ARE NOT PERMITTED. (TYP) ii ,- F� 9 I TOALTERTIMDOCU.MEN'T.
III!)+•.:.
2. OMIT INSULATOR WHEN MOUNTING TO TOWER STEEL OR PLATFORM STEEL
USE INSULATORS WHEN ATTACHING TO BUILDING OR SHELTERS. �._-ij;ll'i: !%,.'ir-- SHEET NUMBER REVISION:
/—,--,�GROUND BAR DETAIL LUG DETAIL �1TRANSITIONING GROUND DETAIL G-3 Q
v SCALE: NOT TO SCALE 7 SCALE: NOT TO SCALE U SCALE: NOT TO SCALE